XWDominion-Dominion Nuclear Connecticut, Inc.
Millstone Power Station Rope Ferry Road Waterford, CT 06385 N
I 0 Z04 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Serial No.
MPS Lic/WEB Docket Nos.04-704 RO 50-336 50-423 DPR-65 NPF-49 License Nos.
DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 OCTOBER 2004 MONTHLY OPERATING REPORTS In accordance with the reporting requirements of Technical Specification 6.9.1.7 for Millstone Power Station Unit 2 (MPS2), and Technical Specification 6.9.1.5 for Millstone Power Station Unit 3 (MPS3), enclosed are the Monthly Operating Reports for the month of October 2004. Attachment 1 contains the MPS2 Monthly Operating Report and Attachment 2 contains the MPS3 Monthly Operating Report.
If you have any questions or require additional information, please contact Mr. David W.
Dodson at (860) 447-1791, extension 2346.
Very truly yours, I P. Sarver, Director Station Operations and Maintenance
Serial No.04-704 October 2004 Monthly Operating Report Page 2 of 2 Attachments:
2 Commitments made in this letter: None.
cc:
U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 Mr. V. Nerses Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8C2 Rockville, MD 20852-2738 Mr. George Wunder Project Manager One White Flint North 11555 Rockville Pike Mail Stop 08-B-1 A Rockville, MD 20852-2738 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station
Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 2 (MPS2)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffev (860) 447-1791 2456 OPERATING STATUS
- 1. Unit Name:
Millstone Unit No. 2
- 2.
Reporting Period:
October 2004
- 3.
Licensed Thermal Power (MWt):
2700.0
- 4. Design Electrical Rating (Net MWe):
883.5
- 5. Maximum Dependable Capacity (Net MWe):
877.7
- 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7. Number of Hours Reactor Was Critical 745.0 7244.5 165270.8
- 8.
Hours Generator On-Line 745.0 7213.9 159449.7
- 9. Unit Reserve Shutdown Hours 0.0 0.0 468.2
- 10.
Net Electrical Energy Generated (MWH) 657563.5 6332161.0 131209736.8
UNIT SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-336 Millstone 2 11/02/2004 S. Claffey (860) 447-1791 2456 REPORTING MONTH: OCTOBER 2004 NO.
DATE TYPE DURATION REASON METHOD OF SHUTTING CAUSE / CORRECTIVE ACTIONS OOURS)DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004.
2 3
F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain)
I - Manual B -Maintenance or Test 2 -Manual Trip C - Refueling 3 -Automatic Trip D - Regulatory Restriction 4 -Continued from previous month E -Operator Training I license Examination 5 - Other (Explain)
F - Administrative 0 - Operational Error (Explain)
H - Other (Explain)
Serial No.04-704 October 2004 Monthly Operating Report Docket No. 50-336 50-423 October 2004 Monthly Operating Report for Millstone Power Station Unit 3 (MPS3)
Millstone Power Station Units 2 and 3 Dominion Nuclear Connecticut, Inc. (DNC)
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/2004 K. Cook (860) 447-1791 6572 OPERATING STATUS
- 1. Unit Name:
Millstone Unit No. 3
- 2. Reporting Period:
October 2004
- 3.
Licensed Thermal Power (MWt):
3411.0
- 4.
Design Electrical Rating (Net MWe):
1153.6
- 5. Maximum Dependable Capacity (Net MWe):
1148.0
- 6. If Changes Occur in Capacity Ratings (Items Number 3 through 5)
N/A Since Last Report, Give Reasons:
This Month Year-to-Date Cumulative
- 7. Number of Hours Reactor Was Critical 745.0 6516.9 117621.6
- 8.
Hours Generator On-Line 745.0 6441.6 115816.7
- 9. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 10. Net Electrical Energy Generated (MWH) 860457.8 7289661.6 127136865.9 OPERATING
SUMMARY
Millstone Unit 3 operated at or near 100% power throughout October, 2004
UNIr SHUTDOWNS DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE EXTENSION 50-423 Millstone 3 11/01/04 K. Cook (860) 447-1791 6572 REPORTING MONTH: OCTOBER 2004 NO.
DATE TYPE1 DURATION REASON2 METHOD OF SHUTTING CAUSE X CORRECTIVE ACTIONS (HOURS)
DOWN REACTOR COMMENTS N/A There was no unit shutdown in October 2004 2
3 F:
Forced Reason:
Method:
S:
Scheduled A - Equipment Failure (Explain) 1 - Manual B -Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip D -Regulatory Restriction 4 - Continued from previous month E -Operator Training / license Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H - Other (Explain)