%d, 101 Cahfornia Street. Suite 1000, San Francisco, CA 941115894             415 397 5600 August 29, 1984 84056.029 Mrs. Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224
%d, 101 Cahfornia Street. Suite 1000, San Francisco, CA 941115894 415 397 5600 August 29, 1984 84056.029 Mrs. Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224


==Subject:==
==Subject:==
Line 23: Line 23:


==Dear Mrs. Ellis:==
==Dear Mrs. Ellis:==
Enclosed please find telecons associated with the Phase 4 Independent Assessment Program.
Enclosed please find telecons associated with the Phase 4 Independent Assessment Program.
If you have any questions or desire to discuss any of these documents, please do not hesitate to call either me or Donna Oldag.
If you have any questions or desire to discuss any of these documents, please do not hesitate to call either me or Donna Oldag.
Very truly yours, e
Very truly yours, e
N. H. Williams Project Manager Attachments cc: Mr. D. Wade (TUGCO) w/ attachments Mr. S. Treby (USNRC) w/ attachments Ms   J. Van Amerongen (TUGC0/EBASCO) w/ attachments Mr. D. Pigott (Orrick, Herrington & Sutcliffe) w/o Mr. S. Burrell (USNRC) w/ attachments 8409040136 840029 PDR ADOCK 05000445
N. H. Williams Project Manager Attachments cc: Mr. D. Wade (TUGCO) w/ attachments Mr. S. Treby (USNRC) w/ attachments Ms J. Van Amerongen (TUGC0/EBASCO) w/ attachments Mr. D. Pigott (Orrick, Herrington & Sutcliffe) w/o Mr. S. Burrell (USNRC) w/ attachments 8409040136 840029 PDR ADOCK 05000445
                                                              \ g),
\\
San Francisco Boston Chicago Richland                                   [
g),
San Francisco Boston Chicago Richland
[


Communications 4(         & i                                                                                                                             Report 111111111111111111111111111111 company: Texas Uti1ities                                                                         # Telecon                                   a conference Report Project.                                                                                                                                     Job N -
Communications Report 4(
84056                     -
& i 111111111111111111111111111111 company: Texas Uti1ities
Comanche Penk Steam Electric Station                                                                                                                                   l Independent. Assessment Program - Phase 4                                                                                         oste:
# Telecon a conference Report Project.
Job N -
84056 Comanche Penk Steam Electric Station l
Independent. Assessment Program - Phase 4 oste:
7/12/84 Walkdown Access Place:
7/12/84 Walkdown Access Place:
SFR0
SFR0


==Participants:==
==Participants:==
George Grace                                                                                                               TUSI R. Hess                                                                                                                   Cygna Required item                                                               Comments                                                                                   Action By
George Grace TUSI R. Hess Cygna Required item Comments Action By 1)
: 1)           Called George to request that Cygna personnel are authorized access to the following areas for the walkdown.
Called George to request that Cygna personnel are authorized access to the following areas for the walkdown.
Walkdown Area Access a)             Elevation 873'6"                               Mechanical Equipment Room 345 Aux. Bldg.                             Column 9 to 1 and K to G b)             Elevation 830'                                 Control Room Aux Bldg.
Walkdown Area Access a)
c)             Elevation 810'6"                               Rooms 204 and 205, 197 and 196 Aux. Bldg.                             Column 4 to 6 and J to F d)             Elevation 807'                                 Cable Room Aux. Bldg.
Elevation 873'6" Mechanical Equipment Room 345 Aux. Bldg.
e)             Elevation 832'6"                               RCP 01 and 03 Containment f)             Elevation 790'                                 Room 168 and 169 Safeguards                             Column 7 to 3 and A to E g)             Elevation 810'6"                               Room 83 - Column 5 to 1 and F to K Safeguards                             Column 4 to 2 and H to A h)             Elevation 854'4"                               Room 150 and 151 Aux. Bldg.                             Column E to C and 2.9 to 7.1 signe                                                                                                                                                               of i                                                                                                                                                               /ljr Page g         g Distnbution:     N'.       Williams, D. Wade, G. Grace, R. Hess, J. Minichiello, E. Van Stigjeren,
Column 9 to 1 and K to G b)
        ,,,,,,,            3 . . c ui ,                     v. . ;;.2, 3. Lu.   .;,          r uscu Fi;c
Elevation 830' Control Room Aux Bldg.
c)
Elevation 810'6" Rooms 204 and 205, 197 and 196 Aux. Bldg.
Column 4 to 6 and J to F d)
Elevation 807' Cable Room Aux. Bldg.
e)
Elevation 832'6" RCP 01 and 03 Containment f)
Elevation 790' Room 168 and 169 Safeguards Column 7 to 3 and A to E g)
Elevation 810'6" Room 83 - Column 5 to 1 and F to K Safeguards Column 4 to 2 and H to A h)
Elevation 854'4" Room 150 and 151 Aux. Bldg.
Column E to C and 2.9 to 7.1 signe of i
/ljr Page g g
Distnbution:
N'. Williams, D. Wade, G. Grace, R. Hess, J. Minichiello, E. Van Stigjeren, 3.. c ui,
;;.2, 3. Lu.
v.
r uscu Fi;c


Fi . .
Fi..
                        ~
~
1 Communications       l 4L       t i                                                     Report milimilmimitilllilliti item                                         Comments                       Ac   y
1 Communications Report 4L t i milimilmimitilllilliti item Comments Ac y
: 1)         Elevation 781'               Near Electrical Equipment Room             I Aux. Bldg.             Column C to A and 2 to A j)         Elevation 852'6"             Column 9 to 1 Aux. Bldg.             and K to E k)         Elevation 886'6"             Column 9 to 1 Aux. Bldg.             and K to G
1)
: 1)         Elevation 831'6"           Column 3 to 1 Aux. Bldg.             and K to A m)         Elevation 790'6"             Colm 5 to 1 Aux. Bldg.             and F to A n)         Main Steam piping from steam generators to outside containment isolation valve.
Elevation 781' Near Electrical Equipment Room Aux. Bldg.
: 2)         Also requested George to provide us access to the following panels for wire termination review:
Column C to A and 2 to A j)
a)         6.9KV switch gear     IEA1   Breaker 1APCC1 b)         CCW motor housing     CP1-CCAPC-01 c)         Solid state isolation cabinet       1-CR-16 d)         Safe shutdown transfer panel e)         JB1A8400 f)         MOV     1-HV-4512 g)         Termination rack     1-TC-07 h)         S0V     1-FV-4536 i)         Motor control center     1EB3-1 j)         MOV     1-HV-4574 k)         Hot shutdown panel
Elevation 852'6" Column 9 to 1 Aux. Bldg.
: 1)         S0V     1-LV-4500 m)         M0V     1-HV-4572 Page   of 8020ota
and K to E k)
Elevation 886'6" Column 9 to 1 Aux. Bldg.
and K to G 1)
Elevation 831'6" Column 3 to 1 Aux. Bldg.
and K to A m)
Elevation 790'6" Colm 5 to 1 Aux. Bldg.
and F to A n)
Main Steam piping from steam generators to outside containment isolation valve.
2)
Also requested George to provide us access to the following panels for wire termination review:
a) 6.9KV switch gear IEA1 Breaker 1APCC1 b)
CCW motor housing CP1-CCAPC-01 c)
Solid state isolation cabinet 1-CR-16 d)
Safe shutdown transfer panel e)
JB1A8400 f)
MOV 1-HV-4512 g)
Termination rack 1-TC-07 h)
S0V 1-FV-4536 i)
Motor control center 1EB3-1 j)
MOV 1-HV-4574 k)
Hot shutdown panel 1)
S0V 1-LV-4500 m)
M0V 1-HV-4572 Page of 8020ota


F.
F.
Communications 4L           t i                                                                                                   Report IMINilll1N191NNilN1111 I
Communications 4L Report t i IMINilll1N191NNilN1111 company: Texas Utilities 1 Teiecon a conference Report J
l company: Texas Utilities                                                           1 Teiecon                       a conference Report                       l J     No.         84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                                                               Dat" 8/14/84 Tim
No.
84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Dat" 8/14/84 Tim
* 11:00 a.m.
* 11:00 a.m.
Cable Tray Support Data Request Place:
Cable Tray Support Data Request Place:
Line 63: Line 106:
==Participants:==
==Participants:==
of TUGC0 (EBASCO)
of TUGC0 (EBASCO)
N. Williams                                                                                                     Cygna iteen                                                        comments                                                                          [c7o"EYy Cygna has some additional data requests for documents which are referenced in other calculations currently being reviewed:
N. Williams Cygna
: 1. Please provide copies of the following cable tray calculations:
[c7o"EYy iteen comments Cygna has some additional data requests for documents which are referenced in other calculations currently being reviewed:
SCS-101C, Set 1, Sheet 114 SCS-101C, Set 3, Sheet 16 SCS-104C, Set 1, Sh'eet 45 SCS-104C,' Set 5, Sheet 1, 27
1.
: 2. Please provide copies of the " Change Verification Checklist" and any supporting des'ign review calculations for all revisions of the following " Component Modification Cards:"
Please provide copies of the following cable tray calculations:
CMC 6108 CMC 6155 CMC 6183 CMC 30878 signe                                                                                                                                                    '
SCS-101C, Set 1, Sheet 114 SCS-101C, Set 3, Sheet 16 SCS-104C, Set 1, Sh'eet 45 SCS-104C,' Set 5, Sheet 1, 27 2.
f                                                                                                                  /dmm
Please provide copies of the " Change Verification Checklist" and any supporting des'ign review calculations for all revisions of the following " Component Modification Cards:"
                                                                                                                                                    "'8' 1         1 o'stnbution       D. Wade, G. Grace, J. Russ, R. Hess, N. Williams, S. Treby, S. Burwell, J. Ellis,
CMC 6108 CMC 6155 CMC 6183 CMC 30878 f
      , , , , ,        . . , ,v i n. .. . . . , T. jsm 7       ',m
/dmm
"'8' 1
1 signe o'stnbution D. Wade, G. Grace, J. Russ, R. Hess, N. Williams, S. Treby, S. Burwell, J. Ellis,
..,,v i n......, T. jsm 7
',m


r Communications A(           t i                                                 Report 181111111111
r Communications Report A(
    "*""#          Texas Utilities                           T*'' coa 9l conference Report Project:                                                         Job No.
t i 181111111111 Texas Utilities T*'' coa 9l conference Report Project:
84056 Comanche Peak Steak Electric Station Independent Assessment Program - Phase 4             D*'':
Job No.
7/16/84 subject:
84056 Comanche Peak Steak Electric Station D*'':
Walkdown                                                          :1   a.m.
Independent Assessment Program - Phase 4 7/16/84 subject:
Place:
:1 a.m.
Walkdown Place:
l
l


==Participants:==
==Participants:==
of TW J. Foley (x226)                                       CES Required g        item                                     Comments                               Auion By Please provide a copy of the latest issue and open change paper on the following specifications:
of TW J. Foley (x226)
CES Required item Comments Auion By g
Please provide a copy of the latest issue and open change paper on the following specifications:
CCW Pump MS-11 CCW Heat Exchange MS-49 CCW Surge Tank MS-65 Containment Spray Heat Exchanger MS-50 Control Room Air Conditioning System Chillers MS-87 Nuclear Chilled Water System Chiller MS c A Nuclear Chilled Water System Chiller MS-80B Orifice Specification 2323-MS-624 Nuclear Valves Over 2-1/2" MS-20B.1 Nuclear Valves Over 2-1/2" MS-20B.2 i
CCW Pump MS-11 CCW Heat Exchange MS-49 CCW Surge Tank MS-65 Containment Spray Heat Exchanger MS-50 Control Room Air Conditioning System Chillers MS-87 Nuclear Chilled Water System Chiller MS c A Nuclear Chilled Water System Chiller MS-80B Orifice Specification 2323-MS-624 Nuclear Valves Over 2-1/2" MS-20B.1 Nuclear Valves Over 2-1/2" MS-20B.2 i
Signed                                                                             Page of oisineution.
Signed Page of oisineution.
N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby,           '
N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby,
    ,e,, ,, ,       v. a iis, a. ouinesi, rru;e u rise j
,e,,,,,
: v. a iis, a. ouinesi, rru;e u rise j


Communications AL             t i                                                 Report BluulfilluullifillllHINI invme tit 414tiac                                 h Project-                                                           Jcb No.
Communications Report AL t i BluulfilluullifillllHINI invme tit 414tiac h
Comanche Peak Steam Electric Station                     o,,,
Project-Jcb No.
Independent Assessment Program - Phase 4                         g /9n nu Stoject:                                                           Time:
Comanche Peak Steam Electric Station o,,,
Conduit support - CMCs and DCAs                         p,,,,
Independent Assessment Program - Phase 4 g /9n nu Stoject:
Time:
Conduit support - CMCs and DCAs p,,,,
PPRF9
PPRF9


==Participants:==
==Participants:==
of Diano R1pokpr                                       DEC noemnnrf Stevant (X??6)                             Cygna Required item                                       Comments                                   Action By a
of Diano R1pokpr DEC noemnnrf Stevant (X??6)
: 1)           Please supply Cygna with a copy of the following             6/21/84 CMCs and DCAs:
Cygna Required item Comments Action By a
CMCs                         DCAs 68438                       18074 68272 (R.4) 69387 (R.1) 68283 (R.2) 62912 (R.1) l l
1)
1    ADA                                   Ime         1       1 Distnbution-N. Williams, D. Wade. G. Grace, R. Hess, J. Russ, D. Stevens. S. Treby, J. Ellis,
Please supply Cygna with a copy of the following 6/21/84 CMCs and DCAs:
  '**'*              S. Bmrwell, Proiect File
CMCs DCAs 68438 18074 68272 (R.4) 69387 (R.1) 68283 (R.2) 62912 (R.1) l 1
ADA Ime 1
1 Distnbution-N. Williams, D. Wade. G. Grace, R. Hess, J. Russ, D. Stevens. S. Treby, J. Ellis, S. Bmrwell, Proiect File
~.. -.


E                                                                                                                                                                     I
E I
    -      .t Communications 41 n i                                                                                       Report NWillllfullNil1N1111till Company Texas Uti1ities                                 0 Telecon                     O( Conference Report 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                                         Dat*:
.t Communications 41 n i Report NWillllfullNil1N1111till Company Texas Uti1ities 0 Telecon O( Conference Report 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Dat*:
7/16/84 T'
7/16/84 T'
* Walkdown Drawings                                                                                      9:00 a.m.
* 9:00 a.m.
Place.
Walkdown Drawings Place.
CPSES
CPSES


==Participants:==
==Participants:==
DAL                                                                                         TUSI Jim Foley (x226)                                                                             CES Required item                                                 Comments                                                                           Action By
DAL TUSI Jim Foley (x226)
: 1.         Please provide 2 copies of the latest issue of the following BRP drawings:
CES Required item Comments Action By 1.
BRP-CC-1-AB-046 BRP-CC-1-AB-030 BRP-CC-1-AB-003 BRP-CC-1-AB-007 BRP-CC-1-AB-005 BRP-CC-1-AB-009 BRP-CC-1-AB-013 BRP-CC-1-AB-049 BRP-CC-1-AB-060 BRP-CC-1-EC-018 BRP-CC-1-EC-019 BRP-CC-1-EC-002 BRP-CC-1-AB-008 BRP-CC-1-AB-041 BRP-CC-1-SB-009 BRP-CC-1-SB-008                                                                                                                         i BRP-CC-1-RB-049                                                                                                                         l BRP-CC-1-RB-033 BRP-CC-1-RB-001 BRP-CC-1-RB-036 BRP-CC-1-RB-037 l
Please provide 2 copies of the latest issue of the following BRP drawings:
l hj)fal                                                                                           /ms             "'8' 1
BRP-CC-1-AB-046 BRP-CC-1-AB-030 BRP-CC-1-AB-003 BRP-CC-1-AB-007 BRP-CC-1-AB-005 BRP-CC-1-AB-009 BRP-CC-1-AB-013 BRP-CC-1-AB-049 BRP-CC-1-AB-060 BRP-CC-1-EC-018 BRP-CC-1-EC-019 BRP-CC-1-EC-002 BRP-CC-1-AB-008 BRP-CC-1-AB-041 BRP-CC-1-SB-009 BRP-CC-1-SB-008 i
2 oistnbution-     N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby,
BRP-CC-1-RB-049 l
              ,,,,,,,          v. Ziisa, S. Lui -cii , i uscu i.ic
BRP-CC-1-RB-033 BRP-CC-1-RB-001 BRP-CC-1-RB-036 BRP-CC-1-RB-037 l
_ _ ___ .___ _            ____ -_ _ __ _ _ . - _ _ _ . _ - - - - _ _ . _ _ _ ~ _ . . . _ . .                -
l hj)fal
/ms
"'8' 1
2 oistnbution-N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby, Ziisa, S. Lui -cii, i uscu i.ic v.
~


Communications L     t i                                               Report 111111481111111111111111111111 Item                                   Comments                                                 Ac on y Please provide two copies of the latest issue of the CCW flow diagram:
Communications Report L
2323-M1-0231 Sheet 1 2323-M1-0230 Sheet 1
t i 111111481111111111111111111111 Item Comments Ac on y Please provide two copies of the latest issue of the CCW flow diagram:
: 3.         Please provide two copies of the latest issue of the following AI drawings:
2323-M1-0231 Sheet 1 2323-M1-0230 Sheet 1 3.
Please provide two copies of the latest issue of the following AI drawings:
2323-Al-0508 2323-Al-0507 2323-Al-0509 2323-Al-0503 2323-Al-0502 2323-AI-0510 2323-AI-0511 2323-Al-0500 2323-AI-0501 i
2323-Al-0508 2323-Al-0507 2323-Al-0509 2323-Al-0503 2323-Al-0502 2323-AI-0510 2323-AI-0511 2323-Al-0500 2323-AI-0501 i
Page   of
Page of


I Communications 4L         6 i                                                   Report 1111111111111111lll1llllllllll Company:
Communications 4L Report 6 i 1111111111111111lll1llllllllll Company:
I                       O           U           RW J   No. 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                 Date.
I O
6/28/84 subiect:                                                           Time   3:30 pm Conduit Supports - CMCs and DCAs Place: CPSES
U RW J
No.
84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 6/28/84 Date.
subiect:
Time 3:30 pm Conduit Supports - CMCs and DCAs Place:
CPSES


==Participants:==
==Participants:==
'    DCC Diane Bleeker Desmond Stevens (x 226)                           Cygna item                                         Comments                                   Ac o By
DCC Diane Bleeker Desmond Stevens (x 226)
.                  Please supply Cygna with a historical listing of all CMCs               A.M.
Cygna item Comments Ac o By Please supply Cygna with a historical listing of all CMCs A.M.
and DCAs (active and closed out) against the following                 6/29/84 drawings:
and DCAs (active and closed out) against the following 6/29/84 drawings:
Notes 2323-S-0910-CA-la 2323-5-0910-CA-2a 2323-S-0910-CA-Sa 2323-S-0910-CA-11a               Formerly CA-11 2323-S-0910-CA-15 2323-S-0910-CSM-6b 2323-S-0910-CSM-15a 2323-S-0910-CSM-18c 2323-S-0910-CSM-18d 2323-S-0910-CSM-42 2323-S-0910-CSD-la               Formerly CS0-1 2323-5-0910-CST-3 2323-S-0910-CST-17 2323-S-0910-CSM-18f 2323-S-0910-CSD-16 l
Notes 2323-S-0910-CA-la 2323-5-0910-CA-2a 2323-S-0910-CA-Sa 2323-S-0910-CA-11a Formerly CA-11 2323-S-0910-CA-15 2323-S-0910-CSM-6b 2323-S-0910-CSM-15a 2323-S-0910-CSM-18c 2323-S-0910-CSM-18d 2323-S-0910-CSM-42 2323-S-0910-CSD-la Formerly CS0-1 2323-5-0910-CST-3 2323-S-0910-CST-17 2323-S-0910-CSM-18f 2323-S-0910-CSD-16 l
l i
i saneo j,s p,,,
saneo
3 l
                                    ,A                                        j ,s p,,, 3 l
,A Distnbution-N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, U. B leeker, d.
Distnbution-       N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, U. B leeker, d. IreDy, d. Eiiis,
IreDy, d. Eiiis,
,,,,,,,            3. Du, m;; ,   'u-
: 3. Du, m;;, 'u-Ti';
                                    ,      Ti';                                                             j
j


Communications 4L           ii                                                                                   Report mmmmmmmmmm Company: Texas Uti1ities                                         o Telecon                         & conference Report
Communications Report 4L ii mmmmmmmmmm Company: Texas Uti1ities o Telecon
      "' I*'''                                                                                           Job No. 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                                               Date:   6/12/84 subject:                                                                                           I' **
& conference Report Job No.
Request for Documents Place:   New York
84056
"' I*'''
Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Date:
6/12/84 subject:
I' **
Request for Documents Place:
New York


==Participants:==
==Participants:==
Al Moersfelder                                                           of       Cygna Borys Czarnogorski                                                               G&H nequirea item                                                 comments                                                                         Action By
Al Moersfelder of Cygna Borys Czarnogorski G&H nequirea item comments Action By Please provide copies of the following documents which are needed to continue the subject Independent Assessment program:
      .                  Please provide copies of the following documents which are needed to continue the subject Independent Assessment program:
l 1.
l             1.       Gibbs & Hill letter GTN-68249 dated December 30, 1983                                                               6/13/84 l                       with an enclosed copy of the Criteria for Setpoint l                       Methodology Balance of Plant (B0P)
Gibbs & Hill letter GTN-68249 dated December 30, 1983 6/13/84 l
,            2.       Gibbs & Hill calculation IC-007, revision 1, dated                                                                 6/13/84
with an enclosed copy of the Criteria for Setpoint l
!                      December 28, 1982 entitled Setpoint Methodology l                       Calculation.
Methodology Balance of Plant (B0P) 2.
: 3.       Gibbs & Hill calculation IC-008, revision 1, dated                                                                 6/13/84 January 12, 1983 entitled Setpoint Methodology Calculation.
Gibbs & Hill calculation IC-007, revision 1, dated 6/13/84 December 28, 1982 entitled Setpoint Methodology l
: 4.         Gibbs & Hill interdisciplinary review paper work for                                                               6/13/84 the following specifications:
Calculation.
;                      MS-600, MS-611B, MS-615, MS-618, MS-621, MS-622, and MS-624 signed gggfjpg                                                                                         /ss     page 1                   of         1 Distribution N. Willianis, u. nade, G. Gr ai.c, 5. Hversielder, R.                                   He>>, I. HarL i ri, 5. Tr eivy ,
3.
                      .1 - F114e R _ Ru rval l - Deninet Filo
Gibbs & Hill calculation IC-008, revision 1, dated 6/13/84 January 12, 1983 entitled Setpoint Methodology Calculation.
4.
Gibbs & Hill interdisciplinary review paper work for 6/13/84 the following specifications:
MS-600, MS-611B, MS-615, MS-618, MS-621, MS-622, and MS-624 gggfjpg
/ss page 1 of 1
signed N. Willianis, u. nade, G. Gr ai.c, 5. Hversielder, R. He>>, I. HarL i ri, 5. Tr eivy,
Distribution
.1 - F114e R _ Ru rval l - Deninet Filo


Communic 3tions L4 L         t i                                                                                                                        Report an compenr Texas Utilities                                                                                                       o Telecon m conference Report N-84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                                                                                     Date 6/27/84 Subject                                                                                                                                 Time:
Communic 3tions Report L4 L t ian compenr Texas Utilities o Telecon m conference Report N-84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 6/27/84 Date Subject Time:
CMC & DCA Listing 3:30 p.m.
3:30 p.m.
Place:
CMC & DCA Listing Place:
CPSES
CPSES


==Participants:==
==Participants:==
of B&R-DCC John Russ                                                                                                                           CES 4
of B&R-DCC John Russ CES 4
Required item                                                                                                           Comments                                                     Action By 1
Required item Comments Action By 1


==Reference:==
==Reference:==
Conference report, dated June 27, 1983, " CMC and DCA l                                                                           Listing," D. Bleeker and J. Russ participating.
Conference report, dated June 27, 1983, " CMC and DCA l
l                                               Ms. Bleeker provided Cygna with the lists requested in the referenced conference report.
Listing," D. Bleeker and J. Russ participating.
l Ms. Bleeker provided Cygna with the lists requested in the referenced conference report.
i t
i t
l l
l l
l l
l of Signed Page g g
Signed                                                                                                                                                                 Page g     of    g Distneution-   N. Williams, D. W'de, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, E vgwww             ww
Distneution-N. Williams, D. W'de, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, E vgwww ww
                                                                ,    , _ . , _ . _ _ _ _ _ _ . _ _ _ . _ _ _ _ . . _ , . _ _ . _ _ _ _ _ _ _ , . , , . . .                    ._,__,_.,.____-,_m._,..,                   , _ _ _ _ _ _ _ _ _
._,__,_.,.____-,_m._,..,


r-                                                                                                                                     1 Wt IMMMMMMMI i
r-1 Communic ^itlOnS Wt Repod i
Communic ^itlOnS Repod company.
IMMMMMMMI company.
Texas Utilities                               a Telecon di Conference Report N-84056 Comanche Peak Steam Electric Station D * '':
Texas Utilities a Telecon di Conference Report N-84056 Comanche Peak Steam Electric Station D * '':
Independent Assessment Program - Phase 4                             7/3/84 subsect                                                                   7""'-
Independent Assessment Program - Phase 4 7/3/84 subsect 7""'-
3:00 p.m.
Conduit Supports 3:00 p.m.
Conduit Supports Document Request                                                     CPSES Diane Bleeker                                         DCC Desmond Stevens (x226)                               Cygna Required item                                           Comments                                                   Action By
Document Request CPSES Diane Bleeker DCC Desmond Stevens (x226)
: 1.           Please supply Cygna with all revisions of following CMC's:                             P.M. 7/3/84 62932 68272 68276
Cygna Required item Comments Action By 1.
: 2.           Please supply one copy of following drawings at revisions shown:
Please supply Cygna with all revisions of following CMC's:
2323-S-0910 SH. LS-2       R.5, and current 2323-S-0910 SH. LS-10     R.2, and current                                                                 l 2323-S-0910 SH. LS-12a R.6, and current l
P.M. 7/3/84 62932 68272 68276 2.
l i
Please supply one copy of following drawings at revisions shown:
signed                                                                                           "'8'                '
2323-S-0910 SH. LS-2 R.5, and current 2323-S-0910 SH. LS-10 R.2, and current l
[j                                           /ms                 1                       1 ointneution. N. WilTiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, i,ycu Ric
2323-S-0910 SH. LS-12a R.6, and current i
                    .-_-~ - . - _ _ . -            _
signed
[j
/ms 1
1
"'8' ointneution.
N. WilTiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, i,ycu Ric
.- -~ -. -


l Communications                       !
Communications AL ci Report meu compny:
AL           ci                                                 Report meu compny:                                                         et conference Repon Texas Utilities                     D Telecon 84056 Comanche Peak Steam Electric Station D*'':
Texas Utilities D Telecon et conference Repon 84056 Comanche Peak Steam Electric Station D*'':
Independent Assessment Program - Phase 4                     6/26/84 subject:                                                                 1:10 p.m.
Independent Assessment Program - Phase 4 6/26/84 subject:
1:10 p.m.
CCW Systems Place.
CCW Systems Place.
pgg
pgg
  "'"'*'P'"''
"'"'*'P'"''
MmMMe                                                 DCC Desmond Stevens (x226)                                 CYGNA Required item                                   Comments                                     Action By Please furnish Cygna with a copy of letter #TSG-608 dated               P.M.
MmMMe DCC Desmond Stevens (x226)
3/9/82, subject, Radiation Monitor Interlock Circuit.                   6/26/84 signed
CYGNA Required item Comments Action By Please furnish Cygna with a copy of letter #TSG-608 dated P.M.
                              //                                           /ms 1           1 D'str'eution: N. Williams, D. W'ade! G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis,
3/9/82, subject, Radiation Monitor Interlock Circuit.
  ,,,,,,,        S. im.-wii, Fi us m Tiic                                                             l
6/26/84 signed
//
/ms 1
1 D'str'eution:
N. Williams, D. W'ade! G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. im.-wii, Fi us m Tiic


Communications 4(         6 i                                                                                                               Report 111111111111111111111111101111 company:
Communications 4(
Texas Utilities                                                         o Telecon                               p conference Report Project:                                                                                                                       Job No.
Report 6 i 111111111111111111111111101111 company:
Comanche Peak Steam Electric Station                                                                                                 84056 Independent Assessment Program - Phase 4                                                                             D * ''
Texas Utilities o Telecon p conference Report Project:
Job No.
Comanche Peak Steam Electric Station 84056 Independent Assessment Program - Phase 4 D * ''
6/28/84
6/28/84


==Subject:==
==Subject:==
Time.
Time.
Document Request                                                                                                                       10:00 a.m.
Document Request 10:00 a.m.
Place:
Place:
pg
pg


==Participants:==
==Participants:==
Tm Mn                                                                                                                 MQ John Russ                                                                                                             CES Bill Horstman                                                                                                         CES Aequired item                                                                       Comments                                                                         Action By Cygna requested and received a copy of site civil's cross-reference of cable tray support numbers versus CMC's for drawing FSE-00185 i
Tm Mn MQ John Russ CES Bill Horstman CES Aequired item Comments Action By Cygna requested and received a copy of site civil's cross-reference of cable tray support numbers versus CMC's for drawing FSE-00185 i
s d
s d
1 1
1 Yh ffff
Yh Distribution
/ms
                    /                  ffff N. Williarns', D.' Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell,
"''' 1 1
                                                                                                                                                      /ms    "''' 1 1
/
    ,,,,,,,        Ti us cu Tiic
N. Williarns', D.' Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, Distribution Ti us cu Tiic
_        __      _ _ , _ _          _ _ _ _ - _ _ - . _ _ . . _ . . _ _ _ _ _ . ,            . _ _ _ _ . _ . ~ . _ . . . . , . _ . _ . . _ _ . .              _ _ . _ _ _ _ _ - _ _ . _ .
. _ _ _ _. _. ~. _....,. _. _.. _ _..


Communications d(             t i                                                                 Report elec n    g Conference Rom Tovat titili ties Project:                                                                             Job No.
Communications d(
84056 Comanche Peak Steam Electric Station                                     g ,,,;
Report t i Tovat titili ties g Conference Rom elec n Project:
Independent Assessment Program - Phase 4                                           6/20/84
Job No.
84056 Comanche Peak Steam Electric Station g,,,;
Independent Assessment Program - Phase 4 6/20/84


==Subject:==
==Subject:==
Time:
Time:
Document Request                                                         pi,c,;
Document Request pi,c,;
PPRFR
PPRFR


==Participants:==
==Participants:==
of Sara Donald                                                           DCC R. Hess                                                               CFM Required item                                                     Comments                                     Action By j
of Sara Donald DCC R. Hess CFM Required item Comments Action By j
: 1)           Cygna requested the latest revision and open change paper against the following specifications:                                                                     !
1)
l MS-0062 - Flow Elements U'''"*"''"
Cygna requested the latest revision and open change paper against the following specifications:
Y))))))n's                                                           Ims   1           1 ,
l MS-0062 - Flow Elements Y))))))n's Ims 1
N. Williams, D. Wade, G. Grace                   R. Hess   T. Martin, S. Treby, J. Ellis, son o,e Swm
1 U'''"*"''"
N. Williams, D. Wade, G. Grace R. Hess T. Martin, S. Treby, J. Ellis, son o,e Swm


n                 .
n Communications Report ti (
Communications ti (         t i                                               Report
t i
                    . ll Towne If t 114 t i oc                             k Protect                                                         Job No.
. ll k
Towne If t 114 t i oc Protect Job No.
840 %
840 %
Comanche Peak Steam Electric Station                 g,,,
Comanche Peak Steam Electric Station g,,,
Independent Assessment Program - Phase 4                       6/14/Ra Subject                                                         Time:
Independent Assessment Program - Phase 4 6/14/Ra Subject Time:
4:30 o.m.                 !
4:30 o.m.
Document Request - Conduits                           p,,,,
Document Request - Conduits p,,,,
GAH- N_Y_
GAH-N_Y_


==Participants:==
==Participants:==
of Dator Haann                                       GAH
of Dator Haann GAH
                          .Inhn Rnce                                         Cvona Required item                                       Comments                                   Action By a
.Inhn Rnce Cvona Required item Comments Action By a
Cygna requested that Gibbs & Hill provide documentation regarding the following Unit 1 items:
Cygna requested that Gibbs & Hill provide documentation regarding the following Unit 1 items:
: 1)         Allowables for normal loadings and load interaction for Unistrut     G&H clamp #P2558.
1)
: 2)         Capacities for bolts used to attach P2558 clamps to materials         GaH other than those specified in Unistrut test reports.
Allowables for normal loadings and load interaction for Unistrut G&H clamp #P2558.
: 3)         Calculations for the design of details on the following sheets of drawing 2323-S-0910:
2)
Capacities for bolts used to attach P2558 clamps to materials GaH other than those specified in Unistrut test reports.
3)
Calculations for the design of details on the following sheets of drawing 2323-S-0910:
A. CSD-Sa B. CSD-14a C. C50-14b
A. CSD-Sa B. CSD-14a C. C50-14b
            %q$ry<' dh4                                                       ,,,      1           1 Distribution.
%q$ry<' dh4 1
N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby. J. Ellis, S. Burwell, i m ei.         .w
1 Distribution.
N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby. J. Ellis, S. Burwell, i m ei.
.w


r Communications 4L n i                                                       Repod unemamma
r Communications 4L n i Repod unemamma
    '"''*"Y; Texas Utilities                         o Telecon a conference neport Project                                                       Job No.
'"''*"Y; Texas Utilities o Telecon a conference neport Project Job No.
Comanche Peak Steam Election Station                         84056 Independent Assessment Program - Phase 4           D*'':
Comanche Peak Steam Election Station 84056 Independent Assessment Program - Phase 4 D*'':
June 27, 1984 subiect                                                       T' "''
June 27, 1984 subiect T' "''
CMC & DCA Listing                                             3:30 pm Place.
CMC & DCA Listing 3:30 pm Place.
PSES D. Bleeker                                           BAR - DCC J. Russ                                               CES nequired item                                     Comments                                 Action By
PSES D. Bleeker BAR - DCC J. Russ CES nequired item Comments Action By


==Reference:==
==Reference:==
Conference Report, dated June 27, 1983, " CMC and DCA Listing," D. Bleeker and J. Russ participating.
Conference Report, dated June 27, 1983, " CMC and DCA Listing," D. Bleeker and J. Russ participating.
Ms. Bleeker provided Cygna with the lists requested in the referenced conference report, signeo                                                                         p.g. or jjJ                                            /ss        l        l D'*tabution   N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell,
Ms. Bleeker provided Cygna with the lists requested in the referenced conference report, signeo jjJ
  . . . .      rrugeu r i s e
/ss l
l p.g.
or D'*tabution N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, rrugeu r i s e


n                                                                                                             i Communicati::ns 4L         i i                                                         Report maammmmme compenr                                                                   N conference neport Texas Ut111 ties                                 a Telecon
n i
* J N     84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                       oste:
Communicati::ns Report 4L i i maammmmme compenr Texas Ut111 ties a Telecon N conference neport J N 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 oste:
6/12/84 subject:                                                                   T'm'     4:00 pm CCW Pump Motor Size Place' G8H offices
6/12/84 subject:
T'm' 4:00 pm CCW Pump Motor Size Place' G8H offices


==Participants:==
==Participants:==
p               j                                   of      ggg S. Martinovich                                               G8H T. R. Martin                                                 Cygna nequireo item                                                 Comments                               Action By Paul and Sam informed me that the CCW pump motor information in specification 2323-ES-ID was provided by the mechanical department on their motor list. This motor sizing information was provided by the Bingham-Willamette Company based on the mechanical requirements given in mechanical specification 2323-MS-11.
of p
j ggg S. Martinovich G8H T. R. Martin Cygna nequireo item Comments Action By Paul and Sam informed me that the CCW pump motor information in specification 2323-ES-ID was provided by the mechanical department on their motor list. This motor sizing information was provided by the Bingham-Willamette Company based on the mechanical requirements given in mechanical specification 2323-MS-11.
Sam provided me with a copy of curve number 33035 which indicates the motor horsepower required is 1000 hp.
Sam provided me with a copy of curve number 33035 which indicates the motor horsepower required is 1000 hp.
Cygna's mechanical department has reviewed the pump sizing calculation, s.oneo g/jg                                                   f35   Page i of 1
Cygna's mechanical department has reviewed the pump sizing calculation, g/jg f35 Page i 1
ointnbution   N. Williams, D. Wade, G. Grace, H. Hess, I. Martin, 5.                 Ireby, i   ris,_     e . . . _ - ,,   n__,_.. ens.
s.oneo of ointnbution N. Williams, D. Wade, G. Grace, H. Hess, I. Martin, 5.
: Ireby, i
ris,_
e... _ -,,
n__,_..
ens.


Communicatisns 4L         6 i                                                   Report manmaamma com pnr 1 Texas Utilities                           o Teiecon a conference Report Comanche Peak Steam Electric Station                             84056 Independent Assessment Program - Phase 4               D*t*:
Communicatisns Report 4L 6 i manmaamma com pnr 1 Texas Utilities o Teiecon a conference Report 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 D*t*:
6/27/84 Conduit Support Fire Protection Reevaluation                     10:30 a.m.
6/27/84 Conduit Support Fire Protection Reevaluation 10:30 a.m.
Place CPSES Participants.                                                     of TUGC0 John Russ                                               CES
Place CPSES Participants.
of TUGC0 John Russ CES
}
}
Required item                                         Comments                                 Action By
Required item Comments Action By


==Reference:==
==Reference:==
Conference report dated June 25, 1984, " Document Request," T. Keiss, J. Russ, and D. Stevens participating.
Conference report dated June 25, 1984, " Document Request," T. Keiss, J. Russ, and D. Stevens participating.
The calculations listed as applicable to sheets marked with IN-f P on sheet C-1 of the referenced conference report do not have calculation binder and set numbers indicated on them. Mr. Keiss stated that these calculations may be in the process of design review. Only after this process will Gibbs & Hill, New York, provide them with calculation numbers.
The calculations listed as applicable to sheets marked with IN-f P on sheet C-1 of the referenced conference report do not have calculation binder and set numbers indicated on them. Mr. Keiss stated that these calculations may be in the process of design review. Only after this process will Gibbs & Hill, New York, provide them with calculation numbers.
I asked Mr. Keiss to provide Cygna with a number and date of the       TUGC0 design review cover sheet used to transmit calculations to Gibbs
I asked Mr. Keiss to provide Cygna with a number and date of the TUGC0 design review cover sheet used to transmit calculations to Gibbs
                      & Hill, New York, for the conduit support calculations referenced above and for any future requests if applicable, 8'oned 4                                                         g     ren      of g
& Hill, New York, for the conduit support calculations referenced above and for any future requests if applicable, 8'oned 4
3 oisinnution    N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. BurweII, e vgs vv   rh
g 3
g re of n
N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. BurweII, oisinnution e vgs vv rh


Communicatlans 4L         6 i                                                                   Report compaar Texas Utilities                                                 o T.i. con 5 cont.rence n. port
Communicatlans 4L Report 6 i compaar Texas Utilities o
* N' Comanche Peak Steam Electric Station                                                   84056 Independent Assessment Program - Phase 4                               Date:
T.i. con 5 cont.rence n. port N'
6/27/84
Comanche Peak Steam Electric Station 84056 Independent Assessment Program - Phase 4 Date:
          "#                                                                                T' **
6/27/84 T' **
CMC and DCA Listing                                                                   10:10 a.m.
CMC and DCA Listing 10:10 a.m.
Place.
Place.
CPSES Participants Diane Bleeker                                                   '
CPSES Participants Diane Bleeker BAR-DCC John Russ CES Reqvwed item Comments Action By Cygna requested that Ms. Bleeker provide a listing of all CMC's and DCA's against the following drawings:
BAR-DCC John Russ                                                                     CES Reqvwed item                                             Comments                                                       Action By Cygna requested that Ms. Bleeker provide a listing of all CMC's and DCA's against the following drawings:
2323-5-0901 BAR-0C 2323-5-0902 2323-S-0903 2323-5-0904 2323-S-0905 2323-5-0906 2323-5-0907 2323-S-0908 2323-S-0909 2323-S-0911 2323-S-0912 2323-S-0913 2323-5-0914 2323-5-0915 2323-5-0916 2323-S-0917 2323-5-0918 2323-5-0919 2323-S-0920 g g gj; j,,
2323-5-0901                                                   BAR-0C 2323-5-0902 2323-S-0903 2323-5-0904 2323-S-0905 2323-5-0906 2323-5-0907 2323-S-0908 2323-S-0909 2323-S-0911 2323-S-0912 2323-S-0913 2323-5-0914 2323-5-0915 2323-5-0916 2323-S-0917 2323-5-0918 2323-5-0919 2323-S-0920 s$nw        g g               gj;               ;                                                j,,   p.g. g o,
p.g.
g o,stneution   M. Wilitams, v. wace, u. urace, H. Ness, v. Huss, d.                             Ireby,.J. Lills, s. Durwell, o_  ,_..en;
g g
_ _ _ _ _ . _ _ . _ . _      _ _ _ _ _ _ _ _ -                    .- __        _      ~ _ _ _ .         ._
s$nw o,
o,stneution M. Wilitams, v. wace, u. urace, H. Ness, v. Huss, d.
Ireby,.J. Lills, s. Durwell,
,_..en; o_
~ _ _ _.


Jh Communications 4Ln             i Repod INNlilllNililllHNilHHit company:
Jh Communications 4Ln Repod i
Texas Utilities'                         o Teiecon n conference n port Job No. 84056 ComanchePeakSteamElActricStation Independent Assessment. Program - Phase 4           Date:
INNlilllNililllHNilHHit company:
Texas Utilities' o Teiecon n conference n port Job No.
84056 ComanchePeakSteamElActricStation Independent Assessment. Program - Phase 4 Date:
6/28/84
6/28/84
                          '~~
'~~
Subject                                                             Time:   8:15 a.m.
Subject Time:
Drawing Request     ,
8:15 a.m.
Place:
Drawing Request Place:
CPSES
CPSES


==Participants:==
==Participants:==
of B&R-DCC John Russ                                           CES Required item                                       Comments                                       Action By
of B&R-DCC John Russ CES Required item Comments Action By Cygna requested and received copies of the following drawings:
                                              ~
~
Cygna requested and received copies of the following drawings:
1)
: 1)         Cable tray support drawing FSE-00159 sheets 2602, 3016, 3019, 6654, 2861
Cable tray support drawing FSE-00159 sheets 2602, 3016, 3019, 6654, 2861 2)
: 2)         FSE-00179 l
FSE-00179 l
l l
l l
l s$ne
l s$ne
                              }                                               /ms Page     1 of   1 Distnbution:     N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, 5. I reby , d . t. I l l s , . d. D u rw el l ,
}
T. m ;; I ';                                                                                     l
/ms Page 1
  . . .                      , . - . . . . -    .-                                                          __-___1
of 1
Distnbution:
N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, 5.
I reby, d. t. I l l s,. d. D u rw el l,
T. m ;; I ';
1


Communications t4 L         t i                                                                                                       Report 111111111111111111111111111111 company: Texas Utilities                                                                                     o Te! econ a conference Report JbN-     84056 Comane.he Peak Steam Election Station Independent Assessment Program - Phase 4                                                                     cate June 22, 1984 suNect:                                                                                                                 Tim':   4:30 pm Document Requests - Open Items Place:
Communications Report t4 L t i 111111111111111111111111111111 company: Texas Utilities o Te! econ a conference Report JbN-84056 Comane.he Peak Steam Election Station Independent Assessment Program - Phase 4 cate June 22, 1984 suNect:
Tim':
Document Requests - Open Items 4:30 pm Place:
G8H, NY
G8H, NY


==Participants:==
==Participants:==
of p                                                                                                           G&H E. Bezkor                                                                                                   G&H J. Russ                                                                                                       CES Required item                                                                           Comments                                                   Action By
of p
G&H E. Bezkor G&H J. Russ CES Required item Comments Action By


==Reference:==
==Reference:==
Conference Report dated June 14, 1984, 4:30 pm,
Conference Report dated June 14, 1984, 4:30 pm,
                                    " Document Request - Conduits," P. Huang and J. Russ participating Cygna discussed open items from Cygna's structural review at Gibbs & Hill with Messrs Huang and Bezkor. The items listed in the referenced conference report were not available to Cygna as of this date. According to Mr. Huang, the requested documents will be ready to review the week of July 2,1984. The material will be sent to Cygna's San Francisco office.
" Document Request - Conduits," P. Huang and J. Russ participating Cygna discussed open items from Cygna's structural review at Gibbs & Hill with Messrs Huang and Bezkor. The items listed in the referenced conference report were not available to Cygna as of this date. According to Mr. Huang, the requested documents will be ready to review the week of July 2,1984. The material will be sent to Cygna's San Francisco office.
signed               i                                                                                                                 Page   of
)
                            )                                                                                                      An         i Distribution: 'N. kiliiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell,
signed i
  ,    ,,        T. us uu T;'ic l
Page of An i
Distribution:
'N. kiliiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, T. us uu T;'ic l


I Communications AL             t i                                                                                               Report 111111111lll191111111111111111
Communications AL Report t i 111111111lll191111111111111111
  "* P'"r         Texas Utilities                                     0 Telecon                                 ( Conference Repon N~
"* P'"r Texas Utilities 0 Telecon
84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                                                           D*'':
( Conference Repon N~
6/14/84 subiect:                                                                                                       **
84056 Comanche Peak Steam Electric Station D*'':
Mechanical Systems Review Valve Specifications                                                                                         G8H, NYC J. Foley                                                                                           Cygna Duk Kim                                                                                             G8H Required item                                             Comments                                                                                                   Action By There was a concern that, although environmental conditions (both normal and accident) for various buildings are clearly stated in the specification, there did not appear to be a way for the manufacturer to determine exactly what valves in his scope would be subject to which environments.
Independent Assessment Program - Phase 4 6/14/84 subiect:
Mechanical Systems Review Valve Specifications G8H, NYC J. Foley Cygna Duk Kim G8H Required item Comments Action By There was a concern that, although environmental conditions (both normal and accident) for various buildings are clearly stated in the specification, there did not appear to be a way for the manufacturer to determine exactly what valves in his scope would be subject to which environments.
Kim explained that although the complete valve list (not just a summary) was not attached to the specification under review, it is part of the specification, and through it the vendor could tell where a particular valve is placed, f
Kim explained that although the complete valve list (not just a summary) was not attached to the specification under review, it is part of the specification, and through it the vendor could tell where a particular valve is placed, f
I l
I l
signed: d                                                                                                                       "*                                    '
signed: d
                                                                                                                            /ms             1                               1 Distneution:     N. W'illiams, D. Wade, G. Grace, J. P. Foley, S. Treby, J. Ellis, S. Burwell,
/ms 1
  ,    ,,          r . va cu   ..c
1 Distneution:
N. W'illiams, D. Wade, G. Grace, J. P. Foley, S. Treby, J. Ellis, S. Burwell, r. va cu
..c


Communications L   i i                                                                                                                               R3 pod 11111111Hilllllllillllilill
Communications R3 pod L
    *E'"#
i i 11111111Hilllllllillllilill
IeXas Utilities                                                           0 Telecon                                         M Conference Repon Project:                                                                                                                                       Job No.
*E'"#
IeXas Utilities 0 Telecon M Conference Repon Project:
Job No.
84056 Comanche Peak Steam Electric Station D*''
84056 Comanche Peak Steam Electric Station D*''
Independent Assessment Program - Phase 4                                                                                                                         7/5/84 Subject-                                                                                                                                       Time:
Independent Assessment Program - Phase 4 7/5/84 Subject-Time:
3:30 Drawings for Tom Martin CPSE3 Site Diane Bleeker                                                                                                                                   B&R DCC Norman Munoz                                                                                                                                     B&R DCC Bill Horstman (x 226)                                                                                                                           CES Required item                                                           Comments                                                                                                             Actiori By
3:30 Drawings for Tom Martin CPSE3 Site Diane Bleeker B&R DCC Norman Munoz B&R DCC Bill Horstman (x 226)
: 1.           Please provide one copy of the current revision of Gibbs & Hill drawing:       2323-El-0173-01,
CES Required item Comments Actiori By 1.
: 2.           Please provide copies of all change documentation (CMCs, DCAs) against drawing in Item 1.
Please provide one copy of the current revision of Gibbs & Hill drawing:
Signed:                                                                                                                                                                             Page of oistnbution:       N. WiTlIams,' D. Wade, B. Horstman, G. Grace, S. Treby, J. Ellis, S. Burwell,
2323-El-0173-01, 2.
                        '"d"''       'C 10M 04
Please provide copies of all change documentation (CMCs, DCAs) against drawing in Item 1.
              .. .,                    _          _ _ . - - - . - _ . . . , . . _ . _ _ _ - . - , - - . . . - , . = , - _ _ . . , _ . . . _ - . . - - . , - - . , . . . - . . . - -
Signed:
Page of oistnbution:
N. WiTlIams,' D. Wade, B. Horstman, G. Grace, S. Treby, J. Ellis, S. Burwell, 10M 04
'"d"''
'C
_ _. - - -. - _...,.. _. _ _ _ -. -, - -... -,. =, - _ _.., _... _ -.. - -., - -.,... -... - -


l Communications oL           t i                                             ,
Communications Report oL t i 111111111111111111111111111111
Report 111111111111111111111111111111
*H"E Texas Utilities a Telecon gt Conference Report Projeca:
    *H"E       Texas Utilities                                                     a Telecon                                               gt Conference Report Projeca:                                                                                                                                   Job No.
Job No.
84056 Comanche Peak Steam Electric Station D't*:
84056 Comanche Peak Steam Electric Station D't*:
Independent Assessment Program - Phase 4                                                                                                                     7/4/84 Change Documentation for Cable Tray Supports CPSES Site
Independent Assessment Program - Phase 4 7/4/84 Change Documentation for Cable Tray Supports CPSES Site


==Participants:==
==Participants:==
of g                                                                                                                                   B8R DCC Bill Horstman                                                                                                                                       CES Required item                                                       Comments                                                                                                               Action 53y
of g
.        1.         Please provide copies of the current revision of all CMC's and DCA's (not just the "Open Design Change Log" items) for drawing 2323-S-0919.
B8R DCC Bill Horstman CES Required item Comments Action 53y 1.
: 2.         Please provide copies of the current revision of the CMCs and DCAs for the listed drawings:
Please provide copies of the current revision of all CMC's and DCA's (not just the "Open Design Change Log" items) for drawing 2323-S-0919.
2323-S-0901 2323-S-0902 2323-S-0903 2323-S-0904 (NOTE:             I received the CMCs listed on the "Open Design Change Log" on 7/2/84, so please provide only those documents which are no longer "Open".)
2.
Please provide copies of the current revision of the CMCs and DCAs for the listed drawings:
2323-S-0901 2323-S-0902 2323-S-0903 2323-S-0904 (NOTE:
I received the CMCs listed on the "Open Design Change Log" on 7/2/84, so please provide only those documents which are no longer "Open".)
l l
l l
l l
l l
l Signed.                                                                                                                                                                       Page   of oistnoution:   N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell, e augsww a asu
l Signed.
Page of oistnoution: N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell, e augsww a asu


1 4
4 Communications ALa
Communications ALa               i 11111111111111111111lll11lll11
.J -
                                          .J -     ,
. : f. '*7 u Report i
                                                      . : f. '*7
11111111111111111111lll11lll11
                                                                ~ 'i u    Report Company: Texas Utilities                                     o Telecon a conference Report Job No.
~ 'i Company: Texas Utilities o Telecon a conference Report Job No.
84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4                   D8t':
84056 Comanche Peak Steam Electric Station D8t':
7/3/84 subject:                                                               Time:
Independent Assessment Program - Phase 4 7/3/84 subject:
Time:
Cable Tray Support Change Documentation CPSES Site
Cable Tray Support Change Documentation CPSES Site


==Participants:==
==Participants:==
Dim Wh                                                   B&R DCC Bill Horstman                                             CES Aequired item                                             Comments                             Action By
Dim Wh B&R DCC Bill Horstman CES Aequired item Comments Action By 1.
: 1.         Please provide copies of the current revision of the following CMCs:
Please provide copies of the current revision of the following l
l 93450           31199   9901 39450           3199 32053           2187
CMCs:
: 2.           Please provide copies of the ci;rrent revision of the following DCA's:
93450 31199 9901 39450 3199 32053 2187 2.
6299           32053   5347 17838           17729   17847 17842           3063   11729 3464 l
Please provide copies of the ci;rrent revision of the following DCA's:
signed.     (/                                                                         Page of Distnbution:   N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell, g          .awgsuw 4 eac
6299 32053 5347 17838 17729 17847 17842 3063 11729 3464 l
signed.
(/
Page of Distnbution:
N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell,
.awgsuw 4 eac g


;d'                                                                                                                   Communications
;d' Communications Report A(
  .        A(           t i                                                                                           Report 18111111111ll11111111111111111 Company: Texas Utilities                                                               o Telecon           z Conference Report Project:                                                                                                     Job No.
t i 18111111111ll11111111111111111 Company: Texas Utilities o Telecon z Conference Report Project:
Comanche Peak Steam Electric Station                                                                       0 056 Independent Assessment Program - Phase 4                                                         D8t*:
Job No.
5/11/84
Comanche Peak Steam Electric Station 0 056 D8t*:
Independent Assessment Program - Phase 4 5/11/84


==Subject:==
==Subject:==
Time:                                                       l Electrical & Systems Review Kick-off Meeting                                                               9:00 a.m.
Time:
Gibbs & Hill, N.Y.
9:00 a.m.
R. Hess, T. R. Martin, P. Rainey                                                           Cygna J.C. Waal, N. Williams                                                                     Cygna J. Irons, D. Ghosh, T. Hawkins, P. Lalaji                                                 G&H S.M. Marano, R.E. Ballard, B. Czarnogorski                                                 G&H Required item                                                                 Comments                                                           Action By A meeting was held to sumarize the Phase 4 scope and allow the Cygca reviewers the opportunity to gather some understanding of the electrical and systems design process.
Electrical & Systems Review Kick-off Meeting Gibbs & Hill, N.Y.
R. Hess, T. R. Martin, P. Rainey Cygna J.C. Waal, N. Williams Cygna J. Irons, D. Ghosh, T. Hawkins, P. Lalaji G&H S.M. Marano, R.E. Ballard, B. Czarnogorski G&H Required item Comments Action By A meeting was held to sumarize the Phase 4 scope and allow the Cygca reviewers the opportunity to gather some understanding of the electrical and systems design process.
The scope of each phase was summarized as follows:
The scope of each phase was summarized as follows:
: 1.       Phase 1:           (Spent Fuel Pool Cooling System) e             As-built walkdown e              Assessment of Texas Utilities and G&H Design Control Program for compliance with ANSI N45.2.11.
1.
* Implementation evaluation of the design change control and interface control elements of the design control program.
Phase 1:
: 2.         Phase 2:           (Residual Heat Removal System) e              Multi-discipline techn1 cal review including: pipe stress analysis, pipe support design electrical power and control, and seismic equipment qualification.
(Spent Fuel Pool Cooling System) e As-built walkdown Assessment of Texas Utilities and G&H Design Control e
* Implementation evaluation of the design analysis control element of the design control program.
Program for compliance with ANSI N45.2.11.
: 3.         Phase 3:           (Main Steam & Component Cooling Water System)
Implementation evaluation of the design change control and interface control elements of the design control program.
I e              Piping and pipe support review e             Criteria I and XVI (10CFR Part 50, Appendix B) evaluation as they pertain to design.
2.
l l
Phase 2:
signed;    gfff AQ                                                                                                           Page             of N. Willieins, D. Wede, G. G.ecc, R. lless, J. Miiiicl.ielle, T. MaiLin, P. Raincy ,
(Residual Heat Removal System)
            ''*"*""
Multi-discipline techn1 cal review including:
pipe stress e
analysis, pipe support design electrical power and control, and seismic equipment qualification.
Implementation evaluation of the design analysis control element of the design control program.
3.
Phase 3:
(Main Steam & Component Cooling Water System)
Piping and pipe support review I
e Criteria I and XVI (10CFR Part 50, Appendix B) evaluation e
as they pertain to design.
l gfff AQ Page of signed; N. Willieins, D. Wede, G. G.ecc, R. lless, J. Miiiicl.ielle, T. MaiLin, P. Raincy,
''*"*""
* S. Bibo, D. Smedley, J. Waal, S. Treby, J. Ellis, S. Burwell, Project File 1020 01a
* S. Bibo, D. Smedley, J. Waal, S. Treby, J. Ellis, S. Burwell, Project File 1020 01a
    .___        _          ~_ _ . - .            _ . _ . _ _ _ . _ _ _ . - . , . . .    . . , . . . _ _ , _ _ . ..        ,    ,
~


r ll'                                                                                                                               Communications k,
r ll' Communications Repod 4L t i k,
4L              t i                                                                                                      Repod lilitilllilillililllitilllllli Item                                                                   Comments                                                                               Ac$n     y
lilitilllilillililllitilllllli Item Comments Ac$n y
: 4.               Phase 4:                 (Component Cooling Water System) e                    Multi-discipline technical review similar to that performed on the RHR system only much more extensive.
4.
* Implementation evaluation of design verification and design input control elements of the design control program.
Phase 4:
(Component Cooling Water System)
Multi-discipline technical review similar to that e
performed on the RHR system only much more extensive.
Implementation evaluation of design verification and design input control elements of the design control program.
~
~
The Rules of Protocol were sumarized as follows:
The Rules of Protocol were sumarized as follows:
* Cygna reviewers write telecons on all discussions and requests for information with G8H.
Cygna reviewers write telecons on all discussions and requests for information with G8H.
* Any matters of policy, issues which are serious enough to become Potential Findings, or items which will result in major re-work at Comanche Peak shall be public noticed meetings.
Any matters of policy, issues which are serious enough to become Potential Findings, or items which will result in major re-work at Comanche Peak shall be public noticed meetings.
The meeting was ajorned to allow the Cygna reviewers the opportunity to discuss specific subjects on the review scope with he appropriate G&H discipline engineers.
The meeting was ajorned to allow the Cygna reviewers the opportunity to discuss specific subjects on the review scope with he appropriate G&H discipline engineers.
l i
l i
Page                   of g
Page of g
    ~ tuoin .
~ tuoin.
                                                        - , . _ . . _ , . . - . _ . __.  . . _ . _ _ _ . _ . _ - . - - - - _ _ _ . _ . . - ._- - . _ _ - - - . _ - . . .      _ . . - . . _}}
._}}

Latest revision as of 08:09, 13 December 2024

Forwards Communication Rept 9 Re Telcons Concerning Phase 4 Independent Assessment Program
ML20096B413
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/29/1984
From: Williams N
CYGNA ENERGY SERVICES
To: Ellis J
Citizens Association for Sound Energy
References
84056.029, NUDOCS 8409040136
Download: ML20096B413 (29)


Text

..

%d, 101 Cahfornia Street. Suite 1000, San Francisco, CA 941115894 415 397 5600 August 29, 1984 84056.029 Mrs. Juanita Ellis President, CASE 1426 S. Polk Dallas, Texas 75224

Subject:

Comunications Report Transmittal #9 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Texas Utilities Generating Company Job. No. 84056

Dear Mrs. Ellis:

Enclosed please find telecons associated with the Phase 4 Independent Assessment Program.

If you have any questions or desire to discuss any of these documents, please do not hesitate to call either me or Donna Oldag.

Very truly yours, e

N. H. Williams Project Manager Attachments cc: Mr. D. Wade (TUGCO) w/ attachments Mr. S. Treby (USNRC) w/ attachments Ms J. Van Amerongen (TUGC0/EBASCO) w/ attachments Mr. D. Pigott (Orrick, Herrington & Sutcliffe) w/o Mr. S. Burrell (USNRC) w/ attachments 8409040136 840029 PDR ADOCK 05000445

\\

g),

San Francisco Boston Chicago Richland

[

Communications Report 4(

& i 111111111111111111111111111111 company: Texas Uti1ities

  1. Telecon a conference Report Project.

Job N -

84056 Comanche Penk Steam Electric Station l

Independent. Assessment Program - Phase 4 oste:

7/12/84 Walkdown Access Place:

SFR0

Participants:

George Grace TUSI R. Hess Cygna Required item Comments Action By 1)

Called George to request that Cygna personnel are authorized access to the following areas for the walkdown.

Walkdown Area Access a)

Elevation 873'6" Mechanical Equipment Room 345 Aux. Bldg.

Column 9 to 1 and K to G b)

Elevation 830' Control Room Aux Bldg.

c)

Elevation 810'6" Rooms 204 and 205, 197 and 196 Aux. Bldg.

Column 4 to 6 and J to F d)

Elevation 807' Cable Room Aux. Bldg.

e)

Elevation 832'6" RCP 01 and 03 Containment f)

Elevation 790' Room 168 and 169 Safeguards Column 7 to 3 and A to E g)

Elevation 810'6" Room 83 - Column 5 to 1 and F to K Safeguards Column 4 to 2 and H to A h)

Elevation 854'4" Room 150 and 151 Aux. Bldg.

Column E to C and 2.9 to 7.1 signe of i

/ljr Page g g

Distnbution:

N'. Williams, D. Wade, G. Grace, R. Hess, J. Minichiello, E. Van Stigjeren, 3.. c ui,

.2, 3. Lu.

v.

r uscu Fi;c

Fi..

~

1 Communications Report 4L t i milimilmimitilllilliti item Comments Ac y

1)

Elevation 781' Near Electrical Equipment Room Aux. Bldg.

Column C to A and 2 to A j)

Elevation 852'6" Column 9 to 1 Aux. Bldg.

and K to E k)

Elevation 886'6" Column 9 to 1 Aux. Bldg.

and K to G 1)

Elevation 831'6" Column 3 to 1 Aux. Bldg.

and K to A m)

Elevation 790'6" Colm 5 to 1 Aux. Bldg.

and F to A n)

Main Steam piping from steam generators to outside containment isolation valve.

2)

Also requested George to provide us access to the following panels for wire termination review:

a) 6.9KV switch gear IEA1 Breaker 1APCC1 b)

CCW motor housing CP1-CCAPC-01 c)

Solid state isolation cabinet 1-CR-16 d)

Safe shutdown transfer panel e)

JB1A8400 f)

MOV 1-HV-4512 g)

Termination rack 1-TC-07 h)

S0V 1-FV-4536 i)

Motor control center 1EB3-1 j)

MOV 1-HV-4574 k)

Hot shutdown panel 1)

S0V 1-LV-4500 m)

M0V 1-HV-4572 Page of 8020ota

F.

Communications 4L Report t i IMINilll1N191NNilN1111 company: Texas Utilities 1 Teiecon a conference Report J

No.

84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Dat" 8/14/84 Tim

  • 11:00 a.m.

Cable Tray Support Data Request Place:

CES-SFR0

Participants:

of TUGC0 (EBASCO)

N. Williams Cygna

[c7o"EYy iteen comments Cygna has some additional data requests for documents which are referenced in other calculations currently being reviewed:

1.

Please provide copies of the following cable tray calculations:

SCS-101C, Set 1, Sheet 114 SCS-101C, Set 3, Sheet 16 SCS-104C, Set 1, Sh'eet 45 SCS-104C,' Set 5, Sheet 1, 27 2.

Please provide copies of the " Change Verification Checklist" and any supporting des'ign review calculations for all revisions of the following " Component Modification Cards:"

CMC 6108 CMC 6155 CMC 6183 CMC 30878 f

/dmm

"'8' 1

1 signe o'stnbution D. Wade, G. Grace, J. Russ, R. Hess, N. Williams, S. Treby, S. Burwell, J. Ellis,

..,,v i n......, T. jsm 7

',m

r Communications Report A(

t i 181111111111 Texas Utilities T* coa 9l conference Report Project:

Job No.

84056 Comanche Peak Steak Electric Station D*:

Independent Assessment Program - Phase 4 7/16/84 subject:

1 a.m.

Walkdown Place:

l

Participants:

of TW J. Foley (x226)

CES Required item Comments Auion By g

Please provide a copy of the latest issue and open change paper on the following specifications:

CCW Pump MS-11 CCW Heat Exchange MS-49 CCW Surge Tank MS-65 Containment Spray Heat Exchanger MS-50 Control Room Air Conditioning System Chillers MS-87 Nuclear Chilled Water System Chiller MS c A Nuclear Chilled Water System Chiller MS-80B Orifice Specification 2323-MS-624 Nuclear Valves Over 2-1/2" MS-20B.1 Nuclear Valves Over 2-1/2" MS-20B.2 i

Signed Page of oisineution.

N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby,

,e,,,,,

v. a iis, a. ouinesi, rru;e u rise j

Communications Report AL t i BluulfilluullifillllHINI invme tit 414tiac h

Project-Jcb No.

Comanche Peak Steam Electric Station o,,,

Independent Assessment Program - Phase 4 g /9n nu Stoject:

Time:

Conduit support - CMCs and DCAs p,,,,

PPRF9

Participants:

of Diano R1pokpr DEC noemnnrf Stevant (X??6)

Cygna Required item Comments Action By a

1)

Please supply Cygna with a copy of the following 6/21/84 CMCs and DCAs:

CMCs DCAs 68438 18074 68272 (R.4) 69387 (R.1) 68283 (R.2) 62912 (R.1) l 1

ADA Ime 1

1 Distnbution-N. Williams, D. Wade. G. Grace, R. Hess, J. Russ, D. Stevens. S. Treby, J. Ellis, S. Bmrwell, Proiect File

~.. -.

E I

.t Communications 41 n i Report NWillllfullNil1N1111till Company Texas Uti1ities 0 Telecon O( Conference Report 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Dat*:

7/16/84 T'

  • 9:00 a.m.

Walkdown Drawings Place.

CPSES

Participants:

DAL TUSI Jim Foley (x226)

CES Required item Comments Action By 1.

Please provide 2 copies of the latest issue of the following BRP drawings:

BRP-CC-1-AB-046 BRP-CC-1-AB-030 BRP-CC-1-AB-003 BRP-CC-1-AB-007 BRP-CC-1-AB-005 BRP-CC-1-AB-009 BRP-CC-1-AB-013 BRP-CC-1-AB-049 BRP-CC-1-AB-060 BRP-CC-1-EC-018 BRP-CC-1-EC-019 BRP-CC-1-EC-002 BRP-CC-1-AB-008 BRP-CC-1-AB-041 BRP-CC-1-SB-009 BRP-CC-1-SB-008 i

BRP-CC-1-RB-049 l

BRP-CC-1-RB-033 BRP-CC-1-RB-001 BRP-CC-1-RB-036 BRP-CC-1-RB-037 l

l hj)fal

/ms

"'8' 1

2 oistnbution-N. Williams, D. Wade, G. Grace, R. Hess, E. van Stijgeren, T. Martin, S. Treby, Ziisa, S. Lui -cii, i uscu i.ic v.

~

Communications Report L

t i 111111481111111111111111111111 Item Comments Ac on y Please provide two copies of the latest issue of the CCW flow diagram:

2323-M1-0231 Sheet 1 2323-M1-0230 Sheet 1 3.

Please provide two copies of the latest issue of the following AI drawings:

2323-Al-0508 2323-Al-0507 2323-Al-0509 2323-Al-0503 2323-Al-0502 2323-AI-0510 2323-AI-0511 2323-Al-0500 2323-AI-0501 i

Page of

Communications 4L Report 6 i 1111111111111111lll1llllllllll Company:

I O

U RW J

No.

84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 6/28/84 Date.

subiect:

Time 3:30 pm Conduit Supports - CMCs and DCAs Place:

CPSES

Participants:

DCC Diane Bleeker Desmond Stevens (x 226)

Cygna item Comments Ac o By Please supply Cygna with a historical listing of all CMCs A.M.

and DCAs (active and closed out) against the following 6/29/84 drawings:

Notes 2323-S-0910-CA-la 2323-5-0910-CA-2a 2323-S-0910-CA-Sa 2323-S-0910-CA-11a Formerly CA-11 2323-S-0910-CA-15 2323-S-0910-CSM-6b 2323-S-0910-CSM-15a 2323-S-0910-CSM-18c 2323-S-0910-CSM-18d 2323-S-0910-CSM-42 2323-S-0910-CSD-la Formerly CS0-1 2323-5-0910-CST-3 2323-S-0910-CST-17 2323-S-0910-CSM-18f 2323-S-0910-CSD-16 l

i saneo j,s p,,,

3 l

,A Distnbution-N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, U. B leeker, d.

IreDy, d. Eiiis,

3. Du, m;;, 'u-Ti';

j

Communications Report 4L ii mmmmmmmmmm Company: Texas Uti1ities o Telecon

& conference Report Job No.

84056

"' I*

Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 Date:

6/12/84 subject:

I' **

Request for Documents Place:

New York

Participants:

Al Moersfelder of Cygna Borys Czarnogorski G&H nequirea item comments Action By Please provide copies of the following documents which are needed to continue the subject Independent Assessment program:

l 1.

Gibbs & Hill letter GTN-68249 dated December 30, 1983 6/13/84 l

with an enclosed copy of the Criteria for Setpoint l

Methodology Balance of Plant (B0P) 2.

Gibbs & Hill calculation IC-007, revision 1, dated 6/13/84 December 28, 1982 entitled Setpoint Methodology l

Calculation.

3.

Gibbs & Hill calculation IC-008, revision 1, dated 6/13/84 January 12, 1983 entitled Setpoint Methodology Calculation.

4.

Gibbs & Hill interdisciplinary review paper work for 6/13/84 the following specifications:

MS-600, MS-611B, MS-615, MS-618, MS-621, MS-622, and MS-624 gggfjpg

/ss page 1 of 1

signed N. Willianis, u. nade, G. Gr ai.c, 5. Hversielder, R. He>>, I. HarL i ri, 5. Tr eivy,

Distribution

.1 - F114e R _ Ru rval l - Deninet Filo

Communic 3tions Report L4 L t ian compenr Texas Utilities o Telecon m conference Report N-84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 6/27/84 Date Subject Time:

3:30 p.m.

CMC & DCA Listing Place:

CPSES

Participants:

of B&R-DCC John Russ CES 4

Required item Comments Action By 1

Reference:

Conference report, dated June 27, 1983, " CMC and DCA l

Listing," D. Bleeker and J. Russ participating.

l Ms. Bleeker provided Cygna with the lists requested in the referenced conference report.

i t

l l

l of Signed Page g g

Distneution-N. Williams, D. W'de, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, E vgwww ww

._,__,_.,.____-,_m._,..,

r-1 Communic ^itlOnS Wt Repod i

IMMMMMMMI company.

Texas Utilities a Telecon di Conference Report N-84056 Comanche Peak Steam Electric Station D * :

Independent Assessment Program - Phase 4 7/3/84 subsect 7""'-

Conduit Supports 3:00 p.m.

Document Request CPSES Diane Bleeker DCC Desmond Stevens (x226)

Cygna Required item Comments Action By 1.

Please supply Cygna with all revisions of following CMC's:

P.M. 7/3/84 62932 68272 68276 2.

Please supply one copy of following drawings at revisions shown:

2323-S-0910 SH. LS-2 R.5, and current 2323-S-0910 SH. LS-10 R.2, and current l

2323-S-0910 SH. LS-12a R.6, and current i

signed

[j

/ms 1

1

"'8' ointneution.

N. WilTiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, i,ycu Ric

.- -~ -. -

Communications AL ci Report meu compny:

Texas Utilities D Telecon et conference Repon 84056 Comanche Peak Steam Electric Station D*:

Independent Assessment Program - Phase 4 6/26/84 subject:

1:10 p.m.

CCW Systems Place.

pgg

"'"'*'P'"

MmMMe DCC Desmond Stevens (x226)

CYGNA Required item Comments Action By Please furnish Cygna with a copy of letter #TSG-608 dated P.M.

3/9/82, subject, Radiation Monitor Interlock Circuit.

6/26/84 signed

//

/ms 1

1 D'str'eution:

N. Williams, D. W'ade! G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. im.-wii, Fi us m Tiic

Communications 4(

Report 6 i 111111111111111111111111101111 company:

Texas Utilities o Telecon p conference Report Project:

Job No.

Comanche Peak Steam Electric Station 84056 Independent Assessment Program - Phase 4 D *

6/28/84

Subject:

Time.

Document Request 10:00 a.m.

Place:

pg

Participants:

Tm Mn MQ John Russ CES Bill Horstman CES Aequired item Comments Action By Cygna requested and received a copy of site civil's cross-reference of cable tray support numbers versus CMC's for drawing FSE-00185 i

s d

1 Yh ffff

/ms

" 1 1

/

N. Williarns', D.' Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, Distribution Ti us cu Tiic

. _ _ _ _. _. ~. _....,. _. _.. _ _..

Communications d(

Report t i Tovat titili ties g Conference Rom elec n Project:

Job No.

84056 Comanche Peak Steam Electric Station g,,,;

Independent Assessment Program - Phase 4 6/20/84

Subject:

Time:

Document Request pi,c,;

PPRFR

Participants:

of Sara Donald DCC R. Hess CFM Required item Comments Action By j

1)

Cygna requested the latest revision and open change paper against the following specifications:

l MS-0062 - Flow Elements Y))))))n's Ims 1

1 U'"*""

N. Williams, D. Wade, G. Grace R. Hess T. Martin, S. Treby, J. Ellis, son o,e Swm

n Communications Report ti (

t i

. ll k

Towne If t 114 t i oc Protect Job No.

840 %

Comanche Peak Steam Electric Station g,,,

Independent Assessment Program - Phase 4 6/14/Ra Subject Time:

4:30 o.m.

Document Request - Conduits p,,,,

GAH-N_Y_

Participants:

of Dator Haann GAH

.Inhn Rnce Cvona Required item Comments Action By a

Cygna requested that Gibbs & Hill provide documentation regarding the following Unit 1 items:

1)

Allowables for normal loadings and load interaction for Unistrut G&H clamp #P2558.

2)

Capacities for bolts used to attach P2558 clamps to materials GaH other than those specified in Unistrut test reports.

3)

Calculations for the design of details on the following sheets of drawing 2323-S-0910:

A. CSD-Sa B. CSD-14a C. C50-14b

%q$ry<' dh4 1

1 Distribution.

N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby. J. Ellis, S. Burwell, i m ei.

.w

r Communications 4L n i Repod unemamma

'"*"Y; Texas Utilities o Telecon a conference neport Project Job No.

Comanche Peak Steam Election Station 84056 Independent Assessment Program - Phase 4 D*:

June 27, 1984 subiect T' "

CMC & DCA Listing 3:30 pm Place.

PSES D. Bleeker BAR - DCC J. Russ CES nequired item Comments Action By

Reference:

Conference Report, dated June 27, 1983, " CMC and DCA Listing," D. Bleeker and J. Russ participating.

Ms. Bleeker provided Cygna with the lists requested in the referenced conference report, signeo jjJ

/ss l

l p.g.

or D'*tabution N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, rrugeu r i s e

n i

Communicati::ns Report 4L i i maammmmme compenr Texas Ut111 ties a Telecon N conference neport J N 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 oste:

6/12/84 subject:

T'm' 4:00 pm CCW Pump Motor Size Place' G8H offices

Participants:

of p

j ggg S. Martinovich G8H T. R. Martin Cygna nequireo item Comments Action By Paul and Sam informed me that the CCW pump motor information in specification 2323-ES-ID was provided by the mechanical department on their motor list. This motor sizing information was provided by the Bingham-Willamette Company based on the mechanical requirements given in mechanical specification 2323-MS-11.

Sam provided me with a copy of curve number 33035 which indicates the motor horsepower required is 1000 hp.

Cygna's mechanical department has reviewed the pump sizing calculation, g/jg f35 Page i 1

s.oneo of ointnbution N. Williams, D. Wade, G. Grace, H. Hess, I. Martin, 5.

Ireby, i

ris,_

e... _ -,,

n__,_..

ens.

Communicatisns Report 4L 6 i manmaamma com pnr 1 Texas Utilities o Teiecon a conference Report 84056 Comanche Peak Steam Electric Station Independent Assessment Program - Phase 4 D*t*:

6/27/84 Conduit Support Fire Protection Reevaluation 10:30 a.m.

Place CPSES Participants.

of TUGC0 John Russ CES

}

Required item Comments Action By

Reference:

Conference report dated June 25, 1984, " Document Request," T. Keiss, J. Russ, and D. Stevens participating.

The calculations listed as applicable to sheets marked with IN-f P on sheet C-1 of the referenced conference report do not have calculation binder and set numbers indicated on them. Mr. Keiss stated that these calculations may be in the process of design review. Only after this process will Gibbs & Hill, New York, provide them with calculation numbers.

I asked Mr. Keiss to provide Cygna with a number and date of the TUGC0 design review cover sheet used to transmit calculations to Gibbs

& Hill, New York, for the conduit support calculations referenced above and for any future requests if applicable, 8'oned 4

g 3

g re of n

N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. BurweII, oisinnution e vgs vv rh

Communicatlans 4L Report 6 i compaar Texas Utilities o

T.i. con 5 cont.rence n. port N'

Comanche Peak Steam Electric Station 84056 Independent Assessment Program - Phase 4 Date:

6/27/84 T' **

CMC and DCA Listing 10:10 a.m.

Place.

CPSES Participants Diane Bleeker BAR-DCC John Russ CES Reqvwed item Comments Action By Cygna requested that Ms. Bleeker provide a listing of all CMC's and DCA's against the following drawings:

2323-5-0901 BAR-0C 2323-5-0902 2323-S-0903 2323-5-0904 2323-S-0905 2323-5-0906 2323-5-0907 2323-S-0908 2323-S-0909 2323-S-0911 2323-S-0912 2323-S-0913 2323-5-0914 2323-5-0915 2323-5-0916 2323-S-0917 2323-5-0918 2323-5-0919 2323-S-0920 g g gj; j,,

p.g.

g g

s$nw o,

o,stneution M. Wilitams, v. wace, u. urace, H. Ness, v. Huss, d.

Ireby,.J. Lills, s. Durwell,

,_..en; o_

~ _ _ _.

Jh Communications 4Ln Repod i

INNlilllNililllHNilHHit company:

Texas Utilities' o Teiecon n conference n port Job No.

84056 ComanchePeakSteamElActricStation Independent Assessment. Program - Phase 4 Date:

6/28/84

'~~

Subject Time:

8:15 a.m.

Drawing Request Place:

CPSES

Participants:

of B&R-DCC John Russ CES Required item Comments Action By Cygna requested and received copies of the following drawings:

~

1)

Cable tray support drawing FSE-00159 sheets 2602, 3016, 3019, 6654, 2861 2)

FSE-00179 l

l l

l s$ne

}

/ms Page 1

of 1

Distnbution:

N. Williams, D. Wade, G. Grace, R. Hess, J. Russ, 5.

I reby, d. t. I l l s,. d. D u rw el l,

T. m ;; I ';

1

Communications Report t4 L t i 111111111111111111111111111111 company: Texas Utilities o Te! econ a conference Report JbN-84056 Comane.he Peak Steam Election Station Independent Assessment Program - Phase 4 cate June 22, 1984 suNect:

Tim':

Document Requests - Open Items 4:30 pm Place:

G8H, NY

Participants:

of p

G&H E. Bezkor G&H J. Russ CES Required item Comments Action By

Reference:

Conference Report dated June 14, 1984, 4:30 pm,

" Document Request - Conduits," P. Huang and J. Russ participating Cygna discussed open items from Cygna's structural review at Gibbs & Hill with Messrs Huang and Bezkor. The items listed in the referenced conference report were not available to Cygna as of this date. According to Mr. Huang, the requested documents will be ready to review the week of July 2,1984. The material will be sent to Cygna's San Francisco office.

)

signed i

Page of An i

Distribution:

'N. kiliiams, D. Wade, G. Grace, R. Hess, J. Russ, S. Treby, J. Ellis, S. Burwell, T. us uu T;'ic l

Communications AL Report t i 111111111lll191111111111111111

"* P'"r Texas Utilities 0 Telecon

( Conference Repon N~

84056 Comanche Peak Steam Electric Station D*:

Independent Assessment Program - Phase 4 6/14/84 subiect:

Mechanical Systems Review Valve Specifications G8H, NYC J. Foley Cygna Duk Kim G8H Required item Comments Action By There was a concern that, although environmental conditions (both normal and accident) for various buildings are clearly stated in the specification, there did not appear to be a way for the manufacturer to determine exactly what valves in his scope would be subject to which environments.

Kim explained that although the complete valve list (not just a summary) was not attached to the specification under review, it is part of the specification, and through it the vendor could tell where a particular valve is placed, f

I l

signed: d

/ms 1

1 Distneution:

N. W'illiams, D. Wade, G. Grace, J. P. Foley, S. Treby, J. Ellis, S. Burwell, r. va cu

..c

Communications R3 pod L

i i 11111111Hilllllllillllilill

  • E'"#

IeXas Utilities 0 Telecon M Conference Repon Project:

Job No.

84056 Comanche Peak Steam Electric Station D*

Independent Assessment Program - Phase 4 7/5/84 Subject-Time:

3:30 Drawings for Tom Martin CPSE3 Site Diane Bleeker B&R DCC Norman Munoz B&R DCC Bill Horstman (x 226)

CES Required item Comments Actiori By 1.

Please provide one copy of the current revision of Gibbs & Hill drawing:

2323-El-0173-01, 2.

Please provide copies of all change documentation (CMCs, DCAs) against drawing in Item 1.

Signed:

Page of oistnbution:

N. WiTlIams,' D. Wade, B. Horstman, G. Grace, S. Treby, J. Ellis, S. Burwell, 10M 04

'"d"

'C

_ _. - - -. - _...,.. _. _ _ _ -. -, - -... -,. =, - _ _.., _... _ -.. - -., - -.,... -... - -

Communications Report oL t i 111111111111111111111111111111

  • H"E Texas Utilities a Telecon gt Conference Report Projeca:

Job No.

84056 Comanche Peak Steam Electric Station D't*:

Independent Assessment Program - Phase 4 7/4/84 Change Documentation for Cable Tray Supports CPSES Site

Participants:

of g

B8R DCC Bill Horstman CES Required item Comments Action 53y 1.

Please provide copies of the current revision of all CMC's and DCA's (not just the "Open Design Change Log" items) for drawing 2323-S-0919.

2.

Please provide copies of the current revision of the CMCs and DCAs for the listed drawings:

2323-S-0901 2323-S-0902 2323-S-0903 2323-S-0904 (NOTE:

I received the CMCs listed on the "Open Design Change Log" on 7/2/84, so please provide only those documents which are no longer "Open".)

l l

l l

l Signed.

Page of oistnoution: N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell, e augsww a asu

4 Communications ALa

.J -

. : f. '*7 u Report i

11111111111111111111lll11lll11

~ 'i Company: Texas Utilities o Telecon a conference Report Job No.

84056 Comanche Peak Steam Electric Station D8t':

Independent Assessment Program - Phase 4 7/3/84 subject:

Time:

Cable Tray Support Change Documentation CPSES Site

Participants:

Dim Wh B&R DCC Bill Horstman CES Aequired item Comments Action By 1.

Please provide copies of the current revision of the following l

CMCs:

93450 31199 9901 39450 3199 32053 2187 2.

Please provide copies of the ci;rrent revision of the following DCA's:

6299 32053 5347 17838 17729 17847 17842 3063 11729 3464 l

signed.

(/

Page of Distnbution:

N. Williams, D. Wade, G. Grace, B. Horstman, S. Treby, J. Ellis, S. Burwell,

.awgsuw 4 eac g

d' Communications Report A(

t i 18111111111ll11111111111111111 Company: Texas Utilities o Telecon z Conference Report Project:

Job No.

Comanche Peak Steam Electric Station 0 056 D8t*:

Independent Assessment Program - Phase 4 5/11/84

Subject:

Time:

9:00 a.m.

Electrical & Systems Review Kick-off Meeting Gibbs & Hill, N.Y.

R. Hess, T. R. Martin, P. Rainey Cygna J.C. Waal, N. Williams Cygna J. Irons, D. Ghosh, T. Hawkins, P. Lalaji G&H S.M. Marano, R.E. Ballard, B. Czarnogorski G&H Required item Comments Action By A meeting was held to sumarize the Phase 4 scope and allow the Cygca reviewers the opportunity to gather some understanding of the electrical and systems design process.

The scope of each phase was summarized as follows:

1.

Phase 1:

(Spent Fuel Pool Cooling System) e As-built walkdown Assessment of Texas Utilities and G&H Design Control e

Program for compliance with ANSI N45.2.11.

Implementation evaluation of the design change control and interface control elements of the design control program.

2.

Phase 2:

(Residual Heat Removal System)

Multi-discipline techn1 cal review including:

pipe stress e

analysis, pipe support design electrical power and control, and seismic equipment qualification.

Implementation evaluation of the design analysis control element of the design control program.

3.

Phase 3:

(Main Steam & Component Cooling Water System)

Piping and pipe support review I

e Criteria I and XVI (10CFR Part 50, Appendix B) evaluation e

as they pertain to design.

l gfff AQ Page of signed; N. Willieins, D. Wede, G. G.ecc, R. lless, J. Miiiicl.ielle, T. MaiLin, P. Raincy,

*"*""

  • S. Bibo, D. Smedley, J. Waal, S. Treby, J. Ellis, S. Burwell, Project File 1020 01a

~

r ll' Communications Repod 4L t i k,

lilitilllilillililllitilllllli Item Comments Ac$n y

4.

Phase 4:

(Component Cooling Water System)

Multi-discipline technical review similar to that e

performed on the RHR system only much more extensive.

Implementation evaluation of design verification and design input control elements of the design control program.

~

The Rules of Protocol were sumarized as follows:

Cygna reviewers write telecons on all discussions and requests for information with G8H.

Any matters of policy, issues which are serious enough to become Potential Findings, or items which will result in major re-work at Comanche Peak shall be public noticed meetings.

The meeting was ajorned to allow the Cygna reviewers the opportunity to discuss specific subjects on the review scope with he appropriate G&H discipline engineers.

l i

Page of g

~ tuoin.

._