{{#Wiki_filter:Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 A SCANA COMPANY December 2, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management
{{#Wiki_filter:A SCANA COMPANY Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 December 2, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management


==Dear Sir / Madam:==
==Dear Sir / Madam:==
==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.
If there are any questions, please call me at your convenience.
If there are any questions, please call me at your convenience.
Very truly yours, AZF4 Jeffrey B. Archie JBA/mbb Attachment c:   T. D. Gatlin                                                                       INPO Records Center T. G. Eppink (w/o Attachment)                                                     J&H Marsh & McLennan R. J. White                                                                        William G. Wendland (ANI)
Very truly yours, AZF4 Jeffrey B. Archie JBA/mbb Attachment c:
W. D. Travers                                                                      Pat Haught (Westinghouse)
T. D. Gatlin T. G. Eppink (w/o Attachment)
K. R. Cotton                                                                      C. W. Adams*
R. J. White W. D. Travers K. R. Cotton G. A. Lippard NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)
G. A. Lippard                                                                      NSRC NRC Resident Inspector                                                            CER (0-L-99-0350-1)
Pat Haught (Westinghouse)
K. M. Sutton                                                                      File (818.03-1, RR 4100)
C. W. Adams*
Paulette Ledbetter                                                                DMS (RC-04-0194)
NSRC CER (0-L-99-0350-1)
W. R. Higgins SCE&G I Virgil (. Summer NuclearStoaion
File (818.03-1, RR 4100)
* P.0. Box 88 .Jenkinsville, South Carolina 29065-T1(803) 345.5209 .www.scona.com 62§f
DMS (RC-04-0194)
SCE&G I Virgil (. Summer NuclearStoaion
* P.0. Box 88.Jenkinsville, South Carolina 29065-T1(803) 345.5209.www.scona.com 62§f


4.
4.
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 1 of 4 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT        V. C. SUMMER I DATE          December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE    (803) 345-4812 November 2004 DAY              AVERAGE DAILY POWER LEVEL        DAY            AVERAGE DAILY POWER LEVEL (Mwe-Net)                                       (Mwe-Net) 1                    985                        17                    986 2                    985                        18                    987 3                    984                        19                    987 4                      985                        20                    987 5                    986                        21                    987 6                    986                        22                    988 7                    986                        23                    987 8                    987                         24                    987 9                    986                        25                    987 10                    986                        26                    987 11                    986                        27                    987 12                    987                         28                    987 13                    987                         29                    987 14                    986                         30                    987 15                    986 16                    986
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 1 of 4 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE November 2004 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 985 17 985 18 984 19 985 20 986 21 986 22 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 AVERAGE DAILY POWER LEVEL (Mwe-Net) 986 987 987 987 987 988 987 987 987 987 987 987 987 987 986 987 986 986 986 987 987 986 986 986 23 24 25 26 27 28 29 30


Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.           50/395 UNIT                  V. C. SUMMER I DATE                  December 1, 2004 COMPLETED BY          T. V. Dao TELEPHONE              (803) 345-4812 OPERATING STATUS I     Reporting Period:                                     November 2004 Gross Hours in Reporting Period:                             720 2     Currently Authorized Power Level (MWt):                     2900 Max. Depend. Capacity (MWe-Net):                             966 Design Electrical Rating (MWe-Net):                         972.7 3     Power Level to Which Restricted (If Any) (MWe-Net):         N/A 4     Reasons for Restrictions:                                   N/A THIS MONTH       YR TO DATE     CUMULATIVE 5     Number of Hours Reactor Critical                     720.0              7762.2        154566.7 6     Reactor Reserve Shutdown Hours                           0.0                  0.0            0.0 7     Hours Generator On Line                               720.0              7747.3        152582.7 8     Unit Reserve Shutdown Hours                             0.0                  0.0            0.0 9     Gross Thermal Energy Generated (MWH)               2085933            22412852        415028907 10     Gross Electrical Energy (MWH)                       738560              7903080        140779939 11     Net Electrical Energy Generated (MWH)               710207              7596594        134599387 12     Reactor Service Factor                               100.0                  96.5            84.3 13     Reactor Availability Factor                           100.0                  96.5            84.3 14     Unit Service Factor                                   100.0                  96.4            83.2 15     Unit Availability Factor                             100.0                  96.4            83.2 16     Unit Capacity Factor (Using MDC)                     102.1                  97.8            80.4 17     Unit Capacity Factor (Using Design)                   101.4                 97.1           79.3 18      Unit Forced Outage Rate                                  0.0                 3.5            3.1 19     Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.
Refuel 15 is scheduled to start on 04/22/05 for a duration of 35 days 20     If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21     Units in Test Status (Prior to Commercial Operation):       N/A
UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 OPERATING STATUS I
Reporting Period:
November 2004 Gross Hours in Reporting Period:
720 2
Currently Authorized Power Level (MWt):
2900 Max. Depend. Capacity (MWe-Net):
966 Design Electrical Rating (MWe-Net):
972.7 3
Power Level to Which Restricted (If Any) (MWe-Net):
N/A 4
Reasons for Restrictions:
N/A THIS MONTH YR TO DATE 5
Number of Hours Reactor Critical 6
Reactor Reserve Shutdown Hours 7
Hours Generator On Line 8
Unit Reserve Shutdown Hours 9
Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 720.0 0.0 720.0 0.0 2085933 738560 710207 100.0 100.0 100.0 100.0 102.1 101.4 0.0 7762.2 0.0 7747.3 0.0 22412852 7903080 7596594 96.5 96.5 96.4 96.4 97.8 97.1 3.5 CUMULATIVE 154566.7 0.0 152582.7 0.0 415028907 140779939 134599387 84.3 84.3 83.2 83.2 80.4 79.3 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):
Refuel 15 is scheduled to start on 04/22/05 for a duration of 35 days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):
N/A


Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.     501395 UNIT           V. C. SUMMER I DATE           December 1, 2004 COMPLETED BY   T. V. Dao TELEPHONE       (803) 345-4812 November 2004 NO.       DATE       TYPE DURATION REASON METHOD           CORRECTIVE ACTION/COMMENTS None I   REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2     METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.
501395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 NO.
DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None I
REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)


==SUMMARY==
==SUMMARY==
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 4 of 4 ATTACHMENT IV NARRATIVE  
Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 4 of 4 ATTACHMENT IV NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT        V. C. SUMMER I DATE        December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE    (803) 345-4812 November 2004 V. C. Summer Station operated at full power for the entire month of November.}}
OF OPERATING EXPERIENCE DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 November 2004 V. C. Summer Station operated at full power for the entire month of November.}}

Latest revision as of 23:28, 15 January 2025

November 2004 Monthly Operating Report for Virgil C Summer Nuclear Station Unit 1
ML043410078
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/02/2004
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043410078 (5)


Text

A SCANA COMPANY Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 December 2, 2004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Director, Office of Resource Management

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 NOVEMBER MONTHLY OPERATING REPORT Enclosed is the November 2004 Monthly Operating Report for the Virgil C. Summer Nuclear Station Unit No. 1. This submittal is made in accordance with the requirements of Technical Specifications, Section 6.9.1.10.

If there are any questions, please call me at your convenience.

Very truly yours, AZF4 Jeffrey B. Archie JBA/mbb Attachment c:

T. D. Gatlin T. G. Eppink (w/o Attachment)

R. J. White W. D. Travers K. R. Cotton G. A. Lippard NRC Resident Inspector K. M. Sutton Paulette Ledbetter W. R. Higgins INPO Records Center J&H Marsh & McLennan William G. Wendland (ANI)

Pat Haught (Westinghouse)

C. W. Adams*

NSRC CER (0-L-99-0350-1)

File (818.03-1, RR 4100)

DMS (RC-04-0194)

SCE&G I Virgil (. Summer NuclearStoaion

  • P.0. Box 88.Jenkinsville, South Carolina 29065-T1(803) 345.5209.www.scona.com 62§f

4.

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 1 of 4 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE November 2004 AVERAGE DAILY POWER LEVEL DAY (Mwe-Net) 985 17 985 18 984 19 985 20 986 21 986 22 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 AVERAGE DAILY POWER LEVEL (Mwe-Net) 986 987 987 987 987 988 987 987 987 987 987 987 987 987 986 987 986 986 986 987 987 986 986 986 23 24 25 26 27 28 29 30

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 2 of 4 ATTACHMENT II OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 OPERATING STATUS I

Reporting Period:

November 2004 Gross Hours in Reporting Period:

720 2

Currently Authorized Power Level (MWt):

2900 Max. Depend. Capacity (MWe-Net):

966 Design Electrical Rating (MWe-Net):

972.7 3

Power Level to Which Restricted (If Any) (MWe-Net):

N/A 4

Reasons for Restrictions:

N/A THIS MONTH YR TO DATE 5

Number of Hours Reactor Critical 6

Reactor Reserve Shutdown Hours 7

Hours Generator On Line 8

Unit Reserve Shutdown Hours 9

Gross Thermal Energy Generated (MWH) 10 Gross Electrical Energy (MWH) 11 Net Electrical Energy Generated (MWH) 12 Reactor Service Factor 13 Reactor Availability Factor 14 Unit Service Factor 15 Unit Availability Factor 16 Unit Capacity Factor (Using MDC) 17 Unit Capacity Factor (Using Design) 18 Unit Forced Outage Rate 720.0 0.0 720.0 0.0 2085933 738560 710207 100.0 100.0 100.0 100.0 102.1 101.4 0.0 7762.2 0.0 7747.3 0.0 22412852 7903080 7596594 96.5 96.5 96.4 96.4 97.8 97.1 3.5 CUMULATIVE 154566.7 0.0 152582.7 0.0 415028907 140779939 134599387 84.3 84.3 83.2 83.2 80.4 79.3 3.1 19 Shutdowns Scheduled Over Next 6 Months (Type, Date, & Duration of Each):

Refuel 15 is scheduled to start on 04/22/05 for a duration of 35 days 20 If Shutdown at End of Report Period, Estimated Date of Startup: N/A 21 Units in Test Status (Prior to Commercial Operation):

N/A

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 3 of 4 ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO.

501395 UNIT V. C. SUMMER I DATE December 1, 2004 COMPLETED BY T. V. Dao TELEPHONE (803) 345-4812 November 2004 NO.

DATE TYPE DURATION REASON METHOD CORRECTIVE ACTION/COMMENTS None I

REASON A: Equipment Failure B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error H: Other (Explain) 2 METHOD 1: Manual 2: Manual Trip/Scram 3: Automatic Trip/Scram 4: Continuation (Use Initial Date) 5: Power Reduction (Duration 0.0) 9: Other (Explain)

SUMMARY

Director, Office of Resource Management November Monthly Operating Report RC-04-01 94 Page 4 of 4 ATTACHMENT IV NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50/395 V. C. SUMMER I December 1, 2004 T. V. Dao (803) 345-4812 November 2004 V. C. Summer Station operated at full power for the entire month of November.