g

...J_. ......~..;.  ; ~

OPER ATING DAT A REPORT 50-317 DOCKET NO.

DATE 12/15/82 COMPLETED BY Liaine Lotito TELEPHONE T3TO 787-us3 OPE RAT 8NG STATUS

1. Und: Name: Calvert Cliffs #1 N"
2. Rerotting Period; Navenber 1982 2,700
3. Li:ensed Thermal Power (MW ):
4. Nameplate Rating IGross MWel: . 918
5. Design Electrical RatingINet MWe): 845
6. Maximum Dependable Capacity IGrass MWe): 860
7. Masimum Dependable Capacity (Net MWe): 825
8. If Charges 0,: cur in Capseity Ratings titems Nunt er 3 Through 7)Since Last Report.Gt e Reasons.
9. Pouer Leiel To hhich Hestricted.lf Any (Net MWe):
10. Reason For Restrictions. lf Any:

This Month Yr. to Date Cs.mulative 1

11. Ilours in Reporting PerioJ 720.0 _8,016.0 _ 66,325.0
12. Number Of Hours Reacts.: Was Critical 707.0 _

5,762.3 _

52,362.0

83. Reactor Resene Shutdown Hours 13.0 16.1 1,808.5
14. Houn Generator On-Line 701.4 5,702.0 51,303.7 ,
15. Unit Resene SI.utdown Hnuts 0.0 0.0 0. 0'
16. Gross Thermal Energy Generated IMWH) 1,865,681 14,863,220 124,782,698 ,
17. Gross Electrical Energy Generated (MWil; 629,462 5,362,926 __ 41,356,923

~

18. Net Electrical Energy Generated (MWH, 603,579 4,744,738 _ 39,046,771
19. Urut Senice Factor 97 ' 71 1 77 '
20. Unit Asailability Facic, 9#*" II I 7# '

I 21. Unit Capacity Factor IUsing MDC Nett

22. Unit C:pacity Factor IUning DER Net) 99.2 70.1 69.7 _
23. Unit Forced Outage Rose 2.6 5.5 8.5
24. Shutdoans Scheduled 0.cr Nes 6 Months (Type. Date.and Duration of Eacht.

i 2f. If Shut Down At End Of Report PerinJ. Estimated Date of Startup:

24. Units in Test Status Prior to Commercial Operation): Fornost Achieted INITIA CRITICALITY.

INITIA L ELECTRICITY COMMERCI AL OPER ATION B212220210 821215 PDR ADOCK 05000317 R PDR (9/77)

r~

. l l

OPER ATihG DAT A REPORT DOCKET NO. 50-318 DATE 12/15/82 COMPLETED BY E. M. Lotito

~

TELEPHONE T3FU 787-).363 OPERATING STAT US

1. U2 h*w Calvert Cliffs #2 Notes
2. Reportmg Period. December 1982
3. Licensed Thermal Power fMWI): 2,700
4. Nameplate Rating IGross MWet U43
5. Desi;;n Electrical RatingINet Mue):

860

6. Maitimum Dependab e Capacity IGross MWel:

825

7. Manimum Dependable Capacit) (Net MWe):
8. If Charges Oecur in Capseity Ratings tire.ns Nunter 3 Through 7) Since Last Report.Gre Reasons.
9. Power Lesel To bhich Restricted. lf Any (Net Mhe):
10. Reasons For Resenctiom. lf Any:

Thia Month Yr. to Date Cs.mubtive

11. Hours in Reporting PerioJ 720.0 8,016.0 __ 49,680.0
12. Number Oi Hotirs Reacier Was Critical 0.0 6,532.9 42,100.9
13. Reactor Resene Shutdown Hours 0.0 81.0 795.2
14. Houn Generator On-Line 0.0 6.498.5 41.542.9 ,
15. Unit Resene Shutdown linor, 0.0 0.0 0.0
16. Cross Thermal Energy Generated IMWH) 0 16,176,201 102,220,757 .
17. Gross Electrical Energy Generated IMWill 0 _ 5.240.801 __ 33,656,204 _
18. Net Electrical Energy Generated IMWH, 0 5,004.951 _ 32,090,762 _

l 19. Urut Senice Factor 0.0 81.1.

83.6

20. Un:t Availability Facect 0.0 81.1 83.6

^

21. Unit Capacity Factor IUsing MDC Net) 0.0 75.7 78.9
22. Unit Copseity factor IUsing I)ER Neti 0.0 73.9 76.4
23. Unit I orced Outage Hsie 0.0 6.0 5.5
34. Shutdowns Scheduled O,er Nest 6 Months (Type. Date.snd Duration of Eacht:

No. 2 Plant will be on a planned outage from 10/17/82 until 2/14/82 for reactor refueling, unit general insoection and retube condenser.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
24. Units in Test Status IPrior to Commercial Operstion): Forecast Achiesed i INITIA L CRITIC A LITY. l INITI4 L ELECTRICITY l COM\lERCl4L OPERATION (Qf77)

e., ..- ,

AVER AGE DAILY UNIT POWER LEVEL 50-317 DOCKET NO.

UNIT Calvert Cliffs #1 17/15/82 DM COMPLETED BY TELEPflONE (301)787-5363 MONTil November 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe-Net) 872 877 I 17 2 874 18 877 3 875 860 19 4 874 875 20 5 842 864 21 6 875 876 22 7 847 876 23 874 876 8 74 9 347 25 876 10 471 876

. 26 13 868 877 27 12 863 2g 876 13 873 893 29 865 857 14 30 872 15 3 876 16 INSTRUCTIONS On this forrnatolist the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771

-_ .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . e

e., . . . ' . .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-318 WIT Calvert Cliffs #2 DATE 12/15/82 COMPLETED BY Elaine Lotito

+

~

  • TELEPflONE MONTH November 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 17 2 In -

3 19 4 20 5 21 6 22

~

7 23 8 24 9 25 10 26 1I 27 12 28

~

~

13 29 14 30 15 31

~

16 INSTRUCTIONS i

On this format, list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to i

the nearest whole megawatt.

l 19/77)

50-317 DOCKET ND. '""*"*#3 UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME

  • DATE 12/15/82 COMPLETED BY Elaine Lotito November 1982 REPORT MONTH TELEPHONE (301) 787-5363 ,

e.

-_E E

' - EO 'E

  • E5 Licensee E, Eg Cause & Corrective .

Nii. Date h jj k 3jch Event ($ hb Action to H aO Prevent Recurrence fE E j ;p, g Report ar g 6

82-08 821109 F 18.6 A 3 XX ZZZZZZ Loss of power to feedwater regulating valves.

I 2 3 4 F: Forced Reason: Method: Edibet G Instructims S: Scheduled A Equipment Failure (Explain) I Manual for Preparation of Data .

B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporiILER) File (NUREG-D-Regulatory Restriction 44 cntinuation 0161) 1.-Operator Training & Ucense Examination 5-Load Reduction F.Admmistrative 5 9-Other Exhibit I -Same Source G-Operational Ernor (Explain) 19/77) Il Other IExplain)

DOCKETNO, 50-318 UNIT SHUTDOWNS AND POWER REDUCI1ONS UNITNAME calvert cliffs #7

  • DATE 12/15/82 _

November 1982 COMPLETED BY Elaine totito REPORT MONTil TELEPif0NE (301) 787-5363 We

- E E EO "e " EU Licensee Ev E*., Cause & Corrective .

No. I}Jie h j5 k 33$ Event y mO hO Action to Prevent Recurrence fE 5 3 a ;g =g Report ar u

o O

82-09 821016 S 720.0 C 4 XX Fuel XX Reactor refueling, unit general inspection and retube condenser.

1 2 3 4 F: Forced Reason: Method: Exhibit G Instructior.s S. Scheduled A-Equiprnent Failure (Explain) 1 Manual for Preparation of Data .

B.Mainterance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling .l Automatic Scram. Event ReporI(LER) File (NUREG.

D. Regulatory Restriction 44 ontinuation 0161)

I:-Operator Training & Ucense Examination 5-Load Reduction F Admimstrative 5 9-Other Exhibit I -Same Simree G-Operainmal Esrur (Explain)

(9/77) 1101her (Explain)

O' December 3,1982 REFUELING INFORMATION REQUEST l

l

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
2. Scheduled date for next Refueling Shutdown: October 1,1983
3. Scheduled date for restart following refueling: December 11,1983
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting iniormation.

June 29,1983

6. Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 732*

Spent Fuel Pools are common to Units 1 and 2

8. The present licensed spent fuel pool storage capacity end the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

1830 Licensed 1358 Currently Installed

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

  • Denotes changes in this report

r December 3,1982 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled date for next refueling shutdown: October 15,1982.
3. Scheduled date for restart fonowing refueling: January 12,1983*.
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a frest reload batch and reshuffled core.

5. Meduled date(s) for submitting proposed licensing action and supporting information.

October 11,1982

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 732*

Spent Fuel Poolis common to Units 1 and 2.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1830 Licensed 1358 Currently Installed

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

  • Denotes changes in this report

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit I was operating at 905 MWe with the reactor at 100% power.

11/5 Decreased load to 880 MWe at 0645 to isolate a lifting relief valve on 16A Feedwater Heater. Resumed full load operation (910 MWe) at 2300.

11/7 At 0620 load was decreased to 790 MWe for replacement of 12A Traveling Screen. Load was increased to capacity (910 MWe) at 1300.

11/9 The reactor tripped at 0947 on low steam generator level when power was lost to the feedwater regulating valves due to the loss of #11 vital AC bus. Loss of the bus was due to the inadvertent opening of the supply breaker to #11 inverter.

The reactor was brought critical at 2247.

11/10 The unit was paralleled at 0423. Resumed full load operation (900 MWe) at 2300.

11/19 At 1530 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 2030 when indications of saltwater leakage disappeared.

11/21 Decreased load to 750 MWe at 0125 to test Main Turbine Control Vaives. Load was increased to capacity (910 MWe) at 0400.

11/30 At 2307 load was reduced to 850 MWe to investigate saltwater leakage into the main condenser. At the end of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser.

_______ _ __ ___1_____-_____.

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE NOVEMBER 1982 11/1 At the beginning of this reporting period Unit 2 was shutdown for its 4th scheduled refueling outage.

11/9 Commenced fuel handling.

11/20 Completed fuel handling.

11/30 At the end of this reporting period Unit 2 remained shutdown for its 4th scheduled refueling outage.