{{#Wiki_filter:NRC F;;lJ65 ---         '                                                        U.S. NUCLEAR REGULATORY COMMISSION (9-1999)
{{#Wiki_filter:NRC F;;lJ65 ---
U.S. NUCLEAR REGULATORY COMMISSION (9-1999)
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, wilt be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, wilt be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.
Do not Include proprietarymaterials.
Do not Include proprietary materials.
DATE OF MEElING The attached document(s), which was/were handed out in this meeting, is/are to be placed 07/25/203         in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
DATE OF MEElING The attached document(s), which was/were handed out in this meeting, is/are to be placed 07/25/203 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:
Docket Number(s)                 50-348 AND 50-364 Plant/Facility Name             FARLEY PLANT, UNITS 1 AND 2 TAC Number(s) (ifavailable)
Docket Number(s) 50-348 AND 50-364 Plant/Facility Name FARLEY PLANT, UNITS 1 AND 2 TAC Number(s) (if available)
Reference Meeting Notice         JULY 17,2003 Purpose of Meeting (copy from meeting notice)       TO DISCUSS RELIANCE ON KAOWOOL FOR SERVICE WATER INTAKE STRUCTURE NAME OF PERSON WHO ISSUED MEETING NOTICE                     TITLE F.RINALDI                                                     PROJECT MANAGER OFFICE NRR DMSION DLPM BRANCH PD 11-1 Distribution of this form and attachments:
Reference Meeting Notice JULY 17,2003 Purpose of Meeting (copy from meeting notice)
Docket File/Central File PUBLIC NRC FORM 658 (9-1999)                               PRINTED ON RECYCLED PAPER                   TNs Imn was designed using InFornis
TO DISCUSS RELIANCE ON KAOWOOL FOR SERVICE WATER INTAKE STRUCTURE NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE F.
RINALDI PROJECT MANAGER OFFICE NRR DMSION DLPM BRANCH PD 11-1 Distribution of this form and attachments:
Docket File/Central File PUBLIC NRC FORM 658 (9-1999)
PRINTED ON RECYCLED PAPER TNs Imn was designed using InFornis


Joseph M. Farley Nuclear Plant Appendix R Status and Elimination of Reliance on Kaowool Fire Barriers for the Service Water Intake Structure (SWIS)
Joseph M. Farley Nuclear Plant Appendix R Status and Elimination of Reliance on Kaowool Fire Barriers for the Service Water Intake Structure (SWIS)
Mike Stinson General Manager Farley Nuclear Support July 25, 2003   SOUTHERN COMPANY Energy to Serve Your World'
Mike Stinson General Manager Farley Nuclear Support July 25, 2003 SOUTHERN COMPANY Energy to Serve Your World'


Agenda
Agenda
: 1. Introduction & Purpose
: 1. Introduction & Purpose
: 2. Appendix R Overview
: 2. Appendix R Overview Current exemption for the SWIS Background information
* Current exemption for the SWIS
: 3. Basis for the New SWIS Exemption Deterministic and risk-informed performance-based approaches Application of risk-informed performance-based methodology Change evaluation process Assessments
* Background information
: 3. Basis for the New SWIS Exemption
* Deterministic and risk-informed performance-based approaches
* Application of risk-informed performance-based methodology
* Change evaluation process
* Assessments
: 4. Summary 2
: 4. Summary 2


Line 53: Line 51:
* SNC re-evaluated the Appendix R program
* SNC re-evaluated the Appendix R program
* SNC planned modifications to eliminate dependence on Kaowool
* SNC planned modifications to eliminate dependence on Kaowool
  -5 modifications completed
-5 modifications completed
  -27 modifications scheduled to be completed by the end of the spring 2006 outage
-27 modifications scheduled to be completed by the end of the spring 2006 outage
* SNC will change licensing documents 6
* SNC will change licensing documents 6


Line 60: Line 58:
For the SWIS, three options were identified
For the SWIS, three options were identified
: 1. Comply with the Current Licensing Basis
: 1. Comply with the Current Licensing Basis
: 2. Install alternate seal injection pump and       V"   k, "11) 0        "
: 2. Install alternate seal injection pump and reroute cables 0 "
reroute cables                                  kJ,
V" k,  
                                                          %r II
"11)
                                                                    -, " ki, A k.,~    9
% r  
: 3. Determine whether a risk-informed performance-based evaluation would justify not relying on Kaowool 7
-, " ki, A
kJ, 
II
: 3. Determine whether a risk-informed performance-based evaluation would justify not relying on Kaowool k.,~
9 7


Background Information (cont.)
Background Information (cont.)
Line 72: Line 74:
* SNC plans modifications and new SWIS exemption 8
* SNC plans modifications and new SWIS exemption 8


SWIS Plan View- Existing
SWIS Plan View-Existing 72A Train B Racew ays Train A Racew ays Strainer Pit It N
                                                                  ..                It N
I Legend Zone 72A - SW PuRrp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room - Train A Zone 73 - Battery Room - Train B Zone 74 - Battery Room - Train A Train A Train B Unit 2 SW Pumps Unit 1 SW Pumps B
Train B Racew ays 72A I
B AB A
Train A Racew ays Legend Strainer Pit                             Zone 72A - SW PuRrp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room - Train A Zone 73 - Battery Room - Train B Zone 74 - Battery Room - Train A Unit 2 SW Pumps                     Unit 1 SW Pumps Train A B       B     AB   A     A 00 00 0 A A     AB     B     B Train B U-72B I 72C         72D 72E Train B                             71             Train A 9
A 00 A
A 00 AB B
0 B
U -
I 72C 72D 72E 72B Train B 71 Train A 9
C (/
C (/


Line 108: Line 114:
* Documentation 15
* Documentation 15


flnItIom ed.Iu atn yes E DtMnsl 16
flnItIom
ed.Iu
atn yes E
DtMnsl 16


Preliminary Assessment                                                                     -        Initial Fire Modeling I
Preliminary Assessment Initial Fire Modeling I
N 72A                       1714
72A 1714 Train B Racew ays Train A Racew ays Strainer Pit N
________    Train B Racew ays Train A _
Legend Zone 72A - SW Rinp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room -Train A Zone 73 - Battery Room - Train B Zone 74 - Battery Room - Train A Train A Train B Fire Scenario 3
Racew ays Legend Strainer Pit                               Zone 72A - SW Rinp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room -Train A Fire Scenario                            Fire Scenario Zone 73 - Battery Room - Train B 3        1                      1      2 Zone 74 - Battery Room - Train A Unit 2 SW Pumps                           Unit 1 SW Pumps Train A Train B B       B      AB       A     A             A A     AB       B     B
1 Unit 2 SW Pumps B
                                                    -U 72C        72D F
B AB A
72B                                                           72E Train B                       73                             Train A 17
A Fire Scenario 1
2 Unit 1 SW Pumps A
A AB B
B
-U F
72B 72C 72D 72E Train B 73 Train A 17


Preliminary Assessment - Initial Risk Assessment Determined that combined analysis was required for SW pumps 18
Preliminary Assessment -
Initial Risk Assessment Determined that combined analysis was required for SW pumps 18


Combined Analysis
Combined Analysis Fire modeling One SW pump remains operable Fire risk analysis CDF determined for one SW pump RG 1.174 criteria met for SWIS Defense-In-Depth Elimination of dependence on Kaowool meets NFPA 805 criteria to Prevent fires from starting Detect fires quickly and suppressing those that occur Provide protection for systems and structures so that safe shutdown can be achieved Safety Margin NRC criteria met 19
* Fire modeling
    -    One SW pump remains operable
* Fire risk analysis
    -    CDF determined for one SW pump
    -    RG 1.174 criteria met for SWIS
* Defense-In-Depth Elimination of dependence on Kaowool meets NFPA 805 criteria to
          - Prevent fires from starting
          - Detect fires quickly and suppressing those that occur
          - Provide protection for systems and structures so that safe shutdown can be achieved
* Safety Margin
    -      NRC criteria met 19


Summary
Summary

Latest revision as of 08:11, 16 January 2025

Meeting Handout Materials for 07/25/03 for Farley Plant, Units 1 and 2, Regarding Reliance on Kaowool for Service Water Intake Structure
ML032260315
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/25/2003
From: Rinaldi F
NRC/NRR/DLPM
To:
References
Download: ML032260315 (21)


Text

NRC F;;lJ65 ---

U.S. NUCLEAR REGULATORY COMMISSION (9-1999)

TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed) by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attached copy of meeting handout materials, wilt be sent to the Document Control Desk on the same day of the meeting; under no circumstances will this be done later than the working day after the meeting.

Do not Include proprietary materials.

DATE OF MEElING The attached document(s), which was/were handed out in this meeting, is/are to be placed 07/25/203 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:

Docket Number(s) 50-348 AND 50-364 Plant/Facility Name FARLEY PLANT, UNITS 1 AND 2 TAC Number(s) (if available)

Reference Meeting Notice JULY 17,2003 Purpose of Meeting (copy from meeting notice)

TO DISCUSS RELIANCE ON KAOWOOL FOR SERVICE WATER INTAKE STRUCTURE NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE F.

RINALDI PROJECT MANAGER OFFICE NRR DMSION DLPM BRANCH PD 11-1 Distribution of this form and attachments:

Docket File/Central File PUBLIC NRC FORM 658 (9-1999)

PRINTED ON RECYCLED PAPER TNs Imn was designed using InFornis

Joseph M. Farley Nuclear Plant Appendix R Status and Elimination of Reliance on Kaowool Fire Barriers for the Service Water Intake Structure (SWIS)

Mike Stinson General Manager Farley Nuclear Support July 25, 2003 SOUTHERN COMPANY Energy to Serve Your World'

Agenda

1. Introduction & Purpose
2. Appendix R Overview Current exemption for the SWIS Background information
3. Basis for the New SWIS Exemption Deterministic and risk-informed performance-based approaches Application of risk-informed performance-based methodology Change evaluation process Assessments
4. Summary 2

Introduction & Purpose

  • Discuss status of Farley's Kaowool issues
  • Discuss SNC's application of risk-informed performance-based methodology for the Farley SWIS Appendix R 10 CFR 50.12 exemption
  • Receive feedback from the NRC on the proposed approach 3

Appendix R Overview Doug McKinney Farley Licensing Manager 4

Background Information

  • Kaowool related Appendix R exemption requests for Plant Farley were approved by the NRC during 1985 and 1986
  • The 1986 exemption for the SWIS relied on Kaowool for protection of several cables
  • On August 26, 1999, the NRC informed Farley that qualification tests did not demonstrate that Kaowool met regulatory requirements 5

Background Information (cont.)

  • SNC re-evaluated the Appendix R program
  • SNC planned modifications to eliminate dependence on Kaowool

-5 modifications completed

-27 modifications scheduled to be completed by the end of the spring 2006 outage

  • SNC will change licensing documents 6

Background Information (cont.)

For the SWIS, three options were identified

1. Comply with the Current Licensing Basis
2. Install alternate seal injection pump and reroute cables 0 "

V" k,

"11)

% r

-, " ki, A

kJ, 

II

3. Determine whether a risk-informed performance-based evaluation would justify not relying on Kaowool k.,~

9 7

Background Information (cont.)

  • A risk-informed performance-based pilot study was completed
  • SNC discussed proposed risk-informed performance-based exemption approach in previous meeting with the NRC
  • A confirming risk-informed performance-based analysis was completed
  • SNC plans modifications and new SWIS exemption 8

SWIS Plan View-Existing 72A Train B Racew ays Train A Racew ays Strainer Pit It N

I Legend Zone 72A - SW PuRrp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room - Train A Zone 73 - Battery Room - Train B Zone 74 - Battery Room - Train A Train A Train B Unit 2 SW Pumps Unit 1 SW Pumps B

B AB A

A 00 A

A 00 AB B

0 B

U -

I 72C 72D 72E 72B Train B 71 Train A 9

C (/

Current Exemption for the SWIS Five of eleven specific configurations rely in part on Kaowool for exemptions from Section III.G.2 requirements:

  • U1 Train A cables for Strainer Pit MOVs
  • U2 Train A cables for Strainer Pit MOVs
  • U2 Train A raceways for certain lube and cooling water pump cables
  • Power cables to pumps
  • Train A / Train B raceways in northeast corner 10

Basis for the New SWIS Exemption Doug McKinney Farley Licensing Manager 11

Deterministic Approach

  • Modifications
  • Deterministic reanalysis, confirming no spurious operation
  • Creation of new fire areas
  • One SW pump for fire scenario 12

Risk-Informed Performance-Based Approach

  • Evaluated power cables to SW pumps
  • Evaluated cable raceways in NE corner 13

Application of Risk-informed Performance-Based Methodology

  • Draft Section 8.3 of NEI Implementation Guide for NFPA 805 14

Change Evaluation Process The Change Evaluation Process consisted of four major parts:

  • Change Definition
  • Initial Assessment
  • Detailed Analysis
  • Documentation 15

flnItIom

ed.Iu

atn yes E

DtMnsl 16

Preliminary Assessment Initial Fire Modeling I

72A 1714 Train B Racew ays Train A Racew ays Strainer Pit N

Legend Zone 72A - SW Rinp Deck and Strainer Pit Zone 72B - Sw itchgear Room - Train B Zone 72C - 5kV Disconnect Sw itch - Train B Zone 72D - 5kV Disconnect Sw itch - Train A Zone 72E - Sw itchgear Room -Train A Zone 73 - Battery Room - Train B Zone 74 - Battery Room - Train A Train A Train B Fire Scenario 3

1 Unit 2 SW Pumps B

B AB A

A Fire Scenario 1

2 Unit 1 SW Pumps A

A AB B

B

-U F

72B 72C 72D 72E Train B 73 Train A 17

Preliminary Assessment -

Initial Risk Assessment Determined that combined analysis was required for SW pumps 18

Combined Analysis Fire modeling One SW pump remains operable Fire risk analysis CDF determined for one SW pump RG 1.174 criteria met for SWIS Defense-In-Depth Elimination of dependence on Kaowool meets NFPA 805 criteria to Prevent fires from starting Detect fires quickly and suppressing those that occur Provide protection for systems and structures so that safe shutdown can be achieved Safety Margin NRC criteria met 19

Summary

  • Continue modifications - complete in 2006
  • SWIS Current licensing bases changes Exemption based on risk-informed performance-based methodology
  • New exemption will be submitted to NRC
  • NRC feedback 20