05000313/LER-1982-010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[05000313/LER-1982-010, Forwards LER 82-010/03L-0]]
| number = ML20054G762
| issue date = 06/08/1982
| title = LER 82-010/03L-0:on 820511,while at 45% Full Power,Standby Hydrogen Purge Sys Failed Monthly Surveillance Test,Failing to Meet Tech Spec Requirements.Caused by Filter Saturated W/Water.Filter Replaced
| author name = Moeggenberg D
| author affiliation = ARKANSAS POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| docket = 05000313
| license number =
| contact person =
| document report number = LER-82-010-03L-01, LER-82-10-3L-1, NUDOCS 8206220277
| package number = ML20054G759
| document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT
| page count = 2
}}
{{LER
| Title = 
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000313
| LER year = 2082
| LER number = 10
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:'
NnC FORM 3f,6                                                                                                                U. S. NUCLE AR REGULATORY COMMISSION LICENSEE EVENT REPORT                                                                    EXHlBIT A coNTRot stoCo 1 1 l l l l l@                                                  (PLEASE PRINT OR TYPE ALL REOUIRED INFORMATION) lo j i j l AlR l A l Nj 0 l 1 lgl 010 l - 10 l0 l 0l 0l 0 l- l 0 l0tactN>t      LectNSE Nuvetn                    25      26 lg;4ay,6    l1l1;ll1[gl JJ l lg 6 8 C A F 6e 7          8 9          LacENSit COog            .4    is CON'T lolil                  3",3 LL_J@l015 9 1010131113 l@l015111118121@l01610181812                69                            34                HF,OH1 DAf f        90 l@
7          8                      60          6'          DOCet t T Nuug g m          td,            EvtNT DaTE                      FS EVE NT DESCRIPTION AND PROBAOLE CONSEQUENCES h t o lai 10n 5/11/82 while at 45% full power, the standby Hydrogen Purge System                                                                                                    1 o 3        i failed the monthly surveillance test, therefore, the system failed to                                                                                            e o .        I meet the requir_ements of T.S.3.14.1.                                                The lead Hvdrogen Purge System wasj n s        ioperable at the time of the occurrence. This occurrence is reportable                                                                                              I o    r,    iper T.S.6.12.3.2.b.                                  Similar occurrences were reported in LER's                                                                    i Io1ilI313/80-037 & 79-001.                                                                                                                                                        I O H        l                                                                                                                                                                  i
                                                                                    ^
                                                  'cS'a"          '[$i  '
s 'ec"Ma                couro~aur cout                  su';'I.7u.        sES:
I,n i 9. I                          I_S I ,eE l@ L,,EJ@ L,,B_j @ l F 1 I l L I T I E I R l@ L,,Z_j@m W @
                                              ,                                                ,2                            ..
vtNTvfAq                            mr    T 0                            C E                  v6
                          @ ,=,L ,af A' HO      18121
_ 21        21 L-J 23 1011101 24          2ti y
27 10I31 7 88        19 LJ N
L            [_-j 3,
                                                                                                                                                                            $31 YANE      A i ON                ,LA T      M THOD                  HQuR$ 22        $ BMs f D          0a    LH        su,,L              UAN,FA TuFtin Laj@ULJ@ LZJ@
34                34 LZJ@
36 1010 to 1040 I LYJ@
JJ LYJ O LAJ                  @ lC I 7 l 810l@
33                                                                                      el                of                43            44              er l
C AUSE DESCR.PTION ANO CORREC flVE ACTIONS h
                , o      1 Investigation revealed that the filter was saturated with water. The                                                                                              i l                  i      isource of the moisture is believed to be the seal water for the enmnrossnys i,i?i i in the system. The filter was replaced and the system was returned to                                                                                                      1 FTTil 1 ooerable status.                                    In view of the history of system fouling and seal watert i          i leakaae. a comnrehensive studv was initi-ated in early Aoril 1982. This
                                        ~
                    ',Ic,ti,.                %,0WER d oc t,.oo n,          (continued on Attachment 32 STAfus                                          OTHEHSTATUS v              Discowf Hv                          DiscovEHY DEtt'Hi,f,0N i s LEJ@ l01415"l@l"                                    NA                l LBJ@lSURVEILLANCETEST                                                                  I AL .., Y        ca,.~,                                                  "        a        a                                                                      e a,< Asio o,          i u As.                                                                                      m,,0~o,,,1,As,@
i <.                                            NA Aoau~r          o, Activ,,, @ l[            NA                                                                          j LZJ
                                  @ LZ_J@l                                                    "            a                                                                          =
                              ,m.
                                    .m s',1, ..o.sa,,...      o,-....o, @
l 0 I 01 Ol@LZ_J@l                    "
NA                                                                                                                      l
                              , .so~d',~,u'.',c s                                                                                                                                      =
                              ~uveta              cisca.,r,0~@
NA i -
8 9 1010101@l                  ,2 l
7                                11
                        ',Te ' *L 3c"#1 o', '''''"" @
            ' 9                              NA LZ_J@l                                                                                                                                                          l
                                                                                                                                                                                        ~
3co,,,,0~ @                                                                                                                nac use ontv 2          ,3 L h f61              NA                                                                                                      1 ltlllllllllll F          G 9              .O                                                                                                              og    ,,9                        ,3
                                      ~ A v . m . . . . . ., ,        Dan Moeggenberg                                                ,,,m              501/964-3100 8206220277 820608 PDR ADOCK 05000313 S                                  PDR                                                                                -
 
ATTACiffENT LER N0. 50-313/82-010/03L-0                                                 l CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (Continued) study should provide long and short term corrective action and is expected to be completed in June 1982. An LER update will be provided when appro-priate long and short tenn corrective actions have been determined.
t
}}
 
{{LER-Nav}}

Latest revision as of 21:44, 18 March 2020