ML20086M006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:March 26, 2020
{{#Wiki_filter:March 26, 2020  
Mr. Jim Barstow
Vice President
Mr. Jim Barstow  
Tennessee Valley Authority
Vice President  
1101 Market Street, LP 3D-C
Tennessee Valley Authority  
Chattanooga, TN 37402-2801
1101 Market Street, LP 3D-C  
SUBJECT:       SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY
Chattanooga, TN 37402-2801  
              INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and
              05000328/2020401
SUBJECT:  
Dear Mr. Barstow:
SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY  
On July 20, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance
INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and  
with Inspection Procedure (IP) 71130.10P Cyber-Security, Revision 0 at Sequoyah Nuclear Plant. The
05000328/2020401  
inspection will be performed to evaluate and verify your ability to meet the Milestone 8 (i.e., full
implementation) requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations
Dear Mr. Barstow:  
(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks.
The onsite portion of the inspection will take place during the weeks of July 20, 2020, and August 3,
On July 20, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance  
2020.
with Inspection Procedure (IP) 71130.10P Cyber-Security, Revision 0 at Sequoyah Nuclear Plant. The  
Experience has shown that these types of inspections are extremely resource intensive, both for the
inspection will be performed to evaluate and verify your ability to meet the Milestone 8 (i.e., full  
NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a
implementation) requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations  
productive inspection for both parties, we have enclosed a request for documents needed for the
(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks.
inspection. These documents have been divided into four groups.
The onsite portion of the inspection will take place during the weeks of July 20, 2020, and August 3,  
The first group specifies information necessary to assist the inspection team in choosing the focus areas
2020.  
(i.e., sample set) to be inspected by the cyber-security IP. This information should be made available
via secure site (i.e., SharePoint, Certrec) no later than April 27, 2020. The inspection team will review
Experience has shown that these types of inspections are extremely resource intensive, both for the  
this information and, by May 25, 2020, will request the specific items that should be provided for
NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a  
review.
productive inspection for both parties, we have enclosed a request for documents needed for the  
The second group of additional requested documents will assist the inspection team in the evaluation of
inspection. These documents have been divided into four groups.  
the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the
licensees CSP selected for the cyber-security inspection. This information will be requested for review
The first group specifies information necessary to assist the inspection team in choosing the focus areas  
via secure site (i.e., SharePoint, Certrec) before June 24, 2020.
(i.e., sample set) to be inspected by the cyber-security IP. This information should be made available  
The third group of requested documents consists of those items that the inspection team will review, or
via secure site (i.e., SharePoint, Certrec) no later than April 27, 2020. The inspection team will review  
need access to, during the inspection. Please have this information available by the first day of the
this information and, by May 25, 2020, will request the specific items that should be provided for  
onsite inspection, July 20, 2020.
review.  
The second group of additional requested documents will assist the inspection team in the evaluation of  
the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the  
licensees CSP selected for the cyber-security inspection. This information will be requested for review  
via secure site (i.e., SharePoint, Certrec) before June 24, 2020.  
The third group of requested documents consists of those items that the inspection team will review, or  
need access to, during the inspection. Please have this information available by the first day of the  
onsite inspection, July 20, 2020.  


J. Barstow                                         2
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a
J. Barstow  
result of the inspection. It is requested that this information be provided to the lead inspector as the
2  
information is generated during the inspection. It is important that all of these documents are up to
date and complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Melana Singletary. We understand that our regulatory contact
for this inspection is Mr. Zachary Kitts of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 404-997-4752 or via e-mail at
The fourth group of information is necessary to aid the inspection team in tracking issues identified as a  
Melana.Singletary@nrc.gov.
result of the inspection. It is requested that this information be provided to the lead inspector as the  
This letter does not contain new or amended information collection requirements subject to the
information is generated during the inspection. It is important that all of these documents are up to  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
date and complete in order to minimize the number of additional documents requested during the  
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
preparation and/or the onsite portions of the inspection.  
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
The lead inspector for this inspection is Melana Singletary. We understand that our regulatory contact  
Management and Budget control number.
for this inspection is Mr. Zachary Kitts of your organization. If there are any questions about the  
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the
inspection or the material requested, please contact the lead inspector at 404-997-4752 or via e-mail at  
NRC's "Rules of Practice," a copy of this letter and its enclosure will not be available electronically for
Melana.Singletary@nrc.gov.
public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
This letter does not contain new or amended information collection requirements subject to the  
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements  
Reading Room).
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not  
                                                    Sincerely,
conduct or sponsor, and a person is not required to respond to, a request for information or an  
                                                    /RA/
information collection requirement unless the requesting document displays a currently valid Office of  
                                                    Scott M. Shaeffer, Chief
Management and Budget control number.  
                                                    Engineering Branch 2
                                                    Division of Reactor Safety
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the  
Docket Nos. 50-327 and 50-328
NRC's "Rules of Practice," a copy of this letter and its enclosure will not be available electronically for  
License Nos. DPR-77 and DPR-79
public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)  
Enclosure:
component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is  
Security Inspection Document Request
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic  
cc: See Page 3
Reading Room).  
Sincerely,  
/RA/  
Scott M. Shaeffer, Chief
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos. 50-327 and 50-328  
License Nos. DPR-77 and DPR-79  
Enclosure:
Security Inspection Document Request  
cc: See Page 3


                          3
3  
cc:
Jeff Sowa
Site Licensing Manager
cc:  
Sequoyah Nuclear Plant
Jeff Sowa  
Tennessee Valley Authority
Site Licensing Manager  
P.O. Box 2000, OPS 4C-SQN
Sequoyah Nuclear Plant  
Soddy Daisy, TN 37384-2000
Tennessee Valley Authority  
Zachary Kitts
P.O. Box 2000, OPS 4C-SQN  
Licensing
Soddy Daisy, TN 37384-2000  
Sequoyah Nuclear Plant
Tennessee Valley Authority
Zachary Kitts  
P.O. Box 2000, OPS 4C-SQN
Licensing  
Soddy Daisy, TN 37384-2000
Sequoyah Nuclear Plant  
Tennessee Valley Authority  
P.O. Box 2000, OPS 4C-SQN  
Soddy Daisy, TN 37384-2000  


                                                  4
4  
SUBJECT:       SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY
              INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and
              05000328/2020401
SUBJECT:  
DISTRIBUTION:
SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY  
M. Singletary, RII
INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and  
L. Jones, RII
05000328/2020401  
C. DeBisschop, NSIR
A. Konkal, NSIR
DISTRIBUTION:  
PUBLIC
M. Singletary, RII  
    PUBLICLY AVAILABLE       NON-PUBLICLY AVAILABLE             SENSITIVE     NON-SENSITIVE
L. Jones, RII  
ADAMS:     Yes   ACCESSION NUMBER: _ML20086M006   SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
C. DeBisschop, NSIR  
  OFFICE             RII/DRS/EB2   RII:DRS/EB2
A. Konkal, NSIR  
  SIGNATURE               MJS6           SMS
PUBLIC  
  NAME               MSINGLETAR     SSHAEFFER
  DATE                 3/26/2020     3/26/2020
  E-MAIL COPY?         YES     NO   YES    NO
PUBLICLY AVAILABLE
NON-PUBLICLY AVAILABLE  
SENSITIVE  
NON-SENSITIVE  
ADAMS:  
Yes  
ACCESSION NUMBER: _ML20086M006
SUNSI REVIEW COMPLETE  
FORM 665 ATTACHED  
OFFICE  
RII/DRS/EB2  
RII:DRS/EB2
SIGNATURE  
MJS6  
SMS  
NAME  
MSINGLETAR
SSHAEFFER
DATE  
3/26/2020  
3/26/2020  
E-MAIL COPY?  
YES  
NO  
YES  
NO
 
      
 
   


            SEQUOYAH NUCLEAR PLANT CYBER SECURITY INSPECTION DOCUMENT REQUEST
Inspection Reports:               05000327/2020401 and 05000328/2020401
Inspection Dates:                 Weeks of July 20, 2020, and August 3, 2020
Inspection Procedure:             IP 71130.10P, Cyber-Security, Revision 0
Reference:                         ML17156A215, Guidance Document for Development of the Request
Enclosure
                                  for Information (RFI) and Notification Letter for Full-Implementation of
SEQUOYAH NUCLEAR PLANT CYBER SECURITY INSPECTION DOCUMENT REQUEST  
                                  the Cyber-Security Inspection, Revision 0
NRC Inspectors:                   Melana Singletary, Lead               Larry Jones
                            404-997-4752                                 404-997-4837
Inspection Reports:  
                                  Melana.Singletary@nrc.gov             Larry.Jones@nrc.gov
NRC Contractors:                   Cynthia DeBisschop                     Al Konkal
05000327/2020401 and 05000328/2020401  
                                  Cynthia.DeBisschop@nrc.gov             Alan.Konkal@nrc.gov
Inspection Dates:  
I.     Information Requested for In-Office Preparation
Weeks of July 20, 2020, and August 3, 2020  
        The initial request for information (i.e., first RFI) concentrates on providing the inspection team
Inspection Procedure:  
        with the general information necessary to select appropriate components and CSP elements to
IP 71130.10P, Cyber-Security, Revision 0  
        develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems
Reference:  
        and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control
ML17156A215, Guidance Document for Development of the Request  
        portions of the CSP to be chosen as the sample set required to be inspected by the cyber-
for Information (RFI) and Notification Letter for Full-Implementation of  
        security IP. The first RFIs requested information is specified below in Table RFI #1. The
the Cyber-Security Inspection, Revision 0  
        Table RFI #1 information is requested to be provided by, April 27, 2020 or sooner, to facilitate
NRC Inspectors:  
        the selection of the specific items that will be reviewed during the onsite inspection weeks.
Melana Singletary, Lead  
        The inspection team will examine the returned documentation from the first RFI and
Larry Jones  
        identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused
                                              404-997-4752  
        follow-up request to develop the second RFI. The inspection team will submit the specific
404-997-4837  
        systems and equipment list to your staff by May 25, 2020, which will identify the specific
Melana.Singletary@nrc.gov
        systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,
Larry.Jones@nrc.gov
        and the areas of the licensees CSP selected for the cyber-security inspection. We request that
        the additional information provided from the second RFI be made available by May 25, 2020.
NRC Contractors:  
        All requests for information shall follow the guidance document ML17156A215 referenced
Cynthia DeBisschop  
        above.
Al Konkal
        The required Table RFI 1 information shall be provided via secure site (i.e., Sharepoint, Certrec)
Cynthia.DeBisschop@nrc.gov
        by April 27, 2020. The preferred file format for all lists is object character recognition (OCR)
Alan.Konkal@nrc.gov  
        readable or a searchable Excel spreadsheet file. These files should be indexed and hyper-linked
                                                                                                      Enclosure
I.  
Information Requested for In-Office Preparation  
The initial request for information (i.e., first RFI) concentrates on providing the inspection team  
with the general information necessary to select appropriate components and CSP elements to  
develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems  
and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control  
portions of the CSP to be chosen as the sample set required to be inspected by the cyber-
security IP. The first RFIs requested information is specified below in Table RFI #1. The  
Table RFI #1 information is requested to be provided by, April 27, 2020 or sooner, to facilitate  
the selection of the specific items that will be reviewed during the onsite inspection weeks.  
The inspection team will examine the returned documentation from the first RFI and  
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused  
follow-up request to develop the second RFI. The inspection team will submit the specific  
systems and equipment list to your staff by May 25, 2020, which will identify the specific  
systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,  
and the areas of the licensees CSP selected for the cyber-security inspection. We request that  
the additional information provided from the second RFI be made available by May 25, 2020.
All requests for information shall follow the guidance document ML17156A215 referenced  
above.  
The required Table RFI 1 information shall be provided via secure site (i.e., Sharepoint, Certrec)  
by April 27, 2020. The preferred file format for all lists is object character recognition (OCR)  
readable or a searchable Excel spreadsheet file. These files should be indexed and hyper-linked  


                OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
                                            2
2  
to facilitate ease of use. If you have any questions regarding this information, please call the
inspection team leader as soon as possible.
to facilitate ease of use. If you have any questions regarding this information, please call the  
inspection team leader as soon as possible.  


                                              Table RFI #1
Section 3,
Paragraph Number/Title:                                                                 Items
2
    1   List All Identified Critical Systems and Critical Digital Assets                   All
Table RFI #1  
        List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet       All
Section 3,  
    2 Protocol (TCP/IP) based Local Area Networks (LANs) and identify those LANs
Paragraph Number/Title:  
        that have non-CDAs on them
Items  
        List CDA facility and site non-ethernet TCP/IP based LANs including those           All
1  
    3
List All Identified Critical Systems and Critical Digital Assets  
        industrial networks and identify LANs that have non-CDAs on them
All  
        Network Topology Diagrams (be sure to include all NIDS and SIEMs for EP             All
2
    4
List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet  
        networks and Security level 3 and 4 networks)
Protocol (TCP/IP) based Local Area Networks (LANs) and identify those LANs  
        List all network security boundary devices for EP networks and all network         All
that have non-CDAs on them  
    8
All
        security boundary devices for levels 3 and 4
3
    9   List CDA wireless Industrial networks                                               All
List CDA facility and site non-ethernet TCP/IP based LANs including those  
        Network intrusion detection system documentation for Critical Systems that       11.a.1)
industrial networks and identify LANs that have non-CDAs on them  
  11
All
        have CDAs associated with them                                                    11.a.2)
4
        Security Information and Event Management (SIEM) documentation for               12.a.1)
Network Topology Diagrams (be sure to include all NIDS and SIEMs for EP  
  12
networks and Security level 3 and 4 networks)  
        Critical systems that have CDAs associated with them                             12.a.2)
All
  14   List EP and Security onsite and offsite digital communication systems               All
8
  25   Cyber-Security Assessment and Cyber-Security Incident Response Teams               All
List all network security boundary devices for EP networks and all network  
        Copy of Current Cyber Security Plan and copy of any 50.54(p) analysis to           All
security boundary devices for levels 3 and 4
  28
All
        support changes to the plan
9  
In addition to the above information please provide the following:
List CDA wireless Industrial networks  
    (1) Electronic copy of the UFSAR and technical specifications.
All  
    (2) Name(s) and phone numbers for the regulatory and technical contacts.
11 Network intrusion detection system documentation for Critical Systems that  
    (3) Current management and engineering organizational charts.
have CDAs associated with them
Based on this information, the inspection team will identify and select specific systems and
11.a.1)  
equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of
11.a.2)  
12 Security Information and Event Management (SIEM) documentation for  
Critical systems that have CDAs associated with them  
12.a.1)
12.a.2)  
14  
List EP and Security onsite and offsite digital communication systems  
All  
25  
Cyber-Security Assessment and Cyber-Security Incident Response Teams  
All  
28
Copy of Current Cyber Security Plan and copy of any 50.54(p) analysis to  
support changes to the plan  
All
In addition to the above information please provide the following:  
(1) Electronic copy of the UFSAR and technical specifications.  
(2) Name(s) and phone numbers for the regulatory and technical contacts.  
(3) Current management and engineering organizational charts.  
Based on this information, the inspection team will identify and select specific systems and  
equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of  
specific systems and equipment to your staff by May 25, 2020 for the second RFI (i.e., RFI #2).
specific systems and equipment to your staff by May 25, 2020 for the second RFI (i.e., RFI #2).
                                              2


II. Additional Information Requested to be Available Prior to Inspection.
 
    As stated in Section I above, the inspection team will examine the returned documentation
    requested from Table RFI #1 and submit the list of specific systems and equipment to your staff
    by May 25, 2020 for the second RFI (i.e., RFI #2). The second RFI will request additional
3
    information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the
II.  
    licensees CSP selected for the cyber-security inspection. The additional information requested
Additional Information Requested to be Available Prior to Inspection.  
    for the specific systems and equipment is identified in Table RFI #2. All requested information
    shall follow the guidance document ML17156A215 referenced above.
As stated in Section I above, the inspection team will examine the returned documentation  
    The Table RFI 2 information shall be provided on secure site (i.e., Sharepoint or Certrec) by May
requested from Table RFI #1 and submit the list of specific systems and equipment to your staff  
    25, 2020. The preferred file format for all lists is object character recognition (OCR) readable or a
by May 25, 2020 for the second RFI (i.e., RFI #2). The second RFI will request additional  
    searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate
information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the  
    ease of use. If you have any questions regarding this information, please call the inspection
licensees CSP selected for the cyber-security inspection. The additional information requested  
    team leader as soon as possible.
for the specific systems and equipment is identified in Table RFI #2. All requested information  
                                                Table RFI #2
shall follow the guidance document ML17156A215 referenced above.  
      Section 3,
      Paragraph Number/Title:                                                                   Items
The Table RFI 2 information shall be provided on secure site (i.e., Sharepoint or Certrec) by May  
            Plant Computer System Block Diagram (if Plant Computer System is selected             All
25, 2020. The preferred file format for all lists is object character recognition (OCR) readable or a  
        5
searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate  
            for inspection)
ease of use. If you have any questions regarding this information, please call the inspection  
            Plant Security System Block Diagram (if Security Computer System is                   All
team leader as soon as possible.  
        6
            selected for inspection)
Table RFI #2  
            Systems that are distributed Block Diagrams (for systems selected for                 All
Section 3,  
        7
Paragraph Number/Title:  
            inspection)
Items  
            Host-Based Intrusion Detection System Documentation (for CDAs for                   10.a.1)
5 Plant Computer System Block Diagram (if Plant Computer System is selected  
      10
for inspection)  
            systems selected for inspection)                                                    10.a.2)
All
            List all Maintenance and Test Equipment (M&TE) used on CDAs for systems               All
6 Plant Security System Block Diagram (if Security Computer System is  
      13
selected for inspection)  
            selected for inspection
All
      15 Configuration Management                                                               All
7 Systems that are distributed Block Diagrams (for systems selected for  
                                                                                                16.a.
inspection)  
      16 Supply Chain Management
All
                                                                                                16.b
10 Host-Based Intrusion Detection System Documentation (for CDAs for  
      17 Portable Media and Mobile Device Control                                               All
systems selected for inspection)
      18 Software Management                                                                     All
10.a.1)  
      20 Vendor Access and Monitoring                                                           All
10.a.2)  
      21 Work Control                                                                           All
13 List all Maintenance and Test Equipment (M&TE) used on CDAs for systems  
                                                  3
selected for inspection  
All
15 Configuration Management  
All  
16 Supply Chain Management
16.a.  
16.b  
17 Portable Media and Mobile Device Control  
All  
18 Software Management  
All  
20 Vendor Access and Monitoring  
All  
21 Work Control  
All  


OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
        22 Device Access and Key Control                                                          All
        23 Password/Authenticator Policy                                                          All
        24 User Account/Credential Policy                                                          All
        26 Corrective Actions since last NRC inspection                                            All
        27 Cyber-Security Assessments for Selected Systems                                        All
III. Information Requested to be Available on First Day of Inspection
    For the specific systems and equipment identified in Section II above, provide the following RFI
    (i.e., Table 1ST Week Onsite) by July 20, 2020, the first day of the inspection. All requested
    information shall follow the guidance document ML17156A215 referenced above.
    The preferred file format for all lists is object character recognition (OCR) readable or a
    searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate
    ease of use. If you have any questions regarding this information, please call the inspection
    team leader as soon as possible.
                                              Table 1ST Week Onsite
      Section 3,
      Paragraph Number/Title:                                                                  Items
                                                                                                10.a.3)
              Host-Based Intrusion Detection System Documentation (for CDAs for
        10                                                                                      thru
              systems selected for inspection)
                                                                                              10.a.12)
                                                                                                11.a.3)
              Network Intrusion Detection System Documentation for Critical Systems
        11                                                                                      thru
              that have CDAs associated with them
                                                                                              11.a.15)
                                                                                                12.a.3)
              Security Information and Event Management (SIEM) Documentation for
        12                                                                                      thru
              Critical Systems that have CDAs associated with them
                                                                                              12.a.14)
        16 Supply Chain Management                                                              16.c
        19 Cyber-Security Event Notifications                                                    All
                                                    4


        In addition to the above information please provide the following:
 
            (1) Copies of the following documents do not need to be solely available to the inspection
                team as long as the inspectors have easy and unrestrained access to them.
                a. Updated Final Safety Analysis Report, if not previously provided;
4
                b. Original FSAR Volumes;
                c. Original SER and Supplements;
22 Device Access and Key Control
                d. FSAR Question and Answers;
All
                e. Quality Assurance Plan;
23 Password/Authenticator Policy
                f. Technical Specifications, if not previously provided; and
All
                g. Vendor Manuals, for applicable systems selected
24 User Account/Credential Policy
            (2) Assessment and Corrective Actions:
All
                a.     The most recent Cyber-Security Quality Assurance (QA) audit and/or
26 Corrective Actions since last NRC inspection 
                        self-assessment; and
All
                b.     The last 73.55(m) assessment performed; and
27 Cyber-Security Assessments for Selected Systems
                c.     Corrective action documents (e.g., condition reports, including status of
All
                        corrective actions) generate as a result of the most recent Cyber-Security
                        Quality Assurance (QA) audit and/or self-assessment.
III.
IV.     Information Requested To Be Provided Throughout the Inspection
Information Requested to be Available on First Day of Inspection
            (1) Copies of any corrective action documents generated as a result of the inspection
For the specific systems and equipment identified in Section II above, provide the following RFI
                teams questions or queries during the inspection.
(i.e., Table 1ST Week Onsite) by July 20, 2020, the first day of the inspection.  All requested
            (2) Copies of the list of questions submitted by the inspection team members and the
information shall follow the guidance document ML17156A215 referenced above.
                status/resolution of the information requested (provided daily during the inspection to
The preferred file format for all lists is object character recognition (OCR) readable or a
                each inspection team member).
searchable Excel spreadsheet file.  These files should be indexed and hyper-linked to facilitate
ease of use.  If you have any questions regarding this information, please call the inspection
team leader as soon as possible.
Table 1ST Week Onsite
Section 3,
Paragraph Number/Title:
Items
10 Host-Based Intrusion Detection System Documentation (for CDAs for
systems selected for inspection)
10.a.3)
thru
10.a.12)
11 Network Intrusion Detection System Documentation for Critical Systems
that have CDAs associated with them
11.a.3)
thru
11.a.15)
12 Security Information and Event Management (SIEM) Documentation for
Critical Systems that have CDAs associated with them
12.a.3)
thru
12.a.14)
16 Supply Chain Management
16.c
19 Cyber-Security Event Notifications
All
 
 
5
In addition to the above information please provide the following:  
(1) Copies of the following documents do not need to be solely available to the inspection  
team as long as the inspectors have easy and unrestrained access to them.  
a. Updated Final Safety Analysis Report, if not previously provided;  
b. Original FSAR Volumes;  
c. Original SER and Supplements;  
d. FSAR Question and Answers;  
e. Quality Assurance Plan;  
f.  
Technical Specifications, if not previously provided; and  
g. Vendor Manuals, for applicable systems selected  
(2) Assessment and Corrective Actions:  
a.  
The most recent Cyber-Security Quality Assurance (QA) audit and/or
self-assessment; and  
b.  
The last 73.55(m) assessment performed; and  
c.  
Corrective action documents (e.g., condition reports, including status of  
corrective actions) generate as a result of the most recent Cyber-Security  
Quality Assurance (QA) audit and/or self-assessment.  
IV.  
Information Requested To Be Provided Throughout the Inspection  
(1) Copies of any corrective action documents generated as a result of the inspection  
teams questions or queries during the inspection.  
(2) Copies of the list of questions submitted by the inspection team members and the  
status/resolution of the information requested (provided daily during the inspection to  
each inspection team member).  
If you have any questions regarding the information requested, please contact the inspection team.
If you have any questions regarding the information requested, please contact the inspection team.
                                                      5
}}
}}

Latest revision as of 02:03, 26 May 2025

Information Request for the Cyber Security Inspection and Notification to Perform Inspection 05000327/2020401 and 05000328/2020401
ML20086M006
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/26/2020
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Jim Barstow
Tennessee Valley Authority
References
IR 2020401
Download: ML20086M006 (11)


See also: IR 05000327/2020401

Text

March 26, 2020

Mr. Jim Barstow

Vice President

Tennessee Valley Authority

1101 Market Street, LP 3D-C

Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY

INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and

05000328/2020401

Dear Mr. Barstow:

On July 20, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance

with Inspection Procedure (IP) 71130.10P Cyber-Security, Revision 0 at Sequoyah Nuclear Plant. The

inspection will be performed to evaluate and verify your ability to meet the Milestone 8 (i.e., full

implementation) requirements of the NRCs Cyber-Security Rule, Title 10, Code of Federal Regulations

(CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks.

The onsite portion of the inspection will take place during the weeks of July 20, 2020, and August 3,

2020.

Experience has shown that these types of inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to ensure a

productive inspection for both parties, we have enclosed a request for documents needed for the

inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas

(i.e., sample set) to be inspected by the cyber-security IP. This information should be made available

via secure site (i.e., SharePoint, Certrec) no later than April 27, 2020. The inspection team will review

this information and, by May 25, 2020, will request the specific items that should be provided for

review.

The second group of additional requested documents will assist the inspection team in the evaluation of

the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the

licensees CSP selected for the cyber-security inspection. This information will be requested for review

via secure site (i.e., SharePoint, Certrec) before June 24, 2020.

The third group of requested documents consists of those items that the inspection team will review, or

need access to, during the inspection. Please have this information available by the first day of the

onsite inspection, July 20, 2020.

J. Barstow

2

The fourth group of information is necessary to aid the inspection team in tracking issues identified as a

result of the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are up to

date and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Melana Singletary. We understand that our regulatory contact

for this inspection is Mr. Zachary Kitts of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 404-997-4752 or via e-mail at

Melana.Singletary@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the

NRC's "Rules of Practice," a copy of this letter and its enclosure will not be available electronically for

public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-327 and 50-328

License Nos. DPR-77 and DPR-79

Enclosure:

Security Inspection Document Request

cc: See Page 3

3

cc:

Jeff Sowa

Site Licensing Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000, OPS 4C-SQN

Soddy Daisy, TN 37384-2000

Zachary Kitts

Licensing

Sequoyah Nuclear Plant

Tennessee Valley Authority

P.O. Box 2000, OPS 4C-SQN

Soddy Daisy, TN 37384-2000

4

SUBJECT:

SEQUOYAH NUCLEAR PLANT - INFORMATION REQUEST FOR THE CYBER-SECURITY

INSPECTION AND NOTIFICATION TO PERFORM INSPECTION 05000327/2020401 and

05000328/2020401

DISTRIBUTION:

M. Singletary, RII

L. Jones, RII

C. DeBisschop, NSIR

A. Konkal, NSIR

PUBLIC

PUBLICLY AVAILABLE

NON-PUBLICLY AVAILABLE

SENSITIVE

NON-SENSITIVE

ADAMS:

Yes

ACCESSION NUMBER: _ML20086M006

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII/DRS/EB2

RII:DRS/EB2

SIGNATURE

MJS6

SMS

NAME

MSINGLETAR

SSHAEFFER

DATE

3/26/2020

3/26/2020

E-MAIL COPY?

YES

NO

YES

NO

Enclosure

SEQUOYAH NUCLEAR PLANT CYBER SECURITY INSPECTION DOCUMENT REQUEST

Inspection Reports:

05000327/2020401 and 05000328/2020401

Inspection Dates:

Weeks of July 20, 2020, and August 3, 2020

Inspection Procedure:

IP 71130.10P, Cyber-Security, Revision 0

Reference:

ML17156A215, Guidance Document for Development of the Request

for Information (RFI) and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Revision 0

NRC Inspectors:

Melana Singletary, Lead

Larry Jones

404-997-4752

404-997-4837

Melana.Singletary@nrc.gov

Larry.Jones@nrc.gov

NRC Contractors:

Cynthia DeBisschop

Al Konkal

Cynthia.DeBisschop@nrc.gov

Alan.Konkal@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team

with the general information necessary to select appropriate components and CSP elements to

develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control

portions of the CSP to be chosen as the sample set required to be inspected by the cyber-

security IP. The first RFIs requested information is specified below in Table RFI #1. The

Table RFI #1 information is requested to be provided by, April 27, 2020 or sooner, to facilitate

the selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused

follow-up request to develop the second RFI. The inspection team will submit the specific

systems and equipment list to your staff by May 25, 2020, which will identify the specific

systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture,

and the areas of the licensees CSP selected for the cyber-security inspection. We request that

the additional information provided from the second RFI be made available by May 25, 2020.

All requests for information shall follow the guidance document ML17156A215 referenced

above.

The required Table RFI 1 information shall be provided via secure site (i.e., Sharepoint, Certrec)

by April 27, 2020. The preferred file format for all lists is object character recognition (OCR)

readable or a searchable Excel spreadsheet file. These files should be indexed and hyper-linked

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

2

to facilitate ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

2

Table RFI #1

Section 3,

Paragraph Number/Title:

Items

1

List All Identified Critical Systems and Critical Digital Assets

All

2

List CDA Facility and Site Ethernet - Transmission Control Protocol/Internet

Protocol (TCP/IP) based Local Area Networks (LANs) and identify those LANs

that have non-CDAs on them

All

3

List CDA facility and site non-ethernet TCP/IP based LANs including those

industrial networks and identify LANs that have non-CDAs on them

All

4

Network Topology Diagrams (be sure to include all NIDS and SIEMs for EP

networks and Security level 3 and 4 networks)

All

8

List all network security boundary devices for EP networks and all network

security boundary devices for levels 3 and 4

All

9

List CDA wireless Industrial networks

All

11 Network intrusion detection system documentation for Critical Systems that

have CDAs associated with them

11.a.1)

11.a.2)

12 Security Information and Event Management (SIEM) documentation for

Critical systems that have CDAs associated with them

12.a.1)

12.a.2)

14

List EP and Security onsite and offsite digital communication systems

All

25

Cyber-Security Assessment and Cyber-Security Incident Response Teams

All

28

Copy of Current Cyber Security Plan and copy of any 50.54(p) analysis to

support changes to the plan

All

In addition to the above information please provide the following:

(1) Electronic copy of the UFSAR and technical specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and

equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of

specific systems and equipment to your staff by May 25, 2020 for the second RFI (i.e., RFI #2).

3

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation

requested from Table RFI #1 and submit the list of specific systems and equipment to your staff

by May 25, 2020 for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the

licensees CSP selected for the cyber-security inspection. The additional information requested

for the specific systems and equipment is identified in Table RFI #2. All requested information

shall follow the guidance document ML17156A215 referenced above.

The Table RFI 2 information shall be provided on secure site (i.e., Sharepoint or Certrec) by May

25, 2020. The preferred file format for all lists is object character recognition (OCR) readable or a

searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate

ease of use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Section 3,

Paragraph Number/Title:

Items

5 Plant Computer System Block Diagram (if Plant Computer System is selected

for inspection)

All

6 Plant Security System Block Diagram (if Security Computer System is

selected for inspection)

All

7 Systems that are distributed Block Diagrams (for systems selected for

inspection)

All

10 Host-Based Intrusion Detection System Documentation (for CDAs for

systems selected for inspection)

10.a.1)

10.a.2)

13 List all Maintenance and Test Equipment (M&TE) used on CDAs for systems

selected for inspection

All

15 Configuration Management

All

16 Supply Chain Management

16.a.

16.b

17 Portable Media and Mobile Device Control

All

18 Software Management

All

20 Vendor Access and Monitoring

All

21 Work Control

All

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

4

22 Device Access and Key Control

All

23 Password/Authenticator Policy

All

24 User Account/Credential Policy

All

26 Corrective Actions since last NRC inspection

All

27 Cyber-Security Assessments for Selected Systems

All

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the following RFI

(i.e., Table 1ST Week Onsite) by July 20, 2020, the first day of the inspection. All requested

information shall follow the guidance document ML17156A215 referenced above.

The preferred file format for all lists is object character recognition (OCR) readable or a

searchable Excel spreadsheet file. These files should be indexed and hyper-linked to facilitate

ease of use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table 1ST Week Onsite

Section 3,

Paragraph Number/Title:

Items

10 Host-Based Intrusion Detection System Documentation (for CDAs for

systems selected for inspection)

10.a.3)

thru

10.a.12)

11 Network Intrusion Detection System Documentation for Critical Systems

that have CDAs associated with them

11.a.3)

thru

11.a.15)

12 Security Information and Event Management (SIEM) Documentation for

Critical Systems that have CDAs associated with them

12.a.3)

thru

12.a.14)

16 Supply Chain Management

16.c

19 Cyber-Security Event Notifications

All

5

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report, if not previously provided;

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f.

Technical Specifications, if not previously provided; and

g. Vendor Manuals, for applicable systems selected

(2) Assessment and Corrective Actions:

a.

The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment; and

b.

The last 73.55(m) assessment performed; and

c.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security

Quality Assurance (QA) audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team.