OPER ATING DAT A REPORT 50-317 DOCKET NO.
......~..;.
~
g OPER ATING DAT A REPORT 50-317 DOCKET NO.
DATE 12/15/82 COMPLETED BY Liaine Lotito TELEPHONE T3TO 787-us3 OPE RAT 8NG STATUS
DATE 12/15/82 COMPLETED BY Liaine Lotito TELEPHONE T3TO 787-us3 OPE RAT 8NG STATUS
: 1. Und: Name:         Calvert Cliffs #1                                   N''"
: 1. Und: Name:
: 2. Rerotting Period;       Navenber 1982 2,700
Calvert Cliffs #1 N''"
Navenber 1982
: 2. Rerotting Period;
: 3. Li:ensed Thermal Power (MW ):
: 3. Li:ensed Thermal Power (MW ):
: 4. Nameplate Rating IGross MWel: . 918
2,700
: 5. Design Electrical RatingINet MWe):       845
: 4. Nameplate Rating IGross MWel:
918
: 5. Design Electrical RatingINet MWe):
845
: 6. Maximum Dependable Capacity IGrass MWe): 860
: 6. Maximum Dependable Capacity IGrass MWe): 860
: 7. Masimum Dependable Capacity (Net MWe):           825
: 7. Masimum Dependable Capacity (Net MWe):
825
: 8. If Charges 0,: cur in Capseity Ratings titems Nunt er 3 Through 7)Since Last Report.Gt e Reasons.
: 8. If Charges 0,: cur in Capseity Ratings titems Nunt er 3 Through 7)Since Last Report.Gt e Reasons.
: 9. Pouer Leiel To hhich Hestricted.lf Any (Net MWe):
: 9. Pouer Leiel To hhich Hestricted.lf Any (Net MWe):
: 10. Reason For Restrictions. lf Any:
: 10. Reason For Restrictions. lf Any:
This Month           Yr. to Date           Cs.mulative 1
This Month Yr. to Date Cs.mulative 1
: 11. Ilours in Reporting PerioJ                             720.0                 _8,016.0           _ 66,325.0
: 11. Ilours in Reporting PerioJ 720.0
: 12. Number Of Hours Reacts.: Was Critical                 707.0           _
_8,016.0
5,762.3       _
_ 66,325.0
52,362.0
: 12. Number Of Hours Reacts.: Was Critical 707.0 5,762.3 52,362.0
: 83. Reactor Resene Shutdown Hours                         13.0                   16.1                 1,808.5
: 83. Reactor Resene Shutdown Hours 13.0 16.1 1,808.5
: 14. Houn Generator On-Line                                 701.4                 5,702.0             51,303.7 ,
: 14. Houn Generator On-Line 701.4 5,702.0 51,303.7,
: 15. Unit Resene SI.utdown Hnuts                             0.0                   0.0                   0. 0'
: 15. Unit Resene SI.utdown Hnuts 0.0 0.0
: 16. Gross Thermal Energy Generated IMWH)                   1,865,681             14,863,220           124,782,698                   ,
: 0. 0'
: 17. Gross Electrical Energy Generated (MWil;               629,462               5,362,926         __ 41,356,923
: 16. Gross Thermal Energy Generated IMWH) 1,865,681 14,863,220 124,782,698
                                                                                                                                                    ~
: 17. Gross Electrical Energy Generated (MWil; 629,462 5,362,926
: 18. Net Electrical Energy Generated (MWH,                   603,579               4,744,738       _ 39,046,771
__ 41,356,923
: 19. Urut Senice Factor                                     97 '                   71 1                 77 '
~
;                  20. Unit Asailability Facic,                                9#*"                   II I                 7# '
: 18. Net Electrical Energy Generated (MWH, 603,579 4,744,738
I                   21. Unit Capacity Factor IUsing MDC Nett
_ 39,046,771
: 22. Unit C:pacity Factor IUning DER Net)                     99.2                 70.1                 69.7                 _
: 19. Urut Senice Factor 97 '
: 23. Unit Forced Outage Rose                                 2.6                   5.5                   8.5
71 1 77 '
9#*"
II I 7# '
: 20. Unit Asailability Facic, I
: 21. Unit Capacity Factor IUsing MDC Nett
: 22. Unit C:pacity Factor IUning DER Net) 99.2 70.1 69.7
: 23. Unit Forced Outage Rose 2.6 5.5 8.5
: 24. Shutdoans Scheduled 0.cr Nes 6 Months (Type. Date.and Duration of Eacht.
: 24. Shutdoans Scheduled 0.cr Nes 6 Months (Type. Date.and Duration of Eacht.
i 2f. If Shut Down At End Of Report PerinJ. Estimated Date of Startup:
i 2f. If Shut Down At End Of Report PerinJ. Estimated Date of Startup:
: 24. Units in Test Status Prior to Commercial Operation):                         Fornost               Achieted INITIA CRITICALITY.
: 24. Units in Test Status Prior to Commercial Operation):
INITIA L ELECTRICITY COMMERCI AL OPER ATION B212220210 821215 PDR ADOCK 05000317 R                         PDR                                                                                                   (9/77)
Fornost Achieted INITIA CRITICALITY.
INITIA L ELECTRICITY COMMERCI AL OPER ATION B212220210 821215 PDR ADOCK 05000317 R
PDR (9/77)


r~
r~
                                                                        .                                                                    l l
OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 12/15/82 COMPLETED BY E. M. Lotito
OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 12/15/82 COMPLETED BY E. M. Lotito
                                                                                                                            ~
~
TELEPHONE T3FU 787-).363 OPERATING STAT US
TELEPHONE T3FU 787-).363 OPERATING STAT US Calvert Cliffs #2 Notes
: 1. U2 h*w           Calvert Cliffs #2                                  Notes
: 1. U2 h*w
: 2. Reportmg Period. December 1982
: 2. Reportmg Period. December 1982
: 3. Licensed Thermal Power fMWI): 2,700
: 3. Licensed Thermal Power fMWI): 2,700
Line 70: Line 85:
: 9. Power Lesel To bhich Restricted. lf Any (Net Mhe):
: 9. Power Lesel To bhich Restricted. lf Any (Net Mhe):
: 10. Reasons For Resenctiom. lf Any:
: 10. Reasons For Resenctiom. lf Any:
Thia Month         Yr. to Date         Cs.mubtive
Thia Month Yr. to Date Cs.mubtive
: 11. Hours in Reporting PerioJ                             720.0               8,016.0       __ 49,680.0
: 11. Hours in Reporting PerioJ 720.0 8,016.0
: 12. Number Oi Hotirs Reacier Was Critical                  0.0                 6,532.9           42,100.9
__ 49,680.0 0.0 6,532.9 42,100.9
: 13. Reactor Resene Shutdown Hours                         0.0                 81.0               795.2
: 12. Number Oi Hotirs Reacier Was Critical
: 14. Houn Generator On-Line                                 0.0                 6.498.5           41.542.9 ,
: 13. Reactor Resene Shutdown Hours 0.0 81.0 795.2
: 15. Unit Resene Shutdown linor,                             0.0                 0.0               0.0
: 14. Houn Generator On-Line 0.0 6.498.5 41.542.9,
: 16. Cross Thermal Energy Generated IMWH)                   0                   16,176,201         102,220,757     .
: 15. Unit Resene Shutdown linor, 0.0 0.0 0.0
: 17. Gross Electrical Energy Generated IMWill               0           _      5.240.801       __ 33,656,204 _
: 16. Cross Thermal Energy Generated IMWH) 0 16,176,201 102,220,757
: 18. Net Electrical Energy Generated IMWH,                   0                   5,004.951       _ 32,090,762       _
: 17. Gross Electrical Energy Generated IMWill 0
l                    19. Urut Senice Factor                                       0.0                 81.1.
5.240.801
83.6
__ 33,656,204 _
: 20. Un:t Availability Facect                                 0.0                81.1                83.6
: 18. Net Electrical Energy Generated IMWH, 0
                                                                                                                                        ^
5,004.951
: 21. Unit Capacity Factor IUsing MDC Net)                       0.0                 75.7               78.9
_ 32,090,762 l
: 22. Unit Copseity factor IUsing I)ER Neti                     0.0                  73.9              76.4
: 19. Urut Senice Factor 0.0 81.1 83.6 0.0 81.1 83.6
: 23. Unit I orced Outage Hsie                                   0.0                 6.0                 5.5
: 20. Un:t Availability Facect
^
: 21. Unit Capacity Factor IUsing MDC Net) 0.0 75.7 78.9 0.0 73.9 76.4
: 22. Unit Copseity factor IUsing I)ER Neti
: 23. Unit I orced Outage Hsie 0.0 6.0 5.5
: 34. Shutdowns Scheduled O,er Nest 6 Months (Type. Date.snd Duration of Eacht:
: 34. Shutdowns Scheduled O,er Nest 6 Months (Type. Date.snd Duration of Eacht:
No. 2 Plant will be on a planned outage from 10/17/82 until 2/14/82 for reactor refueling, unit general insoection and retube condenser.
No. 2 Plant will be on a planned outage from 10/17/82 until 2/14/82 for reactor refueling, unit general insoection and retube condenser.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 24. Units in Test Status IPrior to Commercial Operstion):                           Forecast           Achiesed           i INITIA L CRITIC A LITY.                                                                         l INITI4 L ELECTRICITY                                                                           l COM\lERCl4L OPERATION (Qf77)
: 24. Units in Test Status IPrior to Commercial Operstion):
Forecast Achiesed i
INITIA L CRITIC A LITY.
INITI4 L ELECTRICITY COM\\lERCl4L OPERATION (Qf77)


e.,  ..-  ,
e.,
AVER AGE DAILY UNIT POWER LEVEL 50-317 DOCKET NO.
AVER AGE DAILY UNIT POWER LEVEL 50-317 DOCKET NO.
UNIT Calvert Cliffs #1 17/15/82 DM COMPLETED BY TELEPflONE  (301)787-5363 MONTil November 1982 DAY       AVERAGE DAILY POWER LEVEL                                                         DAY       AVER AGE DAILY POWER LEVEL (MWe Net)                                                                             (MWe-Net) 872                                                                                   877 I                                                                                           17 2                     874 18               877 3                     875                                                                                   860 19 4                     874                                                                                   875 20 5                     842                                                                                   864 21 6                     875                                                                                   876 22 7                     847                                                                                   876 23 874                                                                                   876 8                                                                                           74 9                     347                                                                 25               876 10                     471                                                                                   876
UNIT Calvert Cliffs #1 17/15/82 DM COMPLETED BY (301)787-5363 TELEPflONE MONTil November 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
                                                                                        .                  26 13                     868                                                                                   877 27 12                     863                                                                 2g               876 13                     873                                                                                   893 29 865                                                                                   857 14                                                                                           30 872 15                                                                                           3 876 16 INSTRUCTIONS On this forrnatolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(MWe-Net) 872 877 I
(9/771
17 877 2
                              -_                ..                      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .                                                    e
874 18 3
875 19 860 4
874 20 875 5
842 21 864 6
875 22 876 7
847 23 876 874 876 8
74 9
347 25 876 10 471 26 876 13 868 27 877 12 863 2g 876 13 873 893 29 865 857 14 30 872 15 3
876 16 INSTRUCTIONS On this forrnatolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771 e


e., . . . ' .      .
e.,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 WIT Calvert Cliffs #2 DATE 12/15/82 COMPLETED BY Elaine Lotito
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 Calvert Cliffs #2 WIT DATE 12/15/82 Elaine Lotito
                                                    +
+
                                                                                                                                        ~
COMPLETED BY TELEPflONE
* TELEPflONE MONTH November 1982 DAY       AVER AGE DAILY POWER LEVEL                         DAY       AVER AGE DAILY POWER LEVEL (MWe-Net)                                                   (MWe-Net) 1                                                           17 2                                                           In                     -
~
3                                                            19 4                                                             20 5                                                             21 6                                                             22
MONTH November 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
                                                  ~
(MWe-Net) 1 17 2
7                                                            23 8                                                           24 9                                                             25 10                                                             26 1I                                                             27 12                                                             28
In 3
                                                ~
19 4
                                                                                                              ~
20 5
13                                                            29 14                                                             30 15                                                             31
21 6
                                                ~
22 7
16 INSTRUCTIONS i
~
On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to i
23 8
the nearest whole megawatt.
24 9
l 19/77)
25 10 26 1I 27 12 28 13
~
~
29 14 30 15 31 16
~
INSTRUCTIONS i
On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
i l
19/77)


50-317 DOCKET ND.       '''""''*"*#3 UNIT SHUTDOWNS AND POWER REDUCTIONS                      UNITNAME
50-317 DOCKET ND.
* DATE     12/15/82 COMPLETED BY Elaine Lotito November 1982 REPORT MONTH                                     TELEPHONE         (301) 787-5363       ,
UNIT SHUTDOWNS AND POWER REDUCTIONS
e.
'''""''*"*#3 UNITNAME DATE 12/15/82 Elaine Lotito November 1982 COMPLETED BY REPORT MONTH TELEPHONE (301) 787-5363 e.
                                                                          -_E                                 E
-_E E
                                                ' -        EO         'E
EO
* E5         Licensee     E,       Eg                   Cause & Corrective     .
'E
Nii.        Date     h     jj           k 3jch           Event      ($         hb Action to H                                              aO                              Prevent Recurrence fE           E j ;p, g     Report ar             g 6
* E5 Licensee E,
82-08   821109     F       18.6       A       3                     XX     ZZZZZZ     Loss of power to feedwater regulating valves.
Eg Cause & Corrective Nii.
I                   2                                                 3                               4 F: Forced         Reason:                                           Method:                           Edibet G Instructims S: Scheduled       A Equipment Failure (Explain)                     I Manual                         for Preparation of Data             .
Date h
B. Maintenance of Test                             2-Manual Scram.                   Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram.               Event ReporiILER) File (NUREG-D-Regulatory Restriction                         44 cntinuation                     0161) 1.-Operator Training & Ucense Examination         5-Load Reduction F.Admmistrative                                                                 5 9-Other                           Exhibit I -Same Source G-Operational Ernor (Explain) 19/77)               Il Other IExplain)
jj k
3jch
($
hb Action to Event Prevent Recurrence fE E
j ;p, g Report ar aO H
g 6
82-08 821109 F
18.6 A
3 XX ZZZZZZ Loss of power to feedwater regulating valves.
I 2
3 4
F: Forced Reason:
Method:
Edibet G Instructims S: Scheduled A Equipment Failure (Explain)
I Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporiILER) File (NUREG-D-Regulatory Restriction 44 cntinuation 0161) 1.-Operator Training & Ucense Examination 5-Load Reduction F.Admmistrative 5
9-Other G-Operational Ernor (Explain)
Exhibit I -Same Source 19/77)
Il Other IExplain)


DOCKETNO,        50-318 UNIT SHUTDOWNS AND POWER REDUCI1ONS                       UNITNAME calvert cliffs #7
50-318
* DATE 12/15/82                         _
: DOCKETNO, UNIT SHUTDOWNS AND POWER REDUCI1ONS UNITNAME calvert cliffs #7 DATE 12/15/82 COMPLETED BY Elaine totito November 1982 REPORT MONTil TELEPif0NE (301) 787-5363 We E
November 1982                    COMPLETED BY Elaine totito REPORT MONTil                                       TELEPif0NE (301) 787-5363 We
E
                                                                                                  -     E                            E EO          "e    " EU       Licensee     Ev         E*.,                   Cause & Corrective     .
-" EU Licensee Ev E*.,
No.         I}Jie h     j5           k   33$         Event        y mO          hO Action to Prevent Recurrence fE           5   3 a ;g =g Report ar u
Cause & Corrective EO "e
o O
No.
82-09   821016       S       720.0       C         4                     XX     Fuel XX     Reactor refueling, unit general inspection and retube condenser.
I}Jie h
1                     2                                                 3                                   4 F: Forced             Reason:                                             Method:                             Exhibit G Instructior.s S. Scheduled         A-Equiprnent Failure (Explain)                     1 Manual                           for Preparation of Data                           .
j5 k
B.Mainterance of Test                               2-Manual Scram.                     Entry Sheets for Licensee C-Refueling                                         .l Automatic Scram.                 Event ReporI(LER) File (NUREG.
33$
D. Regulatory Restriction                           44 ontinuation                     0161)
y hO Action to Event Prevent Recurrence Report ar mO fE 5
I:-Operator Training & Ucense Examination           5-Load Reduction F Admimstrative                                                                     5 9-Other                             Exhibit I -Same Simree G-Operainmal Esrur (Explain)
3 ;g =g ou a
(9/77)                   1101her (Explain)
O 82-09 821016 S
720.0 C
4 XX Fuel XX Reactor refueling, unit general inspection and retube condenser.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G Instructior.s S. Scheduled A-Equiprnent Failure (Explain) 1 Manual for Preparation of Data B.Mainterance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling
.l Automatic Scram.
Event ReporI(LER) File (NUREG.
D. Regulatory Restriction 44 ontinuation 0161)
I:-Operator Training & Ucense Examination 5-Load Reduction 5
F Admimstrative 9-Other G-Operainmal Esrur (Explain)
Exhibit I -Same Simree (9/77) 1101her (Explain)


O' December 3,1982 REFUELING INFORMATION REQUEST l
O' December 3,1982 REFUELING INFORMATION REQUEST l
l
1.
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.
: 2. Scheduled date for next Refueling Shutdown: October 1,1983
Scheduled date for next Refueling Shutdown: October 1,1983 3.
: 3. Scheduled date for restart following refueling: December 11,1983
Scheduled date for restart following refueling: December 11,1983 4.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting iniormation.
5.
June 29,1983
Scheduled date(s) for submitting proposed licensing action and supporting iniormation.
: 6. Important licensing considerations associated with the refueling.
June 29,1983 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
7.
(a) 217               (b) 732*
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
Spent Fuel Pools are common to Units 1 and 2
(a) 217 (b) 732*
: 8. The present licensed spent fuel pool storage capacity end the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
Spent Fuel Pools are common to Units 1 and 2 8.
1830 Licensed 1358 Currently Installed
The present licensed spent fuel pool storage capacity end the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
1830 Licensed 1358 Currently Installed 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
April,1991
* Denotes changes in this report
* Denotes changes in this report


r December 3,1982 REFUELING INFORMATION REQUEST
r December 3,1982 REFUELING INFORMATION REQUEST 1.
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
: 2. Scheduled date for next refueling shutdown: October 15,1982.
2.
: 3. Scheduled date for restart fonowing refueling: January 12,1983*.
Scheduled date for next refueling shutdown: October 15,1982.
: 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?
3.
Scheduled date for restart fonowing refueling: January 12,1983*.
4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a frest reload batch and reshuffled core.
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a frest reload batch and reshuffled core.
: 5. Meduled date(s) for submitting proposed licensing action and supporting information.
5.
October 11,1982
Meduled date(s) for submitting proposed licensing action and supporting information.
: 6. Important licensing considerations associated with refueling.
October 11,1982 6.
Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
: 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
7.
(a) 217               (b) 732*
The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 732*
Spent Fuel Poolis common to Units 1 and 2.
Spent Fuel Poolis common to Units 1 and 2.
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
8.
1830 Licensed 1358 Currently Installed
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
1830 Licensed 1358 Currently Installed 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
April,1991
* Denotes changes in this report
* Denotes changes in this report


==SUMMARY==
==SUMMARY==
OF UNIT 1 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit I was operating at 905 MWe with the reactor at 100% power.
OF UNIT 1 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit I was operating at 905 MWe with the reactor at 100% power.
11/5 Decreased load to 880 MWe at 0645 to isolate a lifting relief valve on 16A Feedwater Heater. Resumed full load operation (910 MWe) at 2300.
11/5 Decreased load to 880 MWe at 0645 to isolate a lifting relief valve on 16A Feedwater Heater. Resumed full load operation (910 MWe) at 2300.
11/7 At 0620 load was decreased to 790 MWe for replacement of 12A Traveling Screen. Load was increased to capacity (910 MWe) at 1300.
11/7 At 0620 load was decreased to 790 MWe for replacement of 12A Traveling Screen. Load was increased to capacity (910 MWe) at 1300.
11/9 The reactor tripped at 0947 on low steam generator level when power was lost to the feedwater regulating valves due to the loss of #11 vital AC bus. Loss of the bus was due to the inadvertent opening of the supply breaker to #11 inverter.
11/9 The reactor tripped at 0947 on low steam generator level when power was lost to the feedwater regulating valves due to the loss of #11 vital AC bus. Loss of the bus was due to the inadvertent opening of the supply breaker to #11 inverter.
The reactor was brought critical at 2247.
The reactor was brought critical at 2247.
11/10 The unit was paralleled at 0423. Resumed full load operation (900 MWe) at 2300.
11/10 The unit was paralleled at 0423. Resumed full load operation (900 MWe) at 2300.
11/19 At 1530 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 2030 when indications of saltwater leakage disappeared.
11/19 At 1530 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 2030 when indications of saltwater leakage disappeared.
11/21 Decreased load to 750 MWe at 0125 to test Main Turbine Control Vaives. Load was increased to capacity (910 MWe) at 0400.
11/21 Decreased load to 750 MWe at 0125 to test Main Turbine Control Vaives. Load was increased to capacity (910 MWe) at 0400.
11/30 At 2307 load was reduced to 850 MWe to investigate saltwater leakage into the main condenser. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser.
11/30 At 2307 load was reduced to 850 MWe to investigate saltwater leakage into the main condenser. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser.
_______ _ __        ___1_____-_____.
___1_____-_____.


==SUMMARY==
==SUMMARY==
OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1982 11/1   At the beginning of this reporting period Unit 2 was shutdown for its 4th scheduled refueling outage.
OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit 2 was shutdown for its 4th scheduled refueling outage.
11/9   Commenced fuel handling.
11/9 Commenced fuel handling.
11/20 Completed fuel handling.
11/20 Completed fuel handling.
11/30 At the end of this reporting period Unit 2 remained shutdown for its 4th scheduled refueling outage.
11/30 At the end of this reporting period Unit 2 remained shutdown for its 4th scheduled refueling outage.
i f
i f
l l
l 1
1 I
I l
l                                                                                  l I
I
l
_ _}}
_ _}}

Latest revision as of 09:41, 16 December 2024

Monthly Operating Repts for Nov 1982
ML20070G329
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/15/1982
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20070G326 List:
References
NUDOCS 8212220210
Download: ML20070G329 (10)


Text

-

...J_.

......~..;.

~

g OPER ATING DAT A REPORT 50-317 DOCKET NO.

DATE 12/15/82 COMPLETED BY Liaine Lotito TELEPHONE T3TO 787-us3 OPE RAT 8NG STATUS

1. Und: Name:

Calvert Cliffs #1 N"

Navenber 1982

2. Rerotting Period;
3. Li:ensed Thermal Power (MW ):

2,700

4. Nameplate Rating IGross MWel:

918

5. Design Electrical RatingINet MWe):

845

6. Maximum Dependable Capacity IGrass MWe): 860
7. Masimum Dependable Capacity (Net MWe):

825

8. If Charges 0,: cur in Capseity Ratings titems Nunt er 3 Through 7)Since Last Report.Gt e Reasons.
9. Pouer Leiel To hhich Hestricted.lf Any (Net MWe):
10. Reason For Restrictions. lf Any:

This Month Yr. to Date Cs.mulative 1

11. Ilours in Reporting PerioJ 720.0

_8,016.0

_ 66,325.0

12. Number Of Hours Reacts.: Was Critical 707.0 5,762.3 52,362.0
83. Reactor Resene Shutdown Hours 13.0 16.1 1,808.5
14. Houn Generator On-Line 701.4 5,702.0 51,303.7,
15. Unit Resene SI.utdown Hnuts 0.0 0.0
0. 0'
16. Gross Thermal Energy Generated IMWH) 1,865,681 14,863,220 124,782,698
17. Gross Electrical Energy Generated (MWil; 629,462 5,362,926

__ 41,356,923

~

18. Net Electrical Energy Generated (MWH, 603,579 4,744,738

_ 39,046,771

19. Urut Senice Factor 97 '

71 1 77 '

9#*"

II I 7# '

20. Unit Asailability Facic, I
21. Unit Capacity Factor IUsing MDC Nett
22. Unit C:pacity Factor IUning DER Net) 99.2 70.1 69.7
23. Unit Forced Outage Rose 2.6 5.5 8.5
24. Shutdoans Scheduled 0.cr Nes 6 Months (Type. Date.and Duration of Eacht.

i 2f. If Shut Down At End Of Report PerinJ. Estimated Date of Startup:

24. Units in Test Status Prior to Commercial Operation):

Fornost Achieted INITIA CRITICALITY.

INITIA L ELECTRICITY COMMERCI AL OPER ATION B212220210 821215 PDR ADOCK 05000317 R

PDR (9/77)

r~

OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 12/15/82 COMPLETED BY E. M. Lotito

~

TELEPHONE T3FU 787-).363 OPERATING STAT US Calvert Cliffs #2 Notes

1. U2 h*w
2. Reportmg Period. December 1982
3. Licensed Thermal Power fMWI): 2,700
4. Nameplate Rating IGross MWet U43
5. Desi;;n Electrical RatingINet Mue):

860

6. Maitimum Dependab e Capacity IGross MWel:

825

7. Manimum Dependable Capacit) (Net MWe):
8. If Charges Oecur in Capseity Ratings tire.ns Nunter 3 Through 7) Since Last Report.Gre Reasons.
9. Power Lesel To bhich Restricted. lf Any (Net Mhe):
10. Reasons For Resenctiom. lf Any:

Thia Month Yr. to Date Cs.mubtive

11. Hours in Reporting PerioJ 720.0 8,016.0

__ 49,680.0 0.0 6,532.9 42,100.9

12. Number Oi Hotirs Reacier Was Critical
13. Reactor Resene Shutdown Hours 0.0 81.0 795.2
14. Houn Generator On-Line 0.0 6.498.5 41.542.9,
15. Unit Resene Shutdown linor, 0.0 0.0 0.0
16. Cross Thermal Energy Generated IMWH) 0 16,176,201 102,220,757
17. Gross Electrical Energy Generated IMWill 0

5.240.801

__ 33,656,204 _

18. Net Electrical Energy Generated IMWH, 0

5,004.951

_ 32,090,762 l

19. Urut Senice Factor 0.0 81.1 83.6 0.0 81.1 83.6
20. Un:t Availability Facect

^

21. Unit Capacity Factor IUsing MDC Net) 0.0 75.7 78.9 0.0 73.9 76.4
22. Unit Copseity factor IUsing I)ER Neti
23. Unit I orced Outage Hsie 0.0 6.0 5.5
34. Shutdowns Scheduled O,er Nest 6 Months (Type. Date.snd Duration of Eacht:

No. 2 Plant will be on a planned outage from 10/17/82 until 2/14/82 for reactor refueling, unit general insoection and retube condenser.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
24. Units in Test Status IPrior to Commercial Operstion):

Forecast Achiesed i

INITIA L CRITIC A LITY.

INITI4 L ELECTRICITY COM\\lERCl4L OPERATION (Qf77)

e.,

AVER AGE DAILY UNIT POWER LEVEL 50-317 DOCKET NO.

UNIT Calvert Cliffs #1 17/15/82 DM COMPLETED BY (301)787-5363 TELEPflONE MONTil November 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 872 877 I

17 877 2

874 18 3

875 19 860 4

874 20 875 5

842 21 864 6

875 22 876 7

847 23 876 874 876 8

74 9

347 25 876 10 471 26 876 13 868 27 877 12 863 2g 876 13 873 893 29 865 857 14 30 872 15 3

876 16 INSTRUCTIONS On this forrnatolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771 e

e.,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 Calvert Cliffs #2 WIT DATE 12/15/82 Elaine Lotito

+

COMPLETED BY TELEPflONE

~

MONTH November 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 17 2

In 3

19 4

20 5

21 6

22 7

~

23 8

24 9

25 10 26 1I 27 12 28 13

~

~

29 14 30 15 31 16

~

INSTRUCTIONS i

On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

i l

19/77)

50-317 DOCKET ND.

UNIT SHUTDOWNS AND POWER REDUCTIONS

'""*"*#3 UNITNAME DATE 12/15/82 Elaine Lotito November 1982 COMPLETED BY REPORT MONTH TELEPHONE (301) 787-5363 e.

-_E E

EO

'E

  • E5 Licensee E,

Eg Cause & Corrective Nii.

Date h

jj k

3jch

($

hb Action to Event Prevent Recurrence fE E

j ;p, g Report ar aO H

g 6

82-08 821109 F

18.6 A

3 XX ZZZZZZ Loss of power to feedwater regulating valves.

I 2

3 4

F: Forced Reason:

Method:

Edibet G Instructims S: Scheduled A Equipment Failure (Explain)

I Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event ReporiILER) File (NUREG-D-Regulatory Restriction 44 cntinuation 0161) 1.-Operator Training & Ucense Examination 5-Load Reduction F.Admmistrative 5

9-Other G-Operational Ernor (Explain)

Exhibit I -Same Source 19/77)

Il Other IExplain)

50-318

DOCKETNO, UNIT SHUTDOWNS AND POWER REDUCI1ONS UNITNAME calvert cliffs #7 DATE 12/15/82 COMPLETED BY Elaine totito November 1982 REPORT MONTil TELEPif0NE (301) 787-5363 We E

E

-" EU Licensee Ev E*.,

Cause & Corrective EO "e

No.

I}Jie h

j5 k

33$

y hO Action to Event Prevent Recurrence Report ar mO fE 5

3 ;g =g ou a

O 82-09 821016 S

720.0 C

4 XX Fuel XX Reactor refueling, unit general inspection and retube condenser.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructior.s S. Scheduled A-Equiprnent Failure (Explain) 1 Manual for Preparation of Data B.Mainterance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling

.l Automatic Scram.

Event ReporI(LER) File (NUREG.

D. Regulatory Restriction 44 ontinuation 0161)

I:-Operator Training & Ucense Examination 5-Load Reduction 5

F Admimstrative 9-Other G-Operainmal Esrur (Explain)

Exhibit I -Same Simree (9/77) 1101her (Explain)

O' December 3,1982 REFUELING INFORMATION REQUEST l

1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.

Scheduled date for next Refueling Shutdown: October 1,1983 3.

Scheduled date for restart following refueling: December 11,1983 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5.

Scheduled date(s) for submitting proposed licensing action and supporting iniormation.

June 29,1983 6.

Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 732*

Spent Fuel Pools are common to Units 1 and 2 8.

The present licensed spent fuel pool storage capacity end the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

1830 Licensed 1358 Currently Installed 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

  • Denotes changes in this report

r December 3,1982 REFUELING INFORMATION REQUEST 1.

Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.

2.

Scheduled date for next refueling shutdown: October 15,1982.

3.

Scheduled date for restart fonowing refueling: January 12,1983*.

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a frest reload batch and reshuffled core.

5.

Meduled date(s) for submitting proposed licensing action and supporting information.

October 11,1982 6.

Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 732*

Spent Fuel Poolis common to Units 1 and 2.

8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1830 Licensed 1358 Currently Installed 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

  • Denotes changes in this report

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit I was operating at 905 MWe with the reactor at 100% power.

11/5 Decreased load to 880 MWe at 0645 to isolate a lifting relief valve on 16A Feedwater Heater. Resumed full load operation (910 MWe) at 2300.

11/7 At 0620 load was decreased to 790 MWe for replacement of 12A Traveling Screen. Load was increased to capacity (910 MWe) at 1300.

11/9 The reactor tripped at 0947 on low steam generator level when power was lost to the feedwater regulating valves due to the loss of #11 vital AC bus. Loss of the bus was due to the inadvertent opening of the supply breaker to #11 inverter.

The reactor was brought critical at 2247.

11/10 The unit was paralleled at 0423. Resumed full load operation (900 MWe) at 2300.

11/19 At 1530 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 2030 when indications of saltwater leakage disappeared.

11/21 Decreased load to 750 MWe at 0125 to test Main Turbine Control Vaives. Load was increased to capacity (910 MWe) at 0400.

11/30 At 2307 load was reduced to 850 MWe to investigate saltwater leakage into the main condenser. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser.

___1_____-_____.

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit 2 was shutdown for its 4th scheduled refueling outage.

11/9 Commenced fuel handling.

11/20 Completed fuel handling.

11/30 At the end of this reporting period Unit 2 remained shutdown for its 4th scheduled refueling outage.

i f

l 1

I l