ML18058B762: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 2: Line 2:
| number = ML18058B762
| number = ML18058B762
| issue date = 03/31/1993
| issue date = 03/31/1993
| title = Monthly Operating Rept for Mar 1993 for Palisades Nuclear Plant.W/930409 Ltr
| title = Monthly Operating Rept for Mar 1993 for Palisades Nuclear Plant
| author name = Handlovits S, Kluskowski P
| author name = Handlovits S, Kluskowski P
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:e. -- --- *- * .
{{#Wiki_filter:.,,::,.-,.
:./                                 **
:./
consumers Power POWERIN&
consumers Power POWERIN&
MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.
MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
: e. -- --- *--*.
Sincer~l~'.:'.' :* .,
Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.
                  ~                      .
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.  
~
Sincer~l~'.:'.' :*.,
PJ Kl uskowski.
PJ Kl uskowski.
Reactor Engineer CC:       DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Pali~ades Resident Inspector, Palisades                             _
Reactor Engineer CC:
DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L
DPHoffman, P26-117B ABDavis, USNRC
                  ..-.-~M~93*10-                           ---------------*-
: JLKuemin, Pali~ades Resident Inspector, Palisades DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L  
150023 9304150102 930331**
-.-.. -. -~M~93*10-150023 9304150102 930331**
PDR       ADOCK 05000255 R*                             P*DR I
PDR ADOCK 05000255 R
()'
* P*DR I
()'  


,r. . . '
,r..... '
OPERATING DATA REPORT DOCKET NO DATE 50-255 03-31-93 COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 OPERATING STATUS:
OPERATING DATA REPORT OPERATING STATUS:
NOTES:
: 1.
: 1. UNIT NAME                                                   Palisades
UNIT NAME Palisades
: 2. REPORTING PERIOD:                                         930301-930331
: 2.
: 3. LICENSED THERMAL POYER CMYt)                                   2530.0
REPORTING PERIOD:
: 4. NAMEPLATE RATING (GROSS MYe)                                   811.7
930301-930331
: 5. DESIGN ELECTRICAL RATING (NET MYe)                             805.0
: 3.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe)                         **770
LICENSED THERMAL POYER CMYt) 2530.0
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe)                           **730
: 4.
          - 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
NAMEPLATE RATING (GROSS MYe) 811.7
: 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):
: 5.
DESIGN ELECTRICAL RATING (NET MYe) 805.0
: 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MYe)  
**770
: 7.
MAXIMUM DEPENDABLE CAPACITY (NET MYe)  
**730  
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE GIVE REASONS:
: 9.
POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month      Yr-to-Date    Cumulative
: 11. HOURS IN REPORTING PERIOD
: 11. HOURS IN REPORTING PERIOD                                 744.0          2160.0      186567.0
: 12. NUMBER OF HOURS REACTOR YAS CRITICAL
: 12. NUMBER OF HOURS REACTOR YAS CRITICAL                       744.0          2160.0      105892.6
: 13. REACTOR RESERVE SHUTDOYN HOURS
: 13. REACTOR RESERVE SHUTDOYN HOURS
: 14. HOURS GENERATOR ON-LINE*                                   744.0          2160.0      101366.6
: 14. HOURS GENERATOR ON-LINE*
: 15. UNIT RESERVE SHUTDOYN HOURS
: 15. UNIT RESERVE SHUTDOYN HOURS
: 16. GROSS THERMAL ENERGY GENERATED CMYH)                   1880544.0        5458488.0  217754460.0
: 16. GROSS THERMAL ENERGY GENERATED CMYH)
: 17. GROSS ELECTRICAL ENERGY GENERATED CMYH)                 617450.0        1794720.0    68684903.0
: 17. GROSS ELECTRICAL ENERGY GENERATED CMYH)
: 18. NET ELECTRICAL ENERGY GENERATED CMYH)                   588098.0        1709624.0    64746704.0
: 18. NET ELECTRICAL ENERGY GENERATED CMYH)
: 19. UNIT SERVICE FACTOR                                       100.0%          100.0%          54.3%
: 19. UNIT SERVICE FACTOR
: 20. UNIT AVAILABILITY FACTOR                                   100.0%          100.0%          54.3%
: 20. UNIT AVAILABILITY FACTOR
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                       108.3%          108.4%          51.8%*
: 21. UNIT CAPACITY FACTOR (USING MDC NET)
: 22. UNIT CAPACITY FACTOR (USING DER NET)                       98.2%           98.3%           43.1%
: 22. UNIT CAPACITY FACTOR (USING DER NET)
: 23. UNIT FORCED OUTAGE RATE                                      0.0%             0.0%          29.9%
: 23. UNIT FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1880544.0 617450.0 588098.0 100.0%
: 24.     SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
100.0%
108.3%
98.2%
0.0%
LAST REPORT, Yr-to-Date 2160.0 2160.0 2160.0 5458488.0 1794720.0 1709624.0 100.0%
100.0%
108.4%
98.3%
0.0%
: 24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
____________ F_or:_ecast _________ Ach.i eved _ _ __
DOCKET NO 50-255 DATE 03-31-93 COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 NOTES:
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
Cumulative 186567.0 105892.6 101366.6 217754460.0 68684903.0 64746704.0 54.3%
          ** Based on condenser backpressure
54.3%
* Yeighted Average (635 MYe used as MDC Net prior to October 1985)
51.8%*
43.1%
29.9%
____________ F_or:_ecast _________ Ach.i eved ___ _
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION  
** Based on condenser backpressure
* Yeighted Average (635 MYe used as MDC Net prior to October 1985)  


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO        50-255 UNIT    Palisades DATE      04/09/93 COMPLETED BY SMHandlovits MONTH MARCH 1993                                                 TELEPHONE {616)764-8913 DAY       AVERAGE DAILY POWER LEVEL                      DAY    AVERAGE DAILY POWER LEVEL (MWe Net)                                          (MWe Net)
AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH 1993 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
: 1.                   790                               17.            792
: 1.
: 2.                   791                               18.            792
790
: 3.                   791                               19.            789
: 2.
: 4.                   791                               20.            792
791
: 5.                   791                               21.            792
: 3.
: 6.                   790                              22.            790
791
: 7.                   190                               23.            790
: 4.
: 8.                   791                               24.            787
791
: 9.                   791                               25.            790
: 5.
: 10.                   792                               26.            784
791
: 11.                   792                               27.            798
: 6.
: 12.                   792                               28.            790
790
: 13.                   793                               29.            787
: 7.
: 14.                   793.                             30.            788
190
: 15.                   791                               31.            785
: 8.
: 16.                   789 INSTRUCTIONS:
791
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.           Compute to .the nearest whole megawatt.
: 9.
791
: 10.
792
: 11.
792
: 12.
792
: 13.
793
: 14.
793.
: 15.
791
: 16.
789 INSTRUCTIONS:
DAY
: 17.
: 18.
: 19.
: 20.
: 21.
: 22.
: 23.
: 24.
: 25.
: 26.
: 27.
: 28.
: 29.
: 30.
: 31.
DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits TELEPHONE {616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 792 792 789 792 792 790 790 787 790 784 798 790 787 788 785 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to.the nearest whole megawatt.  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.  
                                        - - ------*-----              -----------}}
-- ------*-----}}

Latest revision as of 07:57, 6 January 2025

Monthly Operating Rept for Mar 1993 for Palisades Nuclear Plant
ML18058B762
Person / Time
Site: Palisades 
Issue date: 03/31/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9304150102
Download: ML18058B762 (4)


Text

.,,::,.-,.

./

consumers Power POWERIN&

MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255

e. -- --- *--*.

Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

~

Sincer~l~'.:'.' :*.,

PJ Kl uskowski.

Reactor Engineer CC:

DPHoffman, P26-117B ABDavis, USNRC

JLKuemin, Pali~ades Resident Inspector, Palisades DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L

-.-.. -. -~M~93*10-150023 9304150102 930331**

PDR ADOCK 05000255 R

  • P*DR I

()'

,r..... '

OPERATING DATA REPORT OPERATING STATUS:

1.

UNIT NAME Palisades

2.

REPORTING PERIOD:

930301-930331

3.

LICENSED THERMAL POYER CMYt) 2530.0

4.

NAMEPLATE RATING (GROSS MYe) 811.7

5.

DESIGN ELECTRICAL RATING (NET MYe) 805.0

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MYe)

    • 770
7.

MAXIMUM DEPENDABLE CAPACITY (NET MYe)

    • 730

- 8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE GIVE REASONS:

9.

POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR YAS CRITICAL
13. REACTOR RESERVE SHUTDOYN HOURS
14. HOURS GENERATOR ON-LINE*
15. UNIT RESERVE SHUTDOYN HOURS
16. GROSS THERMAL ENERGY GENERATED CMYH)
17. GROSS ELECTRICAL ENERGY GENERATED CMYH)
18. NET ELECTRICAL ENERGY GENERATED CMYH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. UNIT FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1880544.0 617450.0 588098.0 100.0%

100.0%

108.3%

98.2%

0.0%

LAST REPORT, Yr-to-Date 2160.0 2160.0 2160.0 5458488.0 1794720.0 1709624.0 100.0%

100.0%

108.4%

98.3%

0.0%

24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

DOCKET NO 50-255 DATE 03-31-93 COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 NOTES:

Cumulative 186567.0 105892.6 101366.6 217754460.0 68684903.0 64746704.0 54.3%

54.3%

51.8%*

43.1%

29.9%

____________ F_or:_ecast _________ Ach.i eved ___ _

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Yeighted Average (635 MYe used as MDC Net prior to October 1985)

AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH 1993 DAY AVERAGE DAILY POWER LEVEL (MWe Net)

1.

790

2.

791

3.

791

4.

791

5.

791

6.

790

7.

190

8.

791

9.

791

10.

792

11.

792

12.

792

13.

793

14.

793.

15.

791

16.

789 INSTRUCTIONS:

DAY

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits TELEPHONE {616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 792 792 789 792 792 790 790 787 790 784 798 790 787 788 785 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to.the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.

-- ------*-----