ML20095H036: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:n | {{#Wiki_filter:n j | ||
iECBVED Mic Arizona Public Service Company M /G 20 FH 1: 4 7 August 16,1984 REGl0N yt,,r ANPP-30259-TDS/TRB | |||
ANPP-30259-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | ~ | ||
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | |||
==Subject:== | ==Subject:== | ||
| Line 28: | Line 29: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days. | The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days. | ||
Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by September 7,1984, at which time a complete report will be submitted. | Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by September 7,1984, at which time a complete report will be submitted. | ||
Very truly our9 CR.LL | Very truly our9 CR.LL hl 4 | ||
E. E. Van Brunt, Jr. | E. E. Van Brunt, Jr. | ||
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:nj Attachment cc: See Page Two | APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:nj Attachment cc: See Page Two 8408280297 840816 DR ADOCM 05000528 g | ||
8408280297 840816 | PDR g | ||
.IE-47 | |||
g | ) | ||
r q | r q | ||
l Mr. T. W. Bishop DER 84-46 Page Two-cc: | l Mr. T. W. Bishop DER 84-46 Page Two-cc: | ||
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr. | |||
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza-D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods | D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza-D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods | ||
.T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | |||
{ | { | ||
l | l | ||
'a | |||
:4# | :4# | ||
INTERIM REPORT - DER 84-46 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC .9ERVICE COMPANY (APS) | INTERIM REPORT - DER 84-46 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC.9ERVICE COMPANY (APS) | ||
PVNGS UNITS 1, 2, 3 | PVNGS UNITS 1, 2, 3 | ||
'I. | |||
II. | Potential Problem Following completion of the final stress calculation for the Chemical and Volume Control' system (CH), it was determined that no design calculation had been performed for the sleeve-to pipe cap plate connection for two 20-inch diameter' pipes penetrating the Refueling Water Tank. Calculations were performed and revealed that the connection would be overstressed during a seismic event due to loads resulting from seismic anchor movement. | ||
III. | II. | ||
Approach To and Status'Of Proposed Resolution Bechtel Engineering is currently studying this problem to determine reportability and technical justification for corrective action. | |||
III. | |||
Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 7, 1984. | |||
1 i | 1 i | ||
I l | I l | ||
l | l | ||
-,. -,...}} | |||
Latest revision as of 08:27, 13 December 2024
| ML20095H036 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/16/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30259-TDS, DER-84-46, NUDOCS 8408280297 | |
| Download: ML20095H036 (3) | |
Text
n j
iECBVED Mic Arizona Public Service Company M /G 20 FH 1: 4 7 August 16,1984 REGl0N yt,,r ANPP-30259-TDS/TRB
~
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Interim Report - DER 84-46 A 50.55(e) Potentially Reportable Deficiency Relating to Refueling Water Tank Penetration Sleeves.
File: 84-019-026; D.4.33.2
Reference:
Telephone Conversation between D. Hollenbach and T. Bradish on July 17, 1984
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by September 7,1984, at which time a complete report will be submitted.
Very truly our9 CR.LL hl 4
E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:nj Attachment cc: See Page Two 8408280297 840816 DR ADOCM 05000528 g
PDR g
.IE-47
)
r q
l Mr. T. W. Bishop DER 84-46 Page Two-cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza-D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods
.T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
{
l
'a
- 4#
INTERIM REPORT - DER 84-46 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC.9ERVICE COMPANY (APS)
PVNGS UNITS 1, 2, 3
'I.
Potential Problem Following completion of the final stress calculation for the Chemical and Volume Control' system (CH), it was determined that no design calculation had been performed for the sleeve-to pipe cap plate connection for two 20-inch diameter' pipes penetrating the Refueling Water Tank. Calculations were performed and revealed that the connection would be overstressed during a seismic event due to loads resulting from seismic anchor movement.
II.
Approach To and Status'Of Proposed Resolution Bechtel Engineering is currently studying this problem to determine reportability and technical justification for corrective action.
III.
Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by September 7, 1984.
1 i
I l
l
-,. -,...