INDEPENDENT REVIEW H                                               l ZIMME     PROJECT MANAGEMENT BIVEEELY STATUS REPORT EO. 3                                           <
e e
FOR THE                                               '
INDEPENDENT REVIEW H ZIMME PROJECT MANAGEMENT BIVEEELY STATUS REPORT EO. 3 FOR THE PERIOD ENDING JUNE 3, 1983 The status report below is in reference to the Torrey Pines Technology Program Plan, document number GA-C17044, Revision A,
PERIOD ENDING JUNE 3, 1983 The status report below is in reference to the Torrey Pines Technology Program Plan, document number GA-C17044, Revision A,
" Independent Review of ZIMMER Project Management," dated May, 1983 Revision A of the program plan, incorporating changes as described in Biweekly Status Report No.
                        " Independent Review of ZIMMER Project Management," dated May, 1983 Revision A of the program plan, incorporating changes as described in Biweekly Status Report No. 2, was described and discussed in a public meeting with the NRC Region III on May 26, in the Americana Hotel at the Greater Cincinnati International Airport.           The revised program plan was accepted by the NRC with the proviso that a review be added of the interfaces between CG&E and Reactor Controls Incorporated (RCI).
2, was described and discussed in a public meeting with the NRC Region III on May 26, in the Americana Hotel at the Greater Cincinnati International Airport.
Three TPT people spent Saturday, May 21, in the CG&E Nuclear Operations Central Files in downtown Cincinnati, reviewing documents which appeared to be pertinent to this study. Thir-teen additional TPT team members travelled to Cincinnati on May 22.           The entire tean of 16 TPT personnel commenced detailed follow-up interviews and a review of documentation related to the Zimmer Project on Monday morning, May 23                                       As of June 3, there were 18 people on the TPT team at Zimmer.
The revised program plan was accepted by the NRC with the proviso that a review be added of the interfaces between CG&E and Reactor Controls Incorporated (RCI).
The TPT team has spent the two weeks covered by this report reviewing the documents identified by the early arriving mem-bers, and reviewing documents in a number of CG&E site depart-mental files as well as subcontractor files.                                       Access to KEI's files was restricted pending review by KEI's legal counsel.
Three TPT people spent Saturday, May 21, in the CG&E Nuclear Operations Central Files in downtown Cincinnati, reviewing documents which appeared to be pertinent to this study. Thir-teen additional TPT team members travelled to Cincinnati on May 22.
Team members interviewed additional CG&E and subcontractor personnel and outside interested parties as well as reinter-viewing individuals on particular points.                                   Attachment A lists the 78 individuals who were interviewed during this reporting period.           Additional personnel were contacted by telephone or in person for simple questions, such as the location of certain documentation.
The entire tean of 16 TPT personnel commenced detailed follow-up interviews and a review of documentation related to the Zimmer Project on Monday morning, May 23 As of June 3, there were 18 people on the TPT team at Zimmer.
The TPT team has spent the two weeks covered by this report reviewing the documents identified by the early arriving mem-bers, and reviewing documents in a number of CG&E site depart-mental files as well as subcontractor files.
Access to KEI's files was restricted pending review by KEI's legal counsel.
Team members interviewed additional CG&E and subcontractor personnel and outside interested parties as well as reinter-viewing individuals on particular points.
Attachment A lists the 78 individuals who were interviewed during this reporting period.
Additional personnel were contacted by telephone or in person for simple questions, such as the location of certain documentation.
Over 2,000 documents have been identified for review and eval-uation by the TPT team during this visit to the Cincinnati area.
Over 2,000 documents have been identified for review and eval-uation by the TPT team during this visit to the Cincinnati area.
One of the additions to the TPT team after May 23 was a records control specialist whose job has been to catalog the documents identified by assigning each one a TPT access number, together with pertinent information on dates, author, subject, key words, etc.         This information is being input into the computerized r"JO6230133 830610 PDR ADOCK 05000358 R                           PDR
One of the additions to the TPT team after May 23 was a records control specialist whose job has been to catalog the documents identified by assigning each one a TPT access number, together with pertinent information on dates, author, subject, key words, etc.
This information is being input into the computerized r"JO6230133 830610 PDR ADOCK 05000358 R
PDR


Biweekly Status Report No. 3 for the period ending June 3, 1983 Page Two document data base at TPT headquarters in San Diego, using a remote terminal connected by telephone to the'TPT computer.
Biweekly Status Report No. 3 for the period ending June 3, 1983 Page Two document data base at TPT headquarters in San Diego, using a remote terminal connected by telephone to the'TPT computer.
Equipment problems delayed this operation and not all of the documents had been cataloged by June 3   Attachment B lists the documents that have been cataloged; the remainder will be listed in the next report.
Equipment problems delayed this operation and not all of the documents had been cataloged by June 3 Attachment B lists the documents that have been cataloged; the remainder will be listed in the next report.
As of June 3, 5,500 manhours had been expended and the project was on schedule in accordance with the Project Schedule given in the revised program plan.
As of June 3, 5,500 manhours had been expended and the project was on schedule in accordance with the Project Schedule given in the revised program plan.
--+r w
e


Attachnent A IEDEPEEDENT REVIEW OF ZIMMER PROJECT MANAGEMENT LIST OF PERSONS INTERVIEWED BETWEEE 5/21 AED 6/3/83 CG&E                             Assigned to CG&E P. L. Adkins                       T. Anderson (BSG)
Attachnent A IEDEPEEDENT REVIEW OF ZIMMER PROJECT MANAGEMENT LIST OF PERSONS INTERVIEWED BETWEEE 5/21 AED 6/3/83 CG&E Assigned to CG&E P. L. Adkins T. Anderson (BSG)
G. E. Bennett                     J. Linetsky (AMK)
G. E. Bennett J. Linetsky (AMK)
H. C. Brinkmann                   F.S. Hoover (EDS)
H. C. Brinkmann F.S. Hoover (EDS)
M. Carpenter                       T. Bartholomew (GCA)
M. Carpenter T. Bartholomew (GCA)
K. K. Chitkara                     B.L. Kallander (GCA)
K. K. Chitkara B.L. Kallander (GCA)
J. E. Conant                       B. Long (GCA)
J. E. Conant B. Long (GCA)
W. D. Corbin                       G. W. Merrill (GCA)
W. D.
W. P. Cooper                       D. L. Ramstrom (GCA)
Corbin G. W. Merrill (GCA)
B. I. Culver                       M. M. Rhodes (GCA)
W. P. Cooper D. L. Ramstrom (GCA)
W. H. Dickhoner                     D. Stringer (GCA)
B. I.
R. P. Ehas                         S. Martin (Independent)
Culver M. M. Rhodes (GCA)
G. C. Ficke                         K. Dempsey (HJK)
W. H. Dickhoner D. Stringer (GCA)
J. D. Flynn                         D. V. Dunnum (HJK)
R. P. Ehas S. Martin (Independent)
R. Foshag                           D. O'Keefe (HJK)
G. C. Ficke K. Dempsey (HJK)
D.J. Frederick                       W. Scott (HJK)
J. D. Flynn D. V. Dunnum (HJK)
B. A. Gott                           L. Vice (MDE)
R. Foshag D. O'Keefe (HJK)
J. C. Herman                         L. Anderson (NES)
D.J. Frederick W. Scott (HJK)
W. Kacer                             W. Herrett (NES)
B. A. Gott L. Vice (MDE)
C. Keller                           W. A. Kaer (NES), '
J. C. Herman L. Anderson (NES)
W. B. Murray                         P. Payne (NES)
W. Kacer W. Herrett (NES)
T.D. O'Farrell                       M. Shannon (NES)
C.
G. M. Pemberton                   E. McVae (NIC)
Keller W. A. Kaer (NES),
H. R. Sager                       B. Newcomb (NIC)
W. B. Murray P. Payne (NES)
J. R. Schott                       C. W. Vincent (NIC)
T.D. O'Farrell M. Shannon (NES)
D. J. Schulte                     P. Wilson (NIC)
G. M. Pemberton E. McVae (NIC)
J. F. Shaffer                     G. Jodrey (SAI)
H. R. Sager B. Newcomb (NIC)
F. J. Svetkovich                   M. Kopp (SAI)
J. R. Schott C. W. Vincent (NIC)
M. Threm                           G. M. Orlov (SAI)
D. J. Schulte P. Wilson (NIC)
W. N. Tobler                       R. Rinderman (SAI)
J. F. Shaffer G.
J. J. Wald                         H. Kinkade (S&L)
Jodrey (SAI)
J. F. Weissenberg                 B. Larson (S&L)
F. J. Svetkovich M.
J. Williams                         P. Luyster (S&L)
Kopp (SAI)
M. Threm G. M. Orlov (SAI)
W. N. Tobler R. Rinderman (SAI)
J. J. Wald H. Kinkade (S&L)
J. F. Weissenberg B. Larson (S&L)
J. Williams P. Luyster (S&L)
D. Miller (S&L)
D. Miller (S&L)
Kaiser                               C. Watson (S&L)
Kaiser C. Watson (S&L)
B. Weinhold (S&L)
B. Weinhold (S&L)
M. Albertin C. Stanfield W. Ferree
M. Albertin C. Stanfield W. Ferree


Attachment A Page 2 LIST OF PERSONS INTERVIEWED BETWEMN 5/21 AND 6/3/83 NRC                                     Others F. Christianson                         V. Griffin P. Gwynn                               E. Hofstader D. Jones E. Pandorf R. Reiter ,
Attachment A Page 2 LIST OF PERSONS INTERVIEWED BETWEMN 5/21 AND 6/3/83 NRC Others F. Christianson V. Griffin P. Gwynn E. Hofstader D. Jones E. Pandorf R. Reiter W. Schweirs 4
W. Schweirs 4           J i
J i
i e(Answered some questions by telephone but declined to be interviewed in person.)
i e(Answered some questions by telephone but declined to be interviewed in person.)
i f
i f
i
i
      .  .            . -. .      . _ _ _ _ = _ _ . _ .    . __    . _ - _ __
=


      ._ 7
._ 7 4, c
    .c      4, c Attachment B
.c Attachment B
      ~
~
l
l
                                                                                                    \
\\
INDEPENDENT REVIEW OF ZIMMER PROJECT MANAGEMENT PARTIAL LISTING OF DOCUMENTS CATALOGUED BY TPT REYIEWERS DURING THE PERIOD MAY 19 THROUGH JUNE 3, 1983 l
INDEPENDENT REVIEW OF ZIMMER PROJECT MANAGEMENT PARTIAL LISTING OF DOCUMENTS CATALOGUED BY TPT REYIEWERS DURING THE PERIOD MAY 19 THROUGH JUNE 3, 1983 l
l
l


a 9   e
a 9
$'%                                                                                                                                                                                                            >% .=.   ,
e
O                                                                                                                                                                                                                   '
. =.
DR$-OFFLINE PRINT 14 JUN 83             08:50:37                                                                                                 DATE 06148?             PAGE 1 THERE WERE     916 MATCHES FOUND tbR THE FOLLOWING KET-WORDS                                                                                                                                         ,
O DR$-OFFLINE PRINT 14 JUN 83 08:50:37 DATE 06148?
I-SITE
PAGE 1
                                                                                                          ~
THERE WERE 916 MATCHES FOUND tbR THE FOLLOWING KET-WORDS I-SITE O
O              THE CUTPUT OPTIONS hERE:                                                                                                                                                                       ''
~
                                                                                                                        - . ~ ~ . . _.-
THE CUTPUT OPTIONS hERE:
^             D-DAr&~             .
-. ~ ~.. _.-
C - xmv woes t YTTLJr5 e - en.sans ren's Ns/moEW.                                          .                .
^
D-DAr&~
C - xmv woes t YTTLJr5 e - en.sans ren's Ns/moEW.
THE FOLLOWING ACCESS huMPERS MATCH THE REQUIREMENTS.
THE FOLLOWING ACCESS huMPERS MATCH THE REQUIREMENTS.
                                              ~
5-CGtt 0-78/02/06 ' C-M E P'b C5-WW-SCHWIER$-FC-EA-BORGMANN
5-CGtt       0-78/02/06 ' C-M E P'b           C5-WW-SCHWIER$-FC-EA-BORGMANN '2-APPROVED-VENDORS-FOR-ES$ENTIAL-COMPONENTS-0R-SERVIC C
~
C-NA                             -              -
'2-APPROVED-VENDORS-FOR-ES$ENTIAL-COMPONENTS-0R-SERVIC C
              $-CGtt       n- 82 L12 t C0__.f re EAuls1110 NS:EA R-9 A h:R EP.LA C EP EN f3_0-Ha s / 82 / 495 __                           ....
C-NA
S-CGet . . 0-83/C1/C7..C-ANALYSIS-OF-IIDR-PROGRAM                         .C1-GA-1875 .C2-LETTER-TO-PALLADINO-t-HJK                                   C3-PROCEDURE-IAP0-5
$-CGtt n-82 L12 t C0__.f re EAuls1110 NS:EA R-9 A h:R EP.LA C EP EN f3_0-Ha s / 82 / 495 __
* 0-HRS /83/021 I             5-CGEE       D-83/b1/03' C-NRC-CURRESPONDENCE                   Ci-I.E.-kN5PkCTION-REPORT-82-06                                       C2-HJK-LETTER-TO-CGRE-DATED-DEC-1,-1982 0:HB5/83/005                                                                                       __ ___._                        .
S-CGet.. 0-83/C1/C7..C-ANALYSIS-OF-IIDR-PROGRAM
(             S-CGtt       D-P2/12/17 .C-TRIP-REPCRT-FRM-AIF-EEI                       C1-SPECIAL-MEETING-ON-CONSTRUCTION-04                                     0=HR$/82/543             ,                      )
.C1-GA-1875.C2-LETTER-TO-PALLADINO-t-HJK C3-PROCEDURE-IAP0-5 0-HRS /83/021 I
5-CGRE       D-82/12/22 . C-REcuEsf-FOR-REPLACEMENT-TECHNICAL-AID-PERSONNEL-IN-0                                                       G-NR$/82/542
5-CGEE D-83/b1/03' C-NRC-CURRESPONDENCE Ci-I.E.-kN5PkCTION-REPORT-82-06 C2-HJK-LETTER-TO-CGRE-DATED-DEC-1,-1982 0:HB5/83/005
__ _.5-J G B t       p-E2110lC7 L .T 8 8_C E ING-fttC . CONC ERN$_L]-E EE9-f 0 R .HR-S A G gR                           a:HR5/P28397
(
(             5-CGRE       D-P2/10/C6 C-UNACCEPTABLE-AFR-RESPONSE-NOTIFICATION                               0-HRS /82/396                                                                                           {
S-CGtt D-P2/12/17.C-TRIP-REPCRT-FRM-AIF-EEI C1-SPECIAL-MEETING-ON-CONSTRUCTION-04 0=HR$/82/543
5-CGtL       D-82/10/f1     C-CRD-DE53GN-t-NRC-CONCERNS                 C1rMEMO               C2-HR-$AGER-TC-EA-PORGPANN                           0-HR5/82/384
)
        .. _ 5.CG8E         B-82/09/30._I-MEC.CChCERNS-0N-CONIR0L-Of $UBCONIPACTOR5 _ .C1-LETTER                                                     0-HRS /82/376
5-CGRE D-82/12/22. C-REcuEsf-FOR-REPLACEMENT-TECHNICAL-AID-PERSONNEL-IN-0 G-NR$/82/542
(,           5-CGRE       D-82/09/28     C-SE PT-198 7-PE E T ING .         C1-EDISON-ELECTRIC-INSTITUTE                               C2-QA* COMMITTEE       C3-LETTER                                       I!
__ _.5-J G B t p-E2110lC7 L.T 8 8_C E ING-fttC. CONC ERN$_L]-E EE9-f 0 R.HR-S A G gR a:HR5/P28397
C-HRS /P2/373 b'           5-CGtt       D-82/09/22" C-NRC-CChCERNS-Oie-C0hTROL-bF-SUBCONTRACTOR $                                           C1-LETTER             0-HR$/82/369 S-CGtt       D-P2/09/22       C-MO CK UP-WEL D-5 AMPLE S-70-C L O SE-0UT-T ASK-V C1-LETTER                                   0-HRS /82/368 S-CGtt       D-P2/C9/24' C-LETTER             C1-L5CK-UF-RESPUNSES-FOR-0 PEN-NRC-fTEP$                                       0-HR$/82/300 h             S-CGRE       D-82/09/12 C-LETTER             C1-IEM-M-19 C2-RNR-VALVE-1E11FOU9                                 Q-HRS /82/298                                                                       e 5-CGtt       0-82/08/12 C-LETTER             C1-MANAGEMENT-CORRECTIVE-ACTION-REQUEST-82-04                                           Q-HR$/P2/296 0                                       .                  .                          _                                                          .                                                              r 5-CGtt       D-P2/08/11     C-LETTER         C 1-C OR R E C T I V E- A C TIO N-R E Q UE ST-8 2-61               0-HR$/82/295 O'           s-CGRE       D-P2/C8sti C-CONTRACT-PERs0NNEt-REau!5ITION                           C i-t E T TE R               o-HRsic2i294                                                                   'r 5-CGtt       D-f2/C7/f8 C-EVALUATION-OF-$J-N0dkEd hb                               Ci-FRb4-HkR-PkRCH-19?2-VISIT C2-LETTER                                   c-HR$/82/266 M             5-CG8E       D-P2/07/06' C-LETTER             (1-PRIOR IT y-OF-G AD-P ER $0NN EL-WOR K-SC HE DUL E S                                   Q-HRS /P2/250
(
                                                                                                                                                                                                                'r
5-CGRE D-P2/10/C6 C-UNACCEPTABLE-AFR-RESPONSE-NOTIFICATION 0-HRS /82/396
                                                                                                                                                                                                                  ~
{
5-CGtL D-82/10/f1 C-CRD-DE53GN-t-NRC-CONCERNS C1rMEMO C2-HR-$AGER-TC-EA-PORGPANN 0-HR5/82/384
.. _ 5.CG8E B-82/09/30._I-MEC.CChCERNS-0N-CONIR0L-Of $UBCONIPACTOR5 _.C1-LETTER 0-HRS /82/376
(,
5-CGRE D-82/09/28 C-SE PT-198 7-PE E T ING.
C1-EDISON-ELECTRIC-INSTITUTE C2-QA* COMMITTEE C3-LETTER I!
C-HRS /P2/373 b'
5-CGtt D-82/09/22" C-NRC-CChCERNS-Oie-C0hTROL-bF-SUBCONTRACTOR $
C1-LETTER 0-HR$/82/369 S-CGtt D-P2/09/22 C-MO CK UP-WEL D-5 AMPLE S-70-C L O SE-0UT-T ASK-V C1-LETTER 0-HRS /82/368 S-CGtt D-P2/C9/24' C-LETTER C1-L5CK-UF-RESPUNSES-FOR-0 PEN-NRC-fTEP$
0-HR$/82/300 h
S-CGRE D-82/09/12 C-LETTER C1-IEM-M-19 C2-RNR-VALVE-1E11FOU9 Q-HRS /82/298 e
5-CGtt 0-82/08/12 C-LETTER C1-MANAGEMENT-CORRECTIVE-ACTION-REQUEST-82-04 Q-HR$/P2/296 0
0-HR$/82/295 5-CGtt D-P2/08/11 C-LETTER C 1-C OR R E C T I V E-A C TIO N-R E Q UE ST-8 2-61 r
O' s-CGRE D-P2/C8sti C-CONTRACT-PERs0NNEt-REau!5ITION C i-t E T TE R o-HRsic2i294
'r 5-CGtt D-f2/C7/f8 C-EVALUATION-OF-$J-N0dkEd hb Ci-FRb4-HkR-PkRCH-19?2-VISIT C2-LETTER c-HR$/82/266
~
M
'r 5-CG8E D-P2/07/06' C-LETTER (1-PRIOR IT y-OF-G AD-P ER $0NN EL-WOR K-SC HE DUL E S Q-HRS /P2/250


                                                                                                                                                                                                          'e e .
'e e
e e
e e
DATE 061483         PAGE     2 DRS-OffLINE PRINT 14 JUN 83             08:50:37 0-82/C5/27 C-LETTER               C 1-R E INS P E C T 10N- C F-THE-C RD-P IP lh G-SU PPOR T S                       C2-INSTALLED-BY-RCI.
DATE 061483 PAGE 2
5-CGtt 0-HR5/82/2P4
DRS-OffLINE PRINT 14 JUN 83 08:50:37 5-CGtt 0-82/C5/27 C-LETTER C 1-R E INS P E C T 10N-C F-THE-C RD-P IP lh G-SU PPOR T S C2-INSTALLED-BY-RCI.
'.                                                                                                                                                                                                  (%
0-HR5/82/2P4
D-81/10/09 C-LETTER           C1-00CurENTAT10N-REVIEW-ALERT-1                         . 0-HR$191/108
(%
              $~CGEE       D-P2/05/21       C-LETTER         C1-NATI0hAL-POARD-AUDIT-REPORT                                     Q-HRS /P2/196                                                     ')
. 0-HR$191/108 D-81/10/09 C-LETTER C1-00CurENTAT10N-REVIEW-ALERT-1
D-22/05/2C                         C1-PROPOSED-POLICY-STATEPENT-fba-IIMPER-SCP                                       0-HRS /82/194 S-CGtt                        C-L E TT E R
$~CGEE D-P2/05/21 C-LETTER C1-NATI0hAL-POARD-AUDIT-REPORT Q-HRS /P2/196
                                                                                                                                                                                                    #1 5-CGtt       D-82/05/C7 C-LETTER               C1-ED-ABe0TTS-VISIT                     G= HRS /82/176 5-CGtt       0 82/04/C1       C-LETTER           C1-RPV-CONTROL-STSTEP                   0-HRS /82/114                                                                               ')
')
C2-UNDERSTANDING-DE51GN-FUNCTION        C3-IDE 5-CGtt       D-P1/12/C4 C-LETTER                 C1-TRAINING-015CUSSIUN-ON-0UALITY-ENGINEERS NTifY-INSPECTION-REQUIPEMENTS                                                                                                                                                         3 0-HRste1/te5
S-CGtt D-22/05/2C C-L E TT E R C1-PROPOSED-POLICY-STATEPENT-fba-IIMPER-SCP 0-HRS /82/194
.            5-CGEE       D-F1/11/21       C-LETTER         C1-PERSONNEL-BRIEFING                   0-HR$/81/171                                                                                   )
#1 5-CGtt D-82/05/C7 C-LETTER C1-ED-ABe0TTS-VISIT G= HRS /82/176 5-CGtt 0 82/04/C1 C-LETTER C1-RPV-CONTROL-STSTEP 0-HRS /82/114
3-CGtt       D-81/11/19 C-LETTEE               Ci-04-M5kUAL-REVIEW                     0-HRS /91/168 0-HR$/81/167                                                                                  3 5- C G t'E   D-81/11/19 C-LETTER               C1-04-MANUAL-REVIEW C1-08-MANUAL-REVIEW                     C2-$TRUCTURAL-DYNAMICS-RESEARCH-CORP                           0-HR$/81/166 5-CGRE        D-F1/11/18 C-LETTER                                                                                                                                                          )
')
4            5-CGRE       D-P1/11/17 C-LETTER               Ci=0A-hkNUAL-REVIEW                     C2-NATIONAL-ELECTRIC-Colt                         0-HR$/81/165 0-HRS /21/162                                          I S-CGRE       D-P1/11/16 C-LETTER               C1-GA-PANUAL-REVIkW                     C2-TRACOR-WESTRONICS D-P1/11/11                         C1-APPolhTMENT-OF-ACTING-DIRECTUR                                   C2-0E-OLALITY-00CUMENTS 0-HRS /87/153
5-CGtt D-P1/12/C4 C-LETTER C1-TRAINING-015CUSSIUN-ON-0UALITY-ENGINEERS C2-UNDERSTANDING-DE51GN-FUNCTION C3-IDE NTifY-INSPECTION-REQUIPEMENTS 3
]              5-CGtt                        C-LETTER                                                                                                                                                  )
0-HRste1/te5 5-CGEE D-F1/11/21 C-LETTER C1-PERSONNEL-BRIEFING 0-HR$/81/171
5-CGtt       D-F1/11/C9 C-LETTER               Ci-DEVELUPMiNT-0F-THE-0PdRATIONS-QA-PLAN 0-HR$/81/149 5-CGEE       D-P5/50/29' C-LETTER               Ci-NECES$1VE-AC-POTUR-$1ARTER-CONTROL-VOLTAGE-DROP                                       C2-LONG-CONTROL-CABLES   C3-BECHTEL-M         )   '
)
_ CAR-50__. C 41 .UNQU A LIF ILL-(jB L [1__{ }-I T E -G.00A D -$ L.AJS-If-EQ UI PM F h:T_ _ _ , ,
3-CGtt D-81/11/19 C-LETTEE Ci-04-M5kUAL-REVIEW 0-HRS /91/168 3
0-NR5/81/128                                                                                                                                                                         ')
5-C G t'E D-81/11/19 C-LETTER C1-04-MANUAL-REVIEW 0-HR$/81/167 5-CGRE D-F1/11/18 C-LETTER C1-08-MANUAL-REVIEW C2-$TRUCTURAL-DYNAMICS-RESEARCH-CORP 0-HR$/81/166
C-LETTER-TC-KA!$ER                 C1-HR-SAGER-Tb-D.-HOWARD                                 (2-AWS-WELD-UNDERCUT       0-KE0/705
)
,              5-CGtt        D-P1/11/20                                                                                                                                                                        '
5-CGRE D-P1/11/17 C-LETTER Ci=0A-hkNUAL-REVIEW C2-NATIONAL-ELECTRIC-Colt 0-HR$/81/165 4
I t
S-CGRE D-P1/11/16 C-LETTER C1-GA-PANUAL-REVIkW C2-TRACOR-WESTRONICS 0-HRS /21/162 I
S-CGtt        D-81/10/59' C U"E"TTip L              C1-STOP-bORK-bRDTR                     C2-REVISION-2                     0-HRS /81/120                                             ')      ;
]
j             5-CGRE       D-P1/10/13 C-LETTER               C1-GA-DEPARTFENT-MEETING                                     0-HRS /81/112                                                           ')
5-CGtt D-P1/11/11 C-LETTER C1-APPolhTMENT-OF-ACTING-DIRECTUR C2-0E-OLALITY-00CUMENTS 0-HRS /87/153
i     F 5-CGRE       D-P1/10/12     C-GA-MAhUAL-REVIEW                 C1-RADCO-TECHNOLOGY-COMPANY                               0-HR$/E1/111 j
)
  ;f           5-CGtt       D-82/01/C7 C-LETTER               C1-CHANGES-TO-ZlFMER-FSAR                                   C2-CHAPTER-14       0-HR$/R1/223                                       ')
5-CGtt D-F1/11/C9 C-LETTER Ci-DEVELUPMiNT-0F-THE-0PdRATIONS-QA-PLAN 0-HR$/81/149 5-CGEE D-P5/50/29' C-LETTER Ci-NECES$1VE-AC-POTUR-$1ARTER-CONTROL-VOLTAGE-DROP C2-LONG-CONTROL-CABLES C3-BECHTEL-M
j               -CGtt       D-P2/01/C4       C-CONTROL-ROD-DRIVE-HYDRAULICS                             0-HR$/81/218                                                                               ')
)
t                                           .            .. ..
C 4.UNQU A LIF ILL-(jB L [1__{ }-I T E -G.00A D -$ L.AJS-If-EQ UI PM F h:T_ _ _,,
C2-HANGER-DRAWINGS 5-CGEE      .D-P1/12/28 C-LETTER                 C1-N EW-H JK-P ER S0PNEL-S IGNING-W ELD-D A T A-F ORP S 4 ,
_ CAR-50__.
0-HR$/81/212                                                                                                                                                                           ,
1 0-NR5/81/128
  !    ,__ _J CGtt         D-P 1/_12 /.22_C-L.E Ti f R.__ C 1-C L E A N L I N E 55-C ON T R OL . 0-HR 5 / 91/2 08 C1-AFR-80-2-9-70RM-MA-20-2                                                                                                         'k fIj3          5-CGEE      D-P2/04/C1      C-LETTER                                                                      0-HR5/t2/96
')
'                                                                                                                                                                                                    q,
5-CGtt D-P1/11/20 C-LETTER-TC-KA!$ER C1-HR-SAGER-Tb-D.-HOWARD (2-AWS-WELD-UNDERCUT 0-KE0/705
')
I U"E"TTip C1-STOP-bORK-bRDTR C2-REVISION-2 0-HRS /81/120 t
S-CGtt D-81/10/59' C L
j 5-CGRE D-P1/10/13 C-LETTER C1-GA-DEPARTFENT-MEETING 0-HRS /81/112
')
F i
5-CGRE D-P1/10/12 C-GA-MAhUAL-REVIEW C1-RADCO-TECHNOLOGY-COMPANY 0-HR$/E1/111 j
;f 5-CGtt D-82/01/C7 C-LETTER C1-CHANGES-TO-ZlFMER-FSAR C2-CHAPTER-14 0-HR$/R1/223
')
j
-CGtt D-P2/01/C4 C-CONTROL-ROD-DRIVE-HYDRAULICS 0-HR$/81/218
')
t
.D-P1/12/28 C-LETTER C1-N EW-H JK-P ER S0PNEL-S IGNING-W ELD-D A T A-F ORP S C2-HANGER-DRAWINGS 5-CGEE 0-HR$/81/212 4,
,__ _J CGtt D-P 1/_12 /.22_C-L.E Ti f R.__ C 1-C L E A N L I N E 55-C ON T R OL. 0-HR 5 / 91/2 08
'k fIj3 5-CGEE D-P2/04/C1 C-LETTER C1-AFR-80-2-9-70RM-MA-20-2 0-HR5/t2/96 q,


w e
w e
'*                                                                                                                                                                                                                                                  ag
ag
                                                                                                                                  ~
~
DRS-OffLINE PRINT 14 J U N 8 3                                                               C8:50:37                                                                               DATE 061483 PAGE 3
DRS-OffLINE PRINT 14 J U N 8 3 C8:50:37 DATE 061483 PAGE 3
,,                                S-CGRE             D-F2/03/11                         C-CLERIEAL-PERSONNEL                                                       C1-LETTER       C2-0PERATIONS-GA-GRCLP G-HR$/22/81                             ,
S-CGRE D-F2/03/11 C-CLERIEAL-PERSONNEL C1-LETTER C2-0PERATIONS-GA-GRCLP G-HR$/22/81 S-CG8E D-f2/03/f5 '~C-VENh0R-AUDIT-5CHEDULE d-NA S-CGtt D-P2/03/C1 C-L5TTER Ci-StL-SPEC 5FkCATION5 0-HRS /82/66 S-CGtt 0-P2/01/20 C-LETTER C1-1882-E08LS-E-0BJECTIVES 0-HR$/82/23 S-CGtt 0-82/01/20 C-LETTER C1-kPPROVht-OF-NhC-REPbRTS-SU5MkTIED-UNDER-10CRF.50.55 0-HR$/82/22 S-CGRE' D-81/07/C6 C-LETTER C1-GA-ORCANIZATIbN
S-CG8E             D-f2/03/f5 '~C-VENh0R-AUDIT-5CHEDULE d-NA S-CGtt             D-P2/03/C1 C-L5TTER                                                             Ci-StL-SPEC 5FkCATION5                       0-HRS /82/66                                                   #%
'G-NA 5-CGtt D-21/06/29 C-LETTER C1-PROPERTT-DEPARTPENT-BUDGET C2-1982-THRU-1992 0-NA S-CGtE i-P1/06/23 ~ C-3.-NORRIS-TU-P.-KhhER C1-MFM0 (2-Kk!
,                                S-CGtt             0-P2/01/20 C-LETTER                                                             C1-1882-E08LS-E-0BJECTIVES                           0-HR$/82/23 S-CGtt             0-82/01/20 C-LETTER                                                             C1-kPPROVht-OF-NhC-REPbRTS-SU5MkTIED-UNDER-10CRF.50.55                               0-HR$/82/22 S-CGRE'           D-81/07/C6 C-LETTER                                                             C1-GA-ORCANIZATIbN                         'G-NA                                                             #%
0-NA 8
5-CGtt             D-21/06/29 C-LETTER                                                             C1-PROPERTT-DEPARTPENT-BUDGET C2-1982-THRU-1992 0-NA S-CGtE             i-P1/06/23 ~ C-3.-NORRIS-TU-P.-KhhER C1-MFM0                                                                                   (2-Kk!       0-NA 8
~D-P1/06/1e 'C-ADeif CNAL-SPACE-REQUIREMENTS C1-SkRv!CE-BUILDING Q-NA S-CGtE S-CGRE D-P1/10/01 C-LETTER C1-LOGGING-0F-NONCONFORMANCE-REPORTS 5-Nk S-CGRE D-2k/d9/22 C-LETTER Ck-WELDS C2-hR5 WING-$-636P C3-REV-A C4-BEAMS-46-t-37-TO-COLUMN-46C 0-NA
S-CGtE        ~D-P1/06/1e 'C-ADeif CNAL-SPACE-REQUIREMENTS                                                                                       C1-SkRv!CE-BUILDING       Q-NA S-CGRE             D-P1/10/01                         C-LETTER                                     C1-LOGGING-0F-NONCONFORMANCE-REPORTS                             5-Nk S-CGRE             D-2k/d9/22 C-LETTER                                                             Ck-WELDS                       C2-hR5 WING-$-636P C3-REV-A       C4-BEAMS-46-t-37-TO-COLUMN-46C 0-NA
(
(
                                                                                                                    ~
~
                                                                                                                                                                                                                                                        )
)
L-CGEE             o-P1/07/11 t-Or_ggalln-stu.D G E T S                                                                           C1 _IE8! .1982_____ _ 0-NA I
L-CGEE o-P1/07/11 t-Or_ggalln-stu.D G E T S C1 _IE8!.1982_____ _ 0-NA I
S-CGtt             D m1/09/18 C-LETTER                                                             .C1-04-0RG-CHART                       C2-KET-PER$0NNEL 0-HR$/81/83                                             I S-CGtt   .        0-f1/C9/14 C-LETTER                                                             C1-FIELD-CONSTRUCTION-PROCEDURE-2-29                             C2-VIOLATION-0F-AWS-CODE N                               0-HRS /E1165                                                                                                                                                                                                     'b S-CGEE             D-81/OS/17 C-LETTER                                                             C1-NRC-REQUEST!ED-DOCUPENTS                           Q-HR$/81/43 i                                                                                                                                                                                                                                                   3 D-F1/C9/14C-PHIL-CITTINGS_                   .- . . . .
S-CGtt D m1/09/18 C-LETTER
S-CGRE                                                                                                  _ _ . . C1-NRC-INTERVIEW 0-KC/15694/0 T                               S-CGLE             D-75/12/26 C-LETTEa                                                             C1-H.C'-kUTTING-CONTRACT
.C1-04-0RG-CHART C2-KET-PER$0NNEL 0-HR$/81/83 I
                                                                                                                                              .                                            Q-REF/PT                                                 )
S-CGtt 0-f1/C9/14 C-LETTER C1-FIELD-CONSTRUCTION-PROCEDURE-2-29 C2-VIOLATION-0F-AWS-CODE N
5-KAISER           D-75/04/11                         C-LETTER                                   C1-INSPE CTION-OF-PH ASE-2-PIPING                           0*FC/3449/0 T''                                                                                                                                                                                                                                                 )
0-HRS /E1165
S-CGEE               D-75/C8/01                         C-INSPECTION-REQUIREPENTS                                                       C1-SEPT-1975-THRU-FEB-1976         0-NA
'b S-CGEE D-81/OS/17 C-LETTER C1-NRC-REQUEST!ED-DOCUPENTS Q-HR$/81/43 i
(*                               S-KAISER             D-74/10/14' C-LETTER                                                           (1-REQUEST-F0h-ADDITIONAL-GA-PERSONNEL                           0-KC/2643/0
C-PHIL-CITTINGS_ _ _.. C1-NRC-INTERVIEW 0-KC/15694/0 S-CGRE D-F1/C9/14.-....
    ,                              5-CGRE               D-74/11/01                         C-PER50kkEL-FOR-IIPMER-PROJECT                                                           0-NA
3 T
                                                                                                                                                                                                                                                      }
S-CGLE D-75/12/26 C-LETTEa C1-H.C'-kUTTING-CONTRACT Q-REF/PT
S-CGRE               D-75/03/31                         C-MIkUTES-OF-J0lNT-CELE-eel-CA-MEETING                                                           Q-NA if                               5-CGRE               D-74/10/30 C-REcuEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL                                                                                   0-kEB/7                                             I S-FAISER             D-74/11/01 C-PAINTING-INSPECTOR                                                                               C1-DOCUMENTATION
)
* CLERK 0"KC/2754/4 S-CGtt               D-75/C1/30 C-EFFICIENCT-0F-0A-0PERATIONS 0-FM/220
5-KAISER D-75/04/11 C-LETTER C1-INSPE CTION-OF-PH ASE-2-PIPING 0*FC/3449/0 T''
  *$'                              S-EG8E               D-75/01/15 C-MAkPobER-AUTHORIIA110NS                                                                               Q-EEP/12                                                                 W S-CGIE               D-75/02/17                         C-EFFICIENCT-OF-0A-OPFRATIONS 0-NA 2bb'                                                                                                                                                                                                                                                 bh D-75/0*t04           C-PAINTING-t-CCATINC-INSPECTION                                                                             0-rEf/S
S-CGEE D-75/C8/01 C-INSPECTION-REQUIREPENTS C1-SEPT-1975-THRU-FEB-1976 0-NA
)
(*
S-KAISER D-74/10/14' C-LETTER (1-REQUEST-F0h-ADDITIONAL-GA-PERSONNEL 0-KC/2643/0 5-CGRE D-74/11/01 C-PER50kkEL-FOR-IIPMER-PROJECT 0-NA
}
S-CGRE D-75/03/31 C-MIkUTES-OF-J0lNT-CELE-eel-CA-MEETING Q-NA if 5-CGRE D-74/10/30 C-REcuEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL 0-kEB/7 I
S-FAISER D-74/11/01 C-PAINTING-INSPECTOR C1-DOCUMENTATION
* CLERK 0"KC/2754/4 S-CGtt D-75/C1/30 C-EFFICIENCT-0F-0A-0PERATIONS 0-FM/220 S-EG8E D-75/01/15 C-MAkPobER-AUTHORIIA110NS Q-EEP/12 W
S-CGIE D-75/02/17 C-EFFICIENCT-OF-0A-OPFRATIONS 0-NA 2bb' D-75/0*t04 C-PAINTING-t-CCATINC-INSPECTION 0-rEf/S bh


e
e
                                                                                                                                                                                                                                                            'e os                                                                                                                                                                                                                                    f5 DRs-OFFLINE PRINT 14 JUN 83               08:55:37                                                                                                   BATE 061483         PAGE   4                                   'T 5-RAISER     D-75/03/21       C-KEI-GA-0C-ORGAN!!ATION                             0-NA                                                                                                                                   #%
'e f5 o s DRs-OFFLINE PRINT 14 JUN 83 08:55:37 BATE 061483 PAGE 4
                              $-CGRE.     D-75/03/26 C-REQUEST-FOR-ADDITIONAL-GUALITT-AS$URANCE-PERSONNEL                                                   Q-NA
'T 5-RAISER D-75/03/21 C-KEI-GA-0C-ORGAN!!ATION 0-NA
                          ._ $.KAISEE     D- 75 /D4 L16 _f_KE 2: 00 A LIIY - A S $ U R A h C E:0R G A N12&J10N -                   0-NA                 _ . _ _
$-CGRE.
S-CGRE       D-76/11/!0 ..C-TELEPHCNE-CONVERSATION                                 C1-DILL-SCHWIER$ Q-KB/16                         0-NA                                                                                 "%
D-75/03/26 C-REQUEST-FOR-ADDITIONAL-GUALITT-AS$URANCE-PERSONNEL Q-NA
                ,            S-CGtt       D-81/07/17 . C-CGEE-t-HJK-CURRENT-t-PROJECTED-QC-INSPECTOR                                             C1-MANNING-LEVELS 0-HR$/81/05                                                                         ,
._ $.KAISEE D-75 /D4 L16 _f_KE 2: 00 A LIIY - A S $ U R A h C E:0R G A N12&J10N -
1-CGts       b-E1IOZL]6 r-guALIll:CONElRt!all0N:EROGR AM '                                   0-HR5L91/04.. _ _ _ . . . _ .
0-NA S-CGRE D-76/11/!0..C-TELEPHCNE-CONVERSATION C1-DILL-SCHWIER$ Q-KB/16 0-NA S-CGtt D-81/07/17. C-CGEE-t-HJK-CURRENT-t-PROJECTED-QC-INSPECTOR C1-MANNING-LEVELS 0-HR$/81/05 1-CGts b-E1IOZL]6 r-guALIll:CONElRt!all0N:EROGR AM '
                #            5-CGtt                                                                                                                                                                                                                       I 0-21/02/17. C-0UALITT-ASSURANCE-5URVEILLANCE                                   0-NA 5-CGRE       D-P1/04/27. C-PAUL-EaRRETT                         C1-DDC-15$UE               0-NA 5:CGgr       e-E1/02/ 2Z_ _C-0EEM:LIELD-AUD UM                               C1:5URVEILLANCE-REPORTS.0-NA_._ _.
0-HR5L91/04.. _ _ _... _.
8           5-CGRE       .0-81/02/C2_ C-50.55E-REPORTS .0-NA                                               *
5-CGtt 0-21/02/17. C-0UALITT-ASSURANCE-5URVEILLANCE 0-NA I
                                                                                                                                                                                                                                                          )
5-CGRE D-P1/04/27. C-PAUL-EaRRETT C1-DDC-15$UE 0-NA 5:CGgr e-E1/02/ 2Z_ _C-0EEM:LIELD-AUD UM C1:5URVEILLANCE-REPORTS.0-NA_._ _.
5-CGtt       D-F1/01/20 C-FIELD-AUDIT-316 0-NA.
8 5-CGRE
E-CGgr       D=L1/ 0.1 L1L__ C C G EE- A UD Il:1C H E D U L E__._A:M A                                   _ _ . . ..
.0-81/02/C2_ C-50.55E-REPORTS.0-NA
I            5-CGtt       D-81/01/13       C-NRC-CC*RITMENTS 0-NA                                                                                                                                                                       }
)
S-CGEE       D-81/01/12 C-OPEN-FIELD-AUDITS                                 _C1-SURVEILLANCE-REPORTS 0-NA 5 CGts       0:E1/01/06 f-REORGPhEZAIIQM__a:NA                                                           _ . . _ _ . - _ .        .
5-CGtt D-F1/01/20 C-FIELD-AUDIT-316 0-NA.
T            5-CGtt       D-80/10/15. C-WORKSHOP C1-REACTOR-CONSTPUCTION-t-CPERATION C2-CON $1RUCTION-MANAGEMENT                                                           C3-QA-PRODLEMS-t-REMEDIE                                     I 5
E-CGgr D=L1/ 0.1 L1L__ C C G EE-A UD Il:1C H E D U L E__._A:M A I
0-NA
5-CGtt D-81/01/13 C-NRC-CC*RITMENTS 0-NA
                                                                                                                                                                                                                                                          ')
}
____5-CGgr       D-f0/02/C1 r:HJK:ALLEGail0NS_LL:5AGEk                                 C2-MINUTES-0E-J0lNT-CGEE-KEI-GA-PEETING                               C3-JANUART-17,-1975 0-NA
S-CGEE D-81/01/12 C-OPEN-FIELD-AUDITS
                ?( .                                                                     .        .. .            .      -
_C1-SURVEILLANCE-REPORTS 0-NA 5 CGts 0:E1/01/06 f-REORGPhEZAIIQM__a:NA T
5-CGtt       D-00/04/21       C-HJK-ALLEGATIONS C1-SAGER                           C2-GA-UNGRADIhG-PROGRAM 0-kA T"         'S-CGEE       D-20/07/14' C-HJN-AttEGAilUNS C 1-S A G ER                           C2-CONCERNS-REGARDING-HJK-0A                     0-NA                                                                                 3 5-CGtt       0-00/00/C0 C-HJF-ALLEGATIONS C1-5AGER                                 C2-WELD-REJECTED-BY-NES 0-NA i' ,                                                                                                                                                                                                                                     ')
5-CGtt D-80/10/15. C-WORKSHOP C1-REACTOR-CONSTPUCTION-t-CPERATION C2-CON $1RUCTION-MANAGEMENT C3-QA-PRODLEMS-t-REMEDIE I
5-CG8E       D-81/12/C8' C-LETTER                     C1-CO'RECTIVE-ACTION-REPORT-STATUS R                                                    0-NA 1P           5-CGtt       0-M1/12/23 C-LETTER                       C1-CORRECTIVE-ACTION-REPORT *tVIEW                           0-eas/P1/16                                                                                           ' 'd
5 0-NA
_        S-CGEE       D-R1/12/?C C-LETTER                       C1-CONDUCT-Of-INSPECTION                       0-kE0/784 9'                                                                                     ..
')
S-CGRE       D-P2/01/15       C-LETTER                 C1-CORRECTIVE-ACTION-REPORT-PROCESSIAG                                 Q-DJS/82/07 3
____5-CGgr D-f0/02/C1 r:HJK:ALLEGail0NS_LL:5AGEk C2-MINUTES-0E-J0lNT-CGEE-KEI-GA-PEETING C3-JANUART-17,-1975 0-NA
5-CGtt       D-P2/01/29 C-LETTER                       Cl-INITI AT TON-0F-CORRE CTIVE- A C TI ON-R EQUE S T S                       0-DJS/82/12 8
?(.
5-CGRE       D-?2/03/02 C-TETTER                       C1-CORRE CTIVE- AC TION-R EQUE ST             4-NA N                   e.rrer       e e * ,n v e ss r-ervere                 r e-r noor r t v wr-a r t o ne -o r n eer e v-r n=rnir e-v p a r r e me       o-ise t s p ? t o ?
C2-GA-UNGRADIhG-PROGRAM 0-kA 5-CGtt D-00/04/21 C-HJK-ALLEGATIONS C1-SAGER T"
'S-CGEE D-20/07/14' C-HJN-AttEGAilUNS C 1-S A G ER C2-CONCERNS-REGARDING-HJK-0A 0-NA 3
5-CGtt 0-00/00/C0 C-HJF-ALLEGATIONS C1-5AGER C2-WELD-REJECTED-BY-NES 0-NA i',
')
5-CG8E D-81/12/C8' C-LETTER C1-CO'RECTIVE-ACTION-REPORT-STATUS 0-NA R
1P 5-CGtt 0-M1/12/23 C-LETTER C1-CORRECTIVE-ACTION-REPORT *tVIEW 0-eas/P1/16
' 'd S-CGEE D-R1/12/?C C-LETTER C1-CONDUCT-Of-INSPECTION 0-kE0/784 9'
S-CGRE D-P2/01/15 C-LETTER C1-CORRECTIVE-ACTION-REPORT-PROCESSIAG Q-DJS/82/07 3
5-CGtt D-P2/01/29 C-LETTER Cl-INITI AT TON-0F-CORRE CTIVE-A C TI ON-R EQUE S T S 0-DJS/82/12 8
5-CGRE D-?2/03/02 C-TETTER C1-CORRE CTIVE-AC TION-R EQUE ST 4-NA N
e.rrer e e *,n v e ss r-ervere r e-r noor r t v wr-a r t o ne -o r n eer e v-r n=rnir e-v p a r r e me o-ise t s p ? t o ?


t a
t a
DRS-0FFLINE PRINT 14 JUN 53                   58:50h37                                                                                     DATE 061483 PAGE 5       'T S-CGRE         D-P2/04/21. C-LETTER                     C 1-UNT IM EL T-RE VI E W S-CF -C AR *S-IN-THE-G A D           0-NA                                             #4
DRS-0FFLINE PRINT 14 JUN 53 58:50h37 DATE 061483 PAGE 5
  ,.          5-CGEE         D-22/04/30 C-LETTER                     C1-CORRECTIVE-ACT10N-REQUEST-STATUS C2-APRIL                           0-NA                                       ,
'T S-CGRE D-P2/04/21. C-LETTER C 1-UNT IM EL T-RE VI E W S-CF -C AR *S-IN-THE-G A D 0-NA
          . 1:Citr         n-E2/D6 f t&___C CQRR EL]lVE:A CI E0!L-RLOUL511:51 AM1 C.1-M A_v                               0-NA _ .__
#4 5-CGEE D-22/04/30 C-LETTER C1-CORRECTIVE-ACT10N-REQUEST-STATUS C2-APRIL 0-NA 1:Citr n-E2/D6 f t&___C CQRR EL]lVE:A CI E0!L-RLOUL511:51 AM1 C.1-M A_v 0-NA _.__
  #                                                                                                                                                                                        T S-CGRE         D 82/02/C8 C-CORRECTIVE-ACTION-RtPORTS                               0-KE0/P83 i
S-CGRE D 82/02/C8 C-CORRECTIVE-ACTION-RtPORTS 0-KE0/P83 T
  ,            5-CGtt         D-E2/08/te C-CORRECTIVE-ACTION-RE0uESTS                               Ci-M AN AGEME NT-COR RE C TiVE-, CTiON-R E0uE ST S 0-DJS/82i.e
i 5-CGtt D-E2/08/te C-CORRECTIVE-ACTION-RE0uESTS Ci-M AN AGEME NT-COR RE C TiVE-, CTiON-R E0uE ST S 0-DJS/82i.e
_ _ 5 CEtt           0:22/08 L2.5_C-IER-EV ALU A130N:8Y 08E._9:N A                                                   ...  ._
_ _ 5 CEtt 0:22/08 L2.5_C-IER-EV ALU A130N:8Y 08E._9:N A 8
8 S-CGtt         D-22/09/20 C-CGRE-CUALITT-ENGINEERING                                 C1-REVIEW-E-SUBSEQUENT-CAR-ISSUANCE 0-HRS /82/361                                       )
S-CGtt D-22/09/20 C-CGRE-CUALITT-ENGINEERING C1-REVIEW-E-SUBSEQUENT-CAR-ISSUANCE 0-HRS /82/361
5-CGRE         D-82/11/02               C-PROCES$1NG-0F-CAR'S                 0-HRS /82/494 1-CGS 8       L:ED/0512E__I:HJE:ALLEGA110N3_CJ-SAGER                               cl-COMBINED CGtt-E-HJK-GA-ORGAN!!ATION                     0-NA S-CGEE         0-79/12/24 _C-HJK-ALLEGATIONS C1-SAGER _                             C2-GA-CONCERNS           0-KE0/359                                                     )
)
5-CGEE     _ D-79/12/10. C-HJK-ALLEGATIONS C1-SAGER                                 C2-0A-STATUS-REPORT-ADDITIONS 0-NA f
5-CGRE D-82/11/02 C-PROCES$1NG-0F-CAR'S 0-HRS /82/494 1-CGS 8 L:ED/0512E__I:HJE:ALLEGA110N3_CJ-SAGER cl-COMBINED CGtt-E-HJK-GA-ORGAN!!ATION 0-NA S-CGEE 0-79/12/24 _C-HJK-ALLEGATIONS C1-SAGER _
                                                                                                                                                                                            )
C2-GA-CONCERNS 0-KE0/359
5tiGgr         e-eatg5/13 C-HJK-ALLEEAltQNS C1-SAEfR                                 ClrHJK;3ANAGEMENTtPEETING _               _0-NA I           S-CGtt     .D-79/03/C6. C-HJK-ALLEGATIONS C1-SAGER                                 C2-HANGEP-DESIGN-STATUS-REPORT                     0-NE0/272                         )
)
5-CGRE         D-79/04/20. C-HJK-ALLEGATIONS C1-SAGER                               .C2-LARGE-DORE-MANGER-INSTALLATION                 0-KE0/284 i i                                                                                                                                                                                         )
5-CGEE
5-CGEL         0:19/0iL1LJ-LLK- Att16 AllD_NS C1-54GEB                               C 2-INST A LL A T10N-VE RIF IC AT ION 0-KE0/308 I           S-CGtt         D-79/09/C7. C-HJK-ALLEGATIONS C1-SAGER                               C2-GA-INSPECT 30N-SCHEDULE                 0-KE0/323                                   )
_ D-79/12/10. C-HJK-ALLEGATIONS C1-SAGER C2-0A-STATUS-REPORT-ADDITIONS 0-NA f
    ,_          S-CGtt         D-79/10/C2._C-HJF-ALLEGATIONS.C1-SAGER                               (2-HJK-LETTER-KC/13369/0                   0-KE0/239 4                                                                                                                                                                                     ')
)
_ S-CGEE           0:20 /01/lL._CaliJ K:ALL E 0 411D N S Cl:S A G E R                   C 2-C OPE N T S-Ch-H J K-L E T T E R-D A T E D-M AR C H-4,-198 0 0-NA I           S-CG'E         D-50/03/C5 C-HJK-ALLEGATIONS C1-SAGER                                 C2-SYSTEP-TURNOVER-PREOPE R ATION AL-TES11NG C3-REVIEW-MEETING                       ')
5tiGgr e-eatg5/13 C-HJK-ALLEEAltQNS C1-SAEfR ClrHJK;3ANAGEMENTtPEETING _
0-h 9"           S-CGRE         D-79/05/C7' C-HJK-ALLEfATIONS C1-SAGER                               C2-5A-CONCERNS           O-NA                                                       ')
_0-NA I
5-KAISER       D-79/06/2P C-HJF-ALLEGATIONS (1-SAGER                                 (2-MANGEPENT-PROBLEMS-t-CONCERNS                   0-NA
S-CGtt
9   ..                                    .. .                . .. .              _. ..
.D-79/03/C6. C-HJK-ALLEGATIONS C1-SAGER C2-HANGEP-DESIGN-STATUS-REPORT 0-NE0/272
W S-CGit        D-79/C1/13              C-HJK-ALLEGATIONS. C1-SAGER                 C2-MEETING C3 -P RO C E DU R E S           C4-GA-REQUIREMENTS 0-NA S:CGEL       P.2.?l191.Cf_ _(-HJE281,LEGA{ ION $_(_1:$AGER _ C2-PFRF0AMANCE-IN-0A                                     0-NA e           S-CGRE         D-79/08/14             C-HJK-ALLEGATIONS C1-SAGER                   C2-INSTALLATION-VERIFICATION 0-KE0/308                                               1N 5-CGtt         D-77/04/01             C-HJK-ALLEGATIONS C1-SAGER                   C2-0A-CONCERNS           0-AL E /120
)
      ,____lifGEE           4:27 /_03 f 25__ C-H J,K- A L L E G A.T I ON S C I: SAGER.           .C2-SUGGESTIONS-FOR-PROJECT-IMPROVEMENT                       0-NA
5-CGRE D-79/04/20. C-HJK-ALLEGATIONS C1-SAGER
[h),         S-CGRE       D-77/03/C7 C-HJK-ALLEGATIONS C1-SAGFR                                 C2-REQUE ST-F OR- ADD ITION A L-INSPEC TION                 0-KE0/112               #W
.C2-LARGE-DORE-MANGER-INSTALLATION 0-KE0/284 i i
)
5-CGEL 0:19/0iL1LJ-LLK-Att16 AllD_NS C1-54GEB C 2-INST A LL A T10N-VE RIF IC AT ION 0-KE0/308 I
S-CGtt D-79/09/C7. C-HJK-ALLEGATIONS C1-SAGER C2-GA-INSPECT 30N-SCHEDULE 0-KE0/323
)
S-CGtt D-79/10/C2._C-HJF-ALLEGATIONS.C1-SAGER (2-HJK-LETTER-KC/13369/0 0-KE0/239 4
')
_ S-CGEE 0:20 /01/lL._CaliJ K:ALL E 0 411D N S Cl:S A G E R C 2-C OPE N T S-Ch-H J K-L E T T E R-D A T E D-M AR C H-4,-198 0 0-NA I
S-CG'E D-50/03/C5 C-HJK-ALLEGATIONS C1-SAGER C2-SYSTEP-TURNOVER-PREOPE R ATION AL-TES11NG C3-REVIEW-MEETING
')
0-h 9"
S-CGRE D-79/05/C7' C-HJK-ALLEfATIONS C1-SAGER C2-5A-CONCERNS O-NA
')
5-KAISER D-79/06/2P C-HJF-ALLEGATIONS (1-SAGER (2-MANGEPENT-PROBLEMS-t-CONCERNS 0-NA 9
. C1-SAGER C2-MEETING C3 -P RO C E DU R E S C4-GA-REQUIREMENTS W
S-CGit D-79/C1/13 C-HJK-ALLEGATIONS 0-NA S:CGEL P.2.?l191.Cf_ _(-HJE281,LEGA{ ION $_(_1:$AGER _ C2-PFRF0AMANCE-IN-0A 0-NA e
S-CGRE D-79/08/14 C-HJK-ALLEGATIONS C1-SAGER C2-INSTALLATION-VERIFICATION 0-KE0/308 1N 5-CGtt D-77/04/01 C-HJK-ALLEGATIONS C1-SAGER C2-0A-CONCERNS 0-AL E /120
,____lifGEE 4:27 /_03 f 25__ C-H J,K-A L L E G A.T I ON S C I: SAGER.
.C2-SUGGESTIONS-FOR-PROJECT-IMPROVEMENT 0-NA
[h),
S-CGRE D-77/03/C7 C-HJK-ALLEGATIONS C1-SAGFR C2-REQUE ST-F OR-ADD ITION A L-INSPEC TION 0-KE0/112 W


e
e
  ''                                                                                                                                                                                                                                                              ,g DRS-0FFLINE PRINT 14 JUN 83                                                             08:50:37                                                                                             DATE 061483             PAGE       6
,g DRS-0FFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 6
  ,,              5-CGEE           D-77/C3/C3 C-HJK-ALLEGATIONS C1-SAGER                                                                 C2-AUDIT-SCHEDULE 0-KE0/1CO S-CGtt           D-77/C2/21         C-HJK-ALLEG5T!0NS C1-SAGER                                                         C2-CGEE-LETTER-KEC-3                               Q*NA S-CGEE           D-83/05/24 C-PUNCHLIST C1-FC-1                                                                   C2-RH-1       C3-PREOPERATIONAL-TURNOVER-MASTER-2PS-1                                   C4-STSTEM-50RT                       '%
5-CGEE D-77/C3/C3 C-HJK-ALLEGATIONS C1-SAGER C2-AUDIT-SCHEDULE 0-KE0/1CO S-CGtt D-77/C2/21 C-HJK-ALLEG5T!0NS C1-SAGER C2-CGEE-LETTER-KEC-3 Q*NA S-CGEE D-83/05/24 C-PUNCHLIST C1-FC-1 C2-RH-1 C3-PREOPERATIONAL-TURNOVER-MASTER-2PS-1 C4-STSTEM-50RT 0-J437 S-CG8L D-00/C0/C0 C-RESIDLAL-HEAT-REMOVAL-SYS-PREOP (1-COMPUTER-PRINTOUT O-P0/RH/01 i
0-J437                                                                                                                                                                   __
5-CGEE D-C0/C0/C0 C-STSTEP-LISTING-DT-1URNOVER-PACKAGE-DESIGNATOR C1-E SSE NTI AL-t-S AFE TY-REL ATE D Q-N A 1:C681 D:00 / 00 /f a__L:RJ Er a L LE G LTl 0 N S_LL:3 A G E R C2.0A. INSPECTION-REQUIREMENTS.C3-SEPT-75-THRU-FEB-76 0-NA 3
S-CG8L           D-00/C0/C0           C-RESIDLAL-HEAT-REMOVAL-SYS-PREOP                                                         (1-COMPUTER-PRINTOUT                             O-P0/RH/01                                                     i
5-KAISER D-74/10/14..
  ,              5-CGEE           D-C0/C0/C0 C-STSTEP-LISTING-DT-1URNOVER-PACKAGE-DESIGNATOR C1-E SSE NTI AL-t-S AFE TY-REL ATE D Q-N A 1:C681           D:00 / 00 /f a__L:RJ Er a L LE G LTl 0 N S_LL:3 A G E R                                                 C2.0A. INSPECTION-REQUIREMENTS.C3-SEPT-75-THRU-FEB-76 0-NA 3
Q-K C /264 3 /o C-HJk-ALLEGATIONS C1-SAGER C2-ADDITIONAL-GA-PER$0NNEL S-CGEE D-75/01/15 C-HJK-ALLEGATIONS C1-SAGER C2-MANPOWER-AUTHORIZATION 0-KEB/12 3
5-KAISER         D-74/10/14 ..C-HJk-ALLEGATIONS C1-SAGER                                                                 C2-ADDITIONAL-GA-PER$0NNEL                               Q-K C /264 3 /o S-CGEE           D-75/01/15 C-HJK-ALLEGATIONS C1-SAGER                                                                 C2-MANPOWER-AUTHORIZATION                               0-KEB/12                                                       3 5-CGRE           D-00/00/C0 C-HJK-ALLEGATIONS C1-SAGER                                                                 C2-EFFICIENCY-OF-GA-CPERATIONS                                   C 3-P AI NT IN G-t-C 0 A T ING=INSPE C TI ON-KE F I               -5         C4-QUALIFICATICHS-0F-C0ATING-INSPECTORS-KEF-12                                                                                                                                             ,                                      ')
5-CGRE D-00/00/C0 C-HJK-ALLEGATIONS C1-SAGER C2-EFFICIENCY-OF-GA-CPERATIONS C 3-P AI NT IN G-t-C 0 A T ING=INSPE C TI ON-KE F I
0-hA 4               S-CGtt           D-75/C3/26 C-HJK-ALLEGATIONS C1-SAGER                                                                                                                                                                                           )
-5 C4-QUALIFICATICHS-0F-C0ATING-INSPECTORS-KEF-12
C3-VENDOR-SURVEYS-FOR-ASME-CODE-PATERIALS C4-K C /1760 /0                                         C2-REQUEST-F cR - A 0 01110 H L-c A-f tR 5phis tl.                                                                                                     . _ _ _ _ . . _ . , _ . . _
')
0-hA 4
S-CGtt D-75/C3/26 C-HJK-ALLEGATIONS C1-SAGER C3-VENDOR-SURVEYS-FOR-ASME-CODE-PATERIALS C4-K C /1760 /0 C2-REQUEST-F
)
cR - A 0 01110 H L-c A-f tR 5phis tl.
Q-NA
Q-NA
                                                                                                                                                                                                                                                                    )
)
S-CGEE           D-75/04/11         C-HJK-ALLEGATIONS C1-SAGTR                                                         C2-INSPECTION-OF-PHASE-2-PIPING                                 0-KC/3449/0 T'             S-CGEE           D-76/10/18 ~ C-HJK-ALLEGATIONS C1-S5GER                                                               C2-5GENDA               C3-HJK-GA/0C-GENERIC                   0-NA                                                     )
S-CGEE D-75/04/11 C-HJK-ALLEGATIONS C1-SAGTR C2-INSPECTION-OF-PHASE-2-PIPING 0-KC/3449/0 T'
S-CGEE           D- 7 6 /11/ ?0     C-HJK-ALLEGATIONS C1-SAGER                                                         C2-TELEPHONE-CONVERSATION                               C3-BILL-SCHWIERS         Q-K B /16
S-CGEE D-76/10/18 ~ C-HJK-ALLEGATIONS C1-S5GER C2-5GENDA C3-HJK-GA/0C-GENERIC 0-NA
                  $= KAISER         D-75/03/21 C-HJK-iLLEG5TIONS Ci-55GER                                                                 C2-KEI-GA/0C-ORG5NICATION                               0-NA i               S-RAISER         D-/5/C4/16         C-HJK-ALLEGATIONS C1-SAGER                                                         C2-KEl-oA-0RGANITATIONS 0-NA                                                                                             I
)
          ~ ~ ~
S-CGEE D-7 6 /11/ ?0 C-HJK-ALLEGATIONS C1-SAGER C2-TELEPHONE-CONVERSATION C3-BILL-SCHWIERS Q-K B /16
  ,              S-CGEE           D-00/00/CD C-HJK-ALLEGATIONS C1-SAGER                                                                 C2-SP[ChijC-5Ri-Cb'CERNS                     H          C3-LARGE-80RE-PIPE-HANGERS
$= KAISER D-75/03/21 C-HJK-iLLEG5TIONS Ci-55GER C2-KEI-GA/0C-ORG5NICATION 0-NA i
  .              0-nA                                                                                                                                                                                                                                           'b
S-RAISER D-/5/C4/16 C-HJK-ALLEGATIONS C1-SAGER C2-KEl-oA-0RGANITATIONS 0-NA I
    . ,          5-CGRE           D-74/02/20         C-NJK-ALLEGATION $ C1-SAGER                                                       C2-VENDOR-SURVETS-FOR-ASPE-CODE-PATERIALS 0-KC/1760/0 o                                                                                                                                                                                                                                                              -)
~ ~ ~
        ...__S-EAISER               D-14 /.10 /_16 C-HJg-ALLEGATIONS _C1-SAGER._ _C2-REQUEST-FOR-ADDITIONAL-GA-PERSONNEL                                                                                               G-KC/2643/Q 9               S-CGRE           D-74/19/?O C-HJk-ALLEGATIONS C1-SAGER                                                                 C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL                                   Q-KEP/7                               h 5-CGtt           D-74/11/01         C-HJK-ALLEGATIONS C1-SAGEN                                                         C2-PER$0NNFL                                 0-NA s'                                                                                                                                                                                                                                                             .)
S-CGEE D-00/00/CD C-HJK-ALLEGATIONS C1-SAGER C2-SP[ChijC-5Ri-Cb'CERNS C3-LARGE-80RE-PIPE-HANGERS H
5-KAISTR         D- 7 4 L11/_Cl__C- H J K- A L L ( G A T I O N S _C 1 -S A G E R _ __ . C 2 -P A I N T I N F -I N S P E C T O R                                           C3-DOCUMENTATION-CLERK 0-KC/2754/0 e l            5-CGRE           D-75/01/?O         C-HJK-ALLEGATIONS C1-SAGER                                                         C2-EFFICIENCV-OF-QA-OPERATIONS                                   0-KM/220                                               >
0-nA
5-CGtt           D-75/02/17 C-HJK-ALLEGATIONS Cl*SAGEk                                                                 C2-EFFECIENCV-OF-GA-OPERATIONS                                   0-NA
'b 5-CGRE D-74/02/20 C-NJK-ALLEGATION $ C1-SAGER C2-VENDOR-SURVETS-FOR-ASPE-CODE-PATERIALS 0-KC/1760/0
        , _ _ _ _ S - C G E_t       D- 7.5 / 0 3 / 04 C-HJK-ALLEGATIONS C1-SAGER                                                           C2-PAINTING-E-C08 TING-INSPECTION                               0 -F E F / 5
-)
$13               5-CGtE           D-75/03/18         C-HJK-ALLEGATIONS C1-SAGER                                                         C2-QA 0-NA
o
...__S-EAISER D-14 /.10 /_16 C-HJg-ALLEGATIONS _C1-SAGER._ _C2-REQUEST-FOR-ADDITIONAL-GA-PERSONNEL G-KC/2643/Q 9
S-CGRE D-74/19/?O C-HJk-ALLEGATIONS C1-SAGER C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL Q-KEP/7 h
5-CGtt D-74/11/01 C-HJK-ALLEGATIONS C1-SAGEN C2-PER$0NNFL 0-NA s'
. )
5-KAISTR D-7 4 L11/_Cl__C-H J K-A L L ( G A T I O N S _C 1 -S A G E R _ __. C 2 -P A I N T I N F -I N S P E C T O R C3-DOCUMENTATION-CLERK 0-KC/2754/0 l
e 5-CGRE D-75/01/?O C-HJK-ALLEGATIONS C1-SAGER C2-EFFICIENCV-OF-QA-OPERATIONS 0-KM/220 5-CGtt D-75/02/17 C-HJK-ALLEGATIONS Cl*SAGEk C2-EFFECIENCV-OF-GA-OPERATIONS 0-NA
, _ _ _ _ S - C G E_t D-7.5 / 0 3 / 04 C-HJK-ALLEGATIONS C1-SAGER C2-PAINTING-E-C08 TING-INSPECTION 0 -F E F / 5
$13 5-CGtE D-75/03/18 C-HJK-ALLEGATIONS C1-SAGER C2-QA 0-NA


                                                                                                                                                                                .W h                                                                                                                                                                           9 DRS-OfFLINE PRINT 14 JUN 83                 08:50:37                                                                               DATE 061483   PAGE 7
.W h
              $-WAISER     D-7$1C3/21         C-HJK-ALLEGATIONS C1-SAGER               C 2-K El-0 A /0C-ORG A N IZ A T ION           0-NA s-CGtt       D-75/03/26 C-HJr-ALLOCATIbNS C1-SAGER                       C2-REQUEST-f0R-ADDITIONAL-0A-PERSONNEL                       0-NA 5-CGRE       D-75/03/31         C-HJK-ALLOGATICNS C1-SAGER               C2-MINUTES-OF-J0!NT-CGtt                       C3-K El-G A-PE ETING 0-N A
9 DRS-OfFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 7
                                                                                                                                ~
$-WAISER D-7$1C3/21 C-HJK-ALLEGATIONS C1-SAGER C 2-K El-0 A /0C-ORG A N IZ A T ION 0-NA s-CGtt D-75/03/26 C-HJr-ALLOCATIbNS C1-SAGER C2-REQUEST-f0R-ADDITIONAL-0A-PERSONNEL 0-NA 5-CGRE D-75/03/31 C-HJK-ALLOGATICNS C1-SAGER C2-MINUTES-OF-J0!NT-CGtt C3-K El-G A-PE ETING 0-N A
  ,,          $= KAISER     D-75/04/11         C-HJK-ALLEGATIONS C1-SAGER               C2-INSPECTION-07-PHISE-2-PIPkNG                       0=KC/3449/0
$= KAISER D-75/04/11 C-HJK-ALLEGATIONS C1-SAGER C2-INSPECTION-07-PHISE-2-PIPkNG 0=KC/3449/0
              $-FAI5*3     D-75/C4/16 C-HJk-ALLEGATIONS C1-5AGER                       C2-KEl-QA-0RGANIZATION                   0-NA a           5-CGEE       D-75/0R/C1         C-HJK-ALLEGATIONS C1-5AGER               C2-0A-INSPECT 10N-REQUIREMENTS C3-SEP-75-THRU-fEB-76                                   'l 42.h A                                                                                                     _ . .
~
I            5-CGRE       D-75/12/26. C-HJr-ALLEGATIONS C1-SAGER                       C2-H.C.-NUTTING-CONTRACT                       C3-0VERTIME 0-KEF/87                     1 5-C , 5. D-76/11/30 C-HJK-ALLEGATIONS C1-$AGER                       C2-TELEPHONE-CONVERSATION                     C3-BILL-SCHWIERS     0-KD/16 6
$-FAI5*3 D-75/C4/16 C-HJk-ALLEGATIONS C1-5AGER C2-KEl-QA-0RGANIZATION 0-NA a
_5-CGRr         B-E0/03L12_L H1E ALLEG All0NS_Cl-$ AGEP                     C2-0A-INSPECTOR _._0-KE0/399
5-CGEE D-75/0R/C1 C-HJK-ALLEGATIONS C1-5AGER C2-0A-INSPECT 10N-REQUIREMENTS C3-SEP-75-THRU-fEB-76
(           5-CGEE       D-78/10/16 C-HJr-ALLEGATIONS C1-5AGEk                       C2-DENNIS-LEDFORD-TERMINATION 0-NA 5-CGRE       D-23/04/18- C-HJK-ALLEGATIONS C1-SAGER                       C2-SAGER-LETTLP                 0-NA 1:CGLE       b:11/09fil__L HJ K:ALLEGLI!DN1_C1:5AGER                     C2: STOPPING-CONSTRUCTION _                   0-NA I           5-CGtt     .D-75/03/18 C-HJK-ALLEGATIONS C1-SAGER                       C2-CORRECTIVE-ACTIONS                   0-NA                                           )
'l 42.h A I
5-FAISER     D-75/04/16 C-HJK-ALLEGATIONS C1-$AGER                       C2-KEl-GA-0RGANIZATION                   0-NA
5-CGRE D-75/12/26. C-HJr-ALLEGATIONS C1-SAGER C2-H.C.-NUTTING-CONTRACT C3-0VERTIME 0-KEF/87 1
_.._.5-KA15ER     D-2 3 / C S I.14 -_C:HJ K: A L L EG A LION 1_11 -1 A G E R   C2 PHIL-GITTINGS-TERMINATION 0-KC/15694/0 i           5-CGEE*     D-76/11/18 C-nJr-ALLEGATICNS C1-SAGER                       C2-stL                   C3-DDC         0-KE0/78                                       I 5-CGRE       D-75/05/27         C-HJK-ALLEGATIONS C1-SAGFR               C2-MECHANICAL-0A-INSPECTICN                   0-KED/27
5-C 5.
          .___5:CGRE       D-15 /07 / 28       t-H J K- A L L E G 4.110 Ni_C1:14 G E R C2-KEl-C04PORATE-AUDIT. 0-NA                                       ,
D-76/11/30 C-HJK-ALLEGATIONS C1-$AGER C2-TELEPHONE-CONVERSATION C3-BILL-SCHWIERS 0-KD/16 6
i'           s-CGtE       D-75/11/10 r-HJK-ALLEGATIONS C1-SAGER                       C2-FIELD-AUDIl-57 0-KE0/46                                                               )
_5-CGRr B-E0/03L12_L H1E ALLEG All0NS_Cl-$ AGEP C2-0A-INSPECTOR _._0-KE0/399
    .,        5-CGtt       D-74/0P/15..C-HJr-ALLEGATIONS C1-5AGER                     C2-FIELD-AUDIT-REPORT-33                       0-KE0/2 1'                                                                                                                                                                             )
(
        ,  ___5-FAISER     D:13/04/24__L:HJK-ALLEGATIONS _C_1:5AGER                     C2-CGLE-8UDIT-1                 0-kCt?O6/0 E'         D-75/01/16 C-HJr-ALLEGATIONS C1-SAGER                       C2-AEC-AUDIT         0-ken /14                                                                       )
5-CGEE D-78/10/16 C-HJr-ALLEGATIONS C1-5AGEk C2-DENNIS-LEDFORD-TERMINATION 0-NA 5-CGRE D-23/04/18-C-HJK-ALLEGATIONS C1-SAGER C2-SAGER-LETTLP 0-NA 1:CGLE b:11/09fil__L HJ K:ALLEGLI!DN1_C1:5AGER C2: STOPPING-CONSTRUCTION _
5-CGRE       D-75/02/21         C-HJF-ALLEGATIONS C1-SAGER               C2-CORPORATE-AUDIT                       0-rE0/22
0-NA I
____ S IG L E_     D.74/11/25__C-HJK-ALLEGAT10NS_C1:5AGER .__..C2-GA-PER50NNEL                                 Q-NA N)           5-CGLE       D-tC/01/19         C-HJk-ALLEGATIONS C1-5AGER               C2-GUALITY-C0hTROL-INSPECTOR 0-KE0/403                                                 Ih 5-CGRE       D-f9/10/16         C-CA-SERVICES               0-kA
5-CGtt
* 5p E-CGLE       0170/12/21_ C-NEWSOLC-15 LAND._C.1.0A-rROGRAP__ _ C2-StL                                   0-NA
.D-75/03/18 C-HJK-ALLEGATIONS C1-SAGER C2-CORRECTIVE-ACTIONS 0-NA
  $53           S-KAISER     t-71/05/C7         C-FEE-ACCRUAL-BY-CONSTRUCTOR           0-NA                                                                                   1h
)
5-FAISER D-75/04/16 C-HJK-ALLEGATIONS C1-$AGER C2-KEl-GA-0RGANIZATION 0-NA
_.._.5-KA15ER D-2 3 / C S I.14 -_C:HJ K: A L L EG A LION 1_11 -1 A G E R C2 PHIL-GITTINGS-TERMINATION 0-KC/15694/0 i
5-CGEE*
D-76/11/18 C-nJr-ALLEGATICNS C1-SAGER C2-stL C3-DDC 0-KE0/78 I
5-CGRE D-75/05/27 C-HJK-ALLEGATIONS C1-SAGFR C2-MECHANICAL-0A-INSPECTICN 0-KED/27
.___5:CGRE D-15 /07 / 28 t-H J K-A L L E G 4.110 Ni_C1:14 G E R C2-KEl-C04PORATE-AUDIT. 0-NA i'
s-CGtE D-75/11/10 r-HJK-ALLEGATIONS C1-SAGER C2-FIELD-AUDIl-57 0-KE0/46
)
5-CGtt D-74/0P/15..C-HJr-ALLEGATIONS C1-5AGER C2-FIELD-AUDIT-REPORT-33 0-KE0/2 1'
)
___5-FAISER D:13/04/24__L:HJK-ALLEGATIONS _C_1:5AGER C2-CGLE-8UDIT-1 0-kCt?O6/0 E'
D-75/01/16 C-HJr-ALLEGATIONS C1-SAGER C2-AEC-AUDIT 0-ken /14
)
5-CGRE D-75/02/21 C-HJF-ALLEGATIONS C1-SAGER C2-CORPORATE-AUDIT 0-rE0/22
____ S IG L E_
D.74/11/25__C-HJK-ALLEGAT10NS_C1:5AGER.__..C2-GA-PER50NNEL Q-NA N) 5-CGLE D-tC/01/19 C-HJk-ALLEGATIONS C1-5AGER C2-GUALITY-C0hTROL-INSPECTOR 0-KE0/403 Ih 5-CGRE D-f9/10/16 C-CA-SERVICES 0-kA 5p E-CGLE 0170/12/21_ C-NEWSOLC-15 LAND._C.1.0A-rROGRAP__ _ C2-StL 0-NA
$53 S-KAISER t-71/05/C7 C-FEE-ACCRUAL-BY-CONSTRUCTOR 0-NA 1h


T
T
                                                                                                                                                                                                                                                                        ?
?
We n \
We n \\
    ''                                                                                                                                                                                                                                                            O DRS-OffLINE PRINT 14 JUN 83                                                                                               08:50:37                                                                         DATE 061483 PAGE 8 5-CGEE                                           D-71/07/14                                                     C-GA-C0h5ULTING-SERVICES               0-0A/52
DRS-OffLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 8
                            $-CGtt                                           D-71/12/23                                                     C-KEl-GA*PANUAL           0-GA/9C ~ ~
O 5-CGEE D-71/07/14 C-GA-C0h5ULTING-SERVICES 0-0A/52
S-CGtt                                           D-71/01/27                                                     C-TRIP-REPORT-TO-KAISER 0-NA                                                                                         O
$-CGtt D-71/12/23 C-KEl-GA*PANUAL 0-GA/9C ~ ~
                                                                                                                                                                                                                ~      ~
S-CGtt D-71/01/27 C-TRIP-REPORT-TO-KAISER 0-NA O
    ,                      S-RAISER                                         D-72/03/r9                                                     C-REVISION-TO-KEl-QA-MANUAL             0-KC/65/0 5-CGtt                                           D-72/07/14 C-PICDERS-CA-PROGRAM-REVIkWS 0-0A/149 5-(Gtt                                           D-73/01/12                                                   C-CONTRACT-CHANGE-0RCER-4               0-KC/445/A                                                                   O
S-RAISER D-72/03/r9 C-REVISION-TO-KEl-QA-MANUAL 0-KC/65/0
                                                                                                                                                                                                            ~
~
S-CERE                                           D-73/02/C1                                                     C-RECOMPENDATION-f0R-AWARD               C1-NONDESTRUCTIVE'-EkM '}NAiiON-SERVICES               0-KC/473/A S-CGEE                                           p-73/11/C7                                                     C-QU AL I T V- A S $UR ANC E-CbNSULii NG-S ER vi C E S     C1-CONAM-INSPECTION-INC 0-NA s-CGRE                                           D-74/01/22 C-ZiPMIR-CA-ORhAN!!A150N                                                                     U-NA                                                                         I 5-CGRE                                           D-77/01/29 C-NONCONFORMANCE-REPORTS                                                                     Q-0A/368 S-CGtt                                           D-74/11/05 C-GA-ORGAN!IAkIUN 0-dA/423
~
                                                                                                                                                                          ~
5-CGtt D-72/07/14 C-PICDERS-CA-PROGRAM-REVIkWS 0-0A/149 5-(Gtt D-73/01/12 C-CONTRACT-CHANGE-0RCER-4 0-KC/445/A O
0                        5-CGRE                                           D-75/01/C3 C-TisilhG-LADORATORT-REGISTRATION                                                                     C1-WELDING-CERTIFICATION               0-N4                           '
S-CERE D-73/02/C1 C-RECOMPENDATION-f0R-AWARD C1-NONDESTRUCTIVE'-Ek '}NAiiON-SERVICES 0-KC/473/A
5-CGtt                                           0-75/0?/27                                                     C*0A-MAhUAL C1-REVIS10N-12               C2-NOTICE-of-CHANGES                 0-NA 5-CGtt                                           0-75/03/31                                                     C-MINUTES-OF-JOINi-CGEE-REl-GA-MFET]NG                     Cl-FEB-28.-1975         0-NA T                       5-CGtt                                           0-75/03/18                                                     C-KEI-QA-WEAKNESSES             0-NA                                                                                   i 5-CCLE                                           D-75/03/21                                                   C-LETTER-RESPONSE C1-KEl-CA/0C-ORGANIZATION                           0-N4 T                                                                                                                                                                                                                                                                 I 5-CGRL                                           D-75/04/16                                                     C-L E TT E R-R E $iid N S E C1-REI-GA/DC-ORGANIZATION                 0-NA
~
                                                                                                                                                                                                                                                                  )
M S-CGEE p-73/11/C7 C-QU AL I T V-A S $UR ANC E-CbNSULii NG-S ER vi C E S C1-CONAM-INSPECTION-INC 0-NA s-CGRE D-74/01/22 C-ZiPMIR-CA-ORhAN!!A150N U-NA I
i                        S-CGtt                                           D-75/10/29 ~ C-Ik-INSPECEION-REPORi-50-35P/75-05 C1-RESRGNSE-TO-NRC                                                                               0-NA 5-CGtE                                           D-75/09/18                                                   C-DEstGN-DOCUMENT-REVIEW-07-CGRE                 0-NA                           '
5-CGRE D-77/01/29 C-NONCONFORMANCE-REPORTS Q-0A/368 S-CGtt D-74/11/05 C-GA-ORGAN!IAkIUN 0-dA/423 0
a   5                                                                                                                                          .                _  .      ..                                                                                  3 5-CGLE                                           D-75/C8/18 C-ASPE-CERTIFICATES-Of-AUTHORI7ATION                                                                           0-GA/579 e                       S-CGtt                                           D-75/10/i0                                                   C-KEl-ALDIT-REPORT-230           C1-CCMPENTS 0-KE0/45                                                                   )
5-CGRE D-75/01/C3 C-TisilhG-LADORATORT-REGISTRATION C1-WELDING-CERTIFICATION 0-N4
5-CGtt                                           D-75/12/C4                                                   C-PACKAGING-Of-RADIOGRAPHS               0-SL O/ 33
~
                                                                                                                                            ~                                                                                                                       }
5-CGtt 0-75/0?/27 C*0A-MAhUAL C1-REVIS10N-12 C2-NOTICE-of-CHANGES 0-NA 5-CGtt 0-75/03/31 C-MINUTES-OF-JOINi-CGEE-REl-GA-MFET]NG Cl-FEB-28.-1975 0-NA T
5-SEL D-75/00/11                                                                                     C-GA-AUDIT       C1-RECEIPT         0-NA S-tGCE                                           D-76/04/77                                                   C-NRC-INSPECTION-REPCRT C1-MECHANICAL-SECTION-RESPONSIDILITY                             0-NA 5-CGEE                                           D-76/05/11                                                   C-TRANSPITTAL-OF-ENGINEERING-DOCUMENTS                     Q-SLQ/39 5-CGtt                                           D-76/05/14                                                   C-CORPORATE-GA-MANAGER           C1-POSITION-VACANT                   0-NA 5-CGRE                                           D-76/07/26 C-ORGANIJATIONAL-t-PERSONNEL-CHANGES                                                                           4-NA S-CGRE                                           D-7t/11/22                                                   C- AU TH O R I2 E D-C GCE-CO NSTRUC T I ON-E NG IN E E RI s.G-S IG M A TUR E S C1-NONCONFORMANCE-RAPORTS
5-CGtt 0-75/03/18 C-KEI-QA-WEAKNESSES 0-NA i
; M                         0-N4
5-CCLE D-75/03/21 C-LETTER-RESPONSE C1-KEl-CA/0C-ORGANIZATION 0-N4 T
I 5-CGRL D-75/04/16 C-L E TT E R-R E $iid N S E C1-REI-GA/DC-ORGANIZATION 0-NA i
S-CGtt D-75/10/29 ~ C-Ik-INSPECEION-REPORi-50-35P/75-05 C1-RESRGNSE-TO-NRC 0-NA
)
5-CGtE D-75/09/18 C-DEstGN-DOCUMENT-REVIEW-07-CGRE 0-NA 5
0-GA/579 3
a 5-CGLE D-75/C8/18 C-ASPE-CERTIFICATES-Of-AUTHORI7ATION e
S-CGtt D-75/10/i0 C-KEl-ALDIT-REPORT-230 C1-CCMPENTS 0-KE0/45
)
5-CGtt D-75/12/C4 C-PACKAGING-Of-RADIOGRAPHS 0-SL O/ 33
~
}
5-SEL D-75/00/11 C-GA-AUDIT C1-RECEIPT 0-NA S-tGCE D-76/04/77 C-NRC-INSPECTION-REPCRT C1-MECHANICAL-SECTION-RESPONSIDILITY 0-NA 5-CGEE D-76/05/11 C-TRANSPITTAL-OF-ENGINEERING-DOCUMENTS Q-SLQ/39 5-CGtt D-76/05/14 C-CORPORATE-GA-MANAGER C1-POSITION-VACANT 0-NA 5-CGRE D-76/07/26 C-ORGANIJATIONAL-t-PERSONNEL-CHANGES 4-NA S-CGRE D-7t/11/22 C-AU TH O R I2 E D-C GCE-CO NSTRUC T I ON-E NG IN E E RI s.G-S IG M A TUR E S C1-NONCONFORMANCE-RAPORTS
; M 0-N4


0 DR$-OFFLINE PRINT 14 JUN 83                                           08:50:3h                                                                       DATE 061483   PAGE 9     O S-CGtt           D-76/11/11                               C-REVIEh-0F-PANUFACTURERS-DRAWINGS                     0-5LO/58
0 DR$-OFFLINE PRINT 14 JUN 83 08:50:3h DATE 061483 PAGE 9
          ^ 5-CGRE ~             D-76/12/1E' C-KAISER-CbNTRACT 0-hA 5-CGtt           D-76/12/14' C-NONCbhf0RMANCE-REPORTS                                                   C1-CLOSED-0UT         0-RE0/83                                           'I 5-CGtt           D-76/12/16 C-ULTRSONIC-TESTING                                                 C-SU RVE ILL AN CE-0F-RE A C TOR-C OUT R'CL S 0-KE0/88 5-CGEE           D-i7/01/C7~~ C-K A l5 E R-CONTR A C T-idl TH-C CEE                                     0-NA 5-CGRE           D-77/02/C7 C-dA-SERIES 0-KEd/102                                                                                                                                 -3
O S-CGtt D-76/11/11 C-REVIEh-0F-PANUFACTURERS-DRAWINGS 0-5LO/58
  ,            5-CGLE           D-77/02/C8                               C-5ITE-CA         0-KE0/103 0-77/02/17
^ 5-CGRE ~
  #            5-CGEE           D-77/U4/C4                               C-NRC-MAhAGEMENT-MEETING                       0-NA
D-76/12/1E' C-KAISER-CbNTRACT 0-hA 5-CGtt D-76/12/14' C-NONCbhf0RMANCE-REPORTS C1-CLOSED-0UT 0-RE0/83
        '                                                                                                                                      ~
'I 5-CGtt D-76/12/16 C-ULTRSONIC-TESTING C-SU RVE ILL AN CE-0F-RE A C TOR-C OUT R'CL S 0-KE0/88 5-CGEE D-i7/01/C7~~ C-K A l5 E R-CONTR A C T-idl TH-C CEE 0-NA 5-CGRE D-77/02/C7 C-dA-SERIES 0-KEd/102
5-CGEE           D-77/04/06                               C-hAC-GA-MANAGEMENT-MEETING                   0-NA
-3 5-CGLE D-77/02/C8 C-5ITE-CA 0-KE0/103 0-77/02/17 5-CGEE D-77/U4/C4 C-NRC-MAhAGEMENT-MEETING 0-NA 5-CGEE D-77/04/06 C-hAC-GA-MANAGEMENT-MEETING 0-NA
(                                                                   '        '
~
D-77/04/22       C-REPLY-10-NRC-INSPECTIbE-REPORT                                               b-NA 5-CGtE           D-77/05/13 C-DE55Gh-DbCUMEkT-R5 VIEW-GUALIFICATIbN                                                     0-NA                                                         )
(
                $-CGtt           D-77/09/C2                               C-HVAC-CONTROL-WORK                   C1-POWER-REGULATORY-COPPANY         0-NA I                                                       .                            .    . .          . .                                                                                      )
D-77/04/22 C-REPLY-10-NRC-INSPECTIbE-REPORT b-NA 5-CGtE D-77/05/13 C-DE55Gh-DbCUMEkT-R5 VIEW-GUALIFICATIbN 0-NA
5-CGtt           D-77/10/11                               C-GA-HOLD-POINTS                 0-NA I                               D- 77 /11/ 0 3 S-CGEE                                                    C= PREPARATION-ObCh'NSTRUCTION-PadCEDURES                     0-NA                                                     3 5-CGRE           D-77/11/30 C-STRUCTURat-Gats-ENGINEER                                                   0-NA
)
                                                                                                  ~
$-CGtt D-77/09/C2 C-HVAC-CONTROL-WORK C1-POWER-REGULATORY-COPPANY 0-NA I
5-CGtt           D-78/07/25                               C-CAPLE-PAN-UANGER$'~~ ~ 0-0A/985 T             S-CGtt           D-P1/02/21 ~'C-EMPLOYEE-REbul$1TibNS'0-UA                                                                                                                         )
)
5-CGtt           D-81/04/13 C-NDE-ACTIVITIES                                               C1-RESCINDED-LETTER-APRIL-22,-1981       0-NA
5-CGtt D-77/10/11 C-GA-HOLD-POINTS 0-NA I
(                                                                                                                                                                                               ')
S-CGEE D-77 /11/ 0 3 C= PREPARATION-ObCh'NSTRUCTION-PadCEDURES 0-NA 3
5-CATALYTIC D-P3/05/19 C-REcutSTED-ConRESPONDEkCE                                                         C1-CATALYTIC-LETTER-TO-TPT         0-H/38570/922 E             $-CATALYTIC D-23/04/12 C'-C4TALTTIC-PRbCEDURE-TRACKjhG-REPORT                                                             0-NA                                                       )
5-CGRE D-77/11/30 C-STRUCTURat-Gats-ENGINEER 0-NA 5-CGtt D-78/07/25 C-CAPLE-PAN-UANGER$'~~ ~ 0-0A/985
                                                                                                                          '-          ~~
~
    ,          5-CATALYTIC D-P3/02/09                                     C-NMP-STATUS-LOG                 0-NA                                                                                     ,
T S-CGtt D-P1/02/21 ~'C-EMPLOYEE-REbul$1TibNS'0-UA
13 '                                                                                                                                                                                               A 5-CATALYTIC D-83/C1/19                                     C-HVAC-5YSTEMS                   C1-GCD-E-STARTUP     0-NA tt '         S-CATALYTIC D-P2/10/16                                     C-ECR'S           0-N4                                                                                                 ey
)
        ~ 5-CATALYTIC D-82/11/10 C-COPPdTICE-OF-WORKAikR AN- U R '                                                               Ci-ECR-426 0-55G/EC#1164 Y                                                                                               . ..                            .
5-CGtt D-81/04/13 C-NDE-ACTIVITIES C1-RESCINDED-LETTER-APRIL-22,-1981 0-NA
W i               5-CATALYTIC 0-P2/11/17                                     C-COPPLETION-OF-WORK-FOR-AN-fCR                       C1-Era-547 0-55G/ECR/150 4 5-CATALYTIC D-82/11/16 C-ECR-A5SICHPENT-FOR-ENGINEERING-t-CONSTRUCTION C1-ECR-822 'G-55G/ECR/146                                                                                   #W S-CATALYTIC D-82/11/22                                     C-COPPLETIPN-OF-5YSTEMS-P/L-ITEMS                     C1-CY-1-089 0-NA t-rat 89YYtr h-87#11#27                                   r-rn FPt F 19 691-O F- t V t T F F-P /g -I YF P S     (1-rV-1-fP9 Q-NA
(
')
5-CATALYTIC D-P3/05/19 C-REcutSTED-ConRESPONDEkCE C1-CATALYTIC-LETTER-TO-TPT 0-H/38570/922 E
$-CATALYTIC D-23/04/12 C'-C4TALTTIC-PRbCEDURE-TRACKjhG-REPORT 0-NA
)
5-CATALYTIC D-P3/02/09 C-NMP-STATUS-LOG 0-NA
~~
13 '
A 5-CATALYTIC D-83/C1/19 C-HVAC-5YSTEMS C1-GCD-E-STARTUP 0-NA tt '
S-CATALYTIC D-P2/10/16 C-ECR'S 0-N4 ey
~ 5-CATALYTIC D-82/11/10 C-COPPdTICE-OF-WORKAikR AN-U R '
Ci-ECR-426 0-55G/EC#1164 Y
W i
5-CATALYTIC 0-P2/11/17 C-COPPLETION-OF-WORK-FOR-AN-fCR C1-Era-547 0-55G/ECR/150 4
5-CATALYTIC D-82/11/16 C-ECR-A5SICHPENT-FOR-ENGINEERING-t-CONSTRUCTION C1-ECR-822 'G-55G/ECR/146 5
W S-CATALYTIC D-82/11/22 C-COPPLETIPN-OF-5YSTEMS-P/L-ITEMS C1-CY-1-089 0-NA t-rat 89YYtr h-87#11#27 r-rn FPt F 19 691-O F-t V t T F F-P /g -I YF P S (1-rV-1-fP9 Q-NA


                                                                                                                                                                                                                          .W4     &%4         ' ,
.W4
4 l''                 -_
&%4 4
DRS-0FFLINE PRINT 14 JUN 83                                         CP:50:37                                                                                         DATE 061483   PAGE     10           ''
l''
I          #'
DRS-0FFLINE PRINT 14 JUN 83 CP:50:37 DATE 061483 PAGE 10
                        .5-CATALYTIC D-82/10/29 . C-COPPLETION-0F-WORK-f0R-AN-ECR                                                                   ..C1-ECR-1043 0-55G/ECR/117                                                       - #N 1-CATALVTIC D-?2/10/28 C-ECP-AS$1GNPENT-F04-ENGINEERING-B-CONSTPUCTION C1-ECR-374 0-SSG/ECR/116
.5-CATALYTIC D-82/10/29. C-COPPLETION-0F-WORK-f0R-AN-ECR
                                                                                                                                                                                                                                          . g 5-CATALYII.C_A22tJO/28-_t-Ett:45$1GNMENT EOR:LNGINELAING-8-CONSTRUCT 10N_C1-ECR-698 .0-$5G/ECR/114 5-CATALYTIC D-82/10/28                               C-E C D- A 5 5 I GNME NT-F OR - ENG IN E E R ING-8-C ON S T R U CT ION C1-ECR-551                       0-SSG/ECR/115                                     '
..C1-ECR-1043 0-55G/ECR/117
                                                                                                                                                                                                                                            )
- #N I
l*                       S-C AT ALYTIC D-22/13/ 22                             C-E C P- A SSIGNPE NT-F OR-ENG IN EERING-B-CONST RUCT ION C 1-EC R -1104 0-S$ G /E C K /112 i                                                                                                                                                                                                                                           s 3
1-CATALVTIC D-?2/10/28 C-ECP-AS$1GNPENT-F04-ENGINEERING-B-CONSTPUCTION C1-ECR-374 0-SSG/ECR/116 g
s- C AI A L111 t a-22L10Lla                           t-r t R- AS SIGNELEL-1OR - ENG IN E ERIMGil-10N 51PU CT ION C )-E C R - 1197 0-S S G /E C R /113
5-CATALYII.C_A22tJO/28-_t-Ett:45$1GNMENT EOR:LNGINELAING-8-CONSTRUCT 10N_C1-ECR-698.0-$5G/ECR/114
              #                                                                                                                                                                                                                            1 S-CATALTTIC_D-82/10/28_ C-ECR-PSSIGNMENT-FCR-ENGINEERING-CONSTRUCTION                                                                     C1-ECR-1210 0-55G/ECR/111 i4 5-CATAL'YTIC D-82/11/23. C-ECD-A5$1GNPENT-FOR-ENGlhEEPING-5-CONSTRUCTION C1-ECR-650 0-SSG/ECA/159 3
)
                  .___1:C AT ALLTIE_A:12/11L23 ~ t-LCA ASSIGNBEML: EAR:LNGINEERING-E-CONSTPUCIION_C1-ECR-657 0-$5G/ECR/158
5-CATALYTIC D-82/10/28 C-E C D-A 5 5 I GNME NT-F OR - ENG IN E E R ING-8-C ON S T R U CT ION C1-ECR-551 0-SSG/ECR/115 l*
-'I'                     S-CATALVTIC D-P2/06/C9 .C-C.I.-CONTRACT-3857C                                                               C1-STEEL-DOOR-RADIOLOGICAL-$HIELDING                   C2-PER$0NNEL-GALLERIES                         1 l                         0-NA 4           5-CG8E                               D-8 2 / 02 /16 C-iORK-ASSIGNMENT Ci-FIREPROCFING-MATERIAL                                             0-NA
S-C AT ALYTIC D-22/13/ 22 C-E C P-A SSIGNPE NT-F OR-ENG IN EERING-B-CONST RUCT ION C 1-EC R -1104 0-S$ G /E C K /112 i
                                                                                                                                                                      ~ " ~ ' ~
s s-C AI A L111 t a-22L10Lla t-r t R-AS SIGNELEL-1OR - ENG IN E ERIMGil-10N 51PU CT ION C )-E C R - 1197 0-S S G /E C R /113 3
i                        S-CATALVTIC D-F2/01/15 C-WELD-UhDERCUT                                                               C1-58L       0-82/16 f
S-CATALTTIC_D-82/10/28_ C-ECR-PSSIGNMENT-FCR-ENGINEERING-CONSTRUCTION C1-ECR-1210 0-55G/ECR/111 1
l S-CATALYTIC D-81/10/C7 C-GusLITY-CONFIRM TION-PROGRAM                                                                           0-81/359 S-CATALYTIC D-P2/10/25                               C-COPPLETION-0F-ECR-440 0-SSG/ECR/105                                                                                                                         6
5-CATAL'YTIC D-82/11/23. C-ECD-A5$1GNPENT-FOR-ENGlhEEPING-5-CONSTRUCTION C1-ECR-650 0-SSG/ECA/159 i4 3
: i. Y
.___1:C AT ALLTIE_A:12/11L23 ~ t-LCA ASSIGNBEML: EAR:LNGINEERING-E-CONSTPUCIION_C1-ECR-657 0-$5G/ECR/158
* j                        $-CATALYTIC D-F2/10/25                               C-COPPLETION-OF-ECR-1188                                   0-SSG/ECR/104 l'T j
-'I' S-CATALVTIC D-P2/06/C9.C-C.I.-CONTRACT-3857C C1-STEEL-DOOR-RADIOLOGICAL-$HIELDING C2-PER$0NNEL-GALLERIES 1
S-CATAlfilt D-P2/10/25. C-COPPLETIeN-Or-ECR-5,._..5 0-S$GiECR/iO6 .
l 0-NA 4
                                                                                              . . . . . . . . . . .                    ..  .    ..                                                                                        I T           S-CATALYTIC D-82/05/19 C-ENGINEERING-CHANGE-REQUEST                                                               C1-PRELIMINARY-COPY                 0=!PS/PECR/263                                             I
5-CG8E D-8 2 / 02 /16 C-iORK-ASSIGNMENT Ci-FIREPROCFING-MATERIAL 0-NA S-CATALVTIC D-F2/01/15 C-WELD-UhDERCUT C1-58L 0-82/16
                                                                                                                                                                        ~~ ~
~ " ~ ' ~
5-CATALYTIC D-F2/08/05                               C-REA55IGNFENT-0F-ECD-586                                   0-S$G/FCR/20 li                                                                           .
i f
                                                                                              . . _                                                                                                                                        'I j                         5-CATALTTIC D.P2/08/C5                               C-REA$$lENPENT-0F-ECR-586                                   0-$$6/ECR/20 i'         S-CATAL4 TIC D-22/07/28' C-C'b"PLET10N-OF-ECR-432 0-$5f/EC#/11                                                                                                                                                   lb         '
l S-CATALYTIC D-81/10/C7 C-GusLITY-CONFIRM TION-PROGRAM 0-81/359
!,                        S-CATALYTIC D-82/07/C2                               C- A S SI G h P E N T-O F-E C R-736 R 1                     0-CCD/ECR/871
: i. Y S-CATALYTIC D-P2/10/25 C-COPPLETION-0F-ECR-440 0-SSG/ECR/105 6
                          $-CATALTTIC D-82/06/ii' C-aS$1'bPENT-OF-ECR-1212                 G                                                0-CCD/ECP/P44
j
              .          S-CATALYTIC D-P2/06/11                               C-COPPLETION-OF-ECR-558 0-GCD/ECR/840                                                                                                                       k 5-CATALYTIC D-E2/06/23                               C- A S SI GhP E NT-0 F-E C R- 114 8                         0-GC D / EC R / P60 5-CATALYTIC D-93/01/19                               C-COPPLETION-0F-ECR-1183                                   0-55G/ECR/202
$-CATALYTIC D-F2/10/25 C-COPPLETION-OF-ECR-1188 0-SSG/ECR/104 l'T j
: j.                        5-CATALYTIC D-P3/01/13                               C-COPPLETION-OF-ECR-1046                                   0-t; A 2
S-CATAlfilt D-P2/10/25. C-COPPLETIeN-Or-ECR-5,._..5 0-S$GiECR/iO6.
5-CATALYTIC D-P3/01/11 C-COPPLETION-OF-ECR-1199                                                                   0-$sG/ECP/195 E                   ._,.......,                          ...,,,,,,o       ,_.e....,....,_o,_&,.                             ,,,      ....r.,,r.,,71
I T
S-CATALYTIC D-82/05/19 C-ENGINEERING-CHANGE-REQUEST C1-PRELIMINARY-COPY 0=!PS/PECR/263 I
~~ ~
5-CATALYTIC D-F2/08/05 C-REA55IGNFENT-0F-ECD-586 0-S$G/FCR/20 li
'I j
5-CATALTTIC D.P2/08/C5 C-REA$$lENPENT-0F-ECR-586 0-$$6/ECR/20 i'
S-CATAL4 TIC D-22/07/28' C-C'b"PLET10N-OF-ECR-432 0-$5f/EC#/11 lb S-CATALYTIC D-82/07/C2 C-A S SI G h P E N T-O F-E C R-736 R 1 0-CCD/ECR/871
$-CATALTTIC D-82/06/ii' C-aS$1'bPENT-OF-ECR-1212 0-CCD/ECP/P44 G
S-CATALYTIC D-P2/06/11 C-COPPLETION-OF-ECR-558 0-GCD/ECR/840 k
5-CATALYTIC D-E2/06/23 C-A S SI GhP E NT-0 F-E C R-114 8 0-GC D / EC R / P60 5-CATALYTIC D-93/01/19 C-COPPLETION-0F-ECR-1183 0-55G/ECR/202 5-CATALYTIC D-P3/01/13 C-COPPLETION-OF-ECR-1046 0-t; A j.
2 5-CATALYTIC D-P3/01/11 C-COPPLETION-OF-ECR-1199 0-$sG/ECP/195 E
...,,,,,,o
,_.e....,....,_o,_&,.
....r.,,r.,,71


_+           .
_+
                                                                                                                                                                                                                ~
~
                                                                                                                                                                                                                      .                4
                                                                                                                                                                                                                                      -q l
        <*                                                                                                                                                                                                                  <3 DRS-OFFLINE PRINT 14 JUN 83                                                08:56:37                                                                  DATE 061483        PAGE  11 I
a S-CATALYTIC D-f2/11/C5..C-RE4551CN*ENT-OF-ECR-516                                                        _.0-55G/ECR/132                                                                                  '
        ,            $-CATALYTIC D-82/10/21 C-REcutST-0F-ECR-COPIES 0-S$G/ECR/99
                . .__1- C A I A LII I L_It.-12 / 06 L11__.L- A MI G k P_ E N I-0 E:I C fL- 1212                                    g-GCD/ECR/244
{                    s-CATALYTIC D-P2/06/11* C-COPPLETION-0F-ECR-558.0-GCD/ECR/840        .
                                                                                                                                                                                                                            'i
        ,            5-CATALYTIC D-P2/C6/C3 C-ECR-1193 0-GCD/ECR/834                                                                                                                                                        ,
5- C &B LYll C_R- S U O 4 / Z O_C- C Qff L E T I 0h0.1- E.Ch316__o_-6 C RllCP I T 8 ?                                                    . _.
8 S-CATALYTIC D-P2/04/23 .C-COPPLET10N-OF-ECR-643 0-GCD/ECR/776                                                                                                                                            1 5-CATALYTIC D-P2/04/22..C-COPPLET10N-0F-ECR-1178                                                            Q-GCDIECR/774
                      *-CAIALUIC D-81LO1LC2 C-AstIMEI31-01 EC.hs1L_9-GCD/ECR/304___                                                                      __.
                                                                                                                                                                                                                                          )
s-CATALYTIC D-82/01/C6. C-tCR-518                                                      0-GCD/ECR/293 5-CATALYTIC D-00/00/C0 .C-PUNCHLIST-WORK-TICKETS                                                            0-N4 3-C aIALJ TIC D *1L11L10 _ C WoPK- A 551GNMN T 0-81/416                                                                        _ _ , _ , , _ _
4
4
                      $. CATALYTIC D-21/10/29 C-WOPK-A$$1GNMENT C1-DDC-5LS-525                                                           0-NA                                                                                 %
-q l
5-CATALYTIC D-A1/12/14                                                 C-REAS$3GNMENT-OF-ECR-425-REV-1             C1-REA$5tGMENT-0F-ECR-547.-598,-1203               o-GCD/ECR/270 3-Lal aLYII C._D.-EIL12/14                                             r-JCR-544       0-Sn /gg_Rf2 M I
<3 DRS-OFFLINE PRINT 14 JUN 83 08:56:37 DATE 061483 PAGE 11 I
T            s-CATAtVT:C D-Ri/12/c8_C-AssIGnPENT-0F-ECR .1208                                                           .o-GCDitCRi253                                                                               )
a S-CATALYTIC D-f2/11/C5..C-RE4551CN*ENT-OF-ECR-516
j                     5-CATALYTIC D-81/12/C4 _C-AS$lGhMENT-0F-ECR-620 0-GCDIECR/233 if
_.0-55G/ECR/132
                                                                                        ~
$-CATALYTIC D-82/10/21 C-REcutST-0F-ECR-COPIES 0-S$G/ECR/99
                                                                                                                                                                                                                                )
..__1-C A I A LII I L_It.-12 / 06 L11__.L-A MI G k P_ E N I-0 E:I C fL-1212 g-GCD/ECR/244
1-C8I ALUlf D-P 1/12LC4                                                 C- A_5 3 I Shf ERL-OL-H R- 1144     0-GCD/ECR/R34 ,__ ._
{
i,           S-CATALVTIC t-81/12/C4                                                 C-ASSIGNPENT-OF-ECR-1147             G-NA                                                                                         )
s-CATALYTIC D-P2/06/11* C-COPPLETION-0F-ECR-558.0-GCD/ECR/840
          , , ,      $-CATALYTIC D-81/12/04._C-ASSIGhPENT-07-ECR-1193                                                             0-GCD/ECR/236 0                                                                                                                                                                                                                     )
'i 5-CATALYTIC D-P2/C6/C3 C-ECR-1193 0-GCD/ECR/834 5-C &B LYll C_R-S U O 4 / Z O_C-C Qff L E T I 0h0.1-E.Ch316__o_-6 C RllCP I T 8 ?
j           ,.. __5 .CM A LIll C_D- P 1/_12 / C4 _ C- A S 119 hP ( NI-0 F.- LC R_- } } 9 4                                       0-GCD/EC#/231 d',           $-CATALYTIC.0-P1/12/C4 _C-AS$IGkPFMT-0F-ECR-1203                   _
8 S-CATALYTIC D-P2/04/23.C-COPPLET10N-OF-ECR-643 0-GCD/ECR/776 1
0-GCD/EC#/232                                                                               )
5-CATALYTIC D-P2/04/22..C-COPPLET10N-0F-ECR-1178 Q-GCDIECR/774
S-CATALYTIC D-81/11/?0 C-COPPLET10N-07-ECR-109 (1-CCMPLETION-0F-ECR-1034                                                                       C2-CANCELLATION-07-ECR-538                               #
*-CAIALUIC D-81LO1LC2 C-AstIMEI31-01 EC.hs1L_9-GCD/ECR/304___
i 4P ..       Q-GCD/ECR/213                                                                                                                                                                                           F
)
,                    5-CATALYTIC D-81/12/C3                                                 C-ECo-547       C1-REQUIRED-C0"PLETION-DATE     0-GCD/EC4/220
s-CATALYTIC D-82/01/C6. C-tCR-518 0-GCD/ECR/293 5-CATALYTIC D-00/00/C0.C-PUNCHLIST-WORK-TICKETS 0-N4 3-C aIALJ TIC D *1L11L10 _ C WoPK-A 551GNMN T 0-81/416 4
' Nd                                                                             .. .                                        .                                                                                            $P
$. CATALYTIC D-21/10/29 C-WOPK-A$$1GNMENT C1-DDC-5LS-525 0-NA 5-CATALYTIC D-A1/12/14 C-REAS$3GNMENT-OF-ECR-425-REV-1 C1-REA$5tGMENT-0F-ECR-547.-598,-1203 o-GCD/ECR/270 3-Lal aLYII C._D.-EIL12/14 r-JCR-544 0-Sn /gg_Rf2 M T
                      $-CATALVTIC D-81/11/?C                                                 C-C A TA LYTIC-PUNCHLIS T-WORK-T ICK ETS   0-NA 4
s-CATAtVT:C D-Ri/12/c8_C-AssIGnPENT-0F-ECR.1208
c)'         $= CATALYTIC D-P1/11/20                                                 C-ASSIGhPENT-0F-EC9-220 C-GCD/ECR/201                                                                                           if
.o-GCDitCRi253
              ''                                                                                      ~          ~
)
5-CATALYTIC D-85[11/2C C-A551GNhkNT-0F-ECP-5E9 Q-GC'p/rCR/200 t
I j
[5]           e-ravaivter n-pistisse                                                 r-acetrawret-nr-Fre-ste e-rrestrettoo I
5-CATALYTIC D-81/12/C4 _C-AS$lGhMENT-0F-ECR-620 0-GCDIECR/233 if
W            '
~
)
1-C8I ALUlf D-P 1/12LC4 C-A_5 3 I Shf ERL-OL-H R-1144 0-GCD/ECR/R34,__._
i, S-CATALVTIC t-81/12/C4 C-ASSIGNPENT-OF-ECR-1147 G-NA
)
$-CATALYTIC D-81/12/04._C-ASSIGhPENT-07-ECR-1193 0-GCD/ECR/236 0
)
j
,.. __5.CM A LIll C_D-P 1/_12 / C4 _ C-A S 119 hP ( NI-0 F.- LC R_- } } 9 4 0-GCD/EC#/231 d',
$-CATALYTIC.0-P1/12/C4 _C-AS$IGkPFMT-0F-ECR-1203 0-GCD/EC#/232
)
S-CATALYTIC D-81/11/?0 C-COPPLET10N-07-ECR-109 (1-CCMPLETION-0F-ECR-1034 C2-CANCELLATION-07-ECR-538 4P..
Q-GCD/ECR/213 F
i 5-CATALYTIC D-81/12/C3 C-ECo-547 C1-REQUIRED-C0"PLETION-DATE 0-GCD/EC4/220
,' Nd
$P
$-CATALVTIC D-81/11/?C C-C A TA LYTIC-PUNCHLIS T-WORK-T ICK ETS 0-NA c)'
$= CATALYTIC D-P1/11/20 C-ASSIGhPENT-0F-EC9-220 C-GCD/ECR/201 if 4
5-CATALYTIC D-85[11/2C C-A551GNhkNT-0F-ECP-5E9 Q-GC'p/rCR/200
~
~
i
[5]
I t
W e-ravaivter n-pistisse r-acetrawret-nr-Fre-ste e-rrestrettoo


rA%
rA%
* 4
4 s
                                                                                                                                                                                                                                                              . s
's DRS-OFFLTNE PRIgf 14 JUN 83 C8:50:37' DATE 061483 PAGE 12 S-C AT ALTTIC 0-P1/11/20 C-ASSIGPENT-0F-ECR-425 0-GCD/ECR/19e 5-CATALTTIC D-81/11/20 C-ASSIGPENT-0F-ECR-426 0-GCD/ECR/197 3
                                                                                                                                                                                                                                                                      's DRS-OFFLTNE PRIgf 14 JUN 83                                   C8:50:37'                                                                                                       DATE 061483         PAGE         12 S-C AT ALTTIC 0-P1/11/20 C-ASSIGPENT-0F-ECR-425 0-GCD/ECR/19e                                                                                                                                                                       ''
____.$ - C A T 4 L U I t_ P-E1/11/ 2 0 C-AsstG ugst-uz-ECL-A H_9-6CDitCR/.116 S-CATALTTIC D-P1/11/20 C-AS$lGhPENT-OF-ECR-439 0-GCD/ECR/195
        ,,                  5-CATALTTIC D-81/11/20                                         C-ASSIGPENT-0F-ECR-426 0-GCD/ECR/197 3
'T
____.$ - C A T 4 L U I t_ P- E1/11/ 2 0 C-AsstG ugst-uz-ECL-A H_9-6CDitCR/.116                                                                                   . _ . _ . .
'~
S-CATALTTIC D-P1/11/20                                       C-AS$lGhPENT-OF-ECR-439 0-GCD/ECR/195                                                                                                                                 'T 4
''I
                            '~               '# ''I                         '' '' '#I       ~#''' "I'*'" C'~ 'I *~ C''             '' '
'' '' '#I
                                                                                                                                                                                                                                                                    \
~#'''
5- C BIA LY.T I C._D- tL1011 L 2 0_C:13 51 G E [N L-O L-E C R_- A !! _0-G C p l.E C R (193                               _ _ _ _ _ , _
"I'*'"
I #                         S-CATALTTIC D-F1/11/20 C-AS$lGhPNET-0F-ECR-516.0-GCD/ECR/192                                                                                                                                                                         'I S-CATALVTIC D-P1/11/20 .C-AS$lGhPENT-0F-ECR-518 0-GCD/ECR/191
C'~
                      . .__ _5:C A T A L U I C 0- P t(11/.2 C._Cra 5_s 1 G h r.ERI-U .LCL- 52 LO-6 C1/ E C RL19 0                                                   . . . _ . . . . . . .
'I *~
I S-CGtt                                         0-00/00/C0   C-GA-t-STANDARDS-$ECTION                 .C1-PERSONNEL-RESUME                                       C2-R.-LEONARD-WC00               0-NA                             3 5-CGtt                                         D-CD/C0/CD..C-04-t-STANDARDS-SECTION.                   C 1-P ER $0 NN E L -R E S UM E                           C 2-J AME S-F ,-WEI S SE %D E R G 0-N A 5:fGEE                                           D:tDIQ0LCQ_ C .03-4-SIAMpM es-3LC110.M                 C 1-Ega $0NN EL-R ESUM E _, C 2-EDW ARD-C.-PA NDO RF                                       0-NA T                 3-CGtt                                           D-C0/00/C0   C-GA-t-$TANDARDS-SECTION                 C1-PER$0NNEL-RESUME                                       C2-WILLIAM-W.-SCHWIERS           0-NA                                 I S-CG8E                                           D-CO/00/C0 C-GA-t-$TANDARDS-SECTION                     C1-PER$0NNEL-RE$UME                                       C2-ROBERT-P.-EHAS 0-NA                                                     r T                                                                                                                                                                                                                                                         )
C''
5-f6*E                                           p-CC/COICO C-08:1:11ANDARDt:1EC110N                     tj-PER$0NNEL; RESUME _,.. C 2-JOHN-H.-HOF F M A N                                         0-NA T                 S-CGtt                                         D-70/10/29 C-AEC-TEEEPHONE-DISCUSSION                   0-NA                                                                                                                           I
4
          .                S-CGRE                                         D-70/11/19 C-CA-t-STANDAntS-SECTION                     C1-MEETING =WIIH-AEC-DIVISION-OF-REACTOR-LICENSING                                               C2-BETHESDA,-MARYL 4                   AND                                                                                                                                                                                                                                   I 0-NA
\\
                  ,.        5-CGtt                                         D-00/00/CD C-INTRADEPARTMENTAL-PROCEDURE Q-NA                                                                                                                                         )
5-C BIA LY.T I C._D-tL1011 L 2 0_C:13 51 G E [N L-O L-E C R_- A !! _0-G C p l.E C R (193 I #
          , . ,              5-CGtt                                         D-75/03/11   CC-MANAGEMENT-$UPPORT-OF-GA               C1-NONES $ENTIAL-DRAWING-REVIEWS                                           C 2-E A*BORGM ANN-TO-DR-MC SPARRIN                 ,
S-CATALTTIC D-F1/11/20 C-AS$lGhPNET-0F-ECR-516.0-GCD/ECR/192
i -                         C3-LETTER                                                                                                                                                                                                                             #
'I S-CATALVTIC D-P1/11/20.C-AS$lGhPENT-0F-ECR-518 0-GCD/ECR/191
                    ,        0:FEQ/15                                                               ..
..__ _5:C A T A L U I C 0- P t(11/.2 C._Cra 5_s 1 G h r.ERI-U.LCL-52 LO-6 C1/ E C RL19 0 I
5-FAISER                                       D-73/09/21   C-FIELD-AUDIT-REPORT-19 C1-LETTER                   C2-WJ-FRIEDRICH-TO-bW-SCHWIERS                                           0-RC/1243/0                                 k
S-CGtt 0-00/00/C0 C-GA-t-STANDARDS-$ECTION
                            $-KAISER                                       D-73/09/21   C-CORRECTIVE-ACTION-COMMITMENT-FOR-CGEE-AUDIT-18                                                   C1-FRIEDRICH-TO-ROTHENPERG-t-PANDORF                   C2-LET TER                                                                                                                                                                                                                                   J 0-KC/1240/0
.C1-PERSONNEL-RESUME C2-R.-LEONARD-WC00 0-NA 3
                            $= KAISER                                       D-73/09/10   C-FRIEDRICH-TO-ROTHEhhERG-t-FANDORF C1-0RGAhllATION                                                 C2-RESPONSIBILITIES-E-FUNCTIONS               C3-RESUMES C4-LETTER 0-KC/1087/0
5-CGtt D-CD/C0/CD..C-04-t-STANDARDS-SECTION.
                  .,        5-gGRt                                         p-73/C6J18   C-WW-$$twirRS-TO-WJ-FRIEDRICN C1-CGEE-AupIT-1                                     (2-LETTER                 0-NA 5153                     S-KAISER                                       .D-73/06/re   C-CGRE-ALDIT-14             C1-VP-PCMAPON-TO-WW-SCHWIERS                         C2-LETTER               0-EC/842/0
C 1-P ER $0 NN E L -R E S UM E C 2-J AME S-F,-WEI S SE %D E R G 0-N A 5:fGEE D:tDIQ0LCQ_ C.03-4-SIAMpM es-3LC110.M C 1-Ega $0NN EL-R ESUM E _, C 2-EDW ARD-C.-PA NDO RF 0-NA T
3-CGtt D-C0/00/C0 C-GA-t-$TANDARDS-SECTION C1-PER$0NNEL-RESUME C2-WILLIAM-W.-SCHWIERS 0-NA I
S-CG8E D-CO/00/C0 C-GA-t-$TANDARDS-SECTION C1-PER$0NNEL-RE$UME C2-ROBERT-P.-EHAS 0-NA r
T
)
5-f6*E p-CC/COICO C-08:1:11ANDARDt:1EC110N tj-PER$0NNEL; RESUME _,.. C 2-JOHN-H.-HOF F M A N 0-NA T
S-CGtt D-70/10/29 C-AEC-TEEEPHONE-DISCUSSION 0-NA I
S-CGRE D-70/11/19 C-CA-t-STANDAntS-SECTION C1-MEETING =WIIH-AEC-DIVISION-OF-REACTOR-LICENSING C2-BETHESDA,-MARYL 4
AND I
0-NA 5-CGtt D-00/00/CD C-INTRADEPARTMENTAL-PROCEDURE Q-NA
)
5-CGtt D-75/03/11 CC-MANAGEMENT-$UPPORT-OF-GA C1-NONES $ENTIAL-DRAWING-REVIEWS C 2-E A*BORGM ANN-TO-DR-MC SPARRIN i -
C3-LETTER 0:FEQ/15 5-FAISER D-73/09/21 C-FIELD-AUDIT-REPORT-19 C1-LETTER C2-WJ-FRIEDRICH-TO-bW-SCHWIERS 0-RC/1243/0 k
$-KAISER D-73/09/21 C-CORRECTIVE-ACTION-COMMITMENT-FOR-CGEE-AUDIT-18 C1-FRIEDRICH-TO-ROTHENPERG-t-PANDORF C2-LET TER J
0-KC/1240/0
$= KAISER D-73/09/10 C-FRIEDRICH-TO-ROTHEhhERG-t-FANDORF C1-0RGAhllATION C2-RESPONSIBILITIES-E-FUNCTIONS C3-RESUMES C4-LETTER 0-KC/1087/0 5-gGRt p-73/C6J18 C-WW-$$twirRS-TO-WJ-FRIEDRICN C1-CGEE-AupIT-1 (2-LETTER 0-NA 5153 S-KAISER
.D-73/06/re C-CGRE-ALDIT-14 C1-VP-PCMAPON-TO-WW-SCHWIERS C2-LETTER 0-EC/842/0


                                                                                                                                                                                                                                                                                                                                  .O e
.O e
e iT a
e iT a
DRS-OFFLINE PRINT T4 JUN 83                                                         08:50:37                                                                                         +         DATE 061483         PAGE     13       'T
DRS-OFFLINE PRINT T4 JUN 83 08:50:37
                                                                                $= KAISER     D-73/01/C7               C-300THkEST-PHASE-1-PIPING                                                                       C1-DOCUMENTATION-PROBLEMS                   C2-JP-J ACK SON-TO-bW-SCHWE IRS C3-LETTER 0-NA                                                                                                                                                                                                                                         'I S-KAISER       D-73/03/02               C-JP-JACK 50N-10-AE-RCTHENBERG-8-EC-PAND0RF                                                                                     C1-WW-SCNWIER$=QA-REPRESENTATIVE         C2-LETTER 0-kC/556/0                                                                                                                                                                                                                                   *)
+
                                                                                                                                                                                                                                                              ~ "
DATE 061483 PAGE 13
S-CGtE         D-75/02/11               C-USE-OF-CCNTRUCTION-AIDS-t-SKETCHES                                                                             Q-NA i
'T
5-KAISER       D-74/10/14 C-REcutST-FOR-ADDITIONAL-QA-PER$0NNEL                                                                                           C1-LETTER             C2-WJ-FRIEDRICH-TO-EA-00RGMANN-t-EC-PANDORF C3-PERSONNEL-SCHEDULE                   C4-ORG-CHARG 8-KC2643/4                                                                                                                                                                                                                                   'l S-KAISER       D-74/02/C7 C-NONCONFORMANCE-REPCRTS                                                                                         C1-LETTER       C2-WJ-FRIEDRICH-TO-AE-ROTHENBERG-8-EC-PANDORF 0-KC/1706/o                 _ . _ .
$= KAISER D-73/01/C7 C-300THkEST-PHASE-1-PIPING C1-DOCUMENTATION-PROBLEMS C2-JP-J ACK SON-TO-bW-SCHWE IRS C3-LETTER 0-NA
                                                                                                                                                                                                                                                                                                                              )
'I S-KAISER D-73/03/02 C-JP-JACK 50N-10-AE-RCTHENBERG-8-EC-PAND0RF C1-WW-SCNWIER$=QA-REPRESENTATIVE C2-LETTER 0-kC/556/0
8 S-CGEE         D-74/05/28               C-AGENDA-ITEPS-FOR-JCINT-KEI-t-GA-PEETING Q-NA
*)
                                                                                                                                                                                                                  .                                                                                                            )
~ "
S-KAISER       n- Z4 L10 /_25           t-E S AR k RIT E:UE-0N:Q L___C1 AEQUIRED-EOR: CHAP _ Tete 17..._ C2-LETTER                                                                             C3-WJ-FRIEDRICH-TO-EA-BORGPANN-&-JD-FLVNN e-KC#2711/o                                                                                                     _    .
S-CGtE D-75/02/11 C-USE-OF-CCNTRUCTION-AIDS-t-SKETCHES Q-NA i
S-KAISER       D-75/01/16 C-LETTER                                                                 C1-DH-WILLIAMS-TC-EA-DORGMANN Ci-KEl-NON-MANUAL-STAFF-ADDITIONS                                         0-NA
5-KAISER D-74/10/14 C-REcutST-FOR-ADDITIONAL-QA-PER$0NNEL C1-LETTER C2-WJ-FRIEDRICH-TO-EA-00RGMANN-t-EC-PANDORF C3-PERSONNEL-SCHEDULE C4-ORG-CHARG 8-KC2643/4
                    /
'l S-KAISER D-74/02/C7 C-NONCONFORMANCE-REPCRTS C1-LETTER C2-WJ-FRIEDRICH-TO-AE-ROTHENBERG-8-EC-PANDORF 0-KC/1706/o
                                                                                                                                                                                                                                                                                                                              )
)
1- f.G L E     Q-Z.5 LD LL17           C-P. Itult 5_LL- A01M1-9 a _mE t_I IN G                                                                     O_ N A
S-CGEE D-74/05/28 C-AGENDA-ITEPS-FOR-JCINT-KEI-t-GA-PEETING Q-NA 8
  '                i                                                          S-CGtt         0-73/07/26               C-KEl-GA-PROCEDURE-16                                                           C1-LETTER                 C2-EC-PANDORF-TO-WJ-FRIEDRICH 0-NA                                                         )
)
5-CGEE         D-75/01/24 C-NONCON F ORM ANCE-R E PORT-E-191 C 1-L ET TE R                                                                                 C2-RJ-V AN-VE E N-TO-DR-MCSP ARRIN               0-NA T                                                                                                                                                                                                                                                                                                         )
S-KAISER n-Z4 L10 /_25 t-E S AR k RIT E:UE-0N:Q L___C1 AEQUIRED-EOR: CHAP _ Tete 17..._ C2-LETTER C3-WJ-FRIEDRICH-TO-EA-BORGPANN-&-JD-FLVNN e-KC#2711/o S-KAISER D-75/01/16 C-LETTER C1-DH-WILLIAMS-TC-EA-DORGMANN Ci-KEl-NON-MANUAL-STAFF-ADDITIONS 0-NA
S:CGtt         D.-15 / C 2 / 21L_C-f!!Au tt s_Cl:J 0 L4 T _98 .*!E E.I.I N G                                                                       G-NA       _ . _ . .
/
1
)
  'T                                                                           S-KAISER F
1-f.G L E Q-Z.5 LD LL17 C-P. Itult 5_LL-A01M1-9 a _mE t_I IN G O_ N A i
D-75/04/11               C-PIPINE-FIELD-WELD                                                             C1-C OMPON E N T-C H E C K LI ST C2-LETTER                     C3-WJ-FRIEDRICH-10-EA-B0RGMANN=&-EC-PANDOR             )
S-CGtt 0-73/07/26 C-KEl-GA-PROCEDURE-16 C1-LETTER C2-EC-PANDORF-TO-WJ-FRIEDRICH 0-NA
0-KC/3449/0 1r                                                                                                                                                                                                                                                                                                         )
)
_S KAISER               D:Z5/04/J6 c - t s.t E: C O N C L EN S 2W LT H:KE l-G A.___ C.1 -L E T T E R_.__ C 2 -O H -W I L LI A M S- T O -E C -P A N D O R F                                                     0-NA E                                                           S-KAISER       D-75/05/19 C-LETTER                                                               C1-WJ-FRIEDRICH-TO-EA-BORGMANN-t-EC-PANDORF                                           C2-KEl-AUDII-193   C3-GA-PROCEDURES                   )
5-CGEE D-75/01/24 C-NONCON F ORM ANCE-R E PORT-E-191 C 1-L ET TE R C2-RJ-V AN-VE E N-TO-DR-MCSP ARRIN 0-NA T
0-EC/3612/0
)
* S-KAISER     D-75/06/C4               C-FIELD-AUDIT-REP 0pT-51 C1-CCRRECTIVE-ACTION                                                                                   C2-WJ-FRIEDRICH-70-EA-BORGMANN-8-JH-HOFFPAN           C3-LET         I
S:CGtt D.-15 / C 2 / 21L_C-f!!Au tt s_Cl:J 0 L4 T _98.*!E E.I.I N G G-NA
                                ,,            ._ _IEP - -                                                                                                                                                                       _ _ _ . .
' T S-KAISER D-75/04/11 C-PIPINE-FIELD-WELD C1-C OMPON E N T-C H E C K LI ST C2-LETTER C3-WJ-FRIEDRICH-10-EA-B0RGMANN=&-EC-PANDOR
,                                                                              0-KC/3698/c
)
                                                                                                                                                                        .                  _..                                                                                                                                S S-KAISER      D-75/07/C9 C-WELDING-PROCEDURES                                                                          C1-LETTER                   C2-DH-WILLIAPS-TO-WW-SCHWIERS 0-NA 9'                                                           S-KAISER       D-75/09/11               C-LETTER                                                 C1-DH-WILLIAPS-TC-EA-00RGMANN C2-INSPECTION-MANPOWER-REQUIREMENTS 0-NA                                                                     if l                       .                                                      S-KAISER       D-77/02/17 C-ELECTRICAL-PR00LEM-AREAS                                                                                       C1-LETTER       C2-DH-WILLIAMS-TO-EA-DORGPANN 0-NA
1 F
: s ',                                                                                                                                                                                                                                                                                                                       GP l                                                                               S-KAISER     D-72/08/31 C-CONCRETE-TESTING                                                                             C1-LETTER                   C2-JP= JACK 50N-TO-AE-ROTHENBERG-&-HE-CRAIL Q-KC/268/Q l                 s'                                                           S-KAISER     D-72/CP/29 C-LETTER                                                                 C1-CONCRETE-DATCH-PL8NT C2-JP-JACK 50N-TO-AE-ROTHENBERG-8-EC-PANDORF                                                                       IP i
0-KC/3449/0 1r
                                    ..____0-NCl265/o_                                                                                                           _ _ _                              _ _ . . _ . _
)
f 2[3 i
_S KAISER D:Z5/04/J6 c - t s.t E: C O N C L EN S 2W LT H:KE l-G A.___ C.1 -L E T T E R_.__ C 2 -O H -W I L LI A M S-T O -E C -P A N D O R F 0-NA E
5-KAISER     D-72/06/29 C-LETTER                                                                 C1-JP-JACK 50N-TO-AE-ROTHENDERG-E-EC-PAND0RF                                         C2-RECEIPT-0F-GE-PURCHASED-EQUIPMENT-8-MAT           SP FRiai s I
S-KAISER D-75/05/19 C-LETTER C1-WJ-FRIEDRICH-TO-EA-BORGMANN-t-EC-PANDORF C2-KEl-AUDII-193 C3-GA-PROCEDURES
)
0-EC/3612/0 S-KAISER D-75/06/C4 C-FIELD-AUDIT-REP 0pT-51 C1-CCRRECTIVE-ACTION C2-WJ-FRIEDRICH-70-EA-BORGMANN-8-JH-HOFFPAN C3-LET I
._ _IEP - -
0-KC/3698/c C1-LETTER C2-DH-WILLIAPS-TO-WW-SCHWIERS 0-NA S
S-KAISER D-75/07/C9 C-WELDING-PROCEDURES 9'
S-KAISER D-75/09/11 C-LETTER C1-DH-WILLIAPS-TC-EA-00RGMANN C2-INSPECTION-MANPOWER-REQUIREMENTS 0-NA if l
S-KAISER D-77/02/17 C-ELECTRICAL-PR00LEM-AREAS C1-LETTER C2-DH-WILLIAMS-TO-EA-DORGPANN 0-NA
: s ',
GP l
S-KAISER D-72/08/31 C-CONCRETE-TESTING C1-LETTER C2-JP= JACK 50N-TO-AE-ROTHENBERG-&-HE-CRAIL Q-KC/268/Q l
s' S-KAISER D-72/CP/29 C-LETTER C1-CONCRETE-DATCH-PL8NT C2-JP-JACK 50N-TO-AE-ROTHENBERG-8-EC-PANDORF IP i
..____0-NCl265/o_
f 2[3 5-KAISER D-72/06/29 C-LETTER C1-JP-JACK 50N-TO-AE-ROTHENDERG-E-EC-PAND0RF C2-RECEIPT-0F-GE-PURCHASED-EQUIPMENT-8-MAT SP i
FRiai s I


f
f e
                                                                                                                                                                                              .      e e
e e
e v.
v.
                                                                                                                                                                                                        ' as DR$-0FFLINE PRINT k4 JUN 83             C8:5U37                                                                                 DATE 061483             PAGE       14
' as DR$-0FFLINE PRINT k4 JUN 83 C8:5U37 DATE 061483 PAGE 14 0-KC/190/0
                                                                                                                            ~          '
~
,,          0-KC/190/0                                                                                                                                                                                 ,
$-KEISER h-72/d3 / 2i ' ' C-L E'TT E R' C2-PibJECT-DREWING-8-$PEtih! Chi 104-CbMTROL-STSTEM 0-KC/85/U 5-KAISER D-71/12/27 'C-RS-EL5CN-TO-JP-JECK$5N C1-LETTER C2-PSAR-GA-REQUIREMENTS 0-NA 5-CGRE D-71/12/16 C-GA-t-INSPECTION-PRACTICES C1-AE-ROTHENBERG-TO-DR-MCSPARRIN C2-LETTER 0-NA 5-CGit D-71/12/03 'C-MEk-04-MANUAL C1-AUh5T-SC'kEULE C2-kk-ROTHkNDERG-10-JP-JACK 50N C3-LETTER H
              $-KEISER       h-72/d3 / 2i ' ' C-L E'TT E R'   C2-PibJECT-DREWING-8-$PEtih! Chi 104-CbMTROL-STSTEM                           0-KC/85/U 5-KAISER       D-71/12/27 'C-RS-EL5CN-TO-JP-JECK$5N                   C1-LETTER         C2-PSAR-GA-REQUIREMENTS 0-NA
0-0A/85 5_18 LP ZLLU /PJ_C-EINu1E 5-3F-J CO R p_1!! AIIN G-E( EJ ING_Ch0 E T WE E N-C GG E,,$ 8L-8-K A I SE R 0-NA S-CGtt D-71/09/23 C-ASPE-CCDE-REQUIREMENTS C1-LETTER C2-AE-ROTHENBERG-TO-JP-JACK $0N 0-NA I
,            5-CGRE         D-71/12/16         C-GA-t-INSPECTION-PRACTICES         C1-AE-ROTHENBERG-TO-DR-MCSPARRIN                       C2-LETTER     0-NA 5-CGit         D-71/12/03 'C-MEk-04-MANUAL             C1-AUh5T-SC'kEULE H        C2-kk-ROTHkNDERG-10-JP-JACK 50N                         C3-LETTER
$-CGRE D-71/02/C2 C-AEC-AUDIT-OF-KE.C1-JAN-27-28.-1971 C2-4E-ROTHEhPERG-TO-TG-DEDFORD C3-LETTER 0-NA
,            0-0A/85                                                                                                                                                                                     ,
)
_ . 5_18 LP ZLLU /PJ_C-EINu1E 5-3F-J CO R p_1!! AIIN G-E( EJ ING_Ch0 E T WE E N-C GG E , ,$ 8L-8-K A I SE R 0-NA
i 5-CGRE D-72/10/17 C-LETTER C1-NDE-BID-DOCUMENTS C2-AE-ROTHENPERG-TO-DR-MCSPARRIN 0-GA/182 S-CGtt 0-72/d9/27 'C-GA-8-STANDARbS-SECTiON-REVikW-hf-SUPPLIER-CA-M NUALS C1-LETTER C2-AE-ROTHENBERG-TO-JP-JACK $0N 4
#                                                                                                                                                                                                        I S-CGtt         D-71/09/23 C-ASPE-CCDE-REQUIREMENTS                     C1-LETTER         C2-AE-ROTHENBERG-TO-JP-JACK $0N                     0-NA
g.,afgy3
              $-CGRE         D-71/02/C2         C-AEC-AUDIT-OF-KE.C1-JAN-27-28.-1971                   C2-4E-ROTHEhPERG-TO-TG-DEDFORD                     C3-LETTER 0-NA                                                                                                                                                                                         )   i 5-CGRE         D-72/10/17 C-LETTER             C1-NDE-BID-DOCUMENTS           C2-AE-ROTHENPERG-TO-DR-MCSPARRIN                       0-GA/182 S-CGtt         0-72/d9/27 'C-GA-8-STANDARbS-SECTiON-REVikW-hf-SUPPLIER-CA-M NUALS                                       C1-LETTER     C2-AE-ROTHENBERG-TO-JP-JACK $0N 4           g.,afgy3                                                                                                                                                                                       )
)
5-CGtE         D-76/09/14         C-PR0 JECT-ORGANilATICN     C1-EA-BORGMANN-10-EL-JORDANe-NRC                         C2-LETTER     0-NA 5-CGtt         0-74/06/25 C-CONDENSATE-PUMP 5                 51-RL-blRR-Tb-J.-MCMiLLEN                         C2-INGER50LL-RAND G-NA T           S-CGtt         D-75/06/C2 C-STCP-CNECK-8-PACKLESS-DIAPMRAGk-$EAL-VA-VES                                 C1-2-INCH-AND-SMALLER         C2-LETTER     C 3-E A-BO R GM A NN               )
5-CGtE D-76/09/14 C-PR0 JECT-ORGANilATICN C1-EA-BORGMANN-10-EL-JORDANe-NRC C2-LETTER 0-NA 5-CGtt 0-74/06/25 C-CONDENSATE-PUMP 5 51-RL-blRR-Tb-J.-MCMiLLEN C2-INGER50LL-RAND G-NA T
W-pl55fE1ER C4-89tKWIL1-1NTERNAJJ0NAL                                                           _ _ . . . ,
S-CGtt D-75/06/C2 C-STCP-CNECK-8-PACKLESS-DIAPMRAGk-$EAL-VA-VES C1-2-INCH-AND-SMALLER C2-LETTER C 3-E A-BO R GM A NN )
0-NA 3-CGtt         D-75/04/14 C-A5R-0FERATEU-TEST 55LE-CHECK-VALVES,-GLOBE-VALVES                                   C1-LETTER     C2-RL-DIRR-10-JD= JACK 50N           C3-ROC KWELL-INTERNATIONAL T           0-NA                                                                                                                                                                                         )
W-pl55fE1ER C4-89tKWIL1-1NTERNAJJ0NAL 0-NA 3-CGtt D-75/04/14 C-A5R-0FERATEU-TEST 55LE-CHECK-VALVES,-GLOBE-VALVES C1-LETTER C2-RL-DIRR-10-JD= JACK 50N C3-ROC KWELL-INTERNATIONAL T
      ~                                                                                          ~      ~
0-NA
S-CGEE         D-74/10/29         C-HANGER $,-SUPPORTS-8-$NUBBERS             C 1 -L'iiT E R'           C2-Ri 'DIRR-To-J.-GsRDINER         C3-CRAWFORD-MANUFACTURIN i,           G-COMPANY 0-NA
)
                                                                                                                                                                                                          ')
~
I           S-CGRE         D-74/10/C4' C-RS-UNES-TO-EC-PkNDCRF C1-ILLIN0!$-POWER 0-001/PF/74/1C/04                                                                                                       )
S-CGEE D-74/10/29 C-HANGER $,-SUPPORTS-8-$NUBBERS C 1 -L'iiT E R' C2-Ri 'DIRR-To-J.-GsRDINER C3-CRAWFORD-MANUFACTURIN
5-CGRE         D-76/05/27         C-GE-DE51GN-DOCUMENTS       C1-EC-PANDORF-TO-WG-MEGENER                       C2-LE,TTER   C3-SCL         0-5LQ/40 0,
~
D-76/03/08 C-INSPECTlbN-PERSONNEL               C1-Ek-BhAGMANN-TO-WJ-FRIEDRiCN                           0-KEB/43 4           5-CGtt         0-76/10/06         C=APPR0wAL-O'F-KEI-IS0 METRICS       C1-WW-SCHWIERS-TO-WJ-FRIED 9tCH                       0-NA                                                           )
~
S-CGtt         D-76/10/12 C-LETTER             C1-WW-$CHUIERS-10-UJ-FRifbRICH'                         C2-N0'CCNFORMANCE-REPORTS N                            0-NA
i, G-COMPANY
=
')
              $-CGtt         D-76/10/19         C-CGtE-SITE-GA       C1-LETTER     C 2-E A-80 RGP ANN-T O-PD-S A HLE E RG C3-R ECR G ANIZ AT 10N 0-NA
0-NA I
.-          5-C?RE         D-77/01/C6 C-LETTER             C1-WW-$CHWIERS-TO-WJ-FRIEDRICH                           C2-HOUSEKEEPING       0-KE0/90
S-CGRE D-74/10/C4' C-RS-UNES-TO-EC-PkNDCRF C1-ILLIN0!$-POWER 0-001/PF/74/1C/04
              $-CGtt         D-77/02/r9         C-LE TT E R C1-NP-GEAR-10-CGRE-SO9 CONTRACTORS                       C2-WELD-R00-CONTROL           0-NA
)
:L3'         t - r r. r t e-7Astn#77 r-eFTTFe             (1-WW~tfMWTFPt-in-WJ-FotFhpfrH                           f?-AUTHC8TFFB-CGtF-CONSTRUCT 10N-FNGINEERING= SIGNATURES
5-CGRE D-76/05/27 C-GE-DE51GN-DOCUMENTS C1-EC-PANDORF-TO-WG-MEGENER C2-LE,TTER C3-SCL 0-5LQ/40 0,
D-76/03/08 C-INSPECTlbN-PERSONNEL C1-Ek-BhAGMANN-TO-WJ-FRIEDRiCN 0-KEB/43 4
5-CGtt 0-76/10/06 C=APPR0wAL-O'F-KEI-IS0 METRICS C1-WW-SCHWIERS-TO-WJ-FRIED 9tCH 0-NA
)
S-CGtt D-76/10/12 C-LETTER C1-WW-$CHUIERS-10-UJ-FRifbRICH' C2-N0'CCNFORMANCE-REPORTS 0-NA N
=
$-CGtt D-76/10/19 C-CGtE-SITE-GA C1-LETTER C 2-E A-80 RGP ANN-T O-PD-S A HLE E RG C3-R ECR G ANIZ AT 10N 0-NA 5-C?RE D-77/01/C6 C-LETTER C1-WW-$CHWIERS-TO-WJ-FRIEDRICH C2-HOUSEKEEPING 0-KE0/90
$-CGtt D-77/02/r9 C-LE TT E R C1-NP-GEAR-10-CGRE-SO9 CONTRACTORS C2-WELD-R00-CONTROL 0-NA
:L3' t - r r. r t e-7Astn#77 r-eFTTFe (1-WW~tfMWTFPt-in-WJ-FotFhpfrH f?-AUTHC8TFFB-CGtF-CONSTRUCT 10N-FNGINEERING= SIGNATURES


                                                                                                                                                                                                                                    +.
+.
e
e
                                                        =         .-                          _
=
  #*              DRS'-OFFLINE PRINT 14 JUN 83             08:50:37'                                 ,                                                          DATE 061483               PAGE   15                       'I
DRS'-OFFLINE PRINT 14 JUN 83 08:50:37' DATE 061483 PAGE 15
                                                                                                                  ~'                  ~~
'I C3-04-NONCONFORMANCE-REPORTS
C3-04-NONCONFORMANCE-REPORTS                                                                                                                                                                                     :
~'
e-uA                                                                                                                                                                                                           *)'      '
~~
S-CGtE         D-76/09/04 .C-GA-t-STANDARDS-SECTION                           Cl-SIGNOFF-OF-DESIGN-DOCUMENTS                           C2-EA-00REMANN-70-EC-PANDORF             C3-LET TEP                                                                                                                                                                                                              'I
e-uA
  .'' _ 9-AA                                                                                                                             _..
*)'
  #                                                                                                                                                                                                                          ~4 S-tGtt         D-77/02/C8 .C-LETTER             C1-WW-SCHWIERS-10-WJ-FRIEDRICH_                                 C2-SITE-04-ASSURANCE             0-KE0/103                                                           ;
S-CGtE D-76/09/04.C-GA-t-STANDARDS-SECTION Cl-SIGNOFF-OF-DESIGN-DOCUMENTS C2-EA-00REMANN-70-EC-PANDORF C3-LET
f c-        S-CGtt         D-77/02/C3         C-LETTER.     C1-WW-SCHWIERS-TC-ALL-CONCERNED                                 C2-REPORTING-OF-DEFICIENCIES               0-NA                                                       ,
.'' _ 9-AA TEP
                                                                                                                                                                                                                              ;)     .
'I S-tGtt D-77/02/C8.C-LETTER C1-WW-SCHWIERS-10-WJ-FRIEDRICH_
31LGtt         D-77 / 03 /_01     C-MINQJ E$ QL JAINT-C-BL-KEL-9A-EEEJING                       Cl-FEB-17e-1977                   C1-FEB-17e-1977         0-NA
C2-SITE-04-ASSURANCE 0-KE0/103
  #          S-CGEE .       D-77/01/C7 C-LETTER               C1-WW-SCHWIERS-TC-WJ-FRIEDRICH                                 C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL                                                 'I 0-age /112
~4 f
  #          5-FAISER       D-77/02/C7 ~C-LETTER                                                                                                                                                                               4 C 1-W J- F'R I E D R I C H-10-WW-S C HW I E R S                 C2-REGUEST-FOR-ADDITIONAL-INPECTION-PERSONNEL
S-CGtt D-77/02/C3 C-LETTER.
          .___4:MC/9125/A                                                                                       _ _ _ . . _ , _ _ _ _
C1-WW-SCHWIERS-TC-ALL-CONCERNED C2-REPORTING-OF-DEFICIENCIES 0-NA c-
f 5-CGEE         D-77/03/16 C-LETTER               C1-WW-SCHWIERS-TO-H9-GEAR                     C2-GENERAL-ELECTRIC-LETTER-CGE-1-77 0-NA                                                                           )
;)
t-CGst         D-77/02/25 C-LETTER               C1-WW-SCHWIERS-TC-BK-CULVER                   C2-04-REQUIREPENTS-FOR-SITE-FILES                           0-NA S-CGCE         D-77t 0 3 tj a__C:LE11E s         C3:v_w styWJEss-IA:ttreLOOM___ C2-GENERAL-ELECTRIC                                     C 3 -G E- F D D R -K N-1 -60       C4-RFVISION-2       C5-FIELD-DEVIATION-DISPOSITION-REQUEST 0-GES/40                                                                                                                                                                                                         )
31LGtt D-77 / 03 /_01 C-MINQJ E$ QL JAINT-C-BL-KEL-9A-EEEJING Cl-FEB-17e-1977 C1-FEB-17e-1977 0-NA S-CGEE.
5-CGtt         .D-76/08/02 C-LETTER               (1-E A-EO RGM A NN-T O-B K-C ULVE R           C2-MONTHLV-PROJECT-MEETIhG                         0-NA S-fE__J:ADL12LD6-_C 1L11.ER               C 1-JI-RLp0 M-T O -CSE E             Ci:NEW:GF.-51TE-0C-ENGINEER                         C3-MM-DICK     0-TEB2/299/80 T         S-CG8E           D-78/02/10     _C-LETTER.       C1-R.-DIRR-TC-C.-$NANKS C2-eAILtv-METER-COMPANY C3-TRANSDUCERS-E-SENSOPS                                                   C4-DEFECTS-E                       I-
D-77/01/C7 C-LETTER C1-WW-SCHWIERS-TC-WJ-FRIEDRICH C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL
              -NONCOMPLIANCES 0-NA T                                                                                                                                                                                                                           I S-CG8E         D-78tJ2f]7         C-L[,11ER _ _(j-WW-S.CHWIERS-TC-RON-{0KER_ C2-STEWART-t-STEVENSON-SERVICES
'I 0-age /112 5-FAISER D-77/02/C7 ~C-LETTER C 1-W J-F'R I E D R I C H-10-WW-S C HW I E R S C2-REGUEST-FOR-ADDITIONAL-INPECTION-PERSONNEL 4
_                                                                                                  C3-THREE-DIESEL-GENERATO R-LNITS i;.       0-he/1065                                                                                                                                                                                                         )
.___4:MC/9125/A f
    ,,      5-CGRE           D-75/10/13 C-GA-DOCUMENTATION                       .C1-LETTER         C2-EC-PANDORF-10-RL-SNYDER                       C3-DRAGON-VALVES-INC.
5-CGEE D-77/03/16 C-LETTER C1-WW-SCHWIERS-TO-H9-GEAR C2-GENERAL-ELECTRIC-LETTER-CGE-1-77 0-NA
9',         Q-hA                                                                                                                                                                                                               )
)
      ,''      S-CGtt         0-82/04/29       C-SYSTEP-AREA-TURNOVER-PLAN'                 (1-RE-SPENCE                     0-NA 4'                                     ...    .
t-CGst D-77/02/25 C-LETTER C1-WW-SCHWIERS-TC-BK-CULVER C2-04-REQUIREPENTS-FOR-SITE-FILES 0-NA S-CGCE D-77t 0 3 tj a__C:LE11E s C3:v_w styWJEss-IA:ttreLOOM___ C2-GENERAL-ELECTRIC C 3 -G E-F D D R -K N-1 -60 C4-RFVISION-2 C5-FIELD-DEVIATION-DISPOSITION-REQUEST 0-GES/40
3 5-NRC. D-77/04/04 C-LETTER               C1-N#C-10-EA-BORGMANN                 C2-NO-PR08LEM-PEPORT                           0-NA dd '       S-kRC 0-77/04/05 C-EETTER               C1-RF=HEISHMAN-TO-EA-BORGMANN 0-NA                                                                                                                                       }     g
)
      ,        5-hAC D-79/06/06       C-C F FICE-O F-lhSPE C T ION-t-E h f 0R CE ME N T             C1-MAY-8-11-E-17-18.-1979-INSPECTION                                 C2-0A-1159       C3-0A-1199 o* ,
5-CGtt
              '0-50/358/79/15                                                                                                                                                                                                   ,
.D-76/08/02 C-LETTER (1-E A-EO RGM A NN-T O-B K-C ULVE R C2-MONTHLV-PROJECT-MEETIhG 0-NA S-fE__J:ADL12LD6-_C 1L11.ER C 1-JI-RLp0 M-T O -CSE E Ci:NEW:GF.-51TE-0C-ENGINEER C3-MM-DICK 0-TEB2/299/80 T
s      S-CGtt         D-23/04/05       C-LETTER       C1-MC-THREM-TO-DJ-SCHULTE                     C2-GAD-PROGRAM-DEVELOPMENT                         C3-QE-REVIEW-t-CONCURRENCE-0F-NI         TPS-1 C 4-CON S T RUC TION-PH ASE-CU A L IT Y- A F FE C T ING-PROL E DL'R E S                                                                                                                                   bh       t
S-CG8E D-78/02/10 _C-LETTER.
          , __0-Isin H 017 Za3         5-CGtE         D-83/02/2e C-LETitR               C1-MC-THpEM-TO-HR-SAGER C2-REDEVELOPPENT-OF-0WNERS-PROJECT-PROCEDURES                                               C3-10-THE-FSAR                           $N fA=DSUff1MN-01-fAP4TT4FNTF-fHSPTfD-17.1
C1-R.-DIRR-TC-C.-$NANKS C2-eAILtv-METER-COMPANY C3-TRANSDUCERS-E-SENSOPS C4-DEFECTS-E I-
-NONCOMPLIANCES 0-NA T
I S-CG8E D-78tJ2f]7 C-L[,11ER _ _(j-WW-S.CHWIERS-TC-RON-{0KER_ C2-STEWART-t-STEVENSON-SERVICES C3-THREE-DIESEL-GENERATO R-LNITS i;.
0-he/1065
)
5-CGRE D-75/10/13 C-GA-DOCUMENTATION
.C1-LETTER C2-EC-PANDORF-10-RL-SNYDER C3-DRAGON-VALVES-INC.
9',
Q-hA
)
S-CGtt 0-82/04/29 C-SYSTEP-AREA-TURNOVER-PLAN' (1-RE-SPENCE 0-NA 4'
. D-77/04/04 C-LETTER C1-N#C-10-EA-BORGMANN C2-NO-PR08LEM-PEPORT 0-NA 5-NRC 3
dd '
S-kRC 0-77/04/05 C-EETTER C1-RF=HEISHMAN-TO-EA-BORGMANN 0-NA
}
g 5-hAC D-79/06/06 C-C F FICE-O F-lhSPE C T ION-t-E h f 0R CE ME N T C1-MAY-8-11-E-17-18.-1979-INSPECTION C2-0A-1159 C3-0A-1199 o*
'0-50/358/79/15 S-CGtt D-23/04/05 C-LETTER C1-MC-THREM-TO-DJ-SCHULTE C2-GAD-PROGRAM-DEVELOPMENT C3-QE-REVIEW-t-CONCURRENCE-0F-s NI TPS-1 C 4-CON S T RUC TION-PH ASE-CU A L IT Y-A F FE C T ING-PROL E DL'R E S bh t
, __0-Isin H 017 Za3 5-CGtE D-83/02/2e C-LETitR C1-MC-THpEM-TO-HR-SAGER C2-REDEVELOPPENT-OF-0WNERS-PROJECT-PROCEDURES C3-10-THE-FSAR
$N fA=DSUff1MN-01-fAP4TT4FNTF-fHSPTfD-17.1


                                                                                                                                                                                                                                                                          . e~
. e~
            ''                                                                                                                                                                                                                                                      or j                                               DRS-0FFLINE PRINT 14 JUN 83                                 CP:50:3f                                                                                                             DATE 061483         PAGE   16     /%
or j
                    ~
DRS-0FFLINE PRINT 14 JUN 83 CP:50:3f DATE 061483 PAGE 16
                                                                                                                                                                                    ~ '"
/%
i 0-PCT /83/006
i
                                                                                                                                                                                                                                                                      'I 5-CGRE                                   D-P3/02/17 C-LETTER                   C1-MC-TRHEM-TC-HR-SAGER C2-hEPORT-ON-NRC-MEETING-OF-FEB-7.-1983                                                         C3 .1EVIS30NS-10-10CRF50.
~
            ''                  54-AND-10CRF50.55 C4-REGARDING-REPORTING-0F-CHANGES-10-THE-GA-PROGRAM 0-PCT /83/005                                                                                                                                                                                                                       'l
0-PCT /83/006
                    ~
~ '"
5-CGtt                                   D-77/09/21 C-LETTER                   C1-WW-SCHWIERS-TC-RE-TURNER                             C2-CONTROL-OF-METERIAL' 0-KE0/166 e.
'I 5-CGRE D-P3/02/17 C-LETTER C1-MC-TRHEM-TC-HR-SAGER C2-hEPORT-ON-NRC-MEETING-OF-FEB-7.-1983 C3.1EVIS30NS-10-10CRF50.
                                                                                ~                                                                                                                                                                                     .)
54-AND-10CRF50.55 C4-REGARDING-REPORTING-0F-CHANGES-10-THE-GA-PROGRAM 0-PCT /83/005
5-NRC D-77/03/24 C-REPORT-0M*CONSTRUCktbN-kESPEkkION C1-lh-kNSPIkThhN-AkPORT 0-050/358/77/02 l                            5-CGtt                                   D-77/C2/C4 C-LETTER                   Ci-WW-SCHWIERS-TC-WJ-FRIEDkICH                                             C2-CLASSIFICATION-OF-CGRE-PURCHASE-0RDERS                                 'l i                               0-ut9/19                                                                                                                                                                 _. _ _ _ _
'l
]                               5-GE. D-78/10/12. C-LETTER _._ C1-WE-$NITH-TO-WW-SCHWIER$                                                                     C2-Ga-C0PMUNICATIONS-WITH-CGtt                                   0-CGE/1024                         'l -
~
1 S-CGL E . ._._ D-77/04/01_.C-LETTER.                                         .C1-WW-SCHWIERS-TC-RE-TURNER                               C2-04-CONCERNS                             0-KE0/120
5-CGtt D-77/09/21 C-LETTER C1-WW-SCHWIERS-TC-RE-TURNER C2-CONTROL-OF-METERIAL' 0-KE0/166 e.
_ .__ D Z1101/27                                   C-LETTER           CJ gW $ CWJiti {A WJ a_LELEDE[fH                                   (2:{IELD-AURIT-REPORTS-86-t-87                                   0-KE0/96 i                                5-CGtt                                 D-P2/C5 /CT . . C-$E RI CR-M A N AGEMENT-C0rMITTE E C1-ACT 90N-IT EM- AGEND A                                                 0-NA                                                           3       t i
~
l                               5-KAISER                             . D-23/04/22 .C-ZIPMER-PROCEDURES-PANUAL_.                                       C1-SECTION-30                     C2-REV-1                 C3-COMPONENT-$UPPORTS-DOCUMENTATION-t-ADMI 8                 NISTRATION C4-PECHANICAL-CONSTRUCTION-PROCEDURE                                                                         C5-zPM                                                                                                       3 R t(P/9                                                                                                                                               ___, _
.)
i                  5-KAISER . _D-83/04/01 . C-IIPMER-PROCEDURES-MANUAL                                                                     C1-IPM         C2-SECTION-3A                               C3-REV-2     C4-WORK-PACKAGE-PROCEDURE           )
5-NRC D-77/03/24 C-REPORT-0M*CONSTRUCktbN-kESPEkkION C1-lh-kNSPIkThhN-AkPORT 0-050/358/77/02 5-CGtt D-77/C2/C4 C-LETTER Ci-WW-SCHWIERS-TC-WJ-FRIEDkICH C2-CLASSIFICATION-OF-CGRE-PURCHASE-0RDERS
'l l
i 0-ut9/19
]
5-GE. D-78/10/12. C-LETTER _._ C1-WE-$NITH-TO-WW-SCHWIER$
C2-Ga-C0PMUNICATIONS-WITH-CGtt 0-CGE/1024
'l -
1 S-CGL E.._._ D-77/04/01_.C-LETTER.
.C1-WW-SCHWIERS-TC-RE-TURNER C2-04-CONCERNS 0-KE0/120
_.__ D Z1101/27 C-LETTER CJ gW $ CWJiti {A WJ a_LELEDE[fH (2:{IELD-AURIT-REPORTS-86-t-87 0-KE0/96 5-CGtt D-P2/C5 /CT.. C-$E RI CR-M A N AGEMENT-C0rMITTE E C1-ACT 90N-IT EM-AGEND A 0-NA 3
t i
i l
5-KAISER
. D-23/04/22.C-ZIPMER-PROCEDURES-PANUAL_.
C1-SECTION-30 C2-REV-1 C3-COMPONENT-$UPPORTS-DOCUMENTATION-t-ADMI 8
NISTRATION C4-PECHANICAL-CONSTRUCTION-PROCEDURE C5-zPM 3
R t(P/9 i
5-KAISER. _D-83/04/01. C-IIPMER-PROCEDURES-MANUAL C1-IPM C2-SECTION-3A C3-REV-2 C4-WORK-PACKAGE-PROCEDURE
)
C5-GENERAL-CONSTRU-CT10N-PROCEDLRE 0-CCP/3
C5-GENERAL-CONSTRU-CT10N-PROCEDLRE 0-CCP/3
(                                                                                                                                                                                                                                                         )
(
5:CGit                                   D:22/_12/23         C-S U RV E I LL AN C E . REP _0 R.T__A:8 2.1810 r                           _ _ . _ _ . _ . . _ . . . _ __
)
T                  S-CGtt                                   D-83/02/23 C-HJK-CORRCCTIVE-ACTION-REPORT-270                                         C1-MEMO-FROM* DENNIS-PREWITT                               4-N4                                       )
5:CGit D:22/_12/23 C-S U RV E I LL AN C E. REP _0 R.T__A:8 2.1810 r T
j                               5-CGtt                                   D-00/00/C0 .C-CORRECTIVE-ACT10N-REPORT-276                                           .0-CAP /276
S-CGtt D-83/02/23 C-HJK-CORRCCTIVE-ACTION-REPORT-270 C1-MEMO-FROM* DENNIS-PREWITT 4-N4
:            T                                                                                                                                                                                                                                                        lb
)
____$-CGRE                                           t:81/03/CB         C-C A R:215 PA N S E:1EV3 E E-2.10                         C1:MEM0:EORMr$ANDY-KING.0-NA T,                 S-tG4E                                   D-82/11/C5 C-CORRECTIVE-ACTION-REPORT                                           0-CAR /270                                                                                                   *)
j 5-CGtt D-00/00/C0.C-CORRECTIVE-ACT10N-REPORT-276
i S-CGLE                                   D-72/07/C7         C-CHANGE-ORDER-1             C1-GENERAL-ELECTRIC-CO*PANV                                     C2-NUCL E AR-STE AM-SUPPLV-SYST EM j           1I,               0-NA                                                                                                                                                                                                                                 1) l                               5-CGEE                                   D-73/04/18         C-CHANGE-ORDER-2             C1-GENERAL-ELECTRIC-COPPANY                                     C2-NUCLEAR-STEAM-5UFPLY-5YSTEM
.0-CAP /276 T
: NI .
lb
0-NA                                                                                                                                                                                                                                 #)
____$-CGRE t:81/03/CB C-C A R:215 PA N S E:1EV3 E E-2.10 C1:MEM0:EORMr$ANDY-KING.0-NA T,
S-CGRE                                   D-74/03/C4         C-CHANGE-ORDER-3             C1-NUCLEAR-STEAM-5UPPLY-SYSTEM                                               C2-LETTER         C3-EA-ROTHENPERG-TO-ML-VAN-$CHOIK NI                 0-h4                                                                                                                                                                                                                                   )
S-tG4E D-82/11/C5 C-CORRECTIVE-ACTION-REPORT 0-CAR /270
5-CGtt                                   D-73/11/02         C-CHANGE-ORDER-NO-3                           (1-GENERAL-ELECTRIC-COMPANY                                 C2-NUCLEAR-STEAM-5UPPLY-SYSTEM dd                 0-hA 1
*)
              .,              S-GE                         D-74/11/21 C-LETTER                     C1-CT-RALLARD-TO-EA-00RGMANN                               C2-CHANGE-0ADER-NO-4                                 0-NA el
i S-CGLE D-72/07/C7 C-CHANGE-ORDER-1 C1-GENERAL-ELECTRIC-CO*PANV C2-NUCL E AR-STE AM-SUPPLV-SYST EM j
                  ,            5:IGRE                                   D:14 /10 / C4__L:LE T T E R_ __.C l-R L- DI R R T C- C .-8 A LL A R D                           C2-CHANGE-ORDER-4 0-GEM /5
1I, 0-NA 1) l 5-CGEE D-73/04/18 C-CHANGE-ORDER-2 C1-GENERAL-ELECTRIC-COPPANY C2-NUCLEAR-STEAM-5UFPLY-5YSTEM
          ]E3                 S-CGtE                                   D-DC/00/C0         C-CHANGE-0RDER-4 .C1-GENERAL-ELECTRIC                                       C2-NUCLEAR-STEAM-SUPPLY-SYSTEM                                 0-NA
: NI.
 
0-NA
    *s                                                                                                                                                                                         er DRS-OFFLINE PRINT 14 JUN 83                         0835h:37                                                                                     DATE 061483   PAGE 17           '
#)
    ,,        5-CGLE           0-75/02/C3 C-LETTER                           C1-EA-90RGMANN-10-LG-MCMANUS                 C2-CHANGE-0R'Dia-5 0-Nk S-CGRE'         0-54/12/C5' 5-CHANGE-bt0ER-5''Ci-GENkRkL-ELECTRIC-COPPkNY                                         C2-NUCLEAR-STEAM-SUPPLY-$YSTEM o,
S-CGRE D-74/03/C4 C-CHANGE-ORDER-3 C1-NUCLEAR-STEAM-5UPPLY-SYSTEM C2-LETTER C3-EA-ROTHENPERG-TO-ML-VAN-$CHOIK NI 0-h4
)
5-CGtt D-73/11/02 C-CHANGE-ORDER-NO-3 (1-GENERAL-ELECTRIC-COMPANY C2-NUCLEAR-STEAM-5UPPLY-SYSTEM dd 0-hA 1
S-GE D-74/11/21 C-LETTER C1-CT-RALLARD-TO-EA-00RGMANN C2-CHANGE-0ADER-NO-4 0-NA l
e 5:IGRE D:14 /10 / C4__L:LE T T E R_ __.C l-R L-DI R R T C-C.-8 A LL A R D C2-CHANGE-ORDER-4 0-GEM /5
]E3 S-CGtE D-DC/00/C0 C-CHANGE-0RDER-4.C1-GENERAL-ELECTRIC C2-NUCLEAR-STEAM-SUPPLY-SYSTEM 0-NA
* s er DRS-OFFLINE PRINT 14 JUN 83 0835h:37 DATE 061483 PAGE 17 5-CGLE 0-75/02/C3 C-LETTER C1-EA-90RGMANN-10-LG-MCMANUS C2-CHANGE-0R'Dia-5 0-Nk S-CGRE' 0-54/12/C5' 5-CHANGE-bt0ER-5''Ci-GENkRkL-ELECTRIC-COPPkNY C2-NUCLEAR-STEAM-SUPPLY-$YSTEM 0-NA o,
,y S-CG8E Dr.Z510iLC2___t:IMNGE-DPDEA fL_L1-GENER AL:LLECTJIC C2: NUCLEAR-STEAM-5UPPLY-5YSTEM 0-NA 5-CG8E 0-75/06/25. C-LETTER
.C1-EA-00RGMANN-10-LG-MCMANUS. C2-CHANGE-ORDER-7 0-NA
'l i
5-CGtt
_0-75/C4/24.C-CHANGE-0RDER-7 _C1-GENERAL-ELECTRIC-COMPANY C2-NUCL E AR-ST E AM-$UPPL Y-5 YS T FM l
0-NA
')
$-CGtt 0-76/C1/12 C-LETTER C1-EA-80RGMANN-TO-LG-MCMANUS C2-CHANGE-ORDER-8 0-NA l
S-CGEE 0-75/iO/51 E-EHANGE-ORDER-8'~Ci-GEN 5RAL-ELECiWIC-COPPANY C2-NUCLEAR-STEAM-5UPPLY-$YSTEM 0-NA g
S-CGLE B-24fCill7 C-CHANGE-Ot0ED-9 C1-SENERAL: ELECTRIC:COPPANY_. C2-NUCLEAR-STEAM-$UPPLY-$YSTEM 0-NA 4
$-CGtt 0-76/06/16 ~'C-EHANGE-0Re5R-50 C1-GENER L'-ELECTRIC-C05 ANY C2-NUCLEAR-STEAM-SUPPLY-$YSTEM P
i 0-NA 5-CQEE 0-76/CS/11 C-CHANiE-080ER-11 C1-GLN(BA(~J((J1R((-COMPANY C2-NUCLEAR-STEAM-$UPPLY-5YSTEM 0-NA r
l 3
S-CGtt, 0-77/C2/15..C-CHANGE-0RDER-12 C1-GENERAL-ELECTRIC-COMPANY 0-NA 4
$-CGtt 0-77/04'/29 C-LETTER C1-Ek-80RGMANN-TO-LG-MCMANUS C2-CHANGE-ORDER-13 0-NA
)
5-CGEE P-77/03/C7 C-CHANGE-ORDER-13 C1-GENERAL-ELECTRIC-COMPANY "C E~N'UC'L E k R-S E E AM-5U PPL Y-$Y S T E M i
0-NA
)
I s-CGtt 0-77/06/10 C-LETTER C1-EA-PORG4 ANN-10-LG-MCMANUS G-NA T
)
5:(GEE Q:llLOS Ll? C-CHANGE:ER0LR_16_01:1EN(PAL:gtE(TRIC-C0ERANY_ C2-NUCL(AR-STEAM-5UPPLY-SYSTEM i
0-NA I
1I..
I l
5-CGtt 0-77/11/C1 C-CHANCE-ORDER-15 C1-GENERAL-ELECTRIC-COPPANY 0-NA di 5-CGLE 0-78/08/C9" C-LETT'R
'C1-EA-PORGMkNk-Td-DR-HERCHE C2-CHANGE-ORDER-16 Q-NA
)
E 5-CGtt 0-78/06/08 C-CHANGE-ORDER-16 C1-GENERAL-ELECTRICvCO*PANY C2-NUCLEAR-STEAM-$UPPLY-$YSTEM i
t '.,
0-NA
0-NA
                                                                                                                                                                                                ,y S-CG8E          Dr.Z510iLC2___t:IMNGE-DPDEA fL_L1-GENER AL:LLECTJIC                                        C2: NUCLEAR-STEAM-5UPPLY-5YSTEM                  0-NA 5-CG8E          0-75/06/25. C-LETTER                        .C1-EA-00RGMANN-10-LG-MCMANUS. C2-CHANGE-ORDER-7 0-NA                                                                'l i
)
5-CGtt        _0-75/C4/24 .C-CHANGE-0RDER-7 _C1-GENERAL-ELECTRIC-COMPANY                                            C2-NUCL E AR-ST E AM-$UPPL Y-5 YS T FM l
5-CGRE 0-78/09/20 C-LETTER C1-WD-WAYMIRE-TO-OR-HERCHE C2* CHANGE-ORDER-17 0-NA
0-NA                                                                                                                                                                              ')
. fi
              $-CGtt          0-76/C1/12 C-LETTER                            C1-EA-80RGMANN-TO-LG-MCMANUS                C2-CHANGE-ORDER-8 0-NA l              S-CGEE          0-75/iO/51          E-EHANGE-ORDER-8'~Ci-GEN 5RAL-ELECiWIC-COPPANY                                C2-NUCLEAR-STEAM-5UPPLY-$YSTEM g
-)
0-NA                                                                                _
S-(GCR 0_-lg./ 09 /10j-( H. A N G [-0 8 0 (R -17 CJ -(.E N E R A L -( L E C T R 3 (-C O *P AN Y C2-NUCLEAR-$ TEAM-5UPPLY-5YSTEM 0-kA kk C1-WD-WAYMIRE-TO-OR-HERCHE C2-CHANGE-ORDER-18 0-NA 5-CGCE 0-79/08/C6 C-LETTER
S-CGLE          B-24fCill7 C-CHANGE-Ot0ED-9 C1-SENERAL: ELECTRIC:COPPANY_. C2-NUCLEAR-STEAM-$UPPLY-$YSTEM 0-NA 4
'h i
              $-CGtt          0-76/06/16 ~'C-EHANGE-0Re5R-50 C1-GENER L'-ELECTRIC-C0 5 PANY                                      C2-NUCLEAR-STEAM-SUPPLY-$YSTEM i              0-NA 5-CQEE          0-76/CS/11          C-CHANiE-080ER-11 C1-GLN(BA(~J((J1R((-COMPANY                                  C2-NUCLEAR-STEAM-$UPPLY-5YSTEM
s 5-CGEE 0-79/05/22 C-CHANGE-080ER-IP C1-GENERAL-ELECTRIC-C0"PANY C2-hUCLEAR-$7EAM-$UPPLY-$YSTEM W
<            0-NA                                                                                                                                                                                        r l                  .                                    ..
i 0-NA
3
[b3 3-CGtt 0-79/OR/C1 C-CHANGE-ORDER-21 C1-NS$$-C0hTRACT 0-NA EP
;              S-CGtt,          0-77/C2/15 ..C-CHANGE-0RDER-12 C1-GENERAL-ELECTRIC-COMPANY                                        0-NA
;    4        $-CGtt          0-77/04'/29 C-LETTER                          C1-Ek-80RGMANN-TO-LG-MCMANUS                C2-CHANGE-ORDER-13              0-NA                                  )
5-CGEE          P-77/03/C7          C-CHANGE-ORDER-13 C1-GENERAL-ELECTRIC-COMPANY                                "C E~N'UC'L E k R-S E E AM-5U PPL Y-$Y S T E M i        0-NA                                                            _ _ _ _ ,
                                                                                                                                                                                                    )
I s-CGtt          0-77/06/10 C-LETTER                            C1-EA-PORG4 ANN-10-LG-MCMANUS G-NA
:    T                                                                                                                                                                                            )
5:(GEE          Q:llLOS Ll? C-CHANGE:ER0LR_16_01:1EN(PAL:gtE(TRIC-C0ERANY_ C2-NUCL(AR-STEAM-5UPPLY-SYSTEM i              0-NA I                                                                                                                                                                                                  I 1I. .                                                .                _.                          .    .. .
l            5-CGtt          0-77/11/C1          C-CHANCE-ORDER-15 C1-GENERAL-ELECTRIC-COPPANY                                  0-NA di        5-CGLE          0-78/08/C9" C-LETT'R        E                'C1-EA-PORGMkNk-Td-DR-HERCHE                C2-CHANGE-ORDER-16              Q-NA                                    )
i
      .      5-CGtt          0-78/06/08          C-CHANGE-ORDER-16 C1-GENERAL-ELECTRICvCO*PANY                                  C2-NUCLEAR-STEAM-$UPPLY-$YSTEM t ' .,    0-NA                                                                                                                                                                                  )
5-CGRE           0-78/09/20 C-LETTER                             C1-WD-WAYMIRE-TO-OR-HERCHE                 C2* CHANGE-ORDER-17             0-NA
                                                                                                                                                                                                -)
  . fi S-(GCR           0_-lg./ 09 /10j-( H. A N G [-0 8 0 (R -17 CJ -(.E N E R A L -( L E C T R 3 (-C O *P AN Y           C2-NUCLEAR-$ TEAM-5UPPLY-5YSTEM 0-kA kk                                         .                                                      .  .                                                                                    'h 5-CGCE          0-79/08/C6 C-LETTER                            C1-WD-WAYMIRE-TO-OR-HERCHE                   C2-CHANGE-ORDER-18               0-NA i
si      5-CGEE           0-79/05/22         C-CHANGE-080ER-IP C1-GENERAL-ELECTRIC-C0"PANY                                 C2-hUCLEAR-$7EAM-$UPPLY-$YSTEM                               #W 0-NA                                             . _ _ _ _ . _ _
[b3       3-CGtt           0-79/OR/C1         C-CHANGE-ORDER-21 C1-NS$$-C0hTRACT                               0-NA                                                                         EP


e~
e~
r,                                                                                                                                                                                     o
r, o
  #'                                                                                                                                                                                      'T Das-OFFLINE PRINT' 14 JUN Si                   0F:5d:37                                                                             DATE 061483         PAGE     18
Das-OFFLINE PRINT' 14 JUN Si 0F:5d:37 DATE 061483 PAGE 18
                                                                                                                            ~
'T C2-CHANGE 0RDER-20' ' 'C3-CHANGE-ORDER-22 2
5-GE     D-80/11/21       C-LETTER           C1-SW-COULTER-TO-EA-PORGMANN                 C2-CHANGE    2 0RDER-20' ' 'C3-CHANGE-ORDER-22
~
  ''                                                                                                                                                                                      'T 0-NA                                                             _ , .                            _
5-GE D-80/11/21 C-LETTER C1-SW-COULTER-TO-EA-PORGMANN
  ,,          5-CGtt         .D-80/06/16 C-CHANGE-040ER-20 C1-NS$5-CONTRACT                             0-NA 3-J64 E           D-l9 / 06/_21 C-C ttagg f.-g R p r R-19 C 1.GLetg R A1-git [La t g-COs'P_4N T__CR-NU C L E A R-S T E AM-SUPPL Y-$Y S T EM 0-NA
'T 0-NA 5-CGtt
  '                                                                                                                                                                                        )
.D-80/06/16 C-CHANGE-040ER-20 C1-NS$5-CONTRACT 0-NA 3-J64 E D-l9 / 06/_21 C-C ttagg f.-g R p r R-19 C 1.GLetg R A1-git [La t g-COs'P_4N T__CR-NU C L E A R-S T E AM-SUPPL Y-$Y S T EM 0-NA
5-CGtE           D-81/C3/C2 C-LETTER                   C1-WD-WATMIRE-TO-DR-HERCHE               .C2-CHANGE-ORDER-22           0-NA
)
                                                ~~
5-CGtE D-81/C3/C2 C-LETTER C1-WD-WATMIRE-TO-DR-HERCHE
  #          5-CGEE           D-00/00/00 C-CHANGEECRDER-Nb-22                         C5-NS$$-CONTRACT           0-NA                                                                   'I 5-CGRE           D-81/12/18 C-LETTER                   C1-BR-STLVIA-TO-AF-HULL C2-CHANGE-ORDER-23                       0-NA S-CGtt           'D-00/00/C0 ' C-CH ANGE-0RDin-23 Ci-NS$$= CENTR AC E ' 0-N
.C2-CHANGE-ORDER-22 0-NA
                                                                          ~
~~
  #          S-SSL 0-GJ/00/00 C-SEL-DESICN-$1ATUS                                                                                                     C3-HANGER-CONSTRUCT 10N-ACTIVIT    3 C1'-INS k ALL A T I0'N-ST ATUS C2-MATERIAL-REQUIREMENTS
5-CGEE D-00/00/00 C-CHANGEECRDER-Nb-22 C5-NS$$-CONTRACT 0-NA
____7-51AIUS                                                                                                         _ __
'I 5-CGRE D-81/12/18 C-LETTER C1-BR-STLVIA-TO-AF-HULL C2-CHANGE-ORDER-23 0-NA S-CGtt
Q-NA 5-TPT D-82/06/02 C-RECORD-bF-TkLEPHUNE-CbNVER$AIION                               Ci-WITH-JIM-BUCK         C2-DIR E CTOR-OF-C GtF- AUDI T-GR OUP     C3-R.G.-PATTER 50N 0-%A 5_CGSE           D.-lZ103/1L_C:AUDIl-S C HE RUL E C1-RARCH-14-31e-197Z                           0 N A _, _ _
'D-00/00/C0 ' C-CH ANGE-0RDin-23 Ci-NS$$= CENTR AC E ' 0-N S-SSL 0-GJ/00/00 C-SEL-DESICN-$1ATUS
I           S-CGRE           D-75/02/10. C-MEPO                   C1-WJ-FRIEDRICH-TO-04               C2-GUALITY-AUDITS-FOR-FEBRUARY               0-NA                                   )
~
5-CG8E           D-77/05/13 C-GAFS-AUDIT-SCHEDULE                       0-NA 1-CGtE           D-79LQ5!17 C-LLTL[R                 C1-WW-S C HWJ E R$-T O-R .-M A R SH A LL-t-R.-T UR N E R C2-04-AUDITS           C3-$UPPRESSION-P00L-WORK 0-NA T                     -
C1'-INS k ALL A T I0'N-ST ATUS C2-MATERIAL-REQUIREMENTS C3-HANGER-CONSTRUCT 10N-ACTIVIT 3
                                                                                                                                                                                              )
____7-51AIUS Q-NA 5-TPT D-82/06/02 C-RECORD-bF-TkLEPHUNE-CbNVER$AIION Ci-WITH-JIM-BUCK C2-DIR E CTOR-OF-C GtF-AUDI T-GR OUP C3-R.G.-PATTER 50N 0-%A 5_CGSE D.-lZ103/1L_C:AUDIl-S C HE RUL E C1-RARCH-14-31e-197Z 0 N A _, _ _
              $-CGRE            D-00/C0/C0 ~ C-GAIS-ALDIT-SCHEDULi                   '0-NA iI         5-CGtt           D-00/00/00 ~C-Gats-SECTIdN                   'Ci-LOG-OF-FIELD-AUDIT-REPORTS 0-NA                                                                           )
I S-CGRE D-75/02/10. C-MEPO C1-WJ-FRIEDRICH-TO-04 C2-GUALITY-AUDITS-FOR-FEBRUARY 0-NA
5-CGtt           D-91/C9/02         C-WORK-CRDER               C1-PAT-ADKINS-TO-HARLAN-SAGER C2-SUPPRESSION-P00L                       0-NA 5-CGRE           D-22/01/20 C-LETTER                 C1-HR-$AGER-TO-GAD-DIRECTORS-t-C00RDINATOR$                       C2-1982-GOAL 5-t-0BJECTIVES
)
    , , ,      0-HRS /82/23                       .
5-CG8E D-77/05/13 C-GAFS-AUDIT-SCHEDULE 0-NA 1-CGtE D-79LQ5!17 C-LLTL[R C1-WW-S C HWJ E R$-T O-R.-M A R SH A LL-t-R.-T UR N E R C2-04-AUDITS C3-$UPPRESSION-P00L-WORK 0-NA T
9                                                                                                                                                                                         #
D-00/C0/C0 ~ C-GAIS-ALDIT-SCHEDULi
S-CGRE           p-P1/02/11 C-Lili f R.               C_1 J T AII CN-0 0A L I T Y-E NG IN E E R-10-J R-S C HOT T .C2-GOALS-FOR-1981 0-ZPS/0A/81/6
'0-NA
* 5-CG8E           D-R2/01/19 C-LETTER                 C1-RR-RIhDERPAN-10-HR-5AGER                 Cd-LIST-OF-SPECIFIC-CGRE-GUAL11Y-AUDIT-SECTION C3-CBJECTIVC               )
)
s-t-GOALS-FOR-1982 0-NA 5- C G t ( ___ ___9- ? 2 / C 1/_19 C-LE 11[R           C1-RR-RlhDERMAN-10-HR-SAGER                 C2-LIST-07-$PECIFIC-AREAS-OF-CONCERN             C3-RELATIVE-TO-08J l             ECT VEs-t-G0ALs-FOR-19P2 0-NA                                                                                                                                                                           '
$-CGRE iI 5-CGtt D-00/00/00 ~C-Gats-SECTIdN
S-CGli           D-P2/01/07 C-LETTER                 C1-JJ-WALD-To-HR-SAGER             C2-GCALS-TO-19P2 0-ZPS/0A/82/06
'Ci-LOG-OF-FIELD-AUDIT-REPORTS 0-NA
          . 5-CGtt           D-8 2 /12 / ? O__C-L E.TT E R       C1-JC-BULK-70-AUDIT-SCHEDULE-FILE                   C2-AUDITS-NOT-PERFORMED 0-JCB/82/212
)
[L]         s-CGEE           D-R2/08/?O C-LETTER                 C1 JC-BUCK-TO-AUDIT-?91-FILE               C2-FIELD-AUDIT-REPORT-393           c-JCB/22/120
5-CGtt D-91/C9/02 C-WORK-CRDER C1-PAT-ADKINS-TO-HARLAN-SAGER C2-SUPPRESSION-P00L 0-NA 5-CGRE D-22/01/20 C-LETTER C1-HR-$AGER-TO-GAD-DIRECTORS-t-C00RDINATOR$
C2-1982-GOAL 5-t-0BJECTIVES 0-HRS /82/23 9
S-CGRE p-P1/02/11 C-Lili f R.
C_1 J T AII CN-0 0A L I T Y-E NG IN E E R-10-J R-S C HOT T.C2-GOALS-FOR-1981 0-ZPS/0A/81/6 5-CG8E D-R2/01/19 C-LETTER C1-RR-RIhDERPAN-10-HR-5AGER Cd-LIST-OF-SPECIFIC-CGRE-GUAL11Y-AUDIT-SECTION C3-CBJECTIVC
)
s-t-GOALS-FOR-1982 0-NA 5-C G t ( ___ ___9- ? 2 / C 1/_19 C-LE 11[R C1-RR-RlhDERMAN-10-HR-SAGER C2-LIST-07-$PECIFIC-AREAS-OF-CONCERN C3-RELATIVE-TO-08J l
ECT VEs-t-G0ALs-FOR-19P2 0-NA S-CGli D-P2/01/07 C-LETTER C1-JJ-WALD-To-HR-SAGER C2-GCALS-TO-19P2 0-ZPS/0A/82/06 5-CGtt D-8 2 /12 / ? O__C-L E.TT E R C1-JC-BULK-70-AUDIT-SCHEDULE-FILE C2-AUDITS-NOT-PERFORMED 0-JCB/82/212
[L]
s-CGEE D-R2/08/?O C-LETTER C1 JC-BUCK-TO-AUDIT-?91-FILE C2-FIELD-AUDIT-REPORT-393 c-JCB/22/120


9
9
                                                                                                                                                                                                                                              . =
=
                                                                                                                                                                                                                                                      's
's
  ''                                                                                                                                                                                                                                              <T.
<T.
  ''                                                                                                                                                                                                                                    ~
DRS-OFFLINE PRINT 14 JUN 83 08:5h:37' DATE 061483 PACE 19
DRS-OFFLINE PRINT 14 JUN 83                                         08:5h:37'                                                                                         DATE 061483                 PACE     19
~
  ,,                      5-CGtt               D-82/03/15 C-LETTER                                 C1-JC-eUCK-T0* AUDIT-SCHEDULE-FILE                         C2-AUDIT-OF-NES-ISI                 0-NA S-CGtt               D-8 3 /05'/13 ' C-LETTER                             C1-JC-8UCK-TO-5U'DIT-SCHEDULE-FILE                         C 2-C H A N G E-T O- DUD ITS -S C H E DUL E D-F*OR -P A Y-198 3
5-CGtt D-82/03/15 C-LETTER C1-JC-eUCK-T0* AUDIT-SCHEDULE-FILE C2-AUDIT-OF-NES-ISI 0-NA S-CGtt D-8 3 /05'/13 ' C-LETTER C1-JC-8UCK-TO-5U'DIT-SCHEDULE-FILE C 2-C H A N G E-T O-DUD ITS -S C H E DUL E D-F OR -P A Y-198 3 0-JCB/83/183 K_ CGS 5 h-82 /.121.30 r-r n tE-51J E-AUD11 *.CItEDUL5 f1-YEAR-19P3 0-NA. _ _.
  ,,                      0-JCB/83/183 K_ CGS 5             h- 82 /.121.30         r-r n tE-51J E- AUD11 *.CItEDUL5                         f1-YEAR-19P3                   0-NA. _ _ .
S-CGRE D-P1/01/16 C-CGRE-AUDIT-SCHEDULE
S-CGRE               D-P1/01/16 C-CGRE-AUDIT-SCHEDULE _C1-REV-2                                             0-WA                                                                                                       'l
_C1-REV-2 0-WA
,                        S-CGtt               D-80/01/24             C-CGEE->JK-AUDIT-SCHEDULE _                             C1-REV-1       ,0-NA
'l S-CGtt D-80/01/24 C-CGEE->JK-AUDIT-SCHEDULE _
_ .5_C.Gli                 D .f._2101/15           t-tGFE 111E 8t1DIT-SCHI.DULE                             c1-YEAR-19&2                   (2-REV-3..       0-NA
C1-REV-1
#                        S-CGRE               D-20/07/C9 C-CGtE-HJK-AUDIT-SCHEDULE _, C1-REV-0                                                   0-NA                                                                                               )
,0-NA
5-CGtt               D-79/11/12             C--0ALS-AUDIT-SCHEDULE..C1-REV-1                                 0-NA
_.5_C.Gli D.f._2101/15 t-tGFE 111E 8t1DIT-SCHI.DULE c1-YEAR-19&2 (2-REV-3..
_5-LG8E                 D-P 1L12L11 c-tG8E 5111:1U.211:1C1!EIUtt                                         C.1-J E A R-1?f t               C 2.-R E V- C . _0-NA I                       S-CGtt               D-80/07/C9..C-CG"E-HJK-AUDIT-SCHEDULE .                                       .C1-REV-0           0-NA                                                                                               '
0-NA S-CGRE D-20/07/C9 C-CGtE-HJK-AUDIT-SCHEDULE _, C1-REV-0 0-NA
S-CGtt             D-79/11/12 C-GASS-AUDif-SCHEDULE                                       C1-REV-1           0-NA I
)
                                                                                                                                                                                                                                                    )
5-CGtt D-79/11/12 C--0ALS-AUDIT-SCHEDULE..C1-REV-1 0-NA
1-IGIf             B-CO LDOLEQ - I: Gats-AUDII_SCliEDUL1                                 0-NA                                   - _ _ _
_5-LG8E D-P 1L12L11 c-tG8E 5111:1U.211:1C1!EIUtt C.1-J E A R-1?f t C 2.-R E V-C.
I                      S-CGLE             D-CD/00/C0 .C-CGCE-SITE-AUDIT-SCHEDULE                                           C1-TEAR-19P2                   C2-REV-1         0-NA                                                             I S-CGRE             D-22/04/19 C-CGtE-SITE-AUDIT-SCHEDULE                                             C1-YEAR-1982                   C2-REV-2         0-NA 3-C.Gtt             D 22/CIL15 _ C-CG RE-AUDII:S CHIDULE                                   (1:118g-1962             _. C 2.-R E V- 3         _.0-NA T                       S-CGRE             D-F1/01/16_ C-CGtE-AUDIT-SCHEDULE.                                     C1-REV-2           0-NA                                                                                                       I S-CGtt             D-81/C8/C3 C-CGRE-SITE-AUDIT-SCHEDULE                                             C1-YEAR-19P1                   0-Ni 5-IGEE             D-P1LQ2L10               C-C G R E:8U RU.. $.CEttyL_E                 C l- R_f.y - 3     9-NA             _ _ _ . , , , _
_0-NA I
iI, .                   5-CGEE     .D-P0/11/C5                     C-GA-PRCCEDURE                       C1-PLANhlNG,-REPORTING-t-FOLLOWUP-0F-AUDITS                                   C2-REV-1         C3-SUPERCEDED                         )
S-CGtt D-80/07/C9..C-CG"E-HJK-AUDIT-SCHEDULE.
0-18/Gn5/G1 i                       S-CGtt             D-77/03/15' C-0A-t-ST5NDiRDS-PROCEDURE                                           C1-PLdNNING,-REPORTING-t-FOLLOWUP-OF-AUDITS                                 C2-REV-0           C3-SUPERCEDE       )
.C1-REV-0 0-NA S-CGtt D-79/11/12 C-GASS-AUDif-SCHEDULE C1-REV-1 0-NA I
r--                                                                                                                               ---- ~
)
4                                                                                                                                                                                                                                                 s S-CGRE             D-F1/03/C6               C-GA-PRCCEDURE                       C1-PL bNING,-REPORT-F-FOLLOWUP-OF-AUDITS                             C2-REV-2         0-18/04/01 d'                       S-CGRE             D-CC/00/C0 (-GA-PRCCEDURES                                   C1-PLANhlNG.-REPORTS-E-F0LLOWUP-OF-AUDITS C2-REV-0                                     0-G A P /18 / 01                               e
1-IGIf B-CO LDOLEQ - I: Gats-AUDII_SCliEDUL1 0-NA I
  ,                      S-KAISER           D-R1/01/26               C-L E TT E R                 (1-PS-CITTING5'-tbs h'SCHWiERS W              C2-CGRE-FIELD-AUDIT-REPORT-334                                 0-kC/15268/0 O'                                                                                                               ..                                                                                                                                W S-C&tt             D-21/01/14               C-LETTER                     C1-WW-SCHWIERS-TO-PS-GITTINGS C2 -F I E L D- AU D I T -R E POR T-334                           0-KE0/507 m'                       S-CGtt             D-P0/11/14               C-GA-t-STANDARDS-AUDIT-SURVEILLANCE-PEPORT-334                                         C1-LETTER         C2-WW-SCHWIERS-TO-PS-GITTINGS                                   #
S-CGLE D-CD/00/C0.C-CGCE-SITE-AUDIT-SCHEDULE C1-TEAR-19P2 C2-REV-1 0-NA I
W 0-NA
S-CGRE D-22/04/19 C-CGtE-SITE-AUDIT-SCHEDULE C1-YEAR-1982 C2-REV-2 0-NA 3-C.Gtt D 22/CIL15 _ C-CG RE-AUDII:S CHIDULE (1:118g-1962
][3                       5-CGtt             D-80/09/22 C-LETTER                                   C1-WW-SCNWIERS-TC-PS-GITTING$ C2-AUDIT-OF-HJK                               0-KEQ/461                                                       TW
_. C 2.-R E V-3
_.0-NA T
S-CGRE D-F1/01/16_ C-CGtE-AUDIT-SCHEDULE.
C1-REV-2 0-NA I
S-CGtt D-81/C8/C3 C-CGRE-SITE-AUDIT-SCHEDULE C1-YEAR-19P1 0-Ni 5-IGEE D-P1LQ2L10 C-C G R E:8U RU.. $.CEttyL_E C l-R_f.y - 3 9-NA iI,.
5-CGEE
.D-P0/11/C5 C-GA-PRCCEDURE C1-PLANhlNG,-REPORTING-t-FOLLOWUP-0F-AUDITS C2-REV-1 C3-SUPERCEDED
)
0-18/Gn5/G1 i
S-CGtt D-77/03/15' C-0A-t-ST5NDiRDS-PROCEDURE C1-PLdNNING,-REPORTING-t-FOLLOWUP-OF-AUDITS C2-REV-0 C3-SUPERCEDE
)
r--
---- ~
4 s
S-CGRE D-F1/03/C6 C-GA-PRCCEDURE C1-PL bNING,-REPORT-F-FOLLOWUP-OF-AUDITS C2-REV-2 0-18/04/01 d'
S-CGRE D-CC/00/C0 (-GA-PRCCEDURES C1-PLANhlNG.-REPORTS-E-F0LLOWUP-OF-AUDITS C2-REV-0 0-G A P /18 / 01 e
S-KAISER D-R1/01/26 C-L E TT E R (1-PS-CITTING5'-tbs h'SCHWiERS C2-CGRE-FIELD-AUDIT-REPORT-334 0-kC/15268/0 W
O' W
S-C&tt D-21/01/14 C-LETTER C1-WW-SCHWIERS-TO-PS-GITTINGS C2 -F I E L D-AU D I T -R E POR T-334 0-KE0/507 m'
S-CGtt D-P0/11/14 C-GA-t-STANDARDS-AUDIT-SURVEILLANCE-PEPORT-334 C1-LETTER C2-WW-SCHWIERS-TO-PS-GITTINGS W
0-NA
][3 5-CGtt D-80/09/22 C-LETTER C1-WW-SCNWIERS-TC-PS-GITTING$ C2-AUDIT-OF-HJK 0-KEQ/461 TW


e as
e as DRS-0FFLINE PRINT 14 JUN 83 08:5'd=3f~~
                                                                                                                                                                                                  ~
~
DRS-0FFLINE PRINT 14 JUN 83                               08:5'd=3f~~                                                                                       DATE 061483         PAGF   20     ''
DATE 061483 PAGF 20 5-CGtt D-73/04/25 C-FIELD-UDIT-REPORT-3 0-NA
                                                                                                                                                                                                                                        ~'
~'
5-CGtt                           D-73/04/25               C-FIELD- UDIT-REPORT-3                           0-NA                                                                                                     ,
S-C'G R E '
                                                                                                                                          ~~
D-f3/Of/12' C-FIELD-50DIT-REPhif-ih h-NA
S- C'G R E '                     D-f3/Of/12' C-FIELD-50DIT-REPhif-ih h-NA
~~
* S-CGtE                           D-74/0i/17               C-FIELD-AUDIT-REPORi-3i~G-NA                                                                                                                               I
S-CGtE D-74/0i/17 C-FIELD-AUDIT-REPORi-3i~G-NA I
                                                                                                                                                                                                                                              "~~ "
I
I
                                                                                $-CGtt                           D-74/10/14 C-FIELD-AUDIT-REPORT-35 e-NA 5-CGEE'                         D-i5/01/23 E-EiELD-AUDIT-REP 0kT-39 U-N5'
"~~ "
                  #                                                                                                                                                                                                                                                                                  I S-C6tE                           D-75/U1/23 C-FIELD-AUDIT-REPORT-4i b-NA
$-CGtt D-74/10/14 C-FIELD-AUDIT-REPORT-35 e-NA 5-CGEE' D-i5/01/23 E-EiELD-AUDIT-REP 0kT-39 U-N5' S-C6tE D-75/U1/23 C-FIELD-AUDIT-REPORT-4i b-NA I
                                                                                                                                                                                                                          '~ ~            ~    ~
5-CGtE D-75/09/1F C-F I EL D-8UDIT-RE PORT-5 5 0-N A
                  ,                                                            5-CGtE                           D-75/09/1F               C-F I EL D-8UDIT-RE PORT-5 5 0-N A
'~ ~
                                                                                $-CGtE                           5-77/04/12 ' C-FIELD-AUDIT-iEPhiT-ibi'                                               U-NA 5-CGri                           D-76/c5/2c ~ C-FIELD-Aubii-kip 0Ri-65 C-NA                                                                                                                                         1)
~
                                                                                                                                                                                                                                  ~ ~ ~ '
~
5-CGBE                         P-76/06/10               C-FIELD-AUDIT-REPORT-70 0-NA
$-CGtE 5-77/04/12 ' C-FIELD-AUDIT-iEPhiT-ibi' U-NA 5-CGri D-76/c5/2c ~ C-FIELD-Aubii-kip 0Ri-65 C-NA 1) 5-CGBE P-76/06/10 C-FIELD-AUDIT-REPORT-70 0-NA
                                                                                                                          .                                        . . . . . _ _ _ __.                                                                                                                )
~ ~ ~ '
5-CGtt                         0-77/01/31. . . . _ . . . . _ . . . . .C-FIELD-AUDIT-REPORT-88 e-NA. . . . . _
5-CGtt 0-77/01/31.... _.... _.....C-FIELD-AUDIT-REPORT-88 e-NA..... _
S-CGtt                         D-77/03/d7 ~'Cliiiip-AUDIi-iEPUii-500                                             'U-Nk                                                                                             )
)
S-CGRE                         D-78/01/[6               C-FIELD-AUDIT-REPORT-170                                 0-NA S-CGtt                         D-78/07/17 ~E-LETTER                           'El-WW-5thWIE55-T5-R-r5RSHALL                               C2-GA-t-STANDARDS-AUDIT-SURVE!LLANCE-REPORT-185 0-fl A                                                                                                 ^
S-CGtt D-77/03/d7 ~'Cliiiip-AUDIi-iEPUii-500
f                                                                                                                                                                                                                                                                                  )
'U-Nk
1-fGtt                         e- Z 4 tClt10 _C -il t L.t- A UJ II-!LE10!l_-J 15                                   e-N4 T                                                           s-CGtE.                         D-79/05/15 C-FIELD-AupIT-REPORT-239                                                 C1-ADDENDUM-1                   0-NA                                                             )
)
5-CGRE                         D-79/05/15. C-FIELD-AUDIT-REPORT-241                                                 0-NA
S-CGRE D-78/01/[6 C-FIELD-AUDIT-REPORT-170 0-NA S-CGtt D-78/07/17 ~E-LETTER
                                                                                                                                                                                                                                                                                                      )
'El-WW-5thWIE55-T5-R-r5RSHALL C2-GA-t-STANDARDS-AUDIT-SURVE!LLANCE-REPORT-185 0-fl A f
                                                                                                                                                            ~
^
T
)
_.___1- f G t t .                                             D-8 2 /05 /3 3__L-qu At g.it- A u t tl-MEED                               C3-CAT A L.T.II C                 C2-A.F.R.-RESPONSE-t-lMPLEMENTATION-ACCEPTANCE o-Jte/82/50
1-fGtt e-Z 4 tClt10 _C -il t L.t-A UJ II-!LE10!l_-J 15 e-N4 T
                                                                                                                                                                    .              . .      . . .                .              .                                                                    )
s-CGtE.
5-CATALYTIC 0-R2/04/22                                   C-RESP 0h5E-TO-FIELD-AUDIT-382 C2-RJ-FISHER-10-HR-SAGER                                                 0-F/38570/310 i                                                           S-CGRE o-catjft5 D-82/03/$1                 C-LETTER             C1-HR-$AGER-10-RJ-FISHER                                   C2-CATALYTIC           C3-QA-AUDIT-REPORT-388                           )
D-79/05/15 C-FIELD-AupIT-REPORT-239 C1-ADDENDUM-1 0-NA
e                                                           $-CGRE                       D-R2/03/11                 C-AUDIT-FINDING-REPURT-388-1                             C1-CATALYTIC                   c-388/1                                                         i 4                                        5-CGtt                       5-CGRE                     D-82/03/11           C-AUDIT-FINDING-REPORT-3P8-2                               C1-CATALYTIC           0-328/2 i
)
S-{ GEE                     9:EllC2[C2                 C-L E_1LE A           C--LRAININ,G E-0UALJFICATION                               C1-RR-RINDERMAN-TO-JC-euCK         C2-UTILIZE-STEVE-05BORM-AS-MEM EER                   C3-AUDIT-TEA 9-!88 0-NA S-CGtt                     D-00/00/f0 C-CATALVilt-AUDIT C 1 -DOC L'ME N T-CCN T RO L                                                   Q-N4
5-CGRE D-79/05/15. C-FIELD-AUDIT-REPORT-241 T
                                          ,      ____J iG RE                                                    0-P2 / C2 /_1E __.( L E li g R _ _ __C 1-J C .Du t r-T O-D L-HOW A R D Co-CGLE-CA-AUDIT-0F-CORRECTIVE-ACTION                                           C3-N0hCONFORMING-MATERIA L
~
((3                                                                   0-JCD/82/12
0-NA
)
_.___1-f G t t.
D-8 2 /05 /3 3__L-qu At g.it-A u t tl-MEED C3-CAT A L.T.II C C2-A.F.R.-RESPONSE-t-lMPLEMENTATION-ACCEPTANCE o-Jte/82/50 0-F/38570/310
)
5-CATALYTIC 0-R2/04/22 C-RESP 0h5E-TO-FIELD-AUDIT-382 C2-RJ-FISHER-10-HR-SAGER i
S-CGRE D-82/03/$1 C-LETTER C1-HR-$AGER-10-RJ-FISHER C2-CATALYTIC C3-QA-AUDIT-REPORT-388
)
o-catjft5 e
$-CGRE D-R2/03/11 C-AUDIT-FINDING-REPURT-388-1 C1-CATALYTIC c-388/1 i
5-CGtt 5-CGRE D-82/03/11 C-AUDIT-FINDING-REPORT-3P8-2 C1-CATALYTIC 0-328/2 4
i S-{ GEE 9:EllC2[C2 C-L E_1LE A C--LRAININ,G E-0UALJFICATION C1-RR-RINDERMAN-TO-JC-euCK C2-UTILIZE-STEVE-05BORM-AS-MEM EER C3-AUDIT-TEA 9-!88 0-NA S-CGtt D-00/00/f0 C-CATALVilt-AUDIT C 1 -DOC L'ME N T-CCN T RO L Q-N4 R
____J iG E 0-P2 / C2 /_1E __.(
L E li g R _ _ __C 1-J C.Du t r-T O-D L-HOW A R D Co-CGLE-CA-AUDIT-0F-CORRECTIVE-ACTION C3-N0hCONFORMING-MATERIA L
((3 0-JCD/82/12


v e
v
                                                                                                                                                                                                                                                                                                '\:
?
                                                                                                                      ^
e
DRS-O'FLINE             F                        PRINT 14 JUN 83'       b8:50i3i                                                                                                           DATE 061483         PAGE     21         ''
'\\:
S-CG8E                                                     D-82/01/19 C-LETTER                   C1-JC-BUCK-TO-DL-HOWARD C2-CG8 E- A A- AUD'if-b t-NbNCbN F0PMING-M A TE R I ALS -P AR TS                                     C3-COMPJNENT S . .                                                 _ _
DRS-O'FLINE PRINT 14 JUN 83' b8:50i3i DATE 061483 PAGE 21
                                                                                                                                                                                                                                                                                                'I 0-NA
^
                                            $-CGEE                                                   D-82/d7/21 'C-LEkTER                   C1-HR-SAEER-Tb-RJ-PRUSKI                               C2-QA-AUDIT-REPORT-82/24                         C3-$st                                       '
F S-CG8E D-82/01/19 C-LETTER C1-JC-BUCK-TO-DL-HOWARD C2-CG8 E-A A-AUD'if-b t-NbNCbN F0PMING-M A TE R I ALS -P AR TS C3-COMPJNENT S..
0 .$(g/115                                                                                                                                                                   _ _ , _ . .
'I 0-NA
S-CGtt                                                   D-82/05/19 C-LETTER                     C1-8.-BEARDSWORTH-TO-HC-9RINKMANN                                     C2-ENGIhEERING-8UDIT-0F-58L-79-14-ACTIVITIES                                     I 0-NA S-CG8E                                                   D-82/b4/29'C-NOTiFICATh0N-bF-GhiENTIALLY-REPbRTABLE-HTEPS                                                   0-Nd                                                                         ')
$-CGEE D-82/d7/21 'C-LEkTER C1-HR-SAEER-Tb-RJ-PRUSKI C2-QA-AUDIT-REPORT-82/24 C3-$st 0.$(g/115 S-CGtt D-82/05/19 C-LETTER C1-8.-BEARDSWORTH-TO-HC-9RINKMANN C2-ENGIhEERING-8UDIT-0F-58L-79-14-ACTIVITIES I
                                                                                                                                                                                                        ~ ~ ~ ~ ~ " ~                ~
0-NA S-CG8E D-82/b4/29'C-NOTiFICATh0N-bF-GhiENTIALLY-REPbRTABLE-HTEPS 0-Nd
        ,                                S-CGet                                                     D-00/C0/C0 C-AuBIT-h0-82/24 0-t//24 S-CGif                                                     D-83/04I20''i-LETiER                   51-HR-SAGER-Tb-W5-HEblIK                               C2-05-FitLD-AUDIT-REPORT-331                     0-KE0/1657 f                                 $= KAISER                                                 b=83/ 3/17''C-Wd-HEDFIK-10-HR-SAGdR'C1-LEITEM                               "C2-CG8E-FIELD-AUDIT-REPORT-331                                     0-KC/18258/0                                 )   '
')
S-CGEE                                                     D-R3/03/C7 C-LETTER                   C1-JC-PUCK-10-WA-MED71K C2-SECOND-DELINGUFT-CORREDHCTIVE RCTION-RESPONSE                                                     C3-NOTIFICAT
S-CGet D-00/C0/C0 C-AuBIT-h0-82/24 0-t//24
          '                                ION                           . . . .
~ ~ ~ ~ ~ " ~
                                                                                                                . _.                    .                                                                                                                                                          )
~
S-CGif D-83/04I20''i-LETiER 51-HR-SAGER-Tb-W5-HEblIK C2-05-FitLD-AUDIT-REPORT-331 0-KE0/1657 f
$= KAISER b=83/ 3/17''C-Wd-HEDFIK-10-HR-SAGdR'C1-LEITEM "C2-CG8E-FIELD-AUDIT-REPORT-331 0-KC/18258/0
)
S-CGEE D-R3/03/C7 C-LETTER C1-JC-PUCK-10-WA-MED71K C2-SECOND-DELINGUFT-CORREDHCTIVE RCTION-RESPONSE C3-NOTIFICAT ION
)
0-JCB/83/49 8
0-JCB/83/49 8
S-CGtt                                                     D-83/02/di 'i-LETIEnk b-K55SER T                  ~       -Ci-NJ-SAGER-iO-WA-HEDIIK                                           C2-AA-FIELD-AUDIT-REPORT-331                                   )
S-CGtt D-83/02/di 'i-LETIEnk b-K55SER ~
0-(1921661                                                                                                                                                       . _ _ _ _ _ _
-Ci-NJ-SAGER-iO-WA-HEDIIK C2-AA-FIELD-AUDIT-REPORT-331
i                                S-KAISFR                                                 D-P0/10/10_C-LETTER                   C1-PS-GITTINGS-TO-WW-SCHWIERS C2-0485-flELD-AUDIT-331 0-NA                                                                                           %
)
S-KAISER.                                                 D-P0/12/10 .C-LEDTER.                 C-P S-GI T TING S-0 0-WW-SC HW IE R S                   C2-CGLE-FIELD-AUDIT-331 0-KC/15180/0 S-KalstR                                                   D-80/12/03       C-LETTER             C 1-P S-G I T T I N GL-10-WW-$ J.H WI.[ R $ _,C 2-C G8 E .F I E L D - AUD I T-31                   0-KC/15171/0 T                                 S-CGtt_                                                   D-P0/10/C2       C-LETTER.         .C1-WW-SCHWIERS-TC-PS-GITTINGS C2-GA-t-STANDARDS-AUDIT--URVEILLANCE-RE(0RT-331                                                                         )
T 0-(1921661 i
0-hA ir                               S-CG8E                                                   D-Pc/09/23~~C-FiitD-AUDIT-iEP0ii-ssi                                 Ci-DATED-SEPT-23-25,-1980                                     0-NA                                                   ')
S-KAISFR D-P0/10/10_C-LETTER C1-PS-GITTINGS-TO-WW-SCHWIERS C2-0485-flELD-AUDIT-331 0-NA S-KAISER.
                                                                                                                                                                                                  ~
D-P0/12/10.C-LEDTER.
D-?0/09/02                                                 C-LETTER-TO-KAISER                     C1-WW-SCHWIERS-TC-PS-GITTIEGS C2- UD55-bh-HJK                                               0-KE0/450 il                                                                                                                                                                                                                                                                                     )
C-P S-GI T TING S-0 0-WW-SC HW IE R S C2-CGLE-FIELD-AUDIT-331 0-KC/15180/0 S-KalstR D-80/12/03 C-LETTER C 1-P S-G I T T I N GL-10-WW-$ J.H WI.[ R $ _,C 2-C G8 E.F I E L D - AUD I T-31 0-KC/15171/0 T
S-CGEE                                                   D-P0/09/24       C-AutIT-FINDING-REPORT-331-i' 0-33i/1 5"                               S-CGEE                                                   D-80/09/24 ~ C-AU6IT-FINDING-REPORT-331-2 0-51/2                                                                                                                                           )
S-CGtt_
                  "                                                                                                                                                            ~ ' ^ ~ ~ " ~ ~
D-P0/10/C2 C-LETTER.
S-CGtt                                                   D-0C/C0/00       C-AUDIT-331 0-NA 9                                                                                                       ..   ..    .    .. . . . .                                                                                                                                                    I S-A                         D-80/09/05                           C-L ATT ER-T C-T ARGE T-ROCK-CORPOR AT ION               . C1-WW-SCHWIERS-TO-G.-AdRU270                                    C2-VALVE-0UALITY-ASSURANCE-00CUMENTATION
.C1-WW-SCHWIERS-TC-PS-GITTINGS C2-GA-t-STANDARDS-AUDIT--URVEILLANCE-RE(0RT-331
                      .                    0-0A/137                                                                                                                                                                                                                                             ,
)
1                                                                                                                                                                                                                                                                                      a S-RAISER                                                 D-R1/C9/28       C-LETTfa-TO-CGEE             C1-DL-HOWARD-TC-HR-SAGER                                     C2-GUALITV-CONFIRMATION-PROGRAM                 C3-INSPECTOR-ADDRE SSES d'                               0-KC/15811/0                                                                                                                                                                                                                                       'k S-KAISER                                                 D-81/11/C2       C-LLTTER-TO-CGtE             C1-M-AlbERTIN-TO-0K-CULVER                                   C2-PROPCSED-SECOND-SHIFT-MANPOWER-REQUIREMENTS 3,
0-hA ir S-CG8E D-Pc/09/23~~C-FiitD-AUDIT-iEP0ii-ssi Ci-DATED-SEPT-23-25,-1980 0-NA
3                               0-KC/15911/4                                                                                                                                                                                                                                       iP
')
                    *~
D-?0/09/02 C-LETTER-TO-KAISER C1-WW-SCHWIERS-TC-PS-GITTIEGS C2-UD55-bh-HJK 0-KE0/450
S-KAISER                                                 D-P1/10/29       C-LETTER-10-CGt[             C1-DL-HOWARD-TO-HR-SAGER                                     C2-LONTROLLED-DISTRIBUTICN-0F-HJK-GA-0C-PROCEDURES T23                                   0-AC15002/0                                                                                                                                                                                                                                         sp
~
il
)
S-CGEE D-P0/09/24 C-AutIT-FINDING-REPORT-331-i' 0-33i/1 5"
S-CGEE D-80/09/24 ~ C-AU6IT-FINDING-REPORT-331-2 0-51/2
)
S-CGtt D-0C/C0/00 C-AUDIT-331 0-NA
~ ' ^ ~ ~ " ~ ~
I 9
. C1-WW-SCHWIERS-TO-G.-AdRU270 C2-VALVE-0UALITY-ASSURANCE-00CUMENTATION S-A D-80/09/05 C-L ATT ER-T C-T ARGE T-ROCK-CORPOR AT ION 0-0A/137 1
a S-RAISER D-R1/C9/28 C-LETTfa-TO-CGEE C1-DL-HOWARD-TC-HR-SAGER C2-GUALITV-CONFIRMATION-PROGRAM C3-INSPECTOR-ADDRE SSES d'
0-KC/15811/0
'k S-KAISER D-81/11/C2 C-LLTTER-TO-CGtE C1-M-AlbERTIN-TO-0K-CULVER C2-PROPCSED-SECOND-SHIFT-MANPOWER-REQUIREMENTS 3,
3 0-KC/15911/4 iP
*~
S-KAISER D-P1/10/29 C-LETTER-10-CGt[
C1-DL-HOWARD-TO-HR-SAGER C2-LONTROLLED-DISTRIBUTICN-0F-HJK-GA-0C-PROCEDURES T23 0-AC15002/0 sp


e
e
  #4
#4 DRS-OFFLINE PRINT 14 JUN 83 08:55:37 DATE 061483 PAGE 22 s-CGRE D-81/09/23 C-LETTER-TC-KAISER C1-HR-SAGER-10-P-KTNER C2-CONTROLLED-DISTRIBUTION-0F-HJK-GA-0C-PROCEDURES 0-FE0/620 S-KAISER D-81/10/16 C-LETTER-TC-CGEE C1-0-HOWARD-10-HR-5AGER C2-TAD-PER$0NhEL 0-KC15866/0 m
      .            DRS-OFFLINE PRINT 14 JUN 83                 08:55:37                                                                                       DATE 061483               PAGE   22     ''
5-EA15EB _ D-511.10/l l C:LEIIEG-10-CGtE_._Cl:D:110W A 9 0-IO _HR:$ A.GER_ CZ-HJK-NR C-COMMI TMEN T C3-NRC-INSPECTIGN-REPORT-79-14 C4-HJK-GE-REVIEW-CF-RECURRING-DISCREPANCIES 0-uC/15P57/0 5-CGtt
s-CGRE         D-81/09/23       C-LETTER-TC-KAISER                     C1-HR-SAGER-10-P-KTNER             C2-CONTROLLED-DISTRIBUTION-0F-HJK-GA-0C-PROCEDURES 0-FE0/620                                                                                                                                                                               '%
.D-77/09/15. C-LETTER-TC-KAISER C1-Wh-SCHWIERS-TO-RL-TURNER C 2-F I R E-PR OT E C T ION-00 AL IT T-C ON T R OL-PR OG R AM 0-rE0/164 5-CGRE D-77/07/27 C-LETTER-TO-KAl$ER C1-WW-SCHWIERS-TO-RD-SAHLBERG 0-KE0/150 5-CGEE D-77/d6/10 C-[ETTER-i5EKAidER
S-KAISER       D-81/10/16       C-LETTER-TC-CGEE           C1-0-HOWARD-10-HR-5AGER C2-TAD-PER$0NhEL 0-KC15866/0 m
'1-WW-SCHWiERS-TU-RE=iURNER C2-J0lNT-KEI-GA-MEETING 0-KE0/39 C '
5-EA15EB _ D-511.10/l l C:LEIIEG-10-CGtE_._Cl:D:110W A 9 0-IO _HR:$ A.GER_ CZ-HJK-NR C-COMMI TMEN T                                   C3-NRC-INSPECTIGN-REPORT-79-14 C4-HJK-GE-REVIEW-CF-RECURRING-DISCREPANCIES 0-uC/15P57/0                                 _                                            _
$-CGtt S-7h/05/i6 k-LETTER-10-KAISER C1-WW-SCHWIERS-TO-RE-TURNER C2-FIELD-AUDIT-REPORT-112 I
5-CGtt       .D-77/09/15. C-LETTER-TC-KAISER                           C1-Wh-SCHWIERS-TO-RL-TURNER                 C 2-F I R E-PR OT E C T ION-00 AL IT T-C ON T R OL-PR OG R AM 0-rE0/164                                                                                                                                                                               '%
c-E t_q tj3 s
5-CGRE         D-77/07/27       C-LETTER-TO-KAl$ER                     C1-WW-SCHWIERS-TO-RD-SAHLBERG 0-KE0/150 5-CGEE         D-77/d6/10 C-[ETTER-i5EKAidER                           C  '
$-CGRE D-77/05/20 C-FIELD-AUDIT-REPORT-11.0-NA_
                                                                                        '1-WW-SCHWiERS-TU-RE=iURNER                 C2-J0lNT-KEI-GA-MEETING 0-KE0/39
1 5-RAISER D-F1/C8/26. C-LETTER-TO-CGRE C1-PR-KTNER-TO-HR-SAGER C2-STATUS-07-HJK-INSPECTOR-STAPPS 0-KC/15739/0 5-KAISER D-fJ LORL20 C-LEJitp-TO-CGst__tt:ER-(TMER:10:Hre!GtR__C2-5EL-REVISICN-HJK-NONCONFORMANCE-REPORTS 0-KC/15727/0 5-KAISER D-7 7 / 08 / 2'3 C-LETTER-TO-dGRE k1-RE-IURNER-TO-WW-SCHWIERS C2-RESPONSE-TO-FIELD-AUDIT-133 0-rC/10422/0 f'
                $-CGtt         S-7h/05/i6 k-LETTER-10-KAISER                           C1-WW-SCHWIERS-TO-RE-TURNER                 C2-FIELD-AUDIT-REPORT-112                                             I c-E t_q tj3 s                                                                                           ,_,        _ _ _
3-EAJ5ER D-fllSllls C-L.EllE.E _I.Q.(_GLE C 1 -P-K_YN E!- LO-f. -5 8.G E R___0-K C /15 6 3 7 / 0 T
                $-CGRE         D-77/05/20       C-FIELD-AUDIT-REPORT-11.0-NA_                                                                                                                             1 5-RAISER       D-F1/C8/26. C-LETTER-TO-CGRE                 C1-PR-KTNER-TO-HR-SAGER C2-STATUS-07-HJK-INSPECTOR-STAPPS                                   0-KC/15739/0 5-KAISER       D-fJ LORL20 C-LEJitp-TO-CGst__tt:ER-(TMER:10:Hre!GtR__C2-5EL-REVISICN-HJK-NONCONFORMANCE-REPORTS 0-KC/15727/0 5-KAISER       D-7 7 / 08 / 2'3 C-LETTER-TO-dGRE           k1-RE-IURNER-TO-WW-SCHWIERS                 C2-RESPONSE-TO-FIELD-AUDIT-133 0-rC/10422/0   '
S-FAISER D-F1/07/02 C-LETTER-TO-CGtE _C1-CH-$TANTIELD-TO-BK-CULVER C2-NRC-INSPECTION-REPORT-80-15 C3-LETTER-FEG-442
f'                                                                                                                                                                                                       ,
)
3-EAJ5ER       D-fllSllls       C-L.EllE.E _I.Q .(_GLE     C 1 -P-K_YN E!- LO-f. -5 8.G E R___0-K C /15 6 3 7 / 0 T             S-FAISER       D-F1/07/02       C-LETTER-TO-CGtE _C1-CH-$TANTIELD-TO-BK-CULVER                           C2-NRC-INSPECTION-REPORT-80-15                         C3-LETTER-FEG-442       )
C4-LETTER-rt-14094-C 0-rt/15616/C
C4-LETTER-rt-14094-C 0-rt/15616/C                                       _
_ 5-RAISER D-P O LOS / 2 0___C-i g11 E B-J p.-LG.l E_._.f1-R_,-f A RsEA L L. _T O-OK -C U L VE R _ _0-K C /14 0 9 4 / C i;
_ 5-RAISER         D- P O LOS / 2 0___C-i g11 E B-J p.-LG.l E_._.f1- R_,-f A RsEA L L. _T O-OK -C U L VE R _ _0-K C /14 0 9 4 / C i;           5-KAISER       D-F1/06/C4 C 1-P.-K T h E R-10-W D-W A TM I R E                 C2-CGEE-PANAGEPENT-AUDIT-PA-81-1                       0 -K C /15 $ 5 9 /0                                 )
5-KAISER D-F1/06/C4 C 1-P.-K T h E R-10-W D-W A TM I R E C2-CGEE-PANAGEPENT-AUDIT-PA-81-1 0 -K C /15 $ 5 9 /0
    . , ,        S-FAISER     .0-F1/06/C1_.C-LETTER-TO-CGRE ..C1-P.-KTNER-TO-D.-WAYRIRD                                   0-KC/15555/0 9~                                                                                                                                                                                                     )
)
          ..  -_3:58ISER       DU LD5 /.11       t-LEHE R QL:CGCE C t-f_s-G1J11N G S-ID-WW-5 f HWI ER $ .,0-K C /15 5 24 /G
S-FAISER
  =             S-KAISER       D-P1/04/C8__C-LETTER-10-CG'E                 C1-PS-GITTANGS-TO-WW-SCHWIER$ C2-RESPONSE-10-Kto-552                             0-KC/15447/0                               )
.0-F1/06/C1_.C-LETTER-TO-CGRE..C1-P.-KTNER-TO-D.-WAYRIRD 0-KC/15555/0 9~
5-KAISER       D-P1/02/16_ C-LETTER-10-CG-E                 C1-PS-CITVINGS-TO-WW-SCHWlERS C 2-T E R P IN A T 10N-0 F-I N SP E C TI ON-PE R S ONN E L G-KC/15316/0 5-RAISER       D-P*/02/04       C-LETTER-TO-CG%E           C1-PS-GifihNGi-50 2~~    WW-5i5'Wiins 5-KC/15291/0
)
                $=FAISER       D-91/01/CP       C-LETTER-10-CG-E ~ C1-PS-FITTINGS-TO-WW-SCHWlERS C2-! DETERMINATE-INSPECTION                                             0-KC/5226/0 5-KAISER       D-81/12/30       C-LETTER-To-CGtt           C1-DL-HOWARD-D0-HR-SAGFR                     C2-COURTEST-INSPECTIONS 0-KC/16087/0 5-KAISER       D-P0/12/16       C-LETTER-TO-CGLE           C1-PS-CITTING5-TO-WW-SCHWlERS C2-NRC-INSPECTION-REPORT                                       C3-UNRESOLVED-ITEM-80-15 2b3           -0?                                                                                                                                                                                       e 0-KC/15?n3/o
-_3:58ISER DU LD5 /.11 t-LEHE R QL:CGCE C t-f_s-G1J11N G S-ID-WW-5 f HWI ER $.,0-K C /15 5 24 /G
=
S-KAISER D-P1/04/C8__C-LETTER-10-CG'E C1-PS-GITTANGS-TO-WW-SCHWIER$ C2-RESPONSE-10-Kto-552 0-KC/15447/0
)
5-KAISER D-P1/02/16_ C-LETTER-10-CG-E C1-PS-CITVINGS-TO-WW-SCHWlERS C 2-T E R P IN A T 10N-0 F-I N SP E C TI ON-PE R S ONN E L G-KC/15316/0 5-RAISER D-P*/02/04 C-LETTER-TO-CG%E C1-PS-GifihNGi-50 WW-5i5'Wiins 5-KC/15291/0 2~~
$=FAISER D-91/01/CP C-LETTER-10-CG-E ~ C1-PS-FITTINGS-TO-WW-SCHWlERS C2-! DETERMINATE-INSPECTION 0-KC/5226/0 5-KAISER D-81/12/30 C-LETTER-To-CGtt C1-DL-HOWARD-D0-HR-SAGFR C2-COURTEST-INSPECTIONS 0-KC/16087/0 5-KAISER D-P0/12/16 C-LETTER-TO-CGLE C1-PS-CITTING5-TO-WW-SCHWlERS C2-NRC-INSPECTION-REPORT C3-UNRESOLVED-ITEM-80-15 2b3
-0?
e 0-KC/15?n3/o


r
r e
                                          ,                                                                                                                                                                                                                                                                                e
.*s
      .*s
?
                    ;-                                                      ?
i h,I 08:50:3f'
i
~
                                                                                                                                                                                                      ~
DR$-0FFLINE PRINT 14 JUN DATE 061483 PAGE 23
DR$-0FFLINE PRINT 14 JUN h,I                                                                                    08:50:3f'                                                                                    DATE 061483               PAGE       23         'I
'I
        #'                                                                                                      / /
/ /
5-FAl$ER                                                                   . 7-Pir1?.t12p C1,-DL-HCWARD-TO-HR-$AGER._                                                         .C2-00ALITT-CONFIRMATION-PROGRAM             C3-INSPECTOR
5-FAl$ER
* ADDRESSES                               'l 0-KC/16349/2,;* ,                               ^
. 7-Pir1?.t12p C1,-DL-HCWARD-TO-HR-$AGER._
        ,.                                                                                -n                    e        ..,?,,.         i- . i.,           ,            1           -      3.     .    .                .
.C2-00ALITT-CONFIRMATION-PROGRAM C3-INSPECTOR
S-CGRE                                                                         D-22/03/25 :c-rs*0 ,                                 .C1-oK-CuEVER-10-pt-5AFER                             C2-WATERTIGHT **ULKHEAD-D00R5         C3*E P0X Y- A DH E S IVE-US E D-F OR-CON
* ADDRESSES
                    .___ C % EI L:RIPAl t-W O R K                                                                                               --                                                                                          _ _ _ _ _ _
'l 0-KC/16349/2,;*,
        ,,                        0-P2/143                                                                                           ,_
^
                                                                                                                                                ' ~
..,?,,.
5-CGRE'                                                                         D-22/12/C1                 C-PEPO',/                 ,C1-DK-juLVE#-Ib-N'R-SAGER                           C2-DOCUMENTATION-FROM-RV-MARTY-COMPANY
i-. i.,
        ,                        0-f2/545                                                                                                                                                                                                                                                                         ,
1 3.
b lGEE                                                                         0-1.Alf 4 L23.- _COLil.T_E R.I.l G .(H,Ll(AGQ-f !! $ 6(.-E -I P Q h(Of_P,_A N I_C- E C PANDORF-10-KJ-0!NG C2-GA-MANUALS-FOR-STAINLES$-STEEL-PG OL-LINER-WORK 8
-n e
0-0A/416                                                               . . _ _
S-CGRE D-22/03/25 :c-rs*0,
S-CCtt                                                                         D-79/06/05 C-LETTER                                     C1-D.-RRAMER-10-J.-DEERWESTER C2-DETIEL-CONSTRUCTION-COPPANY                                   Q-NA 6'                                                 r,                                                                                                                                                                                                                                                          ,
.C1-oK-CuEVER-10-pt-5AFER C2-WATERTIGHT **ULKHEAD-D00R5 C3*E P0X Y-A DH E S IVE-US E D-F OR-CON
                      . . .-_5 - t 6 % E                                                                         Rr12 tDll/3__I:1LlT E R E10.W AL:1h t[ET R I A L:C.O N T R A CICA $ . -I NC__C D-HR-5 A GE R-T O-R .-L E I G H C2-DATWELL-t-$UPPRESSION-P00L-PAINTING                                                                                               "";_
.___ C % EI L:RIPAl t-W O R K 0-P2/143 5-CGRE' D-22/12/C1 C-PEPO',/
8                        c-QA/,1879                                                                                                                         _                    . . _
,C1-DK-juLVE#-Ib-N'R-SAGER C2-DOCUMENTATION-FROM-RV-MARTY-COMPANY
3
' ~
                                  $-t'G t t                                                                       R-22/09/C8 C-LETTLR < . C1-CO ATahC-DOCUMENT ATION-DEF IC TE NCY 0-HR5/82/174 6                                                                                                                             :s                               ,
0-f2/545 b lGEE 0-1.Alf 4 L23.- _COLil.T_E R.I.l G.(H,Ll(AGQ-f !! $ 6(.-E -I P Q h(Of_P,_A N I_C-E C PANDORF-10-KJ-0!NG C2-GA-MANUALS-FOR-STAINLES$-STEEL-PG OL-LINER-WORK 8
                                                                                                                                                                                                                                                                                                                        )
0-0A/416 S-CCtt D-79/06/05 C-LETTER C1-D.-RRAMER-10-J.-DEERWESTER C2-DETIEL-CONSTRUCTION-COPPANY Q-NA 6'
1 ,(GEL                                                                         D-P2/1RL21 t-LE1115. - t 1-H C:.B Rl!8Kf! AN-10 M hS AG E R                                                 C2:COMYINGS.0-NA f
r,
    ~
...-_5 - t 6 % E Rr12 tDll/3__I:1LlT E R E10.W AL:1h t[ET R I A L:C.O N T R A CICA $. -I NC__C D-HR-5 A GE R-T O-R.-L E I G H C2-DATWELL-t-$UPPRESSION-P00L-PAINTING 8
4 I                         s'- S S L D-82/12/06                                                                           (*EtTTER-TO-CEEE .C1-JE-RODRIGUEZ-TO-EA-80RGPANN                                                   C2-FIELD-COATING-t-PAINTING-WORK                                                 I
c-QA/,1879 3
                                ,0-$LC/25351                                                                                             -"
$-t'G t t R-22/09/C8 C-LETTLR <. C1-CO ATahC-DOCUMENT ATION-DEF IC TE NCY 0-HR5/82/174 6
      .o-                  ,
:s
I ',
)
e
f 1,(GEL D-P2/1RL21 t-LE1115. - t 1-H C:.B Rl!8Kf! AN-10 M hS AG E R C2:COMYINGS.0-NA
                              '$-CGRE                                                                             D-83/03/22                 ~C-PEPO'                   I-HR-$AGIR-TO-kA-BORGMAN'N                           C2-GAP-ALLEGATIONS             C3-REFERENCE-GA-2005                                     )
~
0-P_e s / 8 3 /16.2 iI                       5-CGRE                                                                         D-8?/09[20.C                     PEto                   _ CJ:g A-e0'RGM A NN-10-DI ST RIBUTION                     C2-GAP-ALLEGATIONS-PRESENTED-AT-THE-UDALL-HEARINGS-ON                             I 0-GA/2005                                                                                     . ,
I s'- S S L D-82/12/06
t
(*EtTTER-TO-CEEE.C1-JE-RODRIGUEZ-TO-EA-80RGPANN C2-FIELD-COATING-t-PAINTING-WORK I
                                                                                                                                      .ti           -
4
1r                       s-CGEE 0-hA
.o-
                                                                                                  ,                D-P2/02/73 'C-rEr0-
,0-$LC/25351 I ',
                                                                                                                                                                      ,    C1-4e-rLYNN-70-EA-n0RG= ANN-t-eR-sTtVIA                             C2-ACRs-suCC0PMITTEE-MEETING                                           )
'$-CGRE D-83/03/22
          .                                                                                                                        ..            I~                                       ..
~C-PEPO' I-HR-$AGIR-TO-kA-BORGMAN'N C2-GAP-ALLEGATIONS C3-REFERENCE-GA-2005
a;                       s-CGtE.                                                                         D-P0/12122 C -P E P,W                                   C1-WW-sthWIERs-To-WD-WATPIRE                       C2-DESIGN-DRAblNG-APPROVAL $         0-NA                                             )
)
S-CGRE                                                                           D-P0/12/16. C-LETTER-10-Sti'                                         C1-EA-BORGPANN-TO-BF-$CHEIPEL 0-NA 9                                                                                                                                                                                       .                                                                                                                      )
0-P_e s / 8 3 /16.2 e
                ,,,_              5-CGEL                                                                           D-P0/1LLj6 C-Miro                                       C 1-W W-S C HWIJ R S.-TI-HC-8 RINK P A N. C2-E S $ E NT I A L- T HE R M0W E L LS         0-NA   0-NA
iI 5-CGRE D-8?/09[20.C PEto
,      d'       ,
_ CJ:g A-e0'RGM A NN-10-DI ST RIBUTION C2-GAP-ALLEGATIONS-PRESENTED-AT-THE-UDALL-HEARINGS-ON I
1-CGEE                                                                           D-20/12/12                 C-PE*0                       C1-WW-sCHWIERs-TO-OKiCULVEe                       C2-AUDIT-OF-TLeNOVER-AC13VITIES             Q-NA                                       I 5-CGRE                                                                           D-80/12/)2                 C-PEPO                       C1-EA-DORG" ANN-TO-WW-SCHWIERS C2-PROCEDURES-C-NRC9PEQUIREMENTS                                 0-NA g,i     ,
0-GA/2005 t
e
.ti 1r s-CGEE D-P2/02/73 'C-rEr0-C1-4e-rLYNN-70-EA-n0RG= ANN-t-eR-sTtVIA C2-ACRs-suCC0PMITTEE-MEETING
                ,                5-C99                                                                           D-f D_f17 LIE __C_- P E Eg                               (1 W W:_5 MylEn$-TC-L-LUDWIG __ C2-WOBK-PN$1 RUCTIONS-FOR-WEEK-0F-DEC-16-19.-1880 0-NA I        d                                                                                                                                                                                         . .
)
                                                                                                                                                                                                                                                            ~
0-hA I~
e 5-CGtE                                                                         D-P0/12/15                   C-PEPO                       C1-WW-$CpWIERs '4C-WD-WATPIRE                     C2-DDC-APPROVALS        Q-NA 50                         5-CGEE                                                                         D-PC/12/10                   C-PEPO                       C1-WW-5C WWIE RS-T C-E A-B OR CM ANN C2-REPo[ TING-FEQUIRED-BY-THE-FOREIGN-CORRUPT-PRACTICES                                             ip I           .,                    0-NA t
a; s-CGtE.
,    [k),                       S-CGtt                                                                           D 80/11/13 C-MEPO-FROP-WH-ZIMMER                                                     C1-STANDING-COMMITTEE-TO-INSURE-COMPLIANCE                   C2-WITH-THE-ACCOUNTING-PROVI$1                 #sp c..                                     r i-n , - 1.. . , c o r , r. ..- r o . . ... .; . . r t , r r < - , r i -n , _ i O 7 T
D-P0/12122 C -P E P,W C1-WW-sthWIERs-To-WD-WATPIRE C2-DESIGN-DRAblNG-APPROVAL $
0-NA
)
S-CGRE D-P0/12/16. C-LETTER-10-Sti' C1-EA-BORGPANN-TO-BF-$CHEIPEL 0-NA 9
)
5-CGEL D-P0/1LLj6 C-Miro C 1-W W-S C HWIJ R S.-TI-HC-8 RINK P A N. C2-E S $ E NT I A L-T HE R M0W E L LS 0-NA 0-NA d'
1-CGEE D-20/12/12 C-PE*0 C1-WW-sCHWIERs-TO-OKiCULVEe C2-AUDIT-OF-TLeNOVER-AC13VITIES Q-NA I
5-CGRE D-80/12/)2 C-PEPO C1-EA-DORG" ANN-TO-WW-SCHWIERS C2-PROCEDURES-C-NRC9PEQUIREMENTS 0-NA
,i,
g e
5-C99 D-f D_f17 LIE __C_- P E Eg (1 W W:_5 MylEn$-TC-L-LUDWIG __ C2-WOBK-PN$1 RUCTIONS-FOR-WEEK-0F-DEC-16-19.-1880 0-NA d
C2-DDC-APPROVALS Q-NA
~
e I
5-CGtE D-P0/12/15 C-PEPO C1-WW-$CpWIERs '4C-WD-WATPIRE 50 5-CGEE D-PC/12/10 C-PEPO C1-WW-5C WWIE RS-T C-E A-B OR CM ANN C2-REPo[ TING-FEQUIRED-BY-THE-FOREIGN-CORRUPT-PRACTICES ip I
0-NA t
[k),
S-CGtt D 80/11/13 C-MEPO-FROP-WH-ZIMMER C1-STANDING-COMMITTEE-TO-INSURE-COMPLIANCE C2-WITH-THE-ACCOUNTING-PROVI$1
#sp c..
r i-n, - 1..., c o r, r...- r o......;.. r t, r r < -, r i -n, _ i O 7 T


w < <
w < <
(.                                                                                                                                                                                              .
(.
                                                                                                    +                                                                                         . *
+
                                                                        '      ~
*/,
    -                                o                         */,
~
i y
o i,
y               -
y y
DR$-0FFLINE PRINT '14 J'UN 83                       C8:5d:57                                                                         DATE 061483         PAGE   24 o-0-NA es 5-CGtt         D-20/12/C5                   C-PEPO         C1-WW-SCHWiER$-TC-SC E5WAkN            C2-FIRE-PROTECTION             0-NA 5-CGtt        ~D-8b/12/f2 'C-PEPO                           C1EWW-SCHWIERS-TC-HC-BRINEMAN C2-0VERDUE-GA-DOCUMENTATION                     0-NA                               *%
DR$-0FFLINE PRINT '14 J'UN 83 C8:5d:57 DATE 061483 PAGE 24 0-NA o-es 5-CGtt D-20/12/C5 C-PEPO C1-WW-SCHWiER$-TC-SC 5WAkN C2-FIRE-PROTECTION 0-NA E
          ,,          5-tGtt         D-80/07/10                   C-PEPO         C1-WW-SCHWIERS-TC-HC-BRINEMANN                 C2-0VERDUE-Qa-90CU"ENTAT10N         0-NA 5-CGtt         D-80/11/25                   C-PEP 0'       'k2-NRC-!E-CIRCULhA-Eh-22               C3-CONFIRMATION-OF-EMPLOYVE-GUALIFICATIONS I
~D-8b/12/f2 'C-PEPO C1 WW-SCHWIERS-TC-HC-BRINEMAN C2-0VERDUE-GA-DOCUMENTATION 0-NA E
0=tA i                                                                                                                                                                                         ?%
5-CGtt 5-tGtt D-80/07/10 C-PEPO C1-WW-SCHWIERS-TC-HC-BRINEMANN C2-0VERDUE-Qa-90CU"ENTAT10N 0-NA 5-CGtt D-80/11/25 C-PEP 0'
__.1-fG8E         E !0.LJJt24                 C-PAPO           C1-WW-S C PWILES-T O-0 A1MIMBE R$__C2-OPE N-F IE LD- AUDITS-8-5URVE ILL AN C E-R EPORT S 0-kA 5-CGRE        D-P0/11/18                  CEPEPO ~         C-RP-ENAS-TO-WW-5CHWIERS               C2-RECORDS-MahAGEMENT-MEETING 0-NA I           5-CGtt       'D-80/11/24                   C-REPO                                                 C2-AUDIT-OF-PROCUREMENT,-MATERIAL-RECEIVING-8-LAlkTENA                     I C1-WW-SCHWIt'RS-TC-JR-SCHOTT 0-NA
'k2-NRC-!E-CIRCULhA-Eh-22 C3-CONFIRMATION-OF-EMPLOYVE-GUALIFICATIONS I
          #          5-CGtt         D-P0/11/14                   C-MEPO           C1-WW-5CHWIERS-IC-HC-BRINXMANN                 C2-GA-AUDIT-REPORT-312         0-NA                                   )
0=tA i
g 5-CGtt         D-80/11/10..C-PEP 0                           C1-WW-SCHWIER$-TO-AA-90RGMANN C2-G A-POST 3 0N-RE S PONSIB AL ITI E S               0-NA 5-iGtt         D-P0/11/10                   C-r[FO           C 1-WM-lifwJin$-1Q- A LL-(ONC ER!iE D_ _C2-PROC E DUR ES-POLIC T-ST A TEM E N T Q-NA I                                 . .                  ~                .. . . . .. __          .      .
?%
I 5-CGtt      .D-80/10/29                   C-PEPO           C1-WW-SCHWIERS-TO-EA-80RGMANN C2-POLICY-STATEMENT-REGARDING-hRC-UNRL50LVED-ITEMS Q-NA i'                                                                                                                                                                                           )
__.1-fG8E E !0.LJJt24 C-PAPO C1-WW-S C PWILES-T O-0 A MIMBE R$__C2-OPE N-F IE LD-AUDITS-8-5URVE ILL AN C E-R EPORT S 1
___1-CGLE         D-80/J0/15
0-kA C PEPO ~
                                          /                      C-M LP_Q         t 1-J R-IC HQT T _.19-Wd-MHWI E R 5__ C2-N RC-I NS P E C T ION-R E PO R T-NO-80-19 Q-IP5/80/-31 T           5-CGEE         D-P0/10/30                   C-PEP 0         C1-WW-SCHWIER$-TO-JR-SCHOTT             C2-LETTER-2PS-RO-440           0-NA                                           I 5-CGLE         D-20/10/23                   C-PEmo.         C1-JR-SCHOTT-10-bW-5CHWlERS             C2-ROCKWELL-IhTERNATIONAL,-HNC               C3-VENDOR-CA-PROGRAM
C-RP-ENAS-TO-WW-5CHWIERS C2-RECORDS-MahAGEMENT-MEETING 0-NA E
          $          0-195/PO/440                                                                                                                                                                     b 5-CGCE         D-P0/11/C5                   C-PEPC           C1-WW-SCHWIERS-TC-GA-MFMBERS           Ci-0 PEN-FIELD-AUDITS-t-SURVEILLANCE-REPORTS NI,,       0-NA 0-NA                                                                                                                                                                     'lh 5-CGtt         D-PD/11/07 -- C-PEPO -                       C1-WW-SCHWIERS-TC-SE-MARTIN             C2-STARTUP-LAhuAL-REVISIONS           0-NA qp i                                                                                                                                                                                        g l             ,,,    1-{ GEE       D-EQf10 /13 C-M[f9                           Cl-WW-5 MWIERs-TO-EA-80RGMANN.C2-MANAGEMENT-AUDIT                     0-NA dI'         D-P0/10/16     C-C         C-rEPO                   C1-RP-EHAS-10-bW-SCHWIERS             (2-GRLAI-LAKES-GA-PANAGERS-MEETING             0-NA                               i I
5-CGRE D-P0/11/18 I
I
5-CGtt
            .        5-CGtt         D-80/09/16                   C-PEP 0         C1-WW-SchWIERS-TC-0Ats-MEMPEPs                 C2-OPEN-AUDIT-t-50RVEILLANCE-REPORTS g'         0-NA                                                                                                                                                                             ,y 5-CGtt         D-P0/10/C9                   C-MEP0         C1-WW-5CHWIERS-TC-04-MFMPERS           C2-OPEN-FIELD-AUDITS-t-CURVEILLANCE-REPORT 5 o           0-HA                                                                                                                                                                             ,
'D-80/11/24 C-REPO C1-WW-SCHWIt'RS-TC-JR-SCHOTT C2-AUDIT-OF-PROCUREMENT,-MATERIAL-RECEIVING-8-LAlkTENA I
5-CGRE         D-20/09/16                   C-PEPO         C1-WW-SCHWIERS-TC-RP-EHAS-P-RL-WOOD C2-CR05FV-5dFETV-RELIEF-VALVES
0-NA 5-CGtt D-P0/11/14 C-MEPO C1-WW-5CHWIERS-IC-HC-BRINXMANN C2-GA-AUDIT-REPORT-312 0-NA
          -          0-NA
)
_,            5-CGtt         D-P0/09/11                   C-PEPO         C 1-WW-SC HWI E RS-T C-D IS T RI BUTION         C2-PREPARAT10N-OF-AUDIT-REPORTS
5-CGtt D-80/11/10..C-PEP 0 C1-WW-SCHWIER$-TO-AA-90RGMANN C2-G A-POST 3 0N-RE S PONSIB AL ITI E S 0-NA g
_u)           0-NA
5-iGtt D-P0/11/10 C-r[FO C 1-WM-lifwJin$-1Q-A LL-(ONC ER!iE D_ _C2-PROC E DUR ES-POLIC T-ST A TEM E N T Q-NA I
.D-80/10/29 C-PEPO C1-WW-SCHWIERS-TO-EA-80RGMANN C2-POLICY-STATEMENT-REGARDING-hRC-UNRL50LVED-ITEMS 5-CGtt
~
I Q-NA i'
)
___1-CGLE D-80/J0/15 C-M LP_Q t 1-J R-IC HQT T _.19-Wd-MHWI E R 5__ C2-N RC-I NS P E C T ION-R E PO R T-NO-80-19 Q-IP5/80/-31
/
T 5-CGEE D-P0/10/30 C-PEP 0 C1-WW-SCHWIER$-TO-JR-SCHOTT C2-LETTER-2PS-RO-440 0-NA I
5-CGLE D-20/10/23 C-PEmo.
C1-JR-SCHOTT-10-bW-5CHWlERS C2-ROCKWELL-IhTERNATIONAL,-HNC C3-VENDOR-CA-PROGRAM 0-195/PO/440 b
5-CGCE D-P0/11/C5 C-PEPC C1-WW-SCHWIERS-TC-GA-MFMBERS Ci-0 PEN-FIELD-AUDITS-t-SURVEILLANCE-REPORTS NI,,
0-NA 0-NA
'lh 5-CGtt D-PD/11/07 qp i
-- C-PEPO -
C1-WW-SCHWIERS-TC-SE-MARTIN C2-STARTUP-LAhuAL-REVISIONS 0-NA g
l 1-{ GEE D-EQf10 /13 C-M[f9 Cl-WW-5 MWIERs-TO-EA-80RGMANN.C2-MANAGEMENT-AUDIT 0-NA dI' D-P0/10/16 C-C C-rEPO C1-RP-EHAS-10-bW-SCHWIERS (2-GRLAI-LAKES-GA-PANAGERS-MEETING 0-NA i
I I
5-CGtt D-80/09/16 C-PEP 0 C1-WW-SchWIERS-TC-0Ats-MEMPEPs C2-OPEN-AUDIT-t-50RVEILLANCE-REPORTS g'
0-NA
,y 5-CGtt D-P0/10/C9 C-MEP0 C1-WW-5CHWIERS-TC-04-MFMPERS C2-OPEN-FIELD-AUDITS-t-CURVEILLANCE-REPORT 5 o
0-HA 5-CGRE D-20/09/16 C-PEPO C1-WW-SCHWIERS-TC-RP-EHAS-P-RL-WOOD C2-CR05FV-5dFETV-RELIEF-VALVES 0-NA 5-CGtt D-P0/09/11 C-PEPO C 1-WW-SC HWI E RS-T C-D IS T RI BUTION C2-PREPARAT10N-OF-AUDIT-REPORTS
_u) 0-NA


  ''                                                                                                                                                                                                                                                                                            r3 DR$-9FFLINE PRINT     14'JUN 83                                                             08:5d:37                                                                                     DATE Ce1483         PAGE   25
r3 DR$-9FFLINE PRINT 14'JUN 83 08:5d:37 DATE Ce1483 PAGE 25 C2 TR5i'iNG-t-INDOCTRINATION 0-NA 1
  ,,                                                      5-CGRE         D-P0/07/28 C-Pero                                                                   C1-WW-sCHWIERS-TO-ALL-CONCERNED                               C21TR5i'iNG-t-INDOCTRINATION h                     0-NA 5-CGtE'       D-8C/C7/30     C-PEPO                                                               C1-GW-SCHWIFRS-TO-ALL-pA-MEM*ER$                             C2-CORRESPONDENCE-RECEIVED-FROP-JAN-1-THRU-JULY-29.-I7 0-NA                                                                                                                                                                                                                                   >
5-CGRE D-P0/07/28 C-Pero C1-WW-sCHWIERS-TO-ALL-CONCERNED h
S-CGEE         D-P0/07/!0 C-pea 0                                                                   C1-WW-$CHWIERS-10-EA-80REMANN C2-CORPbR5T['05-UPER5fiONS-PULICY         -
5-CGtE' D-8C/C7/30 C-PEPO C1-GW-SCHWIFRS-TO-ALL-pA-MEM*ER$
C2-CORRESPONDENCE-RECEIVED-FROP-JAN-1-THRU-JULY-29.-I7 0-NA S-CGEE D-P0/07/!0 C-pea 0 C1-WW-$CHWIERS-10-EA-80REMANN C2-CORPbR5T['05-UPER5fiONS-PULICY 0-NA 5-CGRE D-50/09/13 ~ ~
'C1-WW-5CEWIERS-50-ALL-AUDITUR$-CONCERNED C2-OPEN-FIELD-AUDIT 1 0-NA
~
C-PEPO S-CG'tE D-80/07/24 C-PEPO C1-WW-SCHWIERS-TO-M.-LUER $fN C2-DRAFT-WRITEUP C3-P0$lT10N-DESCRIPT!0NS
'l 0-kA 5-CGEE _ __D-80/C7/28_ C-PEPO C1-WW-SCHWIERS-70-ALL-CONCERNED
.C2-REORGANIZATION-0F-CONSTRUCT 10N-GA
^I 0-ka S-CGtt 0-80/07/2P
'C-MEP0 kt-WW-SCHWIERS-TC-ALL-CONCTRNED C2-PRAPARATION-FOR-NRC-MEETING
)
I' 0-no i
5-CGtt... _ _ D-80/07/28. C-MEP0_
C1-WW-SCHWIERS-TO-EA-00RGMANN C2-CGEE-HJK-CCP81NED-GA-0RGAN!!ATION
)
0-WA
(
5-CGEE D-F0/07/11' C-PEPU' C1-WW-SCHWiERS-iC-SC-5 WAIN C2-NRC-5NSPECTION-REPORT-80-09 0-NA Y
S-CGtt 0-P0/07/21 C-PEPO-FRO *-WW-SCHWIERS C1-IND0CTRINATION-5ES$IOh 0-NA I
..D-20/07/09 C-PEPO C1-WW-SCHWIERS-TO-EA-DORGMANN C2-COMPLIANCE-WITH-ACCOUNTING-PROVISIONS C3-0F-30 REIGN-CORR S-CGEE k
UPT-PRACTICES-ACT-OF-1977 4
0-NA
0-NA
                                                                                                                                                                                                ~
)
5-CGRE          D-50/09/13 ~ ~ C-PEPO                                                              'C1-WW-5CEWIERS-50-ALL-AUDITUR$-CONCERNED                                C2-OPEN-FIELD-AUDIT 1    0-NA S-CG'tE        D-80/07/24    C-PEPO                                                                C1-WW-SCHWIERS-TO-M.-LUER $fN C2-DRAFT-WRITEUP C3-P0$lT10N-DESCRIPT!0NS                                                          'l 0-kA
5-CGEE D-70/07/C7 C-MEP0 C1-WW-$CHWIER$-TC-WD-WATPIPE C2-REVIEW-OF-VARIOUS-DOCUMENTS 0-NA 4
  #                                                      5-CGEE _ __D-80/C7/28_ C-PEPO                                                                        C1-WW-SCHWIERS-70-ALL-CONCERNED                              .C2-REORGANIZATION-0F-CONSTRUCT 10N-GA                              ^I 0-ka I'
C2-$UBCONTRACTOR-5URVEILLANCE 0-NA S-CGtt 0-F0/C7/C8 C-PEPO C1-CA-BURGESS-TO-E-BACHMAN I
S-CGtt          0-80/07/2P    'C-MEP0                                                                kt-WW-SCHWIERS-TC-ALL-CONCTRNED                              C2-PRAPARATION-FOR-NRC-MEETING                                      )
i E
0-no                                                                                                                                                                  _ . _ -
S-CGEE D-80/06/20 C-PEPO C1-WW-SCHWIERS-TC-OK-CULVER C2-AUDIT-OF-GENERATION-CONSTRUCTION-DEPARTMENT
i 5-CGtt. . . _ _ D-80/07/28. C-MEP0_
)
0-WA C1-WW-SCHWIERS-TO-EA-00RGMANN C2-CGEE-HJK-CCP81NED-GA-0RGAN!!ATION                                                                )
.___9-NA e.
(                                                        5-CGEE        D-F0/07/11' C-PEPU'                                                                  C1-WW-SCHWiERS-iC-SC-5 WAIN                          C2-NRC-5NSPECTION-REPORT-80-09              0-NA                          Y S-CGtt        0-P0/07/21    C-PEPO-FRO *-WW-SCHWIERS C1-IND0CTRINATION-5ES$IOh                                                                                            0-NA I                                                                          -            -                    '..                                                      . _            ..            . .              .                                                                      k S-CGEE        ..D-20/07/09    C-PEPO                                                                C1-WW-SCHWIERS-TO-EA-DORGMANN C2-COMPLIANCE-WITH-ACCOUNTING-PROVISIONS                                  C3-0F-30 REIGN-CORR UPT-PRACTICES-ACT-OF-1977 4                                                      0-NA                                                                                                                                                                                                                                  )
5-CGRE D-P0/06/20 C-CONDUCT-OF-AUDITS C-PEPO C1-WW-SCHWIER$-TO-DISTRIBUTION C2-TRAINING I
5-CGEE          D-70/07/C7   C-MEP0                                                                 C1-WW-$CHWIER$-TC-WD-WATPIPE                         C2-REVIEW-OF-VARIOUS-DOCUMENTS             0-NA 4                                                                                                                                                           .. . _ . . . . _ _ _ _ _ . . . . ..                    .            .    .                                                      I i
0-NA C-PE*0-FROM-WW-SCHWlERS C1-GA-AUDIT-SCHEPULL 0-NA 5-CGRE D-80/07/C9 5-CGtt D-P0/06/13 C-PEPO C1-WW-SCHWIER$-TO-DISTRIRUT10N C2-RFORCANIZATION-07-0A 0-NA 5-CGtt 0-P0/06/16 C-MEPO
S-CGtt         0-F0/C7/C8     C-PEPO                                                               C1-CA-BURGESS-TO-E-BACHMAN                           C2-$UBCONTRACTOR-5URVEILLANCE 0-NA E                                                       S-CGEE         D-80/06/20     C-PEPO                                                               C1-WW-SCHWIERS-TC-OK-CULVER                           C2-AUDIT-OF-GENERATION-CONSTRUCTION-DEPARTMENT                             )
)
                      .                .___9-NA                                                                                                                                                                               .
C1-WW-5CHWIER5-TO-JR-$CHOTT C2-04-AUDIT-OF-EPD-ILC-PER$0NNEL 0-NA d'
: e.                                                      5-CGRE         D-P0/06/20 C-CONDUCT-OF-AUDITS                                                                                       C-PEPO         C1-WW-SCHWIER$-TO-DISTRIBUTION             C2-TRAINING                             I 0-NA
S-CGEE D-P0/06/12 C-PEPO C1-WW-SCHWIERS-To-FA-BORGMANN C2-COMPENTS-Oh-COMPANY-POLICIES 0-NA
* 5-CGRE          D-80/07/C9    C-PE*0-FROM-WW-SCHWlERS C1-GA-AUDIT-SCHEPULL                                                                                         0-NA
'r I
* 5-CGtt         D-P0/06/13   C-PEPO                                                                 C1-WW-SCHWIER$-TO-DISTRIRUT10N                               C2-RFORCANIZATION-07-0A 0-NA
5-CGLE D-F0/06/11 C-OPEN-FIELD-AUDITS C1-CLOSED-FlfLD-AUDITS C2-LOG-SC0K 0-NA g'
  *                                                                                                          ..                                                              _                _ .                                                                                                )
C-rEPO C1-WW-SCHWIERS-To-FA-90RGMANN C2-NRC-LICENSEE-EVALUAT10N5 0-NA 5-CGRE D-80/06/13 i'
5-CGtt         0-P0/06/16   C-MEPO                                                                 C1-WW-5CHWIER5-TO-JR-$CHOTT                         C2-04-AUDIT-OF-EPD-ILC-PER$0NNEL             0-NA d'                                                     S-CGEE         D-P0/06/12   C-PEPO                                                                 C1-WW-SCHWIERS-To-FA-BORGMANN C2-COMPENTS-Oh-COMPANY-POLICIES                                     0-NA                         'r I
s 5-CGtt 0-RC/06/C2 C-PEPO C1-WW-SC5WIERS-TO-DK-CULVER Ci-DISP 051110h-0F-CONCONFORMANCE-RFPORT5 9
    .                                                    5-CGLE           D-F0/06/11   C-OPEN-FIELD-AUDITS                                                                                   C1-CLOSED-FlfLD-AUDITS       C2-LOG-SC0K 0-NA g'                                                                                                                                                                                                                                                                                           .
l
5-CGRE          D-80/06/13    C-rEPO                                                                 C1-WW-SCHWIERS-To-FA-90RGMANN C2-NRC-LICENSEE-EVALUAT10N5                                 0-NA si'                                                     5-CGtt         0-RC/06/C2   C-PEPO                                                                 C1-WW-SC5WIERS-TO-DK-CULVER                         Ci-DISP 051110h-0F-CONCONFORMANCE-RFPORT5 9
,_.__0-na
l             ,_.__0-na                                                                                                                                                             _ _ _ . _ _ . _ . . _.
[k]
[k]                                                     5-CGEL Q-MA D-P0/06/10   C--CCMPEATS-ON-EPD-PROCEDURE-CA.5AD.01                                                                                     C-MEMO             C1-WW-SCHWIERS-TO-tA-BORGMANN C3-REVISION-2           ir
5-CGEL D-P0/06/10 C--CCMPEATS-ON-EPD-PROCEDURE-CA.5AD.01 C-MEMO C1-WW-SCHWIERS-TO-tA-BORGMANN C3-REVISION-2 ir Q-MA


r
r
    **                                                                                                                                                                            ,3 DR$-0FFLINE PRINT 14 JUN 83                     08:50:37                                                                         DATE 061483     PAGE 26 S-CG8E.       .0-P0/05/19 .C-PEPO                           C1-WWr$CHWIER$-TO-PK-CULVER           C2-PROCEDURE-EC-104             0-NA                               '
,3 DR$-0FFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 26 S-CG8E.
5-CGRE           D-P0/05/19                 C-PEPO           C1-WW-SCHWIERS-To-P.-LUKEN           C2=HJK-GA-MANAGER C3-KR RAUMGARTEN-TERMINATION g-wa                                                                                                                                                                 'T
.0-P0/05/19.C-PEPO C1-WWr$CHWIER$-TO-PK-CULVER C2-PROCEDURE-EC-104 0-NA 5-CGRE D-P0/05/19 C-PEPO C1-WW-SCHWIERS-To-P.-LUKEN C2=HJK-GA-MANAGER C3-KR RAUMGARTEN-TERMINATION g-wa
    ,      5-CGtt           D-80/05/23                 C-"EPO           C1-WW-SCHWIERS-TC-BK-CULVER           C2-GA-0C-0CCUPANC'Y-di-RCI-BUILDING           0-NA l           5-CGRE           D-8d/05/2P                 C PEi6 A
'T 5-CGtt D-80/05/23 C-"EPO C1-WW-SCHWIERS-TC-BK-CULVER C2-GA-0C-0CCUPANC'Y-di-RCI-BUILDING 0-NA l
                                                                      ' C i-WW'-5C HWIE R$-T b' 'E A-BdR GM ANN C2-CbMBINED-CGtt-E-HJK-GA-0PGANIFATION
5-CGRE D-8d/05/2P C PEi6
    ,      0-NA.                .                    _                    _ , .
' C i-WW'-5C HWIE R$-T b' 'E A-BdR GM ANN C2-CbMBINED-CGtt-E-HJK-GA-0PGANIFATION A
5-(SRE           D-8Qljlfl9                 C-MCP0           C 1-W W-1(EW] E R S-T C-EK .C.UL.VE R 2-PROCEDURE-EC-104             0-NA 5-CGRE           D-P0/05/19. C-MEP0_                         C1-WW-SCHWIERS-TO-EA-BORGAPNN C2-NRC-GUIDANCE-10CFR50.55E-DEFICIENCV-REPORTING                           'l 0-NA C                                                                                                                                                                             ')
0-NA.
                                                            ~
5-(SRE D-8Qljlfl9 C-MCP0 C 1-W W-1(EW] E R S-T C-EK.C.UL.VE R 2-PROCEDURE-EC-104 0-NA 5-CGRE D-P0/05/19. C-MEP0_
S-CGit           D-P0/05/I6 'C-PEPO                       'Ci-WW-SCHWIERS-TC-bK-CULVE'             C2-4ECORDS-EAhAGEMENT-PROGRAM 0-NA
C1-WW-SCHWIERS-TO-EA-BORGAPNN C2-NRC-GUIDANCE-10CFR50.55E-DEFICIENCV-REPORTING
          ~
'l 0-NA C
S-CGLE           D-80/05/19                 C-PEP 0         C1-WW-SCHWIERS-To-ALL-CONCERNED               C2 E0TiFYIiG-NRC       0-NA 5-CGt t ' '     'D-P0/65I12 I'PErd'           -
S-CGit D-P0/05/I6 'C-PEPO
                                                                  ~ ~ ~C1-WW-$CHWIERS-T'h-dAt5-MEMBERS                 C2-OPEN-AUDIT-t-SURVEILLANCE-REPGRTS 0-NA         .                ..._. . ...-                _ _ .
'Ci-WW-SCHWIERS-TC-bK-CULVE' C2-4ECORDS-EAhAGEMENT-PROGRAM 0-NA
4 5- C G E.E       B- 2 QLQ))JL ,_C-P E P O                   C1-VM-1 GWIEES-1C-px-CULVER           C2-04-SURVEILLANCE-REPORT-NO-20               0-NA T       5-CGtt           0-80/04/16                 C-PEPO     .C1-WW-SCHWIER$-To-gat $-MEMRERS                   C2-gat $-ACTION-ITEMS         0-NA                             )
')
            $-CGEE           D-79/12/C6                 C-PEP 0         C1-WW-SCHWIERS-TC-0At$-MEMPERS               C2-CONDUCT-OF-SCHEDULED-AUDITS T       Q-NA                                                                                                                                                                     )
~
i           5-CGRE           D-79/12/07                 C-PEPO           C1-CA-DURGESS-TO-M.-KOPP             C2-HANDLiNU'-hE-CONDUIT-HANGER-DEFICIENCIES T       0-AA                                             ,        _                                                                                                              )
~
S-CGRE_         D-79/12/19__C-PEP 0_                       C1-WW-SCHWIERS-TC-JJ-WALD             C2-7000-SERIES-NONCONFORMANCE-REPORTS 2
S-CGLE D-80/05/19 C-PEP 0 C1-WW-SCHWIERS-To-ALL-CONCERNED C2 E0TiFYIiG-NRC 0-NA 5-CGt t ' '
4_      0-NA                                                                                                                                                                   l) 5-CGEE           S-CGRE                     D-79/11/C6       C-PEMO         C1-WW-SCHWIERS-TO-pK-CULVER             C2-REWORK-ON-NONCONFORMANCE-REPORTS 4,     0->A                                                                                                                                                                     )
'D-P0/65I12 I'PErd'
      ,,    5-CGEE           D-79/11/14...C-PEPO                         C1-WW-$CHWIERS-TO-PK-CULVER           C2-0AES-5URVEILLANCE/ INSPECTION-REP 0PT-166
~ ~ ~C1-WW-$CHWIERS-T'h-dAt5-MEMBERS C2-OPEN-AUDIT-t-SURVEILLANCE-REPGRTS 0-NA 4
    =       0-NA                                                                                                                                                                     )
5-C G E.E B-2 QLQ))JL,_C-P E P O C1-VM-1 GWIEES-1C-px-CULVER C2-04-SURVEILLANCE-REPORT-NO-20 0-NA T
            $-CGEE           D-79/11/19                 C-MEPO           C1-dW-SCHWIERS-TC-GARS-MEMBERS               C2-OPEN-AUDIT-t-SURVEILLANCE         0-NA
5-CGtt 0-80/04/16 C-PEPO
                                        . .                      .                  .            .                                                                                    )
.C1-WW-SCHWIER$-To-gat $-MEMRERS C2-gat $-ACTION-ITEMS 0-NA
5-CGRE           D-79/09/75                 C-PEP 3         C1-WW-SCHWIERS-TC-DK-CULVER           C2-F E C-C R A F T-WORK ING-T HROUGH-HOL D-T AGS j           0-NA
)
        ,  5-(Gtt           t-11l10/16 C-pet 0                         $1-WW-S NWIERS-TC_-EA-BCRCMANN C2-CORPORATE-Ga-PLAN                   0-NA S-CGCE           D-79/10/10                 C-ME'O           C1-WW-SCHWIERS-TO-KAISER             C2-0 ASS-FIELD-AUDIT-REPORT-272               0-NA 3-CGtE           D-79/11/C1                 C-PEP 0         C1-WW-SCHWIERS-TO-EA-DORCMANM C2 -COR POR AT E-C A-PROG R AM-A UDI T C3-JULY-1979
$-CGEE D-79/12/C6 C-PEP 0 C1-WW-SCHWIERS-TC-0At$-MEMPERS C2-CONDUCT-OF-SCHEDULED-AUDITS T
;            0-EA
Q-NA
_        S-CGtt           D-79/09/25                 C-PEPO           C1-WW-SCHWIER5-Tc-EA-00RGMANN C2-HJK-AUDIT-407                 C3-GAP-16   0-NA t- r e.f r       n-7orrer?'                 r-arro           rt-wu-eruuvres-tr-pr-rnevso           r;-o att-r t r e e-sun t T-?% 5 c-N
)
i 5-CGRE D-79/12/07 C-PEPO C1-CA-DURGESS-TO-M.-KOPP C2-HANDLiNU'-hE-CONDUIT-HANGER-DEFICIENCIES T
0-AA
)
2 4_
S-CGRE_
D-79/12/19__C-PEP 0_
C1-WW-SCHWIERS-TC-JJ-WALD C2-7000-SERIES-NONCONFORMANCE-REPORTS 0-NA l) 5-CGEE S-CGRE D-79/11/C6 C-PEMO C1-WW-SCHWIERS-TO-pK-CULVER C2-REWORK-ON-NONCONFORMANCE-REPORTS 4,
0->A
)
5-CGEE D-79/11/14...C-PEPO C1-WW-$CHWIERS-TO-PK-CULVER C2-0AES-5URVEILLANCE/ INSPECTION-REP 0PT-166
=
0-NA
)
$-CGEE D-79/11/19 C-MEPO C1-dW-SCHWIERS-TC-GARS-MEMBERS C2-OPEN-AUDIT-t-SURVEILLANCE 0-NA
)
C2-F E C-C R A F T-WORK ING-T HROUGH-HOL D-T AGS 5-CGRE D-79/09/75 C-PEP 3 C1-WW-SCHWIERS-TC-DK-CULVER j
0-NA 5-(Gtt t-11l10/16 C-pet 0
$1-WW-S NWIERS-TC_-EA-BCRCMANN C2-CORPORATE-Ga-PLAN 0-NA S-CGCE D-79/10/10 C-ME'O C1-WW-SCHWIERS-TO-KAISER C2-0 ASS-FIELD-AUDIT-REPORT-272 0-NA 3-CGtE D-79/11/C1 C-PEP 0 C1-WW-SCHWIERS-TO-EA-DORCMANM C2 -COR POR AT E-C A-PROG R AM-A UDI T C3-JULY-1979 0-EA S-CGtt D-79/09/25 C-PEPO C1-WW-SCHWIER5-Tc-EA-00RGMANN C2-HJK-AUDIT-407 C3-GAP-16 0-NA t-r e.f r n-7orrer?'
r-arro rt-wu-eruuvres-tr-pr-rnevso r;-o att-r t r e e-sun t T-?% 5 c-N
 
e DR$-bFFLINE PRINT' 14 IUN 83 CP:5bs37 DATE 061483 PAGE 27 S-CGtt D-79/08/28. C-MINUTES-0F-CGRE-t-REGION-3-NRC-PER$0NNEL-ON-JULY-24, e-NA 0-NA S-CGRE D-7 9 / 0 9 / 2 9..
C1-WW-SCHWIERS-TO-BK-CULVER C2-INSTRUMENT-LINE-IDENTIFICAT!0N 0-NA
-..__5 - f G 8 8 e-l9106/20 t-PEPO C1-WW:1CRWIEEE-IQ:JR-$CH0.T1___C2-STOP-WORK-CRDER-79-09-WITH-MODIFICATIONS 0-NA S-CGRE D-79/07/23'~C-MErd C1'W'-SCHWIERS-TC-BK-CULVER' C2-NRC-8ULLETIN C3-NOTICE-TO-EMPLOTEES
-W e-NA E-CGE[
D-79 / Q 6fl.1 C-MEPO C 1-WW-1(HWi[RS-T O-[ A _BOR $M AN N,,C2,,PER 50NhE L-h0TI C E C3-$0 LICIT-SAFETY-CONCERN 5 Q-NA 4
*)
4
~
~
5-CGLE D-79/08/13' C-MEPO C1-WW'-SCHWIER$-TC-PK-CULVER C2-PER$0NNEL-h0TICE C3-NONCOMPL,IANCE-WITH-SAFETV-STANDAR 4
DS
~
I 8
G-NA S-CGEE D-79/C8/13 C-PEPO C1-WW-SC HWIE R5-T O-E A-BOR GM ANN C2 U'D3T-5F-GENERAL-ELECTRIC Q-NA I
S-CGRE D-79/08/14
~
~
)
~
2
~ C-LETTER-70-GEEERAL-E'LIC1RIC' C1-WW-!CHWIERS-TO-WE-SMITH C2-AUDIT-REPORT-79-04-OF-G.E.-NED e-rfo/110 1-16EE t-79/06/19 t-ME'O C 1 -WW-S C HW1E ES:JR-B K-C U(VER___ C2.-.5 E I SM I C-SU P POR T S-CL A SS I F I E D-NON E S S E NT I A L C3-FIELD-AUD IT-REPORT-231 4
G-NA l
S-CGtt
.0-79/07/13 C-MEPO C1-WW-SCHWIERS-10-EA-00RGMANN C2-VENDOR-INSPECTION C3-REPORTS-8-8-9 C4-SARGENT-KINDUS1 f
RIES
)
a-NA T
S-CGRE D-79/06/C6 C-MEP0 C1-WW-SCHWIERS-10-DK-CULVER C2-FLUSHING-STOP-WORK-0RDERS G-NA I
D-82/C9/17 C-LETTER-TO-KAISER C1-HR-SAGER-TO-MF-ALDERTIN C2-WELDING-PROCEDURE-GUALIFICATION 0-CE0/475 T
b
___J-(S E E D-8 2 /,j 0 /11 C-L_E TILR-10-K A IS{R (1-i;p-SAGER-TO-WA-HEDlIK C2-AWS-WELD-UNDERCUT-REVIEW-PROGRAM c-rEo/1235 S-CGtt D-P2/10/12 C-LETTER-10-KAISER C1-HR-SACER-TO-WA-HEDlIK C2-CORRECTIVE-ACTION-REQUEST-181 4
0-KE0/1236
: 1.,
)
S-1GtE D-R2/C8/11 C-CAR C1-CORRECTJVE-ACTICN-REPORT-181 0-CAR /181 i'
D-82/10/20 C-LETTER-To-KAISER C1-HR-SAGER-10-MF-SLMERTIN C2-GAP-ALLEGATIONS-AT-UD-LL-HEARINGS
)
0-rEo/1243 d' '
S-CGRE D-82/11/29 C-LEikra-TC-KAISER C1-HR-SACER-10-WA-HEDZIK C2-GA-AUDIT-fD-t-61 0-KE0/1291 lP j
G-FEo/1294
'P 5-CGtt D-22/12/01 C-LETTER-TO-FAISER C1-HR-SAGER-TO-WA-HED2!K (2-GA-FIELD-AUDIT-REPORT-197 n'
1 g),,
D-P2/12/02 C-LETTER-TC-KAleER C-HR-$AGER-TO-MF-AlbERTIN C2-CGef-GA-DNGINEERING-$UPPORT-OF-PRB-MEETING C3-CANCELLED C4-V0Ih it i
0-rE0flg99 Zu]
S-CGRE D-P2/07/72 C1-HR-SACER-TO-WA-HEDZIK C2-SURVE ILL ANC E-F0PMS-0 F-W ELD-TEST-SHOP C3-VOID C-LETTER-OF-KAISER SW


e DR$-bFFLINE PRINT' 14 IUN 83                                               CP:5bs37                                                                                                                    DATE 061483         PAGE     27 S-CGtt                      D-79/08/28. C-MINUTES-0F-CGRE-t-REGION-3-NRC-PER$0NNEL-ON-JULY-24,                                                                                                e-NA  0-NA                                            ''
.g DRS-OFFLINE PRINT 14 JUN 83 08:5':37 DATE 061483 PAGE 25 0
    ,,                                  S-CGRE                      D- 7 9 / 0 9 / 2 9.. C1-WW-SCHWIERS-TO-BK-CULVER                                                              C2-INSTRUMENT-LINE-IDENTIFICAT!0N                        0-NA
0-KE0/1113
                          -..__5 - f G 8 8                            e-l9106/20                            t-PEPO            C1-WW:1CRWIEEE-IQ:JR-$CH0.T1___C2-STOP-WORK-CRDER-79-09-WITH-MODIFICATIONS
~~ ~~
    ,,                                  0-NA S-CGRE                       D-79/07/23'~C-MErd                                          -W C1'W'-SCHWIERS-TC-BK-CULVER'                                        C2-NRC-8ULLETIN                      C3-NOTICE-TO-EMPLOTEES
q 5-CGEE D-82/07/28 C-LET'TER-TO-KAISER C1-JK-5HAFFER-TO-WA-HED21K C2-POSITION-UNGRADE-0F-PEGGT-PERON C3-00CUMENTA T10N-REVIEWER 0-KE0/1126
    ,                                    e-NA                                                                      _.        .                                                        _
*I 5-CGtt D-82/07/28 C-LETTER-TO-KAISER C1-HR-SAGER-TO-W4-HED28K b2-VENbOR-SURVEV-MONTHLY-REPORT 0-KE0/1129
  ;                                      E-CGE[                      D-79 / Q 6fl.1                        C-MEPO            C 1-WW-1(HWi[RS-T O-[ A _BOR $M AN N,,C2, ,PER 50NhE L-h0TI C E                                                C3-$0 LICIT-SAFETY-CONCERN 5 Q-NA 4    4                                                                                                                                                                                                                                                                                    *)
~S S-CGRE D-82/07/29 C-LETTER-TO-KAISER C1-HR-SAGER-TO-DL-HOWARD C2-INVESTIGATION-0F-SUPPLIERS-GA 0-FE0/1131
                                                                                                              ~                                                              ~
')
5-CGLE                      D-79/08/13' C-MEPO                                      C1-WW'-SCHWIER$-TC-PK-CULVER                                        C2-PER$0NNEL-h0TICE                        C3-NONCOMPL,IANCE-WITH-SAFETV-STANDAR 4                                       DS                                                                    ~
5-CGEE D-F2/08/C9 C1-HR-SAEER-TO-WA-HED21K C2-HJK-CORRECTIVE-ACTION-khPORTS C-LETTER-TO-K AI SE R C
8                                    G-NA                                                                                                                                                                                                                                                  I S-CGEE                      D-79/C8/13                            C-PEPO            C1-WW-SC HWIE R5-T O-E A-BOR GM ANN C2 U'D3T-5F-GENERAL-ELECTRIC                                                          Q-NA
0-E0/1146 _.
                                                                                                                                                                                                                                                                                              )
l 5-CG8E.._
                                                                                                                                                                                                                                ~
D-82/08/C5.C-PEPO C1-JJ-WALD-To-E-ROLF C2-CONSTRUCTION-PROCEDURES-USED-TO-ESTABLISH-GUALITV 4-0PS/0A/82/79 1
I 2
~
                                                                                                                                              ~                  ~
5-CGtt D-82/04/09 C-INSPECTION-MANAGEMENT-REPORT C1-PREPARATION-OF-$PECIAL-PROCESS-PROCEDURES I
S-CGRE                      D-79/08/14 ~ C-LETTER-70-GEEERAL-E'LIC1RIC' C1-WW-!CHWIERS-TO-WE-SMITH                                                                                            C2-AUDIT-REPORT-79-04-OF-G.E.-NED e-rfo/110                                                                _      _ . _ .
Q-NA
1-16EE                      t-79/06/19                            t-ME'O            C 1 -WW-S C HW1E ES:JR-B K-C U(VER___ C2.-.5 E I SM I C-SU P POR T S-CL A SS I F I E D-NON E S S E NT I A L                              C3-FIELD-AUD IT-REPORT-231 4                                    G-NA                                                                                                      _
)
l S-CGtt                  .0-79/07/13                                C-MEPO            C1-WW-SCHWIERS-10-EA-00RGMANN C2-VENDOR-INSPECTION                                                            C3-REPORTS-8-8-9    C4-SARGENT-KINDUS1 f                                    RIES                                                                                                                                                                                                                                              )
$-CGEE
a-NA                                                                                                                                                                      _ _ _ . _ .
._.0-R2/08/30.C-LETTER-TO-KAISER-
T                                    S-CGRE                      D-79/06/C6                            C-MEP0            C1-WW-SCHWIERS-10-DK-CULVER                                        C2-FLUSHING-STOP-WORK-0RDERS                      G-NA                                  I D-82/C9/17                  C-LETTER-TO-KAISER                                       C1-HR-SAGER-TO-MF-ALDERTIN                                          C2-WELDING-PROCEDURE-GUALIFICATION 0-CE0/475 T                                                                                                                                                                                                                                                                                      b
.C1-M.-ALBERTI4
___J-(S E E                                D-8 2 /,j 0 /11                        C-L_E TILR-10-K A IS{R                                          (1-i;p-SAGER-TO-WA-HEDlIK                          C2-AWS-WELD-UNDERCUT-REVIEW-PROGRAM c-rEo/1235 4
.C2-WELDER-0UALIFICATION C3-V010 0-KE0/1174 5:CSEE E:EZ/.09/17 t-LETTER:12:EA15ER Ct:HL:5AGER:.To-WA-HEDZIK ___. 0-KE0/1198 I
S-CGtt                      D-P2/10/12                            C-LETTER-10-KAISER                                              C1-HR-SACER-TO-WA-HEDlIK                            C2-CORRECTIVE-ACTION-REQUEST-181 0-KE0/1236
5-CGtE' D-P2/06/CB C-LETTER-TO-KAISER C1-CONRRECTIVE-ACTION-REQUEST-22-36 0-KE0/1052
: 1. ,                                                                                                                                                                                                                                                                                      )
)
            ,,                          S-1GtE                      D-R2/C8/11                            C-CAR C1-CORRECTJVE-ACTICN-REPORT-181                                                0-CAR /181 i'
5-CGEE D-82/06/C8 C-LETTER-10-KAISER T
* D-82/10/20 C-LETTER-To-KAISER                                                        C1-HR-SAGER-10-MF-SLMERTIN                                          C2-GAP-ALLEGATIONS-AT-UD-LL-HEARINGS                                                      )
NGLE-I
0-rEo/1243 d' '                                S-CGRE                      D-82/11/29                            C-LEikra-TC-KAISER                                              C1-HR-SACER-10-WA-HEDZIK                            C2-GA-AUDIT-fD-t-61        0-KE0/1291                    lP j      ,                                  5-CGtt                       D-22/12/01                            C-LETTER-TO-FAISER                                              C1-HR-SAGER-TO-WA-HED2!K                            (2-GA-FIELD-AUDIT-REPORT-197 n'
_. (1-HR-SAGEp-To-WA-HLDZIK C2-10CRF50.55E-ITEP-5-2-LARMINATION-IN-3X3X1/2-A
G-FEo/1294                                                                                                                                                                                                                                      'P 1
)
D-P2/12/02 C-LETTER-TC-KAleER                                                        C-HR-$AGER-TO-MF-AlbERTIN                                          C2-CGef-GA-DNGINEERING-$UPPORT-OF-PRB-MEETING                        C3-CANCELLED g),,                                        C4-V0Ih                                                                                                                                                                                                                                  it i
0-KgoL1057 1I 5-CG8E 0-P2/06/28~ C-LETTER-TC-KAISER - _.C1-HR-$AGER-10-WA-HE028K C2-WELD-PROCEDURE-0UALIFICATION-RECORDS C3-V01
0-rE0flg99 Zu]                                  S-CGRE                      D-P2/07/72                            C1-HR-SACER-TO-WA-HEDZIK                                                C2-SURVE ILL ANC E-F0PMS-0 F-W ELD-TEST-SHOP                    C3-VOID    C-LETTER-OF-KAISER      SW
)
0 0-kE0/1087 iI
)
: 5..5 L L_D 00/Dclao C - t Ell ER:10:10 EB O N W L 8 LJ K:Ekl 50 N-C O M P.4 N Y C1-NOTES-0F-MEETING _
C2-NOV-5,-1980 C3-NOV-6.-1980 0-NA k'
C1-HR-SACER-TO-HC-BRINKMAN C2-DOCUMENTAT10N-FOR-P0-2220 0-Has/23/012 S-CGtt D-83/01/04 C-PEPO I
e" S-CGRE D-P1/01/16 ~ C-RdCORD-OF-TELEPHbME-C0kVER$ATIbN-To-RCI (1-NRC-COMMONw E ALT H-AU DIT -DE F I CI E N C I E S,-F R OC E DUR E S C2-00E
)
1
.--.. CUIEMI AIION PLf1CJ EN CliS:5-5 CM S DUL E-LAB.-CG RE-AUD 0-NA 5-CGtt 0-21/01/08...
)
..- C-STATUS-TRIP-REPORT C1-RCI-COMPANY 0-NA e
S-CGtt D-P3/05/13 C-PEPO C1-HR-SAGER-10-HC-DRINKMANN C2-RCI-CONTRACT C3-CORRESPONDENCE-HR$-23-012 C 4-C OR RE SPON s
OENCE:HBS-83-214 0-prs /R3/279
$-hRC 0-80/12/24 C-LETTER-To-CCSE C1-JG=KEFPLER-TO-EA-PORGPANN C2-RCI C3-REACTOR-CONTROLS-INCORPORATED C4-STOP-WORK
. 8 0-NA
' ~ '
5-CGEE D-77/03/04 C-LETTEE-10-GENERAL-ELECTRIC C 2-G E NE R AL'-E LE CT RI C5-F D-i t $-R-f D DR 'S 0-hA
~
.'.I. l
..,n,,,,
,-..-o,.
,,,-,n-,.-.
.c..
..,o-o,-,,,,-o...
, -co fir.AvinN-PRO


    #*                                                                                                                                                                                                                                                                                  .g DRS-OFFLINE PRINT 14 JUN 83                     08:5':37      0                                                                                                              DATE 061483             PAGE                                               25      %
'A
                                                                                                                                                        ~~ ~~
'DRS-OF'FLINE PRkNT '14 JUN 83' hk:50:33 DATE 061483 PAGE 29 GRAM C2-TASK-v C3-RADIOGRAPHIC-CONFIRPATION-Of-PULLMAN-POWER-PRODUCTS C4-SHOP-WELD-RADIOGRAPHS 0-NA S-REEDY -HERetPT,-GleBONS-E-ASSOCIATES D-83/03/23 C-LETTER-OF-CGEE C1-RF-REEDY-TO-EA-BORGMANN C2-NATIONAL-80ARD-TASKS-4-t-15 C3-PARTIAL-PIPING-SYSTEMS C4-ASCONSTRUCTED-DRAWINGS J-t-01tLOO1Ln1A S-REEDY.-HERBERT,-Glee 0NS-E-ASSOCIATES.._. B-82/12/06. C-LETTER-TO-CGEE C1-RE-PONROE-P0-EA-BORGMANN C2-SPECIAL-TASK-ASSIGNME I
    ,,            0-KE0/1113 q
HTS 0-NA
5-CGEE            D-82/07/28              C-LET'TER-TO-KAISER                            C1-JK-5HAFFER-TO-WA-HED21K                                            C2-POSITION-UNGRADE-0F-PEGGT-PERON        C3-00CUMENTA T10N-REVIEWER 0-KE0/1126                                                                                                                                                                                                                                                            *I 5-CGtt            D-82/07/28              C-LETTER-TO-KAISER                            C1-HR-SAGER-TO-W4-HED28K                                              b2-VENbOR-SURVEV-MONTHLY-REPORT 0-KE0/1129                                                                                  . . _ .
. ___1:E E E D.r e -H E R B ERI s -G I ERDN S:1.:1510 Cl a LE t_
                                                                                                                                                                                                                                                                                        ~S S-CGRE            D-82/07/29              C-LETTER-TO-KAISER                            C1-HR-SAGER-TO-DL-HOWARD                                              C2-INVESTIGATION-0F-SUPPLIERS-GA 0-FE0/1131                                                                                                                                                                                                                                                            ')
o-E2/12L2n__(-LETIER CJ-RE-PONROE-10-EA-30RGMANN C2-SPECIAL-TASK-ASSIGNPENTS 0-NA 5-CCEE D-78/09/26 C-LETTER-TO-GENERAL-ELECTRIC I
5-CGEE            D-F2/08/C9              C1-HR-SAEER-TO-WA-HED21K                                      C2-HJK-CORRECTIVE-ACTION-khPORTS                                    C-LETTER-TO- K AI SE R C            0-E0/1146 _.                            ,_      __      _                        _                                                                                                                                                                                    l 5-CG8E.._        D-82/08/C5 .C-PEPO                    C1-JJ-WALD-To-E-ROLF                                          C2-CONSTRUCTION-PROCEDURES-USED-TO-ESTABLISH-GUALITV
l C1-WW-SCHWIERS-TO-WE-SMITH C2-GA-COMMUNICATIONS J
    #            4-0PS/0A/82/79                                                                                                                                                                                                                                                        1
0-GE0/87 8
            ~
)
5-CGtt            D-82/04/09 C-INSPECTION-MANAGEMENT-REPORT                                                            C1-PREPARATION-OF-$PECIAL-PROCESS-PROCEDURES I            Q-NA                                          .            _ _ _ . . _.                                                                                                                                                                                              )
s - E E N E R A L:EH ri1 C.5 -t 01F_CA ALLD ES e-74 L11L1 B__C-LLIJ E R110 EGS E__.Cl-C D-00V E L-T C-E-P AN D O R T C2-GA-PROGRAP 0-kA S-CGEE D-77/04/13''C-TITTER-i6-KAISEk' C1-WW-SCHWIERS-TU-RL-TURNER C2-SE!SMIC-CLEARANCE-CRITERIA-V10LATIONS 0-KE0/124 1-16LE D-P1/10/23 C-LETTER-To-SEL C1-HR-3AGER-T0-RJ-PRU$KI.._____C2-HJK-INITIATED-NONCONFORMANCE-REPORTS 0-SLO /400 4
                  $-CGEE       ._ .0-R2/08/30 .C-LETTER-TO-KAISER-                                       .C1-M.-ALBERTI4                            .C2-WELDER-0UALIFICATION C3-V010                      0-KE0/1174 5:CSEE            E:EZ/.09/17 t-LETTER:12:EA15ER                                        Ct:HL:5AGER:.To-WA-HEDZIK ___. 0-KE0/1198 I            5-CGtE'          D-P2/06/CB              C-LETTER-TO-KAISER                            C1-CONRRECTIVE-ACTION-REQUEST-22-36 0-KE0/1052                                                                                                                                )
5-CGEE D-81/10/C9 ~C-PEPO C1=HR-5AGER-50-RP-EHAS 'C2-DOCUMENTATION-REWIEW-ALERT-1 0-NR$/81/108 T
5-CGEE           D-82/06/C8            C-LETTER-10-KAISER                        _. (1-HR-SAGEp-To-WA-HLDZIK                                                C2-10CRF50.55E-ITEP-5-2-LARMINATION-IN-3X3X1/2-A T            NGLE-I                                                                                                                                                                                                                                                                )
S-CGEE D-21/10/06' C-LETTER-TO-NRC C1=EA-BORGPANN-TO-CE-NORELIUS (2-NRC-INSPECT 10N-REPORT-81-17
0-KgoL1057                                                                                                                                    ___ . _ . , _
)
1I            5-CG8E            0-P2/06/28~ C-LETTER-TC-KAISER - _ .C1-HR-$AGER-10-WA-HE028K                                                                                C2-WELD-PROCEDURE-0UALIFICATION-RECORDS                                        C3-V01                  )
0-C Amt_4 T
0 0-kE0/1087 iI                                                                                                                                                                                                                                                                                  )
S-CGEE..
: 5. .5 L L_D 00/Dclao C - t Ell ER:10:10 EB O N W L 8 LJ K:Ekl 50 N- C O M P.4 N Y                                      C1-NOTES-0F-MEETING _                        C2-NOV-5,-1980      C3-NOV-6.-1980 0-NA k'                                                      _ ..                            . . . . .              .
D-P1/10/C6,.C-LETTER-TC-KAISER _
I S-CGtt            D-83/01/04            C-PEPO        C1-HR-SACER-TO-HC-BRINKMAN                                                  C2-DOCUMENTAT10N-FOR-P0-2220 0-Has/23/012 e"            S-CGRE            D-P1/01/16 ~ C-RdCORD-OF-TELEPHbME-C0kVER$ATIbN-To-RCI (1-NRC-COMMONw E ALT H- AU DIT -DE F I CI E N C I E S ,-F R OC E DUR E S                                                                                            C2-00E                  )
_ C1-HR-SAGER-TO-D.-HOWARD C2-CORRECTIVE-ACT10N-REPORT-81-13
1      ,,  .--.. CUIEMI AIION PLf1CJ EN CliS:5-5 CM S DUL E-LAB.-CG RE-AUD                                                                                  .. _.
)
0-NA
0-NE0/629 T
    *                                                                                                                                                                                                                                                                                    )
D-P1/10/02 C-TETTER-Dh-KAISER C1-HR-5AGET-10-M-ALDERTIN 0-RE0/627
0-21/01/08                . ..
)
5-CGtt                        . .- C-STATUS-TRIP-REPORT                                C1-RCI-COMPANY                            0-NA e            S-CGtt            D-P3/05/13            C-PEPO         C1-HR-SAGER-10-HC-DRINKMANN                                                C2-RCI-CONTRACT                  C3-CORRESPONDENCE-HR$-23-012 C 4-C OR RE SPON                                                    s OENCE:HBS-83-214                                                                                      _ . . . _ _ _ _ _ _ . . _ _      _
S-CGFE D-81/11/30 C-LETTER-PC-KAISER C--S PPM-WE LD-P RO C E DU R E S C1-HR-SAGER-TO-DL-HOWARD 0-KE0/719 i
0-prs /R3/279
)
                  $-hRC 0-80/12/24          C-LETTER-To-CCSE            C1-JG=KEFPLER-TO-EA-PORGPANN                                                C2-RCI                    C3-REACTOR-CONTROLS-INCORPORATED          C4-STOP-WORK
5-CGEL D-R1/11/23 C-LETTER-10-KAISER C1-HR-SAGER-TO-D.-HOWARD C2-CGEE-REVIEW-OF-HJK-PROCEPURES 0-FE0/707 4
      . 8          0-NA
)
          '~'                                                                                                                          ~
5_CG5E t-P_1111/19 C-tiB-S A G E R-10-D.-it0W A Rp__C-L E T_T E RrT O-K A IS E R _
5-CGEE           D-77/03/04 C-LETTEE-10-GENERAL-ELECTRIC C 2-G E NE R AL'-E LE CT RI C5-F D-i t $-R-f D DR 'S                                                                    0-hA
C2-AUDIT-SCHEDULE 0-KE0/701 E',
  .'.I. l
S-CGEE D-F1/12/?O C--CCNDLCT-0F-INSPECTION C-LETTER-TO-KAISER C1-HR-SAGER-TO-DL-HOWARD I
                  ....... ........ ...... ... .... .....                                    .      ..,n,,,,              ,-..-o,.              ,,,-,n-,.-.                .c..        ,,-. ..,o-o,-,,,,-o...    , ,-co fir.AvinN-PRO
0-KE0/784 1f 5-CGRE D-P1/12/28 C-PEPO C1-HR-SAGER-To-BK-CULVER Ci-SIGNING-WELD-DATA-f0RMS-t-HANGER-DRAWINGS C3-NEW-HJK-P J
___._fR$0hN[(
0-HRS /81/212 5%
S-CGRE D-81/12/23 C-LETTEP-To-KAISER C1-HP-SAGER-To-D.-HOWARD-E-M.-ALPFRTIN C2-]NTEGRATED-TRAINING-PROGRAM-07-PE
,i, RSONNEL j
s 0-KE0/77
'F l
I S-CGEE D-P1/12/?3 C-PEF 0 C1-BR-SYLVIA-TO-PR-CAGER C2-CORRECPIVE-ACT10N-REPORT-REVIEW 0-BRS/81/16 5h1 W
t-rcer a-Pitt?sr4 r-effirs-Te-rastro r i-H P-g a r.r p -To -n. -pou a R D r,-AppRnyng-nf-C3P-S014C C3-RFVISION-2


                                                                                                                                                                                                                                                            'A
j DR$-OFFLINE PRINT '15 JUN 83 08:50537~ ~'
                            'DRS-OF'FLINE PRkNT '14 JUN 83'                                       hk:50:33                                                                                                          DATE 061483         PAGE   29 GRAM        C2-TASK-v              C3-RADIOGRAPHIC-CONFIRPATION-Of-PULLMAN-POWER-PRODUCTS                                                                                    C4-SHOP-WELD-RADIOGRAPHS 0-NA                                      _ _ _ _                                                      ,                      _          __
DATE 061483 PAGE 30
S-REEDY -HERetPT,-GleBONS-E-ASSOCIATES                                                                D-83/03/23                  C-LETTER-OF-CGEE                  C1-RF-REEDY-TO-EA-BORGMANN        C2-NATIONAL-80ARD-TASKS-4-t-15                  C3-PARTIAL-PIPING-SYSTEMS                                                      C4-ASCONSTRUCTED-DRAWINGS
'T Q-KEG-717 5-CGRE D-81/12/C1 C-LETTER-DC-KAk$tR
* t-01tLOO1Ln1A                                                                                                                                                                  .._
'C1=HR-55GER-TO-DL-HbWARD C2-CORRECTIVE-ACT10N-REPORT-81-1 0-24-4
J-S-REEDY.-HERBERT,-Glee 0NS-E-ASSOCIATES.._. B-82/12/06. C-LETTER-TO-CGEE                                                                                              C1-RE-PONROE-P0-EA-BORGMANN        C2-SPECIAL-TASK-ASSIGNME          I HTS
<g 5-CGRE D-flf_07 / 07 C-L ElILE_-10_K A 111R C1-HR-5ASLR-TO-E.-KVNER 0-KE0/570
    ,              0-NA
$-CGtt.
              . ___1:E E E D.r e -H E R B ERI s -G I ERDN S:1.:1510 Cl a LE t_                                            o-E2/12L2n__(-LETIER                                CJ-RE-PONROE-10-EA-30RGMANN          C2-SPECIAL-TASK-ASSIGNPENTS 0-NA l                .. . . .                  .
D-81/07/C1 C-MEPO.
                                                      . . . . . . . . _ .. . . . . . . . . _ _ _ .. . _ . . . .                                        . . . . . . . . . . .                                                                                I J
C1-HR-$AGER-10-BK-CULVER
5-CCEE                D-78/09/26 C-LETTER-TO-GENERAL-ELECTRIC                                                                    C1-WW-SCHWIERS-TO-WE-SMITH                      C2-GA-COMMUNICATIONS 0-GE0/87                                        _.
.C2-510P-WORK-ORDEs C3-EXPAN$10N-ANCHOR $
8
0-NA 5-CGtt D-F1/05/21' C-LETTER-To-K55'E'R Cl-Ji-$H5FFER-TO-R-D'ARCY C2-DOCEMENTATION-C00RDINATION
                                                                                                                                                                                                                                                              )
'I
s - E E N E R A L:EH ri1 C.5 -t 01F_CA ALLD ES                                      e-74 L11L1 B__C-LLIJ E R110 EGS E__.Cl-C D-00V E L-T C-E-P AN D O R T                                        C2-GA-PROGRAP 0-kA S-CGEE                D-77/04/13''C-TITTER-i6-KAISEk'                                                                C1-WW-SCHWIERS-TU-RL-TURNER                            C2-SE!SMIC-CLEARANCE-CRITERIA-V10LATIONS 0-KE0/124                    _ . _          _ _                  __                            _
~
1-16LE                D-P1/10/23                  C-LETTER-To-SEL                                    C1-HR-3AGER-T0-RJ-PRU$KI.._____C2-HJK-INITIATED-NONCONFORMANCE-REPORTS 4                  0-SLO /400 5-CGEE                D-81/10/C9 ~C-PEPO                                          C1=HR-5AGER-50-RP-EHAS 'C2-DOCUMENTATION-REWIEW-ALERT-1                                                      0-NR$/81/108
S 0-vE0/561 5-CGLE D-F1/05/14
                                                                                                                                                                                                                                                              )
..C-M E P0- f R O*-WD-W A YMI R E C1-CGEE-0UALITY-CONTROL-PROGRAM Q-NA 1b
T              S-CGEE                D-21/10/06' C-LETTER-TO-NRC                                                    C1=EA-BORGPANN-TO-CE-NORELIUS (2-NRC-INSPECT 10N-REPORT-81-17 0-C Amt_4 T              S-CGEE. .              D-P1/10/C6,.C-LETTER-TC-KAISER _                                                        _ C1-HR-SAGER-TO-D.-HOWARD                                  C2-CORRECTIVE-ACT10N-REPORT-81-13                            )
$-CGtt D-P1/06/C6 C-MEPO C-MEM0__
0-NE0/629 T              D-P1/10/02 C-TETTER-Dh-KAISER                                                      C1-HR-5AGET-10-M-ALDERTIN                                                0-RE0/627                                                                    )      >
. C1-W D-W ATMIR E-TO-E A-80RGM ANN 0*NA g
S-CGFE                D-81/11/30                  C-LETTER-PC-KAISER                                                C--S PPM-WE LD-P RO C E DU R E S C1-HR-SAGER-TO-DL-HOWARD                          0-KE0/719 i                                                                                                                                                                                                                                                        )
5-CGBE D_11/D4/JD C-Pero C 1-w w-itjiWJ E st$-IQ-E-G.11T IN G $
5-CGEL                D-R1/11/23                  C-LETTER-10-KAISER                                              C1-HR-SAGER-TO-D.-HOWARD                              C2-CGEE-REVIEW-OF-HJK-PROCEPURES
Q-NA 8
      , , ,        0-FE0/707 4                                                                                                                                                                                                                                                        )
5-tGEE D-31/04/27. C-PEPO C1-WW-5CHWIER$-TC-WD-WAVP!pE C2-CONSTRUCTION C3-WELDING 0-NA I
            ,      5_CG5E                t- P_1111/19                C-tiB-S A G E R-10-D.-it0W A Rp__C-L E T_T E RrT O-K A IS E R _                                                  C2-AUDIT-SCHEDULE 0-KE0/701 E',            S-CGEE                 D-F1/12/?O C--CCNDLCT-0F-INSPECTION                                                                        C-LETTER-TO-KAISER                      C1-HR-SAGER-TO-DL-HOWARD                                      I 0-KE0/784 1f            5-CGRE                D-P1/12/28                  C-PEPO                        C1-HR-SAGER-To-BK-CULVER                                                Ci-SIGNING-WELD-DATA-f0RMS-t-HANGER-DRAWINGS            C3-NEW-HJK-P        J
$-CGtt D-71/04/16.C-MEP0 C1-J.-GILH00LV-TO-R.-MAR $NALL C2-CONSTRUCTICN-$UPERVISOR$-t-WELDERS I
___._fR$0hN[(                                                                                                    _ __. _,__,,,_ __.
0-HRS /81/212
,    5%
* S-CGRE                D-81/12/23 C-LETTEP-To-KAISER                                                                C1-HP-SAGER-To-D.-HOWARD-E-M.-ALPFRTIN                              C2-]NTEGRATED-TRAINING-PROGRAM-07-PE RSONNEL
      ,i,                                                                                                                                                                                                                                                .,
j                  0-KE0/77 l
s                                                                                                                                                                                                                                                    'F I
S-CGEE                D-P1/12/?3                  C-PEF 0                        C1-BR-SYLVIA-TO-PR-CAGER                                                C2-CORRECPIVE-ACT10N-REPORT-REVIEW          0-BRS/81/16 5h1            t-rcer W
a-Pitt?sr4                  r-effirs-Te-rastro                                                r i-H P-g a r.r p -To -n . -pou a R D                  r,-AppRnyng-nf-C3P-S014C          C3-RFVISION-2
* j DR$-OFFLINE PRINT '15 JUN 83          08:50537~ ~'                                                                              DATE 061483        PAGE  30      'T Q-KEG-717 5-CGRE            D-81/12/C1      C-LETTER-DC-KAk$tR                        'C1=HR-55GER-TO-DL-HbWARD                C2-CORRECTIVE-ACT10N-REPORT-81-1 0-24-4
                                                                                                                                                                                            <g 5-CGRE            D-flf_07 / 07  C-L ElILE_-10_K A 111R                    C1-HR-5ASLR-TO-E.-KVNER 0-KE0/570
                $-CGtt.            D-81/07/C1      C-MEPO.            C1-HR-$AGER-10-BK-CULVER                          .C2-510P-WORK-ORDEs        C3-EXPAN$10N-ANCHOR $                    %
0-NA
0-NA
                                                      ~
)
5-CGtt            D-F1/05/21' C-LETTER-To-K55'E'R          S                Cl-Ji-$H5FFER-TO-R-D'ARCY              C2-DOCEMENTATION-C00RDINATION                        'I 0-vE0/561
D-F1/04/21 C-PEM0-FROP-EA-00RGPANN C1-GA-UPGRADING-PROGRAM 0-NA S-CGtt D-81/04/Ce C-LDTTER-r0-KAISER C1-WW-SCHWIER$-Tn-PS-GITTINGS C2-REVISIONS-TO-GAC-MI'S-s-SPPM*S 0-KE0/555 1 _C94L D-P1104(C2 C-LillIR-To-KAISER CQ:tA-egRGMANN,]OgPS-GITTINGS.C2-ALTERAft0NS-70-0UALITY-RECORDS 0-KEF/642 T
  #            5-CGLE            D-F1/05/14 ..C-M E P0- f R O*-WD-W A YMI R E C1-CGEE-0UALITY-CONTROL-PROGRAM                            Q-NA                                            1b g            $-CGtt            D-P1/06/C6      C-MEPO            C-MEM0__            . C1-W D-W ATMIR E-TO-E A-80RGM ANN        0*NA 5-CGBE            D_11/D4/JD C-Pero                  C 1-w w-itjiWJ E st$-IQ-E-G.11T IN G $            Q-NA 8
)
5-tGEE            D-31/04/27. C-PEPO                C1-WW-5CHWIER$-TC-WD-WAVP!pE                      C2-CONSTRUCTION    C3-WELDING  0-NA                                I I
5-CGtt D-81/09/25 C-LETTER-10-NRC" C1'-EE-PORGP5NN-10-JG.-KEPPLER 0-0A/15C9 T
                $-CGtt            D-71/04/16 .C-MEP0                C1-J.-GILH00LV-TO-R.-MAR $NALL C2-CONSTRUCTICN-$UPERVISOR$-t-WELDERS 0-NA                                                                                                                                                                          )
D-P1/09/22 ~ C-LETTER-Th-KAl$fR C=C
D-F1/04/21         C-PEM0-FROP-EA-00RGPANN C1-GA-UPGRADING-PROGRAM 0-NA S-CGtt             D-81/04/Ce     C-LDTTER-r0-KAISER                         C1-WW-SCHWIER$-Tn-PS-GITTINGS C2-REVISIONS-TO-GAC-MI'S-s-SPPM*S 0-KE0/555 1 _C94L           D-P1104(C2 C-LillIR-To-KAISER                             CQ:tA-egRGMANN ,]OgPS-GITTINGS.C2-ALTERAft0NS-70-0UALITY-RECORDS 0-KEF/642
'k1-HR-SAGER-TO-PR-PYNER C2-CAR-81-15 0-KE0/611
,  T                                                                                                                                                                                        )
)
5-CGtt             D-81/09/25     C-LETTER-10-NRC"                 C1'-EE-PORGP5NN-10-JG.-KEPPLER 0-0A/15C9 T           D-P1/09/22 ~ C-LETTER-Th-KAl$fR                       C=C
5-KAISER D-81/08/28 C-LETTEETO-CGLE C1-PR-KYNER-TO-aR-SAGER C2-CORRECTIVE-ACTION-REQUEST-81-15 C3-CAR-81-15 I,
                                                                                  'k1-HR-SAGER-TO-PR-PYNER C2-CAR-81-15                   0-KE0/611                                       )
0-KC/15748/0 lb 5-CGEE D-81/OS/24_. C-CORRECTIVE-ACTION-REPORT-81-15 0-81/15 4
5-KAISER           D-81/08/28 C-LETTEETO-CGLE                       C1-PR-KYNER-TO-aR-SAGER C2-CORRECTIVE-ACTION-REQUEST-81-15                 C3-CAR-81-15 I,           0-KC/15748/0                                                                                                                                                               lb
)
    . . ,      5-CGEE             D-81/OS/24_. C-CORRECTIVE-ACTION-REPORT-81-15                                   0-81/15 4                                                                                                                                                                                         )
1-fGit R:t1/_D?lj8 C -P Er>
        ,,      1-fGit             R:t1/_D?lj8 C -P Er>               Ct-it sWe:N 10-DIsTRIouTION ___C2-WELD-REVIEE-BY-NRC                         0-81-325 g           $-CGEE             D-81/09/C4     C1-HR-SAEER-10-PR-KVNER C2-0CP-ITEM C3-CONCERNING-NONC0hf0RMANCES 0-kEQ/602                                                               )
Ct-it sWe:N 10-DIsTRIouTION ___C2-WELD-REVIEE-BY-NRC 0-81-325 g
I               s-CGEE             D-R1/08/C5     C-LETTER-TO-KAISER                         C1-HP-SACER-TO-KYNER             C2-TRANSMITTAL-OF-DRAFT-PROCEDURES-FOR-CGLE-REVIEW
$-CGEE D-81/09/C4 C1-HR-SAEER-10-PR-KVNER C2-0CP-ITEM C3-CONCERNING-NONC0hf0RMANCES 0-kEQ/602
[ s'           0-kE0/!?8                                                                                                                                                                   )
)
I       .-                            -.                      - - - _ _                      ....__ .._..___..                . .
I s-CGEE D-R1/08/C5 C-LETTER-TO-KAISER C1-HP-SACER-TO-KYNER C2-TRANSMITTAL-OF-DRAFT-PROCEDURES-FOR-CGLE-REVIEW
l                $-CGLE           D-81/09/C0 C-NUCLEAR-OPERATIONS                           C1-ACTIVITY-REP 0pi               0-NA 1
[
l                s-CGEE'           D-71/10/C0 C-NUCLEAR-CPERATIONS                           C1-5CTIVITY-REPORT               0-NA l
s' 0-kE0/!?8
    .*          $=KAlsER           D-77/02/C2     C-LETTER-TO-AGEE                 C1-WJ-FRIEDRICH-TO-WW-SCHb!ERS                   C2-CGLE-FIELD-AUDIT-REPORT-87
)
        ,      0-KC/9061/0
I
((]           $-KAISER         D-77/C2/C2     C-LETTEE-10-CGRE                 C1-WJ-FRIECRICH-00-WW-SCHb!ERS                   C2-APPROVED-SUFPLIER-LIST
$-CGLE D-81/09/C0 C-NUCLEAR-OPERATIONS C1-ACTIVITY-REP 0pi 0-NA l
: n.        rsneers,
1 l
s-CGEE' D-71/10/C0 C-NUCLEAR-CPERATIONS C1-5CTIVITY-REPORT 0-NA l
$=KAlsER D-77/02/C2 C-LETTER-TO-AGEE C1-WJ-FRIEDRICH-TO-WW-SCHb!ERS C2-CGLE-FIELD-AUDIT-REPORT-87 0-KC/9061/0
((]
$-KAISER D-77/C2/C2 C-LETTEE-10-CGRE C1-WJ-FRIECRICH-00-WW-SCHb!ERS C2-APPROVED-SUFPLIER-LIST n.
: rsneers,


c-
c-
                  #9                                                                                                                                                                                                                                                                                                                                                     e%
# 9 e%
DR5-0FFLINE FRINT i4 JUN 83                                                                         P8:50i37                                                                                                                                 DATE 061483       P4GE   31             '
DR5-0FFLINE FRINT i4 JUN 83 P8:50i37 DATE 061483 P4GE 31 5-CGCE D-80/06/24 C-PEPO C1-E.-SCHROEDER-10-G.-KNOR C2-NX-$UPPORTS 0-NA S-CGtt..
5-CGCE                                                                     D-80/06/24 C-PEPO                                   C1-E.-SCHROEDER-10-G.-KNOR                                                           C2-NX-$UPPORTS                   0-NA C'
D-80/07/11 C-LETTER-To--AISER
S-CGtt. .                                                                   D-80/07/11                     C-LETTER-To--AISER                                           .C1-WW-SCPW1ER$-T0=EV-KN0X                                         .C2-DISP 051 TION-OF-NR-E-2708 0-KE0/435 5-CGEE                                                                     D-F0/07/17 C-LETTER-TO-KAISER                                                                   C1-WW-SCHWIER$-TO-EV-KN03                                         C2-PIPE-HANGER-INSPECTION G-FE0/439                                                                             _                            ._.                            .                          _          _
.C1-WW-SCPW1ER$-T0=EV-KN0X
i 5-CGtt                                                                       D-20/07/28                     C-MEP0             C1-WW-SCHWIERS-TC-ALL-CONCERNED                                                                       C2-PREPARATION-FOR-NRC-MEETING 0-NA                                                                                                                                                                                                                                                                                                     'I 5-CGEE                                                                     D-80/08/14                     C-PEPO               C1-WW-SCHWIER5-To-ALL-CONCERNER                                                                       C2-DE$1GN-DOCUMENT-CHANGES       0-NA
.C2-DISP 051 TION-OF-NR-E-2708 C'
                #                                                                                                                                                                                                                                                                                                                                                        I S-CGLE .                                                                     D-80/08/25                     C-MEPO               C1-WW-SCHWIERS-TO-PK-CULVER                                                         C2-WELD-R00-CONTROL-00T-OF-CONTROL                 4-NA I                                             5-CGtt                                                                   'D-80/69/C2                       C-LkTTER-To-NRC                             kt-kA-POR5PANN-TO-G.-FIOREELI C2-NOTIFICATION-00-REGION-3-0F-CERTAIN-$PECIFIED-INSPE                                                                 I 0-NA I                                                                     . .                                                                                                                                                                          .. ...                    .
0-KE0/435 5-CGEE D-F0/07/17 C-LETTER-TO-KAISER C1-WW-SCHWIER$-TO-EV-KN03 C2-PIPE-HANGER-INSPECTION G-FE0/439 i
I 5-CGEE                                                                    . D-20/09/18. . . . _ . _ . . . . . .C-LETTER-TO-KAISER. _.                               ._... ..... ._..
5-CGtt D-20/07/28 C-MEP0 C1-WW-SCHWIERS-TC-ALL-CONCERNED C2-PREPARATION-FOR-NRC-MEETING
                                                                                                                                                                                                                                                  . . _ _ . . .C1-WW-SCHWIERS-TO-PS-GITTINGS C2-NONCONFORMANCE-REPORTS 0-NEG/455                                                                                                         _        _                    _ .._.                      _
'I 0-NA 5-CGEE D-80/08/14 C-PEPO C1-WW-SCHWIER5-To-ALL-CONCERNER C2-DE$1GN-DOCUMENT-CHANGES 0-NA I
5-CGgr                                                                     e .2.0 /02 Lie C-MIMLIES .0fstiE.E.flM6                                                         ft.CDNCEFff!N6-PROJECT-TRAINING                                         .C2-SEPT-17.-1980   0-NA I                                           s-CGtt                                                                       D-20/10/31.. C-LETTER-To-KAISER                                                                 C1-WW-SCHWIER$~TO-PS-GITTING5 C2-0A-CERTIFICAT10N                                           0-KE0/469                       'l>
S-CGLE.
5-CGtt                                                                       D-80/10/C8 C-MEPO                                   C1-SC-$ WAIN-70-Wh-SCHWIERS                                                         C2-GA-DOCUMENTATION-REVIEW                   0-F0/-93 5- C.G g r                                                                   0:10/.1D/ r2 C-tEITER:IQ: KAISER                                                               C1-Wh:3CPWlERS-TO-PS-GITTINGS.C2* AUDIT-OF-HENRY-e.-KA15ER 0-CE0/463 T                                                                                                                                                                               _._ . _ - . . . .. _. .. . . . . .                                                                                                                                        I 5-CGEE                                                                       D-80/10/13 _ . .. . C-PEP    .. . . _ 0              C1-SC-SWAIN-10-R-PAR $ HALL                                                   ..C2-INX-$UPPORT-DDC"5                      0-80/198 D-r0/itici C-PPil
D-80/08/25 C-MEPO C1-WW-SCHWIERS-TO-PK-CULVER C2-WELD-R00-CONTROL-00T-OF-CONTROL 4-NA I
                                                                                                                                                                                                                        ~
5-CGtt
7                                            s-CGli                                                                                                                      ~ C-men 0                                       Ci-eK-CutvfR-TO-EA-00RGMANN                                       C2-TRIP-REPORT     C4-suseuMANNA-STEAM-ELECTRIC-s           )
'D-80/69/C2 C-LkTTER-To-NRC kt-kA-POR5PANN-TO-G.-FIOREELI C2-NOTIFICATION-00-REGION-3-0F-CERTAIN-$PECIFIED-INSPE I
                                    .. _ _TA.TIOA                                                                                                                                                                                                                           _
0-NA I
0-kA 5-CG8E                                                                     D-P0/11/14                     C-LETTER-TO-KA'SER           I                                  C1-LETTER-NC-15005-G                                     C2-CGRE-GA-AUDIT-308       0-KE0/485 i' '                                           S-CGEE                                                                     D-PC/12/18 k-Lk1TER-TO-KAISER                                                                   C1-EA-DORGAMNN-TO-PS-GITTINGS C2-MANAGEMENT-AUDIT-MA-90-2                                                                       )
. D-20/09/18.... _. _......C-LETTER-TO-KAISER.._..... _..
                          ,,, _. JL-J E RLi23                                                                                                                                                                                                                                               _ . _ . .
_....... _ _...C1-WW-SCHWIERS-TO-PS-GITTINGS C2-NONCONFORMANCE-REPORTS 5-CGEE I
d'                                             5-CGtt                                                                     D-80/11/18. C-PEPO                                   (1-RP-EHAS-10-WW-SCHWIERS                                                         0-NA                                                                                     3 S-CGtt                                                                     D-20/11/21                     C-LE TT E R-TO-K AISER                                         C1-Wh-SCPWIERS-TO-PS-GITTINGS C2-$fSTEP-TURNOVER-MATRIK d'.                                          0-KE0/492                                                                                                                                                                                                                                                                                                   A S-MA15ER                                                                   D-P2/04/26                     C-PEPO             C1-WA-HEDZIK-TO-DL-HOWARD                                                             (2-LEAD-AUDITCR-CERTIFICATION C3-WP-FR112 d'.                                           0-NA                                                                                                                                                                                                                                                                                                       h
0-NEG/455 5-CGgr e.2.0 /02 Lie C-MIMLIES.0fstiE.E.flM6 ft.CDNCEFff!N6-PROJECT-TRAINING
                                                                $-FAISER                                                                   D-82/08/09                     C-PEPO               C1-M-GRIP-TO-GA-MEDZlK                                                   C2-GA-RAPORT-AUDIT-REPORT-405 C3-HOWARD-C.-CHANDON ol                                            0-WA                                                                                                                                                                                                                                                                                                     #p S-KAISER                                                                   D-P1/09/10 C-LETTER                                 C 1 -DW-D0 h A S- TO-G .'-N'h bH CL 50N                                             C2-VE ND08-SURVE T-R E POR T C 3-CIN CINN AT I-V ALV E-t-F IT T ING-CO.
.C2-SEPT-17.-1980 0-NA I
((3                                                   0-rt/5687/0                                                                                                                                                                                                                                                                                               fp
s-CGtt D-20/10/31.. C-LETTER-To-KAISER C1-WW-SCHWIER$~TO-PS-GITTING5 C2-0A-CERTIFICAT10N 0-KE0/469
'l>
5-CGtt D-80/10/C8 C-MEPO C1-SC-$ WAIN-70-Wh-SCHWIERS C2-GA-DOCUMENTATION-REVIEW 0-F0/-93 5-C.G g r 0:10/.1D/ r2 C-tEITER:IQ: KAISER C1-Wh:3CPWlERS-TO-PS-GITTINGS.C2* AUDIT-OF-HENRY-e.-KA15ER 0-CE0/463 T
_.... C-PEP 0
..C2-INX-$UPPORT-DDC"5 0-80/198 I
5-CGEE D-80/10/13.... _
C1-SC-SWAIN-10-R-PAR $ HALL 7
s-CGli D-r0/itici C-PPil
~ C-men 0 Ci-eK-CutvfR-TO-EA-00RGMANN C2-TRIP-REPORT C4-suseuMANNA-STEAM-ELECTRIC-s
)
~
.. _ _TA.TIOA 0-kA 5-CG8E D-P0/11/14 C-LETTER-TO-KA'SER C1-LETTER-NC-15005-G C2-CGRE-GA-AUDIT-308 0-KE0/485 I
i' '
S-CGEE D-PC/12/18 k-Lk1TER-TO-KAISER C1-EA-DORGAMNN-TO-PS-GITTINGS C2-MANAGEMENT-AUDIT-MA-90-2
)
,,, _. JL-J E RLi23 d'
5-CGtt D-80/11/18. C-PEPO (1-RP-EHAS-10-WW-SCHWIERS 0-NA 3
d'.
S-CGtt D-20/11/21 C-LE TT E R-TO-K AISER C1-Wh-SCPWIERS-TO-PS-GITTINGS C2-$fSTEP-TURNOVER-MATRIK 0-KE0/492 A
S-MA15ER D-P2/04/26 C-PEPO C1-WA-HEDZIK-TO-DL-HOWARD (2-LEAD-AUDITCR-CERTIFICATION C3-WP-FR112 d'.
0-NA h
$-FAISER D-82/08/09 C-PEPO C1-M-GRIP-TO-GA-MEDZlK C2-GA-RAPORT-AUDIT-REPORT-405 C3-HOWARD-C.-CHANDON l
o 0-WA
#p S-KAISER D-P1/09/10 C-LETTER C 1 -DW-D0 h A S-TO-G.'-N'h bH CL 50N C2-VE ND08-SURVE T-R E POR T C 3-CIN CINN AT I-V ALV E-t-F IT T ING-CO.
((3 0-rt/5687/0 fp


a.
a.
DRS-OFFLINE PRINT 14 JUN 83                   C8:55:37'                                                                                             DATE 061483         PAGE     32       '
DRS-OFFLINE PRINT 14 JUN 83 C8:55:37' DATE 061483 PAGE 32 5-KAISER D-82/10/11 C-IIPMER-PROCEDURES-PANUAL Cl-ZPM C2-SECTi5-IV-E C3-REV-1 C4-VENDOR-URVEY 0*A$P/3 5-KA15ER D-82/01/27 C-IIPMAR-PROCEDURES-PANUAL.
5-KAISER           D-82/10/11           C-IIPMER-PROCEDURES-PANUAL                             Cl-ZPM           C2-SECTi5-IV-E               C3-REV-1     C4-VENDOR-URVEY 0*A$P/3                         . _.___.                                . _ _ . _ _ _ .
;C1-ZPM C2-5ECTIO-IV-C C3-REF-0 C4-VENDOR-$URVEY 0-ASP /3
5-KA15ER           D-82/01/27 C-IIPMAR-PROCEDURES-PANUAL.                                     ;C1-ZPM           C2-5ECTIO-IV-C               C3-REF-0     C4-VENDOR-$URVEY 0-ASP /3                                                                                                                                                                                           #%
$-KAISER D-P2/C1/22 C-FINAL-REVIEW C-!!MMER--ROJECT-MANUAL C2-REV-0 ti-5ENiOR-SURVEY 0-ASP /3
                  $-KAISER           D-P2/C1/22           C-FINAL-REVIEW                 C-!!MMER--ROJECT-MANUAL C2-REV-0                               ti-5ENiOR-SURVEY     0-ASP /3
$~EA!5ER D-F2/b8/05 C-HJN-0A-DhPARTMAND C1-IDENThFICATION-OF-A-POTEKTIALLV-AEPORTABLE-CONDITIO C2-WP-FRITI C3-AUD IT-435 0-ha 4
                  $~EA!5ER           D-F2/b8/05 C-HJN-0A-DhPARTMAND                                       C1-IDENThFICATION-OF-A-POTEKTIALLV-AEPORTABLE-CONDITIO                           C2-WP-FRITI C3-AUD IT-435 0-ha                                                                                                                                                                                                 4 l
l 5-TPT D-83/06/03 C-TELEPHONA-CCPMUNICATION-RECORD C1-JE-CHAFET-L-TR-COLANDREA-TO-AJ-MATT C2-TRACEBILITY-REQUIREMENTS-F0 0-NA R-hALD-FILLER-PATERIAL C3-STRUCTURAL-STEEL _ _ _
5-TPT D-83/06/03 C-TELEPHONA-CCPMUNICATION-RECORD                                               C1-JE-CHAFET-L-TR-COLANDREA-TO-AJ-MATT                       C2-TRACEBILITY-REQUIREMENTS-F0 R-hALD-FILLER-PATERIAL C3-STRUCTURAL-STEEL _ _ _                                                  _
I S-CGEE D-21/06/19' C-J.-NdRRIS-TO-P.-K'NER' C-PEPO' C2-ASME-DEPV-CODE-SECTION-3 C3-DIV1$10N-I-VB-4122 C4-ATDACHMEN Y
0-NA I               S-CGEE             D-21/06/19' C-J.-NdRRIS-TO-P.-K'NER'                             C-PEPO' Y                          C2-ASME-DEPV-CODE-SECTION-3                   C3-DIV1$10N-I-VB-4122     C4-ATDACHMEN         %
.I *_A l 8 0-hA 5-SEL' D-81/09/2I ~ C-EE TiEE-10-CGEE
                  .I *_A l 8                                                                                                                   . _ .
'C1-ii-MCKEENA-TO-B.R.-Si'VIA C2-00ALITT-CohFIRMATION-PROGRAM C3= HEAT-NUP9ER-TRACEADIL L
0-hA 5-SEL' D-81/09/2I ~ C-EE TiEE-10-CGEE                     'C1-ii-MCKEENA-TO-B.R.-Si'VIA               L          C2-00ALITT-CohFIRMATION-PROGRAM                   C3= HEAT-NUP9ER-TRACEADIL ITY     C4-ATTACHMENT-470 4               0-5LC/20000                                                                                                                                                                                           )
ITY C4-ATTACHMENT-470 4
S-CGEE             D-P1/09/17 C-LETTER-TO-SEL                           C1-HR-SAGEP-TO-RF-SCHEIFEL                               ~N C2-I''DEhiiFICATION-C-CONTROL      C3-OF-MATERIAL,-PARTS-E-T               COPPONENTS 0-sLQ/393 C4-HEAT-NUPOER-TRACEABILITY,                                                                                                                                                       )
0-5LC/20000
T               5-CGEE             D-78/05/09 C-R.-TURkiR-T6-DISTRIsui!ON                                       C-PEMO           C-PEMO               C2-TRACEABILITY-FOR-NX-$EISMIC-ANCHOR-HANGER-SPL             )
)
I L-5 L E                                                                                                             _ _ _ . .          .
C2-I''DEhiiFICATION-C-CONTROL C3-OF-MATERIAL,-PARTS-E-
0-NA i $                    ..   . .            . .            . .. .        . -       . . . _ . . . . .                      .  .    .
~ N S-CGEE D-P1/09/17 C-LETTER-TO-SEL C1-HR-SAGEP-TO-RF-SCHEIFEL T
I 5-CINCINNATI-POST D-e2/06/19                     C-NEWSPAPER-ARTICLE-ON-ZIMMER.. C1-CINCINNATI-POST                                            C2-ATTACHMENT-205 C3-GAP 0-NA
COPPONENTS C4-HEAT-NUPOER-TRACEABILITY,
          .___3-EAl$tR               D *jl09ff2 C-wogg:1RprR
)
                                                                                                                                                                                                                        )
0-sLQ/393 T
(1 MEMQ_               C2-PAT-ADKINS-TO-HARLAN-5AGER C3-DOCUMENTATION C4-ATTACHMENT-203 C5-GAP h,             0-NA                                                                                                                                                                                                ')
5-CGEE D-78/05/09 C-R.-TURkiR-T6-DISTRIsui!ON C-PEMO C-PEMO C2-TRACEABILITY-FOR-NX-$EISMIC-ANCHOR-HANGER-SPL
      ,,          5-CGEE            D-00/CO/C0_ C-LIST-CF-LETTERS-E-PEMOS                                        C1-ATTACHMENT-179 L2-GAP                      0-NA
)
  =
I L-5 L E 0-NA i
lb
.. C1-CINCINNATI-POST C2-ATTACHMENT-205 C3-GAP 5-CINCINNATI-POST D-e2/06/19 C-NEWSPAPER-ARTICLE-ON-ZIMMER I
      ,  . ._ _$2 LIM] N N A_LI -f_0_$,J._Q -(DLQQlj Q_,,,(- k E W 3 P A P_( R - A R T j (L E S -O N- Z IMM E R_ _ _ _,., C 1 .A T T A C H M E N T - 19 8 C 2-G A P          0-N4                                .
0-NA
9              $* CINCINNATI-LNCUIRER.                  D-82/06/12 C-NEWSPAPER-ARTICLE                                C1-CINCINNATI-ENQUIRER                  C2-EARL-DORGMANN    C3-ATTACHMEhT-197 C4-GAP          )
)
.___3-EAl$tR D *jl09ff2 C-wogg:1RprR (1 MEMQ_
C2-PAT-ADKINS-TO-HARLAN-5AGER C3-DOCUMENTATION C4-ATTACHMENT-203 C5-GAP h,
0-NA
0-NA
  %                                                                                                                                                                                                                    e l
')
        , .__-_$ -iG E E             4P2 LC6(J2           C-T R !N3(S I PT-0 F-se(( C.H.-D] .E A-00RGM ANN .                       C 1 -D E L IVE R E D-J UNE-?2,- 19 3 2   C2-ATTACHMENT-1950         C3-GAP l
5-CGEE D-00/CO/C0_ C-LIST-CF-LETTERS-E-PEMOS C1-ATTACHMENT-179 L2-GAP 0-NA lb
q'             0-hA                                                                                                                                                                                                 ,
=
5-CINCINNATI-ENQUIRER                   D-F2/06/C9 C-NEWSPAFER-ARTICLE                               C1-ATTACHMENT-195A                     C2-CINCINATTI-ENQUIRER     C3-CAP
.._ _$2 LIM] N N A_LI -f_0_$,J._Q -(DLQQlj Q_,,,(- k E W 3 P A P_( R - A R T j (L E S -O N-Z IMM E R_ _ _ _,., C 1.A T T A C H M E N T - 19 8 C 2-G A P 0-N4 9
  .?             0-t: A S-ALDERSON-REPORTING-COMPANY D=22/06/16 C-COMMISSICN-MFETING                                                     C1-ATTACHMENT-193 (2-GAP                 0-NA
$* CINCINNATI-LNCUIRER.
b)             t-por p-21/11/1D             r=stre             r1-Pa-rapprTT-TO-DF-WADMffr                           r 7- Al t rr. A f t e Nt-D F f F 1 U F D-Nov-4.- 19 81 (1-ATTArHPTNT-1P3 C4-GAP
D-82/06/12 C-NEWSPAPER-ARTICLE C1-CINCINNATI-ENQUIRER C2-EARL-DORGMANN C3-ATTACHMEhT-197 C4-GAP
)
0-NA l
e
,.__-_$ -iG E E 4P2 LC6(J2 C-T R !N3(S I PT-0 F-se(( C.H.-D].E A-00RGM ANN.
C 1 -D E L IVE R E D-J UNE-?2,- 19 3 2 C2-ATTACHMENT-1950 C3-GAP l
q' 0-hA 5-CINCINNATI-ENQUIRER D-F2/06/C9 C-NEWSPAFER-ARTICLE C1-ATTACHMENT-195A C2-CINCINATTI-ENQUIRER C3-CAP
.?
0-t: A S-ALDERSON-REPORTING-COMPANY D=22/06/16 C-COMMISSICN-MFETING C1-ATTACHMENT-193 (2-GAP 0-NA b) t-por p-21/11/1D r=stre r1-Pa-rapprTT-TO-DF-WADMffr r 7-Al t rr. A f t e Nt-D F f F 1 U F D-Nov-4.- 19 81 (1-ATTArHPTNT-1P3 C4-GAP


s
s e
                                                                                                                                                                                                                                    . e ,
i
i
                                                                                                                                                                                                                                                'e s                                                                                                                                                                                                                                   .s DRS-OFFLINL PRINT 14 JUN 83                           C8:50:3f                                                                                                         DATE 061483             PAGE     33       'T 0-NA
'e s
                                                                                                                                                                                                                                            'l D-P2/06/?5.C-MEPO      _. . .
.s DRS-OFFLINL PRINT 14 JUN 83 C8:50:3f DATE 061483 PAGE 33
5-CGtt                                                        C1-KK-CHERIAk-TO-WA-NEDIIK                                 _.C2-ALLEGED-VIOLATION-OF-PROJECT-RULES                             C3-C0hCERNING-WORK ING-HOUR $           (4-ATTACHMENT-180 C5-GAP                   _.
'T 0-NA
0-hA
'l 5-CGtt D-P2/06/?5. _...
                                                                                                                                                                    ~~
C1-KK-CHERIAk-TO-WA-NEDIIK
5-E0VE RNMENT-AC COUNT ABILIT Y-PR OJECT D-82/07/23 C-LETTER                                                       C1-TH04AS-D[V5NE-TO-PORRIs-UDALL                         C2-ATTACHMENT-176 C3-GAP C-NA                                                                                                                                                                                                                         i 5-ARPSTRONG-t-OKET                         D-00/00/C0 C-PUBLIC-UTILITIES-COPMISSION-OF-OHIO                                                           C1-DESP05tTION-0F-EAPL-90RGMANN               C2-ATTACHMEN T-178 C3-GAP                                                                                                                                                                                                             'I G-L1 f.t018iLL L&1 R                                                                                                   _ . . .          . . - _ . .
_.C2-ALLEGED-VIOLATION-OF-PROJECT-RULES C3-C0hCERNING-WORK C-MEPO ING-HOUR $
                  $-CGtt             . 0-00/00/C0 . C- A F FID AVIT C1-ATT AC HPENT-177 C2-THOMAS-W.-APPLEG ATE                                                       C3-GAP       0-NA                                                     1
(4-ATTACHMENT-180 C5-GAP 0-hA 5-E0VE RNMENT-AC COUNT ABILIT Y-PR OJECT D-82/07/23 C-LETTER C1-TH04AS-D[V5NE-TO-PORRIs-UDALL C2-ATTACHMENT-176 C3-GAP
*  #              5-NRC D-82/05/2F. C-NRC-INVESTIGATON-DOUSING-INCIDENT-AT-ZIMMER                                                           C1-NEW5-ANNOUNCEMENT-82-54                     C2-ATTACHMENT-175 C3-GAP e-22/54 5-CGRE               D-81/07/C8 C-PHILLIP-GITTINGS                                 C1-INTERVIEW                         C2- A T T A CHME N'i-if           C3-GAP       G-NA D-80/ 4/ti
~~
                                                                                                                    ~
C-NA i
S-CGEE                                    C-ME'PO           'Ci-WW-SCEUIERS-TO-DK-CULVER                                   C2-NES-NDE-EXAMINATION C3-ATTACHMENT-173 C4-GAP G*NA g
5-ARPSTRONG-t-OKET D-00/00/C0 C-PUBLIC-UTILITIES-COPMISSION-OF-OHIO C1-DESP05tTION-0F-EAPL-90RGMANN C2-ATTACHMEN T-178 C3-GAP
                                                                                                                                                                                                                                              )
'I G-L1 f.t018iLL L&1 R
E-(GRE               D-10/C4/03         C-PEPO             C1-CURRLhi-STATyj-Q1-N[$-RJ _ WORK ____C2-T.-PALLON-t-R.-BAKER-10-E.-eAUMGARTEN                                                       C3-ATTACHMEN T-172 C4-GAP I             Q-NA                                                                                                                                                                                                                       )
$-CGtt
5-PEAe0DY-TESTING D-78/08/29 C-LETTER                                         C1-AE-KESSINGER-t-$-BIMMING-TO-WHOM-IT-MAY-CONCERh                                           C2-RADIATION-ROFIS             C3-ATT I             ACHMENT-171 C4-GAP                                                                                                                                                                                                         I 0-NA T'           S-CGRE                 D-00/00/C0_ C- R E N- E .-B A K E R . _.C1-INTERVIEW                                         C2-ATTACHMENT-170 C3-GAP                         Q-NA                                                   )
. 0-00/00/C0. C-A F FID AVIT C1-ATT AC HPENT-177 C2-THOMAS-W.-APPLEG ATE C3-GAP 0-NA 1
5-CGtt                 D-75/07/21 C-LETTER-To-KAISER                                 _C1-E C-PANDOR F-10-WJ-CR IE DRICH C 2-G A CMI-M R .1                               C3-GENERAL-ELECTRIC-FDI-t-FDDR 1I
5-NRC D-82/05/2F. C-NRC-INVESTIGATON-DOUSING-INCIDENT-AT-ZIMMER C1-NEW5-ANNOUNCEMENT-82-54 C2-ATTACHMENT-175 C3-GAP e-22/54 5-CGRE D-81/07/C8 C-PHILLIP-GITTINGS C1-INTERVIEW C2-A T T A CHME N'i-if C3-GAP G-NA S-CGEE D-80/ 4/ti C-ME'PO
___c-EEoLip C4-ATTACHMENT-167 C5-GAP                                                                                                                                                                                       )
'Ci-WW-SCEUIERS-TO-DK-CULVER C2-NES-NDE-EXAMINATION C3-ATTACHMENT-173 C4-GAP
I', .         5-CGLE                 D-74/10/11 C-LETTER-10-KAISER                                 C1-EA-DORGPANN-TO-DR-MC$PARRIN                                           C2-FIELD-DISPOSTION-INSTRUCTIONS             C3-FIE           I LD-DEVIATION-DISPOSITION-REQUESTS                             C4-FDI                 C5-FDDR                       C6-ATTACHMENT-166 C7-GAP o-KEo/6
~
      , ,. .___4 - f G t t             D-Z1tQELc4         C-L gli tp.-T.0- EA I S tP                 C.1-A.E-ROTHENBEPG TO-DR-MC5PARRIN                                       C2-CONSTRUCTION-C00DINATING-MEETING C3-ATT ACHMENT-164 C4-GAP I             0-NA                                                                                                                                                                                                                       h 5-CGRE               D-77/12/19         C-PEPO             C1-R-TURNER-10-B-MAR $ HALL                                 C2-PRESSURE-TESTING-0F-CLASS-A -P,-C                             C3-PIPING     C4-ATT d'             #CNMENT-163 C5-GAF P
G*NA g
0-HA dk           S-CGRE                 D-79/12/11 C-ME"O                     C1-DC-KRAMER-&-CA-DUPGES$-TO-hW-SCHWIERS                                                 C 2-COMME N T S-T O-HJ K-SU D IT-4 0 7 C3-MECHANICAL-PORT         'M ION     C4-ATTACHMENT-16? C5-GPP 0-kA EI                                                                                                                                                                                                                                     #p 3
)
        ,        1-shtE                 D-?8 /04 / ?O__ C-L E TT E R-J 0-K A j $ E R                 (1-WW-$CHWIERS-TO-R-MARSHALL                                     C2-NONCONFOR"ANCE-REPORTS             C3-ATTACHMENT-161 C4-GAP
E-(GRE D-10/C4/03 C-PEPO C1-CURRLhi-STATyj-Q1-N[$-RJ _ WORK ____C2-T.-PALLON-t-R.-BAKER-10-E.-eAUMGARTEN C3-ATTACHMEN T-172 C4-GAP I
[h3           0-KEc/205                                                                                                                                                                                                               #st
Q-NA
)
5-PEAe0DY-TESTING D-78/08/29 C-LETTER C1-AE-KESSINGER-t-$-BIMMING-TO-WHOM-IT-MAY-CONCERh C2-RADIATION-ROFIS C3-ATT I
ACHMENT-171 C4-GAP I
0-NA T'
S-CGRE D-00/00/C0_ C-R E N-E.-B A K E R. _.C1-INTERVIEW C2-ATTACHMENT-170 C3-GAP Q-NA
)
5-CGtt D-75/07/21 C-LETTER-To-KAISER
_C1-E C-PANDOR F-10-WJ-CR IE DRICH C 2-G A CMI-M R.1 C3-GENERAL-ELECTRIC-FDI-t-FDDR 1I C4-ATTACHMENT-167 C5-GAP
)
___c-EEoLip I',.
5-CGLE D-74/10/11 C-LETTER-10-KAISER C1-EA-DORGPANN-TO-DR-MC$PARRIN C2-FIELD-DISPOSTION-INSTRUCTIONS C3-FIE I
LD-DEVIATION-DISPOSITION-REQUESTS C4-FDI C5-FDDR C6-ATTACHMENT-166 C7-GAP o-KEo/6
,,..___4 - f G t t D-Z1tQELc4 C-L gli tp.-T.0- EA I S tP C.1-A.E-ROTHENBEPG TO-DR-MC5PARRIN C2-CONSTRUCTION-C00DINATING-MEETING C3-ATT ACHMENT-164 C4-GAP I
0-NA h
5-CGRE D-77/12/19 C-PEPO C1-R-TURNER-10-B-MAR $ HALL C2-PRESSURE-TESTING-0F-CLASS-A
-P,-C C3-PIPING C4-ATT d'
#CNMENT-163 C5-GAF P
0-HA dk S-CGRE D-79/12/11 C-ME"O C1-DC-KRAMER-&-CA-DUPGES$-TO-hW-SCHWIERS C 2-COMME N T S-T O-HJ K-SU D IT-4 0 7 C3-MECHANICAL-PORT
'M ION C4-ATTACHMENT-16? C5-GPP 0-kA EI
#p 3
1-shtE D-?8 /04 / ?O__ C-L E TT E R-J 0-K A j $ E R (1-WW-$CHWIERS-TO-R-MARSHALL C2-NONCONFOR"ANCE-REPORTS C3-ATTACHMENT-161 C4-GAP
[h3 0-KEc/205
#st


                                                                                                                                                                                                          -      -  4     4
4 4
      *s                                                                                                                                                                                                                   r%
*s r%
      ''                                                                                                                                                                                                                  'T DRS-OFfLINE PRINT 14 JUN 83                       P8:50:37'                                                                                           DATE 061483         PAGE     34 S-CGEE         D-76/10/18       C-L E TT E R-TC-K A IS E R                         C1-WW-SCHWIERS-TO-WJ-FRIEDRICH                         C2-NONCONF0lPANCE-REPORTS         C3-ATTACHMEN T-160 C4-GAP                                 .
DRS-OFfLINE PRINT 14 JUN 83 P8:50:37' DATE 061483 PAGE 34
                                                                                                                                                                                                                          'T 0-kA S-CG8E         D-81/01/14       C-PEPO                   CIAWW-SCHWIERS-iC-PS-GITTINGS C2-GA-AUDIT-SURVIILLAhCE-REPORT-340 C3-ATTACHMENT-159 C4-GAP                                                 '%
'T S-CGEE D-76/10/18 C-L E TT E R-TC-K A IS E R C1-WW-SCHWIERS-TO-WJ-FRIEDRICH C2-NONCONF0lPANCE-REPORTS C3-ATTACHMEN T-160 C4-GAP
0-NA i                 5-RAISER       D-PU/07/C9 C-NONCONFORMANCE-kEPbph Ci-PIPE-5UPPORi~ Ch-AiidCHMENT-158A                                                             C3-CAP       G-NA C'
'T 0-kA S-CG8E D-81/01/14 C-PEPO CIAWW-SCHWIERS-iC-PS-GITTINGS C2-GA-AUDIT-SURVIILLAhCE-REPORT-340 C3-ATTACHMENT-159 C4-GAP 0-NA i
S-KAISiR        D-h0/C7/C9 ~ CENONC0hf0RMANCE-REP'Ri                         C          Ci-PIPE-5UPP0ii             C2-ATkkCHMENT-1588             C3-GAP       0-NA                                 'l S-BAISER       D-P0/07/22 C-NONC0hf0RMANCE-REPORT C1-ATTACHMENT-15FC                                                         C2-GAP     ' G-kE' S-KAISER       b'-f dIO7/22 ' I-EbNC0hh0hMhNC E-R EPORk (1- ATidCHMENi-15R5                                                 C2-GAP         G-NA I             S-RAISER       D-PC/07/22' E-hhhC0hf0RMANCE-5EPCRT C1-AITACHMENi-15PE                                                       C2-GAP         0-NA                                                       )
5-RAISER D-PU/07/C9 C-NONCONFORMANCE-kEPbph Ci-PIPE-5UPPORi~ Ch-AiidCHMENT-158A C3-CAP G-NA C NONC0hf0RMANCE-REP'Ri Ci-PIPE-5UPP0ii C2-ATkkCHMENT-1588 C3-GAP 0-NA
5-FAISER       D-P0/07/22 C-NONCChf0RMANCE-REPORT C1-ATTACHMENT-15F#                                                         C2-GEP'       '0-NA
'l S-KAISiR D-h0/C7/C9 ~
                                                        ~
E C
S-KAISER'       D-RbIC7/22 C-NbNCb570RMhNCE-REPCRT C5-hii5CHMEN -i5PG                                                         C2-GAP         0-NA
C' S-BAISER D-P0/07/22 C-NONC0hf0RMANCE-REPORT C1-ATTACHMENT-15FC C2-GAP
                                        ^                              '
' G-kE' S-KAISER b'-f dIO7/22 ' I-EbNC0hh0hMhNC E-R EPORk (1-ATidCHMENi-15R5 C2-GAP G-NA I
I             k-CGEE         D-bdibbhC0       C-L bC'-b f-ONCON Fb RM kN G-P ATE R k AL-R EPOR TS                               C1-ATTACHMENT-157 C2-GAP             0-NA S-CGCE         D-73/07/10 C-LETTER-TO-KAISER                                       C1-AF-ROTHENPERG-TO-DRI~i'SPE          M     EiN      C2-NbNCONFORMANCE-REPORT-E-61 C3-ATTACHMEN I             T-156 C4-GAP                   ,
S-RAISER D-PC/07/22' E-hhhC0hf0RMANCE-5EPCRT C1-AITACHMENi-15PE C2-GAP 0-NA
0-hA T              S-KAISER        D-79/10/C5      C-COR'ECTIVE-ACTION-RE0'UNSTS' R                                                C1-MEMO         C2-RE-TURNER-TO-ALL-GA-0C-PERSONNEL C3-ATTACHMENT-1526                             3 C4-GAP 0-N4 T                     -                . _          . . . . . .      . . . . . . . _ .            ... .. . . . .          .
)
I S-CGEE          .D-79/02/16     r-LETTER-TC-KAISER                                 C1-WW-SCHWIERS-TO-RL-TURNER                     C2-INSPECTION-REQUIREMENTS         C3-ATTACHMENT-152F C4-GAP f             0-rE0/267                                                                                                                                                                                               )
5-FAISER D-P0/07/22 C-NONCChf0RMANCE-REPORT C1-ATTACHMENT-15F#
        ,          S-KAISER       D-82/05/24       C-HJK-AhALYSIS-REPORT                             C1-ATTACHMENT-152 C2-GAP                       0-NA 4l                             . .        . _.                    .                  ..  .. .                                                                                                                    I S-KAISER       D-P2/05/28 C-HJK-CCESTRUCTION-80LLETIN                                               C1=N0-14      C2-ATTACHMENT-151 C3-GAP              0-14 i             S-CGEE         D-79/08/2i       C-LETTER-10-KAISER                                 C1-WW-UCHWIERS-TO-RE-TURNER                     C 2-OPEN-NONCONFO RM ANC E-R EPORTS       C3-ATTACHMEN             I o,.___T-15Q_C4: Gap                                                                                                           ___.      .
C2-GEP'
0-KE0/311 dI,                                                                                                                                                                                                                   )
'0-NA S-KAISER' D-RbIC7/22 C-NbNCb570RMhNCE-REPCRT C5-hii5CHMEN -i5PG C2-GAP 0-NA
S-CGEE         D-74/01/29 C-LEfiEA-TC-KAISER                                       C1-AE-ROTHENPERG-TO-DR-MCSPARRIN                       C2-NONCONFORPANCE-REPORTS         C3-ATTACHPEN T-149 C4-GAP 9d             0-0A/368                                                                                                                                                                                               e i       .
~
S-CGfE         D-77IOi/17 C-LETTER-To-KAk[ER                                       (1-W5-hCWWiEhSliU-1J-hRIEDR5CH                         C2-STUD-IDENTIFICATION C3-ATTACHPENT-148 j
I k-CGEE D-bdibbhC0 C-L bC'-b f-ONCON Fb RM kN G-P ATE R k AL-R EPOR TS C1-ATTACHMENT-157 C2-GAP 0-NA
g'             C4-GAP                                                                                                                                                                                                 e l
^
0-kE0/93 l
I~i'SPE EiN C2-NbNCONFORMANCE-REPORT-E-61 C3-ATTACHMEN S-CGCE D-73/07/10 C-LETTER-TO-KAISER C1-AF-ROTHENPERG-TO-DR M I
e'           S-CGEE         D-77/04/13       C-LE TTER-TC-K AIS ER                             C1-WW-SCHWILRS-10-RE-TURNER                     C2-SEISMIC-CLEARANCE-CRITERIA-V10LATIONS         C3-ATT
T-156 C4-GAP 0-hA C-COR'ECTIVE-ACTION-RE0'UNSTS' C1-MEMO C2-RE-TURNER-TO-ALL-GA-0C-PERSONNEL C3-ATTACHMENT-1526 3
              ,    PCPMEht:J41_C4: GAP _                                                                   _....___                _ .
T S-KAISER D-79/10/C5 R
l 0-rE0/124 ILJ             e crec         . vese,ere       c..r,,re-va.                   ..ero               ri es ern ,ree-ve-ue-roernovru                         r>-nrevem-anrnwret-ruauret       (1-NONf0NFOR
C4-GAP 0-N4 T
.D-79/02/16 r-LETTER-TC-KAISER C1-WW-SCHWIERS-TO-RL-TURNER C2-INSPECTION-REQUIREMENTS C3-ATTACHMENT-152F S-CGEE I
C4-GAP f
0-rE0/267
)
S-KAISER D-82/05/24 C-HJK-AhALYSIS-REPORT C1-ATTACHMENT-152 C2-GAP 0-NA I
4l C1=N0-14 C2-ATTACHMENT-151 C3-GAP 0-14 S-KAISER D-P2/05/28 C-HJK-CCESTRUCTION-80LLETIN i
S-CGEE D-79/08/2i C-LETTER-10-KAISER C1-WW-UCHWIERS-TO-RE-TURNER C 2-OPEN-NONCONFO RM ANC E-R EPORTS C3-ATTACHMEN I
o,.___T-15Q_C4: Gap 0-KE0/311 dI,
)
S-CGEE D-74/01/29 C-LEfiEA-TC-KAISER C1-AE-ROTHENPERG-TO-DR-MCSPARRIN C2-NONCONFORPANCE-REPORTS C3-ATTACHPEN T-149 C4-GAP 9d 0-0A/368 e
i S-CGfE D-77IOi/17 C-LETTER-To-KAk[ER (1-W5-hCWWiEhSliU-1J-hRIEDR5CH C2-STUD-IDENTIFICATION C3-ATTACHPENT-148 j
g' C4-GAP e
l 0-kE0/93 l
e' S-CGEE D-77/04/13 C-LE TTER-TC-K AIS ER C1-WW-SCHWILRS-10-RE-TURNER C2-SEISMIC-CLEARANCE-CRITERIA-V10LATIONS C3-ATT PCPMEht:J41_C4: GAP _
l 0-rE0/124 ILJ e crec
. vese,ere c..r,,re-va.
..ero ri es ern,ree-ve-ue-roernovru r>-nrevem-anrnwret-ruauret (1-NONf0NFOR


                                                                                                                                                                                                                                                                                        .c
.c e
                                                                                                                                                                                                                                                                                    . e e
e a
a
,g DRS-OFFLINE PRINT 14 JUN 83 08 id=37' DATE 061483 PAGE 35 PANCE-REPORTS C4-ATTACHMENT-146 C5-GAP
      ''                                                                                                                                                                                                                                                                              ,g DRS-OFFLINE PRINT 14 JUN 83                                           08 id=37'                                                                                                                                 DATE 061483         PAGE     35       '
~ ~ ~ ~ '
                                                                                                                                                                                                                        ~ ~ ~ ~ '
0-RE0/76 5-CGtt.
      ,,            PANCE-REPORTS                       C4-ATTACHMENT-146 C5-GAP
0-73/07/26 C-EC-PAhD0ef-TO-WJ-FRIEDRICH.. C1-KEl-QA-PROCEDURE-16 C2-ATTACHMENT-145 C3-GAP j
.                    0-RE0/76                           _ _ - _ _                                      _ _ . _ . . _ _                                  , _ _ _ _ . _ . .          _
0-NA 4
  !  ,,            5-CGtt.               0-73/07/26                               C-EC-PAhD0ef-TO-WJ-FRIEDRICH.. C1-KEl-QA-PROCEDURE-16                                                                                 C2-ATTACHMENT-145 C3-GAP j                 0-NA 4
S-KAISER D-73/07/17 C-LETTER-10-CGEE C1-WJ-FRIEDRICH-TO-AE-ROTHENBERG C2-ATTACHMENT-144 C3-GAP Q-KC/981/0 I
S-KAISER             D-73/07/17                               C-LETTER-10-CGEE                                             C1-WJ-FRIEDRICH-TO-AE-ROTHENBERG                                         C2-ATTACHMENT-144 C3-GAP Q-KC/981/0                                                                                                                   __                        .
_ S-CGCE D-73/07/C6. C-LETTER-TO-KAISER _.__C1-WW-SCHWIERS-TO-WJ-FREEDRICH C2-KEl-04-PROCEDURE-16 C3-ATTACHMENT-143 C4-GAP
I
.DM I'
_ S-CGCE                   D-73/07/C6. C-LETTER-TO-KAISER _ .__C1-WW-SCHWIERS-TO-WJ-FREEDRICH                                                                                                                       C2-KEl-04-PROCEDURE-16 C3-ATTACHMENT-143 C4-GAP                                                                                                                                                                                                                                                             %
S-CGtt.
                  .DM                                                                                                                                                                                         . . . . . _ .
0-00/00/C0 _C-NEWSPAPER-ARTICLE ___ C1-ATTACHMENT-176.C2= GAP 0-NA
  !  I' S-CGtt.               0-00/00/C0 _C-NEWSPAPER-ARTICLE ___ C1-ATTACHMENT-176.C2= GAP                                                                                                                 0-NA                                                         'I S-CGtt                 0-78/09/C6                               C-MEP0_               .C1-WW-SCHWIERS-TC-BK-CULVER                                                           C2-COMPLIANCE-WITH-10CFR50                     (3-APPENDIX-8     C4-ATTACHMEN T-152E                 C5-GAP                                                                                                                                                                                                                                       )
'I S-CGtt 0-78/09/C6 C-MEP0_
              ---_9-RA                                                                                                                                                                                         _. . _ .
.C1-WW-SCHWIERS-TC-BK-CULVER C2-COMPLIANCE-WITH-10CFR50 (3-APPENDIX-8 C4-ATTACHMEN T-152E C5-GAP
8            S-CGRE.             _ _ D-76 / 09 / C8_ C-L E TT E R-T o-K AIS E R _ . ___ C1-WW-S C HW IE WS-T o-WJ -F RIE DR I C H                                                                                           C2-CLASS-D+= PIPING-BRANCH-WELDS       C3-ATT     )
)
ACHMENT-152D                         C4-GAD g            0-kE0/67                       .                                      _                                                              __
---_9-RA 8
5 - G Q v Lits a_Ini-atinus11n t L I T T - PR 01t tl_n.-M1.07 /15 C-t                                                                                     tlli.R     Cl-IHOMAs-DEVINE TO-JAMES-KEPPLtR                       C2-WELDER-00ALIFICAT10NS C3-HJK-ANALYSIS-REPORT C4-ATTACPMENT-140 C5-GAP 4           0-HA                         _            , _                          _                                                      _, ,                                                                                                                                )
S-CGRE.
5-CGLE                 D-75/01/21 C-LETTER                                                 C1-EA-80RGMANN-TO-VP-MCMAHON                                                       C2-INSPECTION-OF-PHASE-2-PIPING                     C3-ATTACHMENT-127 C4-GAP 0-u te tj s                                                                                                                                                                           ..
_ _ D-76 / 09 / C8_ C-L E TT E R-T o-K AIS E R _. ___ C1-WW-S C HW IE WS-T o-WJ -F RIE DR I C H C2-CLASS-D+= PIPING-BRANCH-WELDS C3-ATT
1I           S-CGEE                 D-73/06/01                               C-L E TT E R -T'0-K A I S E R .                                                 C1-WWiS CHWIE RS-T O-vP-MCM AHON                   C2-CLASS-D-PIPING C3-PHASE-1         C4-ATTACHMENT-126         )
)
ACHMENT-152D C4-GAD 0-kE0/67 g
5 - G Q v Lits a_Ini-atinus11n t L I T T - PR 01t tl_n.-M1.07 /15 C-t tlli.R Cl-IHOMAs-DEVINE TO-JAMES-KEPPLtR C2-WELDER-00ALIFICAT10NS C3-HJK-ANALYSIS-REPORT C4-ATTACPMENT-140 C5-GAP 4
0-HA
)
5-CGLE D-75/01/21 C-LETTER C1-EA-80RGMANN-TO-VP-MCMAHON C2-INSPECTION-OF-PHASE-2-PIPING C3-ATTACHMENT-127 C4-GAP 0-u te tj s 1I S-CGEE D-73/06/01 C-L E TT E R -T'0-K A I S E R.
C1-WWiS CHWIE RS-T O-vP-MCM AHON C2-CLASS-D-PIPING C3-PHASE-1 C4-ATTACHMENT-126
)
C5-GAP 0-NA
C5-GAP 0-NA
      $I                                                                                                                                                                                                                                                                               )
$I
5-F A LSER             D-n g./_04_t.1.4                         C-LETTER                   C 1 -B K- gn y_E_R_-103,.-M R S.H. A L I                                           C2-PW-WELDMENT-ANALTSIS C3-ATTACHMENT-120 C4-GAP c-NA
)
: i.                                                                                       .    .                                        .                                .    .                                                                                                I S-CGtt                D-75/02/10 . C-LETTER-TO-KAISER                                                                                           C1-EC-PANDORF-TO-DR-FCSPARRIN C2-CHIO-PRCSSURE-PIPING-RULES C3-ATTACHMENT-119 4
5-F A LSER D-n g./_04_t.1.4 C-LETTER C 1 -B K-gn y_E_R_-103,.-M R S.H. A L I C2-PW-WELDMENT-ANALTSIS C3-ATTACHMENT-120 C4-GAP c-NA i.
        , , ,        C4-GAP                                                                 _.
. C-LETTER-TO-KAISER C1-EC-PANDORF-TO-DR-FCSPARRIN C2-CHIO-PRCSSURE-PIPING-RULES C3-ATTACHMENT-119 S-CGtt D-75/02/10 I
t             0-kE0#19                                                                                                                                                                                                                                                           )
C4-GAP 4
        .          S-CINCINNATI-ENQUIRER                                           D-8 2 /0 7 /17             C-NEWSPAPER-ARTiCLi~~'                                                   Ci~ETTdEHMkNT-118A                         C2-GAP       0-NA O'                         .  ..        .                                              .  .. .                              . . . . .                        .      ..
t 0-kE0#19
S-CINCINNATI-ENOUIRER                                    . D-82/07/27 C-NEWSPAPER-ARTICLE                                                                           C1-ATTACHMENT-118B                         C2--GAP     0-NA Md           S-RAISER               D-79/03/29 C-PEP 0                                                 C1-RE-TURNER-10-P-CULVER-t-R-MAR $ HALL                                                                   C2-APPROVAI-TO-USE-A-SUBARTICLE-NO-4436           C3-ASM     }
)
E-iQDE-if C1198-!__C'-197 7-E 9 tIIGN                                                     (1-{N-f0N.JUCT{0N:WITH-ASME-CODE-SECTION-3-1971 C6-ALDENDA-THROUGH-SUMMER-1973-DURING-CONS TRUCTION               C7-ATTACHMENT-117 C2-GAP NI           0-NA                                                                                                                                                                                                                                                                 W 5-CGRE                 D-P1/07/C1                               C-PEPO                     C1-HR-SAGER-TO-BE-CULVER                                                           C2-STOP-WORK-CRDER                     C3-EXPANSION-ANCHORS     C4-ATTACHMEN
S-CINCINNATI-ENQUIRER D-8 2 /0 7 /17 C-NEWSPAPER-ARTiCLi~~'
      =I,           T-112 C5-GAP                                                                                                                                                                                                                                                       if q-NA
Ci~ETTdEHMkNT-118A C2-GAP 0-NA O'
[$,3           S-CG8E                 D-73/05/C9                               C-LETTER-10-KAISER                                                             C1-WW-SCPWIERS-TO-CA-SMITH                           C2-KE-AUDIT-REPORI-19         C5-ATTACHPENT-111 C4-GAP       if
. D-82/07/27 C-NEWSPAPER-ARTICLE C1-ATTACHMENT-118B C2--GAP 0-NA S-CINCINNATI-ENOUIRER Md S-RAISER D-79/03/29 C-PEP 0 C1-RE-TURNER-10-P-CULVER-t-R-MAR $ HALL C2-APPROVAI-TO-USE-A-SUBARTICLE-NO-4436 C3-ASM
}
E-iQDE-if C1198-!__C'-197 7-E 9 tIIGN (1-{N-f0N.JUCT{0N:WITH-ASME-CODE-SECTION-3-1971 C6-ALDENDA-THROUGH-SUMMER-1973-DURING-CONS TRUCTION C7-ATTACHMENT-117 C2-GAP NI 0-NA W
5-CGRE D-P1/07/C1 C-PEPO C1-HR-SAGER-TO-BE-CULVER C2-STOP-WORK-CRDER C3-EXPANSION-ANCHORS C4-ATTACHMEN
=I, T-112 C5-GAP if q-NA
[$,3 S-CG8E D-73/05/C9 C-LETTER-10-KAISER C1-WW-SCPWIERS-TO-CA-SMITH C2-KE-AUDIT-REPORI-19 C5-ATTACHPENT-111 C4-GAP if


e-
e-e 9
                                                                                                                                                                                                                                                                                                                                            . e 9
<s DR$-0FFLINE PRINT 14 JUN'85 Oh:50:37 DATE 061483 PAGE 36 0-NA s.
                                                                                                                                                                                                                                                                                                                                                  <s DR$-0FFLINE PRINT 14 JUN'85                                                             Oh:50:37                                                                                                           DATE 061483                 PAGE     36     ''
-g.
s.
5-C G E E' D-7 5 / 01/16' ' C-LETTEi-TO-KAISER
'C1=Ed-PANDORF-TU-WJ-fRIEDRICH C2-AEC-AUDIT C3-JAN-8-10.-1975 C4-ATTACHMEN T-110 C5-GAP 0-kE0/14 3
C2-ATTAC' MINI-109 C3-GAP 0-NA 5-KAISER D-21/12/21 C-MEPO C1-GENERAL-ELECTRIC-AUDIT-FINDINGS H
S-CGRE D-75/09/22' I-LET'ER-10-KA55Ei ~
El-WW-SCHWiERI-TO-CC1GRAT C2-IMPLEMENTATION-0F-PROCEDURES C3-ATTACHMEN T
1-106 C4-GAP 0-uEF/54 16 5-CGLE D-79/12/14 C-LETTER-TO-KAIStn C1-WW-SCHWIER$-TO-ER-BAUPGARTEN C2-FIELD-AUDIT-193-t-282 C3-ATTACHMEN C
0-KE0/356 lb T-102 (4-GAP i
5-CGtE D-76/1b/27 C-LETTER-TO-KA5SER Ei-WW-SCHWiER5-TO-RD-SAHLBERG C2-CD-0P-STUDENT C3-ATTACHMENT-98 C4-GAP
)
0-DE0/72 5-KAISER D-80/03/28
.C-PEPO.
C1-WF-REVNOLDS-10-KR-BAUMGARTEN C2-WORK-A$$1GNMENT-PRIORITIES-FOR-CA-ENGINEERING I
C3-ATTACHEPENT-92 C4-GAP 0-NA 5:IGEE D-75/02/16 C-GA-L-)]ANDAR11-jfCTION C 1-M IN UJ E 3-0 F-J0 !N T-C GC E -K E I-G A-PE E T I NG C2-FEB-28.-1975 C3-ATTACHMEN T-91 C4-GAP T
0-AA 3-FAISER
.D-78/03/27 C-ORE-CHARY C1-ATTACHMENT-90 C2-GAP 0-NA 5-F815ER 0:25/05/C1 C-fEID C L-W 1-I g ] g p t](U-19.-yg-M C M Ap0 N_C2 -0 4 -I N S P E C T I O N -R E Q U I R EM E N T S - FO R MON T H-P E R I O D C3-SEP T-1975-THRU-FEP-1976 f4-ATTACFPENT-99 C5-GAP T
0-NA
)
5-CGtt
. D-74/10/C2 C-LETTER-TO-KAISER i
TES-cF-COMPLIANCE
_ C1-WW-SCHWIERS-TO-WJ-FRIEDRICH C2-ATTACHMENT-69 C3-GAP C4-CERTIFICA I
0-NA d,
S-CGCE.
D-00/00/00 C-ATFIDAVIT C1-VICTOR-GRIFFIN C2-ATTACHMENT-67 C3-GAP 0-NA
)
$-KAISER D-74/C8/19,C-LETTER-TC-CGtt C1-WJ-FRIEDRICH-TO-EA-PORGMANN C2-ATTACHMENT-66 C3-GAP Q
0-NA
0-NA
                                                                                                                                                                                                                                                                                                                                                  -g .
)
5- C G E E'      D-7 5 / 01/16' ' C-LETTEi-TO-KAISER                                                                                'C1=Ed-PANDORF-TU-WJ-fRIEDRICH C2-AEC-AUDIT                                  C3-JAN-8-10.-1975 C4-ATTACHMEN T-110 C5-GAP 0-kE0/14                                                                                                                                                                                                                                                        3
5-CG8E D-21/05/13 C-CORRECTIVE-ACTION-REPORT
                        ,                                                        5-KAISER        D-21/12/21      C-MEPO                                                                      C1-GENERAL-ELECTRIC-AUDIT-FINDINGS                              C2-ATTAC'  H MINI-109 C3-GAP                0-NA S-CGRE          D-75/09/22' I-LET'ER-10-KA55Ei  T                                                                            ~    El-WW-SCHWiERI-TO-CC1GRAT                        C2-IMPLEMENTATION-0F-PROCEDURES                      C3-ATTACHMEN 1-106 C4-GAP 0-uEF/54                                                                                                                                                                                                                                                        16 C
~ C1-ATiACHMENT13 (2-GAP
5-CGLE          D-79/12/14      C-LETTER-TO-KAIStn                                                                                  C1-WW-SCHWIER$-TO-ER-BAUPGARTEN                            C2-FIELD-AUDIT-193-t-282                    C3-ATTACHMEN T-102 (4-GAP                                                                                                                      _            ..
~
lb 0-KE0/356 i                                                        5-CGtE          D-76/1b/27 C-LETTER-TO-KA5SER                                                                                        Ei-WW-SCHWiER5-TO-RD-SAHLBERG C2-CD-0P-STUDENT                            C3-ATTACHMENT-98            C4-GAP              )
0-NA 6
0-DE0/72
S D-82 /06 /C9 C-NEWSPAPER-AR TI CL E C1-ATTACHMENT-61 C2-GAP 0-N4
                        #                                                        5-KAISER        D-80/03/28 .C-PEPO.                                                                                                                                                                                                                              I C1-WF-REVNOLDS-10-KR-BAUMGARTEN                                C2-WORK-A$$1GNMENT-PRIORITIES-FOR-CA-ENGINEERING C3-ATTACHEPENT-92 C4-GAP 0-NA                                                                                                    _            _.
$-CINCINNATI-ENGUIRER 5-CGRE D-81/10/23 C-MEPO C1-DAVE-HOWARD-TO-PARK-ALBERTIN C2-APPRCVED-VENDORS-LIST C3-ATTACHMENT-60 C4-GAP
5:IGEE          D-75/02/16      C-GA-L-)]ANDAR11-jfCTION                                                                                          C 1-M IN UJ E 3-0 F-J0 !N T-C GC E -K E I-G A-PE E T I NG    C2-FEB-28.-1975            C3-ATTACHMEN T-91 C4-GAP T                                                        0-AA 3-FAISER        .D-78/03/27      C-ORE-CHARY C1-ATTACHMENT-90 C2-GAP                                                                                                  0-NA 5-F815ER        0:25/05/C1 C-fEID                                                                            C L-W 1-I g ] g p t](U-19.-yg-M C M Ap0 N_C2 -0 4 -I N S P E C T I O N -R E Q U I R EM E N T S - FO R MON T H-P E R I O D        C3-SEP T-1975-THRU-FEP-1976              f4-ATTACFPENT-99                                                                            C5-GAP T                                                        0-NA                                                                                                                        __                                                                                                                                  )
' 's 5-CGRE D-00/CO/CC C-PEP 0-FROP-EHAS C1-ATTACHMFNT-57A C2-GAP 0-NA f
5-CGtt        . D-74/10/C2      C-LETTER-TO-KAISER                                                                              _ C1-WW-SCHWIERS-TO-WJ-FRIEDRICH                              C2-ATTACHMENT-69          C3-GAP            C4-CERTIFICA i                                                        TES-cF-COMPLIANCE                                                                                                                                                                                                                                                I 0-NA                                                                                                                                                                ,_
5-KAISER D-21/10/26
d,                                                        S-CGCE.          D-00/00/00 C-ATFIDAVIT C1-VICTOR-GRIFFIN C2-ATTACHMENT-67                                                                                                    C3-GAP            0-NA                                                            )
'C-PEPO C1-P.-kThER-TO-DAVE-H0 WARD C2-APPROVED-VE400RS-LIST C3-ATTACHMENT-56 C4-GAP 0-NA 213.
                            ,,                                                    $-KAISER        D-74/C8/19 ,C-LETTER-TC-CGtt                                                                                C1-WJ-FRIEDRICH-TO-EA-PORGMANN                            C2-ATTACHMENT-66        C3-GAP Q                                                        0-NA                                                                                                                                                                                                                                                            )
5-{ A I,5,E R D-77/03/15 C-LETTER-Tc-CGEE C1-WJ-F A IE DRICH-TO-WW-SCHWIER$
13
C2-0A-$URVEY C3-ATTACHMENT-55 C4-GAP
                                                                                                                                                                                                                                                                              ~
5-CG8E           D-21/05/13 C-CORRECTIVE-ACTION-REPORT                                                                                           ~ C1-ATiACHMENT 6            (2-GAP           0-NA
                                                                                                                              . .                                                                          ...              . .                    .                                                                                            S
                                                                                  $-CINCINNATI-ENGUIRER            D-82 /06 /C9                                                                 C-NEWSPAPER- AR TI CL E                       C1-ATTACHMENT-61           C2-GAP           0-N4                           .
                          .                                                      5-CGRE           D-81/10/23       C-MEPO                                                                       C1-DAVE-HOWARD-TO-PARK-ALBERTIN                                 C2-APPRCVED-VENDORS-LIST                   C3-ATTACHMENT-60         C4-GAP     ' 's 5-CGRE           D-00/CO/CC       C-PEP 0-FROP-EHAS                                                                           C1-ATTACHMFNT-57A C2-GAP                         0-NA f                                           5-KAISER         D-21/10/26     'C-PEPO                                                                       C1-P.-kThER-TO-DAVE-H0 WARD                             C2-APPROVED-VE400RS-LIST                 C3-ATTACHMENT-56           C4-GAP 0-NA 213.                                                             5-{ A I,5,E RD-77/03/15       C-LETTER-Tc-CGEE                                                                           C1-WJ-F A IE DRICH-TO-WW-SCHWIER$                         C2-0A-$URVEY             C3-ATTACHMENT-55           C4-GAP


                                                                                                                                                                                                                                                                                                                                                                                                                      *-                    s
s e
                                                                                                                                                                                                                                                                                                                                                                                                                        . e
~
                                                                                                                                                                                                                                                                                                                                                                                                                                            ~
e DRS-0FFLINE PRINT 14 JUN 83 08:50537 DATE 061483 PAGE 37 i
e DRS-0FFLINE PRINT 14 JUN 83                                                                               08:50537                                                                                                                                             DATE 061483           PAGE     37                     i
S-CGRE D-74/03/C4. C-LETTER-TO-KAISER.
                              ''                                                                                                                                                                                                                                                                                                                                                                                                          4 S-CGRE                                                                                 D-74/03/C4. C-LETTER-TO-KAISER.                                                             C1-AE-ROTHENBERG-TO-DR-MCSPARRIN                                     C2-VEND OR-SURVE Y S C3- ATT ACHMENT-54 A C4-GAP 0- Q A / 3 7 7 ..                                                                                             _                                                      _                                ._
C1-AE-ROTHENBERG-TO-DR-MCSPARRIN C2-VEND OR-SURVE Y S C3-ATT ACHMENT-54 A C4-GAP 4
                                                                                            %KA15ER                                                                               D-14 LC2 /.2fL._C:LilIL E-T C:C G R E ..C t-WJefi1ERRICit:IO-AE:RO TH ENBERG _                                                                     C 2- A T T AC HM ENT-53                       C3-GAP o-KC/1760/0
0- Q A / 3 7 7..
: s.                                                                                                                                                                                                                                                                                                                                                                                                           g 5-CGtt.                                                                          ' h' 73-
%KA15ER D-14 LC2 /.2fL._C:LilIL E-T C:C G R E..C t-WJefi1ERRICit:IO-AE:RO TH ENBERG _
                                                                                                                                                                                      /0 7/ 2k ~ C-L k TT E h-TO-K A 5'S kR '                                                 Ci-EC-PANDbRF-id-kJ-kRiEhRICH C2-OUALIFICATION-OF-VENDORS-FOR-ESSENTIAL-t-CODE
C 2-A T T AC HM ENT-53 C3-GAP o-KC/1760/0 s.
                                                                                          -MATER                                                                               _C3-ATTACHMENT-52 C4-GAP.                                     _                                                        _
g
                              #~                                                                                                                                                                                                                                                                                                                                                                                                       'l 0-NA 5-CGRE                                                                                 D-F1/09/17 C-LETTER-10-SEL                                             C1-HR-SAGER-TO-RF-SCHEI8EL                                         C2-IDENT![ICATidN-8-CONTROL-OF-MATERIAL,-PARTS-E-COMPO
' h' 73 /0 7/ 2k ~ C-L k TT E h-TO-K A 5'S kR '
                              #                                                                                                . C3-ATTACHPENT-47C.C4-GAP                                                                         . _ . . _ . _ _ . . . _ . -
Ci-EC-PANDbRF-id-kJ-kRiEhRICH C2-OUALIFICATION-OF-VENDORS-FOR-ESSENTIAL-t-CODE 5-CGtt.
                                                                                                                                                                                                                                                                                                                                                                                                                                        'I 0-SLO /393 8                                                            S-CGRE                                                                               D-73/US/36                   C-A'EC-AUDIT-REPbRT                                           C1-ATTACHMkNT-4fe C2-GAP                               0-NA                                                                                                 I S-KAISER                                                                             D-P1/C6/19                   C-PEPO               C1-J.-NORRIS-10-P.-KYNER                                                 C2-ASME-BBPV-CbDk2kCTiON-3           5                              (3-DIVISION-1-484122       (4-ATT I                                                             ACHMENY-47A C5-GAP                                                                                           __                        _              _ _              . _ .              .
-MATER
0-NA I                                                           S-FAISER                                                                           'D-78/05/C9' C-PkPO '                               C1-R.'-iuiNkR-50-DISTikBui!ON'C2-TRACEABILITY-TO-NX-SEISMIC-ANCHOR-HANGER                                                                                           C3-SPLIT-SLE                     )
_C3-ATTACHMENT-52 C4-GAP.
.                                                                                            e V Es_Ci-uta t u t N t-nt_C5:uP                                                                                                                                                                                             _            _,
'l
i e-NA
#~
.                              N                                                                                      .                          ..                        .            . . . . . . - .                .
0-NA 5-CGRE D-F1/09/17 C-LETTER-10-SEL C1-HR-SAGER-TO-RF-SCHEI8EL C2-IDENT![ICATidN-8-CONTROL-OF-MATERIAL,-PARTS-E-COMPO 0-SLO /393
5
'I
,                                                                                          S-SSL D-81/09/28                                                                                 C-LETTER-TO-CGRE..                       .C1-FA-MCkENNA-TC-BR-SYLVIA .                                           ..C2-GUALITY-CONFIRMATION-PROGRAM                                             C3-MEAT-NUMBER-TRACEABIL ITY . C4-ATTACHPFNT-4FD C5-GAP T                                                           Q-SLC/20000                                                                                                                                                                                                                                                                                                                                 )
. C3-ATTACHPENT-47C.C4-GAP 8
S-KAISER                                                                               D-79/06/15 C-MEMO                                 C1-R.-PAR $ HALL-TO-CK-SMITH                                             C2-IDENTIFIC A TION-0F-PIPE-DURING-F ABRIC ATION-8-INST ALL T                                                           C3-ATTACHMENT-44B C4-GAP..                                                                                           _ ._.                _ _ . . . _ _ _ _                            , _.            _
S-CGRE D-73/US/36 C-A'EC-AUDIT-REPbRT C1-ATTACHMkNT-4fe C2-GAP 0-NA I
                                                                                                                                                                                                                                                                                                                                                                                                                                          )
S-KAISER D-P1/C6/19 C-PEPO C1-J.-NORRIS-10-P.-KYNER C2-ASME-BBPV-CbDk2kCTiON-3 (3-DIVISION-1-484122 (4-ATT 5
o-NA 1                              T                                                           S-CGtt                                                                               0-79/d5/ft                   C-QA-8-STANDARDS-Ph0CiDURE                                                     C1-CkRTIF5 CAT 10N-OF-INSPCCTION-E-TESTING-PERSONNEL                                             C2-10-GAS-02                           )
I ACHMENY-47A C5-GAP 0-NA I
C3:BEV-0                                                                             CkrteLs:%Dtb                                                                                                                     . - - . . . .      .
S-FAISER
i'                                                                                                                                                                                       ..            .. ...                        . . .          . .                    .                .
'D-78/05/C9' C-PkPO '
                                                                                                                                                                                                                                                                                                                                                                                                                                        ')
C1-R.'-iuiNkR-50-DISTikBui!ON'C2-TRACEABILITY-TO-NX-SEISMIC-ANCHOR-HANGER C3-SPLIT-SLE
S-RAISER                                                                              D-79/05/C2                  C-0A-M4hDAL C1-QA-PROCEDURE-20                                                         C2-REF-3             (3-INDOCTRINATION-E-TRAINING Q-0AP/20 i'                                                           S-EALDINGER-CORPORATkdN h=hh/d9/18                                                                                                     C-PRhCEDLRE-FeCP=2.1-1                                           C1-REV-0             (2-oUALIFICATION-OF-INSPECTION                                       C3-EXAMINATION-8-T                     ')
)
                                            ,., __ES T IN G-E ER 50 NMEL.__C_4.-LI ELD 0 E A L11.T 1DNIAQt -P RO C E DUR E-M ANU A L .                                                                                                                                                                           ._ . . . _
e V Es_Ci-uta t u t N t-nt_C5:uP i
                                    ,,                                                      0-FQCP/2/1/1                                                                                                                                                                                                                                                                                                                                 ,
e-NA S-SSL 5
9                 ,
N D-81/09/28 C-LETTER-TO-CGRE..
S-TECHSIL.-INC                                                                                 D-P1/08/01                     C-FROCEDURE-FOR-SELECTION                                                   C1-TRAINING-t-CERTIFICATION-OF-0UALITY-CONTROL-INSPECT
.C1-FA-MCkENNA-TC-BR-SYLVIA.
                                      .g                                                    o-CA/113                                                                                                                                                                                                                                                                                                                                   _
..C2-GUALITY-CONFIRMATION-PROGRAM C3-MEAT-NUMBER-TRACEABIL ITY. C4-ATTACHPFNT-4FD C5-GAP T
4                                                                                                                                                                                                                                                                                                                                                                                                       a S IGtt                                                                             e-P 3 /01/ 26__C:0W nE R S-PR OJ E C I:E R0 ( E DURt ____ C.1-T AB L E -0 F - CO NT E N D S                                                         0-NA e'                                                         S-CGRE                                                                               D-81/09/22                   C-0WNERS-PROJECT-PROCEDURE-2.3                                                         C1-NRC-CORRESPONDCNCE-8-COMMITMENT-CONTROL                                               C2-REva0                               ')
Q-SLC/20000
0--/2 ei                                                          S-CGtt                                                                             D-91/07/28 C-0WNERS-PROJECT-PR0(EDUPES-3.7                                                                           (1-CONTROL-OF-DEVIATIONS-FROP-CODES-STANDARDS                                             C2-FSAR-COPMITMENT                     #st
)
                                                  .._5                                                                                           C.3-REV-u                                                 .                  _ _ .                                        _ _ _ . _ _ . _ . _
S-KAISER D-79/06/15 C-MEMO C1-R.-PAR $ HALL-TO-CK-SMITH C2-IDENTIFIC A TION-0F-PIPE-DURING-F ABRIC ATION-8-INST ALL T
e-3/7 2[3                                                                                                                                                                                     r wrpn 8f t-ratere                                                                           e-79101/>t                                         r t -e . w a p t se a t t -T o-D i t T P1 Pet T 1 oN                                 r ?-M a D F I Nr.-O F -S M Al l -PO R F - A 9 M F -C OD F           C1-PIPING-t-SPCOLS
C3-ATTACHMENT-44B C4-GAP..
)
o-NA T
S-CGtt 0-79/d5/ft C-QA-8-STANDARDS-Ph0CiDURE C1-CkRTIF5 CAT 10N-OF-INSPCCTION-E-TESTING-PERSONNEL C2-10-GAS-02
)
1 C3:BEV-0 CkrteLs:%Dtb i'
C1-QA-PROCEDURE-20 C2-REF-3 (3-INDOCTRINATION-E-TRAINING Q-0AP/20
')
S-RAISER D-79/05/C2 C-0A-M4hDAL i'
S-EALDINGER-CORPORATkdN h=hh/d9/18 C-PRhCEDLRE-FeCP=2.1-1 C1-REV-0 (2-oUALIFICATION-OF-INSPECTION C3-EXAMINATION-8-T
')
,., __ES T IN G-E ER 50 NMEL.__C_4.-LI ELD 0 E A L11.T 1DNIAQt -P RO C E DUR E-M ANU A L.
0-FQCP/2/1/1 9
C1-TRAINING-t-CERTIFICATION-OF-0UALITY-CONTROL-INSPECT S-TECHSIL.-INC D-P1/08/01 C-FROCEDURE-FOR-SELECTION o-CA/113
.g 4
a S IGtt e-P 3 /01/ 26__C:0W nE R S-PR OJ E C I:E R0 ( E DURt ____ C.1-T AB L E -0 F - CO NT E N D S 0-NA e'
S-CGRE D-81/09/22 C-0WNERS-PROJECT-PROCEDURE-2.3 C1-NRC-CORRESPONDCNCE-8-COMMITMENT-CONTROL C2-REva0
')
0--/2 i
e S-CGtt D-91/07/28 C-0WNERS-PROJECT-PR0(EDUPES-3.7 (1-CONTROL-OF-DEVIATIONS-FROP-CODES-STANDARDS C2-FSAR-COPMITMENT
#st
.._5 C.3-REV-u e-3/7 2[3 8f t-ratere e-79101/>t r wrpn r t -e. w a p t se a t t -T o-D i t T P1 Pet T 1 oN r ?-M a D F I Nr.-O F -S M Al l -PO R F - A 9 M F -C OD F C1-PIPING-t-SPCOLS


C e   e         a e
C e
                *%                                                                                                                                                                                                                                                                                                    or DRS-OF'FLINE PRINT i4 JUN 55                                                 08 i0:3F                                                                                                                         DATE 061483         PAGE     38 C4-ATTACHMENT-44A C5-GAP
e a
                ''                                                                                                                                                                                                                                                                                                    es o-us i
e or DRS-OF'FLINE PRINT i4 JUN 55 08 i0:3F DATE 061483 PAGE 38 C4-ATTACHMENT-44A C5-GAP es o-us i
                *-                              S-CGtt                                               D-P2/06/10 .C-TESTIPONY C1-DAVID-JONES.                                                           C2-ATTACHMENT-43                           C3-GAP         0-NA i                                                                                                                                                                                                                                                                                                                     es
S-CGtt D-P2/06/10.C-TESTIPONY C1-DAVID-JONES.
  ;                                                s-tGEE                                             D-00LOQ/C0 C-IRVL$1]GATION-0F-SVPPLign-0A                                                                     C 1 - Al] AC HM E N 1;_41__ C 2_-G A P .             0-NA S-wAISER. _D-80/01/18 . C-LETTER-10-CGRE_.C1-R.-MARSHALL-TO-WW-SCHWIERS C2-CGRE-4UDIT-REPORT-194                                                                                                                                   C3-FOLLOW-UP-NOTICE-JAN-9.-1980                                             C4-REFERENCED-AUDIT-285 C5-ATTACHMENT-39F C6-GAP 0-rC/13645/0                                                       _ _ .                                          _                              _
C2-ATTACHMENT-43 C3-GAP 0-NA i
5:5111(R                                           E12QlDjlC3 C-LLlitR19:1}tt                                         C1-R.-MARSEp(L19 PK.-SutvE R                                             C2-CGRE-GAES-AUDIT-285       C3-DRVWELL-STEEL-MODIFICATIONS C4-ATTACHMENT-39D C5-GAP 8                                 0-rC/13589/0                                                     _..__ __                    _ _                      _
es s-tGEE D-00LOQ/C0 C-IRVL$1]GATION-0F-SVPPLign-0A C 1 - Al] AC HM E N 1;_41__ C 2_-G A P.
lb S-CGtt                                               D-79/12/19                 C-PEPO           C1-WW-SCHWIERS-To-pK-CULVER                                                 C2-GAES-FIELD-AUDIT-285 C3-ATTACHMENT-399 C4-GAP 8                               0-AA                                                                                                                                                                                                                                                                 'll S-CGRE                                               D-79/11/22 C-PEP 0                           C1-WW-SCHWIERS-10-DK-CULVER                                                 C2-GA !k! iAEDARDS-AUDIT-SURVEILLANCE S                                   C3-REPORT-285 I
0-NA S-wAISER. _D-80/01/18. C-LETTER-10-CGRE_.C1-R.-MARSHALL-TO-WW-SCHWIERS C2-CGRE-4UDIT-REPORT-194 C3-FOLLOW-UP-NOTICE-JAN-9.-1980 C4-REFERENCED-AUDIT-285 C5-ATTACHMENT-39F C6-GAP 0-rC/13645/0 5:5111(R E12QlDjlC3 C-LLlitR19:1}tt C1-R.-MARSEp(L19 PK.-SutvE R C2-CGRE-GAES-AUDIT-285 C3-DRVWELL-STEEL-MODIFICATIONS C4-ATTACHMENT-39D C5-GAP 8
C4-ATTACHMENT-39A C 5 - G A P ..._ .. _                                                         _ _ _ _ .                  _ _..__ __. .
0-rC/13589/0 lb S-CGtt D-79/12/19 C-PEPO C1-WW-SCHWIERS-To-pK-CULVER C2-GAES-FIELD-AUDIT-285 C3-ATTACHMENT-399 C4-GAP 8
                                                                                                                                                                                                                                                                                                                          )
0-AA
0-NA
'll
                                                                                                                                                                        ~
!k! iAEDARDS-AUDIT-SURVEILLANCE C3-REPORT-285 S-CGRE D-79/11/22 C-PEP 0 C1-WW-SCHWIERS-10-DK-CULVER C2-GA S
8'                               S-UNITED-0UAllkk-8-MhNI'GEMiET-CokSULTANTS D-EU/b6/bh" C-LETTER-TO-US-HOUSE-0F-REPRESENTATIVES                                                                                                                               C1-JM-NICHOLS-10-MORRIS-UDALL             )   '
I C4-ATTACHMENT-39A C 5 - G A P..._.. _
tt:allaCHMENT-is                                                 C3-6AP                                                                                                         _ _ _ _ _ _ , _ , _ .
)
0-NA i                                             .              .                              . .                                  . .__                          . _ . . . . . .        ...          .    .
0-NA 8'
                                                                                                                                                                                                                                                                                                                          )
S-UNITED-0UAllkk-8-MhNI'GEMiET-CokSULTANTS D-EU/b6/bh" C-LETTER-TO-US-HOUSE-0F-REPRESENTATIVES C1-JM-NICHOLS-10-MORRIS-UDALL
5-CGRE                                            . D-00/00/C0. . . , _ . . . . .C-LETTER-TO-KAISER                             C1-WW-SCHWIERS-70-RE-TURNER                                             C2-ATTACHMENT-35   C3-GAP Q-kA (I                                                                                                                                                                                                                                                                                                       )
)
                                                  $2_C_Gtt                                            D-00(00/10 C-AFFIDayjf C 1-R ON A L D-Y A TL_$                                                   C2-AllACHMENT-33_,C3-GAP.                                 0-NA
~
,                1I                               S-FAISCR . .D-21/12/09 C-LETTER-TO-CGRE C1-RE= JAGGER-TO-EA-BORGMANN                                                                                                                             C2-INVESTIGATION C3-NATIONAL-80ARD-OF-80!LER           C4-PRE         )
tt:allaCHMENT-is C3-6AP 0-NA i
l                                                 $$URE-VESSEL-INSPECTCRS C5-ATTACHPENT-32 C6-GAP 0-h4                                                                     -                              . . . - -
. D-00/00/C0..., _.....C-LETTER-TO-KAISER C1-WW-SCHWIERS-70-RE-TURNER C2-ATTACHMENT-35 C3-GAP 5-CGRE
4
)
_ _S-LGRE                                                         D-73L0?L20                 C-LE.ttg_R-to-yJ r.tg R                           (1.E.C- P.A ND 0e r -T O -W J - F R I E D R I C H C2-DRAWING-CONTROL                               C3* ATTACHMENT-29 C4-GAP i
Q-kA (I
i                                0-GA/309.                                                                                                                                                                                                                                                           lb S-RAISER                                           D-73/09/14 C-LETTER-To-CGRE                                       C1-WJ-FRIEDRICH-TO-AE-ROTHENBEPG                                                   C2-DRAWING-CONTROL       C3-ATTACHMENT-28   C4-GAP
)
                                                                                                                                                                                                                                                                                                                        )
$ _C_Gtt D-00(00/10 C-AFFIDayjf C 1-R ON A L D-Y A TL_$
i e
C2-AllACHMENT-33_,C3-GAP.
                        ,,,                        4-IC/J20714                                                                                                                                                   _.____.
0-NA 2
                *          ,                      S-KAISFR                                       . D-79/01/08                   C-PEPO.     . C1-R.-TUPNER-TO-DISTRIBUTION                                                   C2-ESSENTIAL-PIPING-HANGER-INSTALLATION                       C3-CRITERIA-E-INSP       lh ECTION-REQUIREPENTS                                                           C4-ATTACHPENT-27A C5-GAP 0-NA                                                                                                                                                                                                                                                               ,,
1I S-FAISCR
s                                                                                                                                                                                                                                                                                                      0 1 iGIL                                             P. 19 /.1LLRl__LIL ElI EP:JD:KAISE8                                         C_1-WW-SCHWIERS-TO EW-KN0X
..D-21/12/09 C-LETTER-TO-CGRE C1-RE= JAGGER-TO-EA-BORGMANN C2-INVESTIGATION C3-NATIONAL-80ARD-OF-80!LER C4-PRE
                                                                                                                                                                                                      .                                                  .C2-FDI-0A-DOCUMENTATION C3-ATTACHPl"NT-26     C4-GAP
)
                  -                                0-rE0/139                                                                                                                                                                                                                                                             s 5-RAISER                                           t-F2/C2/03                 C-PE*0       .C1-D.-J0hES-10-JUhE-PRADFORD                                                 C2-SEL-DESIGN-SPECIFICATION-H-2256 C3-ATTACHMENT-25B C4-GAP
l
                          ,                      0-NA
$$URE-VESSEL-INSPECTCRS C5-ATTACHPENT-32 C6-GAP 0-h4
((3                                     5-CGtt                                             D-C0/00/00 C-AFFIDAWIT C1-RICHARD-L.-REITER                                                                   C2-ATTACHMENT-23                       C3-GAP     0-NA
_ _S-LGRE D-73L0?L20 C-LE.ttg_R-to-yJ r.tg R (1.E.C-P.A ND 0e r -T O -W J - F R I E D R I C H C2-DRAWING-CONTROL C3* ATTACHMENT-29 C4-GAP 4
i i
0-GA/309.
lb S-RAISER D-73/09/14 C-LETTER-To-CGRE C1-WJ-FRIEDRICH-TO-AE-ROTHENBEPG C2-DRAWING-CONTROL C3-ATTACHMENT-28 C4-GAP e
)
i 4-IC/J20714 S-KAISFR
. D-79/01/08 C-PEPO.
. C1-R.-TUPNER-TO-DISTRIBUTION C2-ESSENTIAL-PIPING-HANGER-INSTALLATION C3-CRITERIA-E-INSP lh ECTION-REQUIREPENTS C4-ATTACHPENT-27A C5-GAP 0-NA s
0 1 iGIL P. 19 /.1LLRl__LIL ElI EP:JD:KAISE8 C_1-WW-SCHWIERS-TO EW-KN0X
.C2-FDI-0A-DOCUMENTATION C3-ATTACHPl"NT-26 C4-GAP 0-rE0/139 s
5-RAISER t-F2/C2/03 C-PE*0
.C1-D.-J0hES-10-JUhE-PRADFORD C2-SEL-DESIGN-SPECIFICATION-H-2256 C3-ATTACHMENT-25B C4-GAP 0-NA
((3 5-CGtt D-C0/00/00 C-AFFIDAWIT C1-RICHARD-L.-REITER C2-ATTACHMENT-23 C3-GAP 0-NA


s' , .
^
                                                                                                                                                                                                                              ^
s',.
                                                                                                                                                                                                                                        . o.
o.
Y
Y
      # t rT       ,
# t rT l
l DRS-OFFLINE PRINT           14^                     JUN 83                 08:50537''                                                                                       DATE 061483           PAGE     39         'T f,        5-CGtt           D-22/C4/19 t tuDIT-FINDING-REPORT                                                         C1-APRIL-19-2],-1982                     CZ-ATTACNMENT-51       C3-GAP         0-82/1/5                           ,
DRS-OFFLINE PRINT 14^
s-CGtt           D-74/04/C9 ~ C-LETiER-Tc-Kstsin"                                                         C i- A E"-R 6T H E N PE R G - T o- D R-M C 5 P A R R I N C2-ATTACHEMENT-650           C3-GAP       C4-REC EIVING-INSPECTION 0-04/411                                                                                                                                                                                                                     *I
JUN 83 08:50537''
      ,,        $-EAISER         D=74/03/28                     C-WJ-FRIEDRICH-TO-AE-ROTHENBE'RG                                               C1 -L E T TE R-T O-C Gti 'I 2-R E ti! VI NG-IN S PE C T I ON C3-ATTACHMENT-654 C4-GAP c-rC/1908/0 d'
DATE 061483 PAGE 39
5-KAISER        ~D-82/03/12 'C-PEP 0                                               ~~C 1 -T".-Iv i'R $ U L i-T C-c . -H i D F I K     C2-5U8 CONTRACT-AUDIT-8 C3-NES-$ERVICES-IN-PROCESS                     C4-ATT       'I sLEMEN1-64       C1-GAP                                                                                                                                 _ _ .
'T 5-CGtt D-22/C4/19 t tuDIT-FINDING-REPORT C1-APRIL-19-2],-1982 CZ-ATTACNMENT-51 C3-GAP 0-82/1/5 f,
0-hA S-iGRE' ~       D-77/03/01'' C-LETEER-ic-KhtSER                                                           'C1-WW-SCHWIER5-Ib-WJ-FRIE5 RICH                         C2-MINUTES-OF-GA-MEETING           C3-ATTACHMEN T-228 C4-GAP               C5-FEBRUART-17.-1977..
s-CGtt D-74/04/C9 ~ C-LETiER-Tc-Kstsin" C i-A E"-R 6T H E N PE R G - T o-D R-M C 5 P A R R I N C2-ATTACHEMENT-650 C3-GAP C4-REC EIVING-INSPECTION 0-04/411
0-NA                                                                                                                                                                                                                             I
*I
            ~
$-EAISER D=74/03/28 C-WJ-FRIEDRICH-TO-AE-ROTHENBE'RG C1 -L E T TE R-T O-C Gti 'I 2-R E ti! VI NG-IN S PE C T I ON C3-ATTACHMENT-654 C4-GAP c-rC/1908/0 d'
.                5-CGLE           D-73/05/23                     C-LETTER-TO-KAISER                                         C1-WW-$CHWIERS-TO-VP-MCMA565~"C2'-FIELD-AUDIT-13 C3-ATTACHMENT-24                           C4-GAP
~D-82/03/12 'C-PEP 0
!                0-NA         _              . _ _ _                                                _ _ _ . _ _ .
~~C 1 -T".-Iv i'R $ U L i-T C-c. -H i D F I K C2-5U8 CONTRACT-AUDIT-8 C3-NES-$ERVICES-IN-PROCESS C4-ATT
i
'I 5-KAISER sLEMEN1-64 C1-GAP 0-hA S-iGRE' ~
      '          5- C G t E .. D-79/11/12. C-EETTER-TO-KAISER..__._C1-WW-SCHWIERS-TO-K.-BAUPGARTEN                                                                                 C2= INSTALLATION-VERITICAfl0N C3-CGLE-LETT         4 ER$-KEG-308-t-REG-329                           C4-ATTACHMENT-20D C5-GAP                                                                                                                                                       )
D-77/03/01'' C-LETEER-ic-KhtSER
0-kt0/144                                                                                                                                     _ _ .          ___
'C1-WW-SCHWIER5-Ib-WJ-FRIE5 RICH C2-MINUTES-OF-GA-MEETING C3-ATTACHMEN T-228 C4-GAP C5-FEBRUART-17.-1977..
I
I 0-NA
                $=FAISER       D-20/08/18                     C-MEP3                               C1-P-GITTINGS-10= REX-SAKER                       C2-ATTACHMENT-18             C3-GAP       C4-NI-$UPPORTS                               I 0-kA I       ' S-KAISER         D-79/b9/26                     C-LETTER-kO-CGtt                                   C1 ER.-PA2SHALL-TO-WW-$CHWlERS C2-INSTALLATION-VERIFICATION C3-ATTACHPENT-20F C4-GAP                                         l
~
                                                                                                                                                                "~
5-CGLE D-73/05/23 C-LETTER-TO-KAISER C1-WW-$CHWIERS-TO-VP-MCMA565~"C2'-FIELD-AUDIT-13 C3-ATTACHMENT-24 C4-GAP 0-NA i
,                0-rC/13369/0 5-CGtk'         D-79/08/14 ~ C-LE'TiR-To-KAISiR                             T                  ~~~ ~"il-WW-SCHWIERS-TO-RE-TURNER                           C2-INSTALLATION-VERIFICATION C3-ATTACHMENT-20A C4-GAP 1r         0-rE0/308                                                                                                                                                                                                                       )
5-C G t E..
s-hAC D-00/00/00 C-AFFIDAVIT C1-JAPES-TTNER                                                                 C2-ATTACHMENT-17           C3-GAP                 0-NA SI ,                                     .                                                . .                                  .
D-79/11/12. C-EETTER-TO-KAISER..__._C1-WW-SCHWIERS-TO-K.-BAUPGARTEN C2= INSTALLATION-VERITICAfl0N C3-CGLE-LETT 4
I S-tGLE          D-76/10/f6                    C1-WW-SCHWIERS-TO-WJ-FRIEDRICH                                                 C2-APPROVAL-0F-KEl-IS0 METRICS C3-ATTACHMENT-22A C4-GAP 0-NA qi                                           - - -
ER$-KEG-308-t-REG-329 C4-ATTACHMENT-20D C5-GAP
                                                                                                                                                                                                                                                )
)
        ,,,    S *J G M         D_-Hf CRG8
0-kt0/144 I
_                              C-P I NUIE S_-C F-J,0 l N,.T. -{ GH-M(-G A -M E E JI NG,_ ,, C 1-F E B-28.-19 7 5                                   C2-ATTACHMENT-21     (3-GAP 0-kA II '                                                                                                                                                                                                                                       )
$=FAISER D-20/08/18 C-MEP3 C1-P-GITTINGS-10= REX-SAKER C2-ATTACHMENT-18 C3-GAP C4-NI-$UPPORTS I
5-CGtt           D-82/C5/27                   C-PEPO                               C1-HR-SAEER-TO-HC-BRINKMANN                       C2-REIN $PECTICN-0F-THE-CRD-PIPE-UPPORTS                   C3-IN$7ALLED-8T-RC I
0-kA I
9F '       0-PRS /82/2C4                                                                                                                                                                                                                   a 5-CGtt           D-77/08/19                   C-PEPO                               CO-E A-PO RGM A NN-T O-t-HOLLOW ELL C2-INS T ALL A T I ON-O F -R PV-IN T E RN AL-t-C R D-$Y ST EM
' S-KAISER D-79/b9/26 C-LETTER-kO-CGtt C1 E.-PA2SHALL-TO-WW-$CHWlERS C2-INSTALLATION-VERIFICATION C3-ATTACHPENT-20F C4-GAP l
      !I         0-NA                                                                                                                                                                                                                           's S-SSL D-73/12/20 C-SPECIFICATIch                                                   C1-INSTALLATION-CF-REACTOR-PRE 55URE-VESSEL-INTERNALS C 2-CONTROL-ROD-DRIVE-HY DR AULIC-S YST E
R 0-rC/13369/0
      %I.'      P                                                                                                                                                                                                                            5p 0-hA
"~
[n]         $-CGtt         D-75/10/P3                     C-LETTER-TO-KAISER                                           C1-EC-PANDORF-TO-WJ-FRIEDRICH C2-FIELD-AUDIT-REPORT-55                               C3-RtACTOR-CONTROL           Ss
5-CGtk' D-79/08/14 ~ C-LE'TiR-To-KAISiR ~~~ ~"il-WW-SCHWIERS-TO-RE-TURNER C2-INSTALLATION-VERIFICATION C3-ATTACHMENT-20A T
C4-GAP 1r 0-rE0/308
)
s-hAC D-00/00/00 C-AFFIDAVIT C1-JAPES-TTNER C2-ATTACHMENT-17 C3-GAP 0-NA SI,
C1-WW-SCHWIERS-TO-WJ-FRIEDRICH C2-APPROVAL-0F-KEl-IS0 METRICS C3-ATTACHMENT-22A C4-GAP S-tGLE D-76/10/f6 I
0-NA qi
)
S *J G M D_-Hf CRG8 C-P I NUIE S_-C F-J,0 l N,.T. -{ GH-M(-G A -M E E JI NG,_,, C 1-F E B-28.-19 7 5 C2-ATTACHMENT-21 (3-GAP 0-kA II '
5-CGtt D-82/C5/27 C-PEPO C1-HR-SAEER-TO-HC-BRINKMANN C2-REIN $PECTICN-0F-THE-CRD-PIPE-UPPORTS C3-IN$7ALLED-8T-RC
)
I 9F '
0-PRS /82/2C4 a
5-CGtt D-77/08/19 C-PEPO CO-E A-PO RGM A NN-T O-t-HOLLOW ELL C2-INS T ALL A T I ON-O F -R PV-IN T E RN AL-t-C R D-$Y ST EM
!I 0-NA
's
%I.'
S-SSL D-73/12/20 C-SPECIFICATIch C1-INSTALLATION-CF-REACTOR-PRE 55URE-VESSEL-INTERNALS C 2-CONTROL-ROD-DRIVE-HY DR AULIC-S YST E P
5p 0-hA
[n]
$-CGtt D-75/10/P3 C-LETTER-TO-KAISER C1-EC-PANDORF-TO-WJ-FRIEDRICH C2-FIELD-AUDIT-REPORT-55 C3-RtACTOR-CONTROL Ss


                                                                                                                                                                                            ~ct e o 9
~ct e
                                                                                  ~
o 9
DRS-OFFLINE PRIkT 14 JUN 83                       08:50:3'?                                                                               DATE 061487         PAGE   40 0-NA
~
''                                                                                                                                                                                        A 5-CGtE           D-P1/01/C8 .. C-STATUS-TRIP-REPORT                               C1-RCI-COMPANT     0-NA S-CG8E           D-82/05/28 C-MEPh                     (1-HC-BRINKMANN-TO-JC-HERMAN                   C2-RCi-CRD-SUFPORT-WELDING           0-NA                               I s-CGtt           D-f2/05/24         C-RCI-MEETING-ON-THA-CRD-ST5 FEM                           C1-MAT-21.-1982       0-N5' ~
DRS-OFFLINE PRIkT 14 JUN 83 08:50:3'?
S-CGtt           D NU/02/15         C-MEM0           C 1-WW-S C HW i E R $ = h h-H C-O R j NK k A NN         C2-DOCUPENTATION-FOR-CONTRAC-T-H2832             C3-RCI 0-NA.                           ._                          _
DATE 061487 PAGE 40 0-NA A
1 .CGEL           D-81/03/03         t-t uJ E E-IL-ILC f           (1:MW-3 C tfit IER S 10- J.-RIL LUU___.0-0 A .12 4 0. . _ __ _
5-CGtE D-P1/01/C8..
#        5-CGEE           D-81/C1/C2..C-PONTHLT-aCTIVITT-REPORT                                   C1-JAN-30,-1981     0-NA                                                             ')
C-STATUS-TRIP-REPORT C1-RCI-COMPANT 0-NA S-CG8E D-82/05/28 C-MEPh (1-HC-BRINKMANN-TO-JC-HERMAN C2-RCi-CRD-SUFPORT-WELDING 0-NA I
      ..$-5EL D-81/0!/23 C-seEC-H282 C1-5DPPLEMENT-6                                       C2-INSTALLATION-GF-REACTOR-PRE 55URE-VESSEL               C3-INTERNALS-t-CONTROL-ROD-HTD 4       RAULIC-$TSTEP                                                                                                                                                                     T 0-NA
s-CGtt D-f2/05/24 C-RCI-MEETING-ON-THA-CRD-ST5 FEM C1-MAT-21.-1982 0-N5' ~
(       D-79/10/09 .. C-L E D I E R -T O-R C I . . _ . C 1-B K-CULV E R-T O-J A CC-M ILL E T T.           C2-CORE-PLATE-PINS             0-M/250                                         )
S-CGtt D NU/02/15 C-MEM0 C 1-WW-S C HW i E R $ = h h-H C-O R j NK k A NN C2-DOCUPENTATION-FOR-CONTRAC-T-H2832 C3-RCI 0-NA.
5-CG8E           D-79/0$/C1 .C-LETTER-TO-RCI                       C 1-HC-PR IN EM ANN-10-J ACK-MI LL ET T             C2-CRD-HTDRAULIC-$1 STEM 0-NA 5-CGgr           D .Z U O 6 L12.-_C-IIIIJt-J.U t il- R LP_0 R T - 107                     C_1-RCI_     Ot N A _. _ _. . ,
1.CGEL D-81/03/03 t-t uJ E E-IL-ILC f (1:MW-3 C tfit IER S 10- J.-RIL LUU___.0-0 A.12 4 0.. _ __ _
f       5-CGtE           D-81/07/29 C-LETTER-70-RCI _ C1-HC-BRINEMANN-TO-RL-KANANEN 0-NA                                                                                                   I S-CGtE           D-77/02/16 .C-MAPO                   C1-WW-SCHWIERS-TO-EA-BORGMANN C2-AUDIT-REPORT-77/03                             0-NA 5:.CGEE           D_Z6/EZ119 C-Meta                     C.1_E1.-Ea s DD R I _IO.-E A:PO RG M A N N __, C 2 -Q A- A UD I T-7 6 /17 0- N A T       S-CGCE.           D-76/06/C3         C-"EPO           C1-EC-PANDORF-TO-EA-DORGPANN                   C2-0A-AfDIT-76/11 G=NA                                                     1 5-CGEE           .D-75/11/20           C-"EF0           C1-EC-PAN 00RF-T0-EA-00RGMANN C2-AUDIT-REPORT                             C3-WM-POWELL-CO   C4-PLANT-2 T       0-NA                                                                                                                                                                               )
5-CGEE D-81/C1/C2..C-PONTHLT-aCTIVITT-REPORT C1-JAN-30,-1981 0-NA
5-CGtt           D-74/03/28         C-PEPO           C1-EC-PAkDORF-TO-AE-ROTHENBERG                         C2-GA-ALDIT C3-WM-POWELL-A0         0-NA
')
                                                                                                                                                                                          ')
..$-5EL D-81/0!/23 C-seEC-H282 C1-5DPPLEMENT-6 C2-INSTALLATION-GF-REACTOR-PRE 55URE-VESSEL C3-INTERNALS-t-CONTROL-ROD-HTD 4
9"                                                                .      . ..
RAULIC-$TSTEP T
S-Stt 0-00/00/00 C-VENDOR-GA-MANUAL-EVALUATIGN 0-NA f"       D-76/08/10 C-MATERAAL-RECAIVED-REPORT                               C-KAISER             C1-WM-POWELL-C0     0-28795                                                         'l)
0-NA
D-76/09/07 C-MATERIAL-RECEIVED-REPORT                               C-KAISER             C1-WP-COWELL-CO. 0-29607                                                           ,
(
D-76/05/17 C-MATERIAL-RECEIVED-REPORT                               C-KAISER             C1-WP-POWELL-C0      0-26231
D-79/10/09.. C-L E D I E R -T O-R C I.. _. C 1-B K-CULV E R-T O-J A CC-M ILL E T T.
.        0-75/03/21       C-M ATERI AL-PEC E IVE D-EE PORT                   C1-WM-E0WELL-C0             0-15368                                                                         I D-75/04/07       C-PATERIAL-RECEIVED-REPORR                         C-KAISER             C1-Wr-POWELL-00     0-15737
C2-CORE-PLATE-PINS 0-M/250
                                                                                        .                                                                                                  a D-75/02/21       C-PATERIAL-RECAIVED-REPORT                         C-KAISER             C1-Wu-POWELL-00     0-14314 3
)
0-75/05/27 C-PATERIAL-RECEIVED-REPORT                               C-KAISER             C1-WP-POWELL-C0     0-16803 D-75/03/26       C-PATERI8L-RECDIV4D-REPORT                         C-KAISER             (1-WM-POWELL-C0     0-15491 e isrevast       r -evenues ercriven crocar                         r-veiero             es.ur-enuree-so     e-tsSA7
5-CG8E D-79/0$/C1.C-LETTER-TO-RCI C 1-HC-PR IN EM ANN-10-J ACK-MI LL ET T C2-CRD-HTDRAULIC-$1 STEM 0-NA 5-CGgr D.Z U O 6 L12.-_C-IIIIJt-J.U t il-R LP_0 R T - 107 C_1-RCI_
Ot N A _. _ _..,
f 5-CGtE D-81/07/29 C-LETTER-70-RCI _ C1-HC-BRINEMANN-TO-RL-KANANEN 0-NA I
S-CGtE D-77/02/16.C-MAPO C1-WW-SCHWIERS-TO-EA-BORGMANN C2-AUDIT-REPORT-77/03 0-NA 5:.CGEE D_Z6/EZ119 C-Meta C.1_E1.-Ea s DD R I _IO.-E A:PO RG M A N N __, C 2 -Q A-A UD I T-7 6 /17 0- N A T
S-CGCE.
D-76/06/C3 C-"EPO C1-EC-PANDORF-TO-EA-DORGPANN C2-0A-AfDIT-76/11 G=NA 1
5-CGEE
.D-75/11/20 C-"EF0 C1-EC-PAN 00RF-T0-EA-00RGMANN C2-AUDIT-REPORT C3-WM-POWELL-CO C4-PLANT-2 T
0-NA
)
5-CGtt D-74/03/28 C-PEPO C1-EC-PAkDORF-TO-AE-ROTHENBERG C2-GA-ALDIT C3-WM-POWELL-A0 0-NA 9"
')
S-Stt 0-00/00/00 C-VENDOR-GA-MANUAL-EVALUATIGN 0-NA f"
D-76/08/10 C-MATERAAL-RECAIVED-REPORT C-KAISER C1-WM-POWELL-C0 0-28795
'l)
D-76/09/07 C-MATERIAL-RECEIVED-REPORT C-KAISER C1-WP-COWELL-CO.
0-29607 C1-WP-POWELL-C0 0-26231 D-76/05/17 C-MATERIAL-RECEIVED-REPORT C-KAISER 0-75/03/21 C-M ATERI AL-PEC E IVE D-EE PORT C1-WM-E0WELL-C0 0-15368 I
D-75/04/07 C-PATERIAL-RECEIVED-REPORR C-KAISER C1-Wr-POWELL-00 0-15737 a
D-75/02/21 C-PATERIAL-RECAIVED-REPORT C-KAISER C1-Wu-POWELL-00 0-14314 3
0-75/05/27 C-PATERIAL-RECEIVED-REPORT C-KAISER C1-WP-POWELL-C0 0-16803 D-75/03/26 C-PATERI8L-RECDIV4D-REPORT C-KAISER (1-WM-POWELL-C0 0-15491 e isrevast r -evenues ercriven crocar r-veiero es.ur-enuree-so e-tsSA7


o a*
o a*
* e k
* e k
1 I                                                                                                                                                                       .
1 I
                                                                              .                      ..                                                                                                                        O' DRS-0FFLINE PRINT 14 JUN 83                             C8:50:37                                                                                               DATE 061483         PAGE         41           'l S-SLL D-81/12/01 C-PATERIAL-t-ECUIPMENT-5CHEDULE                                           .C1-MECNANICAL-DEPARTMENT                                 G-NA                                                         ')     >
O' DRS-0FFLINE PRINT 14 JUN 83 C8:50:37 DATE 061483 PAGE 41
5-$tt D-81/12/01                                                                                                                                                                                                         {
'l S-SLL D-81/12/01 C-PATERIAL-t-ECUIPMENT-5CHEDULE
C-PATERIAL-t-ECUIPMENT-$CHEDULE.                                     C1-ALECTRICAL-DEPARTMENT                                 0-NA                                                               '
.C1-MECNANICAL-DEPARTMENT G-NA
      . _.5- 5 8 L.9:Z3L12LD3 c-Y11112.T.Q:H U.5 KT:ER o tu CIl-n f e--A                                                                       _ , , _ _ , , , , _
')
D-74/12/30     C-HU$KI-PRODUCTS-ANC.                           C-MATERIAL-RECEltED-REPORT.                         _C-RAISER               0-13481                                                                 )
5-$tt D-81/12/01 C-PATERIAL-t-ECUIPMENT-$CHEDULE.
0-74/12/20. C-PATERIAL-RECEIVED-REPORT.                               C-KAISER             C1-HUSKY-PRODUCTS-INC                         Q-13336
C1-ALECTRICAL-DEPARTMENT 0-NA
_ D Z5101102 t-PaIE81eL-BSCEIVER:REEORI_                                   f-EAISER 7
{
C1:U U S K Y..-P R O DU C T S-I N C _. _.0 - 13 5 3 3 5-C6tt     _ D-78/09/15           C-MEPO                     C1-WN-$CHWIERS-To-EA--ORGMANN C2-GA-EUDIT-78-05 0-NA                                                                                               ')
. _.5-5 8 L.9:Z3L12LD3 c-Y11112.T.Q:H U.5 KT:ER o tu CIl-n f e--A D-74/12/30 C-HU$KI-PRODUCTS-ANC.
5-CGEE         D-78/10/17..C-MEPO                             C1-WW-$CHWIERS-TO-EA-DORCMANN C2-TESTS-MADE-0N-CABLE-TRAY                                             C3-$URVEILLANCE-REPORT-69 o-NA 3
C-MATERIAL-RECEltED-REPORT.
3-CGEE         D-82/05/11         C-CA-AUCIT-REPORT-82-15 C1-HUSKY-PRODUCTS-INC                                             C2-MAY-11-12 -1982                   0-NA i
_C-RAISER 0-13481
                                                                                                                                                                                                                                }
)
                                                  . . .. . . ~ . . _ . .              .
0-74/12/20. C-PATERIAL-RECEIVED-REPORT.
C-KAISER C1-HUSKY-PRODUCTS-INC Q-13336 7
_ D Z5101102 t-PaIE81eL-BSCEIVER:REEORI_
f-EAISER C1:U U S K Y..-P R O DU C T S-I N C _. _.0 - 13 5 3 3 5-C6tt
_ D-78/09/15 C-MEPO C1-WN-$CHWIERS-To-EA--ORGMANN C2-GA-EUDIT-78-05 0-NA
')
5-CGEE D-78/10/17..C-MEPO C1-WW-$CHWIERS-TO-EA-DORCMANN C2-TESTS-MADE-0N-CABLE-TRAY C3-$URVEILLANCE-REPORT-69 o-NA 3
3-CGEE D-82/05/11 C-CA-AUCIT-REPORT-82-15 C1-HUSKY-PRODUCTS-INC C2-MAY-11-12 -1982 0-NA i
. __...C-o A---51 AND A R D S-PRO CE DURE... _ C1-INDOCTRINATION-t-TRAINING-07-PERSONNEL C2-02-eAS-01 C 3-R E VI S ION -
S-CGt!
S-CGt!
D-77/03/15
D-77/03/15
                                  . __ . . .C-o A---51 AND A R D S-PRO CE DURE. . . _ C1-INDOCTRINATION-t-TRAINING-07-PERSONNEL C2-02-eAS-01                                                      C 3-R E VI S ION -
...... ~.. _..
0       C4-V10D                         . _ . _        _
}
c-02/cAS/01 3
0 C4-V10D c-02/cAS/01 3
5-CGtt         D-81/04/11         C-GA-PROCEDURE 0-10/oA/03 C1-CER TIF IC ATION-OF-INSPEC TION-PERSONNEL                                   C2-10-GA-03 C3-REv-0       C4-SUPPERCEDED 1
5-CGtt D-81/04/11 C-GA-PROCEDURE C1-CER TIF IC ATION-OF-INSPEC TION-PERSONNEL C2-10-GA-03 C3-REv-0 C4-SUPPERCEDED 0-10/oA/03 1
5-CGtt         D-31/05/C1 C-on-PRCCEDURE                               C1-QA-INSPECTIONS C2-10-QA-04 C3-REV-C                                         C4-5UPERCEDED       c-10/0A/104 5-(RIL         D-12 /Q L LC]._ ,{-0 A -P R C ((,g y R L               C 1 -Ly,A C y A l_IQN,-J ,0 U A L.I F.I C A T I O N 0 F -G A D- P E R S ON N E L
5-CGtt D-31/05/C1 C-on-PRCCEDURE C1-QA-INSPECTIONS C2-10-QA-04 C3-REV-C C4-5UPERCEDED c-10/0A/104
                                                                                                                                                                                                                                )
)
b                                                                                                                                                              C2-02-GA-04 C3-REV-0     C4-5UPERCEDE 0-02-oA/04                               _                    ,
5-(RIL D-12 /Q L LC]._,{-0 A -P R C ((,g y R L C 1 -Ly,A C y A l_IQN,-J,0 U A L.I F.I C A T I O N 0 F -G A D-P E R S ON N E L C2-02-GA-04 C3-REV-0 C4-5UPERCEDE b
                                                                                                                                                                                                                              ')
0-02-oA/04
D-76/05/06 C-REVISICN-0                 _      C-QA-PROCEDURE-20 C-KAISER                               C2-IND0CTRINATION-t-TRAINING                       0-20
')
_ D.-11(11/24 C -O A .fRACED U R E _Z C_.Cl-RIV.13J Q N-$                           (2=INDQCp jN AJION _t-TR AINING                           0-20 3
D-76/05/06 C-REVISICN-0 C-QA-PROCEDURE-20 C-KAISER C2-IND0CTRINATION-t-TRAINING 0-20
_ D.-11(11/24 C -O A.fRACED U R E _Z C_.Cl-RIV.13J Q N-$
(2=INDQCp jN AJION _t-TR AINING 0-20 3
3 3
3 3
eeEXIT LOCa*0?5447 GPMC,BRE                                                                         .RUNet0/4036 49 ILLEGAL CHARACTER             ._ .                                                                                                                                                                          f RUNSTREAM ANALYSIS TERMINATED                                                                                                                                                                                       $-
eeEXIT LOCa*0?5447 GPMC,BRE
M1 PLOCK S!!E 150 MERGE PChER                                 23 EQP TYPE 3e
.RUNet0/4036 49 ILLEGAL CHARACTER f
,                M? BLOCr SITE 3 E5 PERGE PChER ~                               3 EQ U NE'3d
RUNSTREAM ANALYSIS TERMINATED M1 PLOCK S!!E 150 MERGE PChER 23 EQP TYPE 3e M? BLOCr SITE 3 E5 PERGE PChER ~
' 3                                                                                                                                                                                                                         <,
3 EQ U NE'3d
18.7PS/RFC, Its               918, CCs                     916, PI A s 96 0.                                                                                                                               A}}
' 3 A
18.7PS/RFC, Its 918, CCs 916, PI A s 96 0.}}

Latest revision as of 05:39, 15 December 2024

Independent Review of Zimmer Project Mgt, Biweekly Status Rept 3,for 830521-0603
ML20072D280
Person / Time
Site: Zimmer
Issue date: 06/10/1983
From:
TORREY PINES TECHNOLOGY
To:
Shared Package
ML20072D279 List:
References
NUDOCS 8306230133
Download: ML20072D280 (46)


Text

{{#Wiki_filter:i 7 e e INDEPENDENT REVIEW H ZIMME PROJECT MANAGEMENT BIVEEELY STATUS REPORT EO. 3 FOR THE PERIOD ENDING JUNE 3, 1983 The status report below is in reference to the Torrey Pines Technology Program Plan, document number GA-C17044, Revision A, " Independent Review of ZIMMER Project Management," dated May, 1983 Revision A of the program plan, incorporating changes as described in Biweekly Status Report No. 2, was described and discussed in a public meeting with the NRC Region III on May 26, in the Americana Hotel at the Greater Cincinnati International Airport. The revised program plan was accepted by the NRC with the proviso that a review be added of the interfaces between CG&E and Reactor Controls Incorporated (RCI). Three TPT people spent Saturday, May 21, in the CG&E Nuclear Operations Central Files in downtown Cincinnati, reviewing documents which appeared to be pertinent to this study. Thir-teen additional TPT team members travelled to Cincinnati on May 22. The entire tean of 16 TPT personnel commenced detailed follow-up interviews and a review of documentation related to the Zimmer Project on Monday morning, May 23 As of June 3, there were 18 people on the TPT team at Zimmer. The TPT team has spent the two weeks covered by this report reviewing the documents identified by the early arriving mem-bers, and reviewing documents in a number of CG&E site depart-mental files as well as subcontractor files. Access to KEI's files was restricted pending review by KEI's legal counsel. Team members interviewed additional CG&E and subcontractor personnel and outside interested parties as well as reinter-viewing individuals on particular points. Attachment A lists the 78 individuals who were interviewed during this reporting period. Additional personnel were contacted by telephone or in person for simple questions, such as the location of certain documentation. Over 2,000 documents have been identified for review and eval-uation by the TPT team during this visit to the Cincinnati area. One of the additions to the TPT team after May 23 was a records control specialist whose job has been to catalog the documents identified by assigning each one a TPT access number, together with pertinent information on dates, author, subject, key words, etc. This information is being input into the computerized r"JO6230133 830610 PDR ADOCK 05000358 R PDR

Biweekly Status Report No. 3 for the period ending June 3, 1983 Page Two document data base at TPT headquarters in San Diego, using a remote terminal connected by telephone to the'TPT computer. Equipment problems delayed this operation and not all of the documents had been cataloged by June 3 Attachment B lists the documents that have been cataloged; the remainder will be listed in the next report. As of June 3, 5,500 manhours had been expended and the project was on schedule in accordance with the Project Schedule given in the revised program plan. --+r w e

Attachnent A IEDEPEEDENT REVIEW OF ZIMMER PROJECT MANAGEMENT LIST OF PERSONS INTERVIEWED BETWEEE 5/21 AED 6/3/83 CG&E Assigned to CG&E P. L. Adkins T. Anderson (BSG) G. E. Bennett J. Linetsky (AMK) H. C. Brinkmann F.S. Hoover (EDS) M. Carpenter T. Bartholomew (GCA) K. K. Chitkara B.L. Kallander (GCA) J. E. Conant B. Long (GCA) W. D. Corbin G. W. Merrill (GCA) W. P. Cooper D. L. Ramstrom (GCA) B. I. Culver M. M. Rhodes (GCA) W. H. Dickhoner D. Stringer (GCA) R. P. Ehas S. Martin (Independent) G. C. Ficke K. Dempsey (HJK) J. D. Flynn D. V. Dunnum (HJK) R. Foshag D. O'Keefe (HJK) D.J. Frederick W. Scott (HJK) B. A. Gott L. Vice (MDE) J. C. Herman L. Anderson (NES) W. Kacer W. Herrett (NES) C. Keller W. A. Kaer (NES), W. B. Murray P. Payne (NES) T.D. O'Farrell M. Shannon (NES) G. M. Pemberton E. McVae (NIC) H. R. Sager B. Newcomb (NIC) J. R. Schott C. W. Vincent (NIC) D. J. Schulte P. Wilson (NIC) J. F. Shaffer G. Jodrey (SAI) F. J. Svetkovich M. Kopp (SAI) M. Threm G. M. Orlov (SAI) W. N. Tobler R. Rinderman (SAI) J. J. Wald H. Kinkade (S&L) J. F. Weissenberg B. Larson (S&L) J. Williams P. Luyster (S&L) D. Miller (S&L) Kaiser C. Watson (S&L) B. Weinhold (S&L) M. Albertin C. Stanfield W. Ferree

Attachment A Page 2 LIST OF PERSONS INTERVIEWED BETWEMN 5/21 AND 6/3/83 NRC Others F. Christianson V. Griffin P. Gwynn E. Hofstader D. Jones E. Pandorf R. Reiter W. Schweirs 4 J i i e(Answered some questions by telephone but declined to be interviewed in person.) i f i =

._ 7 4, c .c Attachment B ~ l \\ INDEPENDENT REVIEW OF ZIMMER PROJECT MANAGEMENT PARTIAL LISTING OF DOCUMENTS CATALOGUED BY TPT REYIEWERS DURING THE PERIOD MAY 19 THROUGH JUNE 3, 1983 l l

a 9 e . =. O DR$-OFFLINE PRINT 14 JUN 83 08:50:37 DATE 06148? PAGE 1 THERE WERE 916 MATCHES FOUND tbR THE FOLLOWING KET-WORDS I-SITE O ~ THE CUTPUT OPTIONS hERE: -. ~ ~.. _.- ^ D-DAr&~ C - xmv woes t YTTLJr5 e - en.sans ren's Ns/moEW. THE FOLLOWING ACCESS huMPERS MATCH THE REQUIREMENTS. 5-CGtt 0-78/02/06 ' C-M E P'b C5-WW-SCHWIER$-FC-EA-BORGMANN ~ '2-APPROVED-VENDORS-FOR-ES$ENTIAL-COMPONENTS-0R-SERVIC C C-NA $-CGtt n-82 L12 t C0__.f re EAuls1110 NS:EA R-9 A h:R EP.LA C EP EN f3_0-Ha s / 82 / 495 __ S-CGet.. 0-83/C1/C7..C-ANALYSIS-OF-IIDR-PROGRAM .C1-GA-1875.C2-LETTER-TO-PALLADINO-t-HJK C3-PROCEDURE-IAP0-5 0-HRS /83/021 I 5-CGEE D-83/b1/03' C-NRC-CURRESPONDENCE Ci-I.E.-kN5PkCTION-REPORT-82-06 C2-HJK-LETTER-TO-CGRE-DATED-DEC-1,-1982 0:HB5/83/005 ( S-CGtt D-P2/12/17.C-TRIP-REPCRT-FRM-AIF-EEI C1-SPECIAL-MEETING-ON-CONSTRUCTION-04 0=HR$/82/543 ) 5-CGRE D-82/12/22. C-REcuEsf-FOR-REPLACEMENT-TECHNICAL-AID-PERSONNEL-IN-0 G-NR$/82/542 __ _.5-J G B t p-E2110lC7 L.T 8 8_C E ING-fttC. CONC ERN$_L]-E EE9-f 0 R.HR-S A G gR a:HR5/P28397 ( 5-CGRE D-P2/10/C6 C-UNACCEPTABLE-AFR-RESPONSE-NOTIFICATION 0-HRS /82/396 { 5-CGtL D-82/10/f1 C-CRD-DE53GN-t-NRC-CONCERNS C1rMEMO C2-HR-$AGER-TC-EA-PORGPANN 0-HR5/82/384 .. _ 5.CG8E B-82/09/30._I-MEC.CChCERNS-0N-CONIR0L-Of $UBCONIPACTOR5 _.C1-LETTER 0-HRS /82/376 (, 5-CGRE D-82/09/28 C-SE PT-198 7-PE E T ING. C1-EDISON-ELECTRIC-INSTITUTE C2-QA* COMMITTEE C3-LETTER I! C-HRS /P2/373 b' 5-CGtt D-82/09/22" C-NRC-CChCERNS-Oie-C0hTROL-bF-SUBCONTRACTOR $ C1-LETTER 0-HR$/82/369 S-CGtt D-P2/09/22 C-MO CK UP-WEL D-5 AMPLE S-70-C L O SE-0UT-T ASK-V C1-LETTER 0-HRS /82/368 S-CGtt D-P2/C9/24' C-LETTER C1-L5CK-UF-RESPUNSES-FOR-0 PEN-NRC-fTEP$ 0-HR$/82/300 h S-CGRE D-82/09/12 C-LETTER C1-IEM-M-19 C2-RNR-VALVE-1E11FOU9 Q-HRS /82/298 e 5-CGtt 0-82/08/12 C-LETTER C1-MANAGEMENT-CORRECTIVE-ACTION-REQUEST-82-04 Q-HR$/P2/296 0 0-HR$/82/295 5-CGtt D-P2/08/11 C-LETTER C 1-C OR R E C T I V E-A C TIO N-R E Q UE ST-8 2-61 r O' s-CGRE D-P2/C8sti C-CONTRACT-PERs0NNEt-REau!5ITION C i-t E T TE R o-HRsic2i294 'r 5-CGtt D-f2/C7/f8 C-EVALUATION-OF-$J-N0dkEd hb Ci-FRb4-HkR-PkRCH-19?2-VISIT C2-LETTER c-HR$/82/266 ~ M 'r 5-CG8E D-P2/07/06' C-LETTER (1-PRIOR IT y-OF-G AD-P ER $0NN EL-WOR K-SC HE DUL E S Q-HRS /P2/250

'e e e e DATE 061483 PAGE 2 DRS-OffLINE PRINT 14 JUN 83 08:50:37 5-CGtt 0-82/C5/27 C-LETTER C 1-R E INS P E C T 10N-C F-THE-C RD-P IP lh G-SU PPOR T S C2-INSTALLED-BY-RCI. 0-HR5/82/2P4 (% . 0-HR$191/108 D-81/10/09 C-LETTER C1-00CurENTAT10N-REVIEW-ALERT-1 $~CGEE D-P2/05/21 C-LETTER C1-NATI0hAL-POARD-AUDIT-REPORT Q-HRS /P2/196 ') S-CGtt D-22/05/2C C-L E TT E R C1-PROPOSED-POLICY-STATEPENT-fba-IIMPER-SCP 0-HRS /82/194

  1. 1 5-CGtt D-82/05/C7 C-LETTER C1-ED-ABe0TTS-VISIT G= HRS /82/176 5-CGtt 0 82/04/C1 C-LETTER C1-RPV-CONTROL-STSTEP 0-HRS /82/114

') 5-CGtt D-P1/12/C4 C-LETTER C1-TRAINING-015CUSSIUN-ON-0UALITY-ENGINEERS C2-UNDERSTANDING-DE51GN-FUNCTION C3-IDE NTifY-INSPECTION-REQUIPEMENTS 3 0-HRste1/te5 5-CGEE D-F1/11/21 C-LETTER C1-PERSONNEL-BRIEFING 0-HR$/81/171 ) 3-CGtt D-81/11/19 C-LETTEE Ci-04-M5kUAL-REVIEW 0-HRS /91/168 3 5-C G t'E D-81/11/19 C-LETTER C1-04-MANUAL-REVIEW 0-HR$/81/167 5-CGRE D-F1/11/18 C-LETTER C1-08-MANUAL-REVIEW C2-$TRUCTURAL-DYNAMICS-RESEARCH-CORP 0-HR$/81/166 ) 5-CGRE D-P1/11/17 C-LETTER Ci=0A-hkNUAL-REVIEW C2-NATIONAL-ELECTRIC-Colt 0-HR$/81/165 4 S-CGRE D-P1/11/16 C-LETTER C1-GA-PANUAL-REVIkW C2-TRACOR-WESTRONICS 0-HRS /21/162 I ] 5-CGtt D-P1/11/11 C-LETTER C1-APPolhTMENT-OF-ACTING-DIRECTUR C2-0E-OLALITY-00CUMENTS 0-HRS /87/153 ) 5-CGtt D-F1/11/C9 C-LETTER Ci-DEVELUPMiNT-0F-THE-0PdRATIONS-QA-PLAN 0-HR$/81/149 5-CGEE D-P5/50/29' C-LETTER Ci-NECES$1VE-AC-POTUR-$1ARTER-CONTROL-VOLTAGE-DROP C2-LONG-CONTROL-CABLES C3-BECHTEL-M ) C 4.UNQU A LIF ILL-(jB L [1__{ }-I T E -G.00A D -$ L.AJS-If-EQ UI PM F h:T_ _ _,, _ CAR-50__. 1 0-NR5/81/128 ') 5-CGtt D-P1/11/20 C-LETTER-TC-KA!$ER C1-HR-SAGER-Tb-D.-HOWARD (2-AWS-WELD-UNDERCUT 0-KE0/705 ') I U"E"TTip C1-STOP-bORK-bRDTR C2-REVISION-2 0-HRS /81/120 t S-CGtt D-81/10/59' C L j 5-CGRE D-P1/10/13 C-LETTER C1-GA-DEPARTFENT-MEETING 0-HRS /81/112 ') F i 5-CGRE D-P1/10/12 C-GA-MAhUAL-REVIEW C1-RADCO-TECHNOLOGY-COMPANY 0-HR$/E1/111 j

f 5-CGtt D-82/01/C7 C-LETTER C1-CHANGES-TO-ZlFMER-FSAR C2-CHAPTER-14 0-HR$/R1/223

') j -CGtt D-P2/01/C4 C-CONTROL-ROD-DRIVE-HYDRAULICS 0-HR$/81/218 ') t .D-P1/12/28 C-LETTER C1-N EW-H JK-P ER S0PNEL-S IGNING-W ELD-D A T A-F ORP S C2-HANGER-DRAWINGS 5-CGEE 0-HR$/81/212 4, ,__ _J CGtt D-P 1/_12 /.22_C-L.E Ti f R.__ C 1-C L E A N L I N E 55-C ON T R OL. 0-HR 5 / 91/2 08 'k fIj3 5-CGEE D-P2/04/C1 C-LETTER C1-AFR-80-2-9-70RM-MA-20-2 0-HR5/t2/96 q,

w e ag ~ DRS-OffLINE PRINT 14 J U N 8 3 C8:50:37 DATE 061483 PAGE 3 S-CGRE D-F2/03/11 C-CLERIEAL-PERSONNEL C1-LETTER C2-0PERATIONS-GA-GRCLP G-HR$/22/81 S-CG8E D-f2/03/f5 '~C-VENh0R-AUDIT-5CHEDULE d-NA S-CGtt D-P2/03/C1 C-L5TTER Ci-StL-SPEC 5FkCATION5 0-HRS /82/66 S-CGtt 0-P2/01/20 C-LETTER C1-1882-E08LS-E-0BJECTIVES 0-HR$/82/23 S-CGtt 0-82/01/20 C-LETTER C1-kPPROVht-OF-NhC-REPbRTS-SU5MkTIED-UNDER-10CRF.50.55 0-HR$/82/22 S-CGRE' D-81/07/C6 C-LETTER C1-GA-ORCANIZATIbN 'G-NA 5-CGtt D-21/06/29 C-LETTER C1-PROPERTT-DEPARTPENT-BUDGET C2-1982-THRU-1992 0-NA S-CGtE i-P1/06/23 ~ C-3.-NORRIS-TU-P.-KhhER C1-MFM0 (2-Kk! 0-NA 8 ~D-P1/06/1e 'C-ADeif CNAL-SPACE-REQUIREMENTS C1-SkRv!CE-BUILDING Q-NA S-CGtE S-CGRE D-P1/10/01 C-LETTER C1-LOGGING-0F-NONCONFORMANCE-REPORTS 5-Nk S-CGRE D-2k/d9/22 C-LETTER Ck-WELDS C2-hR5 WING-$-636P C3-REV-A C4-BEAMS-46-t-37-TO-COLUMN-46C 0-NA ( ~ ) L-CGEE o-P1/07/11 t-Or_ggalln-stu.D G E T S C1 _IE8!.1982_____ _ 0-NA I S-CGtt D m1/09/18 C-LETTER .C1-04-0RG-CHART C2-KET-PER$0NNEL 0-HR$/81/83 I S-CGtt 0-f1/C9/14 C-LETTER C1-FIELD-CONSTRUCTION-PROCEDURE-2-29 C2-VIOLATION-0F-AWS-CODE N 0-HRS /E1165 'b S-CGEE D-81/OS/17 C-LETTER C1-NRC-REQUEST!ED-DOCUPENTS Q-HR$/81/43 i C-PHIL-CITTINGS_ _ _.. C1-NRC-INTERVIEW 0-KC/15694/0 S-CGRE D-F1/C9/14.-.... 3 T S-CGLE D-75/12/26 C-LETTEa C1-H.C'-kUTTING-CONTRACT Q-REF/PT ) 5-KAISER D-75/04/11 C-LETTER C1-INSPE CTION-OF-PH ASE-2-PIPING 0*FC/3449/0 T S-CGEE D-75/C8/01 C-INSPECTION-REQUIREPENTS C1-SEPT-1975-THRU-FEB-1976 0-NA ) (* S-KAISER D-74/10/14' C-LETTER (1-REQUEST-F0h-ADDITIONAL-GA-PERSONNEL 0-KC/2643/0 5-CGRE D-74/11/01 C-PER50kkEL-FOR-IIPMER-PROJECT 0-NA } S-CGRE D-75/03/31 C-MIkUTES-OF-J0lNT-CELE-eel-CA-MEETING Q-NA if 5-CGRE D-74/10/30 C-REcuEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL 0-kEB/7 I S-FAISER D-74/11/01 C-PAINTING-INSPECTOR C1-DOCUMENTATION

  • CLERK 0"KC/2754/4 S-CGtt D-75/C1/30 C-EFFICIENCT-0F-0A-0PERATIONS 0-FM/220 S-EG8E D-75/01/15 C-MAkPobER-AUTHORIIA110NS Q-EEP/12 W

S-CGIE D-75/02/17 C-EFFICIENCT-OF-0A-OPFRATIONS 0-NA 2bb' D-75/0*t04 C-PAINTING-t-CCATINC-INSPECTION 0-rEf/S bh

e 'e f5 o s DRs-OFFLINE PRINT 14 JUN 83 08:55:37 BATE 061483 PAGE 4 'T 5-RAISER D-75/03/21 C-KEI-GA-0C-ORGAN!!ATION 0-NA $-CGRE. D-75/03/26 C-REQUEST-FOR-ADDITIONAL-GUALITT-AS$URANCE-PERSONNEL Q-NA ._ $.KAISEE D-75 /D4 L16 _f_KE 2: 00 A LIIY - A S $ U R A h C E:0R G A N12&J10N - 0-NA S-CGRE D-76/11/!0..C-TELEPHCNE-CONVERSATION C1-DILL-SCHWIER$ Q-KB/16 0-NA S-CGtt D-81/07/17. C-CGEE-t-HJK-CURRENT-t-PROJECTED-QC-INSPECTOR C1-MANNING-LEVELS 0-HR$/81/05 1-CGts b-E1IOZL]6 r-guALIll:CONElRt!all0N:EROGR AM ' 0-HR5L91/04.. _ _ _... _. 5-CGtt 0-21/02/17. C-0UALITT-ASSURANCE-5URVEILLANCE 0-NA I 5-CGRE D-P1/04/27. C-PAUL-EaRRETT C1-DDC-15$UE 0-NA 5:CGgr e-E1/02/ 2Z_ _C-0EEM:LIELD-AUD UM C1:5URVEILLANCE-REPORTS.0-NA_._ _. 8 5-CGRE .0-81/02/C2_ C-50.55E-REPORTS.0-NA ) 5-CGtt D-F1/01/20 C-FIELD-AUDIT-316 0-NA. E-CGgr D=L1/ 0.1 L1L__ C C G EE-A UD Il:1C H E D U L E__._A:M A I 5-CGtt D-81/01/13 C-NRC-CC*RITMENTS 0-NA } S-CGEE D-81/01/12 C-OPEN-FIELD-AUDITS _C1-SURVEILLANCE-REPORTS 0-NA 5 CGts 0:E1/01/06 f-REORGPhEZAIIQM__a:NA T 5-CGtt D-80/10/15. C-WORKSHOP C1-REACTOR-CONSTPUCTION-t-CPERATION C2-CON $1RUCTION-MANAGEMENT C3-QA-PRODLEMS-t-REMEDIE I 5 0-NA ') ____5-CGgr D-f0/02/C1 r:HJK:ALLEGail0NS_LL:5AGEk C2-MINUTES-0E-J0lNT-CGEE-KEI-GA-PEETING C3-JANUART-17,-1975 0-NA ?(. C2-GA-UNGRADIhG-PROGRAM 0-kA 5-CGtt D-00/04/21 C-HJK-ALLEGATIONS C1-SAGER T" 'S-CGEE D-20/07/14' C-HJN-AttEGAilUNS C 1-S A G ER C2-CONCERNS-REGARDING-HJK-0A 0-NA 3 5-CGtt 0-00/00/C0 C-HJF-ALLEGATIONS C1-5AGER C2-WELD-REJECTED-BY-NES 0-NA i', ') 5-CG8E D-81/12/C8' C-LETTER C1-CO'RECTIVE-ACTION-REPORT-STATUS 0-NA R 1P 5-CGtt 0-M1/12/23 C-LETTER C1-CORRECTIVE-ACTION-REPORT *tVIEW 0-eas/P1/16 ' 'd S-CGEE D-R1/12/?C C-LETTER C1-CONDUCT-Of-INSPECTION 0-kE0/784 9' S-CGRE D-P2/01/15 C-LETTER C1-CORRECTIVE-ACTION-REPORT-PROCESSIAG Q-DJS/82/07 3 5-CGtt D-P2/01/29 C-LETTER Cl-INITI AT TON-0F-CORRE CTIVE-A C TI ON-R EQUE S T S 0-DJS/82/12 8 5-CGRE D-?2/03/02 C-TETTER C1-CORRE CTIVE-AC TION-R EQUE ST 4-NA N e.rrer e e *,n v e ss r-ervere r e-r noor r t v wr-a r t o ne -o r n eer e v-r n=rnir e-v p a r r e me o-ise t s p ? t o ?

t a DRS-0FFLINE PRINT 14 JUN 53 58:50h37 DATE 061483 PAGE 5 'T S-CGRE D-P2/04/21. C-LETTER C 1-UNT IM EL T-RE VI E W S-CF -C AR *S-IN-THE-G A D 0-NA

  1. 4 5-CGEE D-22/04/30 C-LETTER C1-CORRECTIVE-ACT10N-REQUEST-STATUS C2-APRIL 0-NA 1:Citr n-E2/D6 f t&___C CQRR EL]lVE:A CI E0!L-RLOUL511:51 AM1 C.1-M A_v 0-NA _.__

S-CGRE D 82/02/C8 C-CORRECTIVE-ACTION-RtPORTS 0-KE0/P83 T i 5-CGtt D-E2/08/te C-CORRECTIVE-ACTION-RE0uESTS Ci-M AN AGEME NT-COR RE C TiVE-, CTiON-R E0uE ST S 0-DJS/82i.e _ _ 5 CEtt 0:22/08 L2.5_C-IER-EV ALU A130N:8Y 08E._9:N A 8 S-CGtt D-22/09/20 C-CGRE-CUALITT-ENGINEERING C1-REVIEW-E-SUBSEQUENT-CAR-ISSUANCE 0-HRS /82/361 ) 5-CGRE D-82/11/02 C-PROCES$1NG-0F-CAR'S 0-HRS /82/494 1-CGS 8 L:ED/0512E__I:HJE:ALLEGA110N3_CJ-SAGER cl-COMBINED CGtt-E-HJK-GA-ORGAN!!ATION 0-NA S-CGEE 0-79/12/24 _C-HJK-ALLEGATIONS C1-SAGER _ C2-GA-CONCERNS 0-KE0/359 ) 5-CGEE _ D-79/12/10. C-HJK-ALLEGATIONS C1-SAGER C2-0A-STATUS-REPORT-ADDITIONS 0-NA f ) 5tiGgr e-eatg5/13 C-HJK-ALLEEAltQNS C1-SAEfR ClrHJK;3ANAGEMENTtPEETING _ _0-NA I S-CGtt .D-79/03/C6. C-HJK-ALLEGATIONS C1-SAGER C2-HANGEP-DESIGN-STATUS-REPORT 0-NE0/272 ) 5-CGRE D-79/04/20. C-HJK-ALLEGATIONS C1-SAGER .C2-LARGE-DORE-MANGER-INSTALLATION 0-KE0/284 i i ) 5-CGEL 0:19/0iL1LJ-LLK-Att16 AllD_NS C1-54GEB C 2-INST A LL A T10N-VE RIF IC AT ION 0-KE0/308 I S-CGtt D-79/09/C7. C-HJK-ALLEGATIONS C1-SAGER C2-GA-INSPECT 30N-SCHEDULE 0-KE0/323 ) S-CGtt D-79/10/C2._C-HJF-ALLEGATIONS.C1-SAGER (2-HJK-LETTER-KC/13369/0 0-KE0/239 4 ') _ S-CGEE 0:20 /01/lL._CaliJ K:ALL E 0 411D N S Cl:S A G E R C 2-C OPE N T S-Ch-H J K-L E T T E R-D A T E D-M AR C H-4,-198 0 0-NA I S-CG'E D-50/03/C5 C-HJK-ALLEGATIONS C1-SAGER C2-SYSTEP-TURNOVER-PREOPE R ATION AL-TES11NG C3-REVIEW-MEETING ') 0-h 9" S-CGRE D-79/05/C7' C-HJK-ALLEfATIONS C1-SAGER C2-5A-CONCERNS O-NA ') 5-KAISER D-79/06/2P C-HJF-ALLEGATIONS (1-SAGER (2-MANGEPENT-PROBLEMS-t-CONCERNS 0-NA 9 . C1-SAGER C2-MEETING C3 -P RO C E DU R E S C4-GA-REQUIREMENTS W S-CGit D-79/C1/13 C-HJK-ALLEGATIONS 0-NA S:CGEL P.2.?l191.Cf_ _(-HJE281,LEGA{ ION $_(_1:$AGER _ C2-PFRF0AMANCE-IN-0A 0-NA e S-CGRE D-79/08/14 C-HJK-ALLEGATIONS C1-SAGER C2-INSTALLATION-VERIFICATION 0-KE0/308 1N 5-CGtt D-77/04/01 C-HJK-ALLEGATIONS C1-SAGER C2-0A-CONCERNS 0-AL E /120 ,____lifGEE 4:27 /_03 f 25__ C-H J,K-A L L E G A.T I ON S C I: SAGER. .C2-SUGGESTIONS-FOR-PROJECT-IMPROVEMENT 0-NA [h), S-CGRE D-77/03/C7 C-HJK-ALLEGATIONS C1-SAGFR C2-REQUE ST-F OR-ADD ITION A L-INSPEC TION 0-KE0/112 W

e ,g DRS-0FFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 6 5-CGEE D-77/C3/C3 C-HJK-ALLEGATIONS C1-SAGER C2-AUDIT-SCHEDULE 0-KE0/1CO S-CGtt D-77/C2/21 C-HJK-ALLEG5T!0NS C1-SAGER C2-CGEE-LETTER-KEC-3 Q*NA S-CGEE D-83/05/24 C-PUNCHLIST C1-FC-1 C2-RH-1 C3-PREOPERATIONAL-TURNOVER-MASTER-2PS-1 C4-STSTEM-50RT 0-J437 S-CG8L D-00/C0/C0 C-RESIDLAL-HEAT-REMOVAL-SYS-PREOP (1-COMPUTER-PRINTOUT O-P0/RH/01 i 5-CGEE D-C0/C0/C0 C-STSTEP-LISTING-DT-1URNOVER-PACKAGE-DESIGNATOR C1-E SSE NTI AL-t-S AFE TY-REL ATE D Q-N A 1:C681 D:00 / 00 /f a__L:RJ Er a L LE G LTl 0 N S_LL:3 A G E R C2.0A. INSPECTION-REQUIREMENTS.C3-SEPT-75-THRU-FEB-76 0-NA 3 5-KAISER D-74/10/14.. Q-K C /264 3 /o C-HJk-ALLEGATIONS C1-SAGER C2-ADDITIONAL-GA-PER$0NNEL S-CGEE D-75/01/15 C-HJK-ALLEGATIONS C1-SAGER C2-MANPOWER-AUTHORIZATION 0-KEB/12 3 5-CGRE D-00/00/C0 C-HJK-ALLEGATIONS C1-SAGER C2-EFFICIENCY-OF-GA-CPERATIONS C 3-P AI NT IN G-t-C 0 A T ING=INSPE C TI ON-KE F I -5 C4-QUALIFICATICHS-0F-C0ATING-INSPECTORS-KEF-12 ') 0-hA 4 S-CGtt D-75/C3/26 C-HJK-ALLEGATIONS C1-SAGER C3-VENDOR-SURVEYS-FOR-ASME-CODE-PATERIALS C4-K C /1760 /0 C2-REQUEST-F ) cR - A 0 01110 H L-c A-f tR 5phis tl. Q-NA ) S-CGEE D-75/04/11 C-HJK-ALLEGATIONS C1-SAGTR C2-INSPECTION-OF-PHASE-2-PIPING 0-KC/3449/0 T' S-CGEE D-76/10/18 ~ C-HJK-ALLEGATIONS C1-S5GER C2-5GENDA C3-HJK-GA/0C-GENERIC 0-NA ) S-CGEE D-7 6 /11/ ?0 C-HJK-ALLEGATIONS C1-SAGER C2-TELEPHONE-CONVERSATION C3-BILL-SCHWIERS Q-K B /16 $= KAISER D-75/03/21 C-HJK-iLLEG5TIONS Ci-55GER C2-KEI-GA/0C-ORG5NICATION 0-NA i S-RAISER D-/5/C4/16 C-HJK-ALLEGATIONS C1-SAGER C2-KEl-oA-0RGANITATIONS 0-NA I ~ ~ ~ S-CGEE D-00/00/CD C-HJK-ALLEGATIONS C1-SAGER C2-SP[ChijC-5Ri-Cb'CERNS C3-LARGE-80RE-PIPE-HANGERS H 0-nA 'b 5-CGRE D-74/02/20 C-NJK-ALLEGATION $ C1-SAGER C2-VENDOR-SURVETS-FOR-ASPE-CODE-PATERIALS 0-KC/1760/0 -) o ...__S-EAISER D-14 /.10 /_16 C-HJg-ALLEGATIONS _C1-SAGER._ _C2-REQUEST-FOR-ADDITIONAL-GA-PERSONNEL G-KC/2643/Q 9 S-CGRE D-74/19/?O C-HJk-ALLEGATIONS C1-SAGER C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL Q-KEP/7 h 5-CGtt D-74/11/01 C-HJK-ALLEGATIONS C1-SAGEN C2-PER$0NNFL 0-NA s' . ) 5-KAISTR D-7 4 L11/_Cl__C-H J K-A L L ( G A T I O N S _C 1 -S A G E R _ __. C 2 -P A I N T I N F -I N S P E C T O R C3-DOCUMENTATION-CLERK 0-KC/2754/0 l e 5-CGRE D-75/01/?O C-HJK-ALLEGATIONS C1-SAGER C2-EFFICIENCV-OF-QA-OPERATIONS 0-KM/220 5-CGtt D-75/02/17 C-HJK-ALLEGATIONS Cl*SAGEk C2-EFFECIENCV-OF-GA-OPERATIONS 0-NA , _ _ _ _ S - C G E_t D-7.5 / 0 3 / 04 C-HJK-ALLEGATIONS C1-SAGER C2-PAINTING-E-C08 TING-INSPECTION 0 -F E F / 5 $13 5-CGtE D-75/03/18 C-HJK-ALLEGATIONS C1-SAGER C2-QA 0-NA

.W h 9 DRS-OfFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 7 $-WAISER D-7$1C3/21 C-HJK-ALLEGATIONS C1-SAGER C 2-K El-0 A /0C-ORG A N IZ A T ION 0-NA s-CGtt D-75/03/26 C-HJr-ALLOCATIbNS C1-SAGER C2-REQUEST-f0R-ADDITIONAL-0A-PERSONNEL 0-NA 5-CGRE D-75/03/31 C-HJK-ALLOGATICNS C1-SAGER C2-MINUTES-OF-J0!NT-CGtt C3-K El-G A-PE ETING 0-N A $= KAISER D-75/04/11 C-HJK-ALLEGATIONS C1-SAGER C2-INSPECTION-07-PHISE-2-PIPkNG 0=KC/3449/0 ~ $-FAI5*3 D-75/C4/16 C-HJk-ALLEGATIONS C1-5AGER C2-KEl-QA-0RGANIZATION 0-NA a 5-CGEE D-75/0R/C1 C-HJK-ALLEGATIONS C1-5AGER C2-0A-INSPECT 10N-REQUIREMENTS C3-SEP-75-THRU-fEB-76 'l 42.h A I 5-CGRE D-75/12/26. C-HJr-ALLEGATIONS C1-SAGER C2-H.C.-NUTTING-CONTRACT C3-0VERTIME 0-KEF/87 1 5-C 5. D-76/11/30 C-HJK-ALLEGATIONS C1-$AGER C2-TELEPHONE-CONVERSATION C3-BILL-SCHWIERS 0-KD/16 6 _5-CGRr B-E0/03L12_L H1E ALLEG All0NS_Cl-$ AGEP C2-0A-INSPECTOR _._0-KE0/399 ( 5-CGEE D-78/10/16 C-HJr-ALLEGATIONS C1-5AGEk C2-DENNIS-LEDFORD-TERMINATION 0-NA 5-CGRE D-23/04/18-C-HJK-ALLEGATIONS C1-SAGER C2-SAGER-LETTLP 0-NA 1:CGLE b:11/09fil__L HJ K:ALLEGLI!DN1_C1:5AGER C2: STOPPING-CONSTRUCTION _ 0-NA I 5-CGtt .D-75/03/18 C-HJK-ALLEGATIONS C1-SAGER C2-CORRECTIVE-ACTIONS 0-NA ) 5-FAISER D-75/04/16 C-HJK-ALLEGATIONS C1-$AGER C2-KEl-GA-0RGANIZATION 0-NA _.._.5-KA15ER D-2 3 / C S I.14 -_C:HJ K: A L L EG A LION 1_11 -1 A G E R C2 PHIL-GITTINGS-TERMINATION 0-KC/15694/0 i 5-CGEE* D-76/11/18 C-nJr-ALLEGATICNS C1-SAGER C2-stL C3-DDC 0-KE0/78 I 5-CGRE D-75/05/27 C-HJK-ALLEGATIONS C1-SAGFR C2-MECHANICAL-0A-INSPECTICN 0-KED/27 .___5:CGRE D-15 /07 / 28 t-H J K-A L L E G 4.110 Ni_C1:14 G E R C2-KEl-C04PORATE-AUDIT. 0-NA i' s-CGtE D-75/11/10 r-HJK-ALLEGATIONS C1-SAGER C2-FIELD-AUDIl-57 0-KE0/46 ) 5-CGtt D-74/0P/15..C-HJr-ALLEGATIONS C1-5AGER C2-FIELD-AUDIT-REPORT-33 0-KE0/2 1' ) ___5-FAISER D:13/04/24__L:HJK-ALLEGATIONS _C_1:5AGER C2-CGLE-8UDIT-1 0-kCt?O6/0 E' D-75/01/16 C-HJr-ALLEGATIONS C1-SAGER C2-AEC-AUDIT 0-ken /14 ) 5-CGRE D-75/02/21 C-HJF-ALLEGATIONS C1-SAGER C2-CORPORATE-AUDIT 0-rE0/22 ____ S IG L E_ D.74/11/25__C-HJK-ALLEGAT10NS_C1:5AGER.__..C2-GA-PER50NNEL Q-NA N) 5-CGLE D-tC/01/19 C-HJk-ALLEGATIONS C1-5AGER C2-GUALITY-C0hTROL-INSPECTOR 0-KE0/403 Ih 5-CGRE D-f9/10/16 C-CA-SERVICES 0-kA 5p E-CGLE 0170/12/21_ C-NEWSOLC-15 LAND._C.1.0A-rROGRAP__ _ C2-StL 0-NA $53 S-KAISER t-71/05/C7 C-FEE-ACCRUAL-BY-CONSTRUCTOR 0-NA 1h

T ? We n \\ DRS-OffLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 8 O 5-CGEE D-71/07/14 C-GA-C0h5ULTING-SERVICES 0-0A/52 $-CGtt D-71/12/23 C-KEl-GA*PANUAL 0-GA/9C ~ ~ S-CGtt D-71/01/27 C-TRIP-REPORT-TO-KAISER 0-NA O S-RAISER D-72/03/r9 C-REVISION-TO-KEl-QA-MANUAL 0-KC/65/0 ~ ~ 5-CGtt D-72/07/14 C-PICDERS-CA-PROGRAM-REVIkWS 0-0A/149 5-(Gtt D-73/01/12 C-CONTRACT-CHANGE-0RCER-4 0-KC/445/A O S-CERE D-73/02/C1 C-RECOMPENDATION-f0R-AWARD C1-NONDESTRUCTIVE'-Ek '}NAiiON-SERVICES 0-KC/473/A ~ M S-CGEE p-73/11/C7 C-QU AL I T V-A S $UR ANC E-CbNSULii NG-S ER vi C E S C1-CONAM-INSPECTION-INC 0-NA s-CGRE D-74/01/22 C-ZiPMIR-CA-ORhAN!!A150N U-NA I 5-CGRE D-77/01/29 C-NONCONFORMANCE-REPORTS Q-0A/368 S-CGtt D-74/11/05 C-GA-ORGAN!IAkIUN 0-dA/423 0 5-CGRE D-75/01/C3 C-TisilhG-LADORATORT-REGISTRATION C1-WELDING-CERTIFICATION 0-N4 ~ 5-CGtt 0-75/0?/27 C*0A-MAhUAL C1-REVIS10N-12 C2-NOTICE-of-CHANGES 0-NA 5-CGtt 0-75/03/31 C-MINUTES-OF-JOINi-CGEE-REl-GA-MFET]NG Cl-FEB-28.-1975 0-NA T 5-CGtt 0-75/03/18 C-KEI-QA-WEAKNESSES 0-NA i 5-CCLE D-75/03/21 C-LETTER-RESPONSE C1-KEl-CA/0C-ORGANIZATION 0-N4 T I 5-CGRL D-75/04/16 C-L E TT E R-R E $iid N S E C1-REI-GA/DC-ORGANIZATION 0-NA i S-CGtt D-75/10/29 ~ C-Ik-INSPECEION-REPORi-50-35P/75-05 C1-RESRGNSE-TO-NRC 0-NA ) 5-CGtE D-75/09/18 C-DEstGN-DOCUMENT-REVIEW-07-CGRE 0-NA 5 0-GA/579 3 a 5-CGLE D-75/C8/18 C-ASPE-CERTIFICATES-Of-AUTHORI7ATION e S-CGtt D-75/10/i0 C-KEl-ALDIT-REPORT-230 C1-CCMPENTS 0-KE0/45 ) 5-CGtt D-75/12/C4 C-PACKAGING-Of-RADIOGRAPHS 0-SL O/ 33 ~ } 5-SEL D-75/00/11 C-GA-AUDIT C1-RECEIPT 0-NA S-tGCE D-76/04/77 C-NRC-INSPECTION-REPCRT C1-MECHANICAL-SECTION-RESPONSIDILITY 0-NA 5-CGEE D-76/05/11 C-TRANSPITTAL-OF-ENGINEERING-DOCUMENTS Q-SLQ/39 5-CGtt D-76/05/14 C-CORPORATE-GA-MANAGER C1-POSITION-VACANT 0-NA 5-CGRE D-76/07/26 C-ORGANIJATIONAL-t-PERSONNEL-CHANGES 4-NA S-CGRE D-7t/11/22 C-AU TH O R I2 E D-C GCE-CO NSTRUC T I ON-E NG IN E E RI s.G-S IG M A TUR E S C1-NONCONFORMANCE-RAPORTS

M 0-N4

0 DR$-OFFLINE PRINT 14 JUN 83 08:50:3h DATE 061483 PAGE 9 O S-CGtt D-76/11/11 C-REVIEh-0F-PANUFACTURERS-DRAWINGS 0-5LO/58 ^ 5-CGRE ~ D-76/12/1E' C-KAISER-CbNTRACT 0-hA 5-CGtt D-76/12/14' C-NONCbhf0RMANCE-REPORTS C1-CLOSED-0UT 0-RE0/83 'I 5-CGtt D-76/12/16 C-ULTRSONIC-TESTING C-SU RVE ILL AN CE-0F-RE A C TOR-C OUT R'CL S 0-KE0/88 5-CGEE D-i7/01/C7~~ C-K A l5 E R-CONTR A C T-idl TH-C CEE 0-NA 5-CGRE D-77/02/C7 C-dA-SERIES 0-KEd/102 -3 5-CGLE D-77/02/C8 C-5ITE-CA 0-KE0/103 0-77/02/17 5-CGEE D-77/U4/C4 C-NRC-MAhAGEMENT-MEETING 0-NA 5-CGEE D-77/04/06 C-hAC-GA-MANAGEMENT-MEETING 0-NA ~ ( D-77/04/22 C-REPLY-10-NRC-INSPECTIbE-REPORT b-NA 5-CGtE D-77/05/13 C-DE55Gh-DbCUMEkT-R5 VIEW-GUALIFICATIbN 0-NA ) $-CGtt D-77/09/C2 C-HVAC-CONTROL-WORK C1-POWER-REGULATORY-COPPANY 0-NA I ) 5-CGtt D-77/10/11 C-GA-HOLD-POINTS 0-NA I S-CGEE D-77 /11/ 0 3 C= PREPARATION-ObCh'NSTRUCTION-PadCEDURES 0-NA 3 5-CGRE D-77/11/30 C-STRUCTURat-Gats-ENGINEER 0-NA 5-CGtt D-78/07/25 C-CAPLE-PAN-UANGER$'~~ ~ 0-0A/985 ~ T S-CGtt D-P1/02/21 ~'C-EMPLOYEE-REbul$1TibNS'0-UA ) 5-CGtt D-81/04/13 C-NDE-ACTIVITIES C1-RESCINDED-LETTER-APRIL-22,-1981 0-NA ( ') 5-CATALYTIC D-P3/05/19 C-REcutSTED-ConRESPONDEkCE C1-CATALYTIC-LETTER-TO-TPT 0-H/38570/922 E $-CATALYTIC D-23/04/12 C'-C4TALTTIC-PRbCEDURE-TRACKjhG-REPORT 0-NA ) 5-CATALYTIC D-P3/02/09 C-NMP-STATUS-LOG 0-NA ~~ 13 ' A 5-CATALYTIC D-83/C1/19 C-HVAC-5YSTEMS C1-GCD-E-STARTUP 0-NA tt ' S-CATALYTIC D-P2/10/16 C-ECR'S 0-N4 ey ~ 5-CATALYTIC D-82/11/10 C-COPPdTICE-OF-WORKAikR AN-U R ' Ci-ECR-426 0-55G/EC#1164 Y W i 5-CATALYTIC 0-P2/11/17 C-COPPLETION-OF-WORK-FOR-AN-fCR C1-Era-547 0-55G/ECR/150 4 5-CATALYTIC D-82/11/16 C-ECR-A5SICHPENT-FOR-ENGINEERING-t-CONSTRUCTION C1-ECR-822 'G-55G/ECR/146 5 W S-CATALYTIC D-82/11/22 C-COPPLETIPN-OF-5YSTEMS-P/L-ITEMS C1-CY-1-089 0-NA t-rat 89YYtr h-87#11#27 r-rn FPt F 19 691-O F-t V t T F F-P /g -I YF P S (1-rV-1-fP9 Q-NA

.W4 &%4 4 l DRS-0FFLINE PRINT 14 JUN 83 CP:50:37 DATE 061483 PAGE 10 .5-CATALYTIC D-82/10/29. C-COPPLETION-0F-WORK-f0R-AN-ECR ..C1-ECR-1043 0-55G/ECR/117 - #N I 1-CATALVTIC D-?2/10/28 C-ECP-AS$1GNPENT-F04-ENGINEERING-B-CONSTPUCTION C1-ECR-374 0-SSG/ECR/116 g 5-CATALYII.C_A22tJO/28-_t-Ett:45$1GNMENT EOR:LNGINELAING-8-CONSTRUCT 10N_C1-ECR-698.0-$5G/ECR/114 ) 5-CATALYTIC D-82/10/28 C-E C D-A 5 5 I GNME NT-F OR - ENG IN E E R ING-8-C ON S T R U CT ION C1-ECR-551 0-SSG/ECR/115 l* S-C AT ALYTIC D-22/13/ 22 C-E C P-A SSIGNPE NT-F OR-ENG IN EERING-B-CONST RUCT ION C 1-EC R -1104 0-S$ G /E C K /112 i s s-C AI A L111 t a-22L10Lla t-r t R-AS SIGNELEL-1OR - ENG IN E ERIMGil-10N 51PU CT ION C )-E C R - 1197 0-S S G /E C R /113 3 S-CATALTTIC_D-82/10/28_ C-ECR-PSSIGNMENT-FCR-ENGINEERING-CONSTRUCTION C1-ECR-1210 0-55G/ECR/111 1 5-CATAL'YTIC D-82/11/23. C-ECD-A5$1GNPENT-FOR-ENGlhEEPING-5-CONSTRUCTION C1-ECR-650 0-SSG/ECA/159 i4 3 .___1:C AT ALLTIE_A:12/11L23 ~ t-LCA ASSIGNBEML: EAR:LNGINEERING-E-CONSTPUCIION_C1-ECR-657 0-$5G/ECR/158 -'I' S-CATALVTIC D-P2/06/C9.C-C.I.-CONTRACT-3857C C1-STEEL-DOOR-RADIOLOGICAL-$HIELDING C2-PER$0NNEL-GALLERIES 1 l 0-NA 4 5-CG8E D-8 2 / 02 /16 C-iORK-ASSIGNMENT Ci-FIREPROCFING-MATERIAL 0-NA S-CATALVTIC D-F2/01/15 C-WELD-UhDERCUT C1-58L 0-82/16 ~ " ~ ' ~ i f l S-CATALYTIC D-81/10/C7 C-GusLITY-CONFIRM TION-PROGRAM 0-81/359

i. Y S-CATALYTIC D-P2/10/25 C-COPPLETION-0F-ECR-440 0-SSG/ECR/105 6

j $-CATALYTIC D-F2/10/25 C-COPPLETION-OF-ECR-1188 0-SSG/ECR/104 l'T j S-CATAlfilt D-P2/10/25. C-COPPLETIeN-Or-ECR-5,._..5 0-S$GiECR/iO6. I T S-CATALYTIC D-82/05/19 C-ENGINEERING-CHANGE-REQUEST C1-PRELIMINARY-COPY 0=!PS/PECR/263 I ~~ ~ 5-CATALYTIC D-F2/08/05 C-REA55IGNFENT-0F-ECD-586 0-S$G/FCR/20 li 'I j 5-CATALTTIC D.P2/08/C5 C-REA$$lENPENT-0F-ECR-586 0-$$6/ECR/20 i' S-CATAL4 TIC D-22/07/28' C-C'b"PLET10N-OF-ECR-432 0-$5f/EC#/11 lb S-CATALYTIC D-82/07/C2 C-A S SI G h P E N T-O F-E C R-736 R 1 0-CCD/ECR/871 $-CATALTTIC D-82/06/ii' C-aS$1'bPENT-OF-ECR-1212 0-CCD/ECP/P44 G S-CATALYTIC D-P2/06/11 C-COPPLETION-OF-ECR-558 0-GCD/ECR/840 k 5-CATALYTIC D-E2/06/23 C-A S SI GhP E NT-0 F-E C R-114 8 0-GC D / EC R / P60 5-CATALYTIC D-93/01/19 C-COPPLETION-0F-ECR-1183 0-55G/ECR/202 5-CATALYTIC D-P3/01/13 C-COPPLETION-OF-ECR-1046 0-t; A j. 2 5-CATALYTIC D-P3/01/11 C-COPPLETION-OF-ECR-1199 0-$sG/ECP/195 E ...,,,,,,o ,_.e....,....,_o,_&,. ....r.,,r.,,71

_+ ~ 4 -q l <3 DRS-OFFLINE PRINT 14 JUN 83 08:56:37 DATE 061483 PAGE 11 I a S-CATALYTIC D-f2/11/C5..C-RE4551CN*ENT-OF-ECR-516 _.0-55G/ECR/132 $-CATALYTIC D-82/10/21 C-REcutST-0F-ECR-COPIES 0-S$G/ECR/99 ..__1-C A I A LII I L_It.-12 / 06 L11__.L-A MI G k P_ E N I-0 E:I C fL-1212 g-GCD/ECR/244 { s-CATALYTIC D-P2/06/11* C-COPPLETION-0F-ECR-558.0-GCD/ECR/840 'i 5-CATALYTIC D-P2/C6/C3 C-ECR-1193 0-GCD/ECR/834 5-C &B LYll C_R-S U O 4 / Z O_C-C Qff L E T I 0h0.1-E.Ch316__o_-6 C RllCP I T 8 ? 8 S-CATALYTIC D-P2/04/23.C-COPPLET10N-OF-ECR-643 0-GCD/ECR/776 1 5-CATALYTIC D-P2/04/22..C-COPPLET10N-0F-ECR-1178 Q-GCDIECR/774

  • -CAIALUIC D-81LO1LC2 C-AstIMEI31-01 EC.hs1L_9-GCD/ECR/304___

) s-CATALYTIC D-82/01/C6. C-tCR-518 0-GCD/ECR/293 5-CATALYTIC D-00/00/C0.C-PUNCHLIST-WORK-TICKETS 0-N4 3-C aIALJ TIC D *1L11L10 _ C WoPK-A 551GNMN T 0-81/416 4 $. CATALYTIC D-21/10/29 C-WOPK-A$$1GNMENT C1-DDC-5LS-525 0-NA 5-CATALYTIC D-A1/12/14 C-REAS$3GNMENT-OF-ECR-425-REV-1 C1-REA$5tGMENT-0F-ECR-547.-598,-1203 o-GCD/ECR/270 3-Lal aLYII C._D.-EIL12/14 r-JCR-544 0-Sn /gg_Rf2 M T s-CATAtVT:C D-Ri/12/c8_C-AssIGnPENT-0F-ECR.1208 .o-GCDitCRi253 ) I j 5-CATALYTIC D-81/12/C4 _C-AS$lGhMENT-0F-ECR-620 0-GCDIECR/233 if ~ ) 1-C8I ALUlf D-P 1/12LC4 C-A_5 3 I Shf ERL-OL-H R-1144 0-GCD/ECR/R34,__._ i, S-CATALVTIC t-81/12/C4 C-ASSIGNPENT-OF-ECR-1147 G-NA ) $-CATALYTIC D-81/12/04._C-ASSIGhPENT-07-ECR-1193 0-GCD/ECR/236 0 ) j ,.. __5.CM A LIll C_D-P 1/_12 / C4 _ C-A S 119 hP ( NI-0 F.- LC R_- } } 9 4 0-GCD/EC#/231 d', $-CATALYTIC.0-P1/12/C4 _C-AS$IGkPFMT-0F-ECR-1203 0-GCD/EC#/232 ) S-CATALYTIC D-81/11/?0 C-COPPLET10N-07-ECR-109 (1-CCMPLETION-0F-ECR-1034 C2-CANCELLATION-07-ECR-538 4P.. Q-GCD/ECR/213 F i 5-CATALYTIC D-81/12/C3 C-ECo-547 C1-REQUIRED-C0"PLETION-DATE 0-GCD/EC4/220 ,' Nd $P $-CATALVTIC D-81/11/?C C-C A TA LYTIC-PUNCHLIS T-WORK-T ICK ETS 0-NA c)' $= CATALYTIC D-P1/11/20 C-ASSIGhPENT-0F-EC9-220 C-GCD/ECR/201 if 4 5-CATALYTIC D-85[11/2C C-A551GNhkNT-0F-ECP-5E9 Q-GC'p/rCR/200 ~ ~ i [5] I t W e-ravaivter n-pistisse r-acetrawret-nr-Fre-ste e-rrestrettoo

rA% 4 s 's DRS-OFFLTNE PRIgf 14 JUN 83 C8:50:37' DATE 061483 PAGE 12 S-C AT ALTTIC 0-P1/11/20 C-ASSIGPENT-0F-ECR-425 0-GCD/ECR/19e 5-CATALTTIC D-81/11/20 C-ASSIGPENT-0F-ECR-426 0-GCD/ECR/197 3 ____.$ - C A T 4 L U I t_ P-E1/11/ 2 0 C-AsstG ugst-uz-ECL-A H_9-6CDitCR/.116 S-CATALTTIC D-P1/11/20 C-AS$lGhPENT-OF-ECR-439 0-GCD/ECR/195 'T '~ I '#I ~# "I'*'" C'~ 'I *~ C 4 \\ 5-C BIA LY.T I C._D-tL1011 L 2 0_C:13 51 G E [N L-O L-E C R_- A !! _0-G C p l.E C R (193 I # S-CATALTTIC D-F1/11/20 C-AS$lGhPNET-0F-ECR-516.0-GCD/ECR/192 'I S-CATALVTIC D-P1/11/20.C-AS$lGhPENT-0F-ECR-518 0-GCD/ECR/191 ..__ _5:C A T A L U I C 0- P t(11/.2 C._Cra 5_s 1 G h r.ERI-U.LCL-52 LO-6 C1/ E C RL19 0 I S-CGtt 0-00/00/C0 C-GA-t-STANDARDS-$ECTION .C1-PERSONNEL-RESUME C2-R.-LEONARD-WC00 0-NA 3 5-CGtt D-CD/C0/CD..C-04-t-STANDARDS-SECTION. C 1-P ER $0 NN E L -R E S UM E C 2-J AME S-F,-WEI S SE %D E R G 0-N A 5:fGEE D:tDIQ0LCQ_ C.03-4-SIAMpM es-3LC110.M C 1-Ega $0NN EL-R ESUM E _, C 2-EDW ARD-C.-PA NDO RF 0-NA T 3-CGtt D-C0/00/C0 C-GA-t-$TANDARDS-SECTION C1-PER$0NNEL-RESUME C2-WILLIAM-W.-SCHWIERS 0-NA I S-CG8E D-CO/00/C0 C-GA-t-$TANDARDS-SECTION C1-PER$0NNEL-RE$UME C2-ROBERT-P.-EHAS 0-NA r T ) 5-f6*E p-CC/COICO C-08:1:11ANDARDt:1EC110N tj-PER$0NNEL; RESUME _,.. C 2-JOHN-H.-HOF F M A N 0-NA T S-CGtt D-70/10/29 C-AEC-TEEEPHONE-DISCUSSION 0-NA I S-CGRE D-70/11/19 C-CA-t-STANDAntS-SECTION C1-MEETING =WIIH-AEC-DIVISION-OF-REACTOR-LICENSING C2-BETHESDA,-MARYL 4 AND I 0-NA 5-CGtt D-00/00/CD C-INTRADEPARTMENTAL-PROCEDURE Q-NA ) 5-CGtt D-75/03/11 CC-MANAGEMENT-$UPPORT-OF-GA C1-NONES $ENTIAL-DRAWING-REVIEWS C 2-E A*BORGM ANN-TO-DR-MC SPARRIN i - C3-LETTER 0:FEQ/15 5-FAISER D-73/09/21 C-FIELD-AUDIT-REPORT-19 C1-LETTER C2-WJ-FRIEDRICH-TO-bW-SCHWIERS 0-RC/1243/0 k $-KAISER D-73/09/21 C-CORRECTIVE-ACTION-COMMITMENT-FOR-CGEE-AUDIT-18 C1-FRIEDRICH-TO-ROTHENPERG-t-PANDORF C2-LET TER J 0-KC/1240/0 $= KAISER D-73/09/10 C-FRIEDRICH-TO-ROTHEhhERG-t-FANDORF C1-0RGAhllATION C2-RESPONSIBILITIES-E-FUNCTIONS C3-RESUMES C4-LETTER 0-KC/1087/0 5-gGRt p-73/C6J18 C-WW-$$twirRS-TO-WJ-FRIEDRICN C1-CGEE-AupIT-1 (2-LETTER 0-NA 5153 S-KAISER .D-73/06/re C-CGRE-ALDIT-14 C1-VP-PCMAPON-TO-WW-SCHWIERS C2-LETTER 0-EC/842/0

.O e e iT a DRS-OFFLINE PRINT T4 JUN 83 08:50:37 + DATE 061483 PAGE 13 'T $= KAISER D-73/01/C7 C-300THkEST-PHASE-1-PIPING C1-DOCUMENTATION-PROBLEMS C2-JP-J ACK SON-TO-bW-SCHWE IRS C3-LETTER 0-NA 'I S-KAISER D-73/03/02 C-JP-JACK 50N-10-AE-RCTHENBERG-8-EC-PAND0RF C1-WW-SCNWIER$=QA-REPRESENTATIVE C2-LETTER 0-kC/556/0

  • )

~ " S-CGtE D-75/02/11 C-USE-OF-CCNTRUCTION-AIDS-t-SKETCHES Q-NA i 5-KAISER D-74/10/14 C-REcutST-FOR-ADDITIONAL-QA-PER$0NNEL C1-LETTER C2-WJ-FRIEDRICH-TO-EA-00RGMANN-t-EC-PANDORF C3-PERSONNEL-SCHEDULE C4-ORG-CHARG 8-KC2643/4 'l S-KAISER D-74/02/C7 C-NONCONFORMANCE-REPCRTS C1-LETTER C2-WJ-FRIEDRICH-TO-AE-ROTHENBERG-8-EC-PANDORF 0-KC/1706/o ) S-CGEE D-74/05/28 C-AGENDA-ITEPS-FOR-JCINT-KEI-t-GA-PEETING Q-NA 8 ) S-KAISER n-Z4 L10 /_25 t-E S AR k RIT E:UE-0N:Q L___C1 AEQUIRED-EOR: CHAP _ Tete 17..._ C2-LETTER C3-WJ-FRIEDRICH-TO-EA-BORGPANN-&-JD-FLVNN e-KC#2711/o S-KAISER D-75/01/16 C-LETTER C1-DH-WILLIAMS-TC-EA-DORGMANN Ci-KEl-NON-MANUAL-STAFF-ADDITIONS 0-NA / ) 1-f.G L E Q-Z.5 LD LL17 C-P. Itult 5_LL-A01M1-9 a _mE t_I IN G O_ N A i S-CGtt 0-73/07/26 C-KEl-GA-PROCEDURE-16 C1-LETTER C2-EC-PANDORF-TO-WJ-FRIEDRICH 0-NA ) 5-CGEE D-75/01/24 C-NONCON F ORM ANCE-R E PORT-E-191 C 1-L ET TE R C2-RJ-V AN-VE E N-TO-DR-MCSP ARRIN 0-NA T ) S:CGtt D.-15 / C 2 / 21L_C-f!!Au tt s_Cl:J 0 L4 T _98.*!E E.I.I N G G-NA ' T S-KAISER D-75/04/11 C-PIPINE-FIELD-WELD C1-C OMPON E N T-C H E C K LI ST C2-LETTER C3-WJ-FRIEDRICH-10-EA-B0RGMANN=&-EC-PANDOR ) 1 F 0-KC/3449/0 1r ) _S KAISER D:Z5/04/J6 c - t s.t E: C O N C L EN S 2W LT H:KE l-G A.___ C.1 -L E T T E R_.__ C 2 -O H -W I L LI A M S-T O -E C -P A N D O R F 0-NA E S-KAISER D-75/05/19 C-LETTER C1-WJ-FRIEDRICH-TO-EA-BORGMANN-t-EC-PANDORF C2-KEl-AUDII-193 C3-GA-PROCEDURES ) 0-EC/3612/0 S-KAISER D-75/06/C4 C-FIELD-AUDIT-REP 0pT-51 C1-CCRRECTIVE-ACTION C2-WJ-FRIEDRICH-70-EA-BORGMANN-8-JH-HOFFPAN C3-LET I ._ _IEP - - 0-KC/3698/c C1-LETTER C2-DH-WILLIAPS-TO-WW-SCHWIERS 0-NA S S-KAISER D-75/07/C9 C-WELDING-PROCEDURES 9' S-KAISER D-75/09/11 C-LETTER C1-DH-WILLIAPS-TC-EA-00RGMANN C2-INSPECTION-MANPOWER-REQUIREMENTS 0-NA if l S-KAISER D-77/02/17 C-ELECTRICAL-PR00LEM-AREAS C1-LETTER C2-DH-WILLIAMS-TO-EA-DORGPANN 0-NA

s ',

GP l S-KAISER D-72/08/31 C-CONCRETE-TESTING C1-LETTER C2-JP= JACK 50N-TO-AE-ROTHENBERG-&-HE-CRAIL Q-KC/268/Q l s' S-KAISER D-72/CP/29 C-LETTER C1-CONCRETE-DATCH-PL8NT C2-JP-JACK 50N-TO-AE-ROTHENBERG-8-EC-PANDORF IP i ..____0-NCl265/o_ f 2[3 5-KAISER D-72/06/29 C-LETTER C1-JP-JACK 50N-TO-AE-ROTHENDERG-E-EC-PAND0RF C2-RECEIPT-0F-GE-PURCHASED-EQUIPMENT-8-MAT SP i FRiai s I

f e e e v. ' as DR$-0FFLINE PRINT k4 JUN 83 C8:5U37 DATE 061483 PAGE 14 0-KC/190/0 ~ $-KEISER h-72/d3 / 2i ' ' C-L E'TT E R' C2-PibJECT-DREWING-8-$PEtih! Chi 104-CbMTROL-STSTEM 0-KC/85/U 5-KAISER D-71/12/27 'C-RS-EL5CN-TO-JP-JECK$5N C1-LETTER C2-PSAR-GA-REQUIREMENTS 0-NA 5-CGRE D-71/12/16 C-GA-t-INSPECTION-PRACTICES C1-AE-ROTHENBERG-TO-DR-MCSPARRIN C2-LETTER 0-NA 5-CGit D-71/12/03 'C-MEk-04-MANUAL C1-AUh5T-SC'kEULE C2-kk-ROTHkNDERG-10-JP-JACK 50N C3-LETTER H 0-0A/85 5_18 LP ZLLU /PJ_C-EINu1E 5-3F-J CO R p_1!! AIIN G-E( EJ ING_Ch0 E T WE E N-C GG E,,$ 8L-8-K A I SE R 0-NA S-CGtt D-71/09/23 C-ASPE-CCDE-REQUIREMENTS C1-LETTER C2-AE-ROTHENBERG-TO-JP-JACK $0N 0-NA I $-CGRE D-71/02/C2 C-AEC-AUDIT-OF-KE.C1-JAN-27-28.-1971 C2-4E-ROTHEhPERG-TO-TG-DEDFORD C3-LETTER 0-NA ) i 5-CGRE D-72/10/17 C-LETTER C1-NDE-BID-DOCUMENTS C2-AE-ROTHENPERG-TO-DR-MCSPARRIN 0-GA/182 S-CGtt 0-72/d9/27 'C-GA-8-STANDARbS-SECTiON-REVikW-hf-SUPPLIER-CA-M NUALS C1-LETTER C2-AE-ROTHENBERG-TO-JP-JACK $0N 4 g.,afgy3 ) 5-CGtE D-76/09/14 C-PR0 JECT-ORGANilATICN C1-EA-BORGMANN-10-EL-JORDANe-NRC C2-LETTER 0-NA 5-CGtt 0-74/06/25 C-CONDENSATE-PUMP 5 51-RL-blRR-Tb-J.-MCMiLLEN C2-INGER50LL-RAND G-NA T S-CGtt D-75/06/C2 C-STCP-CNECK-8-PACKLESS-DIAPMRAGk-$EAL-VA-VES C1-2-INCH-AND-SMALLER C2-LETTER C 3-E A-BO R GM A NN ) W-pl55fE1ER C4-89tKWIL1-1NTERNAJJ0NAL 0-NA 3-CGtt D-75/04/14 C-A5R-0FERATEU-TEST 55LE-CHECK-VALVES,-GLOBE-VALVES C1-LETTER C2-RL-DIRR-10-JD= JACK 50N C3-ROC KWELL-INTERNATIONAL T 0-NA ) ~ S-CGEE D-74/10/29 C-HANGER $,-SUPPORTS-8-$NUBBERS C 1 -L'iiT E R' C2-Ri 'DIRR-To-J.-GsRDINER C3-CRAWFORD-MANUFACTURIN ~ ~ i, G-COMPANY ') 0-NA I S-CGRE D-74/10/C4' C-RS-UNES-TO-EC-PkNDCRF C1-ILLIN0!$-POWER 0-001/PF/74/1C/04 ) 5-CGRE D-76/05/27 C-GE-DE51GN-DOCUMENTS C1-EC-PANDORF-TO-WG-MEGENER C2-LE,TTER C3-SCL 0-5LQ/40 0, D-76/03/08 C-INSPECTlbN-PERSONNEL C1-Ek-BhAGMANN-TO-WJ-FRIEDRiCN 0-KEB/43 4 5-CGtt 0-76/10/06 C=APPR0wAL-O'F-KEI-IS0 METRICS C1-WW-SCHWIERS-TO-WJ-FRIED 9tCH 0-NA ) S-CGtt D-76/10/12 C-LETTER C1-WW-$CHUIERS-10-UJ-FRifbRICH' C2-N0'CCNFORMANCE-REPORTS 0-NA N = $-CGtt D-76/10/19 C-CGtE-SITE-GA C1-LETTER C 2-E A-80 RGP ANN-T O-PD-S A HLE E RG C3-R ECR G ANIZ AT 10N 0-NA 5-C?RE D-77/01/C6 C-LETTER C1-WW-$CHWIERS-TO-WJ-FRIEDRICH C2-HOUSEKEEPING 0-KE0/90 $-CGtt D-77/02/r9 C-LE TT E R C1-NP-GEAR-10-CGRE-SO9 CONTRACTORS C2-WELD-R00-CONTROL 0-NA

L3' t - r r. r t e-7Astn#77 r-eFTTFe (1-WW~tfMWTFPt-in-WJ-FotFhpfrH f?-AUTHC8TFFB-CGtF-CONSTRUCT 10N-FNGINEERING= SIGNATURES

+. e = DRS'-OFFLINE PRINT 14 JUN 83 08:50:37' DATE 061483 PAGE 15 'I C3-04-NONCONFORMANCE-REPORTS ~' ~~ e-uA

  • )'

S-CGtE D-76/09/04.C-GA-t-STANDARDS-SECTION Cl-SIGNOFF-OF-DESIGN-DOCUMENTS C2-EA-00REMANN-70-EC-PANDORF C3-LET . _ 9-AA TEP 'I S-tGtt D-77/02/C8.C-LETTER C1-WW-SCHWIERS-10-WJ-FRIEDRICH_ C2-SITE-04-ASSURANCE 0-KE0/103 ~4 f S-CGtt D-77/02/C3 C-LETTER. C1-WW-SCHWIERS-TC-ALL-CONCERNED C2-REPORTING-OF-DEFICIENCIES 0-NA c-

)

31LGtt D-77 / 03 /_01 C-MINQJ E$ QL JAINT-C-BL-KEL-9A-EEEJING Cl-FEB-17e-1977 C1-FEB-17e-1977 0-NA S-CGEE. D-77/01/C7 C-LETTER C1-WW-SCHWIERS-TC-WJ-FRIEDRICH C2-REQUEST-FOR-ADDITIONAL-INSPECTION-PERSONNEL 'I 0-age /112 5-FAISER D-77/02/C7 ~C-LETTER C 1-W J-F'R I E D R I C H-10-WW-S C HW I E R S C2-REGUEST-FOR-ADDITIONAL-INPECTION-PERSONNEL 4 .___4:MC/9125/A f 5-CGEE D-77/03/16 C-LETTER C1-WW-SCHWIERS-TO-H9-GEAR C2-GENERAL-ELECTRIC-LETTER-CGE-1-77 0-NA ) t-CGst D-77/02/25 C-LETTER C1-WW-SCHWIERS-TC-BK-CULVER C2-04-REQUIREPENTS-FOR-SITE-FILES 0-NA S-CGCE D-77t 0 3 tj a__C:LE11E s C3:v_w styWJEss-IA:ttreLOOM___ C2-GENERAL-ELECTRIC C 3 -G E-F D D R -K N-1 -60 C4-RFVISION-2 C5-FIELD-DEVIATION-DISPOSITION-REQUEST 0-GES/40 ) 5-CGtt .D-76/08/02 C-LETTER (1-E A-EO RGM A NN-T O-B K-C ULVE R C2-MONTHLV-PROJECT-MEETIhG 0-NA S-fE__J:ADL12LD6-_C 1L11.ER C 1-JI-RLp0 M-T O -CSE E Ci:NEW:GF.-51TE-0C-ENGINEER C3-MM-DICK 0-TEB2/299/80 T S-CG8E D-78/02/10 _C-LETTER. C1-R.-DIRR-TC-C.-$NANKS C2-eAILtv-METER-COMPANY C3-TRANSDUCERS-E-SENSOPS C4-DEFECTS-E I- -NONCOMPLIANCES 0-NA T I S-CG8E D-78tJ2f]7 C-L[,11ER _ _(j-WW-S.CHWIERS-TC-RON-{0KER_ C2-STEWART-t-STEVENSON-SERVICES C3-THREE-DIESEL-GENERATO R-LNITS i;. 0-he/1065 ) 5-CGRE D-75/10/13 C-GA-DOCUMENTATION .C1-LETTER C2-EC-PANDORF-10-RL-SNYDER C3-DRAGON-VALVES-INC. 9', Q-hA ) S-CGtt 0-82/04/29 C-SYSTEP-AREA-TURNOVER-PLAN' (1-RE-SPENCE 0-NA 4' . D-77/04/04 C-LETTER C1-N#C-10-EA-BORGMANN C2-NO-PR08LEM-PEPORT 0-NA 5-NRC 3 dd ' S-kRC 0-77/04/05 C-EETTER C1-RF=HEISHMAN-TO-EA-BORGMANN 0-NA } g 5-hAC D-79/06/06 C-C F FICE-O F-lhSPE C T ION-t-E h f 0R CE ME N T C1-MAY-8-11-E-17-18.-1979-INSPECTION C2-0A-1159 C3-0A-1199 o* '0-50/358/79/15 S-CGtt D-23/04/05 C-LETTER C1-MC-THREM-TO-DJ-SCHULTE C2-GAD-PROGRAM-DEVELOPMENT C3-QE-REVIEW-t-CONCURRENCE-0F-s NI TPS-1 C 4-CON S T RUC TION-PH ASE-CU A L IT Y-A F FE C T ING-PROL E DL'R E S bh t , __0-Isin H 017 Za3 5-CGtE D-83/02/2e C-LETitR C1-MC-THpEM-TO-HR-SAGER C2-REDEVELOPPENT-OF-0WNERS-PROJECT-PROCEDURES C3-10-THE-FSAR $N fA=DSUff1MN-01-fAP4TT4FNTF-fHSPTfD-17.1

. e~ or j DRS-0FFLINE PRINT 14 JUN 83 CP:50:3f DATE 061483 PAGE 16 /% i ~ 0-PCT /83/006 ~ '" 'I 5-CGRE D-P3/02/17 C-LETTER C1-MC-TRHEM-TC-HR-SAGER C2-hEPORT-ON-NRC-MEETING-OF-FEB-7.-1983 C3.1EVIS30NS-10-10CRF50. 54-AND-10CRF50.55 C4-REGARDING-REPORTING-0F-CHANGES-10-THE-GA-PROGRAM 0-PCT /83/005 'l ~ 5-CGtt D-77/09/21 C-LETTER C1-WW-SCHWIERS-TC-RE-TURNER C2-CONTROL-OF-METERIAL' 0-KE0/166 e. ~ .) 5-NRC D-77/03/24 C-REPORT-0M*CONSTRUCktbN-kESPEkkION C1-lh-kNSPIkThhN-AkPORT 0-050/358/77/02 5-CGtt D-77/C2/C4 C-LETTER Ci-WW-SCHWIERS-TC-WJ-FRIEDkICH C2-CLASSIFICATION-OF-CGRE-PURCHASE-0RDERS 'l l i 0-ut9/19 ] 5-GE. D-78/10/12. C-LETTER _._ C1-WE-$NITH-TO-WW-SCHWIER$ C2-Ga-C0PMUNICATIONS-WITH-CGtt 0-CGE/1024 'l - 1 S-CGL E.._._ D-77/04/01_.C-LETTER. .C1-WW-SCHWIERS-TC-RE-TURNER C2-04-CONCERNS 0-KE0/120 _.__ D Z1101/27 C-LETTER CJ gW $ CWJiti {A WJ a_LELEDE[fH (2:{IELD-AURIT-REPORTS-86-t-87 0-KE0/96 5-CGtt D-P2/C5 /CT.. C-$E RI CR-M A N AGEMENT-C0rMITTE E C1-ACT 90N-IT EM-AGEND A 0-NA 3 t i i l 5-KAISER . D-23/04/22.C-ZIPMER-PROCEDURES-PANUAL_. C1-SECTION-30 C2-REV-1 C3-COMPONENT-$UPPORTS-DOCUMENTATION-t-ADMI 8 NISTRATION C4-PECHANICAL-CONSTRUCTION-PROCEDURE C5-zPM 3 R t(P/9 i 5-KAISER. _D-83/04/01. C-IIPMER-PROCEDURES-MANUAL C1-IPM C2-SECTION-3A C3-REV-2 C4-WORK-PACKAGE-PROCEDURE ) C5-GENERAL-CONSTRU-CT10N-PROCEDLRE 0-CCP/3 ( ) 5:CGit D:22/_12/23 C-S U RV E I LL AN C E. REP _0 R.T__A:8 2.1810 r T S-CGtt D-83/02/23 C-HJK-CORRCCTIVE-ACTION-REPORT-270 C1-MEMO-FROM* DENNIS-PREWITT 4-N4 ) j 5-CGtt D-00/00/C0.C-CORRECTIVE-ACT10N-REPORT-276 .0-CAP /276 T lb ____$-CGRE t:81/03/CB C-C A R:215 PA N S E:1EV3 E E-2.10 C1:MEM0:EORMr$ANDY-KING.0-NA T, S-tG4E D-82/11/C5 C-CORRECTIVE-ACTION-REPORT 0-CAR /270

  • )

i S-CGLE D-72/07/C7 C-CHANGE-ORDER-1 C1-GENERAL-ELECTRIC-CO*PANV C2-NUCL E AR-STE AM-SUPPLV-SYST EM j 1I, 0-NA 1) l 5-CGEE D-73/04/18 C-CHANGE-ORDER-2 C1-GENERAL-ELECTRIC-COPPANY C2-NUCLEAR-STEAM-5UFPLY-5YSTEM

NI.

0-NA

  1. )

S-CGRE D-74/03/C4 C-CHANGE-ORDER-3 C1-NUCLEAR-STEAM-5UPPLY-SYSTEM C2-LETTER C3-EA-ROTHENPERG-TO-ML-VAN-$CHOIK NI 0-h4 ) 5-CGtt D-73/11/02 C-CHANGE-ORDER-NO-3 (1-GENERAL-ELECTRIC-COMPANY C2-NUCLEAR-STEAM-5UPPLY-SYSTEM dd 0-hA 1 S-GE D-74/11/21 C-LETTER C1-CT-RALLARD-TO-EA-00RGMANN C2-CHANGE-0ADER-NO-4 0-NA l e 5:IGRE D:14 /10 / C4__L:LE T T E R_ __.C l-R L-DI R R T C-C.-8 A LL A R D C2-CHANGE-ORDER-4 0-GEM /5 ]E3 S-CGtE D-DC/00/C0 C-CHANGE-0RDER-4.C1-GENERAL-ELECTRIC C2-NUCLEAR-STEAM-SUPPLY-SYSTEM 0-NA

  • s er DRS-OFFLINE PRINT 14 JUN 83 0835h:37 DATE 061483 PAGE 17 5-CGLE 0-75/02/C3 C-LETTER C1-EA-90RGMANN-10-LG-MCMANUS C2-CHANGE-0R'Dia-5 0-Nk S-CGRE' 0-54/12/C5' 5-CHANGE-bt0ER-5Ci-GENkRkL-ELECTRIC-COPPkNY C2-NUCLEAR-STEAM-SUPPLY-$YSTEM 0-NA o,

,y S-CG8E Dr.Z510iLC2___t:IMNGE-DPDEA fL_L1-GENER AL:LLECTJIC C2: NUCLEAR-STEAM-5UPPLY-5YSTEM 0-NA 5-CG8E 0-75/06/25. C-LETTER .C1-EA-00RGMANN-10-LG-MCMANUS. C2-CHANGE-ORDER-7 0-NA 'l i 5-CGtt _0-75/C4/24.C-CHANGE-0RDER-7 _C1-GENERAL-ELECTRIC-COMPANY C2-NUCL E AR-ST E AM-$UPPL Y-5 YS T FM l 0-NA ') $-CGtt 0-76/C1/12 C-LETTER C1-EA-80RGMANN-TO-LG-MCMANUS C2-CHANGE-ORDER-8 0-NA l S-CGEE 0-75/iO/51 E-EHANGE-ORDER-8'~Ci-GEN 5RAL-ELECiWIC-COPPANY C2-NUCLEAR-STEAM-5UPPLY-$YSTEM 0-NA g S-CGLE B-24fCill7 C-CHANGE-Ot0ED-9 C1-SENERAL: ELECTRIC:COPPANY_. C2-NUCLEAR-STEAM-$UPPLY-$YSTEM 0-NA 4 $-CGtt 0-76/06/16 ~'C-EHANGE-0Re5R-50 C1-GENER L'-ELECTRIC-C05 ANY C2-NUCLEAR-STEAM-SUPPLY-$YSTEM P i 0-NA 5-CQEE 0-76/CS/11 C-CHANiE-080ER-11 C1-GLN(BA(~J((J1R((-COMPANY C2-NUCLEAR-STEAM-$UPPLY-5YSTEM 0-NA r l 3 S-CGtt, 0-77/C2/15..C-CHANGE-0RDER-12 C1-GENERAL-ELECTRIC-COMPANY 0-NA 4 $-CGtt 0-77/04'/29 C-LETTER C1-Ek-80RGMANN-TO-LG-MCMANUS C2-CHANGE-ORDER-13 0-NA ) 5-CGEE P-77/03/C7 C-CHANGE-ORDER-13 C1-GENERAL-ELECTRIC-COMPANY "C E~N'UC'L E k R-S E E AM-5U PPL Y-$Y S T E M i 0-NA ) I s-CGtt 0-77/06/10 C-LETTER C1-EA-PORG4 ANN-10-LG-MCMANUS G-NA T ) 5:(GEE Q:llLOS Ll? C-CHANGE:ER0LR_16_01:1EN(PAL:gtE(TRIC-C0ERANY_ C2-NUCL(AR-STEAM-5UPPLY-SYSTEM i 0-NA I 1I.. I l 5-CGtt 0-77/11/C1 C-CHANCE-ORDER-15 C1-GENERAL-ELECTRIC-COPPANY 0-NA di 5-CGLE 0-78/08/C9" C-LETT'R 'C1-EA-PORGMkNk-Td-DR-HERCHE C2-CHANGE-ORDER-16 Q-NA ) E 5-CGtt 0-78/06/08 C-CHANGE-ORDER-16 C1-GENERAL-ELECTRICvCO*PANY C2-NUCLEAR-STEAM-$UPPLY-$YSTEM i t '., 0-NA ) 5-CGRE 0-78/09/20 C-LETTER C1-WD-WAYMIRE-TO-OR-HERCHE C2* CHANGE-ORDER-17 0-NA . fi -) S-(GCR 0_-lg./ 09 /10j-( H. A N G [-0 8 0 (R -17 CJ -(.E N E R A L -( L E C T R 3 (-C O *P AN Y C2-NUCLEAR-$ TEAM-5UPPLY-5YSTEM 0-kA kk C1-WD-WAYMIRE-TO-OR-HERCHE C2-CHANGE-ORDER-18 0-NA 5-CGCE 0-79/08/C6 C-LETTER 'h i s 5-CGEE 0-79/05/22 C-CHANGE-080ER-IP C1-GENERAL-ELECTRIC-C0"PANY C2-hUCLEAR-$7EAM-$UPPLY-$YSTEM W i 0-NA [b3 3-CGtt 0-79/OR/C1 C-CHANGE-ORDER-21 C1-NS$$-C0hTRACT 0-NA EP

e~ r, o Das-OFFLINE PRINT' 14 JUN Si 0F:5d:37 DATE 061483 PAGE 18 'T C2-CHANGE 0RDER-20' ' 'C3-CHANGE-ORDER-22 2 ~ 5-GE D-80/11/21 C-LETTER C1-SW-COULTER-TO-EA-PORGMANN 'T 0-NA 5-CGtt .D-80/06/16 C-CHANGE-040ER-20 C1-NS$5-CONTRACT 0-NA 3-J64 E D-l9 / 06/_21 C-C ttagg f.-g R p r R-19 C 1.GLetg R A1-git [La t g-COs'P_4N T__CR-NU C L E A R-S T E AM-SUPPL Y-$Y S T EM 0-NA ) 5-CGtE D-81/C3/C2 C-LETTER C1-WD-WATMIRE-TO-DR-HERCHE .C2-CHANGE-ORDER-22 0-NA ~~ 5-CGEE D-00/00/00 C-CHANGEECRDER-Nb-22 C5-NS$$-CONTRACT 0-NA 'I 5-CGRE D-81/12/18 C-LETTER C1-BR-STLVIA-TO-AF-HULL C2-CHANGE-ORDER-23 0-NA S-CGtt 'D-00/00/C0 ' C-CH ANGE-0RDin-23 Ci-NS$$= CENTR AC E ' 0-N S-SSL 0-GJ/00/00 C-SEL-DESICN-$1ATUS ~ C1'-INS k ALL A T I0'N-ST ATUS C2-MATERIAL-REQUIREMENTS C3-HANGER-CONSTRUCT 10N-ACTIVIT 3 ____7-51AIUS Q-NA 5-TPT D-82/06/02 C-RECORD-bF-TkLEPHUNE-CbNVER$AIION Ci-WITH-JIM-BUCK C2-DIR E CTOR-OF-C GtF-AUDI T-GR OUP C3-R.G.-PATTER 50N 0-%A 5_CGSE D.-lZ103/1L_C:AUDIl-S C HE RUL E C1-RARCH-14-31e-197Z 0 N A _, _ _ I S-CGRE D-75/02/10. C-MEPO C1-WJ-FRIEDRICH-TO-04 C2-GUALITY-AUDITS-FOR-FEBRUARY 0-NA ) 5-CG8E D-77/05/13 C-GAFS-AUDIT-SCHEDULE 0-NA 1-CGtE D-79LQ5!17 C-LLTL[R C1-WW-S C HWJ E R$-T O-R.-M A R SH A LL-t-R.-T UR N E R C2-04-AUDITS C3-$UPPRESSION-P00L-WORK 0-NA T D-00/C0/C0 ~ C-GAIS-ALDIT-SCHEDULi '0-NA ) $-CGRE iI 5-CGtt D-00/00/00 ~C-Gats-SECTIdN 'Ci-LOG-OF-FIELD-AUDIT-REPORTS 0-NA ) 5-CGtt D-91/C9/02 C-WORK-CRDER C1-PAT-ADKINS-TO-HARLAN-SAGER C2-SUPPRESSION-P00L 0-NA 5-CGRE D-22/01/20 C-LETTER C1-HR-$AGER-TO-GAD-DIRECTORS-t-C00RDINATOR$ C2-1982-GOAL 5-t-0BJECTIVES 0-HRS /82/23 9 S-CGRE p-P1/02/11 C-Lili f R. C_1 J T AII CN-0 0A L I T Y-E NG IN E E R-10-J R-S C HOT T.C2-GOALS-FOR-1981 0-ZPS/0A/81/6 5-CG8E D-R2/01/19 C-LETTER C1-RR-RIhDERPAN-10-HR-5AGER Cd-LIST-OF-SPECIFIC-CGRE-GUAL11Y-AUDIT-SECTION C3-CBJECTIVC ) s-t-GOALS-FOR-1982 0-NA 5-C G t ( ___ ___9- ? 2 / C 1/_19 C-LE 11[R C1-RR-RlhDERMAN-10-HR-SAGER C2-LIST-07-$PECIFIC-AREAS-OF-CONCERN C3-RELATIVE-TO-08J l ECT VEs-t-G0ALs-FOR-19P2 0-NA S-CGli D-P2/01/07 C-LETTER C1-JJ-WALD-To-HR-SAGER C2-GCALS-TO-19P2 0-ZPS/0A/82/06 5-CGtt D-8 2 /12 / ? O__C-L E.TT E R C1-JC-BULK-70-AUDIT-SCHEDULE-FILE C2-AUDITS-NOT-PERFORMED 0-JCB/82/212 [L] s-CGEE D-R2/08/?O C-LETTER C1 JC-BUCK-TO-AUDIT-?91-FILE C2-FIELD-AUDIT-REPORT-393 c-JCB/22/120

9 = 's <T. DRS-OFFLINE PRINT 14 JUN 83 08:5h:37' DATE 061483 PACE 19 ~ 5-CGtt D-82/03/15 C-LETTER C1-JC-eUCK-T0* AUDIT-SCHEDULE-FILE C2-AUDIT-OF-NES-ISI 0-NA S-CGtt D-8 3 /05'/13 ' C-LETTER C1-JC-8UCK-TO-5U'DIT-SCHEDULE-FILE C 2-C H A N G E-T O-DUD ITS -S C H E DUL E D-F OR -P A Y-198 3 0-JCB/83/183 K_ CGS 5 h-82 /.121.30 r-r n tE-51J E-AUD11 *.CItEDUL5 f1-YEAR-19P3 0-NA. _ _. S-CGRE D-P1/01/16 C-CGRE-AUDIT-SCHEDULE _C1-REV-2 0-WA 'l S-CGtt D-80/01/24 C-CGEE->JK-AUDIT-SCHEDULE _ C1-REV-1 ,0-NA _.5_C.Gli D.f._2101/15 t-tGFE 111E 8t1DIT-SCHI.DULE c1-YEAR-19&2 (2-REV-3.. 0-NA S-CGRE D-20/07/C9 C-CGtE-HJK-AUDIT-SCHEDULE _, C1-REV-0 0-NA ) 5-CGtt D-79/11/12 C--0ALS-AUDIT-SCHEDULE..C1-REV-1 0-NA _5-LG8E D-P 1L12L11 c-tG8E 5111:1U.211:1C1!EIUtt C.1-J E A R-1?f t C 2.-R E V-C. _0-NA I S-CGtt D-80/07/C9..C-CG"E-HJK-AUDIT-SCHEDULE. .C1-REV-0 0-NA S-CGtt D-79/11/12 C-GASS-AUDif-SCHEDULE C1-REV-1 0-NA I ) 1-IGIf B-CO LDOLEQ - I: Gats-AUDII_SCliEDUL1 0-NA I S-CGLE D-CD/00/C0.C-CGCE-SITE-AUDIT-SCHEDULE C1-TEAR-19P2 C2-REV-1 0-NA I S-CGRE D-22/04/19 C-CGtE-SITE-AUDIT-SCHEDULE C1-YEAR-1982 C2-REV-2 0-NA 3-C.Gtt D 22/CIL15 _ C-CG RE-AUDII:S CHIDULE (1:118g-1962 _. C 2.-R E V-3 _.0-NA T S-CGRE D-F1/01/16_ C-CGtE-AUDIT-SCHEDULE. C1-REV-2 0-NA I S-CGtt D-81/C8/C3 C-CGRE-SITE-AUDIT-SCHEDULE C1-YEAR-19P1 0-Ni 5-IGEE D-P1LQ2L10 C-C G R E:8U RU.. $.CEttyL_E C l-R_f.y - 3 9-NA iI,. 5-CGEE .D-P0/11/C5 C-GA-PRCCEDURE C1-PLANhlNG,-REPORTING-t-FOLLOWUP-0F-AUDITS C2-REV-1 C3-SUPERCEDED ) 0-18/Gn5/G1 i S-CGtt D-77/03/15' C-0A-t-ST5NDiRDS-PROCEDURE C1-PLdNNING,-REPORTING-t-FOLLOWUP-OF-AUDITS C2-REV-0 C3-SUPERCEDE ) r--


~

4 s S-CGRE D-F1/03/C6 C-GA-PRCCEDURE C1-PL bNING,-REPORT-F-FOLLOWUP-OF-AUDITS C2-REV-2 0-18/04/01 d' S-CGRE D-CC/00/C0 (-GA-PRCCEDURES C1-PLANhlNG.-REPORTS-E-F0LLOWUP-OF-AUDITS C2-REV-0 0-G A P /18 / 01 e S-KAISER D-R1/01/26 C-L E TT E R (1-PS-CITTING5'-tbs h'SCHWiERS C2-CGRE-FIELD-AUDIT-REPORT-334 0-kC/15268/0 W O' W S-C&tt D-21/01/14 C-LETTER C1-WW-SCHWIERS-TO-PS-GITTINGS C2 -F I E L D-AU D I T -R E POR T-334 0-KE0/507 m' S-CGtt D-P0/11/14 C-GA-t-STANDARDS-AUDIT-SURVEILLANCE-PEPORT-334 C1-LETTER C2-WW-SCHWIERS-TO-PS-GITTINGS W 0-NA ][3 5-CGtt D-80/09/22 C-LETTER C1-WW-SCNWIERS-TC-PS-GITTING$ C2-AUDIT-OF-HJK 0-KEQ/461 TW

e as DRS-0FFLINE PRINT 14 JUN 83 08:5'd=3f~~ ~ DATE 061483 PAGF 20 5-CGtt D-73/04/25 C-FIELD-UDIT-REPORT-3 0-NA ~' S-C'G R E ' D-f3/Of/12' C-FIELD-50DIT-REPhif-ih h-NA ~~ S-CGtE D-74/0i/17 C-FIELD-AUDIT-REPORi-3i~G-NA I I "~~ " $-CGtt D-74/10/14 C-FIELD-AUDIT-REPORT-35 e-NA 5-CGEE' D-i5/01/23 E-EiELD-AUDIT-REP 0kT-39 U-N5' S-C6tE D-75/U1/23 C-FIELD-AUDIT-REPORT-4i b-NA I 5-CGtE D-75/09/1F C-F I EL D-8UDIT-RE PORT-5 5 0-N A '~ ~ ~ ~ $-CGtE 5-77/04/12 ' C-FIELD-AUDIT-iEPhiT-ibi' U-NA 5-CGri D-76/c5/2c ~ C-FIELD-Aubii-kip 0Ri-65 C-NA 1) 5-CGBE P-76/06/10 C-FIELD-AUDIT-REPORT-70 0-NA ~ ~ ~ ' 5-CGtt 0-77/01/31.... _.... _.....C-FIELD-AUDIT-REPORT-88 e-NA..... _ ) S-CGtt D-77/03/d7 ~'Cliiiip-AUDIi-iEPUii-500 'U-Nk ) S-CGRE D-78/01/[6 C-FIELD-AUDIT-REPORT-170 0-NA S-CGtt D-78/07/17 ~E-LETTER 'El-WW-5thWIE55-T5-R-r5RSHALL C2-GA-t-STANDARDS-AUDIT-SURVE!LLANCE-REPORT-185 0-fl A f ^ ) 1-fGtt e-Z 4 tClt10 _C -il t L.t-A UJ II-!LE10!l_-J 15 e-N4 T s-CGtE. D-79/05/15 C-FIELD-AupIT-REPORT-239 C1-ADDENDUM-1 0-NA ) 5-CGRE D-79/05/15. C-FIELD-AUDIT-REPORT-241 T ~ 0-NA ) _.___1-f G t t. D-8 2 /05 /3 3__L-qu At g.it-A u t tl-MEED C3-CAT A L.T.II C C2-A.F.R.-RESPONSE-t-lMPLEMENTATION-ACCEPTANCE o-Jte/82/50 0-F/38570/310 ) 5-CATALYTIC 0-R2/04/22 C-RESP 0h5E-TO-FIELD-AUDIT-382 C2-RJ-FISHER-10-HR-SAGER i S-CGRE D-82/03/$1 C-LETTER C1-HR-$AGER-10-RJ-FISHER C2-CATALYTIC C3-QA-AUDIT-REPORT-388 ) o-catjft5 e $-CGRE D-R2/03/11 C-AUDIT-FINDING-REPURT-388-1 C1-CATALYTIC c-388/1 i 5-CGtt 5-CGRE D-82/03/11 C-AUDIT-FINDING-REPORT-3P8-2 C1-CATALYTIC 0-328/2 4 i S-{ GEE 9:EllC2[C2 C-L E_1LE A C--LRAININ,G E-0UALJFICATION C1-RR-RINDERMAN-TO-JC-euCK C2-UTILIZE-STEVE-05BORM-AS-MEM EER C3-AUDIT-TEA 9-!88 0-NA S-CGtt D-00/00/f0 C-CATALVilt-AUDIT C 1 -DOC L'ME N T-CCN T RO L Q-N4 R ____J iG E 0-P2 / C2 /_1E __.( L E li g R _ _ __C 1-J C.Du t r-T O-D L-HOW A R D Co-CGLE-CA-AUDIT-0F-CORRECTIVE-ACTION C3-N0hCONFORMING-MATERIA L ((3 0-JCD/82/12

v ? e '\\: DRS-O'FLINE PRINT 14 JUN 83' b8:50i3i DATE 061483 PAGE 21 ^ F S-CG8E D-82/01/19 C-LETTER C1-JC-BUCK-TO-DL-HOWARD C2-CG8 E-A A-AUD'if-b t-NbNCbN F0PMING-M A TE R I ALS -P AR TS C3-COMPJNENT S.. 'I 0-NA $-CGEE D-82/d7/21 'C-LEkTER C1-HR-SAEER-Tb-RJ-PRUSKI C2-QA-AUDIT-REPORT-82/24 C3-$st 0.$(g/115 S-CGtt D-82/05/19 C-LETTER C1-8.-BEARDSWORTH-TO-HC-9RINKMANN C2-ENGIhEERING-8UDIT-0F-58L-79-14-ACTIVITIES I 0-NA S-CG8E D-82/b4/29'C-NOTiFICATh0N-bF-GhiENTIALLY-REPbRTABLE-HTEPS 0-Nd ') S-CGet D-00/C0/C0 C-AuBIT-h0-82/24 0-t//24 ~ ~ ~ ~ ~ " ~ ~ S-CGif D-83/04I20i-LETiER 51-HR-SAGER-Tb-W5-HEblIK C2-05-FitLD-AUDIT-REPORT-331 0-KE0/1657 f $= KAISER b=83/ 3/17C-Wd-HEDFIK-10-HR-SAGdR'C1-LEITEM "C2-CG8E-FIELD-AUDIT-REPORT-331 0-KC/18258/0 ) S-CGEE D-R3/03/C7 C-LETTER C1-JC-PUCK-10-WA-MED71K C2-SECOND-DELINGUFT-CORREDHCTIVE RCTION-RESPONSE C3-NOTIFICAT ION ) 0-JCB/83/49 8 S-CGtt D-83/02/di 'i-LETIEnk b-K55SER ~ -Ci-NJ-SAGER-iO-WA-HEDIIK C2-AA-FIELD-AUDIT-REPORT-331 ) T 0-(1921661 i S-KAISFR D-P0/10/10_C-LETTER C1-PS-GITTINGS-TO-WW-SCHWIERS C2-0485-flELD-AUDIT-331 0-NA S-KAISER. D-P0/12/10.C-LEDTER. C-P S-GI T TING S-0 0-WW-SC HW IE R S C2-CGLE-FIELD-AUDIT-331 0-KC/15180/0 S-KalstR D-80/12/03 C-LETTER C 1-P S-G I T T I N GL-10-WW-$ J.H WI.[ R $ _,C 2-C G8 E.F I E L D - AUD I T-31 0-KC/15171/0 T S-CGtt_ D-P0/10/C2 C-LETTER. .C1-WW-SCHWIERS-TC-PS-GITTINGS C2-GA-t-STANDARDS-AUDIT--URVEILLANCE-RE(0RT-331 ) 0-hA ir S-CG8E D-Pc/09/23~~C-FiitD-AUDIT-iEP0ii-ssi Ci-DATED-SEPT-23-25,-1980 0-NA ') D-?0/09/02 C-LETTER-TO-KAISER C1-WW-SCHWIERS-TC-PS-GITTIEGS C2-UD55-bh-HJK 0-KE0/450 ~ il ) S-CGEE D-P0/09/24 C-AutIT-FINDING-REPORT-331-i' 0-33i/1 5" S-CGEE D-80/09/24 ~ C-AU6IT-FINDING-REPORT-331-2 0-51/2 ) S-CGtt D-0C/C0/00 C-AUDIT-331 0-NA ~ ' ^ ~ ~ " ~ ~ I 9 . C1-WW-SCHWIERS-TO-G.-AdRU270 C2-VALVE-0UALITY-ASSURANCE-00CUMENTATION S-A D-80/09/05 C-L ATT ER-T C-T ARGE T-ROCK-CORPOR AT ION 0-0A/137 1 a S-RAISER D-R1/C9/28 C-LETTfa-TO-CGEE C1-DL-HOWARD-TC-HR-SAGER C2-GUALITV-CONFIRMATION-PROGRAM C3-INSPECTOR-ADDRE SSES d' 0-KC/15811/0 'k S-KAISER D-81/11/C2 C-LLTTER-TO-CGtE C1-M-AlbERTIN-TO-0K-CULVER C2-PROPCSED-SECOND-SHIFT-MANPOWER-REQUIREMENTS 3, 3 0-KC/15911/4 iP

  • ~

S-KAISER D-P1/10/29 C-LETTER-10-CGt[ C1-DL-HOWARD-TO-HR-SAGER C2-LONTROLLED-DISTRIBUTICN-0F-HJK-GA-0C-PROCEDURES T23 0-AC15002/0 sp

e

  1. 4 DRS-OFFLINE PRINT 14 JUN 83 08:55:37 DATE 061483 PAGE 22 s-CGRE D-81/09/23 C-LETTER-TC-KAISER C1-HR-SAGER-10-P-KTNER C2-CONTROLLED-DISTRIBUTION-0F-HJK-GA-0C-PROCEDURES 0-FE0/620 S-KAISER D-81/10/16 C-LETTER-TC-CGEE C1-0-HOWARD-10-HR-5AGER C2-TAD-PER$0NhEL 0-KC15866/0 m

5-EA15EB _ D-511.10/l l C:LEIIEG-10-CGtE_._Cl:D:110W A 9 0-IO _HR:$ A.GER_ CZ-HJK-NR C-COMMI TMEN T C3-NRC-INSPECTIGN-REPORT-79-14 C4-HJK-GE-REVIEW-CF-RECURRING-DISCREPANCIES 0-uC/15P57/0 5-CGtt .D-77/09/15. C-LETTER-TC-KAISER C1-Wh-SCHWIERS-TO-RL-TURNER C 2-F I R E-PR OT E C T ION-00 AL IT T-C ON T R OL-PR OG R AM 0-rE0/164 5-CGRE D-77/07/27 C-LETTER-TO-KAl$ER C1-WW-SCHWIERS-TO-RD-SAHLBERG 0-KE0/150 5-CGEE D-77/d6/10 C-[ETTER-i5EKAidER '1-WW-SCHWiERS-TU-RE=iURNER C2-J0lNT-KEI-GA-MEETING 0-KE0/39 C ' $-CGtt S-7h/05/i6 k-LETTER-10-KAISER C1-WW-SCHWIERS-TO-RE-TURNER C2-FIELD-AUDIT-REPORT-112 I c-E t_q tj3 s $-CGRE D-77/05/20 C-FIELD-AUDIT-REPORT-11.0-NA_ 1 5-RAISER D-F1/C8/26. C-LETTER-TO-CGRE C1-PR-KTNER-TO-HR-SAGER C2-STATUS-07-HJK-INSPECTOR-STAPPS 0-KC/15739/0 5-KAISER D-fJ LORL20 C-LEJitp-TO-CGst__tt:ER-(TMER:10:Hre!GtR__C2-5EL-REVISICN-HJK-NONCONFORMANCE-REPORTS 0-KC/15727/0 5-KAISER D-7 7 / 08 / 2'3 C-LETTER-TO-dGRE k1-RE-IURNER-TO-WW-SCHWIERS C2-RESPONSE-TO-FIELD-AUDIT-133 0-rC/10422/0 f' 3-EAJ5ER D-fllSllls C-L.EllE.E _I.Q.(_GLE C 1 -P-K_YN E!- LO-f. -5 8.G E R___0-K C /15 6 3 7 / 0 T S-FAISER D-F1/07/02 C-LETTER-TO-CGtE _C1-CH-$TANTIELD-TO-BK-CULVER C2-NRC-INSPECTION-REPORT-80-15 C3-LETTER-FEG-442 ) C4-LETTER-rt-14094-C 0-rt/15616/C _ 5-RAISER D-P O LOS / 2 0___C-i g11 E B-J p.-LG.l E_._.f1-R_,-f A RsEA L L. _T O-OK -C U L VE R _ _0-K C /14 0 9 4 / C i; 5-KAISER D-F1/06/C4 C 1-P.-K T h E R-10-W D-W A TM I R E C2-CGEE-PANAGEPENT-AUDIT-PA-81-1 0 -K C /15 $ 5 9 /0 ) S-FAISER .0-F1/06/C1_.C-LETTER-TO-CGRE..C1-P.-KTNER-TO-D.-WAYRIRD 0-KC/15555/0 9~ ) -_3:58ISER DU LD5 /.11 t-LEHE R QL:CGCE C t-f_s-G1J11N G S-ID-WW-5 f HWI ER $.,0-K C /15 5 24 /G = S-KAISER D-P1/04/C8__C-LETTER-10-CG'E C1-PS-GITTANGS-TO-WW-SCHWIER$ C2-RESPONSE-10-Kto-552 0-KC/15447/0 ) 5-KAISER D-P1/02/16_ C-LETTER-10-CG-E C1-PS-CITVINGS-TO-WW-SCHWlERS C 2-T E R P IN A T 10N-0 F-I N SP E C TI ON-PE R S ONN E L G-KC/15316/0 5-RAISER D-P*/02/04 C-LETTER-TO-CG%E C1-PS-GifihNGi-50 WW-5i5'Wiins 5-KC/15291/0 2~~ $=FAISER D-91/01/CP C-LETTER-10-CG-E ~ C1-PS-FITTINGS-TO-WW-SCHWlERS C2-! DETERMINATE-INSPECTION 0-KC/5226/0 5-KAISER D-81/12/30 C-LETTER-To-CGtt C1-DL-HOWARD-D0-HR-SAGFR C2-COURTEST-INSPECTIONS 0-KC/16087/0 5-KAISER D-P0/12/16 C-LETTER-TO-CGLE C1-PS-CITTING5-TO-WW-SCHWlERS C2-NRC-INSPECTION-REPORT C3-UNRESOLVED-ITEM-80-15 2b3 -0? e 0-KC/15?n3/o

r e .*s ? i h,I 08:50:3f' ~ DR$-0FFLINE PRINT 14 JUN DATE 061483 PAGE 23 'I / / 5-FAl$ER . 7-Pir1?.t12p C1,-DL-HCWARD-TO-HR-$AGER._ .C2-00ALITT-CONFIRMATION-PROGRAM C3-INSPECTOR

  • ADDRESSES

'l 0-KC/16349/2,;*, ^ ..,?,,. i-. i., 1 3. -n e S-CGRE D-22/03/25 :c-rs*0, .C1-oK-CuEVER-10-pt-5AFER C2-WATERTIGHT **ULKHEAD-D00R5 C3*E P0X Y-A DH E S IVE-US E D-F OR-CON .___ C % EI L:RIPAl t-W O R K 0-P2/143 5-CGRE' D-22/12/C1 C-PEPO',/ ,C1-DK-juLVE#-Ib-N'R-SAGER C2-DOCUMENTATION-FROM-RV-MARTY-COMPANY ' ~ 0-f2/545 b lGEE 0-1.Alf 4 L23.- _COLil.T_E R.I.l G.(H,Ll(AGQ-f !! $ 6(.-E -I P Q h(Of_P,_A N I_C-E C PANDORF-10-KJ-0!NG C2-GA-MANUALS-FOR-STAINLES$-STEEL-PG OL-LINER-WORK 8 0-0A/416 S-CCtt D-79/06/05 C-LETTER C1-D.-RRAMER-10-J.-DEERWESTER C2-DETIEL-CONSTRUCTION-COPPANY Q-NA 6' r, ...-_5 - t 6 % E Rr12 tDll/3__I:1LlT E R E10.W AL:1h t[ET R I A L:C.O N T R A CICA $. -I NC__C D-HR-5 A GE R-T O-R.-L E I G H C2-DATWELL-t-$UPPRESSION-P00L-PAINTING 8 c-QA/,1879 3 $-t'G t t R-22/09/C8 C-LETTLR <. C1-CO ATahC-DOCUMENT ATION-DEF IC TE NCY 0-HR5/82/174 6

s

) f 1,(GEL D-P2/1RL21 t-LE1115. - t 1-H C:.B Rl!8Kf! AN-10 M hS AG E R C2:COMYINGS.0-NA ~ I s'- S S L D-82/12/06 (*EtTTER-TO-CEEE.C1-JE-RODRIGUEZ-TO-EA-80RGPANN C2-FIELD-COATING-t-PAINTING-WORK I 4 .o- ,0-$LC/25351 I ', '$-CGRE D-83/03/22 ~C-PEPO' I-HR-$AGIR-TO-kA-BORGMAN'N C2-GAP-ALLEGATIONS C3-REFERENCE-GA-2005 ) 0-P_e s / 8 3 /16.2 e iI 5-CGRE D-8?/09[20.C PEto _ CJ:g A-e0'RGM A NN-10-DI ST RIBUTION C2-GAP-ALLEGATIONS-PRESENTED-AT-THE-UDALL-HEARINGS-ON I 0-GA/2005 t .ti 1r s-CGEE D-P2/02/73 'C-rEr0-C1-4e-rLYNN-70-EA-n0RG= ANN-t-eR-sTtVIA C2-ACRs-suCC0PMITTEE-MEETING ) 0-hA I~ a; s-CGtE. D-P0/12122 C -P E P,W C1-WW-sthWIERs-To-WD-WATPIRE C2-DESIGN-DRAblNG-APPROVAL $ 0-NA ) S-CGRE D-P0/12/16. C-LETTER-10-Sti' C1-EA-BORGPANN-TO-BF-$CHEIPEL 0-NA 9 ) 5-CGEL D-P0/1LLj6 C-Miro C 1-W W-S C HWIJ R S.-TI-HC-8 RINK P A N. C2-E S $ E NT I A L-T HE R M0W E L LS 0-NA 0-NA d' 1-CGEE D-20/12/12 C-PE*0 C1-WW-sCHWIERs-TO-OKiCULVEe C2-AUDIT-OF-TLeNOVER-AC13VITIES Q-NA I 5-CGRE D-80/12/)2 C-PEPO C1-EA-DORG" ANN-TO-WW-SCHWIERS C2-PROCEDURES-C-NRC9PEQUIREMENTS 0-NA ,i, g e 5-C99 D-f D_f17 LIE __C_- P E Eg (1 W W:_5 MylEn$-TC-L-LUDWIG __ C2-WOBK-PN$1 RUCTIONS-FOR-WEEK-0F-DEC-16-19.-1880 0-NA d C2-DDC-APPROVALS Q-NA ~ e I 5-CGtE D-P0/12/15 C-PEPO C1-WW-$CpWIERs '4C-WD-WATPIRE 50 5-CGEE D-PC/12/10 C-PEPO C1-WW-5C WWIE RS-T C-E A-B OR CM ANN C2-REPo[ TING-FEQUIRED-BY-THE-FOREIGN-CORRUPT-PRACTICES ip I 0-NA t [k), S-CGtt D 80/11/13 C-MEPO-FROP-WH-ZIMMER C1-STANDING-COMMITTEE-TO-INSURE-COMPLIANCE C2-WITH-THE-ACCOUNTING-PROVI$1

  1. sp c..

r i-n, - 1..., c o r, r...- r o......;.. r t, r r < -, r i -n, _ i O 7 T

w < < (. +

  • /,

~ o i, y y DR$-0FFLINE PRINT '14 J'UN 83 C8:5d:57 DATE 061483 PAGE 24 0-NA o-es 5-CGtt D-20/12/C5 C-PEPO C1-WW-SCHWiER$-TC-SC 5WAkN C2-FIRE-PROTECTION 0-NA E ~D-8b/12/f2 'C-PEPO C1 WW-SCHWIERS-TC-HC-BRINEMAN C2-0VERDUE-GA-DOCUMENTATION 0-NA E 5-CGtt 5-tGtt D-80/07/10 C-PEPO C1-WW-SCHWIERS-TC-HC-BRINEMANN C2-0VERDUE-Qa-90CU"ENTAT10N 0-NA 5-CGtt D-80/11/25 C-PEP 0' 'k2-NRC-!E-CIRCULhA-Eh-22 C3-CONFIRMATION-OF-EMPLOYVE-GUALIFICATIONS I 0=tA i ?% __.1-fG8E E !0.LJJt24 C-PAPO C1-WW-S C PWILES-T O-0 A MIMBE R$__C2-OPE N-F IE LD-AUDITS-8-5URVE ILL AN C E-R EPORT S 1 0-kA C PEPO ~ C-RP-ENAS-TO-WW-5CHWIERS C2-RECORDS-MahAGEMENT-MEETING 0-NA E 5-CGRE D-P0/11/18 I 5-CGtt 'D-80/11/24 C-REPO C1-WW-SCHWIt'RS-TC-JR-SCHOTT C2-AUDIT-OF-PROCUREMENT,-MATERIAL-RECEIVING-8-LAlkTENA I 0-NA 5-CGtt D-P0/11/14 C-MEPO C1-WW-5CHWIERS-IC-HC-BRINXMANN C2-GA-AUDIT-REPORT-312 0-NA ) 5-CGtt D-80/11/10..C-PEP 0 C1-WW-SCHWIER$-TO-AA-90RGMANN C2-G A-POST 3 0N-RE S PONSIB AL ITI E S 0-NA g 5-iGtt D-P0/11/10 C-r[FO C 1-WM-lifwJin$-1Q-A LL-(ONC ER!iE D_ _C2-PROC E DUR ES-POLIC T-ST A TEM E N T Q-NA I .D-80/10/29 C-PEPO C1-WW-SCHWIERS-TO-EA-80RGMANN C2-POLICY-STATEMENT-REGARDING-hRC-UNRL50LVED-ITEMS 5-CGtt ~ I Q-NA i' ) ___1-CGLE D-80/J0/15 C-M LP_Q t 1-J R-IC HQT T _.19-Wd-MHWI E R 5__ C2-N RC-I NS P E C T ION-R E PO R T-NO-80-19 Q-IP5/80/-31 / T 5-CGEE D-P0/10/30 C-PEP 0 C1-WW-SCHWIER$-TO-JR-SCHOTT C2-LETTER-2PS-RO-440 0-NA I 5-CGLE D-20/10/23 C-PEmo. C1-JR-SCHOTT-10-bW-5CHWlERS C2-ROCKWELL-IhTERNATIONAL,-HNC C3-VENDOR-CA-PROGRAM 0-195/PO/440 b 5-CGCE D-P0/11/C5 C-PEPC C1-WW-SCHWIERS-TC-GA-MFMBERS Ci-0 PEN-FIELD-AUDITS-t-SURVEILLANCE-REPORTS NI,, 0-NA 0-NA 'lh 5-CGtt D-PD/11/07 qp i -- C-PEPO - C1-WW-SCHWIERS-TC-SE-MARTIN C2-STARTUP-LAhuAL-REVISIONS 0-NA g l 1-{ GEE D-EQf10 /13 C-M[f9 Cl-WW-5 MWIERs-TO-EA-80RGMANN.C2-MANAGEMENT-AUDIT 0-NA dI' D-P0/10/16 C-C C-rEPO C1-RP-EHAS-10-bW-SCHWIERS (2-GRLAI-LAKES-GA-PANAGERS-MEETING 0-NA i I I 5-CGtt D-80/09/16 C-PEP 0 C1-WW-SchWIERS-TC-0Ats-MEMPEPs C2-OPEN-AUDIT-t-50RVEILLANCE-REPORTS g' 0-NA ,y 5-CGtt D-P0/10/C9 C-MEP0 C1-WW-5CHWIERS-TC-04-MFMPERS C2-OPEN-FIELD-AUDITS-t-CURVEILLANCE-REPORT 5 o 0-HA 5-CGRE D-20/09/16 C-PEPO C1-WW-SCHWIERS-TC-RP-EHAS-P-RL-WOOD C2-CR05FV-5dFETV-RELIEF-VALVES 0-NA 5-CGtt D-P0/09/11 C-PEPO C 1-WW-SC HWI E RS-T C-D IS T RI BUTION C2-PREPARAT10N-OF-AUDIT-REPORTS _u) 0-NA

r3 DR$-9FFLINE PRINT 14'JUN 83 08:5d:37 DATE Ce1483 PAGE 25 C2 TR5i'iNG-t-INDOCTRINATION 0-NA 1 5-CGRE D-P0/07/28 C-Pero C1-WW-sCHWIERS-TO-ALL-CONCERNED h 5-CGtE' D-8C/C7/30 C-PEPO C1-GW-SCHWIFRS-TO-ALL-pA-MEM*ER$ C2-CORRESPONDENCE-RECEIVED-FROP-JAN-1-THRU-JULY-29.-I7 0-NA S-CGEE D-P0/07/!0 C-pea 0 C1-WW-$CHWIERS-10-EA-80REMANN C2-CORPbR5T['05-UPER5fiONS-PULICY 0-NA 5-CGRE D-50/09/13 ~ ~ 'C1-WW-5CEWIERS-50-ALL-AUDITUR$-CONCERNED C2-OPEN-FIELD-AUDIT 1 0-NA ~ C-PEPO S-CG'tE D-80/07/24 C-PEPO C1-WW-SCHWIERS-TO-M.-LUER $fN C2-DRAFT-WRITEUP C3-P0$lT10N-DESCRIPT!0NS 'l 0-kA 5-CGEE _ __D-80/C7/28_ C-PEPO C1-WW-SCHWIERS-70-ALL-CONCERNED .C2-REORGANIZATION-0F-CONSTRUCT 10N-GA ^I 0-ka S-CGtt 0-80/07/2P 'C-MEP0 kt-WW-SCHWIERS-TC-ALL-CONCTRNED C2-PRAPARATION-FOR-NRC-MEETING ) I' 0-no i 5-CGtt... _ _ D-80/07/28. C-MEP0_ C1-WW-SCHWIERS-TO-EA-00RGMANN C2-CGEE-HJK-CCP81NED-GA-0RGAN!!ATION ) 0-WA ( 5-CGEE D-F0/07/11' C-PEPU' C1-WW-SCHWiERS-iC-SC-5 WAIN C2-NRC-5NSPECTION-REPORT-80-09 0-NA Y S-CGtt 0-P0/07/21 C-PEPO-FRO *-WW-SCHWIERS C1-IND0CTRINATION-5ES$IOh 0-NA I ..D-20/07/09 C-PEPO C1-WW-SCHWIERS-TO-EA-DORGMANN C2-COMPLIANCE-WITH-ACCOUNTING-PROVISIONS C3-0F-30 REIGN-CORR S-CGEE k UPT-PRACTICES-ACT-OF-1977 4 0-NA ) 5-CGEE D-70/07/C7 C-MEP0 C1-WW-$CHWIER$-TC-WD-WATPIPE C2-REVIEW-OF-VARIOUS-DOCUMENTS 0-NA 4 C2-$UBCONTRACTOR-5URVEILLANCE 0-NA S-CGtt 0-F0/C7/C8 C-PEPO C1-CA-BURGESS-TO-E-BACHMAN I i E S-CGEE D-80/06/20 C-PEPO C1-WW-SCHWIERS-TC-OK-CULVER C2-AUDIT-OF-GENERATION-CONSTRUCTION-DEPARTMENT ) .___9-NA e. 5-CGRE D-P0/06/20 C-CONDUCT-OF-AUDITS C-PEPO C1-WW-SCHWIER$-TO-DISTRIBUTION C2-TRAINING I 0-NA C-PE*0-FROM-WW-SCHWlERS C1-GA-AUDIT-SCHEPULL 0-NA 5-CGRE D-80/07/C9 5-CGtt D-P0/06/13 C-PEPO C1-WW-SCHWIER$-TO-DISTRIRUT10N C2-RFORCANIZATION-07-0A 0-NA 5-CGtt 0-P0/06/16 C-MEPO ) C1-WW-5CHWIER5-TO-JR-$CHOTT C2-04-AUDIT-OF-EPD-ILC-PER$0NNEL 0-NA d' S-CGEE D-P0/06/12 C-PEPO C1-WW-SCHWIERS-To-FA-BORGMANN C2-COMPENTS-Oh-COMPANY-POLICIES 0-NA 'r I 5-CGLE D-F0/06/11 C-OPEN-FIELD-AUDITS C1-CLOSED-FlfLD-AUDITS C2-LOG-SC0K 0-NA g' C-rEPO C1-WW-SCHWIERS-To-FA-90RGMANN C2-NRC-LICENSEE-EVALUAT10N5 0-NA 5-CGRE D-80/06/13 i' s 5-CGtt 0-RC/06/C2 C-PEPO C1-WW-SC5WIERS-TO-DK-CULVER Ci-DISP 051110h-0F-CONCONFORMANCE-RFPORT5 9 l ,_.__0-na [k] 5-CGEL D-P0/06/10 C--CCMPEATS-ON-EPD-PROCEDURE-CA.5AD.01 C-MEMO C1-WW-SCHWIERS-TO-tA-BORGMANN C3-REVISION-2 ir Q-MA

r ,3 DR$-0FFLINE PRINT 14 JUN 83 08:50:37 DATE 061483 PAGE 26 S-CG8E. .0-P0/05/19.C-PEPO C1-WWr$CHWIER$-TO-PK-CULVER C2-PROCEDURE-EC-104 0-NA 5-CGRE D-P0/05/19 C-PEPO C1-WW-SCHWIERS-To-P.-LUKEN C2=HJK-GA-MANAGER C3-KR RAUMGARTEN-TERMINATION g-wa 'T 5-CGtt D-80/05/23 C-"EPO C1-WW-SCHWIERS-TC-BK-CULVER C2-GA-0C-0CCUPANC'Y-di-RCI-BUILDING 0-NA l 5-CGRE D-8d/05/2P C PEi6 ' C i-WW'-5C HWIE R$-T b' 'E A-BdR GM ANN C2-CbMBINED-CGtt-E-HJK-GA-0PGANIFATION A 0-NA. 5-(SRE D-8Qljlfl9 C-MCP0 C 1-W W-1(EW] E R S-T C-EK.C.UL.VE R 2-PROCEDURE-EC-104 0-NA 5-CGRE D-P0/05/19. C-MEP0_ C1-WW-SCHWIERS-TO-EA-BORGAPNN C2-NRC-GUIDANCE-10CFR50.55E-DEFICIENCV-REPORTING 'l 0-NA C S-CGit D-P0/05/I6 'C-PEPO 'Ci-WW-SCHWIERS-TC-bK-CULVE' C2-4ECORDS-EAhAGEMENT-PROGRAM 0-NA ') ~ ~ S-CGLE D-80/05/19 C-PEP 0 C1-WW-SCHWIERS-To-ALL-CONCERNED C2 E0TiFYIiG-NRC 0-NA 5-CGt t ' ' 'D-P0/65I12 I'PErd' ~ ~ ~C1-WW-$CHWIERS-T'h-dAt5-MEMBERS C2-OPEN-AUDIT-t-SURVEILLANCE-REPGRTS 0-NA 4 5-C G E.E B-2 QLQ))JL,_C-P E P O C1-VM-1 GWIEES-1C-px-CULVER C2-04-SURVEILLANCE-REPORT-NO-20 0-NA T 5-CGtt 0-80/04/16 C-PEPO .C1-WW-SCHWIER$-To-gat $-MEMRERS C2-gat $-ACTION-ITEMS 0-NA ) $-CGEE D-79/12/C6 C-PEP 0 C1-WW-SCHWIERS-TC-0At$-MEMPERS C2-CONDUCT-OF-SCHEDULED-AUDITS T Q-NA ) i 5-CGRE D-79/12/07 C-PEPO C1-CA-DURGESS-TO-M.-KOPP C2-HANDLiNU'-hE-CONDUIT-HANGER-DEFICIENCIES T 0-AA ) 2 4_ S-CGRE_ D-79/12/19__C-PEP 0_ C1-WW-SCHWIERS-TC-JJ-WALD C2-7000-SERIES-NONCONFORMANCE-REPORTS 0-NA l) 5-CGEE S-CGRE D-79/11/C6 C-PEMO C1-WW-SCHWIERS-TO-pK-CULVER C2-REWORK-ON-NONCONFORMANCE-REPORTS 4, 0->A ) 5-CGEE D-79/11/14...C-PEPO C1-WW-$CHWIERS-TO-PK-CULVER C2-0AES-5URVEILLANCE/ INSPECTION-REP 0PT-166 = 0-NA ) $-CGEE D-79/11/19 C-MEPO C1-dW-SCHWIERS-TC-GARS-MEMBERS C2-OPEN-AUDIT-t-SURVEILLANCE 0-NA ) C2-F E C-C R A F T-WORK ING-T HROUGH-HOL D-T AGS 5-CGRE D-79/09/75 C-PEP 3 C1-WW-SCHWIERS-TC-DK-CULVER j 0-NA 5-(Gtt t-11l10/16 C-pet 0 $1-WW-S NWIERS-TC_-EA-BCRCMANN C2-CORPORATE-Ga-PLAN 0-NA S-CGCE D-79/10/10 C-ME'O C1-WW-SCHWIERS-TO-KAISER C2-0 ASS-FIELD-AUDIT-REPORT-272 0-NA 3-CGtE D-79/11/C1 C-PEP 0 C1-WW-SCHWIERS-TO-EA-DORCMANM C2 -COR POR AT E-C A-PROG R AM-A UDI T C3-JULY-1979 0-EA S-CGtt D-79/09/25 C-PEPO C1-WW-SCHWIER5-Tc-EA-00RGMANN C2-HJK-AUDIT-407 C3-GAP-16 0-NA t-r e.f r n-7orrer?' r-arro rt-wu-eruuvres-tr-pr-rnevso r;-o att-r t r e e-sun t T-?% 5 c-N

e DR$-bFFLINE PRINT' 14 IUN 83 CP:5bs37 DATE 061483 PAGE 27 S-CGtt D-79/08/28. C-MINUTES-0F-CGRE-t-REGION-3-NRC-PER$0NNEL-ON-JULY-24, e-NA 0-NA S-CGRE D-7 9 / 0 9 / 2 9.. C1-WW-SCHWIERS-TO-BK-CULVER C2-INSTRUMENT-LINE-IDENTIFICAT!0N 0-NA -..__5 - f G 8 8 e-l9106/20 t-PEPO C1-WW:1CRWIEEE-IQ:JR-$CH0.T1___C2-STOP-WORK-CRDER-79-09-WITH-MODIFICATIONS 0-NA S-CGRE D-79/07/23'~C-MErd C1'W'-SCHWIERS-TC-BK-CULVER' C2-NRC-8ULLETIN C3-NOTICE-TO-EMPLOTEES -W e-NA E-CGE[ D-79 / Q 6fl.1 C-MEPO C 1-WW-1(HWi[RS-T O-[ A _BOR $M AN N,,C2,,PER 50NhE L-h0TI C E C3-$0 LICIT-SAFETY-CONCERN 5 Q-NA 4

  • )

4 ~ ~ 5-CGLE D-79/08/13' C-MEPO C1-WW'-SCHWIER$-TC-PK-CULVER C2-PER$0NNEL-h0TICE C3-NONCOMPL,IANCE-WITH-SAFETV-STANDAR 4 DS ~ I 8 G-NA S-CGEE D-79/C8/13 C-PEPO C1-WW-SC HWIE R5-T O-E A-BOR GM ANN C2 U'D3T-5F-GENERAL-ELECTRIC Q-NA I S-CGRE D-79/08/14 ~ ~ ) ~ 2 ~ C-LETTER-70-GEEERAL-E'LIC1RIC' C1-WW-!CHWIERS-TO-WE-SMITH C2-AUDIT-REPORT-79-04-OF-G.E.-NED e-rfo/110 1-16EE t-79/06/19 t-ME'O C 1 -WW-S C HW1E ES:JR-B K-C U(VER___ C2.-.5 E I SM I C-SU P POR T S-CL A SS I F I E D-NON E S S E NT I A L C3-FIELD-AUD IT-REPORT-231 4 G-NA l S-CGtt .0-79/07/13 C-MEPO C1-WW-SCHWIERS-10-EA-00RGMANN C2-VENDOR-INSPECTION C3-REPORTS-8-8-9 C4-SARGENT-KINDUS1 f RIES ) a-NA T S-CGRE D-79/06/C6 C-MEP0 C1-WW-SCHWIERS-10-DK-CULVER C2-FLUSHING-STOP-WORK-0RDERS G-NA I D-82/C9/17 C-LETTER-TO-KAISER C1-HR-SAGER-TO-MF-ALDERTIN C2-WELDING-PROCEDURE-GUALIFICATION 0-CE0/475 T b ___J-(S E E D-8 2 /,j 0 /11 C-L_E TILR-10-K A IS{R (1-i;p-SAGER-TO-WA-HEDlIK C2-AWS-WELD-UNDERCUT-REVIEW-PROGRAM c-rEo/1235 S-CGtt D-P2/10/12 C-LETTER-10-KAISER C1-HR-SACER-TO-WA-HEDlIK C2-CORRECTIVE-ACTION-REQUEST-181 4 0-KE0/1236

1.,

) S-1GtE D-R2/C8/11 C-CAR C1-CORRECTJVE-ACTICN-REPORT-181 0-CAR /181 i' D-82/10/20 C-LETTER-To-KAISER C1-HR-SAGER-10-MF-SLMERTIN C2-GAP-ALLEGATIONS-AT-UD-LL-HEARINGS ) 0-rEo/1243 d' ' S-CGRE D-82/11/29 C-LEikra-TC-KAISER C1-HR-SACER-10-WA-HEDZIK C2-GA-AUDIT-fD-t-61 0-KE0/1291 lP j G-FEo/1294 'P 5-CGtt D-22/12/01 C-LETTER-TO-FAISER C1-HR-SAGER-TO-WA-HED2!K (2-GA-FIELD-AUDIT-REPORT-197 n' 1 g),, D-P2/12/02 C-LETTER-TC-KAleER C-HR-$AGER-TO-MF-AlbERTIN C2-CGef-GA-DNGINEERING-$UPPORT-OF-PRB-MEETING C3-CANCELLED C4-V0Ih it i 0-rE0flg99 Zu] S-CGRE D-P2/07/72 C1-HR-SACER-TO-WA-HEDZIK C2-SURVE ILL ANC E-F0PMS-0 F-W ELD-TEST-SHOP C3-VOID C-LETTER-OF-KAISER SW

.g DRS-OFFLINE PRINT 14 JUN 83 08:5':37 DATE 061483 PAGE 25 0 0-KE0/1113 ~~ ~~ q 5-CGEE D-82/07/28 C-LET'TER-TO-KAISER C1-JK-5HAFFER-TO-WA-HED21K C2-POSITION-UNGRADE-0F-PEGGT-PERON C3-00CUMENTA T10N-REVIEWER 0-KE0/1126

  • I 5-CGtt D-82/07/28 C-LETTER-TO-KAISER C1-HR-SAGER-TO-W4-HED28K b2-VENbOR-SURVEV-MONTHLY-REPORT 0-KE0/1129

~S S-CGRE D-82/07/29 C-LETTER-TO-KAISER C1-HR-SAGER-TO-DL-HOWARD C2-INVESTIGATION-0F-SUPPLIERS-GA 0-FE0/1131 ') 5-CGEE D-F2/08/C9 C1-HR-SAEER-TO-WA-HED21K C2-HJK-CORRECTIVE-ACTION-khPORTS C-LETTER-TO-K AI SE R C 0-E0/1146 _. l 5-CG8E.._ D-82/08/C5.C-PEPO C1-JJ-WALD-To-E-ROLF C2-CONSTRUCTION-PROCEDURES-USED-TO-ESTABLISH-GUALITV 4-0PS/0A/82/79 1 ~ 5-CGtt D-82/04/09 C-INSPECTION-MANAGEMENT-REPORT C1-PREPARATION-OF-$PECIAL-PROCESS-PROCEDURES I Q-NA ) $-CGEE ._.0-R2/08/30.C-LETTER-TO-KAISER- .C1-M.-ALBERTI4 .C2-WELDER-0UALIFICATION C3-V010 0-KE0/1174 5:CSEE E:EZ/.09/17 t-LETTER:12:EA15ER Ct:HL:5AGER:.To-WA-HEDZIK ___. 0-KE0/1198 I 5-CGtE' D-P2/06/CB C-LETTER-TO-KAISER C1-CONRRECTIVE-ACTION-REQUEST-22-36 0-KE0/1052 ) 5-CGEE D-82/06/C8 C-LETTER-10-KAISER T NGLE-I _. (1-HR-SAGEp-To-WA-HLDZIK C2-10CRF50.55E-ITEP-5-2-LARMINATION-IN-3X3X1/2-A ) 0-KgoL1057 1I 5-CG8E 0-P2/06/28~ C-LETTER-TC-KAISER - _.C1-HR-$AGER-10-WA-HE028K C2-WELD-PROCEDURE-0UALIFICATION-RECORDS C3-V01 ) 0 0-kE0/1087 iI )

5..5 L L_D 00/Dclao C - t Ell ER:10:10 EB O N W L 8 LJ K:Ekl 50 N-C O M P.4 N Y C1-NOTES-0F-MEETING _

C2-NOV-5,-1980 C3-NOV-6.-1980 0-NA k' C1-HR-SACER-TO-HC-BRINKMAN C2-DOCUMENTAT10N-FOR-P0-2220 0-Has/23/012 S-CGtt D-83/01/04 C-PEPO I e" S-CGRE D-P1/01/16 ~ C-RdCORD-OF-TELEPHbME-C0kVER$ATIbN-To-RCI (1-NRC-COMMONw E ALT H-AU DIT -DE F I CI E N C I E S,-F R OC E DUR E S C2-00E ) 1 .--.. CUIEMI AIION PLf1CJ EN CliS:5-5 CM S DUL E-LAB.-CG RE-AUD 0-NA 5-CGtt 0-21/01/08... ) ..- C-STATUS-TRIP-REPORT C1-RCI-COMPANY 0-NA e S-CGtt D-P3/05/13 C-PEPO C1-HR-SAGER-10-HC-DRINKMANN C2-RCI-CONTRACT C3-CORRESPONDENCE-HR$-23-012 C 4-C OR RE SPON s OENCE:HBS-83-214 0-prs /R3/279 $-hRC 0-80/12/24 C-LETTER-To-CCSE C1-JG=KEFPLER-TO-EA-PORGPANN C2-RCI C3-REACTOR-CONTROLS-INCORPORATED C4-STOP-WORK . 8 0-NA ' ~ ' 5-CGEE D-77/03/04 C-LETTEE-10-GENERAL-ELECTRIC C 2-G E NE R AL'-E LE CT RI C5-F D-i t $-R-f D DR 'S 0-hA ~ .'.I. l ..,n,,,, ,-..-o,. ,,,-,n-,.-. .c.. ..,o-o,-,,,,-o... , -co fir.AvinN-PRO

'A 'DRS-OF'FLINE PRkNT '14 JUN 83' hk:50:33 DATE 061483 PAGE 29 GRAM C2-TASK-v C3-RADIOGRAPHIC-CONFIRPATION-Of-PULLMAN-POWER-PRODUCTS C4-SHOP-WELD-RADIOGRAPHS 0-NA S-REEDY -HERetPT,-GleBONS-E-ASSOCIATES D-83/03/23 C-LETTER-OF-CGEE C1-RF-REEDY-TO-EA-BORGMANN C2-NATIONAL-80ARD-TASKS-4-t-15 C3-PARTIAL-PIPING-SYSTEMS C4-ASCONSTRUCTED-DRAWINGS J-t-01tLOO1Ln1A S-REEDY.-HERBERT,-Glee 0NS-E-ASSOCIATES.._. B-82/12/06. C-LETTER-TO-CGEE C1-RE-PONROE-P0-EA-BORGMANN C2-SPECIAL-TASK-ASSIGNME I HTS 0-NA . ___1:E E E D.r e -H E R B ERI s -G I ERDN S:1.:1510 Cl a LE t_ o-E2/12L2n__(-LETIER CJ-RE-PONROE-10-EA-30RGMANN C2-SPECIAL-TASK-ASSIGNPENTS 0-NA 5-CCEE D-78/09/26 C-LETTER-TO-GENERAL-ELECTRIC I l C1-WW-SCHWIERS-TO-WE-SMITH C2-GA-COMMUNICATIONS J 0-GE0/87 8 ) s - E E N E R A L:EH ri1 C.5 -t 01F_CA ALLD ES e-74 L11L1 B__C-LLIJ E R110 EGS E__.Cl-C D-00V E L-T C-E-P AN D O R T C2-GA-PROGRAP 0-kA S-CGEE D-77/04/13C-TITTER-i6-KAISEk' C1-WW-SCHWIERS-TU-RL-TURNER C2-SE!SMIC-CLEARANCE-CRITERIA-V10LATIONS 0-KE0/124 1-16LE D-P1/10/23 C-LETTER-To-SEL C1-HR-3AGER-T0-RJ-PRU$KI.._____C2-HJK-INITIATED-NONCONFORMANCE-REPORTS 0-SLO /400 4 5-CGEE D-81/10/C9 ~C-PEPO C1=HR-5AGER-50-RP-EHAS 'C2-DOCUMENTATION-REWIEW-ALERT-1 0-NR$/81/108 T S-CGEE D-21/10/06' C-LETTER-TO-NRC C1=EA-BORGPANN-TO-CE-NORELIUS (2-NRC-INSPECT 10N-REPORT-81-17 ) 0-C Amt_4 T S-CGEE.. D-P1/10/C6,.C-LETTER-TC-KAISER _ _ C1-HR-SAGER-TO-D.-HOWARD C2-CORRECTIVE-ACT10N-REPORT-81-13 ) 0-NE0/629 T D-P1/10/02 C-TETTER-Dh-KAISER C1-HR-5AGET-10-M-ALDERTIN 0-RE0/627 ) S-CGFE D-81/11/30 C-LETTER-PC-KAISER C--S PPM-WE LD-P RO C E DU R E S C1-HR-SAGER-TO-DL-HOWARD 0-KE0/719 i ) 5-CGEL D-R1/11/23 C-LETTER-10-KAISER C1-HR-SAGER-TO-D.-HOWARD C2-CGEE-REVIEW-OF-HJK-PROCEPURES 0-FE0/707 4 ) 5_CG5E t-P_1111/19 C-tiB-S A G E R-10-D.-it0W A Rp__C-L E T_T E RrT O-K A IS E R _ C2-AUDIT-SCHEDULE 0-KE0/701 E', S-CGEE D-F1/12/?O C--CCNDLCT-0F-INSPECTION C-LETTER-TO-KAISER C1-HR-SAGER-TO-DL-HOWARD I 0-KE0/784 1f 5-CGRE D-P1/12/28 C-PEPO C1-HR-SAGER-To-BK-CULVER Ci-SIGNING-WELD-DATA-f0RMS-t-HANGER-DRAWINGS C3-NEW-HJK-P J ___._fR$0hN[( 0-HRS /81/212 5% S-CGRE D-81/12/23 C-LETTEP-To-KAISER C1-HP-SAGER-To-D.-HOWARD-E-M.-ALPFRTIN C2-]NTEGRATED-TRAINING-PROGRAM-07-PE ,i, RSONNEL j s 0-KE0/77 'F l I S-CGEE D-P1/12/?3 C-PEF 0 C1-BR-SYLVIA-TO-PR-CAGER C2-CORRECPIVE-ACT10N-REPORT-REVIEW 0-BRS/81/16 5h1 W t-rcer a-Pitt?sr4 r-effirs-Te-rastro r i-H P-g a r.r p -To -n. -pou a R D r,-AppRnyng-nf-C3P-S014C C3-RFVISION-2

j DR$-OFFLINE PRINT '15 JUN 83 08:50537~ ~' DATE 061483 PAGE 30 'T Q-KEG-717 5-CGRE D-81/12/C1 C-LETTER-DC-KAk$tR 'C1=HR-55GER-TO-DL-HbWARD C2-CORRECTIVE-ACT10N-REPORT-81-1 0-24-4 <g 5-CGRE D-flf_07 / 07 C-L ElILE_-10_K A 111R C1-HR-5ASLR-TO-E.-KVNER 0-KE0/570 $-CGtt. D-81/07/C1 C-MEPO. C1-HR-$AGER-10-BK-CULVER .C2-510P-WORK-ORDEs C3-EXPAN$10N-ANCHOR $ 0-NA 5-CGtt D-F1/05/21' C-LETTER-To-K55'E'R Cl-Ji-$H5FFER-TO-R-D'ARCY C2-DOCEMENTATION-C00RDINATION 'I ~ S 0-vE0/561 5-CGLE D-F1/05/14 ..C-M E P0- f R O*-WD-W A YMI R E C1-CGEE-0UALITY-CONTROL-PROGRAM Q-NA 1b $-CGtt D-P1/06/C6 C-MEPO C-MEM0__ . C1-W D-W ATMIR E-TO-E A-80RGM ANN 0*NA g 5-CGBE D_11/D4/JD C-Pero C 1-w w-itjiWJ E st$-IQ-E-G.11T IN G $ Q-NA 8 5-tGEE D-31/04/27. C-PEPO C1-WW-5CHWIER$-TC-WD-WAVP!pE C2-CONSTRUCTION C3-WELDING 0-NA I $-CGtt D-71/04/16.C-MEP0 C1-J.-GILH00LV-TO-R.-MAR $NALL C2-CONSTRUCTICN-$UPERVISOR$-t-WELDERS I 0-NA ) D-F1/04/21 C-PEM0-FROP-EA-00RGPANN C1-GA-UPGRADING-PROGRAM 0-NA S-CGtt D-81/04/Ce C-LDTTER-r0-KAISER C1-WW-SCHWIER$-Tn-PS-GITTINGS C2-REVISIONS-TO-GAC-MI'S-s-SPPM*S 0-KE0/555 1 _C94L D-P1104(C2 C-LillIR-To-KAISER CQ:tA-egRGMANN,]OgPS-GITTINGS.C2-ALTERAft0NS-70-0UALITY-RECORDS 0-KEF/642 T ) 5-CGtt D-81/09/25 C-LETTER-10-NRC" C1'-EE-PORGP5NN-10-JG.-KEPPLER 0-0A/15C9 T D-P1/09/22 ~ C-LETTER-Th-KAl$fR C=C 'k1-HR-SAGER-TO-PR-PYNER C2-CAR-81-15 0-KE0/611 ) 5-KAISER D-81/08/28 C-LETTEETO-CGLE C1-PR-KYNER-TO-aR-SAGER C2-CORRECTIVE-ACTION-REQUEST-81-15 C3-CAR-81-15 I, 0-KC/15748/0 lb 5-CGEE D-81/OS/24_. C-CORRECTIVE-ACTION-REPORT-81-15 0-81/15 4 ) 1-fGit R:t1/_D?lj8 C -P Er> Ct-it sWe:N 10-DIsTRIouTION ___C2-WELD-REVIEE-BY-NRC 0-81-325 g $-CGEE D-81/09/C4 C1-HR-SAEER-10-PR-KVNER C2-0CP-ITEM C3-CONCERNING-NONC0hf0RMANCES 0-kEQ/602 ) I s-CGEE D-R1/08/C5 C-LETTER-TO-KAISER C1-HP-SACER-TO-KYNER C2-TRANSMITTAL-OF-DRAFT-PROCEDURES-FOR-CGLE-REVIEW [ s' 0-kE0/!?8 ) I $-CGLE D-81/09/C0 C-NUCLEAR-OPERATIONS C1-ACTIVITY-REP 0pi 0-NA l 1 l s-CGEE' D-71/10/C0 C-NUCLEAR-CPERATIONS C1-5CTIVITY-REPORT 0-NA l $=KAlsER D-77/02/C2 C-LETTER-TO-AGEE C1-WJ-FRIEDRICH-TO-WW-SCHb!ERS C2-CGLE-FIELD-AUDIT-REPORT-87 0-KC/9061/0 ((] $-KAISER D-77/C2/C2 C-LETTEE-10-CGRE C1-WJ-FRIECRICH-00-WW-SCHb!ERS C2-APPROVED-SUFPLIER-LIST n.

rsneers,

c-

  1. 9 e%

DR5-0FFLINE FRINT i4 JUN 83 P8:50i37 DATE 061483 P4GE 31 5-CGCE D-80/06/24 C-PEPO C1-E.-SCHROEDER-10-G.-KNOR C2-NX-$UPPORTS 0-NA S-CGtt.. D-80/07/11 C-LETTER-To--AISER .C1-WW-SCPW1ER$-T0=EV-KN0X .C2-DISP 051 TION-OF-NR-E-2708 C' 0-KE0/435 5-CGEE D-F0/07/17 C-LETTER-TO-KAISER C1-WW-SCHWIER$-TO-EV-KN03 C2-PIPE-HANGER-INSPECTION G-FE0/439 i 5-CGtt D-20/07/28 C-MEP0 C1-WW-SCHWIERS-TC-ALL-CONCERNED C2-PREPARATION-FOR-NRC-MEETING 'I 0-NA 5-CGEE D-80/08/14 C-PEPO C1-WW-SCHWIER5-To-ALL-CONCERNER C2-DE$1GN-DOCUMENT-CHANGES 0-NA I S-CGLE. D-80/08/25 C-MEPO C1-WW-SCHWIERS-TO-PK-CULVER C2-WELD-R00-CONTROL-00T-OF-CONTROL 4-NA I 5-CGtt 'D-80/69/C2 C-LkTTER-To-NRC kt-kA-POR5PANN-TO-G.-FIOREELI C2-NOTIFICATION-00-REGION-3-0F-CERTAIN-$PECIFIED-INSPE I 0-NA I . D-20/09/18.... _. _......C-LETTER-TO-KAISER.._..... _.. _....... _ _...C1-WW-SCHWIERS-TO-PS-GITTINGS C2-NONCONFORMANCE-REPORTS 5-CGEE I 0-NEG/455 5-CGgr e.2.0 /02 Lie C-MIMLIES.0fstiE.E.flM6 ft.CDNCEFff!N6-PROJECT-TRAINING .C2-SEPT-17.-1980 0-NA I s-CGtt D-20/10/31.. C-LETTER-To-KAISER C1-WW-SCHWIER$~TO-PS-GITTING5 C2-0A-CERTIFICAT10N 0-KE0/469 'l> 5-CGtt D-80/10/C8 C-MEPO C1-SC-$ WAIN-70-Wh-SCHWIERS C2-GA-DOCUMENTATION-REVIEW 0-F0/-93 5-C.G g r 0:10/.1D/ r2 C-tEITER:IQ: KAISER C1-Wh:3CPWlERS-TO-PS-GITTINGS.C2* AUDIT-OF-HENRY-e.-KA15ER 0-CE0/463 T _.... C-PEP 0 ..C2-INX-$UPPORT-DDC"5 0-80/198 I 5-CGEE D-80/10/13.... _ C1-SC-SWAIN-10-R-PAR $ HALL 7 s-CGli D-r0/itici C-PPil ~ C-men 0 Ci-eK-CutvfR-TO-EA-00RGMANN C2-TRIP-REPORT C4-suseuMANNA-STEAM-ELECTRIC-s ) ~ .. _ _TA.TIOA 0-kA 5-CG8E D-P0/11/14 C-LETTER-TO-KA'SER C1-LETTER-NC-15005-G C2-CGRE-GA-AUDIT-308 0-KE0/485 I i' ' S-CGEE D-PC/12/18 k-Lk1TER-TO-KAISER C1-EA-DORGAMNN-TO-PS-GITTINGS C2-MANAGEMENT-AUDIT-MA-90-2 ) ,,, _. JL-J E RLi23 d' 5-CGtt D-80/11/18. C-PEPO (1-RP-EHAS-10-WW-SCHWIERS 0-NA 3 d'. S-CGtt D-20/11/21 C-LE TT E R-TO-K AISER C1-Wh-SCPWIERS-TO-PS-GITTINGS C2-$fSTEP-TURNOVER-MATRIK 0-KE0/492 A S-MA15ER D-P2/04/26 C-PEPO C1-WA-HEDZIK-TO-DL-HOWARD (2-LEAD-AUDITCR-CERTIFICATION C3-WP-FR112 d'. 0-NA h $-FAISER D-82/08/09 C-PEPO C1-M-GRIP-TO-GA-MEDZlK C2-GA-RAPORT-AUDIT-REPORT-405 C3-HOWARD-C.-CHANDON l o 0-WA

  1. p S-KAISER D-P1/09/10 C-LETTER C 1 -DW-D0 h A S-TO-G.'-N'h bH CL 50N C2-VE ND08-SURVE T-R E POR T C 3-CIN CINN AT I-V ALV E-t-F IT T ING-CO.

((3 0-rt/5687/0 fp

a. DRS-OFFLINE PRINT 14 JUN 83 C8:55:37' DATE 061483 PAGE 32 5-KAISER D-82/10/11 C-IIPMER-PROCEDURES-PANUAL Cl-ZPM C2-SECTi5-IV-E C3-REV-1 C4-VENDOR-URVEY 0*A$P/3 5-KA15ER D-82/01/27 C-IIPMAR-PROCEDURES-PANUAL.

C1-ZPM C2-5ECTIO-IV-C C3-REF-0 C4-VENDOR-$URVEY 0-ASP /3

$-KAISER D-P2/C1/22 C-FINAL-REVIEW C-!!MMER--ROJECT-MANUAL C2-REV-0 ti-5ENiOR-SURVEY 0-ASP /3 $~EA!5ER D-F2/b8/05 C-HJN-0A-DhPARTMAND C1-IDENThFICATION-OF-A-POTEKTIALLV-AEPORTABLE-CONDITIO C2-WP-FRITI C3-AUD IT-435 0-ha 4 l 5-TPT D-83/06/03 C-TELEPHONA-CCPMUNICATION-RECORD C1-JE-CHAFET-L-TR-COLANDREA-TO-AJ-MATT C2-TRACEBILITY-REQUIREMENTS-F0 0-NA R-hALD-FILLER-PATERIAL C3-STRUCTURAL-STEEL _ _ _ I S-CGEE D-21/06/19' C-J.-NdRRIS-TO-P.-K'NER' C-PEPO' C2-ASME-DEPV-CODE-SECTION-3 C3-DIV1$10N-I-VB-4122 C4-ATDACHMEN Y .I *_A l 8 0-hA 5-SEL' D-81/09/2I ~ C-EE TiEE-10-CGEE 'C1-ii-MCKEENA-TO-B.R.-Si'VIA C2-00ALITT-CohFIRMATION-PROGRAM C3= HEAT-NUP9ER-TRACEADIL L ITY C4-ATTACHMENT-470 4 0-5LC/20000 ) C2-IDEhiiFICATION-C-CONTROL C3-OF-MATERIAL,-PARTS-E- ~ N S-CGEE D-P1/09/17 C-LETTER-TO-SEL C1-HR-SAGEP-TO-RF-SCHEIFEL T COPPONENTS C4-HEAT-NUPOER-TRACEABILITY, ) 0-sLQ/393 T 5-CGEE D-78/05/09 C-R.-TURkiR-T6-DISTRIsui!ON C-PEMO C-PEMO C2-TRACEABILITY-FOR-NX-$EISMIC-ANCHOR-HANGER-SPL ) I L-5 L E 0-NA i .. C1-CINCINNATI-POST C2-ATTACHMENT-205 C3-GAP 5-CINCINNATI-POST D-e2/06/19 C-NEWSPAPER-ARTICLE-ON-ZIMMER I 0-NA ) .___3-EAl$tR D *jl09ff2 C-wogg:1RprR (1 MEMQ_ C2-PAT-ADKINS-TO-HARLAN-5AGER C3-DOCUMENTATION C4-ATTACHMENT-203 C5-GAP h, 0-NA ') 5-CGEE D-00/CO/C0_ C-LIST-CF-LETTERS-E-PEMOS C1-ATTACHMENT-179 L2-GAP 0-NA lb = .._ _$2 LIM] N N A_LI -f_0_$,J._Q -(DLQQlj Q_,,,(- k E W 3 P A P_( R - A R T j (L E S -O N-Z IMM E R_ _ _ _,., C 1.A T T A C H M E N T - 19 8 C 2-G A P 0-N4 9 $* CINCINNATI-LNCUIRER. D-82/06/12 C-NEWSPAPER-ARTICLE C1-CINCINNATI-ENQUIRER C2-EARL-DORGMANN C3-ATTACHMEhT-197 C4-GAP ) 0-NA l e ,.__-_$ -iG E E 4P2 LC6(J2 C-T R !N3(S I PT-0 F-se(( C.H.-D].E A-00RGM ANN. C 1 -D E L IVE R E D-J UNE-?2,- 19 3 2 C2-ATTACHMENT-1950 C3-GAP l q' 0-hA 5-CINCINNATI-ENQUIRER D-F2/06/C9 C-NEWSPAFER-ARTICLE C1-ATTACHMENT-195A C2-CINCINATTI-ENQUIRER C3-CAP .? 0-t: A S-ALDERSON-REPORTING-COMPANY D=22/06/16 C-COMMISSICN-MFETING C1-ATTACHMENT-193 (2-GAP 0-NA b) t-por p-21/11/1D r=stre r1-Pa-rapprTT-TO-DF-WADMffr r 7-Al t rr. A f t e Nt-D F f F 1 U F D-Nov-4.- 19 81 (1-ATTArHPTNT-1P3 C4-GAP

s e i 'e s .s DRS-OFFLINL PRINT 14 JUN 83 C8:50:3f DATE 061483 PAGE 33 'T 0-NA 'l 5-CGtt D-P2/06/?5. _... C1-KK-CHERIAk-TO-WA-NEDIIK _.C2-ALLEGED-VIOLATION-OF-PROJECT-RULES C3-C0hCERNING-WORK C-MEPO ING-HOUR $ (4-ATTACHMENT-180 C5-GAP 0-hA 5-E0VE RNMENT-AC COUNT ABILIT Y-PR OJECT D-82/07/23 C-LETTER C1-TH04AS-D[V5NE-TO-PORRIs-UDALL C2-ATTACHMENT-176 C3-GAP ~~ C-NA i 5-ARPSTRONG-t-OKET D-00/00/C0 C-PUBLIC-UTILITIES-COPMISSION-OF-OHIO C1-DESP05tTION-0F-EAPL-90RGMANN C2-ATTACHMEN T-178 C3-GAP 'I G-L1 f.t018iLL L&1 R $-CGtt . 0-00/00/C0. C-A F FID AVIT C1-ATT AC HPENT-177 C2-THOMAS-W.-APPLEG ATE C3-GAP 0-NA 1 5-NRC D-82/05/2F. C-NRC-INVESTIGATON-DOUSING-INCIDENT-AT-ZIMMER C1-NEW5-ANNOUNCEMENT-82-54 C2-ATTACHMENT-175 C3-GAP e-22/54 5-CGRE D-81/07/C8 C-PHILLIP-GITTINGS C1-INTERVIEW C2-A T T A CHME N'i-if C3-GAP G-NA S-CGEE D-80/ 4/ti C-ME'PO 'Ci-WW-SCEUIERS-TO-DK-CULVER C2-NES-NDE-EXAMINATION C3-ATTACHMENT-173 C4-GAP ~ G*NA g ) E-(GRE D-10/C4/03 C-PEPO C1-CURRLhi-STATyj-Q1-N[$-RJ _ WORK ____C2-T.-PALLON-t-R.-BAKER-10-E.-eAUMGARTEN C3-ATTACHMEN T-172 C4-GAP I Q-NA ) 5-PEAe0DY-TESTING D-78/08/29 C-LETTER C1-AE-KESSINGER-t-$-BIMMING-TO-WHOM-IT-MAY-CONCERh C2-RADIATION-ROFIS C3-ATT I ACHMENT-171 C4-GAP I 0-NA T' S-CGRE D-00/00/C0_ C-R E N-E.-B A K E R. _.C1-INTERVIEW C2-ATTACHMENT-170 C3-GAP Q-NA ) 5-CGtt D-75/07/21 C-LETTER-To-KAISER _C1-E C-PANDOR F-10-WJ-CR IE DRICH C 2-G A CMI-M R.1 C3-GENERAL-ELECTRIC-FDI-t-FDDR 1I C4-ATTACHMENT-167 C5-GAP ) ___c-EEoLip I',. 5-CGLE D-74/10/11 C-LETTER-10-KAISER C1-EA-DORGPANN-TO-DR-MC$PARRIN C2-FIELD-DISPOSTION-INSTRUCTIONS C3-FIE I LD-DEVIATION-DISPOSITION-REQUESTS C4-FDI C5-FDDR C6-ATTACHMENT-166 C7-GAP o-KEo/6 ,,..___4 - f G t t D-Z1tQELc4 C-L gli tp.-T.0- EA I S tP C.1-A.E-ROTHENBEPG TO-DR-MC5PARRIN C2-CONSTRUCTION-C00DINATING-MEETING C3-ATT ACHMENT-164 C4-GAP I 0-NA h 5-CGRE D-77/12/19 C-PEPO C1-R-TURNER-10-B-MAR $ HALL C2-PRESSURE-TESTING-0F-CLASS-A -P,-C C3-PIPING C4-ATT d'

  1. CNMENT-163 C5-GAF P

0-HA dk S-CGRE D-79/12/11 C-ME"O C1-DC-KRAMER-&-CA-DUPGES$-TO-hW-SCHWIERS C 2-COMME N T S-T O-HJ K-SU D IT-4 0 7 C3-MECHANICAL-PORT 'M ION C4-ATTACHMENT-16? C5-GPP 0-kA EI

  1. p 3

1-shtE D-?8 /04 / ?O__ C-L E TT E R-J 0-K A j $ E R (1-WW-$CHWIERS-TO-R-MARSHALL C2-NONCONFOR"ANCE-REPORTS C3-ATTACHMENT-161 C4-GAP [h3 0-KEc/205

  1. st

4 4

  • s r%

DRS-OFfLINE PRINT 14 JUN 83 P8:50:37' DATE 061483 PAGE 34 'T S-CGEE D-76/10/18 C-L E TT E R-TC-K A IS E R C1-WW-SCHWIERS-TO-WJ-FRIEDRICH C2-NONCONF0lPANCE-REPORTS C3-ATTACHMEN T-160 C4-GAP 'T 0-kA S-CG8E D-81/01/14 C-PEPO CIAWW-SCHWIERS-iC-PS-GITTINGS C2-GA-AUDIT-SURVIILLAhCE-REPORT-340 C3-ATTACHMENT-159 C4-GAP 0-NA i 5-RAISER D-PU/07/C9 C-NONCONFORMANCE-kEPbph Ci-PIPE-5UPPORi~ Ch-AiidCHMENT-158A C3-CAP G-NA C NONC0hf0RMANCE-REP'Ri Ci-PIPE-5UPP0ii C2-ATkkCHMENT-1588 C3-GAP 0-NA 'l S-KAISiR D-h0/C7/C9 ~ E C C' S-BAISER D-P0/07/22 C-NONC0hf0RMANCE-REPORT C1-ATTACHMENT-15FC C2-GAP ' G-kE' S-KAISER b'-f dIO7/22 ' I-EbNC0hh0hMhNC E-R EPORk (1-ATidCHMENi-15R5 C2-GAP G-NA I S-RAISER D-PC/07/22' E-hhhC0hf0RMANCE-5EPCRT C1-AITACHMENi-15PE C2-GAP 0-NA ) 5-FAISER D-P0/07/22 C-NONCChf0RMANCE-REPORT C1-ATTACHMENT-15F# C2-GEP' '0-NA S-KAISER' D-RbIC7/22 C-NbNCb570RMhNCE-REPCRT C5-hii5CHMEN -i5PG C2-GAP 0-NA ~ I k-CGEE D-bdibbhC0 C-L bC'-b f-ONCON Fb RM kN G-P ATE R k AL-R EPOR TS C1-ATTACHMENT-157 C2-GAP 0-NA ^ I~i'SPE EiN C2-NbNCONFORMANCE-REPORT-E-61 C3-ATTACHMEN S-CGCE D-73/07/10 C-LETTER-TO-KAISER C1-AF-ROTHENPERG-TO-DR M I T-156 C4-GAP 0-hA C-COR'ECTIVE-ACTION-RE0'UNSTS' C1-MEMO C2-RE-TURNER-TO-ALL-GA-0C-PERSONNEL C3-ATTACHMENT-1526 3 T S-KAISER D-79/10/C5 R C4-GAP 0-N4 T .D-79/02/16 r-LETTER-TC-KAISER C1-WW-SCHWIERS-TO-RL-TURNER C2-INSPECTION-REQUIREMENTS C3-ATTACHMENT-152F S-CGEE I C4-GAP f 0-rE0/267 ) S-KAISER D-82/05/24 C-HJK-AhALYSIS-REPORT C1-ATTACHMENT-152 C2-GAP 0-NA I 4l C1=N0-14 C2-ATTACHMENT-151 C3-GAP 0-14 S-KAISER D-P2/05/28 C-HJK-CCESTRUCTION-80LLETIN i S-CGEE D-79/08/2i C-LETTER-10-KAISER C1-WW-UCHWIERS-TO-RE-TURNER C 2-OPEN-NONCONFO RM ANC E-R EPORTS C3-ATTACHMEN I o,.___T-15Q_C4: Gap 0-KE0/311 dI, ) S-CGEE D-74/01/29 C-LEfiEA-TC-KAISER C1-AE-ROTHENPERG-TO-DR-MCSPARRIN C2-NONCONFORPANCE-REPORTS C3-ATTACHPEN T-149 C4-GAP 9d 0-0A/368 e i S-CGfE D-77IOi/17 C-LETTER-To-KAk[ER (1-W5-hCWWiEhSliU-1J-hRIEDR5CH C2-STUD-IDENTIFICATION C3-ATTACHPENT-148 j g' C4-GAP e l 0-kE0/93 l e' S-CGEE D-77/04/13 C-LE TTER-TC-K AIS ER C1-WW-SCHWILRS-10-RE-TURNER C2-SEISMIC-CLEARANCE-CRITERIA-V10LATIONS C3-ATT PCPMEht:J41_C4: GAP _ l 0-rE0/124 ILJ e crec . vese,ere c..r,,re-va. ..ero ri es ern,ree-ve-ue-roernovru r>-nrevem-anrnwret-ruauret (1-NONf0NFOR

.c e e a ,g DRS-OFFLINE PRINT 14 JUN 83 08 id=37' DATE 061483 PAGE 35 PANCE-REPORTS C4-ATTACHMENT-146 C5-GAP ~ ~ ~ ~ ' 0-RE0/76 5-CGtt. 0-73/07/26 C-EC-PAhD0ef-TO-WJ-FRIEDRICH.. C1-KEl-QA-PROCEDURE-16 C2-ATTACHMENT-145 C3-GAP j 0-NA 4 S-KAISER D-73/07/17 C-LETTER-10-CGEE C1-WJ-FRIEDRICH-TO-AE-ROTHENBERG C2-ATTACHMENT-144 C3-GAP Q-KC/981/0 I _ S-CGCE D-73/07/C6. C-LETTER-TO-KAISER _.__C1-WW-SCHWIERS-TO-WJ-FREEDRICH C2-KEl-04-PROCEDURE-16 C3-ATTACHMENT-143 C4-GAP .DM I' S-CGtt. 0-00/00/C0 _C-NEWSPAPER-ARTICLE ___ C1-ATTACHMENT-176.C2= GAP 0-NA 'I S-CGtt 0-78/09/C6 C-MEP0_ .C1-WW-SCHWIERS-TC-BK-CULVER C2-COMPLIANCE-WITH-10CFR50 (3-APPENDIX-8 C4-ATTACHMEN T-152E C5-GAP ) ---_9-RA 8 S-CGRE. _ _ D-76 / 09 / C8_ C-L E TT E R-T o-K AIS E R _. ___ C1-WW-S C HW IE WS-T o-WJ -F RIE DR I C H C2-CLASS-D+= PIPING-BRANCH-WELDS C3-ATT ) ACHMENT-152D C4-GAD 0-kE0/67 g 5 - G Q v Lits a_Ini-atinus11n t L I T T - PR 01t tl_n.-M1.07 /15 C-t tlli.R Cl-IHOMAs-DEVINE TO-JAMES-KEPPLtR C2-WELDER-00ALIFICAT10NS C3-HJK-ANALYSIS-REPORT C4-ATTACPMENT-140 C5-GAP 4 0-HA ) 5-CGLE D-75/01/21 C-LETTER C1-EA-80RGMANN-TO-VP-MCMAHON C2-INSPECTION-OF-PHASE-2-PIPING C3-ATTACHMENT-127 C4-GAP 0-u te tj s 1I S-CGEE D-73/06/01 C-L E TT E R -T'0-K A I S E R. C1-WWiS CHWIE RS-T O-vP-MCM AHON C2-CLASS-D-PIPING C3-PHASE-1 C4-ATTACHMENT-126 ) C5-GAP 0-NA $I ) 5-F A LSER D-n g./_04_t.1.4 C-LETTER C 1 -B K-gn y_E_R_-103,.-M R S.H. A L I C2-PW-WELDMENT-ANALTSIS C3-ATTACHMENT-120 C4-GAP c-NA i. . C-LETTER-TO-KAISER C1-EC-PANDORF-TO-DR-FCSPARRIN C2-CHIO-PRCSSURE-PIPING-RULES C3-ATTACHMENT-119 S-CGtt D-75/02/10 I C4-GAP 4 t 0-kE0#19 ) S-CINCINNATI-ENQUIRER D-8 2 /0 7 /17 C-NEWSPAPER-ARTiCLi~~' Ci~ETTdEHMkNT-118A C2-GAP 0-NA O' . D-82/07/27 C-NEWSPAPER-ARTICLE C1-ATTACHMENT-118B C2--GAP 0-NA S-CINCINNATI-ENOUIRER Md S-RAISER D-79/03/29 C-PEP 0 C1-RE-TURNER-10-P-CULVER-t-R-MAR $ HALL C2-APPROVAI-TO-USE-A-SUBARTICLE-NO-4436 C3-ASM } E-iQDE-if C1198-!__C'-197 7-E 9 tIIGN (1-{N-f0N.JUCT{0N:WITH-ASME-CODE-SECTION-3-1971 C6-ALDENDA-THROUGH-SUMMER-1973-DURING-CONS TRUCTION C7-ATTACHMENT-117 C2-GAP NI 0-NA W 5-CGRE D-P1/07/C1 C-PEPO C1-HR-SAGER-TO-BE-CULVER C2-STOP-WORK-CRDER C3-EXPANSION-ANCHORS C4-ATTACHMEN =I, T-112 C5-GAP if q-NA [$,3 S-CG8E D-73/05/C9 C-LETTER-10-KAISER C1-WW-SCPWIERS-TO-CA-SMITH C2-KE-AUDIT-REPORI-19 C5-ATTACHPENT-111 C4-GAP if

e-e 9 t r wrpn r t -e. w a p t se a t t -T o-D i t T P1 Pet T 1 oN r ?-M a D F I Nr.-O F -S M Al l -PO R F - A 9 M F -C OD F C1-PIPING-t-SPCOLS

C e e a e or DRS-OF'FLINE PRINT i4 JUN 55 08 i0:3F DATE 061483 PAGE 38 C4-ATTACHMENT-44A C5-GAP es o-us i S-CGtt D-P2/06/10.C-TESTIPONY C1-DAVID-JONES. C2-ATTACHMENT-43 C3-GAP 0-NA i es s-tGEE D-00LOQ/C0 C-IRVL$1]GATION-0F-SVPPLign-0A C 1 - Al] AC HM E N 1;_41__ C 2_-G A P. 0-NA S-wAISER. _D-80/01/18. C-LETTER-10-CGRE_.C1-R.-MARSHALL-TO-WW-SCHWIERS C2-CGRE-4UDIT-REPORT-194 C3-FOLLOW-UP-NOTICE-JAN-9.-1980 C4-REFERENCED-AUDIT-285 C5-ATTACHMENT-39F C6-GAP 0-rC/13645/0 5:5111(R E12QlDjlC3 C-LLlitR19:1}tt C1-R.-MARSEp(L19 PK.-SutvE R C2-CGRE-GAES-AUDIT-285 C3-DRVWELL-STEEL-MODIFICATIONS C4-ATTACHMENT-39D C5-GAP 8 0-rC/13589/0 lb S-CGtt D-79/12/19 C-PEPO C1-WW-SCHWIERS-To-pK-CULVER C2-GAES-FIELD-AUDIT-285 C3-ATTACHMENT-399 C4-GAP 8 0-AA 'll !k! iAEDARDS-AUDIT-SURVEILLANCE C3-REPORT-285 S-CGRE D-79/11/22 C-PEP 0 C1-WW-SCHWIERS-10-DK-CULVER C2-GA S I C4-ATTACHMENT-39A C 5 - G A P..._.. _ ) 0-NA 8' S-UNITED-0UAllkk-8-MhNI'GEMiET-CokSULTANTS D-EU/b6/bh" C-LETTER-TO-US-HOUSE-0F-REPRESENTATIVES C1-JM-NICHOLS-10-MORRIS-UDALL ) ~ tt:allaCHMENT-is C3-6AP 0-NA i . D-00/00/C0..., _.....C-LETTER-TO-KAISER C1-WW-SCHWIERS-70-RE-TURNER C2-ATTACHMENT-35 C3-GAP 5-CGRE ) Q-kA (I ) $ _C_Gtt D-00(00/10 C-AFFIDayjf C 1-R ON A L D-Y A TL_$ C2-AllACHMENT-33_,C3-GAP. 0-NA 2 1I S-FAISCR ..D-21/12/09 C-LETTER-TO-CGRE C1-RE= JAGGER-TO-EA-BORGMANN C2-INVESTIGATION C3-NATIONAL-80ARD-OF-80!LER C4-PRE ) l $$URE-VESSEL-INSPECTCRS C5-ATTACHPENT-32 C6-GAP 0-h4 _ _S-LGRE D-73L0?L20 C-LE.ttg_R-to-yJ r.tg R (1.E.C-P.A ND 0e r -T O -W J - F R I E D R I C H C2-DRAWING-CONTROL C3* ATTACHMENT-29 C4-GAP 4 i i 0-GA/309. lb S-RAISER D-73/09/14 C-LETTER-To-CGRE C1-WJ-FRIEDRICH-TO-AE-ROTHENBEPG C2-DRAWING-CONTROL C3-ATTACHMENT-28 C4-GAP e ) i 4-IC/J20714 S-KAISFR . D-79/01/08 C-PEPO. . C1-R.-TUPNER-TO-DISTRIBUTION C2-ESSENTIAL-PIPING-HANGER-INSTALLATION C3-CRITERIA-E-INSP lh ECTION-REQUIREPENTS C4-ATTACHPENT-27A C5-GAP 0-NA s 0 1 iGIL P. 19 /.1LLRl__LIL ElI EP:JD:KAISE8 C_1-WW-SCHWIERS-TO EW-KN0X .C2-FDI-0A-DOCUMENTATION C3-ATTACHPl"NT-26 C4-GAP 0-rE0/139 s 5-RAISER t-F2/C2/03 C-PE*0 .C1-D.-J0hES-10-JUhE-PRADFORD C2-SEL-DESIGN-SPECIFICATION-H-2256 C3-ATTACHMENT-25B C4-GAP 0-NA ((3 5-CGtt D-C0/00/00 C-AFFIDAWIT C1-RICHARD-L.-REITER C2-ATTACHMENT-23 C3-GAP 0-NA

^ s',. o. Y

  1. t rT l

DRS-OFFLINE PRINT 14^ JUN 83 08:50537 DATE 061483 PAGE 39 'T 5-CGtt D-22/C4/19 t tuDIT-FINDING-REPORT C1-APRIL-19-2],-1982 CZ-ATTACNMENT-51 C3-GAP 0-82/1/5 f, s-CGtt D-74/04/C9 ~ C-LETiER-Tc-Kstsin" C i-A E"-R 6T H E N PE R G - T o-D R-M C 5 P A R R I N C2-ATTACHEMENT-650 C3-GAP C4-REC EIVING-INSPECTION 0-04/411

  • I

$-EAISER D=74/03/28 C-WJ-FRIEDRICH-TO-AE-ROTHENBE'RG C1 -L E T TE R-T O-C Gti 'I 2-R E ti! VI NG-IN S PE C T I ON C3-ATTACHMENT-654 C4-GAP c-rC/1908/0 d' ~D-82/03/12 'C-PEP 0 ~~C 1 -T".-Iv i'R $ U L i-T C-c. -H i D F I K C2-5U8 CONTRACT-AUDIT-8 C3-NES-$ERVICES-IN-PROCESS C4-ATT 'I 5-KAISER sLEMEN1-64 C1-GAP 0-hA S-iGRE' ~ D-77/03/01 C-LETEER-ic-KhtSER 'C1-WW-SCHWIER5-Ib-WJ-FRIE5 RICH C2-MINUTES-OF-GA-MEETING C3-ATTACHMEN T-228 C4-GAP C5-FEBRUART-17.-1977.. I 0-NA ~ 5-CGLE D-73/05/23 C-LETTER-TO-KAISER C1-WW-$CHWIERS-TO-VP-MCMA565~"C2'-FIELD-AUDIT-13 C3-ATTACHMENT-24 C4-GAP 0-NA i 5-C G t E.. D-79/11/12. C-EETTER-TO-KAISER..__._C1-WW-SCHWIERS-TO-K.-BAUPGARTEN C2= INSTALLATION-VERITICAfl0N C3-CGLE-LETT 4 ER$-KEG-308-t-REG-329 C4-ATTACHMENT-20D C5-GAP ) 0-kt0/144 I $=FAISER D-20/08/18 C-MEP3 C1-P-GITTINGS-10= REX-SAKER C2-ATTACHMENT-18 C3-GAP C4-NI-$UPPORTS I 0-kA I ' S-KAISER D-79/b9/26 C-LETTER-kO-CGtt C1 E.-PA2SHALL-TO-WW-$CHWlERS C2-INSTALLATION-VERIFICATION C3-ATTACHPENT-20F C4-GAP l R 0-rC/13369/0 "~ 5-CGtk' D-79/08/14 ~ C-LE'TiR-To-KAISiR ~~~ ~"il-WW-SCHWIERS-TO-RE-TURNER C2-INSTALLATION-VERIFICATION C3-ATTACHMENT-20A T C4-GAP 1r 0-rE0/308 ) s-hAC D-00/00/00 C-AFFIDAVIT C1-JAPES-TTNER C2-ATTACHMENT-17 C3-GAP 0-NA SI, C1-WW-SCHWIERS-TO-WJ-FRIEDRICH C2-APPROVAL-0F-KEl-IS0 METRICS C3-ATTACHMENT-22A C4-GAP S-tGLE D-76/10/f6 I 0-NA qi ) S *J G M D_-Hf CRG8 C-P I NUIE S_-C F-J,0 l N,.T. -{ GH-M(-G A -M E E JI NG,_,, C 1-F E B-28.-19 7 5 C2-ATTACHMENT-21 (3-GAP 0-kA II ' 5-CGtt D-82/C5/27 C-PEPO C1-HR-SAEER-TO-HC-BRINKMANN C2-REIN $PECTICN-0F-THE-CRD-PIPE-UPPORTS C3-IN$7ALLED-8T-RC ) I 9F ' 0-PRS /82/2C4 a 5-CGtt D-77/08/19 C-PEPO CO-E A-PO RGM A NN-T O-t-HOLLOW ELL C2-INS T ALL A T I ON-O F -R PV-IN T E RN AL-t-C R D-$Y ST EM !I 0-NA 's %I.' S-SSL D-73/12/20 C-SPECIFICATIch C1-INSTALLATION-CF-REACTOR-PRE 55URE-VESSEL-INTERNALS C 2-CONTROL-ROD-DRIVE-HY DR AULIC-S YST E P 5p 0-hA [n] $-CGtt D-75/10/P3 C-LETTER-TO-KAISER C1-EC-PANDORF-TO-WJ-FRIEDRICH C2-FIELD-AUDIT-REPORT-55 C3-RtACTOR-CONTROL Ss

~ct e o 9 ~ DRS-OFFLINE PRIkT 14 JUN 83 08:50:3'? DATE 061487 PAGE 40 0-NA A 5-CGtE D-P1/01/C8.. C-STATUS-TRIP-REPORT C1-RCI-COMPANT 0-NA S-CG8E D-82/05/28 C-MEPh (1-HC-BRINKMANN-TO-JC-HERMAN C2-RCi-CRD-SUFPORT-WELDING 0-NA I s-CGtt D-f2/05/24 C-RCI-MEETING-ON-THA-CRD-ST5 FEM C1-MAT-21.-1982 0-N5' ~ S-CGtt D NU/02/15 C-MEM0 C 1-WW-S C HW i E R $ = h h-H C-O R j NK k A NN C2-DOCUPENTATION-FOR-CONTRAC-T-H2832 C3-RCI 0-NA. 1.CGEL D-81/03/03 t-t uJ E E-IL-ILC f (1:MW-3 C tfit IER S 10- J.-RIL LUU___.0-0 A.12 4 0.. _ __ _ 5-CGEE D-81/C1/C2..C-PONTHLT-aCTIVITT-REPORT C1-JAN-30,-1981 0-NA ') ..$-5EL D-81/0!/23 C-seEC-H282 C1-5DPPLEMENT-6 C2-INSTALLATION-GF-REACTOR-PRE 55URE-VESSEL C3-INTERNALS-t-CONTROL-ROD-HTD 4 RAULIC-$TSTEP T 0-NA ( D-79/10/09.. C-L E D I E R -T O-R C I.. _. C 1-B K-CULV E R-T O-J A CC-M ILL E T T. C2-CORE-PLATE-PINS 0-M/250 ) 5-CG8E D-79/0$/C1.C-LETTER-TO-RCI C 1-HC-PR IN EM ANN-10-J ACK-MI LL ET T C2-CRD-HTDRAULIC-$1 STEM 0-NA 5-CGgr D.Z U O 6 L12.-_C-IIIIJt-J.U t il-R LP_0 R T - 107 C_1-RCI_ Ot N A _. _ _.., f 5-CGtE D-81/07/29 C-LETTER-70-RCI _ C1-HC-BRINEMANN-TO-RL-KANANEN 0-NA I S-CGtE D-77/02/16.C-MAPO C1-WW-SCHWIERS-TO-EA-BORGMANN C2-AUDIT-REPORT-77/03 0-NA 5:.CGEE D_Z6/EZ119 C-Meta C.1_E1.-Ea s DD R I _IO.-E A:PO RG M A N N __, C 2 -Q A-A UD I T-7 6 /17 0- N A T S-CGCE. D-76/06/C3 C-"EPO C1-EC-PANDORF-TO-EA-DORGPANN C2-0A-AfDIT-76/11 G=NA 1 5-CGEE .D-75/11/20 C-"EF0 C1-EC-PAN 00RF-T0-EA-00RGMANN C2-AUDIT-REPORT C3-WM-POWELL-CO C4-PLANT-2 T 0-NA ) 5-CGtt D-74/03/28 C-PEPO C1-EC-PAkDORF-TO-AE-ROTHENBERG C2-GA-ALDIT C3-WM-POWELL-A0 0-NA 9" ') S-Stt 0-00/00/00 C-VENDOR-GA-MANUAL-EVALUATIGN 0-NA f" D-76/08/10 C-MATERAAL-RECAIVED-REPORT C-KAISER C1-WM-POWELL-C0 0-28795 'l) D-76/09/07 C-MATERIAL-RECEIVED-REPORT C-KAISER C1-WP-COWELL-CO. 0-29607 C1-WP-POWELL-C0 0-26231 D-76/05/17 C-MATERIAL-RECEIVED-REPORT C-KAISER 0-75/03/21 C-M ATERI AL-PEC E IVE D-EE PORT C1-WM-E0WELL-C0 0-15368 I D-75/04/07 C-PATERIAL-RECEIVED-REPORR C-KAISER C1-Wr-POWELL-00 0-15737 a D-75/02/21 C-PATERIAL-RECAIVED-REPORT C-KAISER C1-Wu-POWELL-00 0-14314 3 0-75/05/27 C-PATERIAL-RECEIVED-REPORT C-KAISER C1-WP-POWELL-C0 0-16803 D-75/03/26 C-PATERI8L-RECDIV4D-REPORT C-KAISER (1-WM-POWELL-C0 0-15491 e isrevast r -evenues ercriven crocar r-veiero es.ur-enuree-so e-tsSA7

o a*

  • e k

1 I O' DRS-0FFLINE PRINT 14 JUN 83 C8:50:37 DATE 061483 PAGE 41 'l S-SLL D-81/12/01 C-PATERIAL-t-ECUIPMENT-5CHEDULE .C1-MECNANICAL-DEPARTMENT G-NA ') 5-$tt D-81/12/01 C-PATERIAL-t-ECUIPMENT-$CHEDULE. C1-ALECTRICAL-DEPARTMENT 0-NA { . _.5-5 8 L.9:Z3L12LD3 c-Y11112.T.Q:H U.5 KT:ER o tu CIl-n f e--A D-74/12/30 C-HU$KI-PRODUCTS-ANC. C-MATERIAL-RECEltED-REPORT. _C-RAISER 0-13481 ) 0-74/12/20. C-PATERIAL-RECEIVED-REPORT. C-KAISER C1-HUSKY-PRODUCTS-INC Q-13336 7 _ D Z5101102 t-PaIE81eL-BSCEIVER:REEORI_ f-EAISER C1:U U S K Y..-P R O DU C T S-I N C _. _.0 - 13 5 3 3 5-C6tt _ D-78/09/15 C-MEPO C1-WN-$CHWIERS-To-EA--ORGMANN C2-GA-EUDIT-78-05 0-NA ') 5-CGEE D-78/10/17..C-MEPO C1-WW-$CHWIERS-TO-EA-DORCMANN C2-TESTS-MADE-0N-CABLE-TRAY C3-$URVEILLANCE-REPORT-69 o-NA 3 3-CGEE D-82/05/11 C-CA-AUCIT-REPORT-82-15 C1-HUSKY-PRODUCTS-INC C2-MAY-11-12 -1982 0-NA i . __...C-o A---51 AND A R D S-PRO CE DURE... _ C1-INDOCTRINATION-t-TRAINING-07-PERSONNEL C2-02-eAS-01 C 3-R E VI S ION - S-CGt! D-77/03/15 ...... ~.. _.. } 0 C4-V10D c-02/cAS/01 3 5-CGtt D-81/04/11 C-GA-PROCEDURE C1-CER TIF IC ATION-OF-INSPEC TION-PERSONNEL C2-10-GA-03 C3-REv-0 C4-SUPPERCEDED 0-10/oA/03 1 5-CGtt D-31/05/C1 C-on-PRCCEDURE C1-QA-INSPECTIONS C2-10-QA-04 C3-REV-C C4-5UPERCEDED c-10/0A/104 ) 5-(RIL D-12 /Q L LC]._,{-0 A -P R C ((,g y R L C 1 -Ly,A C y A l_IQN,-J,0 U A L.I F.I C A T I O N 0 F -G A D-P E R S ON N E L C2-02-GA-04 C3-REV-0 C4-5UPERCEDE b 0-02-oA/04 ') D-76/05/06 C-REVISICN-0 C-QA-PROCEDURE-20 C-KAISER C2-IND0CTRINATION-t-TRAINING 0-20 _ D.-11(11/24 C -O A.fRACED U R E _Z C_.Cl-RIV.13J Q N-$ (2=INDQCp jN AJION _t-TR AINING 0-20 3 3 3 eeEXIT LOCa*0?5447 GPMC,BRE .RUNet0/4036 49 ILLEGAL CHARACTER f RUNSTREAM ANALYSIS TERMINATED M1 PLOCK S!!E 150 MERGE PChER 23 EQP TYPE 3e M? BLOCr SITE 3 E5 PERGE PChER ~ 3 EQ U NE'3d ' 3 A 18.7PS/RFC, Its 918, CCs 916, PI A s 96 0.}}