ML20154C850: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_       ..          .          _.        ._    .        _-    .  .
{{#Wiki_filter:_
s 1 Y ."                                    NAY I I iges                                 i In Reply Refer To:
s 1
Docket: 50-368/0L88-01                                                               i Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear                                                     i
Y NAY I I iges i
;                Operations i      P.O. Box 551                                                           .
In Reply Refer To:
4 Little Rock, Arkansas 72203                                                         i.
Docket: 50-368/0L88-01 i
l 4     Gentlemen:
Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear i
Operations P.O. Box 551 i
4 Little Rock, Arkansas 72203 i
l 4
Gentlemen:
1
1


==SUBJECT:==
==SUBJECT:==
EXAMINATIONREPORT,ARKANSASNUCLEARONEUNIT2(AN02) 4 l
EXAMINATIONREPORT,ARKANSASNUCLEARONEUNIT2(AN02) l 4
;      During April 18-20, 1988. NRC administered examinations to employees of your company who had applied f or licenses to operate your AN02 facility.
During April 18-20, 1988. NRC administered examinations to employees of your company who had applied f or licenses to operate your AN02 facility.
At the conclusion of the written examinations, the examination keys were             :
At the conclusion of the written examinations, the examination keys were provided to facility staff personnel. Based upon the initial number of applicants, the number of candidates actually examined, and the performance of those candidates, it appears that an extensive and thorough screening 1
provided to facility staff personnel. Based upon the initial number                 !
process was utilized by the AN02 Training Department, with only the candidates J
of applicants, the number of candidates actually examined, and the performance 1
having a high probability of successfully completing the examination being tested. Examination results have been discussed with AN02 Training Department staff.
of those candidates, it appears that an extensive and thorough screening process was utilized by the AN02 Training Department, with only the candidates       .
J      having a high probability of successfully completing the examination                 !
being tested. Examination results have been discussed with AN02 Training             ;
;      Department staff.                                                                   ,
Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.
Sincerely, Original Signed By 1                                                                                           .
Sincerely, Original Signed By 1
4 1.3.Causa                           !
1.3.Causa 4
:                                                L. J. Callan Director Division of Reactor Projects               !
L. J. Callan Director Division of Reactor Projects 1
1 I    
I


==Enclosure:==
==Enclosure:==
j Examination Report 50-368/0L88-01 cc w/ enclosure:
)
Arkansas Nuclear One I
ATTN:
J. M. Levine Director l
Site Nuclear Operations j
P.O. Box 608
)
Russellville, Arkansas 72801 Battelle, Pacific Northwest Laboratories ATTN:
L. J. Defferding 4
1 P.O. Box 999 i
Richland, Washington 99352 Arkansas Radiation Control Program Dir
.t r
$[ ]@ @ ggggo360 f
bec:
(seenextpage)
REM C:0LSN
,R d.0 D:DRk Reconcer l
DGraves:cs JPellet
@M oan LCallan JPelletM j
5/to/88 5/ic/88 5//o/88 5/jo/88 5/ H /88


j      Examination Report 50-368/0L88-01
.?
!      cc w/ enclosure:                                                                      )
~. 3 g-fs.
,'    Arkansas Nuclear One                                                                  I ATTN:    J. M. Levine Director                                                        '
1 Arkansas Power &-Light Company bcc:-
l l                Site Nuclear Operations j      P.O. Box 608
bec to DMB (IE42) bec distrib. by RIV:
)      Russellville, Arkansas 72801 Battelle, Pacific Northwest Laboratories 4
RRI R. D. Martin, RA RPSB-DRSS SectionChief-(DRP/A)
ATTN:    L. J. Defferding 1      P.O. Box 999 i    Richland, Washington 99352 Arkansas Radiation Control Program Dir    .t r          $[ ]@ @ ggggo360 bec:    (seenextpage) f
Lisa Shea, RM/ALF
                                              ,R                    D:DRk REM DGraves:cs C:0LSN JPellet          @M oan d.0 LCallan Reconcer JPelletM l
- RIV File.
j      5/to/88            5/ic/88          5//o/88                5/jo/88      5/ H /88
DRP MIS System RSTS Operator Project Engineer, DRP/A G. Dick, NRR Project Manager DRS TSS J. Pellet-D. Graves i
 
            .?    ~. 3 g-       fs.                        .
1 Arkansas Power &-Light Company                                                   bcc:-
bec to DMB (IE42) bec distrib. by RIV:     '
RRI                                                   R. D. Martin, RA RPSB-DRSS                                             SectionChief-(DRP/A)
Lisa Shea, RM/ALF                                     - RIV File.
DRP                                                   MIS System RSTS Operator                                         Project Engineer, DRP/A G. Dick, NRR Project Manager                           DRS                                                                           ,
TSS                                                     J. Pellet-D. Graves i
a l
a l
                                                                                                                                                                                            -l l
-l j
j i
i l
l
...,.,--,,r,,
    ...,.,--,,r,,         .-,,--,n,-----,--,--     , - , . . . - ,,  n,.--     . . - , , , - - - - , , - , , . . , , . . . , - - . . .    ._ n .- , - ,-- . - ,n.,-- - -. -.,,,. '}}
.-,,--,n,-----,--,--
n,.--
._ n.-, -,--. -,n.,-- - -. -.,,,. '}}

Latest revision as of 01:22, 11 December 2024

Forwards Exam Rept 50-368/OL-88-01 Administered on 880418- 20
ML20154C850
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/11/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20154C853 List:
References
NUDOCS 8805180343
Download: ML20154C850 (2)


Text

_

s 1

Y NAY I I iges i

In Reply Refer To:

Docket: 50-368/0L88-01 i

Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear i

Operations P.O. Box 551 i

4 Little Rock, Arkansas 72203 i

l 4

Gentlemen:

1

SUBJECT:

EXAMINATIONREPORT,ARKANSASNUCLEARONEUNIT2(AN02) l 4

During April 18-20, 1988. NRC administered examinations to employees of your company who had applied f or licenses to operate your AN02 facility.

At the conclusion of the written examinations, the examination keys were provided to facility staff personnel. Based upon the initial number of applicants, the number of candidates actually examined, and the performance of those candidates, it appears that an extensive and thorough screening 1

process was utilized by the AN02 Training Department, with only the candidates J

having a high probability of successfully completing the examination being tested. Examination results have been discussed with AN02 Training Department staff.

Should you have any questions concerning this letter, please contact us.

Sincerely, Original Signed By 1

1.3.Causa 4

L. J. Callan Director Division of Reactor Projects 1

I

Enclosure:

j Examination Report 50-368/0L88-01 cc w/ enclosure:

)

Arkansas Nuclear One I

ATTN:

J. M. Levine Director l

Site Nuclear Operations j

P.O. Box 608

)

Russellville, Arkansas 72801 Battelle, Pacific Northwest Laboratories ATTN:

L. J. Defferding 4

1 P.O. Box 999 i

Richland, Washington 99352 Arkansas Radiation Control Program Dir

.t r

$[ ]@ @ ggggo360 f

bec:

(seenextpage)

REM C:0LSN

,R d.0 D:DRk Reconcer l

DGraves:cs JPellet

@M oan LCallan JPelletM j

5/to/88 5/ic/88 5//o/88 5/jo/88 5/ H /88

.?

~. 3 g-fs.

1 Arkansas Power &-Light Company bcc:-

bec to DMB (IE42) bec distrib. by RIV:

RRI R. D. Martin, RA RPSB-DRSS SectionChief-(DRP/A)

Lisa Shea, RM/ALF

- RIV File.

DRP MIS System RSTS Operator Project Engineer, DRP/A G. Dick, NRR Project Manager DRS TSS J. Pellet-D. Graves i

a l

-l j

i l

...,.,--,,r,,

.-,,--,n,-----,--,--

n,.--

._ n.-, -,--. -,n.,-- - -. -.,,,. '