{{#Wiki_filter:Dominion Nuclear Connecticut, Inc. | {{#Wiki_filter:XWDominion-Dominion Nuclear Connecticut, Inc. | ||
Millstone Power Station | Millstone Power Station Rope Ferry Road Waterford, CT 06385 N | ||
I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No. | |||
MPS Lic/WEB Docket Nos. | |||
04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos. | |||
DOMINION NUCLEAR CONNECTICUT, INC. | |||
MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report. | MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report. | ||
If you have any questions or require additional information, please contact Mr. David W. | If you have any questions or require additional information, please contact Mr. David W. | ||
| Line 23: | Line 27: | ||
Very truly yours, I P. Sarver, Director Station Operations and Maintenance | Very truly yours, I P. Sarver, Director Station Operations and Maintenance | ||
Serial No. 04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments: | Serial No. 04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments: | ||
cc: | 2 Commitments made in this letter: None. | ||
cc: | |||
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station | |||
Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 | Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2) | ||
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC) | Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC) | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
: 1. Unit Name: | UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS | ||
: 2. Reporting Period: | : 1. Unit Name: | ||
: 3. Licensed Thermal Power (MWt): | Millstone Unit No. 2 | ||
: 4. Design Electrical Rating (Net MWe): | : 2. | ||
: 5. Maximum Dependable Capacity (Net MWe): | Reporting Period: | ||
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5) | October 2004 | ||
This Month | : 3. | ||
: 7. Number of Hours Reactor Was Critical | Licensed Thermal Power (MWt): | ||
: 8. Hours Generator On-Line | 2700.0 | ||
: 9. Unit Reserve Shutdown Hours | : 4. Design Electrical Rating (Net MWe): | ||
: 10. Net Electrical Energy Generated (MWH) | 883.5 | ||
: 5. Maximum Dependable Capacity (Net MWe): | |||
877.7 | |||
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5) | |||
N/A Since Last Report, Give Reasons: | |||
This Month Year-to-Date Cumulative | |||
: 7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8 | |||
: 8. | |||
Hours Generator On-Line 745.0 7213.9 159449.7 | |||
: 9. Unit Reserve Shutdown Hours 0.0 0.0 468.2 | |||
: 10. | |||
Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8 | |||
UNIT SHUTDOWNS DOCKET NO. | UNIT SHUTDOWNS DOCKET NO. | ||
2 | UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO. | ||
S: | DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004. | ||
2 3 | |||
F: | |||
Forced Reason: | |||
Method: | |||
S: | |||
Scheduled A - Equipment Failure (Explain) | |||
I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain) | |||
F - Administrative 0 - Operational Error (Explain) | F - Administrative 0 - Operational Error (Explain) | ||
H - Other (Explain) | H - Other (Explain) | ||
Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 | Serial No. 04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3) | ||
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC) | Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC) | ||
OPERATING DATA REPORT DOCKET NO. | OPERATING DATA REPORT DOCKET NO. | ||
: 1. Unit Name: | UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS | ||
: 2. Reporting Period: | : 1. Unit Name: | ||
: 3. Licensed Thermal Power (MWt): | Millstone Unit No. 3 | ||
: 4. Design Electrical Rating (Net MWe): | : 2. Reporting Period: | ||
: 5. Maximum Dependable Capacity (Net MWe): | October 2004 | ||
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5) | : 3. | ||
This Month | Licensed Thermal Power (MWt): | ||
: 7. Number of Hours Reactor Was Critical | 3411.0 | ||
: 8. Hours Generator On-Line | : 4. | ||
: 9. Unit Reserve Shutdown Hours | Design Electrical Rating (Net MWe): | ||
: 10. Net Electrical Energy Generated (MWH) | 1153.6 | ||
: 5. Maximum Dependable Capacity (Net MWe): | |||
1148.0 | |||
: 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5) | |||
N/A Since Last Report, Give Reasons: | |||
This Month Year-to-Date Cumulative | |||
: 7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6 | |||
: 8. | |||
Hours Generator On-Line 745.0 6441.6 115816.7 | |||
: 9. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING | |||
==SUMMARY== | ==SUMMARY== | ||
Millstone Unit 3 operated at or near 100% power throughout October, 2004 | Millstone Unit 3 operated at or near 100% power throughout October, 2004 | ||
UNIr SHUTDOWNS DOCKET NO. | UNIr SHUTDOWNS DOCKET NO. | ||
S: | UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO. | ||
F - Administrative G - Operational Error (Explain) | DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS) | ||
DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2 | |||
3 F: | |||
Forced Reason: | |||
Method: | |||
S: | |||
Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain) | |||
F - Administrative G -Operational Error (Explain) | |||
H - Other (Explain)}} | H - Other (Explain)}} | ||
Latest revision as of 23:31, 15 January 2025
| ML043350366 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/10/2004 |
| From: | Sarver S Dominion Nuclear Connecticut |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 04-704 | |
| Download: ML043350366 (8) | |
Text
XWDominion-Dominion Nuclear Connecticut, Inc.
Millstone Power Station Rope Ferry Road Waterford, CT 06385 N
I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.
MPS Lic/WEB Docket Nos.04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos.
DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.
If you have any questions or require additional information, please contact Mr. David W.
Dodson at (860) 447-1791, extension 2346.
Very truly yours, I P. Sarver, Director Station Operations and Maintenance
Serial No.04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:
2 Commitments made in this letter: None.
cc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station
Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS
- 1. Unit Name:
Millstone Unit No. 2
- 2.
Reporting Period:
October 2004
- 3.
Licensed Thermal Power (MWt):
2700.0
- 4. Design Electrical Rating (Net MWe):
883.5
- 5. Maximum Dependable Capacity (Net MWe):
877.7
- 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8
- 8.
Hours Generator On-Line 745.0 7213.9 159449.7
- 9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 10.
Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO.
DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain)
F - Administrative 0 - Operational Error (Explain)
H - Other (Explain)
Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS
- 1. Unit Name:
Millstone Unit No. 3
- 2. Reporting Period:
October 2004
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1153.6
- 5. Maximum Dependable Capacity (Net MWe):
1148.0
- 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6
- 8.
Hours Generator On-Line 745.0 6441.6 115816.7
- 9. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING
SUMMARY
Millstone Unit 3 operated at or near 100% power throughout October, 2004
UNIr SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO.
DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2
3 F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H - Other (Explain)