ML20080G374: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20080G374 | | number = ML20080G374 | ||
| issue date = 01/23/1984 | | issue date = 01/23/1984 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in IE Insp Rept 50-483/83-30.Corrective Actions:Revised Procedure GS-22, Radiological Environ Monitoring Program, Defining Program Mgt Responsibilities | ||
| author name = Schnell D | | author name = Schnell D | ||
| author affiliation = UNION ELECTRIC CO. | | author affiliation = UNION ELECTRIC CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = ULNRC-737, NUDOCS 8402130370 | | document report number = ULNRC-737, NUDOCS 8402130370 | ||
| title reference date = 01-09-1984 | |||
| package number = ML20080G369 | | package number = ML20080G369 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 19: | Line 20: | ||
{{#Wiki_filter:C | {{#Wiki_filter:C | ||
: 4. N UNION ELECTRIC COM PANY | : 4. N UNION ELECTRIC COM PANY | ||
$ 908 GRATIOT STREET ST. LOUIS, MISSOURI January 23, 1984 | |||
"'R'"*.^o."/.**' | |||
o o ~,co,..c.,~.u. | |||
.r.too... m.. | |||
o.,..... | o.,..... | ||
Mr. C. J. | |||
Paperiello Emergency Preparedness and Radiological Safety Branch U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road. | |||
Glen Ellyn, IL 60137 | |||
==Dear Mr. Paperiello:== | ==Dear Mr. Paperiello:== | ||
ULNRC-7 37 INSPECTION REPORT NO. 50-483/83-30 (DRMSP) | ULNRC-7 37 INSPECTION REPORT NO. 50-483/83-30 (DRMSP) | ||
This reply is in response to your letter of January | This reply is in response to your letter of January 9, 1984 which transmitted the report of the inspection conducted at Callaway Plant, Unit 1 during the period of December 13, 1983 to December 15, 1983. | ||
Our response to the open item listed within the body of Inspection Report Number 50-483/83-30 (DRMSP) is presented below. | |||
None of the material in the inspection report or in this response is considered proprietary by Union Electric Company. | None of the material in the inspection report or in this response is considered proprietary by Union Electric Company. | ||
(50 483/83-07-05) OPEN ITEM Finalize procedure QS-22 defining REMP management responsibilities. This procedure is under review by the licensee's management and has not been approved as yet. | (50 483/83-07-05) OPEN ITEM Finalize procedure QS-22 defining REMP management responsibilities. | ||
This procedure is under review by the licensee's management and has not been approved as yet. | |||
This item will remain open, pending licensee approval of this procedure. | |||
===RESPONSE=== | ===RESPONSE=== | ||
Please find enclosed the approved procedure QS-22 titled | Please find enclosed the approved procedure QS-22 titled | ||
" Radiological Environmental Monitoring Program." | |||
If you have any questions regarding this response or if additional information is r= quired, please let me know. | If you have any questions regarding this response or if additional information is r= quired, please let me know. | ||
Very truly yours Mh & Ab Donald F. Schnell BFH/lw Enclosures cc: | Very truly yours | ||
- Mh & Ab Donald F. Schnell BFH/lw Enclosures cc: | |||
Dr. M. J. | |||
Oestmann, NRC Region III Mr. J. E. Konklin, NRC Region III 3g NRC Resident Inspector, Callaway Plant g | |||
Missouri Public Service Commission 8402130370 840200 PDR ADOCK 0500048,2}} | |||
Latest revision as of 22:10, 14 December 2024
| ML20080G374 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 01/23/1984 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20080G369 | List: |
| References | |
| ULNRC-737, NUDOCS 8402130370 | |
| Download: ML20080G374 (1) | |
Text
C
- 4. N UNION ELECTRIC COM PANY
$ 908 GRATIOT STREET ST. LOUIS, MISSOURI January 23, 1984
"'R'"*.^o."/.**'
o o ~,co,..c.,~.u.
.r.too... m..
o.,.....
Mr. C. J.
Paperiello Emergency Preparedness and Radiological Safety Branch U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road.
Glen Ellyn, IL 60137
Dear Mr. Paperiello:
ULNRC-7 37 INSPECTION REPORT NO. 50-483/83-30 (DRMSP)
This reply is in response to your letter of January 9, 1984 which transmitted the report of the inspection conducted at Callaway Plant, Unit 1 during the period of December 13, 1983 to December 15, 1983.
Our response to the open item listed within the body of Inspection Report Number 50-483/83-30 (DRMSP) is presented below.
None of the material in the inspection report or in this response is considered proprietary by Union Electric Company.
(50 483/83-07-05) OPEN ITEM Finalize procedure QS-22 defining REMP management responsibilities.
This procedure is under review by the licensee's management and has not been approved as yet.
This item will remain open, pending licensee approval of this procedure.
RESPONSE
Please find enclosed the approved procedure QS-22 titled
" Radiological Environmental Monitoring Program."
If you have any questions regarding this response or if additional information is r= quired, please let me know.
Very truly yours
- Mh & Ab Donald F. Schnell BFH/lw Enclosures cc:
Dr. M. J.
Oestmann, NRC Region III Mr. J. E. Konklin, NRC Region III 3g NRC Resident Inspector, Callaway Plant g
Missouri Public Service Commission 8402130370 840200 PDR ADOCK 0500048,2