ML20095H068: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 20: | Line 20: | ||
a.. | a.. | ||
MCEIVED tulo Arizona Public Service Company i | MCEIVED tulo Arizona Public Service Company i | ||
P O. BOX 21666 . | AUS I7 PH 12: S8 PHOENIX. ARIZONA 85036 P O. BOX 21666. | ||
BEGIONvaf August 13, 1984 ANPP-30189-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks ' Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs | |||
==Subject:== | ==Subject:== | ||
| Line 31: | Line 32: | ||
==Dear Sir:== | ==Dear Sir:== | ||
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984. | The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984. | ||
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted. | Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted. | ||
There is no new information or change to the Interim Report at this time. | There is no new information or change to the Interim Report at this time. | ||
Very truly yours, 21U | Very truly yours, 21U | ||
% h | |||
>C E. E. Van Brunt, Jr. | |||
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O | APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O | ||
.TE-27 tle | |||
;-, ? ' | |||
. rI ~ | . rI ~ | ||
Mr. T. W. Bishop DER 83-51 Page.Two cc: | Mr. T. W. Bishop DER 83-51 Page.Two cc: | ||
Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u | |||
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom | Washington, D. C. 20555 | ||
Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | .T. G. Woods, Jr. | ||
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 | |||
.}} | |||
Latest revision as of 08:27, 13 December 2024
| ML20095H068 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/13/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-30189-TDS, DER-83-51, NUDOCS 8408280325 | |
| Download: ML20095H068 (2) | |
Text
_ _ _ - - _ _ _ _ _ _ - _ _ - _ -
a'~
a..
MCEIVED tulo Arizona Public Service Company i
AUS I7 PH 12: S8 PHOENIX. ARIZONA 85036 P O. BOX 21666.
BEGIONvaf August 13, 1984 ANPP-30189-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks ' Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-51 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Auxiliary Feedwater Pump Failed T.: Meet Requirements Of Hot Functional Test.
File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbt.c and R. Tucker on August 2, 1984 (B) ANPP-27602, dated August 27, 1984'(Interim Report)
(C) ANPP-29830, dated June 26, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, 21U
% h
>C E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O
.TE-27 tle
- -, ? '
. rI ~
Mr. T. W. Bishop DER 83-51 Page.Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u
Washington, D. C. 20555
.T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
.