Docket No. 50-423 Attachment No. 3 Millstone Nuclear Power Station, Unit No. 3 SPDS Man-in-the-loop Validation Scenarios Y | Docket No. 50-423 Attachment No. 3 Millstone Nuclear Power Station, Unit No. 3 SPDS Man-in-the-loop Validation Scenarios Y | ||
r510290249 851016 PDR | r510290249 851016 PDR ADOCK 05000423 F | ||
PDR October,1985 L | |||
.., c, | |||
e i, | e i, | ||
SPDS MAN-IN-THE-LOOP VALIDATION SCENARIOS A' | SPDS MAN-IN-THE-LOOP VALIDATION SCENARIOS A' | ||
- 4 Inch Cold Leg Break with No High Head Safety Injection | |||
C | ' Steam Line Break Inside Containment with all Main Steam Isolation B | ||
Small Steam Generator Leak Simultaneous with Loss of Offsite Power and Subsequent Steam Generator Tube Rupture. | Valves Failing to Close and Main Feedwater Failing to Isolate. | ||
C Small Steam Generator Leak Simultaneous with Loss of Offsite Power and Subsequent Steam Generator Tube Rupture. | |||
Rupture of Two Main Steam Lines Outside Containment with all Main Steam Isolation Valves Falling to Close and Main Feedwater Falling to Isolate. | Rupture of Two Main Steam Lines Outside Containment with all Main D | ||
E | Steam Isolation Valves Falling to Close and Main Feedwater Falling to Isolate. | ||
Anticipated Transient Without Trip with Loss of All Feedwater ar:d | E Anticipated Transient Without Trip with Loss of All Feedwater ar:d | ||
- Subsequent Pressurizer Manway Leak. | |||
Rod Ejection During Startup with Plant Failing to Trip. | Rod Ejection During Startup with Plant Failing to Trip. | ||
I I | F I | ||
L | I L | ||
p- | p- | ||
'. x : ,:a | '. x :, ':a SCENARIO A INITIAL CONDITIONS: | ||
SCENARIO A INITIAL CONDITIONS: | 100% Power, EOL FAILED EQUIPMENT: | ||
' Charging Pump B out of service Sequencer in Train B out of service FAILED INSTRUMENTS: | |||
PZR' level RCS-P456 failed high RCS Cold Leg C Temp. RCS-T433B failed high SG 2 Level FWS-L528 failed low SG 3 Press. MSS-PS35 failed low INITIATING EVENT: | |||
4 inch cold leg break on loop B SIMULTANEOUS FAILURES: | |||
No high head safety injection CTMT Spray fails to auto actuate Loss of 4160 Bus 34C SUBSEQUENT FAILURES: | |||
None | |||
a SCENARIO B INITIAL CONDITIONS: | |||
SCENARIO B INITIAL CONDITIONS: | 100% Power, EOL FAILED EQUIPMENT: | ||
FW to SG3 flow FWS-F530 failed low RCS Pressure RCS-P403 failed high INITIATING EVENT: | . Charging Pump B out of service FAILED INSTRUMENTS: | ||
SG 3 level FWS-L538 failed high FW to SG3 flow FWS-F530 failed low RCS Pressure RCS-P403 failed high INITIATING EVENT: | |||
Steam Generator 3 steam line break inside CTMT SIMULTANEOUS FAILURES: | |||
All MSIVs fail to close | |||
. Main FW falls to isolate SUBSEQUENT FAILURES: | |||
SG3 Level FWS-L537 fails high i | |||
t. | t. | ||
i SCENARIO C INITIAL CONDITIONS: | |||
SCENARIO C INITIAL CONDITIONS: | 100% Power, EOL; 5% failed fuel FAILED EQUIPMENT: | ||
Diesel General A out for maintenance Charging Pump A out of service FAILED INSTRUMENTATION: | |||
None | |||
l | .INTIATING EVENTS: | ||
SGI Tube Leak of 5 GPM Loss of Offsite Power SIMULTANEOUS FAILURES: | |||
None SUBSEQUENT FAILURES: | |||
RCS Cold Leg A Temp. RCS-T4138 falls low SGI Tube Rupture of 1 KGPM Diesel Generator B Trips a | |||
l l | |||
f4 'D | f4 'D O. | ||
SCENARIO D | SCENARIO D INITIAL CONDITIONS: | ||
INITIAL CONDITIONS: | 3% Power, BOL FAILED EQUIPMENT: | ||
INITIATING EVENT: | None FAILED INSTRUMENTS: | ||
None at start of scenario SG 2 Level FWS-L527 drifts to 6% prior to initiating event INITIATING EVENT: | |||
Main Steam Line 2 rupture outside CTMT of SE6LB Main Steam Line 3 rupture outside CTMT of 5E6LB SIMULTANEOUS FAILURES: | |||
MSIVs fail to close Main FW fails to isolate SUBSEQUENT FAILURES: | |||
SGI Level RWS-L519 fails high | |||
/ | |||
.f h | |||
\\; | |||
6 I | 6 I | ||
o#3 SCENARIO F INITIAL CONDITIONS: | o- | ||
. SCENARIO E INITIAL CONDITIONS: | |||
100% Power, BOL; All rods in FAILED EQUIPMENT: | |||
Charging Pump A out of service FAILED INSTRUMENTS: | |||
None at start of scenario Main FW to SG3 FWS-F330 fails low INITIATING EVENT: | |||
Anticipated Transient Without Trip SIMULTANEOUS FAILURES: | |||
Loss of all Feedwater SUBSEQUENT FAILURES: | |||
PZR Manway leak of 1.3 E5 LB W | |||
o#3 SCENARIO F INITIAL CONDITIONS: | |||
Approx.101 on source range; BOL; Pulling rods manually to startup plant | |||
. FAILED EQUIPMENT: | |||
Steam Dump Setpoint greater than 1090 PSIG FAILED INSTRUMENTS: | |||
None at start of scenario SG 3 pressure MSS-P535 fails to 650 PSIG INITIATING EVENT: | |||
Rod ejection SIMULTANEOUS FAILURES: | |||
None SUBSEQUENT FAILURES: | |||
None e | |||
-}} | |||
Latest revision as of 19:10, 11 December 2024
| ML20138J098 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1985 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20138J066 | List: |
| References | |
| NUDOCS 8510290249 | |
| Download: ML20138J098 (8) | |
Text
o.
Docket No. 50-423 Attachment No. 3 Millstone Nuclear Power Station, Unit No. 3 SPDS Man-in-the-loop Validation Scenarios Y
r510290249 851016 PDR ADOCK 05000423 F
PDR October,1985 L
.., c,
e i,
SPDS MAN-IN-THE-LOOP VALIDATION SCENARIOS A'
- 4 Inch Cold Leg Break with No High Head Safety Injection
' Steam Line Break Inside Containment with all Main Steam Isolation B
Valves Failing to Close and Main Feedwater Failing to Isolate.
C Small Steam Generator Leak Simultaneous with Loss of Offsite Power and Subsequent Steam Generator Tube Rupture.
Rupture of Two Main Steam Lines Outside Containment with all Main D
Steam Isolation Valves Falling to Close and Main Feedwater Falling to Isolate.
E Anticipated Transient Without Trip with Loss of All Feedwater ar:d
- Subsequent Pressurizer Manway Leak.
Rod Ejection During Startup with Plant Failing to Trip.
F I
I L
p-
'. x :, ':a SCENARIO A INITIAL CONDITIONS:
100% Power, EOL FAILED EQUIPMENT:
' Charging Pump B out of service Sequencer in Train B out of service FAILED INSTRUMENTS:
PZR' level RCS-P456 failed high RCS Cold Leg C Temp. RCS-T433B failed high SG 2 Level FWS-L528 failed low SG 3 Press. MSS-PS35 failed low INITIATING EVENT:
4 inch cold leg break on loop B SIMULTANEOUS FAILURES:
No high head safety injection CTMT Spray fails to auto actuate Loss of 4160 Bus 34C SUBSEQUENT FAILURES:
None
a SCENARIO B INITIAL CONDITIONS:
100% Power, EOL FAILED EQUIPMENT:
. Charging Pump B out of service FAILED INSTRUMENTS:
SG 3 level FWS-L538 failed high FW to SG3 flow FWS-F530 failed low RCS Pressure RCS-P403 failed high INITIATING EVENT:
Steam Generator 3 steam line break inside CTMT SIMULTANEOUS FAILURES:
All MSIVs fail to close
. Main FW falls to isolate SUBSEQUENT FAILURES:
SG3 Level FWS-L537 fails high i
t.
i SCENARIO C INITIAL CONDITIONS:
100% Power, EOL; 5% failed fuel FAILED EQUIPMENT:
Diesel General A out for maintenance Charging Pump A out of service FAILED INSTRUMENTATION:
None
.INTIATING EVENTS:
SGI Tube Leak of 5 GPM Loss of Offsite Power SIMULTANEOUS FAILURES:
None SUBSEQUENT FAILURES:
RCS Cold Leg A Temp. RCS-T4138 falls low SGI Tube Rupture of 1 KGPM Diesel Generator B Trips a
l l
f4 'D O.
SCENARIO D INITIAL CONDITIONS:
3% Power, BOL FAILED EQUIPMENT:
None FAILED INSTRUMENTS:
None at start of scenario SG 2 Level FWS-L527 drifts to 6% prior to initiating event INITIATING EVENT:
Main Steam Line 2 rupture outside CTMT of SE6LB Main Steam Line 3 rupture outside CTMT of 5E6LB SIMULTANEOUS FAILURES:
MSIVs fail to close Main FW fails to isolate SUBSEQUENT FAILURES:
SGI Level RWS-L519 fails high
/
.f h
\\;
6 I
o-
. SCENARIO E INITIAL CONDITIONS:
100% Power, BOL; All rods in FAILED EQUIPMENT:
Charging Pump A out of service FAILED INSTRUMENTS:
None at start of scenario Main FW to SG3 FWS-F330 fails low INITIATING EVENT:
Anticipated Transient Without Trip SIMULTANEOUS FAILURES:
Loss of all Feedwater SUBSEQUENT FAILURES:
PZR Manway leak of 1.3 E5 LB W
o#3 SCENARIO F INITIAL CONDITIONS:
Approx.101 on source range; BOL; Pulling rods manually to startup plant
. FAILED EQUIPMENT:
Steam Dump Setpoint greater than 1090 PSIG FAILED INSTRUMENTS:
None at start of scenario SG 3 pressure MSS-P535 fails to 650 PSIG INITIATING EVENT:
Rod ejection SIMULTANEOUS FAILURES:
None SUBSEQUENT FAILURES:
None e
-