ML20077C567: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ _ . _ _ _ . _ _ _ _ . _ . _ . . . _ _ _ _ . _ _ _ . _ . | {{#Wiki_filter:_ _ _ _ _. _ _ _. _ _ _ _. _. _... _ _ _ _. _ _ _. _. _ _ | ||
OfE8Ai!NG DATA REF0tti | OfE8Ai!NG DATA REF0tti 00Citi k0 | ||
00Citi k0 | !0-ali LATE Mn 15, 1951 91E~ATINGSTATUS (DyL[![D by Ti,A, Wp))j n g TELEPH M 704,-3734997 | ||
: 1. Ur.it Nase Catawba 1_ | : 1. Ur.it Nase Catawba 1_ | ||
: 2. Fepcrting feriod A;ril 1,1911-April 30,1H1 | : 2. Fepcrting feriod A;ril 1,1911-April 30,1H1 | ||
: 3. Licensed Thersal freer irkt): | : 3. Licensed Thersal freer irkt): | ||
: 4. N ue? late Rating (Gress Mde): | 3411 | ||
: 5. Lesig1 Electrical Rating (Ntt MWelt_ | : 4. N ue? late Rating (Gress Mde): | ||
: 6. Matisun Depencatle Capacity (Gress MWe): | 13M4 Notes theseplate Retir>g | ||
: 7. Marisce Drpencable Capacity thet Mhe): | : 5. Lesig1 Electrical Rating (Ntt MWelt_ | ||
1145 (Brtss MJe) calculated as | |||
: 6. Matisun Depencatle Capacity (Gress MWe): | |||
1192 1450.000 M 4 :.90 p ner | |||
: 7. Marisce Drpencable Capacity thet Mhe): | |||
1129 factor per F ge ilt, B._ If Changes Ocur in Capetity Fatings t!!en Nusber 3 itrtugh 7) finte test NAEG-0020. | |||
Report. Give Reasons | Report. Give Reasons | ||
: 9. Fcuer level 10 Which Restricted, if Any (Net MWe): | : 9. Fcuer level 10 Which Restricted, if Any (Net MWe): | ||
: 10. Reason Fct Restri;tions, if cy: | : 10. Reason Fct Restri;tions, if cy: | ||
This Month | This Month Yr.-tointe Cumulative | ||
!!. Hours le Reporting feriod 719.0 fi?9.0 51160.0 | |||
: 12. No ber Of H:urs Feactor Was Critical | : 12. No ber Of H:urs Feactor Was Critical 0.0 1664.7 37662.4 | ||
: 13. Reactor Reserve Stutdown Hours | : 13. Reactor Reserve Stutdown Hours - | ||
l | --0-- | ||
: 15. Unit Reserve tibutdcan Hours | --0-- | ||
l | l | ||
: 17. Gross Electrical Energy Generated (MWH) | : 14. Hours Benerator On-Line 0.0 1604.9 36769.E i | ||
: 19. Unit Service factor | : 15. Unit Reserve tibutdcan Hours | ||
: 20. Unit enilability Facter | --0-- | ||
: 21. Unit Capacity factor (Using MDC Net)- | --0-- - | ||
: 22. Uritt Capacity Facter (Using DER Net) | l | ||
: 16. Srcss Thersal Energy Bertrated (PWH) 0 5132392' | |||
!!B434036 | |||
: 17. Gross Electrical Energy Generated (MWH) 0 1828982 41573466 L | |||
: 18. Net Electrical Er,ergy 6ererated (MWHI | |||
-4651. | |||
1710136 36976?67 | |||
: 19. Unit Service factor 0.0 55.7 7i.9 | |||
: 20. Unit enilability Facter 0.0 55.7 71.9 | |||
: 21. Unit Capacity factor (Using MDC Net)- | |||
0.0 52.6 67.1 | |||
: 22. Uritt Capacity Facter (Using DER Net) 0.0 51.9 66.5 23, Unit Forced Dutage Rate - | |||
- 0.0 5.3 12A 24.'Stutdown $tteduled Over Nest'6 Months (Type, f ate, and bratton of Each): | |||
-Currently Refuelina | |||
-25. If h t Denn At End Of_Feport Feriod. Estisated Date of Startup _ June 1 ( _1991 26.' Units in fest Status (Friet to Ctasercial Operation): | |||
Forecast. | |||
A:hiped INITIAL CRITICAL!iY lh1TIALELECTRICITY COMERCIAL OPERAi!ON 9103220137 910515 PDR ADOCK 05000413 R | |||
pop L | |||
o. | |||
.m | |||
. _. _ _. _. _...,. _ _. _ = | |||
GFEUTING M1A REPGET IDM1 NO | GFEUTING M1A REPGET IDM1 NO | ||
$4-413 UNil | |||
P]Nih | . O te s t,1 Mitrev15.193 CONFLETEDIV R. A _W11]jun 1ELEFP0kE 706-3?l i9? L l | ||
P]Nih Arrl).1991 | |||
) | |||
l | l | ||
.1 | |||
[AY, | [AY, MEF AGE MILY FCWER LEVEL Eh?! | ||
RERABE DAILY P M R L N L (Me-Net) | |||
2 | (MWe-Net 1 | ||
20 | -1 0 | ||
17 0 | |||
2 0 | |||
16 0 | |||
3 0 | |||
19 0 | |||
6 0 | |||
20 0 | |||
5 0 | |||
21 0 | |||
6 0 | |||
22 0 | |||
7 0 | |||
F3 0 | |||
8-0 P4 0 | |||
9 0 | |||
0 10 0 | |||
26 0 | |||
11 0 | |||
27 0 | |||
12 0 | |||
EB 0 | |||
13 0 | |||
29 0 | |||
14 0 | |||
30 C | |||
l L | |||
i 15 0 | |||
l 16 0 | |||
l i | l i | ||
1 I. | 1 I. | ||
I 1 | I 1 | ||
DOCKET NO. 50-413 | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
A) | 50-413 UNIT NAME CATAW13A 1 DATE v3f id/ 91 REPORT MONTH April 1991 COMPLETED BY s. | ||
w. | |||
Must.x TELEPHONE (iusJ-J/J-b/62 (2 | |||
R/X | (3) | ||
(3) | (4) | ||
(5) | |||
(1) | |||
A) }}Et-E HOD T | |||
E-Operator Training & License Examination F-Administrative | A OF LICENSE N | ||
Y S | |||
SHUT EVENT SYS-CAUSE AND CORRECTIVE O | |||
P DURATION O | |||
DOWN REPORT TEM COMPONENT ACTION TO DATE E | |||
HOURS N | |||
. R/X NO. | |||
CODE CODE PREVENT RECURRENCE 4 | |||
91 1 S | |||
719.00 C | |||
1 RC FUELXX END OF CYCLE | |||
'4' REFUELING OUTAGE (3) | |||
(4) l (1) | |||
(2) | |||
Method: | |||
Exhibit G - Instructions 1-Manual for Preparation of, Data F Forced Reason-A-Equi ment FailureB-Main enance or test (Explain) 2-Manual Scram Ent U Sneets For Licensee S Scheduled Event Report (LER (NUREG-Ol61)) | |||
3-Automatic Scram C-Refueling 4-Other (Explain) | |||
File D-Regulatory Restriction E-Operator Training & License Examination l | |||
(5) | |||
F-Administrative Exhibit I - Same Source G-Operator Error (Explain) | |||
H-Other (Explain) | H-Other (Explain) | ||
MONTHLY REFUELING INFORMATION REQUEST | MONTHLY REFUELING INFORMATION REQUEST 1. | ||
Facility name: Catawba. Unit 1 2. | |||
Scheduled next refueling shutdown: Currently Refueling 3. | |||
Scheduled restart following refueling: June 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | |||
4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
If yes, what will these be? | If yes, what will these be? | ||
If no, has reload design and core configuration been reviewed by Safety Review Connittee regarding unreviewed safety questions? | If no, has reload design and core configuration been reviewed by Safety Review Connittee regarding unreviewed safety questions? | ||
5. | |||
Scheduled date(s) for submitting proposed licensing action and supporting information: | |||
6. | |||
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). | |||
7. | |||
Number of fuel assemblies (a) in the coro: 193 (b) in the spent fuel pool: 337 8. | |||
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: | |||
9. | |||
Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: May 15, 1991 Name of | |||
==Contact:== | ==Contact:== | ||
J. A. Reavis | J. A. Reavis Phone: | ||
704-373-7567 i | |||
4 il | 4 il e | ||
DOCKET No: | |||
50 413 j | |||
UNIT: | |||
Catawba 1 DATE: | |||
$/15/91 NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
MONTHi April 1991 Catawba Unit 1 began the month of April shut down for its end of cycle "5"_ refueling outage. The unit remained in the outage for the entire month. | |||
MONTHi April 1991 Catawba Unit 1 began the month of April shut down for its end of cycle "5"_ | |||
i l' | i l' | ||
i L | i L | ||
i | i Prepared by: | ||
S. V, Moser i. | |||
l Telephone: | |||
704 373_5762 | |||
~ | |||
->wsc- | |||
,-w-+,vv e en--rvv v, | |||
ww=--w-my | |||
-,e-w-= | |||
v | |||
--w-v' we-n me*w-s vr, v, w* + 1w w-- w' evwvv w w ro-e-r -,ww e w re v-r---e---.-ae-e+-- | |||
w-m--------..-m =a m | |||
-------- +- | |||
-~.~-_ | |||
_ -~~ | |||
(f(RA11NG DA14 FEf Dki 1 | |||
0 ATE % 1' .149L | ! @ [I W3 | ||
%- 411. | |||
0 ATE % 1'.149L Elft.11N9 $1 AfDS CC'IPlilfC H _ F.Ai_WillitiL r | |||
TEL(PHN 74 373-5597 i | |||
: 6. Marleue Detendatle Captity (Ltces Pke): | ). Unit hates Catante 2 2.Finttingfernt Apal1,1991+Artil30,1991 S. Liter 4e! Itereal Net (Et): | ||
: 7. Fauswo Depetiddle Captity (Net Ne): | 3411 l | ||
: 8. If thegH 0(tvr in Captity f atirgs illus Nester 3 ftroegt '' finte tut | 4.NaeeplateFeling:Grus PAelt 130$t Notes Hauplate Fating- | ||
Reprt. Give Renonst | ! DHign [ltttrital Rating (het MWels 1145 (Ettst Nel calculaitd n | ||
: 6. Marleue Detendatle Captity (Ltces Pke): | |||
1192 1450.090 MVA i.90 pwer | |||
[ | |||
: 7. Fauswo Depetiddle Captity (Net Ne): | |||
!!29 f atter per f age in, | |||
: 8. If thegH 0(tvr in Captity f atirgs illus Nester 3 ftroegt '' finte tut NUF!640E0. | |||
Reprt. Give Renonst | |||
) | |||
i | i | ||
: 9. f tur level le Which Restricted, if Any net Mdelt | : 9. f tur level le Which Restricted, if Any net Mdelt | ||
: 10. Reassn for festrictions, if n y th h Month | : 10. Reassn for festrictions, if n y th h Month it.-to-Date Cteviatlie | ||
: 11. Hcurs in Rentting Peritc | : 11. Hcurs in Rentting Peritc 719.0 2679.0 411E6.0 12, Nueber Of Hats Featter Wu Critical 573.E 2641.9 30239.9 13.ReactorFeierveShutdoanHours - -0-- | ||
: 14. H nts Eenerator On Line | : 14. H nts Eenerator On Line 553.2 F609.4 E9tS0.4 | ||
: 15. Unit Resene Stutton Hats | : 15. Unit Resene Stutton Hats 4-- | ||
: 16. Gr a s Tr.ersal Energy Eenerated W W) | - -0-- | ||
: 17. Bress Electrical Energy Generated MWH) | : 16. Gr a s Tr.ersal Energy Eenerated W W) 1698737 6521?B1 918e0361 | ||
: 19. Net Electrital Erergy Canerated (N'O | : 17. Bress Electrical Energy Generated MWH) 613731 3050947 3t!!4372 | ||
: 19. Unit Service facter | : 19. Net Electrital Erergy Canerated (N'O | ||
: 21. Unit Cap etty Factor (Using PSC Net) | $7E'.91 EtE1762 3044375 | ||
: 22. Unit Capetity Fattor iU510% PIE Wet) | : 19. Unit Service facter 74.9 90.6 71.8 E0. Unit Anilability fattr>r 76 9 90.6 71.E | ||
: 24. Shutdtn9 $cteduled Over Next 6 Months (Type Date, ed Duratten t<f Eachit l | : 21. Unit Cap etty Factor (Using PSC Net) 70.5 B3.7 65.3 | ||
: 22. Unit Capetity Fattor iU510% PIE Wet) 69.6 27.4 64.6 E3 Urit Forced Outap Rate P3.1 o.0 13.9 | |||
l t | : 24. Shutdtn9 $cteduled Over Next 6 Months (Type Date, ed Duratten t<f Eachit l | ||
RefuellDg - Ortnhr.e 1R. 1Q01. h eels j | |||
: 25. If Dut Donn At [nd 3f Fentt feriod. Estlaated Date of Startupt l | |||
' 26. Units In fest Status (f ript te Coeurcial Opration): | |||
Forecnt Achined. | |||
l t | |||
-IN111At CRlilCAt111 l | |||
lhlilAL ELECTRICITY (CMER;lAL OftRAi!0N 1. | |||
I; | I; | ||
f f | f f | ||
I Di[PAllNG I ATA F,lfbri | I Di[PAllNG I ATA F,lfbri 1 | ||
I KCi[I WO to 616 Wil D.itdtl__ | |||
KCi[I WO | Nil O < l$ 1451 l | ||
Wil | Co m titD BV l A, Willie:1 l | ||
TE LLIO[ | |||
_ LAY, | "ne p3 54F7 h0h1H. | ||
AU11.1891 | |||
_ LAY, AVEF:ME MILY ffWIR La% | |||
9 | [11 AVlPA(4E [' tdt) F0WlR LEVEL (PFr-Netl OWedet) 1-113$ | ||
l .-. | 17 0 | ||
1130 16 | 2 1135 16 0 | ||
3 1135 19 0 | |||
1 6 | |||
1133 Et 0 | |||
_1110 il | |||
_ - ~ - _ _... - - - | |||
-6. | |||
1102 F2 0 | |||
7 11?? | |||
23 0 | |||
E 1130 24 209 i | |||
9 1131 25 - | |||
683 10 1136 (6 | |||
10f5 11 | |||
_ll3B 27 1135 1E 1160 Eb 1130 13 1160 27 1.g7 14 1135 30 1137 _ | |||
l.-. | |||
15 1130 16 6E7 l | |||
c,--,,.n,-. | |||
.,,---,..,,,...,--n.,.-,--,,.-v.,_,.-, | |||
-..,,-..,.-,.,-..,,,~...,-n,- | |||
,,-,-w. | |||
UNIT SFiUTDOWNS AND POWER REDUCTIONS | UNIT SFiUTDOWNS AND POWER REDUCTIONS DOCKET WO. | ||
(4) | 50-414 UNIT NAME W AhBA 2 DATE v>/1d/91 PAGE 1 OF 2 REPORT MONTH April 1991 COMPLETED BY s. | ||
E | w. | ||
WB | rivs t,x TELEPHONE | ||
HH | (/v41-;/3-3/ee (1) 2) | ||
HA | (4) | ||
A | (5) | ||
HH | E HOD T | ||
CONTAINMENT ISOLATION VALVE FAILURE l | A OF LICENSC N | ||
B | Y S | ||
HB | SHUT EVENT SYS-CAUSE AND CORRECTIVE O | ||
B | P DURATION O | ||
IA | DOW74 REPORT TEM COMPONENT ACTION TO DATE E | ||
! (1) | HOURS N | ||
R/X NO. | |||
CODE CODE PREVENT RECURRENCE 4 | |||
I 2 | |||
91-4-16 F | |||
0.02 A | |||
3 HB VALVEX TRIP DUE TO STEAM GENERATOR | |||
'C' 3 | |||
HI-HI LEVEL DUE TO FEEDWATER REGULATING VALVE FAILURE 3 | |||
91-4-16 F | |||
57.10 A | |||
WB PUMPXX SEAL REPLACEMENT ON '1A' YUCLEAR SERVICE WATER PUMP 4 | |||
91-4-19 F | |||
97.00 A | |||
HH VALVEX FEEDWATER CHECK VALVE PROBLEMS I | |||
5 91-4-23 F | |||
11.72 A | |||
HA GENERA DIFFERENTIAL GENERATOR SEAL OIL PRESSURE i | |||
4-P 91-4-23 F | |||
A HH VALVEX STEAM GENERATOR | |||
'2C' FEEDWATER i | |||
CONTAINMENT ISOLATION VALVE FAILURE l | |||
5-P 91-4-24 S | |||
B HB VALVEX CONTROL VALVE MOVEMENT TEST 6-P 91-4 F B | |||
IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION l | |||
! (1) | |||
(2) | |||
(3) | |||
(4) | (4) | ||
Exhibit G - Instructions S Scheduled | F Forced Reason-Method: | ||
E-Operator Training & License Examination F-Administrative | Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Autcmatic Scram Event Report (LER (NUREG-Ol61)) | ||
D-Regulatory Restriction-4-Other (Explain) | |||
File E-Operator Training & License Examination F-Administrative (5) | |||
H-Other (Explain) (Explain) | |||
Exhibit I - Same Source G-Operator Error t | |||
e i | |||
I t | |||
I l | |||
l 1 | |||
i i | |||
l l | l l | ||
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | |||
50-414 UNIT NAME CATAwnA 2 l | |||
DATE ud/13/ 91 i | |||
l UNIT SHUTDOWNS AND POWER REDUCTIONS | .PAGE 2 OF 2 REPORT MONTH April 1991 COMPLETED BY s. | ||
w. | |||
(1) | rIvs t.H TELEPHONE (ev4J-Jia-o/62 (1) | ||
E | : 2) g_ | ||
(4) | |||
(5). | |||
A | E HOD l | ||
CB | T A | ||
OF LICENSE 16 Y | |||
A | S SHUT EVENT SYS-CAUSE AND CORRECTIVE O | ||
HH | P DURATION O | ||
A | DOWN REPORT TEM COMPONENT ACTION TO l | ||
HH | . DATE E | ||
A | HOURS N | ||
HH | R/X NO. | ||
CODE CODE PREVENT RECURRENCE 7-P 91-4 F A | |||
CB PUMPXX REACTOR COOLANT LEAKAGE AT REACTOR COOLANT PUMP 8-P 91-4-25 F | |||
A HH TURBIN MAIN FEEDWATER PUMP TURBINE '2A' REPAIR 9-P 91-4-25 F | |||
A HH PUMPXX HIGH VIBRATION ON | |||
'B' CONDENSATE BOOSTER PUMP l | |||
10-P 91-4-25' F | |||
A HH TURBIN MAIN FEEDWATER PUMP TURBINE | |||
'2A' REPAIR 1 | |||
l t | l t | ||
' - (1)' | |||
F Forced | (2) | ||
S Scheduled | (2) | ||
(4) | |||
F Forced Reason-Method: | |||
Exhibit G - Instructions l | |||
S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) | |||
File (NUREG-0161)) | |||
E-Operator Training & License Examination 1 | E-Operator Training & License Examination 1 | ||
F-Administrative | F-Administrative (5) | ||
G-Operator Error (Explain) | G-Operator Error (Explain) | ||
Exhibit I - Same Source i | |||
H-Other (Explain) i i | |||
4 i | 4 i | ||
l J | l J | ||
t MONTHLY REFUELING INFORMATION REQUEST | t MONTHLY REFUELING INFORMATION REQUEST 1. | ||
Facility name: Catawba, Unit 2 2. | |||
Scheduled next refueling shutdown: October 1991 t | |||
3. | |||
Scheduled restart following refueling: | |||
specification change or other license amendment? | December 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | ||
If yes, what will these be? | 4. | ||
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | |||
If yes, what will these be? | |||
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? | If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? | ||
5. | |||
Scheduled date(s) for submitting proposed licensing action and supporting information: | |||
6. | |||
Important licensing considerations (new or different design or supplier, | |||
. unreviewed design or performance analysis methods, significant changes in design or new operating procedures). | |||
7. | |||
Number of fuel assemblies (a) in the core: '193 (b). in the spent fuel pool: 204 8. | |||
.Present licensed fuel pool capacity: | |||
1418 Size of requested or-planned increase: | |||
9. | |||
Projected date of last refueling which can be accommcdated by present licensed capacity: | |||
September 2011 DUKE POWER COMPANY-DATE: | |||
May 15, 1991 Name of | |||
==Contact:== | ==Contact:== | ||
J. A. Reavis | J. A. Reavis Phone: | ||
704-373-7567 | |||
~. -, -. _,. _, _. -. _... _ _.. _ _ _ _. _.. _. _. | |||
DOCKET NO: | DOCKET NO: | ||
l DATE: $/15/91 NARRATIVE | 50 414 UNIT: | ||
Catawba 2 L | |||
l DATE: | |||
$/15/91 NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
MONTH: April 1991 Catawba Unit 2 began the month of April operating at 100% full power. | MONTH: April 1991 Catawba Unit 2 began the month of April operating at 100% full power. | ||
The unit operated at or near 100% full power until 1054 on 04/16, when | The unit operated at or near 100% full power until 1054 on 04/16, when a power decrease to 10% was begun as a precautionary measure for work on the nuclear service water system associated with the unit i refueling outage. At 1453 on 04/16, the turbine tripped from 256 power due to high level in 'C' steam generator which resulted from the main feedwater control valve not responding. | ||
a power decrease to 10% was begun as a precautionary measure for work | The unit remained off line until 1243 on 04/23. | ||
Critien1 path work during this outage included nuclear service water system work and feedwater check valve work. After taking the reactor critical, a delay in putting the generator on line was caused by generator seal oil pressure problems. During the subsequent power increase, the unit was held at 29% power from 0700 to 1000 on 04/24 for a turbine control valve movement test, at 496 power from 1715 on 04/24 l | |||
a turbine control valve movement test, at 496 power from 1715 on 04/24 | to 0235 on 04/z5 for nuclear instrumentation power misnscesi sdjustments, at 63% power from 0410 to 1405 on 04/25 for '2A' main feedwater pump turbine repairs, at 646 power from 1440 to 1606 on 04/25 for high vibration on '2B' condensate booster pump, and at 68% from 1730 on 04/25 to 0005 on 04/26 for repairs to the '2A' main feedwater pump turbine. | ||
The unit reached 100% full power at 1050 on 04/26, and operated at or | The unit reached 100% full power at 1050 on 04/26, and operated at or near 100% full power.for_the remainder of the month, i | ||
near 100% full power.for_the remainder of the month, i | Prepared by: | ||
Prepared by: S. W. Moser Telephone: | S. W. Moser Telephone: | ||
704 373 5762 | |||
. ~. | |||
.}} | |||
Latest revision as of 01:55, 15 December 2024
| ML20077C567 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/30/1991 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20077C394 | List: |
| References | |
| NUDOCS 9105220137 | |
| Download: ML20077C567 (11) | |
Text
_ _ _ _ _. _ _ _. _ _ _ _. _. _... _ _ _ _. _ _ _. _. _ _
OfE8Ai!NG DATA REF0tti 00Citi k0
!0-ali LATE Mn 15, 1951 91E~ATINGSTATUS (DyL[![D by Ti,A, Wp))j n g TELEPH M 704,-3734997
- 1. Ur.it Nase Catawba 1_
- 2. Fepcrting feriod A;ril 1,1911-April 30,1H1
- 3. Licensed Thersal freer irkt):
3411
- 4. N ue? late Rating (Gress Mde):
13M4 Notes theseplate Retir>g
- 5. Lesig1 Electrical Rating (Ntt MWelt_
1145 (Brtss MJe) calculated as
- 6. Matisun Depencatle Capacity (Gress MWe):
1192 1450.000 M 4 :.90 p ner
- 7. Marisce Drpencable Capacity thet Mhe):
1129 factor per F ge ilt, B._ If Changes Ocur in Capetity Fatings t!!en Nusber 3 itrtugh 7) finte test NAEG-0020.
Report. Give Reasons
- 9. Fcuer level 10 Which Restricted, if Any (Net MWe):
- 10. Reason Fct Restri;tions, if cy:
This Month Yr.-tointe Cumulative
!!. Hours le Reporting feriod 719.0 fi?9.0 51160.0
- 12. No ber Of H:urs Feactor Was Critical 0.0 1664.7 37662.4
- 13. Reactor Reserve Stutdown Hours -
--0--
--0--
l
- 14. Hours Benerator On-Line 0.0 1604.9 36769.E i
- 15. Unit Reserve tibutdcan Hours
--0--
--0-- -
l
- 16. Srcss Thersal Energy Bertrated (PWH) 0 5132392'
!!B434036
- 17. Gross Electrical Energy Generated (MWH) 0 1828982 41573466 L
- 18. Net Electrical Er,ergy 6ererated (MWHI
-4651.
1710136 36976?67
- 19. Unit Service factor 0.0 55.7 7i.9
- 20. Unit enilability Facter 0.0 55.7 71.9
- 21. Unit Capacity factor (Using MDC Net)-
0.0 52.6 67.1
- 22. Uritt Capacity Facter (Using DER Net) 0.0 51.9 66.5 23, Unit Forced Dutage Rate -
- 0.0 5.3 12A 24.'Stutdown $tteduled Over Nest'6 Months (Type, f ate, and bratton of Each):
-Currently Refuelina
-25. If h t Denn At End Of_Feport Feriod. Estisated Date of Startup _ June 1 ( _1991 26.' Units in fest Status (Friet to Ctasercial Operation):
Forecast.
A:hiped INITIAL CRITICAL!iY lh1TIALELECTRICITY COMERCIAL OPERAi!ON 9103220137 910515 PDR ADOCK 05000413 R
pop L
o.
.m
. _. _ _. _. _...,. _ _. _ =
GFEUTING M1A REPGET IDM1 NO
$4-413 UNil
. O te s t,1 Mitrev15.193 CONFLETEDIV R. A _W11]jun 1ELEFP0kE 706-3?l i9? L l
P]Nih Arrl).1991
)
l
.1
[AY, MEF AGE MILY FCWER LEVEL Eh?!
RERABE DAILY P M R L N L (Me-Net)
(MWe-Net 1
-1 0
17 0
2 0
16 0
3 0
19 0
6 0
20 0
5 0
21 0
6 0
22 0
7 0
F3 0
8-0 P4 0
9 0
0 10 0
26 0
11 0
27 0
12 0
EB 0
13 0
29 0
14 0
30 C
l L
i 15 0
l 16 0
l i
1 I.
I 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAW13A 1 DATE v3f id/ 91 REPORT MONTH April 1991 COMPLETED BY s.
w.
Must.x TELEPHONE (iusJ-J/J-b/62 (2
(3)
(4)
(5)
(1)
A)Et-E HOD T A OF LICENSE N Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO DATE E HOURS N . R/X NO. CODE CODE PREVENT RECURRENCE 4 91 1 S 719.00 C 1 RC FUELXX END OF CYCLE '4' REFUELING OUTAGE (3) (4) l (1) (2) Method: Exhibit G - Instructions 1-Manual for Preparation of, Data F Forced Reason-A-Equi ment FailureB-Main enance or test (Explain) 2-Manual Scram Ent U Sneets For Licensee S Scheduled Event Report (LER (NUREG-Ol61)) 3-Automatic Scram C-Refueling 4-Other (Explain) File D-Regulatory Restriction E-Operator Training & License Examination l (5) F-Administrative Exhibit I - Same Source G-Operator Error (Explain) H-Other (Explain)
MONTHLY REFUELING INFORMATION REQUEST 1. Facility name: Catawba. Unit 1 2. Scheduled next refueling shutdown: Currently Refueling 3. Scheduled restart following refueling: June 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If yes, what will these be? If no, has reload design and core configuration been reviewed by Safety Review Connittee regarding unreviewed safety questions? 5. Scheduled date(s) for submitting proposed licensing action and supporting information: 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). 7. Number of fuel assemblies (a) in the coro: 193 (b) in the spent fuel pool: 337 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 DUKE POWER COMPANY DATE: May 15, 1991 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 i
4 il e DOCKET No: 50 413 j UNIT: Catawba 1 DATE: $/15/91 NARRATIVE
SUMMARY
MONTHi April 1991 Catawba Unit 1 began the month of April shut down for its end of cycle "5"_ refueling outage. The unit remained in the outage for the entire month. i l' i L i Prepared by: S. V, Moser i. l Telephone: 704 373_5762 ~ ->wsc- ,-w-+,vv e en--rvv v, ww=--w-my -,e-w-= v --w-v' we-n me*w-s vr, v, w* + 1w w-- w' evwvv w w ro-e-r -,ww e w re v-r---e---.-ae-e+-- w-m--------..-m =a m
+-
-~.~-_ _ -~~ (f(RA11NG DA14 FEf Dki 1 ! @ [I W3 %- 411. 0 ATE % 1'.149L Elft.11N9 $1 AfDS CC'IPlilfC H _ F.Ai_WillitiL r TEL(PHN 74 373-5597 i ). Unit hates Catante 2 2.Finttingfernt Apal1,1991+Artil30,1991 S. Liter 4e! Itereal Net (Et): 3411 l 4.NaeeplateFeling:Grus PAelt 130$t Notes Hauplate Fating- ! DHign [ltttrital Rating (het MWels 1145 (Ettst Nel calculaitd n
- 6. Marleue Detendatle Captity (Ltces Pke):
1192 1450.090 MVA i.90 pwer [
- 7. Fauswo Depetiddle Captity (Net Ne):
!!29 f atter per f age in,
- 8. If thegH 0(tvr in Captity f atirgs illus Nester 3 ftroegt finte tut NUF!640E0.
Reprt. Give Renonst ) i
- 9. f tur level le Which Restricted, if Any net Mdelt
- 10. Reassn for festrictions, if n y th h Month it.-to-Date Cteviatlie
- 11. Hcurs in Rentting Peritc 719.0 2679.0 411E6.0 12, Nueber Of Hats Featter Wu Critical 573.E 2641.9 30239.9 13.ReactorFeierveShutdoanHours - -0--
- 14. H nts Eenerator On Line 553.2 F609.4 E9tS0.4
- 15. Unit Resene Stutton Hats 4--
- -0--
- 16. Gr a s Tr.ersal Energy Eenerated W W) 1698737 6521?B1 918e0361
- 17. Bress Electrical Energy Generated MWH) 613731 3050947 3t!!4372
- 19. Net Electrital Erergy Canerated (N'O
$7E'.91 EtE1762 3044375
- 19. Unit Service facter 74.9 90.6 71.8 E0. Unit Anilability fattr>r 76 9 90.6 71.E
- 21. Unit Cap etty Factor (Using PSC Net) 70.5 B3.7 65.3
- 22. Unit Capetity Fattor iU510% PIE Wet) 69.6 27.4 64.6 E3 Urit Forced Outap Rate P3.1 o.0 13.9
- 24. Shutdtn9 $cteduled Over Next 6 Months (Type Date, ed Duratten t<f Eachit l
RefuellDg - Ortnhr.e 1R. 1Q01. h eels j
- 25. If Dut Donn At [nd 3f Fentt feriod. Estlaated Date of Startupt l
' 26. Units In fest Status (f ript te Coeurcial Opration): Forecnt Achined. l t -IN111At CRlilCAt111 l lhlilAL ELECTRICITY (CMER;lAL OftRAi!0N 1. I;
f f I Di[PAllNG I ATA F,lfbri 1 I KCi[I WO to 616 Wil D.itdtl__ Nil O < l$ 1451 l Co m titD BV l A, Willie:1 l TE LLIO[ "ne p3 54F7 h0h1H. AU11.1891 _ LAY, AVEF:ME MILY ffWIR La% [11 AVlPA(4E [' tdt) F0WlR LEVEL (PFr-Netl OWedet) 1-113$ 17 0 2 1135 16 0 3 1135 19 0 1 6 1133 Et 0 _1110 il _ - ~ - _ _... - - - -6. 1102 F2 0 7 11?? 23 0 E 1130 24 209 i 9 1131 25 - 683 10 1136 (6 10f5 11 _ll3B 27 1135 1E 1160 Eb 1130 13 1160 27 1.g7 14 1135 30 1137 _ l.-. 15 1130 16 6E7 l c,--,,.n,-. .,,---,..,,,...,--n.,.-,--,,.-v.,_,.-, -..,,-..,.-,.,-..,,,~...,-n,- ,,-,-w.
UNIT SFiUTDOWNS AND POWER REDUCTIONS DOCKET WO. 50-414 UNIT NAME W AhBA 2 DATE v>/1d/91 PAGE 1 OF 2 REPORT MONTH April 1991 COMPLETED BY s. w. rivs t,x TELEPHONE (/v41-;/3-3/ee (1) 2) (4) (5) E HOD T A OF LICENSC N Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE O P DURATION O DOW74 REPORT TEM COMPONENT ACTION TO DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 4 I 2 91-4-16 F 0.02 A 3 HB VALVEX TRIP DUE TO STEAM GENERATOR 'C' 3 HI-HI LEVEL DUE TO FEEDWATER REGULATING VALVE FAILURE 3 91-4-16 F 57.10 A WB PUMPXX SEAL REPLACEMENT ON '1A' YUCLEAR SERVICE WATER PUMP 4 91-4-19 F 97.00 A HH VALVEX FEEDWATER CHECK VALVE PROBLEMS I 5 91-4-23 F 11.72 A HA GENERA DIFFERENTIAL GENERATOR SEAL OIL PRESSURE i 4-P 91-4-23 F A HH VALVEX STEAM GENERATOR '2C' FEEDWATER i CONTAINMENT ISOLATION VALVE FAILURE l 5-P 91-4-24 S B HB VALVEX CONTROL VALVE MOVEMENT TEST 6-P 91-4 F B IA INSTRU NUCLEAR INSTRUMENTATION CALIBRATION l ! (1) (2) (3) (4) F Forced Reason-Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Autcmatic Scram Event Report (LER (NUREG-Ol61)) D-Regulatory Restriction-4-Other (Explain) File E-Operator Training & License Examination F-Administrative (5) H-Other (Explain) (Explain) Exhibit I - Same Source G-Operator Error t e i I t I l l 1
i i l l l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME CATAwnA 2 l DATE ud/13/ 91 i .PAGE 2 OF 2 REPORT MONTH April 1991 COMPLETED BY s. w. rIvs t.H TELEPHONE (ev4J-Jia-o/62 (1)
- 2) g_
(4) (5). E HOD l T A OF LICENSE 16 Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO l . DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 7-P 91-4 F A CB PUMPXX REACTOR COOLANT LEAKAGE AT REACTOR COOLANT PUMP 8-P 91-4-25 F A HH TURBIN MAIN FEEDWATER PUMP TURBINE '2A' REPAIR 9-P 91-4-25 F A HH PUMPXX HIGH VIBRATION ON 'B' CONDENSATE BOOSTER PUMP l 10-P 91-4-25' F A HH TURBIN MAIN FEEDWATER PUMP TURBINE '2A' REPAIR 1 l t ' - (1)' (2) (2) (4) F Forced Reason-Method: Exhibit G - Instructions l S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)) E-Operator Training & License Examination 1 F-Administrative (5) G-Operator Error (Explain) Exhibit I - Same Source i H-Other (Explain) i i 4 i l J
t MONTHLY REFUELING INFORMATION REQUEST 1. Facility name: Catawba, Unit 2 2. Scheduled next refueling shutdown: October 1991 t 3. Scheduled restart following refueling: December 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If yes, what will these be? If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? 5. Scheduled date(s) for submitting proposed licensing action and supporting information: 6. Important licensing considerations (new or different design or supplier, . unreviewed design or performance analysis methods, significant changes in design or new operating procedures). 7. Number of fuel assemblies (a) in the core: '193 (b). in the spent fuel pool: 204 8. .Present licensed fuel pool capacity: 1418 Size of requested or-planned increase: 9. Projected date of last refueling which can be accommcdated by present licensed capacity: September 2011 DUKE POWER COMPANY-DATE: May 15, 1991 Name of
Contact:
J. A. Reavis Phone: 704-373-7567 ~. -, -. _,. _, _. -. _... _ _.. _ _ _ _. _.. _. _.
DOCKET NO: 50 414 UNIT: Catawba 2 L l DATE: $/15/91 NARRATIVE
SUMMARY
MONTH: April 1991 Catawba Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100% full power until 1054 on 04/16, when a power decrease to 10% was begun as a precautionary measure for work on the nuclear service water system associated with the unit i refueling outage. At 1453 on 04/16, the turbine tripped from 256 power due to high level in 'C' steam generator which resulted from the main feedwater control valve not responding. The unit remained off line until 1243 on 04/23. Critien1 path work during this outage included nuclear service water system work and feedwater check valve work. After taking the reactor critical, a delay in putting the generator on line was caused by generator seal oil pressure problems. During the subsequent power increase, the unit was held at 29% power from 0700 to 1000 on 04/24 for a turbine control valve movement test, at 496 power from 1715 on 04/24 l to 0235 on 04/z5 for nuclear instrumentation power misnscesi sdjustments, at 63% power from 0410 to 1405 on 04/25 for '2A' main feedwater pump turbine repairs, at 646 power from 1440 to 1606 on 04/25 for high vibration on '2B' condensate booster pump, and at 68% from 1730 on 04/25 to 0005 on 04/26 for repairs to the '2A' main feedwater pump turbine. The unit reached 100% full power at 1050 on 04/26, and operated at or near 100% full power.for_the remainder of the month, i Prepared by: S. W. Moser Telephone: 704 373 5762 . ~. .}}