f, OPERATING DATA REPORT' DOCKET NO. 50-413 DATE$ _01-15-85 COh!PLETED BY     J.A. Reavis TELEPHONE     7na 473-7567 OPERATING STATUS
OPERATING DATA REPORT' DOCKET NO.
50-413 DATE$ _01-15-85 COh!PLETED BY J.A. Reavis TELEPHONE 7na 473-7567 OPERATING STATUS Catawba.1-Notes
* Nameplate Rating
: 1. Unit Name:
: 1. Unit Name:
* Catawba.1-                                      Notes
December 1-December J1,1954 (Gross MWe) calculated as
* Nameplate Rating
' 2. Reporting Period:
                      ' 2. Reporting Period:
December 1- December J1,1954                     (Gross MWe) calculated as 3411                            1450.000 MVA ,c .90 power
: 3. Licensed Thermall'ower (hlWt):
: 3. Licensed Thermall'ower (hlWt):
: 4. Nameplate Rating (Gross 31We):       1305                                   r Per ,Page lii,
3411 1450.000 MVA,c.90 power
: 5. Design Electrhal Rating (Net SIWE):     1145                                                                       ,
: 4. Nameplate Rating (Gross 31We):
: 6. Maximum Dependable Capacity (Gross SIWE):                                                                         it
1305 r Per,Page lii,
: 5. Design Electrhal Rating (Net SIWE):
1145
: 6. Maximum Dependable Capacity (Gross SIWE):
it IID
: 7. Maximum Dependable Capacity (Net SIWE):
: 7. Maximum Dependable Capacity (Net SIWE):
IID h
h
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None                                                                                                 ,
None
: 9. Power Level To Which Restricted. lf Any (Net 31We):
: 9. Power Level To Which Restricted. lf Any (Net 31We):
10.' Reasons For Restrictions.lf Any:
10.' Reasons For Restrictions.lf Any:
This 31onth           Yr. to-Date         Cumulative I1. Hours In Reporting Period
This 31onth Yr. to-Date Cumulative I1. Hours In Reporting Period
: 12. Number Of Hours Reactor Was Critical                                                                 -
: 12. Number Of Hours Reactor Was Critical
: 13. Reactor Reserve Shutdown Hours
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On Line
: 14. Hours Generator On Line
: 15. Unit Reserve Shutdown Hours
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (SIWH)
: 16. Gross Thermal Energy Generated (SIWH)
                    ,17. Gross Electrical Energy Generated (31WH)             Not in Commercial Operation IS.~ Net Electrical Energy Generated (SIWH)
,17. Gross Electrical Energy Generated (31WH)
                                                            ~
Not in Commercial Operation IS.~ Net Electrical Energy Generated (SIWH)
: 19. Unit Service Factor
: 19. Unit Service Factor
~
: 20. Unit Availability Factor
: 20. Unit Availability Factor
: 21. Unit Capacity Factor (Using SIDC Net)
: 21. Unit Capacity Factor (Using SIDC Net)
: 22. Unit Capacity Factor (Using DER Net)
: 22. Unit Capacity Factor (Using DER Net)
: 23. Unit Forced Outage Rate -
: 23. Unit Forced Outage Rate -
                    ' 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eachl:
' 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eachl:
                      .25. If Shut Down At End Of Report Period. Estimated Date of Startup:
.25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status tPrior to Commercial Operation):                     Forecast ~         :Achiesed INITIA L CR,ITICA LITY                                 01-07                                               INITIAL ELECTRICITY                                   _01-19-85' COAIN!ERCIAL OPERATION                                   03/85 4
: 26. Units in Test Status tPrior to Commercial Operation):
Forecast ~
:Achiesed INITIA L CR,ITICA LITY 01-07 INITIAL ELECTRICITY
_01-19-85' COAIN!ERCIAL OPERATION 03/85 4
8501220051 841231 19/77)
8501220051 841231 19/77)
PDR ADOCK 05000                     ,
PDR ADOCK 05000
                                  "                                  ~
~
                                                                                                                            ; gcn \ ,g   . -
; gcn \\,g


                . ,            .  - .-              - .-    .. -.    . -.    .  . . . - . - . -        _ - . - ~ . . .. . .
. - ~......
(
(
          .g
.g
          .s .
.s
                    .s CATAWBA NUCLEAR STATION 1
.s.
:                                        Pressurizer Power Operated Relief Valve (PORV)
CATAWBA NUCLEAR STATION 1
                                                  .and Safety Valve Challenges
~
                  ~
Pressurizer Power Operated Relief Valve (PORV)
E.
.and Safety Valve Challenges E.
i, l
i, l
1.r g
1.r i
i
g f.
: f.                     UNIT                 DATE                     VALVE i (*)               # OF CHALLENGES 1-               12-26-84                   INC323 (*)                         1 t
UNIT DATE VALVE i (*)
# OF CHALLENGES 1-12-26-84 INC323 (*)
1 t
i i
i i
I-i t
I-i t
i I
i I
1 j-                               a i~
1 j-a i~
f I
f I
t.
t.
[
[
                      *S - SAFETY VALVE.                                                                                           -
*S - SAFETY VALVE.
i-P - PORV I
i-P - PORV I
I r
I r
,                                                                                                                                  i
i
: f l
: f l
L
L


4 CATAWBA NUCLEAR STATION Monthly Operating Status Report
4 CATAWBA NUCLEAR STATION Monthly Operating Status Report 1.
: 1. Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
: 2. The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
2.
The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
r L
r L


n
n
'c-1 g
'c-1 g
    .a DUKE POWER GOMPAhT P.O. BOX 33189 CHARLOTrE. N.C. 28242 HAL H. TUCKER                                                                     reuPHONE January 15, 1985                           (*) **
.a DUKE POWER GOMPAhT P.O. BOX 33189 CHARLOTrE. N.C. 28242 HAL H. TUCKER reuPHONE January 15, 1985
(*) **
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission
            -Washington, D. C. 20555 Attention: Document Control Desk Re: Catawba Nuclear Station Docket No. 50-413
-Washington, D. C.
20555 Attention: Document Control Desk Re: Catawba Nuclear Station Docket No. 50-413


==Dear Sir:==
==Dear Sir:==
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of December 1984.
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of December 1984.
Very truly yours, 46 $ J Hal B. Tucker JAR:scs Attachments cc:   Mr. J. P. O'Reilly, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission             c/o Dottie Sherman, ANI Library Region II                                       The Exchange, Suite 245 101 Marietta Street, Suite 2900                 270 Farmington Avenue Atlanta. Georgia 30323                           Farmington, Connecticut 06032 Mr. Phil Ross                                   Robert Guild, Esq.
Very truly yours, 46 $ J Hal B. Tucker JAR:scs Attachments cc:
U. S. Nuclear Regulatory Commission             Attorney-At-Law
Mr. J. P. O'Reilly, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farmington Avenue Atlanta. Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.
                    ;MBB-5715                                       P. O. Box 2097 Washington, D. C. 20555                       Charleston, South Carolina 29412 INPO Records Center                             Palmetto Alliance Suite 1500                                       2135 Devine Street
U. S. Nuclear Regulatory Commission Attorney-At-Law
                    '1100 circle 75 Parkway                           Columbia, South Carolina 29205 Atlanta, Georgia 30339 NRC Resident Inspector                         Ms. Judy Dovers Catawba Nuclear Station                       ' Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092           ,
;MBB-5715 P. O. Box 2097 Washington, D. C.
f/
20555 Charleston, South Carolina 29412 INPO Records Center Palmetto Alliance Suite 1500 2135 Devine Street
r\}}
'1100 circle 75 Parkway Columbia, South Carolina 29205 Atlanta, Georgia 30339 NRC Resident Inspector Ms. Judy Dovers Catawba Nuclear Station
' Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 f/
r\\}}

Latest revision as of 01:23, 13 December 2024

Monthly Operating Rept for Dec 1984
ML20113B633
Person / Time
Site: Catawba 
Issue date: 12/31/1984
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8501220051
Download: ML20113B633 (4)


Text

._,.

a

-.f f,

OPERATING DATA REPORT' DOCKET NO.

50-413 DATE$ _01-15-85 COh!PLETED BY J.A. Reavis TELEPHONE 7na 473-7567 OPERATING STATUS Catawba.1-Notes

  • Nameplate Rating
1. Unit Name:

December 1-December J1,1954 (Gross MWe) calculated as

' 2. Reporting Period:

3. Licensed Thermall'ower (hlWt):

3411 1450.000 MVA,c.90 power

4. Nameplate Rating (Gross 31We):

1305 r Per,Page lii,

5. Design Electrhal Rating (Net SIWE):

1145

6. Maximum Dependable Capacity (Gross SIWE):

it IID

7. Maximum Dependable Capacity (Net SIWE):

h

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

None

9. Power Level To Which Restricted. lf Any (Net 31We):

10.' Reasons For Restrictions.lf Any:

This 31onth Yr. to-Date Cumulative I1. Hours In Reporting Period

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (SIWH)

,17. Gross Electrical Energy Generated (31WH)

Not in Commercial Operation IS.~ Net Electrical Energy Generated (SIWH)

19. Unit Service Factor

~

20. Unit Availability Factor
21. Unit Capacity Factor (Using SIDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate -

' 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eachl:

.25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Test Status tPrior to Commercial Operation):

Forecast ~

Achiesed INITIA L CR,ITICA LITY 01-07 INITIAL ELECTRICITY

_01-19-85' COAIN!ERCIAL OPERATION 03/85 4

8501220051 841231 19/77)

PDR ADOCK 05000

~

gcn \\,g

. - ~......

(

.g

.s

.s.

CATAWBA NUCLEAR STATION 1

~

Pressurizer Power Operated Relief Valve (PORV)

.and Safety Valve Challenges E.

i, l

1.r i

g f.

UNIT DATE VALVE i (*)

  1. OF CHALLENGES 1-12-26-84 INC323 (*)

1 t

i i

I-i t

i I

1 j-a i~

f I

t.

[

  • S - SAFETY VALVE.

i-P - PORV I

I r

i

f l

L

4 CATAWBA NUCLEAR STATION Monthly Operating Status Report 1.

Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

r L

n

'c-1 g

.a DUKE POWER GOMPAhT P.O. BOX 33189 CHARLOTrE. N.C. 28242 HAL H. TUCKER reuPHONE January 15, 1985

(*) **

Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

-Washington, D. C.

20555 Attention: Document Control Desk Re: Catawba Nuclear Station Docket No. 50-413

Dear Sir:

Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of December 1984.

Very truly yours, 46 $ J Hal B. Tucker JAR:scs Attachments cc:

Mr. J. P. O'Reilly, Regional Administrator American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245 101 Marietta Street, Suite 2900 270 Farmington Avenue Atlanta. Georgia 30323 Farmington, Connecticut 06032 Mr. Phil Ross Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law

MBB-5715 P. O. Box 2097 Washington, D. C.

20555 Charleston, South Carolina 29412 INPO Records Center Palmetto Alliance Suite 1500 2135 Devine Street

'1100 circle 75 Parkway Columbia, South Carolina 29205 Atlanta, Georgia 30339 NRC Resident Inspector Ms. Judy Dovers Catawba Nuclear Station

' Nuclear Assurance Corporation 5720 Peachtree Parkway Norcross, Georgia 30092 f/

r\\