{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000. Spring City, Tennessee 37381-2000 DEC 14 2004 U.S. Nuclear Regulatory Commission ATTN:         Document Control Desk Washington, D. C. 20555 Gentlemen:
{{#Wiki_filter:Tennessee Valley Authority, Post Office Box 2000. Spring City, Tennessee 37381-2000 DEC 14 2004 U.S. Nuclear Regulatory Commission ATTN:
In the Matter of                                                                   Docket No.50-390 Tennessee Valley Authority                                      )
Document Control Desk Washington, D. C. 20555 Gentlemen:
WATTS BAR NUCLEAR PLANT (WBN)                               - NOVEMBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for November 2004 as required by WBN Technical Specification Section 5.9.4.               There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
In the Matter of Tennessee Valley Authority
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report - November 2004 cc:       See page 2 Pated onIcWd pam
)
Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -
NOVEMBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for November 2004 as required by WBN Technical Specification Section 5.9.4.
There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.
Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -
November 2004 cc:
See page 2 Pated o nIcWd pam


U.S. Nuclear Regulatory Commission Page 2 DEC 1 4 2004 cc (Enclosure):
U.S. Nuclear Regulatory Commission Page 2 DEC 1 4 2004 cc (Enclosure):
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. D. V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303
NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. D. V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303


ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT   (WBN)
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)
MONTHLY OPERATING REPORT NOVEMBER 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1
MONTHLY OPERATING REPORT NOVEMBER 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1


OPERATING DATA REPORT Docket No.                   50-390 Unit Name:                  WBN Unit 1 Date:                        December 07, 2004 Completed By:                J. L. Kasten Telephone:                    (423) 365-8022 Reporting Period:            November 2004
OPERATING DATA REPORT Docket No.
: 1. Design Electrical Rating                               1,155.00
Unit Name:
: 2. Maximum Dependable Capacity (MWe-Net)                 1,121.00 This Month    Yr-to-Date      Cumulative
Date:
: 3. Number of Hours the Reactor was Critical             720.00        7,959.53        68,723.40
Completed By:
: 4. Number of Hours Generator On-line                     720.00        7,935.55        68,387.96
Telephone:
: 5. Reserve Shutdown Hours                                 0.00          0.00            0.00
Reporting Period:
: 6. Net Electrical Energy Generated (MWHrs)             828,868.00   8,994,046.59   76,009,730.26 UNIT SHUTDOWNS Type                         Method of F: Forced Duration               Shutting       Cause & Corrective Action No.       Date     S: Scheduled (Hours) Reason 1 Down 2                         Comments
50-390 WBN Unit 1 December 07, 2004 J. L. Kasten (423) 365-8022 November 2004
: 1.
Design Electrical Rating
: 2.
Maximum Dependable Capacity (MWe-Net) 1,155.00 1,121.00
: 3. Number of Hours the Reactor was Critical
: 4. Number of Hours Generator On-line
: 5. Reserve Shutdown Hours
: 6. Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 0.00 828,868.00 Yr-to-Date 7,959.53 7,935.55 0.00 8,994,046.59 Cumulative 68,723.40 68,387.96 0.00 76,009,730.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments


==SUMMARY==
==SUMMARY==
: The unit operated at or near 100% power for the month of November 2004.
: The unit operated at or near 100% power for the month of November 2004.
1                                                       2 Reason:                                                Method:
1 2
A Equipment Failure (Explain)                         1 Manual B Maintenance or Test                                 2 Manual Trip/Scram C Refueling                                           3 Automatic Trip/Scram D Regulatory Restriction                             4 Continuation E Operator Training & License Examination             5 Other (Explain)
Reason:
F Administration G Operational Error (Explain)
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
E-2}}
E-2}}

Latest revision as of 23:19, 15 January 2025

November 2004 Monthly Operating Report for Watts Bar Nuclear Plant
ML043550136
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/14/2004
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML043550136 (4)


Text

Tennessee Valley Authority, Post Office Box 2000. Spring City, Tennessee 37381-2000 DEC 14 2004 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C. 20555 Gentlemen:

In the Matter of Tennessee Valley Authority

)

Docket No.50-390 WATTS BAR NUCLEAR PLANT (WBN) -

NOVEMBER 2004 MONTHLY OPERATING REPORT Provided in the enclosure is the Monthly Operating Report for November 2004 as required by WBN Technical Specification Section 5.9.4.

There are no regulatory commitments in this submittal and should there be questions regarding this letter, please telephone me at (423) 365-1824.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure Monthly Operating Report -

November 2004 cc:

See page 2 Pated o nIcWd pam

U.S. Nuclear Regulatory Commission Page 2 DEC 1 4 2004 cc (Enclosure):

NRC Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 Mr. D. V. Pickett, Project Manager U.S. Nuclear Regulatory Commission MS 07A15 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303

ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT (WBN)

MONTHLY OPERATING REPORT NOVEMBER 2004 UNIT 1 DOCKET NUMBER 50-390 LICENSE NUMBER NPF-90 E-1

OPERATING DATA REPORT Docket No.

Unit Name:

Date:

Completed By:

Telephone:

Reporting Period:

50-390 WBN Unit 1 December 07, 2004 J. L. Kasten (423) 365-8022 November 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,155.00 1,121.00

3. Number of Hours the Reactor was Critical
4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 828,868.00 Yr-to-Date 7,959.53 7,935.55 0.00 8,994,046.59 Cumulative 68,723.40 68,387.96 0.00 76,009,730.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated at or near 100% power for the month of November 2004.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

E-2