{{#Wiki_filter:VIRGINIA Eir..CTRIC AND POWEvR COMPANY RIcuNIOND, VIRGINIA 23261 November 12, 2003 United States Nuclear Regulatory Commission                   Serial No. 03-573 Attention: Document Control Desk                             NAPS/JRP Washington, D. C. 20555                                       Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
{{#Wiki_filter:VIRGINIA Eir..CTRIC AND POWEvR COMPANY RIcuNIOND, VIRGINIA 23261 November 12, 2003 United States Nuclear Regulatory Commission Serial No.
03-573 Attention: Document Control Desk NAPS/JRP Washington, D. C. 20555 Docket Nos.
50-338 50-339 License Nos.
NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the October, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the October, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, D. A. Heacock Site Vice President Enclosure Commitments made in this letter: None.
Very truly yours, D. A. Heacock Site Vice President Enclosure Commitments made in this letter: None.
cc:     U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
cc:
      'Mr. M.J. Morgan NRC Senior Resident Inspector North Anna Power Station
U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
'Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station


VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT OCTOBER 2003 Approved:                              l(10163 -
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT OCTOBER 2003 Vice President l(10163 -
Vice President      Date
Date Approved:


OPERATING DATA REPORT
OPERATING DATA REPORT
                                                                                              ' Docket No.:   50-338 Date:   11/12/03
' Docket No.:
Date:


==Contact:==
==Contact:==
D. A. Heacock Telephone:.  (540) 894-2101
Telephone:.
: 1. Unit Name:............................................................ North Anna Unit 1
50-338 11/12/03 D. A. Heacock (540) 894-2101 1.
: 2. Reporting Period:.................................................. October, 2003
2.
: 3. Licensed Thermal Power (MWt): ..........................                 2,893
3.
: 4. Nameplate Rating (Gross MWe):..........................                     979.74
4.
: 5. Design Electrical Rating (Net MWe):....................                     907
5.
: 6. Maximum Dependable Capacity (Gross MWe):....                               971
6.
: 7. Maximum Dependable Capacity (Net MWe):........                             925
7.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Unit Name:............................................................
N/A
Reporting Period:..................................................
: 9. Power Level To Which Restricted, If Any (Net MWe):                       N/A
Licensed Thermal Power (MWt):..........................
: 10. Reasons For Restrictions, If Any:                 N/A This Month   Year-To-Date       Cumulative
Nameplate Rating (Gross MWe):..........................
: 11. Hours in Reporting Period                                                         745.0         7,296.0         222,300.0
Design Electrical Rating (Net MWe):....................
: 12. Hours Reactor Was Critical                                                       745.0         5,776.6         180,832.4
Maximum Dependable Capacity (Gross MWe):....
: 13. Reactor Reserve Shutdown Hours                                                     0.0           306.9           7,582.1
Maximum Dependable Capacity (Net MWe):........
: 14. Hours Generator On-Line                                                           745.0         5,737.3         177,526.6
North Anna Unit 1 October, 2003 2,893 979.74 907 971 925
: 15. Unit Reserve Shutdown Hours                                                         0.0             0.0               0.0
: 8.
: 16. Gross Thermal Energy Generated (MWH)                                       2,153,777.4     16,058,839.6     484,769,899.9
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 17. Gross Electrical Energy Generated (MWH)                                     730,326.0     5,428,331.0     197,361,946.0
N/A 9.
: 18. Net Electrical Energy Generated (MWH)                                       695,166.0     5,154,869.0     152,138,771.0
10.
: 19. Unit Service Factor                                                             100.0%           78.6%             79.9%
11.
: 20. Unit Availability Factor                                                       100.0%           78.6%             79.9%
12.
: 21. Unit Capacity Factor (Using MDC Net)                                           100.9%           76.4%             76.3%
13.
: 22. Unit Capacity Factor (Using DER Net)                                           102.9%           77.9%             75.5%
14.
: 23. Unit Forced Outage Rate                                                           0.0%           4.2%               6.3%
15.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Power Level To Which Restricted, If Any (Net MWe):
N/A Reasons For Restrictions, If Any:
N/A This Month Year-To-Date Cumulative Hours in Reporting Period 745.0 7,296.0 222,300.0 Hours Reactor Was Critical 745.0 5,776.6 180,832.4 Reactor Reserve Shutdown Hours 0.0 306.9 7,582.1 Hours Generator On-Line 745.0 5,737.3 177,526.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Gross Thermal Energy Generated (MWH) 2,153,777.4 16,058,839.6 484,769,899.9 Gross Electrical Energy Generated (MWH) 730,326.0 5,428,331.0 197,361,946.0 Net Electrical Energy Generated (MWH) 695,166.0 5,154,869.0 152,138,771.0 Unit Service Factor 100.0%
78.6%
79.9%
Unit Availability Factor 100.0%
78.6%
79.9%
Unit Capacity Factor (Using MDC Net) 100.9%
76.4%
76.3%
Unit Capacity Factor (Using DER Net) 102.9%
77.9%
75.5%
Unit Forced Outage Rate 0.0%
4.2%
6.3%
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
If Shut Down at End of Report Period, Estimated Date of Start-up:
N/A Estimated start-up dates are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST             ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION


AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-338 Unit Name:   North Anna Unit 1 Date: 11/12/03
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name:
North Anna Unit 1 Date:
11/12/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 MONTH:     October, 2003 Average Daily Power Level                         Average Daily Power Level Day                  (MWe - Net)                 Day                  (MWe - Net) 1                        932                     17                        934 2                        932                     18                        934 3                        932                     19                        933 4                        932                     20                        934 5                        933             -      21                        933 6                        933                     22                       933 7                        932                      23                       935 8                        932                      24                       935 9                        932                      25                       934 10                        932                      26                       934 11                        932                      27                       934 12                        931                      28                        934 13                        933                     29                        934 14                        933                     30                        934 15                        933                      31                        934 16                        934 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
D. A. Heacock Telephone: (540) 894-2101 MONTH:
October, 2003 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 932 932 932 932 933 933 932 932 932 932 932 931 933 933 933 934 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 934 934 933 934 933 933 935 935 934 934 934 934 934 934 934 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 11/12/03
Docket No.:
50-338 Unit Name:
North Anna Unit 1 Date:
11/12/03


==Contact:==
==Contact:==
D. A. Heacock Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: October, 2003
D. A. Heacock Telephone:
(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: October, 2003


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related Incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related Incidents.
Date                 Time                  Data October 1, 2003                 0000           Began the month in Mode 1, 100% power, 981 MWe.
Date October 1, 2003 October 31, 2003 Time 0000 2400 Data Began the month in Mode 1, 100% power, 981 MWe.
October 31, 2003                2400          Ended the month in Mode 1, 100% power, 978 MWe.
Ended the month in Mode 1, 100% power, 978 MWe.


Docket No.:   50-338 Unit Name:   North Anna Unit 1 Date: 11112/03
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date:
11112/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EaUAL To OR GREATER THAN 20%)
D. A. Heacock Telephone:
REPORT MONTH: October, 2003 (1)               (2)       (3)             (4)           (5)
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EaUAL To OR GREATER THAN 20%)
Method Report                           Duration                 of     LER   System   Component     Cause &
REPORT MONTH: October, 2003 (1)
No.         Date     Type     Hours   Reason     Shutting No. Code         Code     Corrective Action Down                                   to Prevent
(2)
_ Reactor                                 Recurrence I                           =     I           ==
(3)
No entries for this period (1)                          (2)                                                  (3)
(4)
F: Forced                    REASON:                                            METHOD:
(5)
S: Scheduled                A - Equipment Failure (Explain)                    1 - Manual B - Maintenance or Test                            2 - Manual Scram C - Refueling                                      3 - Automatic Scram D - Regulatory Restriction                        4 - Continuations E - Operator Training & Ucensing Examination      5 - Load Reduction F - Administrative                                9 - Other G - Operational Error H - Other (Explain)
Method Report Duration of LER System Component Cause &
(4)                                                                                (5)
No.
Exhibit G - Instructions for Preparation of Data Entry Sheets                    Exhibit H - Same Source for Ucensee Event Report (LER) File (NUREG 0161)
Date Type Hours Reason Shutting No.
Code Code Corrective Action Down to Prevent
_ Reactor Recurrence I  
=
I  


OPERATING DATA REPORT Docket No.:   50-339 Date:   11/12103
==
No entries for this period (1)
F:
Forced S: Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Test C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error H -
Other (Explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit H - Same Source
 
OPERATING DATA REPORT Docket No.:
Date:


==Contact:==
==Contact:==
D. A. Heacock Telephone:    (540) 894-2101
Telephone:
: 1. Unit Name:............................................................ North Anna Unit 2
50-339 11/12103 D. A. Heacock (540) 894-2101 1.
: 2. Reporting Period:.................................................. October, 2003
2.
: 3. Licensed Thermal Power (MWt): ..........................                 2,893
3.
: 4. Nameplate Rating (Gross MWe):..........................                     979
4.
: 5. Design Electrical Rating (Net MWe):....................                     907
5.
: 6. Maximum Dependable Capacity (Gross MWe):....                               963
6.
: 7. Maximum Dependable Capacity (Net MWe):........                             917
7.
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
Unit Name:............................................................
: 9. Power Level To Which Restricted, If Any (Net MWe):                       N/A
Reporting Period:..................................................
: 10. Reasons For Restrictions, If Any:                 N/A This Month       Year-To-Date         Cumulative
Licensed Thermal Power (MWt):..........................
: 11. Hours in Reporting Period                                                         745.0           7,296.0           200,568.0
Nameplate Rating (Gross MWe):..........................
: 12. Hours Reactor Was Critical                                                       745.0           6,568.1           170,018.8
Design Electrical Rating (Net MWe):....................
: 13. Reactor Reserve Shutdown Hours                                                       0.0               44.6           7,547.0
Maximum Dependable Capacity (Gross MWe):....
: 14. Hours Generator On-Une                                                           745.0           6,487.1           168,603.5
Maximum Dependable Capacity (Net MWe):........
: 15. Unit Reserve Shutdown Hours                                                         0.0               0.0                 0.0
North Anna Unit 2 October, 2003 2,893 979 907 963 917
: 16. Gross Thermal Energy Generated (MWH)                                       2,153,751.4       18,639,171.9       466,494,321.2
: 8.
: 17. Gross Electrical Energy Generated (MWH)                                       720,341.0       6,214,131.0       153,224,807.0
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A 9.
: 18. Net Electrical Energy Generated (MWH)                                         685,956.0       5,909,784.0       146,213,353.0
10.
: 19. Unit Service Factor                                                             100.0%               88.9%             84.1%
11.
: 20. Unit Availability Factor                                                       100.0%               88.9%             84.1%
12.
: 21. Unit Capacity Factor (Using MDC Net)                                           100.4%               88.3%             80.9%
13.
: 22. Unit Capacity Factor (Using DER Net)                                           101.5%               89.3%             80.4%
14.
: 23. Unit Forced Outage Rate                                                           0.0%               0.3%               3.9%
15.
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
Power Level To Which Restricted, If Any (Net MWe):
N/A Reasons For Restrictions, If Any:
N/A This Month Year-To-Date Cumulative Hours in Reporting Period 745.0 7,296.0 200,568.0 Hours Reactor Was Critical 745.0 6,568.1 170,018.8 Reactor Reserve Shutdown Hours 0.0 44.6 7,547.0 Hours Generator On-Une 745.0 6,487.1 168,603.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Gross Thermal Energy Generated (MWH) 2,153,751.4 18,639,171.9 466,494,321.2 Gross Electrical Energy Generated (MWH) 720,341.0 6,214,131.0 153,224,807.0 Net Electrical Energy Generated (MWH) 685,956.0 5,909,784.0 146,213,353.0 Unit Service Factor 100.0%
88.9%
84.1%
Unit Availability Factor 100.0%
88.9%
84.1%
Unit Capacity Factor (Using MDC Net) 100.4%
88.3%
80.9%
Unit Capacity Factor (Using DER Net) 101.5%
89.3%
80.4%
Unit Forced Outage Rate 0.0%
0.3%
3.9%
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A Estimated start-up dates are no longer provided.
If Shut Down at End of Report Period, Estimated Date of Start-up:
N/A Estimated start-up dates are no longer provided.
(
(


==Reference:==
==Reference:==
Letter Serial No. 00-070, dated February 11, 2000)
Letter Serial No. 00-070, dated February 11, 2000)
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26.
FORECAST                 ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Unit In Test Status (Prior to Commercial Operation):
                                                                                                                                    /I
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
/I


AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-339 Unit Name:   North Anna Unit 2 Date: 11/12/03
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit Name:
North Anna Unit 2 Date:
11/12/03


==Contact:==
==Contact:==
D. A. Heacock Telephone:   (540) 894-2101 MONTH:     October, 2003 Average Daily Power Level                         Average Daily Power Level Day                    (MWe - Net)                 Day                   (MWe - Net) 1                        922                     17                      922 2                        922                      18                      923 3                        923                     19                      924 4                        923                      20                      924 5                        923                      21                      924 6                        913                      22                      924 7                        914                      23                      925 8                        914                      24                      924 9                        916                      25                      924 10                        922                      26                      924 11                        922                      27                      924 12                        922                      28                      925 13                        911                      29                        924 14                        914                      30                        924 15                        910                      31                        923 16                        916 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
D. A. Heacock Telephone: (540) 894-2101 MONTH:
October, 2003 Day 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 922 922 923 923 923 913 914 914 916 922 922 922 911 914 910 916 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 922 923 924 924 924 924 925 924 924 924 924 925 924 924 923 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.


Docket No.: 50-339 Unit Name: North Anna Unit 2 Date:       11/12/03
Docket No.:
Unit Name:
Date:


==Contact:==
==Contact:==
D. A. Heacock Telephone:  (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: October, 2003
Telephone:
50-339 North Anna Unit 2 11/12/03 D. A. Heacock (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: October, 2003


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted In significant non-load related Incidents.
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted In significant non-load related Incidents.
Date                     Time            Data October 1, 2003             0000         Began the month in Mode 1, 100% power, 970 MWe.
Date October 1, 2003 October 31,2003 Time 0000 2400 Data Began the month in Mode 1, 100% power, 970 MWe.
October 31,2003              2400          Ended the Month In Mode 1, 100% power, 968 MWe.
Ended the Month In Mode 1, 100% power, 968 MWe.
r
r


Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 11/12/03
Docket No.: 50-339 Unit Name:
North Anna Unit 2 Date:
11/12/03


==Contact:==
==Contact:==
D. A. Heacock Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
D. A. Heacock Telephone:
REPORT MONTH: October, 2003 (1)                       (2)       (3)   l           (4)         (5)
(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
Method of Report                           Duration                   Shutting   LER     System   Component     Cause & Corrective No         Date       Type       Hours         Reason   Down       No. Code       Code     Action to Prevent
REPORT MONTH: October, 2003 (1)
_________ I _    I   _______
(2)
_____Reactor                                                     Recurrence No entries for this period (1)                               (2)                                                    (3)
(3) l (4)
F: Forced                      REASON:                                                METHOD:
(5)
S: Scheduled                  A - Equipment Failure (Explain)                         1 - Manual B - Maintenance or Tost                                 2 - Manual Scram C - Refueling                                           3 - Automatic Scram D - Regulatory Restriction                             4 - Continuations E - Operator Training & Ucensing Examination           5 - Load Reduction F - Administrative                                     9 - Other G - Operational Error H - Other (explain)
Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.
(4)                                                                                      (5)
Code Code Action to Prevent I _______
Exhibit G - Instructions for Preparation of Data Entry Sheets                         Exhibit H - Same Source for Ucensee Event Report (LER) File (NUREG 0161) 1 V.}}
I
_____Reactor Recurrence No entries for this period (1)
F:
Forced S: Scheduled (2)
REASON:
A -
Equipment Failure (Explain)
B -
Maintenance or Tost C -
Refueling D -
Regulatory Restriction E -
Operator Training & Ucensing Examination F -
Administrative G -
Operational Error H -
Other (explain)
(3)
METHOD:
1 -
Manual 2 -
Manual Scram 3 -
Automatic Scram 4 -
Continuations 5 -
Load Reduction 9 -
Other (4)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)
(5)
Exhibit H - Same Source
1 V.}}

Latest revision as of 06:27, 16 January 2025

October 2003 Monthly Operating Report for North Anna, Units 1 & 2
ML033240063
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 11/12/2003
From: Heacock D
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
03-573
Download: ML033240063 (10)


Text

VIRGINIA Eir..CTRIC AND POWEvR COMPANY RIcuNIOND, VIRGINIA 23261 November 12, 2003 United States Nuclear Regulatory Commission Serial No.03-573 Attention: Document Control Desk NAPS/JRP Washington, D. C. 20555 Docket Nos.

50-338 50-339 License Nos.

NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the October, 2003, Monthly Operating Report for North Anna Power Station Units 1 and 2.

Very truly yours, D. A. Heacock Site Vice President Enclosure Commitments made in this letter: None.

cc:

U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

'Mr. M. J. Morgan NRC Senior Resident Inspector North Anna Power Station

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT OCTOBER 2003 Vice President l(10163 -

Date Approved:

OPERATING DATA REPORT

' Docket No.:

Date:

Contact:

Telephone:.

50-338 11/12/03 D. A. Heacock (540) 894-2101 1.

2.

3.

4.

5.

6.

7.

Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

North Anna Unit 1 October, 2003 2,893 979.74 907 971 925

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Power Level To Which Restricted, If Any (Net MWe):

N/A Reasons For Restrictions, If Any:

N/A This Month Year-To-Date Cumulative Hours in Reporting Period 745.0 7,296.0 222,300.0 Hours Reactor Was Critical 745.0 5,776.6 180,832.4 Reactor Reserve Shutdown Hours 0.0 306.9 7,582.1 Hours Generator On-Line 745.0 5,737.3 177,526.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Gross Thermal Energy Generated (MWH) 2,153,777.4 16,058,839.6 484,769,899.9 Gross Electrical Energy Generated (MWH) 730,326.0 5,428,331.0 197,361,946.0 Net Electrical Energy Generated (MWH) 695,166.0 5,154,869.0 152,138,771.0 Unit Service Factor 100.0%

78.6%

79.9%

Unit Availability Factor 100.0%

78.6%

79.9%

Unit Capacity Factor (Using MDC Net) 100.9%

76.4%

76.3%

Unit Capacity Factor (Using DER Net) 102.9%

77.9%

75.5%

Unit Forced Outage Rate 0.0%

4.2%

6.3%

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

If Shut Down at End of Report Period, Estimated Date of Start-up:

N/A Estimated start-up dates are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit Name:

North Anna Unit 1 Date:

11/12/03

Contact:

D. A. Heacock Telephone: (540) 894-2101 MONTH:

October, 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 932 932 932 932 933 933 932 932 932 932 932 931 933 933 933 934 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 934 934 933 934 933 933 935 935 934 934 934 934 934 934 934 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Docket No.:

50-338 Unit Name:

North Anna Unit 1 Date:

11/12/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 1 MONTH: October, 2003

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Usted below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related Incidents.

Date October 1, 2003 October 31, 2003 Time 0000 2400 Data Began the month in Mode 1, 100% power, 981 MWe.

Ended the month in Mode 1, 100% power, 978 MWe.

Docket No.: 50-338 Unit Name: North Anna Unit 1 Date:

11112/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EaUAL To OR GREATER THAN 20%)

REPORT MONTH: October, 2003 (1)

(2)

(3)

(4)

(5)

Method Report Duration of LER System Component Cause &

No.

Date Type Hours Reason Shutting No.

Code Code Corrective Action Down to Prevent

_ Reactor Recurrence I

=

I

==

No entries for this period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Test C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error H -

Other (Explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Continuations 5 -

Load Reduction 9 -

Other (4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit H - Same Source

OPERATING DATA REPORT Docket No.:

Date:

Contact:

Telephone:

50-339 11/12103 D. A. Heacock (540) 894-2101 1.

2.

3.

4.

5.

6.

7.

Unit Name:............................................................

Reporting Period:..................................................

Licensed Thermal Power (MWt):..........................

Nameplate Rating (Gross MWe):..........................

Design Electrical Rating (Net MWe):....................

Maximum Dependable Capacity (Gross MWe):....

Maximum Dependable Capacity (Net MWe):........

North Anna Unit 2 October, 2003 2,893 979 907 963 917

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A 9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

Power Level To Which Restricted, If Any (Net MWe):

N/A Reasons For Restrictions, If Any:

N/A This Month Year-To-Date Cumulative Hours in Reporting Period 745.0 7,296.0 200,568.0 Hours Reactor Was Critical 745.0 6,568.1 170,018.8 Reactor Reserve Shutdown Hours 0.0 44.6 7,547.0 Hours Generator On-Une 745.0 6,487.1 168,603.5 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Gross Thermal Energy Generated (MWH) 2,153,751.4 18,639,171.9 466,494,321.2 Gross Electrical Energy Generated (MWH) 720,341.0 6,214,131.0 153,224,807.0 Net Electrical Energy Generated (MWH) 685,956.0 5,909,784.0 146,213,353.0 Unit Service Factor 100.0%

88.9%

84.1%

Unit Availability Factor 100.0%

88.9%

84.1%

Unit Capacity Factor (Using MDC Net) 100.4%

88.3%

80.9%

Unit Capacity Factor (Using DER Net) 101.5%

89.3%

80.4%

Unit Forced Outage Rate 0.0%

0.3%

3.9%

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A Type and duration of scheduled shutdowns are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

If Shut Down at End of Report Period, Estimated Date of Start-up:

N/A Estimated start-up dates are no longer provided.

(

Reference:

Letter Serial No.00-070, dated February 11, 2000)

26.

Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

/I

AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit Name:

North Anna Unit 2 Date:

11/12/03

Contact:

D. A. Heacock Telephone: (540) 894-2101 MONTH:

October, 2003 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 Average Daily Power Level (MWe - Net) 922 922 923 923 923 913 914 914 916 922 922 922 911 914 910 916 Day 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Average Daily Power Level (MWe - Net) 922 923 924 924 924 924 925 924 924 924 924 925 924 924 923 INSTRUCTIONS On this format, list the average daily unit power level In MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

Docket No.:

Unit Name:

Date:

Contact:

Telephone:

50-339 North Anna Unit 2 11/12/03 D. A. Heacock (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.: 2 MONTH: October, 2003

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted In significant non-load related Incidents.

Date October 1, 2003 October 31,2003 Time 0000 2400 Data Began the month in Mode 1, 100% power, 970 MWe.

Ended the Month In Mode 1, 100% power, 968 MWe.

r

Docket No.: 50-339 Unit Name:

North Anna Unit 2 Date:

11/12/03

Contact:

D. A. Heacock Telephone:

(540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: October, 2003 (1)

(2)

(3) l (4)

(5)

Method of Report Duration Shutting LER System Component Cause & Corrective No Date Type Hours Reason Down No.

Code Code Action to Prevent I _______

I

_____Reactor Recurrence No entries for this period (1)

F:

Forced S: Scheduled (2)

REASON:

A -

Equipment Failure (Explain)

B -

Maintenance or Tost C -

Refueling D -

Regulatory Restriction E -

Operator Training & Ucensing Examination F -

Administrative G -

Operational Error H -

Other (explain)

(3)

METHOD:

1 -

Manual 2 -

Manual Scram 3 -

Automatic Scram 4 -

Continuations 5 -

Load Reduction 9 -

Other (4)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Ucensee Event Report (LER) File (NUREG 0161)

(5)

Exhibit H - Same Source

1 V.