ML20137M984: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:r | {{#Wiki_filter:r | ||
/8/d | |||
> | |||
. | |||
1AN 211386 | |||
__ | |||
jATTN:eorgia Power Company | |||
Mr. R. J. Kelly | |||
Executive Vice President | |||
P. O. Box 4545 | |||
Atlanta, GA 30302 | |||
Gentlemen: | |||
SUBJECT: | |||
REPORT NO. 50-321/85-37 | |||
On December 26-27, 1985, NRC inspected activities authorized by NRC Operating | |||
License No. DPR-57 for your Hatch facility. At the conclusion of the inspection, | |||
the findings were discussed with those members of your staff identified in the | |||
enclosed inspection report. | |||
Areas examined during the inspection are identified in the report. Within these | |||
areas, the inspection consisted of selective examinations of procedures and | |||
representative records, interviews with personnel, and observation of activities | |||
in progress. | |||
Within the scope of the inspection, no violations or deviations were identified. | |||
Should you have any questions concerning this letter, please contact us. | |||
Sincerely, | |||
\\Sd | |||
Virgil L. Brownlee, Chief | |||
Reactor Projects Branch 3 | |||
Division of Reactor Projects | |||
Enclosure: | |||
Inspection Report No. 50-321/85-37 | |||
cp w/ encl: | |||
W. T. Beckham, Vice President and | |||
eneral Manager-Nuclear Operation | |||
C. Nix, Site General Manager | |||
,. E. Fornel, Site QA Supervisor | |||
tE. Gucwa, Chief, Nuclear Engineer | |||
c w/ encl: | |||
C Resident Inspector | |||
8601290119 e60121 | |||
gh S. Jordan, Executive Secretary | |||
PDR | |||
ADOCK 05000321 | |||
Document Control Desk | |||
G | |||
PDR | |||
State of Georgia | |||
RII | |||
RIId | |||
RII | |||
A | |||
,A | |||
y | |||
~ | |||
- | |||
TGi ons:bhg | |||
TConlon | |||
AHerdt | |||
1/ /86 | |||
l b g | |||
1//6'/86 | |||
1/g/86 | |||
, | |||
.CEO l | |||
'- | |||
}} | }} | ||
Latest revision as of 22:42, 11 December 2024
| ML20137M984 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/21/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20137M990 | List: |
| References | |
| NUDOCS 8601290119 | |
| Download: ML20137M984 (1) | |
See also: IR 05000321/1985037
Text
r
/8/d
>
.
1AN 211386
__
jATTN:eorgia Power Company
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT NO. 50-321/85-37
On December 26-27, 1985, NRC inspected activities authorized by NRC Operating
License No. DPR-57 for your Hatch facility. At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
\\Sd
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-321/85-37
cp w/ encl:
W. T. Beckham, Vice President and
eneral Manager-Nuclear Operation
C. Nix, Site General Manager
,. E. Fornel, Site QA Supervisor
tE. Gucwa, Chief, Nuclear Engineer
c w/ encl:
C Resident Inspector
8601290119 e60121
gh S. Jordan, Executive Secretary
ADOCK 05000321
Document Control Desk
G
State of Georgia
RII
RIId
RII
A
,A
y
~
-
TGi ons:bhg
TConlon
AHerdt
1/ /86
l b g
1//6'/86
1/g/86
,
.CEO l
'-