ML20128M592: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[U-602100, Annual Operating Rept for Jan-Dec 1992]]
| number = ML20128M592
| issue date = 12/31/1992
| title = Annual Operating Rept for Jan-Dec 1992
| author name = Spangenberg F
| author affiliation = ILLINOIS POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000461
| license number =
| contact person =
| document report number = U-602100, NUDOCS 9302220223
| document type = ANNUAL OPERATING REPORT, TEXT-SAFETY REPORT
| page count = 6
}}
 
=Text=
{{#Wiki_filter:7 .,                                                                    U. 602100 L30-93 (02-10)LP lh no ower Company Chnton Power Station P.O. Box 676 -
Cunttin. IL 61727 Te' 217 935-8881 POWER
                                                          --February 10, 1993 10CFR50,36 Docket No. 50-461 Document Control Desk Nuclear Regulatary Commission Washington, D.C. 20"55
 
==Subject:==
6HUual Operatinn Report
 
==Dear Sir:==
 
In accordance with Section 6.9.1.4 of the Clinton Power Station Technical. Specifications, Illinois Power. Company is submitting the attached Clinton Power Station annual Operating-Report for the period of January 1,1992 through December 31, 1992.
Sincerely yours, I
C-    A.    %        ,,
F. A. Spa genbe 7, III Manager, .icens ng and      fety SFB/msh Attachments cc    NRC Region III, Regional Administrator NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Director, Office of Nuclear Regulatory Research Illinois Department of Nuclear Safety 190129
                                                                                            'D I
g!8 agg gggg 1
 
            ,, .. +      . ,    -
                              -as          ,
k      #-    %. 6'  5
                                                                                                                  +
: y.                                                                        ,
                                                        +                                      m
                                                                                                                          .7 i                                                                                          -
                                                                                                                          ,s l-t
                                                                                                                          ')
                                                  'Clinton Power Station; Clinton, Illinois
                                                                                                                          ^C s
P J
                                                - Annual Operating Report January 1, 1992 through December 31,-1992 s
                                                                                                                              ?
)                                                                                                ._
+'
                                                  -USNRC Docket 50-461' I h h                l                                                                                i          b" Y '
 
        .. . -I '                                                                                [Attechmantill to.Us 602100                            '
                                                                                                  .. Page' 1. of ; 2 -
Attachments
                  'I.                  Personnel Man-Rem by Work and Job Function''                      4. <:
II.                  Performance'Characceristics and Tests Safety. Valve and . Safe ty/Reitef Valve ' Challenges Primary Coolant Specific Activity Analyses p
                                                                                                                                          'n i
1.
e l'
i l                                                                                                                                .-
                    ,.-,..-.,-,,,-,.-e                              . , , , . , , , , .  ,,,w- --                  . , - . + + . , .
 
                                                          -ILLIN0!$ POWER COMPANT CLIN 10N POWER STAil0N-BOX 678
                                                          -CLINTON,-lLLINOIS 61727 Reg. Ouide 1.16 Report
_ Reporting tear 92
                                                # PERSONNEL (>100 MREM) _                                  TOTAL MAN REM WORK & JOS FUNCTION          -STATION          UTILITT      CONTRACT        STATION      UTILITY        ! CONTRACT Routine operations and Surveillance Maintenence and Construction            136-              3          270-            6.215-      0.238              5.949 operations                                45                0            11            10.111        0.000-            0.157.
Health PhysIer and Lab                  46                0            58          .15.326        0.000'            15.596' Supervisory and offlee Staff              14                0            12            1.099.      0.000              0.437 '
Engineering Staff                        14                0            13            0.975        0.000              0.323        g Routine Plant Maintenance Maintenance and Construction            115                2            82              5.046        '0.159 -            1.979 operations                              - 31                0            '2              1.015        0.000              0.030 Heatth Physics and Lab                  24                0            5              0.692        0.000              0.150-Supervisory and office Staff              4                0            2              0.067      ~ 0.000 -            0.059-Engineering Staff                          9                0            0              0.227.      '0.000            'O 000 Inservice Inspection Miintenance and Construction              10                0          171              0.387        0.000            40.604
            -operations                                3                0            3              0.064        0.000-              0.970 '
Heatth Physics and Lab                    5                0          .14              0.172        0.00.              0.704 Supervisory and Office Staff              1                0              1            0.056        0.000              0.275 -
Engineering Staff                          4                0            11              0.094        0.000            = 4.416 Special Plant Maintenance Naintenance and Construction            154                3          362            57.703        0.914-        147.004-Operations                                45                0            12              9.602        0.000              2.262 Health Physics and Lab                  39                0            44 -            8.837        0.000              3.867 Supervisory and Office Staff              13                0            9              2.632-        0.000              2.744 Engineering Staff                        12                0            13              2.332        0.000-          -0.876-Waste Processing Maintenance and construction              8                0            2              0.684 i      0.000 -            0.651 -
Ope >ations                                0                0            0              0.000-        0.000              0.000 Health Physics and Lab                    7                0              1            0.462        0.000              0.060 Supervisory and Office staff              0                0            0              0.000        0.000              0.000 Engineering Staff                          0                0            0              0.000        0.000            ' 0.000 . -
Refueling Operations Maintenance and construction              48                0          158              1.157        0.000          -21.069 Operations                                17                0            2              0.206        0.000              0.025 Health Physics and Lab                    14                0            26              1.603        0.000              2.495.
S @ervisory and Office Staff              7                0            8              0.109        0.000              2.174 Engineering staff                          5                0            6              0.124        0.000              1.908
      > VORK & JOB FUNCTIOP TOTALS                  821                -8          1307          127.047          1.311          256.543
                                                # PERSONNEL (>100 MREM)                                  TOTAL MAN REM STATION        UTILITT      COCRCT        STATION      UTILITT      CONTRACT ORAk0 TOTALS                              268            3          498          127.047        1.311      256.543-
    .f
                                                                                                                            ,v a  w---                          ,
 
O[ - '
Report of Personnel-~and Man-Rem by Work and Job Function This report is a tabulation on a-annual basis of the .iumber of-station, utility'and other1 personnel-(including _      _ .
contractors) who received exposures greater than 100 mrem /hr and their associated man-rem exposure according to work and; job function.-
The work and job functionftotals for personnel greater 1than 100 mrem /yr are different:than grand' totals because an
        ' individual may perform work under more than-one work and job function during.the year.
The total man-rem is based on a ratio of the official-TLD' results.
1 4
                              - =g ,,  --                , ,.
 
                                      .                                                                                                                                              Attachment 2 to U- 602100 Page 1 of 1 EfRFORMANCE CHARACTERISTICS AND TESTS S_afety Valve and Safety / Relief Valve Challentes
(
 
==Reference:==
l'UREG-0737, Action Item II.K.3.3)
Therewere no unplanned or planned challenges to Safety Relief Valves during 1992.
Primary Coolar.t Specific Activity Analyses
(
 
==Reference:==
CPS Technical Specifications, Section 6.9.1.5(c))
All analysos for specific activity of primary coolant were within tha limits of Technical Specification 3.4.5 for 1992.
    - __ _ - _ _ - - _ _ _ _ _ _ - - _ - _        _.___m.____.-____-__.__-___._m_        - - . _ _ . - __                        __.__-_-_______.__m-__m. ---. - _ - - - . - _ - _ .        ___  --}}

Latest revision as of 19:55, 21 August 2022