June 5,1997 | |||
l | l | ||
i. | i. | ||
i | i | ||
'- | ' - | ||
Mr. Michael B. Sellman | |||
i | i | ||
President | |||
Maine Yankee Atomic Power Company | |||
, | , | ||
j | |||
329 Bath Road . | |||
Brunswick, Maine 04011 | |||
;. | j | ||
.' | ;. | ||
1 | |||
.' | |||
SUBJECT: | |||
NRC INTEGRATED INSPECTION REPORT 50-309/97-03 | |||
i | |||
' | |||
Dear Mr. Sellman: | |||
' | ' | ||
. | |||
. | |||
i | i | ||
! | ! | ||
. | On April 26,1997, the NRC completed an inspection at your Maine Yankee reactor facility. | ||
i | { | ||
I | . | ||
! | The results of that inspection were discussed with Messrs. G. Leitch, R. Blackmore, and | ||
L. | i | ||
others of your staff at an exit meeting held on May 2,1997. The enclosed report presents | |||
I | |||
.the results of that inspection. | |||
! | |||
1 | |||
L. | |||
During this 6-week inspection, the NRC observed that the conduct of activities at the | |||
4 | 4 | ||
Maine Yankee facility was safety focused. Operators were generally focused on safety | |||
! | ! | ||
and properly operated the systems required to maintain the plant in safe shutdown. | |||
; | However, we are concerned about a problem that occurred during the period involving an | ||
j | . | ||
; | |||
operator error during the conduct of a test. Specifically, the operator erroneously started a | |||
j | |||
low pressure safety injection pump instead of a containment spray pump as required by the | |||
i | i | ||
test procedure. While the error itself was of minor consequence, the performance of the | |||
I | I | ||
! | licensed and senior licensed operators in response to the event was weak. Poor | ||
! | |||
communications and weak command and control resulted in the failure to stop the test in | |||
i. | j | ||
! | violation of your administrative procedures. Further, additional human performance errors | ||
i- | . | ||
j | i. | ||
were identified during this inspection period involving testing of the residual heat removal | |||
j | ! | ||
system valves and, control of contamination at the plant. These examples, when | |||
i- | |||
combined with similar problems identified in the recent past, indicates the need for | |||
j | |||
continued strong management attention. | |||
; | |||
The violation is cited in the enclosed Notice of Violation, and the circumstances | |||
j | |||
surrounding the violation'is described in detail in the enclosed report. Please note that you | |||
are required to respond to this letter and should follow the instructions specified in the | |||
a | a | ||
' | |||
enclosed Notice when preparing your response. The NRC will use your response, in part, | |||
to determine whether further enforcement action is necessary to ensure compliance with | |||
regulatory requirements. | |||
g ot | |||
\\ | |||
\\ | |||
\\ | |||
~ | |||
i | |||
9706100025 970605 | |||
: | P | ||
: | |||
PDR | |||
ADOCK 05000309 | |||
G | |||
PM | |||
* | |||
, | |||
.- | |||
_ | |||
- | |||
- | |||
- | |||
._. _ | |||
. | |||
. _ | |||
~. | |||
~ | |||
. - _ _ _ _ _ _ _ . _ . . _ . _ . _ . _ . . _ . . _ . _ ~._. ._. _ _ .. ______..._. . | |||
. | |||
s | |||
. | |||
' | |||
Michael B. Sellman | |||
2 | |||
t | t | ||
i | i | ||
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter . | |||
i | i | ||
and its enclosure will be placed in the NRC Public Document Room. | |||
$ | $ | ||
l | l | ||
j | Sincerely, | ||
) | j | ||
ORIGINAL SIGNED BY: | |||
. | ) | ||
Curtis J. Cowgill, lll | |||
1 | |||
Projects Branch 5 | |||
. | |||
. | |||
Division of Reactor Projects | |||
: | : | ||
1 | 1 | ||
Docket No: | |||
50-309 | |||
, | , | ||
License No: DRP-36 | |||
$ | |||
$ | Enclosures: | ||
1. | |||
Appendix A Notice of Violation | |||
2. | |||
NRC Inspection Report No. 50-309/97-03 | |||
cc w/encis: | |||
i | |||
B. Blackmore, Acting Vice Prasident, Operations / Plant Manager | |||
j | |||
M. Meisner, Vice President, Licensing and Regulatory Compliance | |||
- | - | ||
' | ' | ||
R. Fraser, Acting Vice President, Engineering | |||
J. M. Block, Attorney at Law | |||
, | |||
{. | {. | ||
P. L. Anderson, Project Manager (Yankee Atomic Electric Company) | |||
L. Diehl, Manager of Public and Governmental Affairs | |||
' | ' | ||
J. A. Ritsher, Attorney (Ropes and Gray) | |||
; | ; | ||
P. Dostie, State Nuclear Safety inspector | |||
! | |||
'. | P. Brann, Assistant Attorney General | ||
! | ; | ||
: | U. Vanags, State Nuclear Safety Advisor | ||
* | C. Brinkman, Combustion Engineering, Inc. | ||
'. | |||
W. D. Meinert, Nuclear Engineer | |||
! | |||
First Selectmen of Wiscasset | |||
: | |||
Maine State Planning Officer - Nuclear Safety Advisor | |||
* | |||
State of Maine, SLO Designee | |||
State Planning Officer - Executive Department | |||
] | ] | ||
Friends of the Coast | |||
4 | 4 | ||
$ | $ | ||
| Line 134: | Line 204: | ||
i | i | ||
. | . | ||
t | |||
: | |||
2 | 2 | ||
1. | 1. | ||
l | l | ||
! | !. | ||
i | |||
.- | |||
. | |||
-. | |||
. | . | ||
-- | |||
- | |||
._ _ | |||
- | |||
_ | |||
. | |||
. | |||
. | |||
Michael B. Sellman | |||
3 | |||
i | |||
Distribution w/encis: | |||
Region I Docket Room (with concurrences) | |||
Nuclear Safety Information Center (NSIC) | |||
j | |||
PUBLIC | |||
NRC Resident inspector | |||
D. Screnci, PAO | |||
W. Axelson, DRA | |||
C. Cowgill, DRP | |||
R. Summers, DRP | |||
j | |||
D. Bearde, DRP | |||
l | |||
Distribution w/encls (VIA E-MAIL): | |||
W. Dean, OEDC | |||
S. Varga, Director,1/11, DRPE, NRR | |||
D. Dorman, LPM, NRR | |||
M. Callahan, OCA | |||
R. Correia, NRR | |||
F. Talbot, NRR | |||
' | ' | ||
D. Screnci, PAO | |||
N. Sheehan, PAO | |||
Inspection Program Branch, NRR (IPAS) | |||
t | |||
't | 't | ||
DOCUMENT NAME: G:\\ BRANCH 5\\MY9703. INS | |||
To receive a copy 9 this document, indicate in the box: "C" = Copy without | |||
f | |||
attachment /soclospre | |||
"E" = Copy with atfachment/enclosuyp | |||
"N" = No copy | |||
OFFICE | |||
Rl/QRf | |||
Rl/DRP ///[JV | |||
Rl/DRP ///[f | |||
NAME | |||
Rasnyussen | |||
Yerokurt I,J | |||
, | |||
Cowgill V / | |||
' | |||
, , | |||
DATE | |||
5//9K | |||
EH97 [f f g/ty) | |||
M /f/ ( p; 7 | |||
/ | |||
OFFICIAL RECORD COPY | |||
/ /' | |||
}} | }} | ||
Latest revision as of 17:07, 11 December 2024
| ML20140C679 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 06/05/1997 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sellman M Maine Yankee |
| Shared Package | |
| ML20140C683 | List: |
| References | |
| 50-309-97-03, 50-309-97-3, NUDOCS 9706100025 | |
| Download: ML20140C679 (3) | |
See also: IR 05000309/1997003
Text
-
-_
. .
- . . _ - - -.
. - --. ---.
-. - - .- - - -
_. - - .
.
,
- ..
.
June 5,1997
l
i.
i
' -
Mr. Michael B. Sellman
i
President
Maine Yankee Atomic Power Company
,
j
329 Bath Road .
Brunswick, Maine 04011
j
- .
1
.'
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-309/97-03
i
'
Dear Mr. Sellman:
'
.
i
!
On April 26,1997, the NRC completed an inspection at your Maine Yankee reactor facility.
{
.
The results of that inspection were discussed with Messrs. G. Leitch, R. Blackmore, and
i
others of your staff at an exit meeting held on May 2,1997. The enclosed report presents
I
.the results of that inspection.
!
1
L.
During this 6-week inspection, the NRC observed that the conduct of activities at the
4
Maine Yankee facility was safety focused. Operators were generally focused on safety
!
and properly operated the systems required to maintain the plant in safe shutdown.
However, we are concerned about a problem that occurred during the period involving an
.
operator error during the conduct of a test. Specifically, the operator erroneously started a
j
low pressure safety injection pump instead of a containment spray pump as required by the
i
test procedure. While the error itself was of minor consequence, the performance of the
I
licensed and senior licensed operators in response to the event was weak. Poor
!
communications and weak command and control resulted in the failure to stop the test in
j
violation of your administrative procedures. Further, additional human performance errors
.
i.
were identified during this inspection period involving testing of the residual heat removal
!
system valves and, control of contamination at the plant. These examples, when
i-
combined with similar problems identified in the recent past, indicates the need for
j
continued strong management attention.
The violation is cited in the enclosed Notice of Violation, and the circumstances
j
surrounding the violation'is described in detail in the enclosed report. Please note that you
are required to respond to this letter and should follow the instructions specified in the
a
'
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
g ot
\\
\\
\\
~
i
9706100025 970605
P
ADOCK 05000309
G
,
.-
_
-
-
-
._. _
.
. _
~.
~
. - _ _ _ _ _ _ _ . _ . . _ . _ . _ . _ . . _ . . _ . _ ~._. ._. _ _ .. ______..._. .
.
s
.
'
Michael B. Sellman
2
t
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter .
i
and its enclosure will be placed in the NRC Public Document Room.
$
l
Sincerely,
j
ORIGINAL SIGNED BY:
)
Curtis J. Cowgill, lll
1
Projects Branch 5
.
.
Division of Reactor Projects
1
Docket No:
50-309
,
License No: DRP-36
$
Enclosures:
1.
Appendix A Notice of Violation
2.
NRC Inspection Report No. 50-309/97-03
cc w/encis:
i
B. Blackmore, Acting Vice Prasident, Operations / Plant Manager
j
M. Meisner, Vice President, Licensing and Regulatory Compliance
-
'
R. Fraser, Acting Vice President, Engineering
J. M. Block, Attorney at Law
,
{.
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
L. Diehl, Manager of Public and Governmental Affairs
'
J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostie, State Nuclear Safety inspector
!
P. Brann, Assistant Attorney General
U. Vanags, State Nuclear Safety Advisor
C. Brinkman, Combustion Engineering, Inc.
'.
W. D. Meinert, Nuclear Engineer
!
First Selectmen of Wiscasset
Maine State Planning Officer - Nuclear Safety Advisor
State Planning Officer - Executive Department
]
Friends of the Coast
4
$
1
i
.
t
2
1.
l
!.
i
.-
.
-.
.
--
-
._ _
-
_
.
.
.
Michael B. Sellman
3
i
Distribution w/encis:
Region I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
j
PUBLIC
NRC Resident inspector
D. Screnci, PAO
W. Axelson, DRA
C. Cowgill, DRP
R. Summers, DRP
j
D. Bearde, DRP
l
Distribution w/encls (VIA E-MAIL):
W. Dean, OEDC
S. Varga, Director,1/11, DRPE, NRR
D. Dorman, LPM, NRR
M. Callahan, OCA
R. Correia, NRR
F. Talbot, NRR
'
D. Screnci, PAO
N. Sheehan, PAO
Inspection Program Branch, NRR (IPAS)
t
't
DOCUMENT NAME: G:\\ BRANCH 5\\MY9703. INS
To receive a copy 9 this document, indicate in the box: "C" = Copy without
f
attachment /soclospre
"E" = Copy with atfachment/enclosuyp
"N" = No copy
OFFICE
Rl/QRf
Rl/DRP ///[JV
Rl/DRP ///[f
NAME
Rasnyussen
Yerokurt I,J
,
Cowgill V /
'
, ,
DATE
5//9K
EH97 [f f g/ty)
M /f/ ( p; 7
/
OFFICIAL RECORD COPY
/ /'