ML20134F974: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:1 4
{{#Wiki_filter:1 4
  ~'
~'
NOTATION
......................o.I RELEASED TO THE PDR.\\
                                                                  ......................o.I yOTE.            RELEASED TO THE PDR
NOTATION yOTE.
                                                                                                  .\ '
RESPONSE SHEET bat 5
RESPONSE SHEET                     bat 5
,,,, in} a{s,,
                                                                                , , , , in} a{s,,
TO, J hn C. Hoyle, Secretary FROM:
TO,               J hn C. Hoyle, Secretary FROM:             CHAIRMAN JACKSON
CHAIRMAN JACKSON


==SUBJECT:==
==SUBJECT:==
SECY-96-215 - REQUIREMENTS FOR SHIPPING PACKAGES USED TO TRANSPORT VITRIFIED WASTES CONTAINING PLUTONIUM Approved                   Disapproved       XX             Abstain Not Participating                           Request Discussion I
SECY-96-215 - REQUIREMENTS FOR SHIPPING PACKAGES USED TO TRANSPORT VITRIFIED WASTES CONTAINING PLUTONIUM Approved Disapproved XX Abstain Not Participating Request Discussion COMMENTS:
COMMENTS:                                                                                     l See attached comments.
See attached comments.
lA4 4-bV      SIdNATURE Release Vote       / XX /                     October 18, 1996 DATE Withhold Vote         /     /
lA4 4-b V
Entered on "AS"         Yes     XX   No
SIdNATURE Release Vote
{%        ()
/ XX /
9611080219 961018 PDR   COMMS NRCC CORRESPONDENCE PDR C O t l t@
October 18, 1996 DATE Withhold Vote
/
/
{%
()
Entered on "AS" Yes XX No 9611080219 961018 PDR COMMS NRCC CORRESPONDENCE PDR C O t l t@


i g .
i g
CHAIRMAN JACKSON'S COMMENTS ON SECY-96-215 I disapprove the staff's recommendation to make and issue a
CHAIRMAN JACKSON'S COMMENTS ON SECY-96-215 I disapprove the staff's recommendation to make and issue a determination under 10 CFR 71.63 (b) (3) regarding canisters 4
;        determination under 10 CFR 71.63 (b) (3) regarding canisters 4
containing plutonium-bearing vitrified wastes.
containing plutonium-bearing vitrified wastes.     Such a determination could result in an exemption from the requirements of 71.63 (b) for double containment of plutonium shipments and set policy for a large number of plutonium shipments from U.S.
Such a determination could result in an exemption from the requirements of 71.63 (b) for double containment of plutonium shipments and set policy for a large number of plutonium shipments from U.S.
Department of Energy (DOE) facilities.     This policy issue should be addressed through rulemaking.
Department of Energy (DOE) facilities.
The staff should deny DOE's request for a determination under
This policy issue should be addressed through rulemaking.
,        10 CFR 71. 63 (b) (3) .
The staff should deny DOE's request for a determination under 10 CFR 71. 63 (b) (3).
!        The staff should immediately begin rulemaking on the issue of j         plutonium shipments. The staff should initially focus on rulemaking that addresses DOE's issue of shipping plutonium-bearing vitrified wastes in single containment packages. In the i
The staff should immediately begin rulemaking on the issue of j
longer term, the staff should also address through rulemaking whether the technical bases for 10 CFR 71.63 remain valid, or 3        whether a major revision or elimination of portions of 10 CFR 71.63 is needed to provide flexibility for current and possible i         future technologies.
plutonium shipments.
'        In SECY-96-215, the staff does not discuss the reasons for pursuing a determination process over rulemaking.     If the staff has a compelling reason for an urgent Commission decision on DOE's determination request, or a strong basis for not pursuing rulemaking, then the staff should inform the Commission immediately, before starting rulemaking.
The staff should initially focus on rulemaking that addresses DOE's issue of shipping plutonium-bearing vitrified wastes in single containment packages.
l
In the longer term, the staff should also address through rulemaking i
                                                                            ~i
whether the technical bases for 10 CFR 71.63 remain valid, or whether a major revision or elimination of portions of 10 CFR 3
      -,}}
71.63 is needed to provide flexibility for current and possible i
future technologies.
In SECY-96-215, the staff does not discuss the reasons for pursuing a determination process over rulemaking.
If the staff has a compelling reason for an urgent Commission decision on DOE's determination request, or a strong basis for not pursuing rulemaking, then the staff should inform the Commission immediately, before starting rulemaking.
~i
-,}}

Latest revision as of 04:36, 12 December 2024

Notation Vote Disapproving W/Comments SECY-96-215, Requirements for Shipping Packages Used to Transport Vitrified Wastes Containing Plutonium
ML20134F974
Person / Time
Issue date: 10/18/1996
From: Shirley Ann Jackson, The Chairman
NRC COMMISSION (OCM)
To: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
References
SECY-96-215-C, NUDOCS 9611080219
Download: ML20134F974 (2)


Text

1 4

~'

......................o.I RELEASED TO THE PDR.\\

NOTATION yOTE.

RESPONSE SHEET bat 5

,,,, in} a{s,,

TO, J hn C. Hoyle, Secretary FROM:

CHAIRMAN JACKSON

SUBJECT:

SECY-96-215 - REQUIREMENTS FOR SHIPPING PACKAGES USED TO TRANSPORT VITRIFIED WASTES CONTAINING PLUTONIUM Approved Disapproved XX Abstain Not Participating Request Discussion COMMENTS:

See attached comments.

lA4 4-b V

SIdNATURE Release Vote

/ XX /

October 18, 1996 DATE Withhold Vote

/

/

{%

()

Entered on "AS" Yes XX No 9611080219 961018 PDR COMMS NRCC CORRESPONDENCE PDR C O t l t@

i g

CHAIRMAN JACKSON'S COMMENTS ON SECY-96-215 I disapprove the staff's recommendation to make and issue a determination under 10 CFR 71.63 (b) (3) regarding canisters 4

containing plutonium-bearing vitrified wastes.

Such a determination could result in an exemption from the requirements of 71.63 (b) for double containment of plutonium shipments and set policy for a large number of plutonium shipments from U.S.

Department of Energy (DOE) facilities.

This policy issue should be addressed through rulemaking.

The staff should deny DOE's request for a determination under 10 CFR 71. 63 (b) (3).

The staff should immediately begin rulemaking on the issue of j

plutonium shipments.

The staff should initially focus on rulemaking that addresses DOE's issue of shipping plutonium-bearing vitrified wastes in single containment packages.

In the longer term, the staff should also address through rulemaking i

whether the technical bases for 10 CFR 71.63 remain valid, or whether a major revision or elimination of portions of 10 CFR 3

71.63 is needed to provide flexibility for current and possible i

future technologies.

In SECY-96-215, the staff does not discuss the reasons for pursuing a determination process over rulemaking.

If the staff has a compelling reason for an urgent Commission decision on DOE's determination request, or a strong basis for not pursuing rulemaking, then the staff should inform the Commission immediately, before starting rulemaking.

~i

-,