ML20095H068: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 20: Line 20:
a..
a..
MCEIVED tulo Arizona Public Service Company i
MCEIVED tulo Arizona Public Service Company i
P O. BOX 21666 . PHOENIX. ARIZONA 85036      AUS I7 PH 12: S8 BEGIONvaf August 13, 1984 ANPP-30189-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks ' Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
AUS I7 PH 12: S8 PHOENIX. ARIZONA 85036 P O. BOX 21666.
BEGIONvaf August 13, 1984 ANPP-30189-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks ' Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs


==Subject:==
==Subject:==
Line 31: Line 32:


==Dear Sir:==
==Dear Sir:==
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984.
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted.
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
There is no new information or change to the Interim Report at this time.
Very truly yours, 21U             % h           >C E. E. Van Brunt, Jr.
Very truly yours, 21U
% h
>C E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O
                                                                                                                            .TE-27 tle
.TE-27 tle


      ;-, ? '
;-, ? '
. rI ~
. rI ~
Mr. T. W. Bishop DER 83-51 Page.Two cc:         Richard DeYoung, Director Office of Inspection and Enforcement U. S. N uclear Regulatory Commission Washington, D. C. 20555
Mr. T. W. Bishop DER 83-51 Page.Two cc:
                        .T. G. Woods, Jr.
Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom                           $
Washington, D. C. 20555
Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
.T. G. Woods, Jr.
                                                              .}}
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
.}}

Latest revision as of 08:27, 13 December 2024

Interim Deficiency Rept DER 83-51 Re Auxiliary Feedwater Pump Failure to Meet Requirements of Hot Functional Test. Initially Reported on 840802.Extension Until 840915 Requested for Submittal of post-demonstration Test Rept
ML20095H068
Person / Time
Site: Palo Verde 
Issue date: 08/13/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30189-TDS, DER-83-51, NUDOCS 8408280325
Download: ML20095H068 (2)


Text

_ _ _ - - _ _ _ _ _ _ - _ _ - _ -

a'~

a..

MCEIVED tulo Arizona Public Service Company i

AUS I7 PH 12: S8 PHOENIX. ARIZONA 85036 P O. BOX 21666.

BEGIONvaf August 13, 1984 ANPP-30189-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks ' Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-51 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Auxiliary Feedwater Pump Failed T.: Meet Requirements Of Hot Functional Test.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbt.c and R. Tucker on August 2, 1984 (B) ANPP-27602, dated August 27, 1984'(Interim Report)

(C) ANPP-29830, dated June 26, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B) and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by August 15, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by September 15, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, 21U

% h

>C E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two O

.TE-27 tle

-, ? '

. rI ~

Mr. T. W. Bishop DER 83-51 Page.Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. N clear Regulatory Commission u

Washington, D. C. 20555

.T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339

.