ML20140C930: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:~ . . . .          . .        ..    . . . - -      -- -~               ---- -        --      -    --,  - - - - - -
{{#Wiki_filter:[_.
[_.   :          .,
-- -~
yg.               4                             UNITED STATES j
~....
  . .                                                                                                                                  t g .3                             NUCLEAR REGULATORY COMMISSION o,                't                         WASHINGTON. D.C. 20$5M)001
yg.
                  %.....,/.
4 UNITED STATES t
g.3 j
NUCLEAR REGULATORY COMMISSION
't WASHINGTON. D.C. 20$5M)001 o,
%.....,/
April 16, 1997 i
April 16, 1997 i
t Mr. George Rael, Acting Director U.S. Department of Energy .                                                                                     ,
t Mr. George Rael, Acting Director U.S. Department of Energy.
Albuquerque Operations Office                                                                                   j ERD /UMTRA
Albuquerque Operations Office j
}                       P.O.-Box 5400                                                                                                   :
ERD /UMTRA
                      . Albuquerque. NM 87185-5400 i
}
P.O.-Box 5400
. Albuquerque. NM 87185-5400 i


==SUBJECT:==
==SUBJECT:==
FINAL COMPLETION REVIEW REPORT FOR THE FALLS CITY, TEXAS
FINAL COMPLETION REVIEW REPORT FOR THE FALLS CITY, TEXAS URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITE
!                                      URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITE


==Dear Mr. Rael:==
==Dear Mr. Rael:==
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report and associated documents pertinent to the Uranium Mill Tailings Remedial Action Project i                      inactive uranium mill tailings site at Falls City. Texas. These documents                                     i include Completion Report pages transmitted on August 14 and September 13,
The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report and associated documents pertinent to the Uranium Mill Tailings Remedial Action Project inactive uranium mill tailings site at Falls City. Texas. These documents i
'                        1996, as well as on March 17 and April 10, 1997.
i include Completion Report pages transmitted on August 14 and September 13, 1996, as well as on March 17 and April 10, 1997.
The NRC staff's review is documented in the enclosed final Completion Review Report (Enclosure 1), which discusses the staff's evaluation of the completed remedial action against the previously approved plans and specifications.
The NRC staff's review is documented in the enclosed final Completion Review Report (Enclosure 1), which discusses the staff's evaluation of the completed remedial action against the previously approved plans and specifications.
Based on its review of the Com)letion Report, NRC staff concurs that DOE has performed remedial' action at tie Falls City :ite in accordance with the approved plans and specifications, with the exception of the selection and performance of a groundwater cleanup program.               DOE, with NRC approval, has deferred this aspect of the remedial action to a separate groundwater                                         ,
Based on its review of the Com)letion Report, NRC staff concurs that DOE has performed remedial' action at tie Falls City :ite in accordance with the approved plans and specifications, with the exception of the selection and performance of a groundwater cleanup program.
restoration program. I have, therefore, signed and enclosed the DOE Certification Summary (Enclosure 2) signifying concurrence in completion of the Falls City remedial action (other than groundwater cleanup).
DOE, with NRC approval, has deferred this aspect of the remedial action to a separate groundwater restoration program.
k 9704210127 970416 PDR     WASTE
I have, therefore, signed and enclosed the DOE Certification Summary (Enclosure 2) signifying concurrence in completion of the Falls City remedial action (other than groundwater cleanup).
                                                            "                                                    l hN WM-65               PDR 21002G                                                                                         j
k hN l
9704210127 970416 PDR WASTE WM-65 PDR 21002G j


..        s-
s-
                .G. Real                                                                                         If you have any questions concerning this subject letter or the enclosures, please contact the-NRC Project Manager for the Falls. City site, Ms. Elaine Brummett, (301) 415-6606.
.G.
Real If you have any questions concerning this subject letter or the enclosures, please contact the-NRC Project Manager for the Falls. City site, Ms. Elaine Brummett, (301) 415-6606.
Sincerely.
Sincerely.
(Original signed by)
(Original signed by)
Charles L. Cain, Acting Chief Uranium Recovery Branch           !
Charles L. Cain, Acting Chief Uranium Recovery Branch Division of Waste Management i
Division of Waste Management       i Office of Nuclear Material Safety and Safeguards i
Office of Nuclear Material Safety and Safeguards


==Enclosures:==
==Enclosures:==
As stated                                                                                                 ;
As stated cc:
cc:         R. Edge, DOE Alb                                                                                         ;
R. Edge, DOE Alb S. Hamp. DOE Alb 1
S. Hamp. DOE Alb                                                                                           1 E. Artiglia. TAC Alb 1
E. Artiglia. TAC Alb 1
i l
i DISTRIBUTION w/ Encl.:
DISTRIBUTION w/ Encl.:                             FiliC' enter                 PUBLIC           NMSS r/f       URB r/f l                                                       CNWRA                       JHolonich                                           l l                                                                                                                                          !
FiliC' enter PUBLIC NMSS r/f URB r/f l
l w/o Enci.:                           MFederline                   ACNW DOCUMENT NAME:                   S:\DWM\ URB \ESB\FCT CRR.LTR                                                                     l OFC             URB E URB N                             $        URB             6                         !
CNWRA JHolonich l
EBrummeN., -
w/o Enci.:
7 j_      NAME-                                        ,
MFederline ACNW l
DGillen                             CCainGLL                                 j l       DATE             4/l5'97                           4/10/97                   N       4//6/97                                 l l                                                                              OF21CIAL RECORD CDPf                                     l i
DOCUMENT NAME:
l a
S:\\DWM\\ URB \\ESB\\FCT CRR.LTR OFC URB E URB N URB 6
t l
j_
4 l
NAME-EBrummeN., -
l' L
7 DGillen CCainGLL j
u - -                                                                   -              w       my
l DATE 4/l5'97 4/10/97 N
4//6/97 l
OF21CIAL RECORD CDPf i
la t
l 4
l l'
L u - -
w my


si4+             4*-,- m na 8     >
- 4 si4+
s     ,8 0
4*-,-
m na 8
s
,8 0
G 1
G 1
h I
h I
Line 73: Line 90:
i i
i i
l 1
l 1
1 1
i l
i l
l
l
            .}}
.}}

Latest revision as of 18:04, 11 December 2024

Forwards Final Completion Review Rept for Remedial Action at Falls City,Tx Umtra Project Site, for Apr 1997
ML20140C930
Person / Time
Issue date: 04/16/1997
From: Cain C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
Shared Package
ML20140C935 List:
References
REF-WM-65 NUDOCS 9704210127
Download: ML20140C930 (4)


Text

[_.

-- -~

~....

yg.

4 UNITED STATES t

g.3 j

NUCLEAR REGULATORY COMMISSION

't WASHINGTON. D.C. 20$5M)001 o,

%.....,/

April 16, 1997 i

t Mr. George Rael, Acting Director U.S. Department of Energy.

Albuquerque Operations Office j

ERD /UMTRA

}

P.O.-Box 5400

. Albuquerque. NM 87185-5400 i

SUBJECT:

FINAL COMPLETION REVIEW REPORT FOR THE FALLS CITY, TEXAS URANIUM MILL TAILINGS REMEDIAL ACTION PROJECT SITE

Dear Mr. Rael:

The U.S. Nuclear Regulatory Commission staff has completed its review of the U.S. Department of Energy's (DOE's) Final Completion Report and associated documents pertinent to the Uranium Mill Tailings Remedial Action Project inactive uranium mill tailings site at Falls City. Texas. These documents i

i include Completion Report pages transmitted on August 14 and September 13, 1996, as well as on March 17 and April 10, 1997.

The NRC staff's review is documented in the enclosed final Completion Review Report (Enclosure 1), which discusses the staff's evaluation of the completed remedial action against the previously approved plans and specifications.

Based on its review of the Com)letion Report, NRC staff concurs that DOE has performed remedial' action at tie Falls City :ite in accordance with the approved plans and specifications, with the exception of the selection and performance of a groundwater cleanup program.

DOE, with NRC approval, has deferred this aspect of the remedial action to a separate groundwater restoration program.

I have, therefore, signed and enclosed the DOE Certification Summary (Enclosure 2) signifying concurrence in completion of the Falls City remedial action (other than groundwater cleanup).

k hN l

9704210127 970416 PDR WASTE WM-65 PDR 21002G j

s-

.G.

Real If you have any questions concerning this subject letter or the enclosures, please contact the-NRC Project Manager for the Falls. City site, Ms. Elaine Brummett, (301) 415-6606.

Sincerely.

(Original signed by)

Charles L. Cain, Acting Chief Uranium Recovery Branch Division of Waste Management i

Office of Nuclear Material Safety and Safeguards

Enclosures:

As stated cc:

R. Edge, DOE Alb S. Hamp. DOE Alb 1

E. Artiglia. TAC Alb 1

i DISTRIBUTION w/ Encl.:

FiliC' enter PUBLIC NMSS r/f URB r/f l

CNWRA JHolonich l

w/o Enci.:

MFederline ACNW l

DOCUMENT NAME:

S:\\DWM\\ URB \\ESB\\FCT CRR.LTR OFC URB E URB N URB 6

j_

NAME-EBrummeN., -

7 DGillen CCainGLL j

l DATE 4/l5'97 4/10/97 N

4//6/97 l

OF21CIAL RECORD CDPf i

la t

l 4

l l'

L u - -

w my

- 4 si4+

4*-,-

m na 8

s

,8 0

G 1

h I

ENCLOSURE 1 1

I i

i i

l 1

i l

l

.