{{#Wiki_filter:Dominion Nuclear Connecticut, Inc.
{{#Wiki_filter:XWDominion-Dominion Nuclear Connecticut, Inc.
Millstone Power Station XWDominion-Rope Ferry Road Waterford, CT 06385 N I 0 Z04 U.S. Nuclear Regulatory Commission                             Serial No.      04-704 Attention: Document Control Desk                               MPS Lic/WEB RO Washington, DC 20555                                            Docket Nos. 50-336 50-423 License Nos. DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.
Millstone Power Station Rope Ferry Road Waterford, CT 06385 N
I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.
MPS Lic/WEB Docket Nos.
04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos.
DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.
MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.
If you have any questions or require additional information, please contact Mr. David W.
If you have any questions or require additional information, please contact Mr. David W.
Line 23: Line 27:
Very truly yours, I P. Sarver, Director Station Operations and Maintenance
Very truly yours, I P. Sarver, Director Station Operations and Maintenance


Serial No. 04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:     2 Commitments made in this letter: None.
Serial No. 04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:
cc:   U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station
2 Commitments made in this letter: None.
cc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station


Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 Attachment 1 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)
Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)


OPERATING DATA REPORT DOCKET NO.           50-336 UNIT NAME            Millstone 2 DATE                  11/02/2004 COMPLETED BY          S. Claffev TELEPHONE            (860) 447-1791 EXTENSION            2456 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                                                               Millstone Unit No. 2
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS
: 2. Reporting Period:                                                           October 2004
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):                                                   2700.0
Millstone Unit No. 2
: 4. Design Electrical Rating (Net MWe):                                               883.5
: 2.
: 5. Maximum Dependable Capacity (Net MWe):                                           877.7
Reporting Period:
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)                   N/A Since Last Report, Give Reasons:
October 2004
This Month       Year-to-Date         Cumulative
: 3.
: 7. Number of Hours Reactor Was Critical                       745.0           7244.5             165270.8
Licensed Thermal Power (MWt):
: 8. Hours Generator On-Line                                     745.0           7213.9             159449.7
2700.0
: 9. Unit Reserve Shutdown Hours                                   0.0               0.0               468.2
: 4. Design Electrical Rating (Net MWe):
: 10. Net Electrical Energy Generated (MWH)                   657563.5       6332161.0         131209736.8
883.5
: 5. Maximum Dependable Capacity (Net MWe):
877.7
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
: 7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8
: 8.
Hours Generator On-Line 745.0 7213.9 159449.7
: 9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
: 10.
Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8


UNIT SHUTDOWNS DOCKET NO.             50-336 UNIT NAME              Millstone 2 DATE                    11/02/2004 COMPLETED BY            S. Claffey TELEPHONE              (860) 447-1791 EXTENSION              2456 REPORTING MONTH: OCTOBER 2004 NO.           DATE   TYPE         DURATION           REASON       METHOD OF SHUTTING                         CAUSE /CORRECTIVE ACTIONS REACTOR OOURS)DOWN                                       COMMENTS N/A                                                                                                 There was no unit shutdown in October 2004.
UNIT SHUTDOWNS DOCKET NO.
2                                             3 F:   Forced           Reason:                                       Method:
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO.
S:   Scheduled       A - Equipment Failure (Explain)               I - Manual B - Maintenance or Test                       2 - Manual Trip C - Refueling                                 3 - Automatic Trip D - Regulatory Restriction                   4 - Continued from previous month E - Operator Training I license Examination   5 - Other (Explain)
DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain)
F - Administrative 0 - Operational Error (Explain)
F - Administrative 0 - Operational Error (Explain)
H - Other (Explain)
H - Other (Explain)


Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 Attachment 2 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)
Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)


OPERATING DATA REPORT DOCKET NO.           50-423 UNIT NAME            Millstone 3 DATE                  11/01/2004 COMPLETED BY          K. Cook TELEPHONE            (860) 447-1791 EXTENSION            6572 OPERATING STATUS
OPERATING DATA REPORT DOCKET NO.
: 1. Unit Name:                                                               Millstone Unit No. 3
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS
: 2. Reporting Period:                                                           October 2004
: 1. Unit Name:
: 3. Licensed Thermal Power (MWt):                                                   3411.0
Millstone Unit No. 3
: 4. Design Electrical Rating (Net MWe):                                             1153.6
: 2. Reporting Period:
: 5. Maximum Dependable Capacity (Net MWe):                                           1148.0
October 2004
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)                   N/A Since Last Report, Give Reasons:
: 3.
This Month       Year-to-Date         Cumulative
Licensed Thermal Power (MWt):
: 7. Number of Hours Reactor Was Critical                         745.0           6516.9             117621.6
3411.0
: 8. Hours Generator On-Line                                     745.0           6441.6             115816.7
: 4.
: 9. Unit Reserve Shutdown Hours                                   0.0               0.0                 0.0
Design Electrical Rating (Net MWe):
: 10. Net Electrical Energy Generated (MWH)                   860457.8       7289661.6         127136865.9 OPERATING  
1153.6
: 5. Maximum Dependable Capacity (Net MWe):
1148.0
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
: 7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6
: 8.
Hours Generator On-Line 745.0 6441.6 115816.7
: 9. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING  


==SUMMARY==
==SUMMARY==
Millstone Unit 3 operated at or near 100% power throughout October, 2004
Millstone Unit 3 operated at or near 100% power throughout October, 2004


UNIr SHUTDOWNS DOCKET NO.             50-423 UNIT NAME              Millstone 3 DATE                  11/01/04 COMPLETED BY          K. Cook TELEPHONE              (860) 447-1791 EXTENSION              6572 REPORTING MONTH: OCTOBER 2004 NO.           DATE   TYPE1         DURATION           REASON2       METHOD OF SHUTTING                         CAUSE XCORRECTIVE ACTIONS (HOURS)                             DOWN REACTOR                                     COMMENTS N/A There was no unit shutdown in October 2004 2                                             3 F:   Forced           Reason:                                       Method:
UNIr SHUTDOWNS DOCKET NO.
S:   Scheduled         A - Equipment Failure (Explain)               1 - Manual B - Maintenance or Test                       2 - Manual Trip C - Refueling                                 3 - Automatic Trip D - Regulatory Restriction                   4 - Continued from previous month E - Operator Training / license Examination   5 - Other (Explain)
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO.
F - Administrative G - Operational Error (Explain)
DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2
3 F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H - Other (Explain)}}
H - Other (Explain)}}

Latest revision as of 23:31, 15 January 2025

October 2004 Monthly Operating Report for Millstone Power Station, Units 2 and 3
ML043350366
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/10/2004
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-704
Download: ML043350366 (8)


Text

XWDominion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 N

I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/WEB Docket Nos.04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.

If you have any questions or require additional information, please contact Mr. David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, I P. Sarver, Director Station Operations and Maintenance

Serial No.04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2.

Reporting Period:

October 2004

3.

Licensed Thermal Power (MWt):

2700.0

4. Design Electrical Rating (Net MWe):

883.5

5. Maximum Dependable Capacity (Net MWe):

877.7

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8
8.

Hours Generator On-Line 745.0 7213.9 159449.7

9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
10.

Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO.

DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain)

F - Administrative 0 - Operational Error (Explain)

H - Other (Explain)

Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 3

2. Reporting Period:

October 2004

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1153.6

5. Maximum Dependable Capacity (Net MWe):

1148.0

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6
8.

Hours Generator On-Line 745.0 6441.6 115816.7

9. Unit Reserve Shutdown Hours 0.0 0.0 0.0
10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING

SUMMARY

Millstone Unit 3 operated at or near 100% power throughout October, 2004

UNIr SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO.

DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2

3 F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H - Other (Explain)