October 2004 Monthly Operating Report for Millstone Power Station, Units 2 and 3
ML043350366
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 11/10/2004
From: Sarver S
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
04-704
Download: ML043350366 (8)


Text

XWDominion-Dominion Nuclear Connecticut, Inc.

Millstone Power Station Rope Ferry Road Waterford, CT 06385 N

I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.

MPS Lic/WEB Docket Nos.04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos.

DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.

If you have any questions or require additional information, please contact Mr. David W.

Dodson at (860) 447-1791, extension 2346.

Very truly yours, I P. Sarver, Director Station Operations and Maintenance

Serial No.04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:

2 Commitments made in this letter: None.

cc:

U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 2

2.

Reporting Period:

October 2004

3.

Licensed Thermal Power (MWt):

2700.0

4. Design Electrical Rating (Net MWe):

883.5

5. Maximum Dependable Capacity (Net MWe):

877.7

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8
8.

Hours Generator On-Line 745.0 7213.9 159449.7

9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
10.

Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8

UNIT SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO.

DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004.

2 3

F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain)

I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain)

F - Administrative 0 - Operational Error (Explain)

H - Other (Explain)

Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)

Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS

1. Unit Name:

Millstone Unit No. 3

2. Reporting Period:

October 2004

3.

Licensed Thermal Power (MWt):

3411.0

4.

Design Electrical Rating (Net MWe):

1153.6

5. Maximum Dependable Capacity (Net MWe):

1148.0

6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)

N/A Since Last Report, Give Reasons:

This Month Year-to-Date Cumulative

7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6
8.

Hours Generator On-Line 745.0 6441.6 115816.7

9. Unit Reserve Shutdown Hours 0.0 0.0 0.0
10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING

SUMMARY

Millstone Unit 3 operated at or near 100% power throughout October, 2004

UNIr SHUTDOWNS DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO.

DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS)

DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2

3 F:

Forced Reason:

Method:

S:

Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H - Other (Explain)