ML20148P410: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams package | {{Adams package | ||
| number = ML20148P410 | | number = ML20148P410 | ||
| title = Forwards LER | | title = Forwards LER 78-063/03L-0 | ||
| release date = 06/10/2020 | | release date = 06/10/2020 | ||
| package contents = {{Adams package content | | package contents = {{Adams package content | ||
| number = ML20148P415 | | number = ML20148P415 | ||
| issue date = 11/20/1978 | | issue date = 11/20/1978 | ||
| title = | | title = /03L-0 on 781102:reactor Maximum Cooldown Rate of 100 Degrees F Exceeded During Reactor Auto Scram & Vessel Depressurization.Caused by Personnel Error;Personnel Have Been Admonished | ||
| author name = Baxley S | | author name = Baxley S | ||
| author affiliation = GEORGIA POWER CO. | | author affiliation = GEORGIA POWER CO. |
Latest revision as of 10:44, 23 July 2022
Date released: 06/10/2020 | Download: ML20148P410 |
---|---|
ML20148P415 | |
Person / Time | |
---|---|
Site: | Hatch |
Issue date: | 11/20/1978 |
From: | Baxley S GEORGIA POWER CO. |
To: | |
References | |
Download: ML20148P415 (2) | |