ML20133B569: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:_ -. _. | ||
t i | |||
APPENDIX A NOTICE OF VIOLATION | |||
} | |||
l Mobile Pipeline Docket No. 99990001 i | |||
l Paoli, Pennsylvania 19301 General License l | |||
As a result of the inspection conducted on June 14, 1985, and in accordance I | |||
with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violations I | |||
were identified: | |||
i | |||
) | |||
10 CFR 31.5(c)(2) requires that any device possessed pursuant to 10 CFR 31.5(a) be tested for leakage of radioactive material and proper | |||
] | |||
operation of the on-off mechanism and indicator, if any, at no longer than six months intervals. | |||
Centrary to the above, as of June 14, 1985, a sealed source containing 4 I | |||
millicuries of cadmium-109 had not been tested for contamination or | |||
. leakage since October 1, 1984, an interval of more than six months. | |||
l This is a Severity Level IV violation (Supplement VI). | |||
1 i | |||
Pursuant to the provisions of 10 CFR 2.201, Mobile Pipeline is hereby required | |||
[ | |||
to submit to this office within thirty days of the date of the letter which l | |||
l transmitted this Notice, a written statement or explanation in reply, i | |||
including: (1) the corrective steps widch have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations, and (3) the date when full compliance will be achieved. Where good cause is l | |||
shown, consideration will be given to extending +his response time. | |||
i l | |||
1 I | |||
i i | |||
I i | |||
l f | |||
l | |||
[ | |||
i i | |||
0510070004 050924 IE GA999 EMvMDPIP 99990001 PDR i | |||
l j | |||
OFFICIAL RECORD COPY DL MOBILE - 0003.0.0 j | |||
09/17/85 i | |||
( | |||
3 1}} | |||
Latest revision as of 09:05, 12 December 2024
| ML20133B569 | |
| Person / Time | |
|---|---|
| Issue date: | 09/24/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20133B566 | List: |
| References | |
| 99990001-85-10, NUDOCS 8510070004 | |
| Download: ML20133B569 (1) | |
Text
_ -. _.
t i
APPENDIX A NOTICE OF VIOLATION
}
l Mobile Pipeline Docket No. 99990001 i
l Paoli, Pennsylvania 19301 General License l
As a result of the inspection conducted on June 14, 1985, and in accordance I
with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following violations I
were identified:
i
)
10 CFR 31.5(c)(2) requires that any device possessed pursuant to 10 CFR 31.5(a) be tested for leakage of radioactive material and proper
]
operation of the on-off mechanism and indicator, if any, at no longer than six months intervals.
Centrary to the above, as of June 14, 1985, a sealed source containing 4 I
millicuries of cadmium-109 had not been tested for contamination or
. leakage since October 1, 1984, an interval of more than six months.
l This is a Severity Level IV violation (Supplement VI).
1 i
Pursuant to the provisions of 10 CFR 2.201, Mobile Pipeline is hereby required
[
to submit to this office within thirty days of the date of the letter which l
l transmitted this Notice, a written statement or explanation in reply, i
including: (1) the corrective steps widch have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations, and (3) the date when full compliance will be achieved. Where good cause is l
shown, consideration will be given to extending +his response time.
i l
1 I
i i
I i
l f
l
[
i i
0510070004 050924 IE GA999 EMvMDPIP 99990001 PDR i
l j
OFFICIAL RECORD COPY DL MOBILE - 0003.0.0 j
09/17/85 i
(
3 1