MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
g
...J_. ......~..;. ; ~
OPER ATING DAT A REPORT 50-317 DOCKET NO.
DATE 12/15/82 COMPLETED BY Liaine Lotito TELEPHONE T3TO 787-us3 OPE RAT 8NG STATUS
- 1. Und: Name: Calvert Cliffs #1 N"
- 2. Rerotting Period; Navenber 1982 2,700
- 3. Li:ensed Thermal Power (MW ):
- 4. Nameplate Rating IGross MWel: . 918
- 5. Design Electrical RatingINet MWe): 845
- 6. Maximum Dependable Capacity IGrass MWe): 860
- 7. Masimum Dependable Capacity (Net MWe): 825
- 8. If Charges 0,: cur in Capseity Ratings titems Nunt er 3 Through 7)Since Last Report.Gt e Reasons.
- 9. Pouer Leiel To hhich Hestricted.lf Any (Net MWe):
- 10. Reason For Restrictions. lf Any:
This Month Yr. to Date Cs.mulative 1
- 11. Ilours in Reporting PerioJ 720.0 _8,016.0 _ 66,325.0
- 12. Number Of Hours Reacts.: Was Critical 707.0 _
5,762.3 _
52,362.0
- 83. Reactor Resene Shutdown Hours 13.0 16.1 1,808.5
- 14. Houn Generator On-Line 701.4 5,702.0 51,303.7 ,
- 15. Unit Resene SI.utdown Hnuts 0.0 0.0 0. 0'
- 16. Gross Thermal Energy Generated IMWH) 1,865,681 14,863,220 124,782,698 ,
- 17. Gross Electrical Energy Generated (MWil; 629,462 5,362,926 __ 41,356,923
~
- 18. Net Electrical Energy Generated (MWH, 603,579 4,744,738 _ 39,046,771
- 19. Urut Senice Factor 97 ' 71 1 77 '
- 20. Unit Asailability Facic, 9#*" II I 7# '
I 21. Unit Capacity Factor IUsing MDC Nett
- 22. Unit C:pacity Factor IUning DER Net) 99.2 70.1 69.7 _
- 23. Unit Forced Outage Rose 2.6 5.5 8.5
- 24. Shutdoans Scheduled 0.cr Nes 6 Months (Type. Date.and Duration of Eacht.
i 2f. If Shut Down At End Of Report PerinJ. Estimated Date of Startup:
- 24. Units in Test Status Prior to Commercial Operation): Fornost Achieted INITIA CRITICALITY.
INITIA L ELECTRICITY COMMERCI AL OPER ATION B212220210 821215 PDR ADOCK 05000317 R PDR (9/77)
r~
. l l
OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 12/15/82 COMPLETED BY E. M. Lotito
~
TELEPHONE T3FU 787-).363 OPERATING STAT US
- 1. U2 h*w Calvert Cliffs #2 Notes
- 2. Reportmg Period. December 1982
- 3. Licensed Thermal Power fMWI): 2,700
- 4. Nameplate Rating IGross MWet U43
- 5. Desi;;n Electrical RatingINet Mue):
860
- 6. Maitimum Dependab e Capacity IGross MWel:
825
- 7. Manimum Dependable Capacit) (Net MWe):
- 8. If Charges Oecur in Capseity Ratings tire.ns Nunter 3 Through 7) Since Last Report.Gre Reasons.
- 9. Power Lesel To bhich Restricted. lf Any (Net Mhe):
- 10. Reasons For Resenctiom. lf Any:
Thia Month Yr. to Date Cs.mubtive
- 11. Hours in Reporting PerioJ 720.0 8,016.0 __ 49,680.0
- 12. Number Oi Hotirs Reacier Was Critical 0.0 6,532.9 42,100.9
- 13. Reactor Resene Shutdown Hours 0.0 81.0 795.2
- 14. Houn Generator On-Line 0.0 6.498.5 41.542.9 ,
- 15. Unit Resene Shutdown linor, 0.0 0.0 0.0
- 16. Cross Thermal Energy Generated IMWH) 0 16,176,201 102,220,757 .
- 17. Gross Electrical Energy Generated IMWill 0 _ 5.240.801 __ 33,656,204 _
- 18. Net Electrical Energy Generated IMWH, 0 5,004.951 _ 32,090,762 _
l 19. Urut Senice Factor 0.0 81.1.
83.6
- 20. Un:t Availability Facect 0.0 81.1 83.6
^
- 21. Unit Capacity Factor IUsing MDC Net) 0.0 75.7 78.9
- 22. Unit Copseity factor IUsing I)ER Neti 0.0 73.9 76.4
- 23. Unit I orced Outage Hsie 0.0 6.0 5.5
- 34. Shutdowns Scheduled O,er Nest 6 Months (Type. Date.snd Duration of Eacht:
No. 2 Plant will be on a planned outage from 10/17/82 until 2/14/82 for reactor refueling, unit general insoection and retube condenser.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 24. Units in Test Status IPrior to Commercial Operstion): Forecast Achiesed i INITIA L CRITIC A LITY. l INITI4 L ELECTRICITY l COM\lERCl4L OPERATION (Qf77)
e., ..- ,
AVER AGE DAILY UNIT POWER LEVEL 50-317 DOCKET NO.
UNIT Calvert Cliffs #1 17/15/82 DM COMPLETED BY TELEPflONE (301)787-5363 MONTil November 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 872 877 I 17 2 874 18 877 3 875 860 19 4 874 875 20 5 842 864 21 6 875 876 22 7 847 876 23 874 876 8 74 9 347 25 876 10 471 876
. 26 13 868 877 27 12 863 2g 876 13 873 893 29 865 857 14 30 872 15 3 876 16 INSTRUCTIONS On this forrnatolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/771
-_ .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . e
e., . . . ' . .
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 WIT Calvert Cliffs #2 DATE 12/15/82 COMPLETED BY Elaine Lotito
+
~
- TELEPflONE MONTH November 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 In -
3 19 4 20 5 21 6 22
~
7 23 8 24 9 25 10 26 1I 27 12 28
~
~
13 29 14 30 15 31
~
16 INSTRUCTIONS i
On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to i
the nearest whole megawatt.
l 19/77)
50-317 DOCKET ND. '""*"*#3 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME
- DATE 12/15/82 COMPLETED BY Elaine Lotito November 1982 REPORT MONTH TELEPHONE (301) 787-5363 ,
e.
-_E E
' - EO 'E
- E5 Licensee E, Eg Cause & Corrective .
Nii. Date h jj k 3jch Event ($ hb Action to H aO Prevent Recurrence fE E j ;p, g Report ar g 6
82-08 821109 F 18.6 A 3 XX ZZZZZZ Loss of power to feedwater regulating valves.
I 2 3 4 F: Forced Reason: Method: Edibet G Instructims S: Scheduled A Equipment Failure (Explain) I Manual for Preparation of Data .
B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporiILER) File (NUREG-D-Regulatory Restriction 44 cntinuation 0161) 1.-Operator Training & Ucense Examination 5-Load Reduction F.Admmistrative 5 9-Other Exhibit I -Same Source G-Operational Ernor (Explain) 19/77) Il Other IExplain)
DOCKETNO, 50-318 UNIT SHUTDOWNS AND POWER REDUCI1ONS UNITNAME calvert cliffs #7
November 1982 COMPLETED BY Elaine totito REPORT MONTil TELEPif0NE (301) 787-5363 We
- E E EO "e " EU Licensee Ev E*., Cause & Corrective .
No. I}Jie h j5 k 33$ Event y mO hO Action to Prevent Recurrence fE 5 3 a ;g =g Report ar u
o O
82-09 821016 S 720.0 C 4 XX Fuel XX Reactor refueling, unit general inspection and retube condenser.
1 2 3 4 F: Forced Reason: Method: Exhibit G Instructior.s S. Scheduled A-Equiprnent Failure (Explain) 1 Manual for Preparation of Data .
B.Mainterance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling .l Automatic Scram. Event ReporI(LER) File (NUREG.
D. Regulatory Restriction 44 ontinuation 0161)
I:-Operator Training & Ucense Examination 5-Load Reduction F Admimstrative 5 9-Other Exhibit I -Same Simree G-Operainmal Esrur (Explain)
(9/77) 1101her (Explain)
O' December 3,1982 REFUELING INFORMATION REQUEST l
l
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
- 2. Scheduled date for next Refueling Shutdown: October 1,1983
- 3. Scheduled date for restart following refueling: December 11,1983
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting iniormation.
June 29,1983
- 6. Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 732*
Spent Fuel Pools are common to Units 1 and 2
- 8. The present licensed spent fuel pool storage capacity end the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Denotes changes in this report
r December 3,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: October 15,1982.
- 3. Scheduled date for restart fonowing refueling: January 12,1983*.
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a frest reload batch and reshuffled core.
- 5. Meduled date(s) for submitting proposed licensing action and supporting information.
October 11,1982
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 732*
Spent Fuel Poolis common to Units 1 and 2.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Denotes changes in this report
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit I was operating at 905 MWe with the reactor at 100% power.
11/5 Decreased load to 880 MWe at 0645 to isolate a lifting relief valve on 16A Feedwater Heater. Resumed full load operation (910 MWe) at 2300.
11/7 At 0620 load was decreased to 790 MWe for replacement of 12A Traveling Screen. Load was increased to capacity (910 MWe) at 1300.
11/9 The reactor tripped at 0947 on low steam generator level when power was lost to the feedwater regulating valves due to the loss of #11 vital AC bus. Loss of the bus was due to the inadvertent opening of the supply breaker to #11 inverter.
The reactor was brought critical at 2247.
11/10 The unit was paralleled at 0423. Resumed full load operation (900 MWe) at 2300.
11/19 At 1530 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 2030 when indications of saltwater leakage disappeared.
11/21 Decreased load to 750 MWe at 0125 to test Main Turbine Control Vaives. Load was increased to capacity (910 MWe) at 0400.
11/30 At 2307 load was reduced to 850 MWe to investigate saltwater leakage into the main condenser. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser.
_______ _ __ ___1_____-_____.
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit 2 was shutdown for its 4th scheduled refueling outage.
11/9 Commenced fuel handling.
11/20 Completed fuel handling.
11/30 At the end of this reporting period Unit 2 remained shutdown for its 4th scheduled refueling outage.