ML20135A829: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
I | I GPU Nv,! ear,Inc. | ||
k | k Route 441 South NUCLEAR Post once Box 480 Middletown, PA 17057 0480 Tel 717-944 7621 November 13, 1996 6710-96-2383 i | ||
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen: | U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen: | ||
==Subject:== | ==Subject:== | ||
Three Mile Island Nuclear Station, Unit I (TMI-1) l | Three Mile Island Nuclear Station, Unit I (TMI-1) l Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for October 1996 l | ||
Docket No. 50-289 Monthly Operating Report for October 1996 l | 1 l | ||
1 l | Enclosed are two copies of the October 1996 Monthly Operating Repon for Three Mile Island Nuclear Station, Unit 1. | ||
l Sincerely, J. Knubel | l Sincerely, J. Knubel Vice President and Director, TMI WGH 030094 T' g } k j | ||
cc: Administrator, Region I TMI Senior Resident Inspector 96001 9612040057 961031 PDR ADOCK 05000289 R | |||
PDR t | |||
~ | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-289 UNIT | AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
50-289 UNIT TMI-1 DATE 11 1L 46 COMPLETED BY W G HEYSEK TELEPHONE (717) 948-8191 MONTH: | |||
13 | OCTOBER DAY AVERAGE DAILY POWG LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) | ||
14 | (MWe-NET) 1 807 17 805 2 | ||
808 18 807 3 | |||
811 19 818 4 | |||
822 20 817 5 | |||
819 21 817 6 | |||
817 22 814 7 | |||
815 23 809 8 | |||
812 24 812 9 | |||
810 25 814 10 813 26 813 11 819 27 808 12 819 28 807 13 B12 29 817 14 807 30 807 15 817 31 814 16 808 l | |||
l i | l i | ||
l | l | ||
OPERATING DATA REPORT r | |||
DOCKET NO. | |||
: 1. UNIT NAME: | 50-289 DATE 11-13-96 COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191 | ||
: 2. REPORTING PERIOD: | : 1. UNIT NAME: | ||
: 3. LICENSED THERMAL POWER: | THREE MILE ISLAND UNIT 1 NOTES: | ||
: 4. NAMEPLATE RATING (GROSS MWe): | : 2. REPORTING PERIOD: | ||
: 5. DESIGN ELECTRICAL RATING (NET MWe): | OCTOBE 1996 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) | : 3. LICENSED THERMAL POWER: | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): | 2568 | ||
: 4. NAMEPLATE RATING (GROSS MWe): | |||
872 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWe): | |||
819 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 834 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): | |||
786 | |||
: 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS: | : 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS: | ||
4 | 4 | ||
| Line 51: | Line 66: | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
lHIS MONTH YR-TO-DATE CUMMULATIVE 1 | lHIS MONTH YR-TO-DATE CUMMULATIVE 1 | ||
: 11. HOURS IN REPORTING PERIOD | : 11. HOURS IN REPORTING PERIOD (HRS) 745.0 7320.0 194305.0 | ||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL | : 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 745.0 7320.0 116863.1 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 2284.0 | ||
: 14. HOURS GENERATOR ON-LINE | : 14. HOURS GENERATOR ON-LINE (HRS) 745.0 7320.0 115701.3 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0 | ||
: 16. GROSS THERMAL ENERGY GENERATED | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,911,208.3 18,734,895.4 284,849,821.4 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 639,813.0 6,240,218.0 95,693,692.1 | ||
: 18. NET ELECTRICAL ENERGY GENERATED | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 605,435.0 5,898,205.0 89,941,609.1 | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR | ||
: 20. UNIT AVAILABILITY FACTOR | (%) | ||
: 21. UNIT CAPACITY FACTOR | 100.0 100.0 59.5 | ||
: 22. UNIT CAPACITY FACTOR | : 20. UNIT AVAILABILITY FACTOR | ||
: 23. UNIT FORCED OUTAGE RATE | (%) | ||
100.0 100.0 59.5 | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.4 102.5 58.9 | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 98.4 56.5 | |||
: 23. UNIT FORCED OUTAGE RATE | |||
(%) | |||
0.0 0.0 34.4 UNIT FORCED OUTAGE HOURS (HRS) 0.0 0.0 60761.2 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
DOCKET No. | DOCKET No. | ||
DATE 11-13-96 | 50-289 UNIT NAME TMI-1 DATE REPORT MONTH October 1996 11-13-96 COMPLETED BY W. G. Heysek | ||
*4 TELEPHONE (717) 948-8191 Method of Luensee Sie Compnnent Came & Cmectws Shumng Event Code Code Actwn to N* | |||
(Hours) | Osm hve Durstwn Reason' 2 | ||
C-Refinelmg | gg | ||
D Regulatory Resen1mn | %p,- | ||
EWoe Tang & hmg Exanunnon | (Hours) pg ogs ege None 1 | ||
H-Other (Explem) | 2 3 | ||
4 F F:vced Reason Method Exh: tut G-Imtnn1mns for 5 Scheduled A Eqinpment Fadure qErpimn) 1-Manual preparanon of Data Entry Shees B4tamrenance or Test 2 ManualScram forImensee Event Report (LER) | |||
C-Refinelmg 3-Automanc Scram File (NUREG-0161) | |||
D Regulatory Resen1mn 4other(Explam) | |||
EWoe Tang & hmg Exanunnon 5 Exinw i.an.curce F-Adnurweative G-opernixmal Emv IExplam) | |||
H-Other (Explem) b Actuary used exhibin F & 11 NL1tEG G16t | |||
- -}} | |||
Latest revision as of 02:51, 12 December 2024
| ML20135A829 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/31/1996 |
| From: | Heysek W, James Knubel GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6710-96-2383, NUDOCS 9612040057 | |
| Download: ML20135A829 (4) | |
Text
.
I GPU Nv,! ear,Inc.
k Route 441 South NUCLEAR Post once Box 480 Middletown, PA 17057 0480 Tel 717-944 7621 November 13, 1996 6710-96-2383 i
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1) l Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for October 1996 l
1 l
Enclosed are two copies of the October 1996 Monthly Operating Repon for Three Mile Island Nuclear Station, Unit 1.
l Sincerely, J. Knubel Vice President and Director, TMI WGH 030094 T' g } k j
cc: Administrator, Region I TMI Senior Resident Inspector 96001 9612040057 961031 PDR ADOCK 05000289 R
PDR t
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-289 UNIT TMI-1 DATE 11 1L 46 COMPLETED BY W G HEYSEK TELEPHONE (717) 948-8191 MONTH:
OCTOBER DAY AVERAGE DAILY POWG LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 807 17 805 2
808 18 807 3
811 19 818 4
822 20 817 5
819 21 817 6
817 22 814 7
815 23 809 8
812 24 812 9
810 25 814 10 813 26 813 11 819 27 808 12 819 28 807 13 B12 29 817 14 807 30 807 15 817 31 814 16 808 l
l i
l
OPERATING DATA REPORT r
DOCKET NO.
50-289 DATE 11-13-96 COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191
- 1. UNIT NAME:
THREE MILE ISLAND UNIT 1 NOTES:
- 2. REPORTING PERIOD:
OCTOBE 1996
- 3. LICENSED THERMAL POWER:
2568
- 4. NAMEPLATE RATING (GROSS MWe):
872
- 5. DESIGN ELECTRICAL RATING (NET MWe):
819
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 834
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
786
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
4
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
lHIS MONTH YR-TO-DATE CUMMULATIVE 1
- 11. HOURS IN REPORTING PERIOD (HRS) 745.0 7320.0 194305.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 745.0 7320.0 116863.1
- 13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 2284.0
- 14. HOURS GENERATOR ON-LINE (HRS) 745.0 7320.0 115701.3
- 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,911,208.3 18,734,895.4 284,849,821.4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 639,813.0 6,240,218.0 95,693,692.1
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 605,435.0 5,898,205.0 89,941,609.1
- 19. UNIT SERVICE FACTOR
(%)
100.0 100.0 59.5
- 20. UNIT AVAILABILITY FACTOR
(%)
100.0 100.0 59.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.4 102.5 58.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 98.4 56.5
- 23. UNIT FORCED OUTAGE RATE
(%)
0.0 0.0 34.4 UNIT FORCED OUTAGE HOURS (HRS) 0.0 0.0 60761.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET No.
50-289 UNIT NAME TMI-1 DATE REPORT MONTH October 1996 11-13-96 COMPLETED BY W. G. Heysek
- 4 TELEPHONE (717) 948-8191 Method of Luensee Sie Compnnent Came & Cmectws Shumng Event Code Code Actwn to N*
Osm hve Durstwn Reason' 2
gg
%p,-
(Hours) pg ogs ege None 1
2 3
4 F F:vced Reason Method Exh: tut G-Imtnn1mns for 5 Scheduled A Eqinpment Fadure qErpimn) 1-Manual preparanon of Data Entry Shees B4tamrenance or Test 2 ManualScram forImensee Event Report (LER)
C-Refinelmg 3-Automanc Scram File (NUREG-0161)
D Regulatory Resen1mn 4other(Explam)
EWoe Tang & hmg Exanunnon 5 Exinw i.an.curce F-Adnurweative G-opernixmal Emv IExplam)
H-Other (Explem) b Actuary used exhibin F & 11 NL1tEG G16t
- -