ML20137X942: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. .
{{#Wiki_filter:.
Arizona Nuclear Power Project P O. BOX 52034
Arizona Nuclear Power Project P O. BOX 52034
* PHOENIX, ARIZCNA 85072-2034 February 26, 1986 ANPP-35322-EEVBJr/LAS/DRL-92.ll iG
* PHOENIX, ARIZCNA 85072-2034 February 26, 1986 ANPP-35322-EEVBJr/LAS/DRL-92.ll iG
                                                                                    .n     .
.n
                                                                                  .@n     $:
.@n U. S. Nuclear Regulatory Commission li i
U. S. Nuclear Regulatory Commission                                           li       i       m Region V                                                                   U             [j 1450 Maria' Lane - Suite 210                                               ;;            'g Walnut Creek, California 94596-5368 3        L4 Attention: Mr. D. F. Kirsch, Acting Director                                     D Division of Reactor Safety & Projects Palo Verde Nuclear Generating Station (PVNGS)
m Region V U
[j 1450 Maria' Lane - Suite 210 3
'g L4 Walnut Creek, California 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director D
Division of Reactor Safety & Projects Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. 50/530
Unit 3 Docket No. 50/530


Line 32: Line 36:


==Dear Sir:==
==Dear Sir:==
The NRC was notified of the subject Deficiency Evaluation in the refer-enced telephone conversation, with a determination of reportability to be made within thirty (30) days (February 28, 1986).
The NRC was notified of the subject Deficiency Evaluation in the refer-enced telephone conversation, with a determination of reportability to be made within thirty (30) days (February 28, 1986).
The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e) and 10CFR21, therefore no written report is required. Necessary documentation of the evaluation will be maintained in ANPP files.
The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e) and 10CFR21, therefore no written report is required. Necessary documentation of the evaluation will be maintained in ANPP files.
Very truly yours.
Very truly yours.
l c
l c
                                                      -      -    CCJLL   (\LLL E. E. Van Brunt, Jr.
CCJLL
Executive Vice President Project Director EEVB/DRL/pgk-cc: See Page Two 8603120046 860226 PDR   ADOCK 05000530 S                 PM                                                                           'O Z E .2 1
(\\LLL E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/DRL/pgk-cc:
See Page Two 8603120046 860226 PDR ADOCK 05000530 S
PM
'O Z E.2 1


ANPP-35322-EEVLJr/LAS/DRL-92.11 February 26, 1986 Mr. D. F. Kirsch DER 86-02 Page Two cc:                 Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555 A. C. Gehr         (4141)
ANPP-35322-EEVLJr/LAS/DRL-92.11 February 26, 1986 Mr. D. F. Kirsch DER 86-02 Page Two cc:
R. P. Zimmerman   (6241)
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141)
R. P. Zimmerman (6241)
Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339}}
Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339}}

Latest revision as of 20:37, 11 December 2024

Final Part 21 & Deficiency Rept DER 86-02 Concerning Evaluation of Reactor Coolant Pump Coast Down Time.Initially Reported on 860129.Deficiency Not Reportable Under 10CFR50.55(e) & 10CFR21
ML20137X942
Person / Time
Site: Palo Verde 
Issue date: 02/26/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-86-086-000 DER-86-02, DER-86-2, PT21-86-086-000, PT21-86-86, NUDOCS 8603120046
Download: ML20137X942 (2)


Text

.

Arizona Nuclear Power Project P O. BOX 52034

.n

.@n U. S. Nuclear Regulatory Commission li i

m Region V U

[j 1450 Maria' Lane - Suite 210 3

'g L4 Walnut Creek, California 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director D

Division of Reactor Safety & Projects Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No. 50/530

Subject:

Deficiency Evaluation Report - DER 86-02 A 50.55(e) Evaluation Relating to RC Pump Coast Down Time File: 86-006-216; D.4.33.2; 86-056-026

Reference:

Telephone Conversation between L. Miller and T. R. Bradish on January 29, 1986

Dear Sir:

The NRC was notified of the subject Deficiency Evaluation in the refer-enced telephone conversation, with a determination of reportability to be made within thirty (30) days (February 28, 1986).

The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e) and 10CFR21, therefore no written report is required. Necessary documentation of the evaluation will be maintained in ANPP files.

Very truly yours.

l c

CCJLL

(\\LLL E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/DRL/pgk-cc:

See Page Two 8603120046 860226 PDR ADOCK 05000530 S

PM

'O Z E.2 1

ANPP-35322-EEVLJr/LAS/DRL-92.11 February 26, 1986 Mr. D. F. Kirsch DER 86-02 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555 A. C. Gehr (4141)

R. P. Zimmerman (6241)

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339