                ), fatroq(q                                     UNITED STATES
fatroq(q
              !                g                NUCLEAR REGULATORY COMMISSION
),
              ;            :; y                                   REGION V
UNITED STATES g
              %              g                            1450 MARIA LANE, SUITE 210
NUCLEAR REGULATORY COMMISSION
                %        ,d                           WALNUT CREEK, CALIFORN!A 94596 JUL 191985 MEMORANDUM FOR:         _J '. Crews , 'RV''
:; y REGION V g
A. Chaffee, RV g (p - 31%
1450 MARIA LANE, SUITE 210
L. Miller, RV C. Myers, RV J. Eckhardt, RV G. Perez, RV R. Scarano, RV' G. Lainas, AD/0R, NRR S. Miner, Project Manager, NRR L. Norderhaug, RV M. Cillis, RV R. Fish, RV P. Qualls, RV FROM:                   D. Kirsch, Acting Director Division of Reactor Safety and Projects, RV
,d WALNUT CREEK, CALIFORN!A 94596 JUL 191985 MEMORANDUM FOR:
_J '. Crews, 'RV''
g (p - 31%
A. Chaffee, RV L. Miller, RV C. Myers, RV J. Eckhardt, RV G. Perez, RV R. Scarano, RV' G. Lainas, AD/0R, NRR S. Miner, Project Manager, NRR L. Norderhaug, RV M. Cillis, RV R. Fish, RV P. Qualls, RV FROM:
D. Kirsch, Acting Director Division of Reactor Safety and Projects, RV


==SUBJECT:==
==SUBJECT:==
Line 32: Line 36:
==References:==
==References:==
(1) NRC Manual Chapter 0516 (2) Proposed changes to the SALP process, J. M. Taylor Memorandum dated June 27, 1985 (3) Region V Instruction 0701 (4) SALP Board Schedule, J. B. Martin Memorandum dated July 18, 1985 l
(1) NRC Manual Chapter 0516 (2) Proposed changes to the SALP process, J. M. Taylor Memorandum dated June 27, 1985 (3) Region V Instruction 0701 (4) SALP Board Schedule, J. B. Martin Memorandum dated July 18, 1985 l
Pursuant to references (1), (2), (3) and (4) above, the regional SALP Review Board meeting for Rancho Seco is scheduled to convene at the Region V Walnut Creek office on August 7, 1985, at 8:30 a.m. The board members will consist of the above addressees and myself who will serve as chairperson.
Pursuant to references (1), (2), (3) and (4) above, the regional SALP Review Board meeting for Rancho Seco is scheduled to convene at the Region V Walnut Creek office on August 7, 1985, at 8:30 a.m.
1 I                   This assessment will cover the 18 month period from December 1, 1983, through May 31, 1985. Since this period ends during completion of a refueling outage, the evaluation period will be updated to include recent events through July, 1985.
The board members will consist of the above addressees and myself who will serve as chairperson.
1 I
This assessment will cover the 18 month period from December 1, 1983, through May 31, 1985. Since this period ends during completion of a refueling outage, the evaluation period will be updated to include recent events through July, 1985.
Members of the Rancho Seco SALP Board are herewith provided a review guidance package to be used in preparing performance analyses of the various functional areas. This package consists of the following:
Members of the Rancho Seco SALP Board are herewith provided a review guidance package to be used in preparing performance analyses of the various functional areas. This package consists of the following:
Description of functional areas (Attachment 1)
Description of functional areas (Attachment 1)
Evaluation criteria (Attachment 2)
Evaluation criteria (Attachment 2)
Attributes for the evaluation criteria (Attachment 3)
Attributes for the evaluation criteria (Attachment 3)
Performance categories         (Attachment 4)
Performance categories (Attachment 4)
SALP evaluation matrix (Attachment 5)
SALP evaluation matrix (Attachment 5)
Sample SALP functional area performance analysis (Attachment 6)
Sample SALP functional area performance analysis (Attachment 6)
Supporting Data and Summaries           (Attachment 7) 7 8508050567 850719                 ,                                                      II PDR     ADOCK 05000312 G                 ,
Supporting Data and Summaries (Attachment 7)
PDR       ,
II 7
f)
8508050567 850719 PDR ADOCK 05000312 G
PDR f)


P. . 9 l
P..
Memo on SALP 50-312                       2 The'following is the anticipated outline of the Rancho Seco SALP report, along with the individuals assigned lead responsibility for preparing input for each section.
9 l
I Introduction                                 Myers II Criteria                                       Myers III Summary of Results                             Myers IV Performance Analysis
Memo on SALP 50-312 2
: 1. Plant Operations                   Eckhardt
The'following is the anticipated outline of the Rancho Seco SALP report, along with the individuals assigned lead responsibility for preparing input for each section.
: 2. Radiological Controls               Cillis
I Introduction Myers II Criteria Myers III Summary of Results Myers IV Performance Analysis 1.
: 3. Maintenance                         Eckhardt
Plant Operations Eckhardt 2.
: 4. Surveillance                       Eckhardt
Radiological Controls Cillis 3.
: 5. Fire Protection                     Qualls
Maintenance Eckhardt 4.
: 6. Emergency Preparedness             Fish
Surveillance Eckhardt 5.
: 7. Security and Safeguards             Norderhaug
Fire Protection Qualls 6.
: 8. Refueling                           Eckhardt
Emergency Preparedness Fish 7.
: 9. Quality Programs and Administrative Controls Affecting Safety                 Eckhardt
Security and Safeguards Norderhaug 8.
: 10. Licensing Activities               Minor
Refueling Eckhardt 9.
: 11.     Eng;ineering & Construction         Crews /Echkardt
Quality Programs and Administrative Controls Affecting Safety Eckhardt 10.
: 12. Training                           Eckhardt V     Supporting Data and Summar*Ms             Myers (Including tables)
Licensing Activities Minor 11.
Eng;ineering & Construction Crews /Echkardt 12.
Training Eckhardt V
Supporting Data and Summar*Ms Myers (Including tables)
Eachpersonassignedleadresponsibilityforafuncti$nalareashallprepare a performance analysis and submit it to C. J. Myers by C.O.B. July 26, 1985.
Eachpersonassignedleadresponsibilityforafuncti$nalareashallprepare a performance analysis and submit it to C. J. Myers by C.O.B. July 26, 1985.
Each performance analysis shall be prepared as follows:     ,
Each performance analysis shall be prepared as follows:
                                                          'i
'i 1.
: 1. Assess the licensee's performance in the functional area based upon inspections performed, available ^ data and observations of the licensee's performance during the SALP period. Obt'ain~ inputs from others who had inspection responsibilities in the functional area.
Assess the licensee's performance in the functional area based upon inspections performed, available ^ data and observations of the licensee's performance during the SALP period. Obt'ain~ inputs from others who had inspection responsibilities in the functional area.
In assessing the licensee's performance, use the guidance in Attachment I through 4.           -
In assessing the licensee's performance, use the guidance in Attachment I through 4.
: 2. Prepare a performance analysis for the functional area following the format of Attachment 6. If possible, discuss the trend'of the licensee's performance since the previous SALP period. The analysis should reference pertinent data, enforcement items or events, when appropriate, but should be principally a quantitative analysis of the licensee's performance in the area (depending upon the level of activity, approximately one to one and one-half page in length when single space typed).
2.
: 3. Include recommendations for licensee actions related to the functional area.
Prepare a performance analysis for the functional area following the format of Attachment 6.
: 4. Provide a copy of the SALP evaluation matrix (Attachment 5),
If possible, discuss the trend'of the licensee's performance since the previous SALP period. The analysis should reference pertinent data, enforcement items or events, when appropriate, but should be principally a quantitative analysis of the licensee's performance in the area (depending upon the level of activity, approximately one to one and one-half page in length when single space typed).
3.
Include recommendations for licensee actions related to the functional area.
4.
Provide a copy of the SALP evaluation matrix (Attachment 5),
assigning a performance category for each evaluation criterion.
assigning a performance category for each evaluation criterion.


y, c -           .
y, c -
    ;.^,
;.^,
IMemo on SALP 50-312                             '3                                                                                               ,
IMemo on SALP 50-312
By copy of this memorandum, the Director, Office of Investigaticas, San Francisco Field Office, is requested to provide a summary of major
'3 By copy of this memorandum, the Director, Office of Investigaticas, San Francisco Field Office, is requested to provide a summary of major
                  -investigative activities and results-involving Rancho Seco by July 26, 1985.
-investigative activities and results-involving Rancho Seco by July 26, 1985.
In addition.Iby-copy of'this memorandum .the offices of NMSS and AEOD are requested tolprovide performance analyses by July 26, 1985 (or updated earlier submittals to address the extended SALP period).
In addition.Iby-copy of'this memorandum.the offices of NMSS and AEOD are requested tolprovide performance analyses by July 26, 1985 (or updated earlier submittals to address the extended SALP period).
k D. F. Kir ch SALP Board Chairman.
k D. F. Kir ch SALP Board Chairman.
Acting Director, Division of Reactor Safety and Projects
Acting Director, Division of Reactor Safety and Projects


==Enclosures:==
==Enclosures:==
As Stated                                   .                                      .    .3 cc: 'J. Davis, NMSS                                                     '
As Stated
* R. Seyfrit,'AEOD                                     - "
.3 cc:
O. Shackleton, OI/SFF0           ',
'J. Davis, NMSS R. Seyfrit,'AEOD O. Shackleton, OI/SFF0
                          .J. Carter, NRR I
.J. Carter, NRR I
                                                                                                                                        /               j F. Wenslawski, RV         ,
/
                                                                              - t=     ,        3 ;                             7 2                        Ti, .         , ,.
j F. Wenslawski, RV
                                                          =*                                     .-
- t=
R;                     #              &
3 ;
                                                                                      .                          w  r 1
7 Ti,.
k                               .
2
                                                                                                                                                          .7 4                                 ,
=*
                                                                                                                                      '        4         ",
R; w
                                                                            .J                                                   *1       ,            ,
r k
                                                                ,                        ,2-             ,
. 7 1
:.        e                                                                     !      3
4 4
                                                                                  ;                -                                s                     w
.J
                                                                                  ~..
* 1
4 l                                                   (
,2-e 3
s w
~..
4 l
(


Functional Areas.           ,
Functional Areas.
: a. Operating Phase Reactors
a.
: 1. Plant Operations Consists chiefly of the activities of the licensee's operationalstaff(e.g.,licensedoperators, shift technical advisors, and auxiliary operators). It is         !
Operating Phase Reactors 1.
intended to be limited to operating activities such as       i plant startup, power operation, plant shutdown, and system lineups. Thus, it includes activities such as reading and logging plant conditions; responding to
Plant Operations Consists chiefly of the activities of the licensee's operationalstaff(e.g.,licensedoperators, shift technical advisors, and auxiliary operators).
                ^      off-normal conditions; manipulating the reactor and auxiliary controls; and training / retraining of licensed operators, shift technical advisors, and auxiliary operators.                                        .
It is intended to be limited to operating activities such as i
: 2. Radiolooical Controls Includes controls for occupational radiation protection; radioactive materials and contamination controls; radiological surveys and monitoring; processing of gas-eous, liquid, and solid wastes; transportation of radioactive materials; radiological effluent and environmental monitoring; and the results of the fiRC's independent measurement program.
plant startup, power operation, plant shutdown, and system lineups. Thus, it includes activities such as reading and logging plant conditions; responding to off-normal conditions; manipulating the reactor and
: 3. liaintenance Includes all activities associated with preventive or corrective maintenance of instrumentation and control equipment and mechanical and electrical systems.
^
: 4. Surveillance Includes all surveillance testing activities as well as     -
auxiliary controls; and training / retraining of licensed operators, shift technical advisors, and auxiliary operators.
all inservice inspection and testing activities.               '
2.
Examples of activities included are: instrument cali-brations, equipment operability tests, containment leak rate tests, special tests, inservice inspection and performance tests of pumps and valves, and all other inservice inspection activities.
Radiolooical Controls Includes controls for occupational radiation protection; radioactive materials and contamination controls; radiological surveys and monitoring; processing of gas-eous, liquid, and solid wastes; transportation of radioactive materials; radiological effluent and environmental monitoring; and the results of the fiRC's independent measurement program.
: 5. Fire Protection Includes routine housekeeping and fire protection /
3.
prevention program activities. Thus, it includes the storage of combustible material; fire brigade staffing and training; fire 50ppression system maintanence and operation; and those fire protection features provided for structures, systems, and components important.to safe shutdown.
liaintenance Includes all activities associated with preventive or corrective maintenance of instrumentation and control equipment and mechanical and electrical systems.
!                                                        ~
4.
Surveillance Includes all surveillance testing activities as well as all inservice inspection and testing activities.
Examples of activities included are:
instrument cali-brations, equipment operability tests, containment leak rate tests, special tests, inservice inspection and performance tests of pumps and valves, and all other inservice inspection activities.
5.
Fire Protection Includes routine housekeeping and fire protection /
prevention program activities.
Thus, it includes the storage of combustible material; fire brigade staffing and training; fire 50ppression system maintanence and operation; and those fire protection features provided for structures, systems, and components important.to safe shutdown.
~
Attachment *1 Page 1 l
Attachment *1 Page 1 l
t           '
t
: 6. Emergency Preparedness                 -
 
Includei' activities relating to the implementation of the emergency plan and implementing procedures. Thus, it includes such activities as licensee's performance during exercises which test the licensee, state, and local emergency plans; plan administration and implemen-tation; notification; communications; facilities and equipment; staffing; training;' assessment; emergency                         ,
6.
classification; medical treatment; radiological exposure
Emergency Preparedness Includei' activities relating to the implementation of the emergency plan and implementing procedures. Thus, it includes such activities as licensee's performance during exercises which test the licensee, state, and local emergency plans; plan administration and implemen-tation; notification; communications; facilities and equipment; staffing; training;' assessment; emergency classification; medical treatment; radiological exposure control; recovery; protective actions; and interfaces with onsite and offsite emergency response organizations.
        .            control; recovery; protective actions; and interfaces                         ;
7.
with onsite and offsite emergency response organizations.
Security Includes all activities whose purpose is to ensure the security and continued operability of the plant.
: 7. Security Includes all activities whose purpose is to ensure the security and continued operability of the plant.
Specifically it includes all aspects of the licensee's security program (e.g. access control, security checks, badging).
Specifically it includes all aspects of the licensee's security program (e.g. access control, security checks, badging).
: 8. Refueling Includes all activities associated with refueling.
8.
Refueling Includes all activities associated with refueling.
Thus, it includes outage management, and the manipu-lation of new and spent fuel.
Thus, it includes outage management, and the manipu-lation of new and spent fuel.
: 9. Quality Procrams and Administrative Controls Affectino                 -
9.
Quality Includes all verification and oversight activities which affect or assure the quality of plant activities, structures, systems and components. This area may be viewed as a comprehensive management system for con-trolling the quality of work performed as well as the quality of verification activities that confirm that
Quality Procrams and Administrative Controls Affectino Quality Includes all verification and oversight activities which affect or assure the quality of plant activities, structures, systems and components. This area may be viewed as a comprehensive management system for con-trolling the quality of work performed as well as the quality of verification activities that confirm that the work was performed correctly. The evaluation of the effectiveness of the quality assurance system should be based on the results of management actions to ensure that necessary people, procedures, facilities and materials are provided and used during the opera-tion of the nuclear power plant.
          -          the work was performed correctly. The evaluation of                   ,
Principal emphasis should be given to evaluating the effectiveness and involvement of management in establishing and assuring the effective implementation of the quality assurance program along with evaluating the history of licensee performance in the key areas of:
the effectiveness of the quality assurance system                         :
comittee activities, design and procurement control. control of desion change processes, inspections, audits, corrective action systems, and records.
should be based on the results of management actions to ensure that necessary people, procedures, facilities and materials are provided and used during the opera-tion of the nuclear power plant. Principal emphasis should be given to evaluating the effectiveness and involvement of management in establishing and assuring the effective implementation of the quality assurance program along with evaluating the history of licensee performance in the key areas of: comittee activities, design and procurement control. control of desion change processes, inspections, audits, corrective action systems, and records.
Page 2
Attachment 1 Page 2


                                                              ,                ,r     v ,
,r v,
i                           ,    ' .r           .      <,1
<,1 i
                                -                        ,        ;            'f.                     ,
'.r
                                                                                                                    .l
'f.
                              ~
l
y O 'l
..: l
                                                                'u l                  . .: l i    l  l'             '
.l
                                                  .        i. ,#
~
                                                                      ";      - !!,'.              , y .."  ,
'u y O 'l i
c                                                    ,        .
l l' i.
                                                                                                ,,,m
y..
: 10. . Licensing Activities ~ ^ ' " [; I ,
: 10.. Licensing Activities ~ ^ ' " [; I,
                        ~
g,
I g,            l#
,,,m c
                                                                                                '"                      'I
~
                                  .        .                  . . :. ? ;..                                   ~
Il#
Includes the . adequacy; and ~ timeliness of all'. licensing submittals, responsiveness to NRC licedsing' initiatives, and the' licensee's approach to'resolutionfof' technical ~ issues from
'I
                                                                          ~
.. :. ? ;..
~
Includes the. adequacy; and ~ timeliness of all'. licensing submittals, responsiveness to NRC licedsing' initiatives, and the' licensee's approach to'resolutionfof' technical ~ issues from
~
a safety standpoint.-
a safety standpoint.-
                                                                  ~
~
                                                                            ?# ^       "
?# ^
s
s
: 11. Engineering and Construction _;<                                                   ,
: 11. Engineering and Construction _;<
s v
s v
Includes all design'and' installation activities associated with plant modifications including design changes and reviews.
Includes all design'and' installation activities associated with plant modifications including design changes and reviews.
: 12. Training-Includes the following facility training categories:
: 12. Training-Includes the following facility training categories:
Non-licensed operators Control room operators             .
Non-licensed operators Control room operators Senior control room operators / shift supervisors-Shift Technical advisors Instrument and. control technicians Electrical maintenance personnel Mechanical maintenance personnel Radiological protection technicians Chemistry technicians Onsite technical staff and managers Page 3
Senior control room operators / shift supervisors-Shift Technical advisors Instrument and. control technicians Electrical maintenance personnel Mechanical maintenance personnel Radiological protection technicians Chemistry technicians Onsite technical staff and managers Attachment 1 Page 3


045   Evaluation Criteria. Elements'which must be considered when assessing a licensee's performance in a functional ares.
045 Evaluation Criteria. Elements'which must be considered when assessing a licensee's performance in a functional ares.
                  ,i
,i a.
: a. The evaluation criteria are as follows:
The evaluation criteria are as follows:
                    ,            1. Management involvement in assuring quality .
1.
: 2. Approach to resolution of technic'al issues from safety standpoint .          .
Management involvement in assuring quality.
                                                                                  '      ~
2.
: 3. Responsiveness to NRC initiatives
Approach to resolution of technic'al issues from safety standpoint.
: 4. Enforcement history .                                     -
~
3.
Responsiveness to NRC initiatives 4.
Enforcement history.
5.
5.
Reporting and analysis of _ reportable events
Reporting and analysis of _ reportable events 6.
: 6. Staffing (including management)                       ,
Staffing (including management) 7.
: 7. Training effectiveness and qualification
Training effectiveness and qualification b.
: b. Guidance for us+ng these criteria to arrive at a category assignment is found in the Appendix to this Chapter.
Guidance for us+ng these criteria to arrive at a category assignment is found in the Appendix to this Chapter.
I l
I l
1 l
1 l
t l
t l
\
\\
ATTACIDfDJT 2 l                                                                                                               e
ATTACIDfDJT 2 l
e


EVALUATION ClllTEltIA WITil ATThll3UTES FOR ASSESSMLHT OF LICENSEE PEhFORMANCE 1.
EVALUATION ClllTEltIA WITil ATThll3UTES FOR ASSESSMLHT OF LICENSEE PEhFORMANCE 1.
MAN AGEMENT INVOLVEMENT AND CONTROL IN ASSURING QtfALITY Category 1                           Caterory 2                             Category 3 consistent evidence of prior plan-     evidence of prior planning ning and assignment of priorities;                                       littic evidence of prior planning and assignment of prioritiest     and assignment of priorities; well stated, controUed and explicit   stated, defined procedures         poorly stated or ill understood procedures for control of activities   for control of activities         procedures for control of activities well stated, disseminated and under-   adequately stated and under-standable policies                                                        poorly stated, poorly understood stood policies                     or non-existent policies decision making consistently at a       decision making usuauy at a       decision making seldom at a level level that ensures adequate           level that ensures adequate management review                                                          that ensures adequate management management review                   review corporate management frequently         corporate management usuaUy       corporate r.anagement seldom involved in site activities             involved in site activities       involved in site activities audits complete, timely and thorough   audits generally complete,         audits frequently not timely, and thorough                       incomplete or not thorough committecs properly staffed and         committees usuauy properly functioning.in abnost au cases                                             committees not properly staffed staffed and functioning           or functioning -
MAN AGEMENT INVOLVEMENT AND CONTROL IN ASSURING QtfALITY Category 1 Caterory 2 Category 3 consistent evidence of prior plan-evidence of prior planning littic evidence of prior planning ning and assignment of priorities; and assignment of prioritiest and assignment of priorities; well stated, controUed and explicit stated, defined procedures poorly stated or ill understood procedures for control of activities for control of activities procedures for control of activities well stated, disseminated and under-adequately stated and under-poorly stated, poorly understood standable policies stood policies or non-existent policies decision making consistently at a decision making usuauy at a decision making seldom at a level level that ensures adequate level that ensures adequate that ensures adequate management management review management review review corporate management frequently corporate management usuaUy corporate r.anagement seldom involved in site activities involved in site activities involved in site activities audits complete, timely and thorough audits generally complete, audits frequently not timely, and thorough incomplete or not thorough committecs properly staffed and committees usuauy properly committees not properly staffed functioning.in abnost au cases staffed and functioning or functioning -
reviews timely, thorough and           reviews generally timely,         reviews not timely, thorough or technically sound                       thorough and technically sound     technicauy sound records complete, weU maintained       records generaUy complete, weu     records not complete, not weu nnd available                           maintained and avcDable
reviews timely, thorough and reviews generally timely, reviews not timely, thorough or technically sound thorough and technically sound technicauy sound records complete, weU maintained records generaUy complete, weu records not complete, not weu nnd available maintained and avcDable
* rr.aintained or unavaUable procedures and policies strictly       procedures and policies rarely     procedures and poUcies ocea-adhered to                             violated                           sionauy violated corrective action systems promptly     corrective action systems         corrective action systen s rarely and consistently recognize and         generally recognize and             recognize and address non-address non reportable concerns         address non reportable concerns   reportable concerns procurement weu controued and           procurement generally weU documented                                                                repetitive breakdown in procure-controUed and documented           ment control design weU controUed and verified       rare breakdowns of minor           repetitive breakdown in designs significance in design control     control or verification or verification
* rr.aintained or unavaUable procedures and policies strictly procedures and policies rarely procedures and poUcies ocea-adhered to violated sionauy violated corrective action systems promptly corrective action systems corrective action systen s rarely and consistently recognize and generally recognize and recognize and address non-address non reportable concerns address non reportable concerns reportable concerns procurement weu controued and procurement generally weU repetitive breakdown in procure-documented controUed and documented ment control design weU controUed and verified rare breakdowns of minor repetitive breakdown in designs significance in design control control or verification or verification 2.
: 2. APPROACl! TO RESOLUTION OF TECllNICAL ISSUES FROM A SAFETY STANDPolNT Category 1                             Category 2                             Category 3               .
APPROACl! TO RESOLUTION OF TECllNICAL ISSUES FROM A SAFETY STANDPolNT Category 1 Category 2 Category 3 glear understanding of issues understanding of issues understanding of issues demonstrated generally apparent frequently lacking conservatism routinely exhibited conservatism generauy exhibited sneets minimum requirements when potential for safety significance exists technicauy sound and thorough viable and generally sound and of ten viable approaches, but approaches in almost all cases thorough approaches lacking in thoroughness or g
glear understanding of issues           understanding of issues           understanding of issues demonstrated                           generally apparent                 frequently lacking conservatism routinely exhibited       conservatism generauy exhibited   sneets minimum requirements when potential for safety significance exists technicauy sound and thorough           viable and generally sound and     of ten viable approaches, but approaches in almost all cases         thorough approaches               lacking in thoroughness or g
depth timely resolutions in almost all generally timely resolutions resolutions often delayed cases 3.
depth                                       ,
RESPONSIVENESS TO NRC INITIATIVES Category 1 Category 2 Cat eged meets deadlines generally timely responses frequently requires ester.sions of tune timely resolution of issues few longstanding regulatory longstandst regulatory issues issues attr6t'utatele to licennet altributable to hetnSee ATTAC1LMEFT 3 Page 1
timely resolutions in almost all       generally timely resolutions       resolutions often delayed cases
: 3. RESPONSIVENESS TO NRC INITIATIVES Category 1                             Category 2                             Cat eged meets deadlines                       generally timely responses frequently requires ester.sions of tune timely resolution of issues           few longstanding regulatory       longstandst regulatory issues issues attr6t'utatele to licennet altributable to hetnSee ATTAC1LMEFT 3 Page 1


  +.
+.
                . teclinically sound and thorough         viable and generally sound and       of ten viable rssp:nses, but lacking in tht> roughness of responses in almost all cases             thorough responses                 dcpth acceptable resolutions proposed         acceptable resolutions generally     considerable NRC effort nr initially in most cases                 proposed                             repeated submittals needed to obtain acceptable resolutions
. teclinically sound and thorough viable and generally sound and of ten viable rssp:nses, but lacking in tht> roughness of responses in almost all cases thorough responses dcpth acceptable resolutions proposed acceptable resolutions generally considerable NRC effort nr initially in most cases proposed repeated submittals needed to obtain acceptable resolutions 4.
: 4. ENFORCEMENT HISTORY Category 1                                 Category 2                           Category 3 major violations are rare and are         major violations are rare and may multiple major violations or
ENFORCEMENT HISTORY Category 1 Category 2 Category 3 major violations are rare and are major violations are rare and may multiple major violations or not indicative of programmatic indicate minor programmatic programmatic breakdown breakdown breakdown indicated minor violations are not repetitive multiple minor violations or minor violations are repetitive and not indicative of programmatic minor programmatic breakdawn and indicative of programmatic breakdown indicated breakdown corrective action is prompt and corrective action is timely corrective action is delayed effective and effective in most cases or not effective 5.
.                not indicative of programmatic           indicate minor programmatic         programmatic breakdown breakdown                                 breakdown                           indicated minor violations are not repetitive       multiple minor violations or       minor violations are repetitive and not indicative of programmatic       minor programmatic breakdawn         and indicative of programmatic breakdown                                 indicated                           breakdown corrective action is prompt and           corrective action is timely         corrective action is delayed effective                                 and effective in most cases         or not effective
REPORTING AND ANALYSIS OF REPORTABLE EVENTS Category 1 Categoryj Category 3 events promptly and ccmpletely events are reported in a timely event reperting is frequently late reported manner, some information may or incomplete be lacking events are properly identified events are accurately identified, events are poorly identified or and analyzed some analyses are marginal analyses are mangmal, events are associated with programmatic weaknesses corrective action is effective corrective action is usuaUy corrective action is not timely as indicated oy lack of repetition taken but may not be effective nor effective, events are as indicated by occasional repetitive repetition 6.
: 5. REPORTING AND ANALYSIS OF REPORTABLE EVENTS Category 1                         -
STAFFING (INCLUDING MANAGEMENT)
Categoryj                             Category 3 events promptly and ccmpletely           events are reported in a timely       event reperting is frequently late reported
Caterosy 1 Category 2 Category 3 positions are identified, authorities key positions are identified, positions are poorly identified, and responsibilities are weu defined and authorities and responsi*
* manner, some information may         or incomplete be lacking events are properly identified           events are accurately identified,     events are poorly identified or and analyzed         .                    some analyses are marginal           analyses are mangmal, events are associated with programmatic weaknesses corrective action is effective           corrective action is usuaUy           corrective action is not timely as indicated oy lack of repetition       taken but may not be effective       nor effective, events are as indicated by occasional           repetitive repetition
or authorities and responsibil.
: 6. STAFFING (INCLUDING MANAGEMENT)
bilities are defined ities are (U defined vacant key positions are filled key positions ususUy filled key positions are left vacant on priority basis in a reasonable time for extended periods of time staffing is ample as indicated by staffing is adequate, staffing is weak or minimal ns control over backlog and overtime occasional ddficulties with indicated by eacessive backlog backlog or overtime and overtime 7.
Caterosy 1                             Category 2                           Category 3 positions are identified, authorities   key positions are identified,         positions are poorly identified, and responsibilities are weu defined     and authorities and responsi*         or authorities and responsibil.
TRAINING AND QUALIFICATION EFFECTIVENESS Category 1 Category 2 Category 3 training and qualification program training and hualification training and quahfication makes a positive contribulton, program conttsbutes to an program is found to be the commensurate with procedures adequate understanding of major contributmg factor to and staffing, to understanding work and fair adherence poor understanding of work, of work and adherence to procedures to procedures with a modest as indicated by numerous proce-with few personnel errors number of personnel errors dure violations or personnel errors training program is weU defined a defined program is program may be either lacking.
bilities are defined                 ities are (U defined vacant key positions are filled         key positions ususUy filled           key positions are left vacant on priority basis                       in a reasonable time                 for extended periods of time staffing is ample as indicated by       staffing is adequate,                 staffing is weak or minimal ns control over backlog and overtime       occasional ddficulties with           indicated by eacessive backlog backlog or overtime                   and overtime
and implemented with dedicated implemented for a large portion poorly defined, or ineffectively resources and a means for feed of the staff appbed for a signdicant segment back esperience; program is applied of the staff to nearly su staff ATTACletENT 3 Page 2 e
: 7. TRAINING AND QUALIFICATION EFFECTIVENESS Category 1                             Category 2                           Category 3 training and qualification program       training and hualification           training and quahfication makes a positive contribulton,           program conttsbutes to an           program is found to be the commensurate with procedures             adequate understanding of           major contributmg factor to and staffing, to understanding           work and fair adherence             poor understanding of work, of work and adherence to procedures       to procedures with a modest         as indicated by numerous proce-with few personnel errors                 number of personnel errors           dure violations or personnel errors training program is weU defined           a defined program is                 program may be either lacking.
and implemented with dedicated           implemented for a large portion     poorly defined, or ineffectively resources and a means for feed           of the staff                         appbed for a signdicant segment back esperience; program is applied                                           of the staff to nearly su staff                                                                           ATTACletENT 3 e
Page 2


  /*
/*
4 Criteria for Use in Evaluating Training Asetional Area Catenarv 1                               Category 2                             Category 3 management frequently involved in         management occasionally involved       management seldom involved in review of training activities             in review of training activities       review of training activities acceptable resolution to NRC train-       acceptable resolution generally     , considerable NRC effort needed ing initiatives proposed initially       proposed                               to obtain acceptable resolutions in most cases few significant events have occurred     occasional significant events have     frequent significant events have that are indicative of a training         occurred that are indicative of a     occurred that are indicative of a deficiency                               training deficiency                   training deficiency
4 Criteria for Use in Evaluating Training Asetional Area Catenarv 1 Category 2 Category 3 management frequently involved in management occasionally involved management seldom involved in review of training activities in review of training activities review of training activities acceptable resolution to NRC train-acceptable resolution generally considerable NRC effort needed ing initiatives proposed initially proposed to obtain acceptable resolutions in most cases few significant events have occurred occasional significant events have frequent significant events have that are indicative of a training occurred that are indicative of a occurred that are indicative of a deficiency training deficiency training deficiency
                                                                                                                                                  *h 8
*h 8
Attachment 3                            :
Page 3 9
Page 3 9


                '  ~
~
Performance Cateoories.' ~ % rating of licensee perforsynce in a given functional area.
Performance Cateoories.' ~ % rating of licensee perforsynce in a given functional area.
                      ,        s. Cateoory 1 Reduced 'NRC attention say be appropriate. Licensee management attentierr and . involvement are aggressiv' e and oriented toward
s.
                                  . nuclear safety; licenset resources are ample and effectivsly         J used so that a high level.of perfo'rmance with respect to operational safety or construction is being achieved. , .,
Cateoory 1 Reduced 'NRC attention say be appropriate. Licensee management attentierr and. involvement are aggressiv' e and oriented toward
: b.     Catenory 2             ,  ,
. nuclear safety; licenset resources are ample and effectivsly J
NRC attention should be maintained at normal levels. Lican-see management attention and involvement are evident and are concerned with nuclear safety; licensee resou'rces are ade-quate and reasonably effective so that satisfactory perform-ance with respect to operational safety or construction is being achieved.                  .
used so that a high level.of perfo'rmance with respect to operational safety or construction is being achieved.,
: c.   ' Category 3
b.
* Both NRC and licensee attention should be increased. Licen-see management attention or involvement is acceptable and considers nuclear safety, but weaknesses are evident; licen-see resources appear to be strained or not effectively used so that minimally satisfactory performance with respect to operational safety or construction is being achieved.
Catenory 2 NRC attention should be maintained at normal levels. Lican-see management attention and involvement are evident and are concerned with nuclear safety; licensee resou'rces are ade-quate and reasonably effective so that satisfactory perform-ance with respect to operational safety or construction is being achieved.
c.
' Category 3 Both NRC and licensee attention should be increased.
Licen-see management attention or involvement is acceptable and considers nuclear safety, but weaknesses are evident; licen-see resources appear to be strained or not effectively used so that minimally satisfactory performance with respect to operational safety or construction is being achieved.
O e
O e
ATTACIDENT 4 9
ATTACIDENT 4 9


                                                                                                  *                                                                            .a.
.a.
H       M   P       A3 At     t/1       M     "Tl
H M
        'S      3    a.      c  se f./1   *E     3t3 "U
P A3 At t/1 M
* D      N  n    3m >
"Tl f./1
                                        #D         3     *.
*E 3t3 "U
                                                                .cg    su     ew   .-.e
'S 3
                                  -eg   n         op   =g             .a. gg   >
a.
{       {   4   CL ==* C C         *1   S     .<
c se
3       a. 3
#D 3
        ;      g  ?,   2.-^           3.       'S     o            2         .
.c su ew
a       et
.-.e D
: a. 3M       *.    #        3     -1       -*    3.     O   O
N n
.                    3 MT
3m >
: a. 3     M         n     O       w     w     to   t
-eg n
* M 3 to           to               k     e       .      3       a. sw M *1                            89      3      n      n      1
op
* e  3*    1O                  . "O     n       n     89     m   m n   me to                       1   e       et           -*  e O   e. a. as                         O O   <-  < g n    0                              -
=g g
4     a. ft M y    a                    o    a                                                                                      .
.a.
                                                  -1                       . 3   M                                                                   *
gg
                %  'l   n.                       E                          "                                                                            -
{
                'S so   O3                       3                           O
{
: g. M   3 cm                     so                         -
4 CL==*
n        ,r+                       M                           M
C C
                -                                 M o       O
*1 S
                =       ;;;'      .                                        .
3 a.
                                    '                                                                        a s
3 g
t-
?,
                                                  .                                          Management Involvement in                                       t           si Assuring Quality                       .
2.-^
                                                                                                                                              .,                    y do v,
3.
m   z Approach to Resolution of                           .
'S 2
g    g Technical Issues from a                     -                        g g Safety Standpoint                           .
o a.
d     ;
3M 3
o
-1 3.
                                                                                                                                                                    =    -1
O O
:ie g Responsiveness to NRC                                                 3     o Initiatives                      *,
a et 3
A    ;P, Enforcement History M $
a.
                                                                        .                                                                                                d 2
3 M
                                                                                                                                                                .        m Reporting and Analysis of                     .
n O
R
w w
                              .                                          .                  Reportable Events
to t
  =                                                                                                                                 .              .
3 to MT to k
e 3
a.
sw M
M *1
. "O n
n 89 m
m 89 3
n n
1 3*
1O e
n me to 1
e et e
O e.
: a. as O
n 0
O
< g y
a o
a 4
a.
ft M
-1 3
M
'l E
n.
'S so O3 3
O g.
M 3 cm so
,r+
M M
n M
-o O
=
,,,s a
t-Management Involvement in t
si Assuring Quality y
d v,
o m
z Approach to Resolution of g
g Technical Issues from a g
g Safety Standpoint d
o=
-1
:ie g
Responsiveness to NRC Initiatives 3
o A
;P, M
Enforcement History d
2m Reporting and Analysis of R
Reportable Events
"=
n
n
[         ,
[
Staffing (including Management)                                     '
Staffing (including Management)
E                                                           -
E u.
u.
Training and Qualification Effectiveness m
Training and Qualification Effectiveness
* m


Sample Performanca Analysis
Sample Performanca Analysis 4.
: 4. Surveillance The surveillance program has been inspected on a monthly basis by       '
Surveillance The surveillance program has been inspected on a monthly basis by the resident inspectors throughout this SALP period.
the resident inspectors throughout this SALP period. (See also Section IV.5, Fire Protection).
(See also Section IV.5, Fire Protection).
During this SALP period the licensee asked the NRC for, and received, Technical Specifications changes to delay surveillances because of outage delays. Bowever, good planning and scheduling techniques and stronger usangement control could have precluded the need for some of these changes. Even though specific surveillance tests were covered in certain Technical Specifications changes, there have been a ausber of licensee event reports (LERs) written on missed surveillances.
During this SALP period the licensee asked the NRC for, and received, Technical Specifications changes to delay surveillances because of outage delays. Bowever, good planning and scheduling techniques and stronger usangement control could have precluded the need for some of these changes. Even though specific surveillance tests were covered in certain Technical Specifications changes, there have been a ausber of licensee event reports (LERs) written on missed surveillances.
In general, there was a decline in the licensee's performance in this area. partially in response to NRC criticism of this area, the licassee has instituted a daily asnagement meeting in which the status of surveillances is discussed. The effectiveness of this meeting in eliminating missed surveillances is yet to be
In general, there was a decline in the licensee's performance in this area. partially in response to NRC criticism of this area, the licassee has instituted a daily asnagement meeting in which the status of surveillances is discussed. The effectiveness of this meeting in eliminating missed surveillances is yet to be determined by the inspectors.
;                determined by the inspectors.
I An item of noncompliance issued during this SALP period dealt with j
I An item of noncompliance issued during this SALP period dealt with j
the failure to meet surveillance and technical specification requirements on parse valve leakage. The licensee did not respond l               in a timely usaner to the failure of the surveillance because of an apparent lack of awareness of Technical Specifications by the engineer in charge of the work. This illustrates the fact that there any not be proper sensitivity at all levels in the organization on issues important to safety or, as *the inspectors i               have stated in past inspection reports, there may be a ceamunications problem between people within the operating organisations. The 12R synopsis (Table 5) La this SALP report indicates that a ausber of reports have been issued which are surveillance related. Ceemusications related problems contributed
the failure to meet surveillance and technical specification requirements on parse valve leakage. The licensee did not respond l
* to a number of these IIRs.                                                 ,
in a timely usaner to the failure of the surveillance because of an apparent lack of awareness of Technical Specifications by the engineer in charge of the work. This illustrates the fact that there any not be proper sensitivity at all levels in the organization on issues important to safety or, as *the inspectors i
Conclusion
have stated in past inspection reports, there may be a ceamunications problem between people within the operating organisations. The 12R synopsis (Table 5) La this SALP report indicates that a ausber of reports have been issued which are surveillance related. Ceemusications related problems contributed to a number of these IIRs.
          . performance assessment - Category 3. This represents a decline in perforssace from the Category 2 assigned during the previous SALP cycle.                                               .                          #
Conclusion performance assessment - Category 3.
This represents a decline in perforssace from the Category 2 assigned during the previous SALP cycle.
Board Receamendation Increased awareness of and attention to related Technical Specifications requirements should be demonstrated by persons involved la scheduling, performing, and reviewing surveillance activities.
Board Receamendation Increased awareness of and attention to related Technical Specifications requirements should be demonstrated by persons involved la scheduling, performing, and reviewing surveillance activities.
ATTACIMENT 6 L
ATTACIMENT 6 L


4     V DRAFT     ,
4 V
SUPPORTING DATA FOR' RANCHO SECO'SALP (12/1/83 - 5/31/85)
DRAFT SUPPORTING DATA FOR' RANCHO SECO'SALP (12/1/83 - 5/31/85)
OPERATION ACTIVITIES LICENSEE EVENT REPORTS (LERs)
OPERATION ACTIVITIES LICENSEE EVENT REPORTS (LERs)
SYNOPSIS OF LERs ENFORCEMENT ITEMS INSPECTION AND ENFORCEMENT  
SYNOPSIS OF LERs ENFORCEMENT ITEMS INSPECTION AND ENFORCEMENT  


==SUMMARY==
==SUMMARY==
ATTACHMENT 7 i
ATTACHMENT 7 i
l
l
Line 293: Line 369:
OPERATION ACTIVITIES During the first three months of the SALP period the plant operated within the range of approximately sixty to ninety percent power except for two automatic reactor trips. The first trip occurred on December 3, 1983 while troubleshooting the "A" inverter power supply. The second reactor trip occurred on February 29, 1984, when the "A" reactor coolant pump tripped off line in coincidence with a power oscillation on the power grid, and the plant was not able to respond and automatically tripped.
OPERATION ACTIVITIES During the first three months of the SALP period the plant operated within the range of approximately sixty to ninety percent power except for two automatic reactor trips. The first trip occurred on December 3, 1983 while troubleshooting the "A" inverter power supply. The second reactor trip occurred on February 29, 1984, when the "A" reactor coolant pump tripped off line in coincidence with a power oscillation on the power grid, and the plant was not able to respond and automatically tripped.
On March 19, 1984 while the plant was operating at ninety-two percent power a leak of the main generator cooling medium, hydrogen gas, developed into an explosive mixture in the space between the main generator and the high pressure turbine. A major explosion and subsequent fire occurred. The fire was extinguished by the carbon dioxide fire protection system within fourteen minutes. The operators manually tripped the turbine and reactor. The incident was declared an unusual event.
On March 19, 1984 while the plant was operating at ninety-two percent power a leak of the main generator cooling medium, hydrogen gas, developed into an explosive mixture in the space between the main generator and the high pressure turbine. A major explosion and subsequent fire occurred. The fire was extinguished by the carbon dioxide fire protection system within fourteen minutes. The operators manually tripped the turbine and reactor. The incident was declared an unusual event.
The licensee brought the plant back to power on April 15, 1984, after completion of repair and maintenance activities. The plant operated at approximately ninety percent power from April 25 through June 1, with exception of a seven day period where the power was reduced to fifty percent to repair a condenser tube leak. On June 1, the reactor experienced an automatic trip due to feedwater overspeed. The plant returned to power and operated at ninety-two percent through July 3, until the plant was manually shutdown for the first of three steam generator tube leak repairs. The plant remained in cold shutdown until August 12 while a licensee investigation of piping fittings was performed. The plant was brought back to power u 11 August 31whentheplantwasagainmanuallyshutdownduetothesecon[d"B" steam generator tube Icak. The plant started back to power on October 7, but was shutdown for a "A" steam generator tube leak. The plant returned to power operation on October 11 and had to be shutdown on October 13 to investigate a hot spot on the main generator lead box. Repairs were made and the plant was on line on October 19. The plant remained in operation until the end of December although power was reduced due to feedwater heater leaks. A six day outage occurred to repair the known leak in the feedwater heater system and ended on January 6, 1985 when the plant went critical. The plant remained on line at various power icvels until March 15, 1985, when the licensee began the Cycle seven refueling outage.
The licensee brought the plant back to power on April 15, 1984, after completion of repair and maintenance activities. The plant operated at approximately ninety percent power from April 25 through June 1, with exception of a seven day period where the power was reduced to fifty percent to repair a condenser tube leak. On June 1, the reactor experienced an automatic trip due to feedwater overspeed. The plant returned to power and operated at ninety-two percent through July 3, until the plant was manually shutdown for the first of three steam generator tube leak repairs. The plant remained in cold shutdown until August 12 while a licensee investigation of August 31whentheplantwasagainmanuallyshutdownduetothesecon[d"B" piping fittings was performed. The plant was brought back to power u 11 steam generator tube Icak. The plant started back to power on October 7, but was shutdown for a "A" steam generator tube leak. The plant returned to power operation on October 11 and had to be shutdown on October 13 to investigate a hot spot on the main generator lead box. Repairs were made and the plant was on line on October 19. The plant remained in operation until the end of December although power was reduced due to feedwater heater leaks. A six day outage occurred to repair the known leak in the feedwater heater system and ended on January 6, 1985 when the plant went critical. The plant remained on line at various power icvels until March 15, 1985, when the licensee began the Cycle seven refueling outage.
ATTACl! MENT 7 Page 1
ATTACl! MENT 7 Page 1


p     - . _ _ .
p
  .?
.?
RANCHO SECO Licensee Event Reports Table (12/01/83 - 05/31/85)
RANCHO SECO Licensee Event Reports Table (12/01/83 - 05/31/85)
LER       TITLE                                                                                       SALP AREA /CAUSE CODE
LER TITLE SALP AREA /CAUSE CODE
* 83-38     DHR PUMP B SUCTION VALVE FROM                                                                         4/E BWST FAILED TO OPEN 83-39     OPERABLE PRESSURIZER LEVEL                                                                           4/A D CHANNELS BELOW MINIMUM TECli.                                                                         9/D SPEC.
* 83-38 DHR PUMP B SUCTION VALVE FROM 4/E BWST FAILED TO OPEN 83-39 OPERABLE PRESSURIZER LEVEL 4/A D CHANNELS BELOW MINIMUM TECli.
83-40     INCORRECTLY SIZED AUXILIARY                                                                           9/B FEED FLOW ORIFICES                                                                                   11/B 83-41     COOLING WATER FOUND ISOLATED                                                                         1/D FROM AUX. FEED PUMP TURBINE                                                                           4/D BEARINGS 83-37-01 REACTOR BUILDING EMERCENCY                                                                             4/D Followup SUMP VALVE FAILED TO OPEN DURING SURVEILLANCE TEST 84-01     EXHAUST FAN BEARING FAILURE                                                                           2/E 84-02     SUBMITTAL OF ISI RESULTS REPORT TO NRC LATE                                                           9/A,C 84-03     PROCEDURE WRITTEN IN CONTRADICTION TO                                                                 4/D TECH. SPECS.
9/D SPEC.
84-05     EMERGENCY SIREN MALFUNCTION                                                                           6/E 84-06     FIRE BRIGADE. TRAINING                                                                               5/X 9/X 84-04     METEOROLOGICAL TOWER POWER FAILURE                                                                   6/E 84-07     REACTOR TRIP                                                                                           1/E 84-08     FAILURE OF ION CllROMATOCRAPH       .
83-40 INCORRECTLY SIZED AUXILIARY 9/B FEED FLOW ORIFICES 11/B 83-41 COOLING WATER FOUND ISOLATED 1/D FROM AUX. FEED PUMP TURBINE 4/D BEARINGS 83-37-01 REACTOR BUILDING EMERCENCY 4/D Followup SUMP VALVE FAILED TO OPEN DURING SURVEILLANCE TEST 84-01 EXHAUST FAN BEARING FAILURE 2/E 84-02 SUBMITTAL OF ISI RESULTS REPORT TO NRC LATE 9/A,C 84-03 PROCEDURE WRITTEN IN CONTRADICTION TO 4/D TECH. SPECS.
2/B.E 84-09     LIFTING SLING FAILURE                                 ,                                              3/D 4
84-05 EMERGENCY SIREN MALFUNCTION 6/E 84-06 FIRE BRIGADE. TRAINING 5/X 9/X 84-04 METEOROLOGICAL TOWER POWER FAILURE 6/E 84-07 REACTOR TRIP 1/E 84-08 FAILURE OF ION CllROMATOCRAPH 2/B.E 84-09 LIFTING SLING FAILURE 3/D
                                                                                                                                ,9/D 84-10     FAILURE TO COMPLETE SURVEILLANCE PROCEDURE ''                                                         9/D i
,9/D 4
84-12     MISSED STACK SAMPLE                                       ,
84-10 FAILURE TO COMPLETE SURVEILLANCE PROCEDURE ''
2/A 84-11       INCORRECT CONFIGURATION TABLE IN'                         -
9/D i
4/D SURVEILLANCE PROCEDURE 84-13     SECURED !!IGli RADIATION AREA DOORS OPEN                                                             2/A l
84-12 MISSED STACK SAMPLE 2/A 84-11 INCORRECT CONFIGURATION TABLE IN' 4/D SURVEILLANCE PROCEDURE 84-13 SECURED !!IGli RADIATION AREA DOORS OPEN 2/A l
* Cause Codes identified in LER Synopsis Table.
* Cause Codes identified in LER Synopsis Table.
Attachment 7 Page 2
Page 2


r     ,
r
    .p '
.p '
E*
E*
LER       TITLE                                         SALP FUNCTIONAL AREA CAUSE CODE 84-14     SURVEILLANCE PROCEURE SP 205.02                               ' 4/D,A 84-15     RELATED INCIDENTS TO HYDROCEN EXPLOSION                         1/E 3/D 84-16     CONTAINMENT ISOLATION VALVE STROKE TIME                         4/D IN EXCESS OF TECH. SPEC. LIMIT-                           .
LER TITLE SALP FUNCTIONAL AREA CAUSE CODE 84-14 SURVEILLANCE PROCEURE SP 205.02
84-17     CORE FLOOD TANK VENT VALVE         ,
' 4/D,A 84-15 RELATED INCIDENTS TO HYDROCEN EXPLOSION 1/E 3/D 84-16 CONTAINMENT ISOLATION VALVE STROKE TIME 4/D IN EXCESS OF TECH. SPEC. LIMIT-84-17 CORE FLOOD TANK VENT VALVE 1/D 83-0301 TESTING OF MASTER REACTOR TRIP RELAY 4/D Follow-up 1/E 84-18 PLANT TRIP i
1/D 83-0301   TESTING OF MASTER REACTOR TRIP RELAY                           4/D Follow-up 84-18     PLANT TRIP                                           i         1/E 84-19     AMBIENT STARTUP OF DIESEL CENERATOR                             4/D 84-20     TUBE LEAK OF REACTOR TRIP                                       1/E 2/E 84-18-01 PLANT TRIP - FOLLOW-UP                                           1/E 84-21     FAILURE OF SURVEILLANCE PROCEDURE TO SATISFY                   4/D                         i TECH SPECS 83-40-01 AUXILIARY FEEDWATER FLOW ORIFICES Revision 84-22     TUBE LEAK                                                       1/E 84-24     SIf.0LTANEOUS PLANT llEATUP AND DEB 0 RATION                     1/A 84-25     FEACTOR TRIP                                                     1/E 84-23     F1.TER TESTING                                                   4/D 84-22-01 TUBE L"*                                                           2/E Supplement 84-23-01 FILTER TESTING                                                     4/A Follow-up                                                                   9/A 85-01     LOSS OF CONTAINMENT INTEGRITY VIA OPEN                           2/A VALVES                                                           9/D 85-02     UNRESTRAINED HEAVY LOAD IN REACTOR BUILDING                     3/A 85-03     INCORRECT BORON CONCENTRATION TECll                             1/C SPEC LIMIT                                                       9/C 85-04     FIRE DAMPERS NOT INSTALLED                                       5/B Attachment 7 Pago 3
84-19 AMBIENT STARTUP OF DIESEL CENERATOR 4/D 84-20 TUBE LEAK OF REACTOR TRIP 1/E 2/E 84-18-01 PLANT TRIP - FOLLOW-UP 1/E 84-21 FAILURE OF SURVEILLANCE PROCEDURE TO SATISFY 4/D i
TECH SPECS 83-40-01 AUXILIARY FEEDWATER FLOW ORIFICES Revision 84-22 TUBE LEAK 1/E 84-24 SIf.0LTANEOUS PLANT llEATUP AND DEB 0 RATION 1/A 84-25 FEACTOR TRIP 1/E 84-23 F1.TER TESTING 4/D 84-22-01 TUBE L"*
2/E Supplement 84-23-01 FILTER TESTING 4/A Follow-up 9/A 85-01 LOSS OF CONTAINMENT INTEGRITY VIA OPEN 2/A VALVES 9/D 85-02 UNRESTRAINED HEAVY LOAD IN REACTOR BUILDING 3/A 85-03 INCORRECT BORON CONCENTRATION TECll 1/C SPEC LIMIT 9/C 85-04 FIRE DAMPERS NOT INSTALLED 5/B Pago 3


g,         .
g, h*
h*
e
e     ., 4 DRAFT SPECIAL REPORT                                                   TITLE                                             AREA /CAUSE 83-08                                                       ERROR IN COMPUTER CODE FOR                           2/B,D OFFSITE DOSE CALCULATIONS t
., 4 DRAFT SPECIAL REPORT TITLE AREA /CAUSE 83-08 ERROR IN COMPUTER CODE FOR 2/B,D OFFSITE DOSE CALCULATIONS t
1 4
1 4
p
p
                                                                                                              /                     }
/
                                                                                                                .y - s a
}
s A s p
.y -
1 Attachment 7 Page 4
s a
s A
s p
1 Page 4


e i
e i
SYNOPSIS OF LICENSEE EVENT REPORTS **
SYNOPSIS OF LICENSEE EVENT REPORTS **
Functional                         SALP Cause Code
Functional SALP Cause Code
* Area                       A     B,   C,   D       E,         X               Totals
* Area A
: 1. Plant Operations           1     0   1   2       7           0                 11
B, C,
                -2. Radiation Protection       3     1   0   0'     4           0                   8
D E,
: 3. Maintenance               1     0   0     2     0           0                   3
X Totals 1.
: 4. Surveillance               3     0   0   10       2           0                 15
Plant Operations 1
: 5. Fire Protection           0     1   0   0       0           1                   2     ,
0 1
: 6. Emergency Preparedness     0     0   0   0       2           0                   2
2 7
: 7. Safeguards                 0     0   0   0       0           0                   0 t' . Refueling                 0     0   0   0       0           0                   0
0 11
: 9. Quality Programs and       2     1   2     4     0           1                 10 Administrative Controlu Affecting Safety                                                                                   ,
-2.
: 10. Licensing                   0     0   0   0       0           0                   0-
Radiation Protection 3
: 11. Engineering and             0     1   0     0     0           0                   1     .
1 0
0' 4
0 8
3.
Maintenance 1
0 0
2 0
0 3
4.
Surveillance 3
0 0
10 2
0 15 5.
Fire Protection 0
1 0
0 0
1 2
6.
Emergency Preparedness 0
0 0
0 2
0 2
7.
Safeguards 0
0 0
0 0
0 0
t'. Refueling 0
0 0
0 0
0 0
9.
Quality Programs and 2
1 2
4 0
1 10 Administrative Controlu Affecting Safety
: 10. Licensing 0
0 0
0 0
0 0-
: 11. Engineering and 0
1 0
0 0
0 1
4 Construction
4 Construction
: 12. Training                     0     0   0   0       0           0                   0 TOTALS         10     4   3   18   .15           2                 52
: 12. Training 0
0 0
0 0
0 0
TOTALS 10 4
3 18
.15 2
52
* Cause Codes:
* Cause Codes:
A-Personnel Error B-Design. Manufacturing or Installation Error           ,                                  ,
A-Personnel Error B-Design. Manufacturing or Installation Error C-External Cause
C-External Cause
.D-Defective Procedures
                  .D-Defective Procedures
'E-Component Failure ~
                  'E-Component Failure ~                                                         .
1 X-Other i
1 X-Other                                                   ,
l
i
.m Synopsis includes LER Nos. 83-38 through 85-04 i,,-
                **                                                                l         .m Synopsis includes LER Nos. 83-38 through 85-04       *
i NOTE:
                                                                                .,      i,,-                   ,
Several LER's categorized in multiple. areas of cause codes _---
i NOTE:       Several LER's categorized in multiple. areas of cause codes _---                   l
l follow-up LER's which do not. identify additional areas or causes
!                          follow-up LER's which do not. identify additional areas or causes
(
(                           were not double accounted along'with the original LER during'this           '
were not double accounted along'with the original LER during'this period.
period.
Attachment 7 !
Pago 5
Pago 5


h r
h r
Table Rancho Seco Enforcement Items (12/01/83 - 05/31/85)
Table Rancho Seco Enforcement Items (12/01/83 - 05/31/85)
Inspection Report No.           '<  Subject ,         . Severity Level                                                     Functional Area 83-34             Failure of PRC to review temporary                                                   '1V                   9 change to emergency dicac1 generator operating procedure.
Inspection Report No.
Failure of PRC to review a                                                                 IV               9 temporary change to an incore instrument. surveillance proceu(y@.
Subject,
Inadequate control of abnormal tags.                                                               V       9 83-36             Failure to follow revised pro-cedure for hydrogen monitor and purge system.
. Severity Level Functional Area 83-34 Failure of PRC to review temporary
Continued operation without                                           IV                                   1 minimum required operable pressurizer level instruments.
'1V 9
84-02             PRC did not evaluato Technical Specification violations                                               IV                               9 (2 examplen)
change to emergency dicac1 generator operating procedure.
PRC did not review Abnormal Tags                                       IV                               9 Inadequate PRC membership                                                     V                       9 PRC failed to review                                                           V                       9 proceduto changes Failure to document PRC                                                       V                       9 determination of procedure review Failure to document PRC                                                         V                       9 datormination as to unreviewed safety questions MSRC did not review QA audit                                           IV                               9 reports Tardy responses to QA audit                                           IV                               9 findings Use of out-of-date equipment                                           IV                               9 classification documents by Hafntenance and Procuromont Attachment 7 Page 6 u_
Failure of PRC to review a IV 9
temporary change to an incore instrument. surveillance proceu(y@.
Inadequate control of abnormal tags.
V 9
83-36 Failure to follow revised pro-cedure for hydrogen monitor and purge system.
Continued operation without IV 1
minimum required operable pressurizer level instruments.
84-02 PRC did not evaluato Technical Specification violations IV 9
(2 examplen)
PRC did not review Abnormal Tags IV 9
Inadequate PRC membership V
9 PRC failed to review V
9 proceduto changes Failure to document PRC V
9 determination of procedure review Failure to document PRC V
9 datormination as to unreviewed safety questions MSRC did not review QA audit IV 9
reports Tardy responses to QA audit IV 9
findings Use of out-of-date equipment IV 9
classification documents by Hafntenance and Procuromont Page 6 u


Inspection                                                                                                                     Severity         Functional Report No.               Subj ect                                                                                               Level             Area
Inspection Severity Functional Report No.
_85-02             No training programs for                                                                                       IV             12 (continued)         Maintenance or Procurement personnel 84-07             Failure to maintain up-to-date                                                                                   V               9 i                                revisions of surveillance procedures in the Control Room 84-09       Nuclear instrument calibrations were                                                                                 IV               1 not performed as required.
Subj ect Level Area
l               84-11       Emergency Preparedness training                                                                                       IV               12 not given after reassignment.
_85-02 No training programs for IV 12 (continued)
Inadequate data and procedures for                                                                                   IV               6 meteorological program.
Maintenance or Procurement personnel 84-07 Failure to maintain up-to-date V
84-13       Insufficient records relating to                                                                                                       9 storage and protection of Class IE motor control centers.
9 revisions of surveillance i
!                            A contractor QC inspector wss not                                                                                                       11 listed as an authorized inspector.
procedures in the Control Room 84-09 Nuclear instrument calibrations were IV 1
84-14       Welding filler material was not                                                                                       V               3 adequately controlled by, Tool Room.
not performed as required.
Written quizzes were not administered                                                                       '"
l 84-11 Emergency Preparedness training IV 12 not given after reassignment.
                                                                                                                                                -  V                12 during requalification training.                                                                           ,
Inadequate data and procedures for IV 6
84-15       Designcalculationsfor'theauxiktary                                                                             4 IV               11 feedwater flow orificies plates were not adequately reviewed and approved.
meteorological program.
84-19       Improper control of combustible daterials. V                                                                     ,
84-13 Insufficient records relating to 9
5 Improper setting of code safety valve.                                                                               IV,     ,        3 84-22       Expanded Fire Brigade Training                                                                                       Deviation         5 had not been performed.                                                                                                 ,
storage and protection of Class IE motor control centers.
A Senior Control Room Operator had not                                                                               IV               5 been trained in his designated role as ftre brigade leader.
A contractor QC inspector wss not 11 listed as an authorized inspector.
Improper control of combustible                                                                                       IV               5 materials.
84-14 Welding filler material was not V
Annual training with the Herald                                                                                       IV             5 Fire Department was not held.
3 adequately controlled by, Tool Room.
Attachment 7 Page 7
Written quizzes were not administered V
12 during requalification training.
84-15 Designcalculationsfor'theauxiktary IV 11 4
feedwater flow orificies plates were not adequately reviewed and approved.
84-19 Improper control of combustible daterials. V 5
Improper setting of code safety valve.
IV, 3
84-22 Expanded Fire Brigade Training Deviation 5
had not been performed.
A Senior Control Room Operator had not IV 5
been trained in his designated role as ftre brigade leader.
Improper control of combustible IV 5
materials.
Annual training with the Herald IV 5
Fire Department was not held.
Page 7


Inspection                                         Severity   Functional Report No.           Subj ect                         Level       Area t
Inspection Severity Functional Report No.
85-25   Inadequate radiological survey of radioactive fragment removed from steam generator.
Subj ect Level Area t
85-25 Inadequate radiological survey of radioactive fragment removed from steam generator.
Inadequate placement of personnel monitoring devices.
Inadequate placement of personnel monitoring devices.
Inadequate records of surveya of radioactive fragment.
Inadequate records of surveya of radioactive fragment.
Line 393: Line 555:
Inadequate posting of source of radiation.
Inadequate posting of source of radiation.
Improper use of radiological work permit (RWP).
Improper use of radiological work permit (RWP).
Inadequate airborne radioactivity               III       2 survey.                                 (collectively)
Inadequate airborne radioactivity III 2
MSRC audits of facility staff                   IV       9 qualifications did not extend below the level of supervisory personnel.
survey.
84-29   A Licensed Senior Operator was not       Deviation       12 present during licensed operator instruction.
(collectively)
85-01   Inadequate design verification and       Deviation       11     i field change procedures.
MSRC audits of facility staff IV 9
Four NSEB HVAC seismic supports did         IV             11 not conform to drawings but had been.     ,
qualifications did not extend below the level of supervisory personnel.
84-29 A Licensed Senior Operator was not Deviation 12 present during licensed operator instruction.
85-01 Inadequate design verification and Deviation 11 i
field change procedures.
Four NSEB HVAC seismic supports did IV 11 not conform to drawings but had been.
inspected and accepted by QC..
inspected and accepted by QC..
s 85-02   Inaccurate welder recertification             V               9 records.
s 85-02 Inaccurate welder recertification V
Incomplete welding filler material           IV               9 control records.                         (repeat) 85-03   Air particulate and charcoal filter         IV               2 saspies were not taken and analyzed on u regular weekly schedule.
9 records.
85-08   Inadequate battery testing procedures.       IV               4
Incomplete welding filler material IV 9
            .            Incomplete updating of drawingo   '
control records.
                                                                      'V               9 associated with NCR dispositions.
(repeat) 85-03 Air particulate and charcoal filter IV 2
                  \
saspies were not taken and analyzed on u regular weekly schedule.
Attachment 7 Page 8 I   <
85-08 Inadequate battery testing procedures.
IV 4
Incomplete updating of drawingo
'V 9
associated with NCR dispositions.
\\
Page 8 I


s--                                       t TABI.E INSPECTION ACTIVITIES AND ENFORCEMENT SIMMARY -(12/01/83 '-- 05/31/85)
s--
              ,.                                                                                  RANCHO SEC0 Inspections conducted " Enforcement Items Inspection
t TABI.E INSPECTION ACTIVITIES AND ENFORCEMENT SIMMARY -(12/01/83 '-- 05/31/85)
* Percent         Severity Level **
RANCHO SEC0 Inspections conducted " Enforcement Items Inspection
Functional Area                                                                       Nours                                 of Effort I II           111 IV V Dev.
* Percent Severity Level **
: 1. Plant Operations                                                           3671                                         '57                           2
Functional Area Nours of Effort I II 111 IV V Dev.
: 2. Radiological Controls                                                               544                                 9                   1     1
1.
: 3. Maintenance                                                                         270                                 4                           1   1
Plant Operations 3671
              .4. Surveillance                                                                           108                               2                           1
'57 2
,.              5. Fire Protection                                                                                 72                         1                         3 1     1
2.
: 6. Emergency Preparedness                                                               398                                 6                           1
Radiological Controls 544 9
: 7. Security and Safeguards                                                             404                                 6
1 1
: 8.     Refueling                                                                                   81                         1 1)9. Quality Programs and                                                                 378                                 6                       9     8 Administrative Controls
3.
: 10. ticensing                                                                                       0                       0 11".     Engineering & Construction                                                         336                                 5                       2     1 12.'     Training                                                                           212                           , ,3                           2     1   1 Total                                                                     *
Maintenance 270 4
1 1
.4.
Surveillance 108 2
1 5.
Fire Protection 72 1
3 1 1
6.
Emergency Preparedness 398 6
1 7.
Security and Safeguards 404 6
8.
Refueling 81 1
1)9.
Quality Programs and 378 6
9 8
Administrative Controls 10.
ticensing 0
0 11".
Engineering & Construction 336 5
2 1
12.'
Training 212
,,3 2
1 1
Total
* Allocations of inspection hours vs. functional areas are approximations based upon inspection report data, and include onsite and inoffice inspection effort.
* Allocations of inspection hours vs. functional areas are approximations based upon inspection report data, and include onsite and inoffice inspection effort.
              ** Severity levels are in accordance with NRC Enforcement Policy (10 CFR Part 2, Appendix C).
** Severity levels are in accordance with NRC Enforcement Policy (10 CFR Part 2, Appendix C).
Data reflects Reports 83-32 through 85-12                                                                                             ,
Data reflects Reports 83-32 through 85-12 Page 9
Attachment 7 Page 9
- - - _ _ _ _}}
                                                                                                                          - - - _ _ _ _}}

Latest revision as of 09:12, 12 December 2024

Informs That Regional SALP Review Board Meeting Scheduled to Convene at Region V Ofc on 850807.Assessment Will Cover Dec 1983 - May 1985.Listed Individuals Will Prepare Performance Analysis.Review Guidance Package Encl
ML20133A821
Person / Time
Site: Rancho Seco
Issue date: 07/19/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Chaffee A, Crews J, Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8508050567
Download: ML20133A821 (23)


Text

-

z s *'

fatroq(q

),

UNITED STATES g

NUCLEAR REGULATORY COMMISSION

y REGION V g

1450 MARIA LANE, SUITE 210

,d WALNUT CREEK, CALIFORN!A 94596 JUL 191985 MEMORANDUM FOR:

_J '. Crews, 'RV

g (p - 31%

A. Chaffee, RV L. Miller, RV C. Myers, RV J. Eckhardt, RV G. Perez, RV R. Scarano, RV' G. Lainas, AD/0R, NRR S. Miner, Project Manager, NRR L. Norderhaug, RV M. Cillis, RV R. Fish, RV P. Qualls, RV FROM:

D. Kirsch, Acting Director Division of Reactor Safety and Projects, RV

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

FOR RANCHO SECO (Period December 1, 1983 through May 31, 1985)

References:

(1) NRC Manual Chapter 0516 (2) Proposed changes to the SALP process, J. M. Taylor Memorandum dated June 27, 1985 (3) Region V Instruction 0701 (4) SALP Board Schedule, J. B. Martin Memorandum dated July 18, 1985 l

Pursuant to references (1), (2), (3) and (4) above, the regional SALP Review Board meeting for Rancho Seco is scheduled to convene at the Region V Walnut Creek office on August 7, 1985, at 8:30 a.m.

The board members will consist of the above addressees and myself who will serve as chairperson.

1 I

This assessment will cover the 18 month period from December 1, 1983, through May 31, 1985. Since this period ends during completion of a refueling outage, the evaluation period will be updated to include recent events through July, 1985.

Members of the Rancho Seco SALP Board are herewith provided a review guidance package to be used in preparing performance analyses of the various functional areas. This package consists of the following:

Description of functional areas (Attachment 1)

Evaluation criteria (Attachment 2)

Attributes for the evaluation criteria (Attachment 3)

Performance categories (Attachment 4)

SALP evaluation matrix (Attachment 5)

Sample SALP functional area performance analysis (Attachment 6)

Supporting Data and Summaries (Attachment 7)

II 7

8508050567 850719 PDR ADOCK 05000312 G

PDR f)

P..

9 l

Memo on SALP 50-312 2

The'following is the anticipated outline of the Rancho Seco SALP report, along with the individuals assigned lead responsibility for preparing input for each section.

I Introduction Myers II Criteria Myers III Summary of Results Myers IV Performance Analysis 1.

Plant Operations Eckhardt 2.

Radiological Controls Cillis 3.

Maintenance Eckhardt 4.

Surveillance Eckhardt 5.

Fire Protection Qualls 6.

Emergency Preparedness Fish 7.

Security and Safeguards Norderhaug 8.

Refueling Eckhardt 9.

Quality Programs and Administrative Controls Affecting Safety Eckhardt 10.

Licensing Activities Minor 11.

Eng;ineering & Construction Crews /Echkardt 12.

Training Eckhardt V

Supporting Data and Summar*Ms Myers (Including tables)

Eachpersonassignedleadresponsibilityforafuncti$nalareashallprepare a performance analysis and submit it to C. J. Myers by C.O.B. July 26, 1985.

Each performance analysis shall be prepared as follows:

'i 1.

Assess the licensee's performance in the functional area based upon inspections performed, available ^ data and observations of the licensee's performance during the SALP period. Obt'ain~ inputs from others who had inspection responsibilities in the functional area.

In assessing the licensee's performance, use the guidance in Attachment I through 4.

2.

Prepare a performance analysis for the functional area following the format of Attachment 6.

If possible, discuss the trend'of the licensee's performance since the previous SALP period. The analysis should reference pertinent data, enforcement items or events, when appropriate, but should be principally a quantitative analysis of the licensee's performance in the area (depending upon the level of activity, approximately one to one and one-half page in length when single space typed).

3.

Include recommendations for licensee actions related to the functional area.

4.

Provide a copy of the SALP evaluation matrix (Attachment 5),

assigning a performance category for each evaluation criterion.

y, c -

.^,

IMemo on SALP 50-312

'3 By copy of this memorandum, the Director, Office of Investigaticas, San Francisco Field Office, is requested to provide a summary of major

-investigative activities and results-involving Rancho Seco by July 26, 1985.

In addition.Iby-copy of'this memorandum.the offices of NMSS and AEOD are requested tolprovide performance analyses by July 26, 1985 (or updated earlier submittals to address the extended SALP period).

k D. F. Kir ch SALP Board Chairman.

Acting Director, Division of Reactor Safety and Projects

Enclosures:

As Stated

.3 cc:

'J. Davis, NMSS R. Seyfrit,'AEOD O. Shackleton, OI/SFF0

.J. Carter, NRR I

/

j F. Wenslawski, RV

- t=

3 ;

7 Ti,.

2

=*

R; w

r k

. 7 1

4 4

.J

  • 1

,2-e 3

s w

~..

4 l

(

Functional Areas.

a.

Operating Phase Reactors 1.

Plant Operations Consists chiefly of the activities of the licensee's operationalstaff(e.g.,licensedoperators, shift technical advisors, and auxiliary operators).

It is intended to be limited to operating activities such as i

plant startup, power operation, plant shutdown, and system lineups. Thus, it includes activities such as reading and logging plant conditions; responding to off-normal conditions; manipulating the reactor and

^

auxiliary controls; and training / retraining of licensed operators, shift technical advisors, and auxiliary operators.

2.

Radiolooical Controls Includes controls for occupational radiation protection; radioactive materials and contamination controls; radiological surveys and monitoring; processing of gas-eous, liquid, and solid wastes; transportation of radioactive materials; radiological effluent and environmental monitoring; and the results of the fiRC's independent measurement program.

3.

liaintenance Includes all activities associated with preventive or corrective maintenance of instrumentation and control equipment and mechanical and electrical systems.

4.

Surveillance Includes all surveillance testing activities as well as all inservice inspection and testing activities.

Examples of activities included are:

instrument cali-brations, equipment operability tests, containment leak rate tests, special tests, inservice inspection and performance tests of pumps and valves, and all other inservice inspection activities.

5.

Fire Protection Includes routine housekeeping and fire protection /

prevention program activities.

Thus, it includes the storage of combustible material; fire brigade staffing and training; fire 50ppression system maintanence and operation; and those fire protection features provided for structures, systems, and components important.to safe shutdown.

~

Attachment *1 Page 1 l

t

6.

Emergency Preparedness Includei' activities relating to the implementation of the emergency plan and implementing procedures. Thus, it includes such activities as licensee's performance during exercises which test the licensee, state, and local emergency plans; plan administration and implemen-tation; notification; communications; facilities and equipment; staffing; training;' assessment; emergency classification; medical treatment; radiological exposure control; recovery; protective actions; and interfaces with onsite and offsite emergency response organizations.

7.

Security Includes all activities whose purpose is to ensure the security and continued operability of the plant.

Specifically it includes all aspects of the licensee's security program (e.g. access control, security checks, badging).

8.

Refueling Includes all activities associated with refueling.

Thus, it includes outage management, and the manipu-lation of new and spent fuel.

9.

Quality Procrams and Administrative Controls Affectino Quality Includes all verification and oversight activities which affect or assure the quality of plant activities, structures, systems and components. This area may be viewed as a comprehensive management system for con-trolling the quality of work performed as well as the quality of verification activities that confirm that the work was performed correctly. The evaluation of the effectiveness of the quality assurance system should be based on the results of management actions to ensure that necessary people, procedures, facilities and materials are provided and used during the opera-tion of the nuclear power plant.

Principal emphasis should be given to evaluating the effectiveness and involvement of management in establishing and assuring the effective implementation of the quality assurance program along with evaluating the history of licensee performance in the key areas of:

comittee activities, design and procurement control. control of desion change processes, inspections, audits, corrective action systems, and records.

Page 2

,r v,

<,1 i

'.r

'f.

l

..: l

.l

~

'u y O 'l i

l l' i.

y..

10.. Licensing Activities ~ ^ ' " [; I,

g,

,,,m c

~

Il#

'I

.. :. ? ;..

~

Includes the. adequacy; and ~ timeliness of all'. licensing submittals, responsiveness to NRC licedsing' initiatives, and the' licensee's approach to'resolutionfof' technical ~ issues from

~

a safety standpoint.-

~

?# ^

s

11. Engineering and Construction _;<

s v

Includes all design'and' installation activities associated with plant modifications including design changes and reviews.

12. Training-Includes the following facility training categories:

Non-licensed operators Control room operators Senior control room operators / shift supervisors-Shift Technical advisors Instrument and. control technicians Electrical maintenance personnel Mechanical maintenance personnel Radiological protection technicians Chemistry technicians Onsite technical staff and managers Page 3

045 Evaluation Criteria. Elements'which must be considered when assessing a licensee's performance in a functional ares.

,i a.

The evaluation criteria are as follows:

1.

Management involvement in assuring quality.

2.

Approach to resolution of technic'al issues from safety standpoint.

~

3.

Responsiveness to NRC initiatives 4.

Enforcement history.

5.

Reporting and analysis of _ reportable events 6.

Staffing (including management) 7.

Training effectiveness and qualification b.

Guidance for us+ng these criteria to arrive at a category assignment is found in the Appendix to this Chapter.

I l

1 l

t l

\\

ATTACIDfDJT 2 l

e

EVALUATION ClllTEltIA WITil ATThll3UTES FOR ASSESSMLHT OF LICENSEE PEhFORMANCE 1.

MAN AGEMENT INVOLVEMENT AND CONTROL IN ASSURING QtfALITY Category 1 Caterory 2 Category 3 consistent evidence of prior plan-evidence of prior planning littic evidence of prior planning ning and assignment of priorities; and assignment of prioritiest and assignment of priorities; well stated, controUed and explicit stated, defined procedures poorly stated or ill understood procedures for control of activities for control of activities procedures for control of activities well stated, disseminated and under-adequately stated and under-poorly stated, poorly understood standable policies stood policies or non-existent policies decision making consistently at a decision making usuauy at a decision making seldom at a level level that ensures adequate level that ensures adequate that ensures adequate management management review management review review corporate management frequently corporate management usuaUy corporate r.anagement seldom involved in site activities involved in site activities involved in site activities audits complete, timely and thorough audits generally complete, audits frequently not timely, and thorough incomplete or not thorough committecs properly staffed and committees usuauy properly committees not properly staffed functioning.in abnost au cases staffed and functioning or functioning -

reviews timely, thorough and reviews generally timely, reviews not timely, thorough or technically sound thorough and technically sound technicauy sound records complete, weU maintained records generaUy complete, weu records not complete, not weu nnd available maintained and avcDable

  • rr.aintained or unavaUable procedures and policies strictly procedures and policies rarely procedures and poUcies ocea-adhered to violated sionauy violated corrective action systems promptly corrective action systems corrective action systen s rarely and consistently recognize and generally recognize and recognize and address non-address non reportable concerns address non reportable concerns reportable concerns procurement weu controued and procurement generally weU repetitive breakdown in procure-documented controUed and documented ment control design weU controUed and verified rare breakdowns of minor repetitive breakdown in designs significance in design control control or verification or verification 2.

APPROACl! TO RESOLUTION OF TECllNICAL ISSUES FROM A SAFETY STANDPolNT Category 1 Category 2 Category 3 glear understanding of issues understanding of issues understanding of issues demonstrated generally apparent frequently lacking conservatism routinely exhibited conservatism generauy exhibited sneets minimum requirements when potential for safety significance exists technicauy sound and thorough viable and generally sound and of ten viable approaches, but approaches in almost all cases thorough approaches lacking in thoroughness or g

depth timely resolutions in almost all generally timely resolutions resolutions often delayed cases 3.

RESPONSIVENESS TO NRC INITIATIVES Category 1 Category 2 Cat eged meets deadlines generally timely responses frequently requires ester.sions of tune timely resolution of issues few longstanding regulatory longstandst regulatory issues issues attr6t'utatele to licennet altributable to hetnSee ATTAC1LMEFT 3 Page 1

+.

. teclinically sound and thorough viable and generally sound and of ten viable rssp:nses, but lacking in tht> roughness of responses in almost all cases thorough responses dcpth acceptable resolutions proposed acceptable resolutions generally considerable NRC effort nr initially in most cases proposed repeated submittals needed to obtain acceptable resolutions 4.

ENFORCEMENT HISTORY Category 1 Category 2 Category 3 major violations are rare and are major violations are rare and may multiple major violations or not indicative of programmatic indicate minor programmatic programmatic breakdown breakdown breakdown indicated minor violations are not repetitive multiple minor violations or minor violations are repetitive and not indicative of programmatic minor programmatic breakdawn and indicative of programmatic breakdown indicated breakdown corrective action is prompt and corrective action is timely corrective action is delayed effective and effective in most cases or not effective 5.

REPORTING AND ANALYSIS OF REPORTABLE EVENTS Category 1 Categoryj Category 3 events promptly and ccmpletely events are reported in a timely event reperting is frequently late reported manner, some information may or incomplete be lacking events are properly identified events are accurately identified, events are poorly identified or and analyzed some analyses are marginal analyses are mangmal, events are associated with programmatic weaknesses corrective action is effective corrective action is usuaUy corrective action is not timely as indicated oy lack of repetition taken but may not be effective nor effective, events are as indicated by occasional repetitive repetition 6.

STAFFING (INCLUDING MANAGEMENT)

Caterosy 1 Category 2 Category 3 positions are identified, authorities key positions are identified, positions are poorly identified, and responsibilities are weu defined and authorities and responsi*

or authorities and responsibil.

bilities are defined ities are (U defined vacant key positions are filled key positions ususUy filled key positions are left vacant on priority basis in a reasonable time for extended periods of time staffing is ample as indicated by staffing is adequate, staffing is weak or minimal ns control over backlog and overtime occasional ddficulties with indicated by eacessive backlog backlog or overtime and overtime 7.

TRAINING AND QUALIFICATION EFFECTIVENESS Category 1 Category 2 Category 3 training and qualification program training and hualification training and quahfication makes a positive contribulton, program conttsbutes to an program is found to be the commensurate with procedures adequate understanding of major contributmg factor to and staffing, to understanding work and fair adherence poor understanding of work, of work and adherence to procedures to procedures with a modest as indicated by numerous proce-with few personnel errors number of personnel errors dure violations or personnel errors training program is weU defined a defined program is program may be either lacking.

and implemented with dedicated implemented for a large portion poorly defined, or ineffectively resources and a means for feed of the staff appbed for a signdicant segment back esperience; program is applied of the staff to nearly su staff ATTACletENT 3 Page 2 e

/*

4 Criteria for Use in Evaluating Training Asetional Area Catenarv 1 Category 2 Category 3 management frequently involved in management occasionally involved management seldom involved in review of training activities in review of training activities review of training activities acceptable resolution to NRC train-acceptable resolution generally considerable NRC effort needed ing initiatives proposed initially proposed to obtain acceptable resolutions in most cases few significant events have occurred occasional significant events have frequent significant events have that are indicative of a training occurred that are indicative of a occurred that are indicative of a deficiency training deficiency training deficiency

  • h 8

Page 3 9

~

Performance Cateoories.' ~ % rating of licensee perforsynce in a given functional area.

s.

Cateoory 1 Reduced 'NRC attention say be appropriate. Licensee management attentierr and. involvement are aggressiv' e and oriented toward

. nuclear safety; licenset resources are ample and effectivsly J

used so that a high level.of perfo'rmance with respect to operational safety or construction is being achieved.,

b.

Catenory 2 NRC attention should be maintained at normal levels. Lican-see management attention and involvement are evident and are concerned with nuclear safety; licensee resou'rces are ade-quate and reasonably effective so that satisfactory perform-ance with respect to operational safety or construction is being achieved.

c.

' Category 3 Both NRC and licensee attention should be increased.

Licen-see management attention or involvement is acceptable and considers nuclear safety, but weaknesses are evident; licen-see resources appear to be strained or not effectively used so that minimally satisfactory performance with respect to operational safety or construction is being achieved.

O e

ATTACIDENT 4 9

.a.

H M

P A3 At t/1 M

"Tl f./1

  • E 3t3 "U

'S 3

a.

c se

  1. D 3

.c su ew

.-.e D

N n

3m >

-eg n

op

=g g

.a.

gg

{

{

4 CL==*

C C

  • 1 S

3 a.

3 g

?,

2.-^

3.

'S 2

o a.

3M 3

-1 3.

O O

a et 3

a.

3 M

n O

w w

to t

3 to MT to k

e 3

a.

sw M

M *1

. "O n

n 89 m

m 89 3

n n

1 3*

1O e

n me to 1

e et e

O e.

a. as O

n 0

O

< g y

a o

a 4

a.

ft M

-1 3

M

'l E

n.

'S so O3 3

O g.

M 3 cm so

,r+

M M

n M

-o O

=

,,,s a

t-Management Involvement in t

si Assuring Quality y

d v,

o m

z Approach to Resolution of g

g Technical Issues from a g

g Safety Standpoint d

o=

-1

ie g

Responsiveness to NRC Initiatives 3

o A

P, M

Enforcement History d

2m Reporting and Analysis of R

Reportable Events

"=

n

[

Staffing (including Management)

E u.

Training and Qualification Effectiveness m

Sample Performanca Analysis 4.

Surveillance The surveillance program has been inspected on a monthly basis by the resident inspectors throughout this SALP period.

(See also Section IV.5, Fire Protection).

During this SALP period the licensee asked the NRC for, and received, Technical Specifications changes to delay surveillances because of outage delays. Bowever, good planning and scheduling techniques and stronger usangement control could have precluded the need for some of these changes. Even though specific surveillance tests were covered in certain Technical Specifications changes, there have been a ausber of licensee event reports (LERs) written on missed surveillances.

In general, there was a decline in the licensee's performance in this area. partially in response to NRC criticism of this area, the licassee has instituted a daily asnagement meeting in which the status of surveillances is discussed. The effectiveness of this meeting in eliminating missed surveillances is yet to be determined by the inspectors.

I An item of noncompliance issued during this SALP period dealt with j

the failure to meet surveillance and technical specification requirements on parse valve leakage. The licensee did not respond l

in a timely usaner to the failure of the surveillance because of an apparent lack of awareness of Technical Specifications by the engineer in charge of the work. This illustrates the fact that there any not be proper sensitivity at all levels in the organization on issues important to safety or, as *the inspectors i

have stated in past inspection reports, there may be a ceamunications problem between people within the operating organisations. The 12R synopsis (Table 5) La this SALP report indicates that a ausber of reports have been issued which are surveillance related. Ceemusications related problems contributed to a number of these IIRs.

Conclusion performance assessment - Category 3.

This represents a decline in perforssace from the Category 2 assigned during the previous SALP cycle.

Board Receamendation Increased awareness of and attention to related Technical Specifications requirements should be demonstrated by persons involved la scheduling, performing, and reviewing surveillance activities.

ATTACIMENT 6 L

4 V

DRAFT SUPPORTING DATA FOR' RANCHO SECO'SALP (12/1/83 - 5/31/85)

OPERATION ACTIVITIES LICENSEE EVENT REPORTS (LERs)

SYNOPSIS OF LERs ENFORCEMENT ITEMS INSPECTION AND ENFORCEMENT

SUMMARY

ATTACHMENT 7 i

l

OPERATION ACTIVITIES During the first three months of the SALP period the plant operated within the range of approximately sixty to ninety percent power except for two automatic reactor trips. The first trip occurred on December 3, 1983 while troubleshooting the "A" inverter power supply. The second reactor trip occurred on February 29, 1984, when the "A" reactor coolant pump tripped off line in coincidence with a power oscillation on the power grid, and the plant was not able to respond and automatically tripped.

On March 19, 1984 while the plant was operating at ninety-two percent power a leak of the main generator cooling medium, hydrogen gas, developed into an explosive mixture in the space between the main generator and the high pressure turbine. A major explosion and subsequent fire occurred. The fire was extinguished by the carbon dioxide fire protection system within fourteen minutes. The operators manually tripped the turbine and reactor. The incident was declared an unusual event.

The licensee brought the plant back to power on April 15, 1984, after completion of repair and maintenance activities. The plant operated at approximately ninety percent power from April 25 through June 1, with exception of a seven day period where the power was reduced to fifty percent to repair a condenser tube leak. On June 1, the reactor experienced an automatic trip due to feedwater overspeed. The plant returned to power and operated at ninety-two percent through July 3, until the plant was manually shutdown for the first of three steam generator tube leak repairs. The plant remained in cold shutdown until August 12 while a licensee investigation of August 31whentheplantwasagainmanuallyshutdownduetothesecon[d"B" piping fittings was performed. The plant was brought back to power u 11 steam generator tube Icak. The plant started back to power on October 7, but was shutdown for a "A" steam generator tube leak. The plant returned to power operation on October 11 and had to be shutdown on October 13 to investigate a hot spot on the main generator lead box. Repairs were made and the plant was on line on October 19. The plant remained in operation until the end of December although power was reduced due to feedwater heater leaks. A six day outage occurred to repair the known leak in the feedwater heater system and ended on January 6, 1985 when the plant went critical. The plant remained on line at various power icvels until March 15, 1985, when the licensee began the Cycle seven refueling outage.

ATTACl! MENT 7 Page 1

p

.?

RANCHO SECO Licensee Event Reports Table (12/01/83 - 05/31/85)

LER TITLE SALP AREA /CAUSE CODE

  • 83-38 DHR PUMP B SUCTION VALVE FROM 4/E BWST FAILED TO OPEN 83-39 OPERABLE PRESSURIZER LEVEL 4/A D CHANNELS BELOW MINIMUM TECli.

9/D SPEC.

83-40 INCORRECTLY SIZED AUXILIARY 9/B FEED FLOW ORIFICES 11/B 83-41 COOLING WATER FOUND ISOLATED 1/D FROM AUX. FEED PUMP TURBINE 4/D BEARINGS 83-37-01 REACTOR BUILDING EMERCENCY 4/D Followup SUMP VALVE FAILED TO OPEN DURING SURVEILLANCE TEST 84-01 EXHAUST FAN BEARING FAILURE 2/E 84-02 SUBMITTAL OF ISI RESULTS REPORT TO NRC LATE 9/A,C 84-03 PROCEDURE WRITTEN IN CONTRADICTION TO 4/D TECH. SPECS.

84-05 EMERGENCY SIREN MALFUNCTION 6/E 84-06 FIRE BRIGADE. TRAINING 5/X 9/X 84-04 METEOROLOGICAL TOWER POWER FAILURE 6/E 84-07 REACTOR TRIP 1/E 84-08 FAILURE OF ION CllROMATOCRAPH 2/B.E 84-09 LIFTING SLING FAILURE 3/D

,9/D 4

84-10 FAILURE TO COMPLETE SURVEILLANCE PROCEDURE

9/D i

84-12 MISSED STACK SAMPLE 2/A 84-11 INCORRECT CONFIGURATION TABLE IN' 4/D SURVEILLANCE PROCEDURE 84-13 SECURED !!IGli RADIATION AREA DOORS OPEN 2/A l

  • Cause Codes identified in LER Synopsis Table.

Page 2

r

.p '

E*

LER TITLE SALP FUNCTIONAL AREA CAUSE CODE 84-14 SURVEILLANCE PROCEURE SP 205.02

' 4/D,A 84-15 RELATED INCIDENTS TO HYDROCEN EXPLOSION 1/E 3/D 84-16 CONTAINMENT ISOLATION VALVE STROKE TIME 4/D IN EXCESS OF TECH. SPEC. LIMIT-84-17 CORE FLOOD TANK VENT VALVE 1/D 83-0301 TESTING OF MASTER REACTOR TRIP RELAY 4/D Follow-up 1/E 84-18 PLANT TRIP i

84-19 AMBIENT STARTUP OF DIESEL CENERATOR 4/D 84-20 TUBE LEAK OF REACTOR TRIP 1/E 2/E 84-18-01 PLANT TRIP - FOLLOW-UP 1/E 84-21 FAILURE OF SURVEILLANCE PROCEDURE TO SATISFY 4/D i

TECH SPECS 83-40-01 AUXILIARY FEEDWATER FLOW ORIFICES Revision 84-22 TUBE LEAK 1/E 84-24 SIf.0LTANEOUS PLANT llEATUP AND DEB 0 RATION 1/A 84-25 FEACTOR TRIP 1/E 84-23 F1.TER TESTING 4/D 84-22-01 TUBE L"*

2/E Supplement 84-23-01 FILTER TESTING 4/A Follow-up 9/A 85-01 LOSS OF CONTAINMENT INTEGRITY VIA OPEN 2/A VALVES 9/D 85-02 UNRESTRAINED HEAVY LOAD IN REACTOR BUILDING 3/A 85-03 INCORRECT BORON CONCENTRATION TECll 1/C SPEC LIMIT 9/C 85-04 FIRE DAMPERS NOT INSTALLED 5/B Pago 3

g, h*

e

., 4 DRAFT SPECIAL REPORT TITLE AREA /CAUSE 83-08 ERROR IN COMPUTER CODE FOR 2/B,D OFFSITE DOSE CALCULATIONS t

1 4

p

/

}

.y -

s a

s A

s p

1 Page 4

e i

SYNOPSIS OF LICENSEE EVENT REPORTS **

Functional SALP Cause Code

  • Area A

B, C,

D E,

X Totals 1.

Plant Operations 1

0 1

2 7

0 11

-2.

Radiation Protection 3

1 0

0' 4

0 8

3.

Maintenance 1

0 0

2 0

0 3

4.

Surveillance 3

0 0

10 2

0 15 5.

Fire Protection 0

1 0

0 0

1 2

6.

Emergency Preparedness 0

0 0

0 2

0 2

7.

Safeguards 0

0 0

0 0

0 0

t'. Refueling 0

0 0

0 0

0 0

9.

Quality Programs and 2

1 2

4 0

1 10 Administrative Controlu Affecting Safety

10. Licensing 0

0 0

0 0

0 0-

11. Engineering and 0

1 0

0 0

0 1

4 Construction

12. Training 0

0 0

0 0

0 0

TOTALS 10 4

3 18

.15 2

52

  • Cause Codes:

A-Personnel Error B-Design. Manufacturing or Installation Error C-External Cause

.D-Defective Procedures

'E-Component Failure ~

1 X-Other i

l

.m Synopsis includes LER Nos. 83-38 through 85-04 i,,-

i NOTE:

Several LER's categorized in multiple. areas of cause codes _---

l follow-up LER's which do not. identify additional areas or causes

(

were not double accounted along'with the original LER during'this period.

Pago 5

h r

Table Rancho Seco Enforcement Items (12/01/83 - 05/31/85)

Inspection Report No.

Subject,

. Severity Level Functional Area 83-34 Failure of PRC to review temporary

'1V 9

change to emergency dicac1 generator operating procedure.

Failure of PRC to review a IV 9

temporary change to an incore instrument. surveillance proceu(y@.

Inadequate control of abnormal tags.

V 9

83-36 Failure to follow revised pro-cedure for hydrogen monitor and purge system.

Continued operation without IV 1

minimum required operable pressurizer level instruments.

84-02 PRC did not evaluato Technical Specification violations IV 9

(2 examplen)

PRC did not review Abnormal Tags IV 9

Inadequate PRC membership V

9 PRC failed to review V

9 proceduto changes Failure to document PRC V

9 determination of procedure review Failure to document PRC V

9 datormination as to unreviewed safety questions MSRC did not review QA audit IV 9

reports Tardy responses to QA audit IV 9

findings Use of out-of-date equipment IV 9

classification documents by Hafntenance and Procuromont Page 6 u

Inspection Severity Functional Report No.

Subj ect Level Area

_85-02 No training programs for IV 12 (continued)

Maintenance or Procurement personnel 84-07 Failure to maintain up-to-date V

9 revisions of surveillance i

procedures in the Control Room 84-09 Nuclear instrument calibrations were IV 1

not performed as required.

l 84-11 Emergency Preparedness training IV 12 not given after reassignment.

Inadequate data and procedures for IV 6

meteorological program.

84-13 Insufficient records relating to 9

storage and protection of Class IE motor control centers.

A contractor QC inspector wss not 11 listed as an authorized inspector.

84-14 Welding filler material was not V

3 adequately controlled by, Tool Room.

Written quizzes were not administered V

12 during requalification training.

84-15 Designcalculationsfor'theauxiktary IV 11 4

feedwater flow orificies plates were not adequately reviewed and approved.

84-19 Improper control of combustible daterials. V 5

Improper setting of code safety valve.

IV, 3

84-22 Expanded Fire Brigade Training Deviation 5

had not been performed.

A Senior Control Room Operator had not IV 5

been trained in his designated role as ftre brigade leader.

Improper control of combustible IV 5

materials.

Annual training with the Herald IV 5

Fire Department was not held.

Page 7

Inspection Severity Functional Report No.

Subj ect Level Area t

85-25 Inadequate radiological survey of radioactive fragment removed from steam generator.

Inadequate placement of personnel monitoring devices.

Inadequate records of surveya of radioactive fragment.

Improper reporting of unusual radiation levels.

Inadequate posting of source of radiation.

Improper use of radiological work permit (RWP).

Inadequate airborne radioactivity III 2

survey.

(collectively)

MSRC audits of facility staff IV 9

qualifications did not extend below the level of supervisory personnel.

84-29 A Licensed Senior Operator was not Deviation 12 present during licensed operator instruction.

85-01 Inadequate design verification and Deviation 11 i

field change procedures.

Four NSEB HVAC seismic supports did IV 11 not conform to drawings but had been.

inspected and accepted by QC..

s 85-02 Inaccurate welder recertification V

9 records.

Incomplete welding filler material IV 9

control records.

(repeat) 85-03 Air particulate and charcoal filter IV 2

saspies were not taken and analyzed on u regular weekly schedule.

85-08 Inadequate battery testing procedures.

IV 4

Incomplete updating of drawingo

'V 9

associated with NCR dispositions.

\\

Page 8 I

s--

t TABI.E INSPECTION ACTIVITIES AND ENFORCEMENT SIMMARY -(12/01/83 '-- 05/31/85)

RANCHO SEC0 Inspections conducted " Enforcement Items Inspection

  • Percent Severity Level **

Functional Area Nours of Effort I II 111 IV V Dev.

1.

Plant Operations 3671

'57 2

2.

Radiological Controls 544 9

1 1

3.

Maintenance 270 4

1 1

.4.

Surveillance 108 2

1 5.

Fire Protection 72 1

3 1 1

6.

Emergency Preparedness 398 6

1 7.

Security and Safeguards 404 6

8.

Refueling 81 1

1)9.

Quality Programs and 378 6

9 8

Administrative Controls 10.

ticensing 0

0 11".

Engineering & Construction 336 5

2 1

12.'

Training 212

,,3 2

1 1

Total

  • Allocations of inspection hours vs. functional areas are approximations based upon inspection report data, and include onsite and inoffice inspection effort.

Data reflects Reports 83-32 through 85-12 Page 9

- - - _ _ _ _