ML19332C470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[ST-HL-AE-3296, Monthly Operating Repts for Oct 1989 for South Texas Units 1 & 2]]
| number = ML19332C470
| issue date = 10/31/1989
| title = Monthly Operating Repts for Oct 1989 for South Texas Units 1 & 2.W/891115 Ltr
| author name = Kent A, Mcburnett M
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = ST-HL-AE-3296, NUDOCS 8911280168
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 14
}}
 
=Text=
{{#Wiki_filter:,
4
    ,,                                      4 4
  .,s i  -
          .              The Light                                                                                        1 P.0, Box 1700 Houston. Thas 77001 (713) 228 9211 E caton Lighting & Power ___._.
L 4
November 15, 1989                ;
ST-HL-AE 3296 File No.: G02                    .
10CFR50.71                      ;
^
U. S. Nuclear Regulatory Commission Attention: Document Control Desk
                          - Washington, DC--      20555 South- Texas Project Electric Generating Station Units 1 6 2                                              ,.
Docket Nos. STN 50 498'& 50-499 Month 1v Ooerr. ting Reports for October. 1989                          -
Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly                           i Operating Reports.for October, 1989.                                                                ,
If yoti should have any questions on this matter, please contact -
Mr. C. A. Ayala at (512) 972-8628.
nett Manager                                        :
Support Licensing                              i i
MAM/BEM/n1 Attachments:      .1)  STPEGS Unit 1 Monthly Operating Report - October, 1989                      <
: 2)  STPEGS Unit 2 Monthly Operating Report - October, 1989                      -
                                                                                                                              .i 1.
l 091'1280168 891031 DR  ADOCK 0500        93                                                              p).]
A1/023.NL5                A Subsidiary of Houston Industries incorporated
                                .ac
 
    ,-...          c                                                                                            P L
                    .1
                ''                                                                    ST-HL-AE 3296 m                          Houston Lighting & Power Company                      File No.: CO2
    '"                      ' South Texas Project Electric Generating Station        Page 2 cc:                                                                                r
    '                  :    Regional Administrator Region IV                  Rufus S. Scott Nuclear Regulatory Commission                    Associate General Counsel y                        611'Ryan Plaza Drive, Suite 1000                  Houston Lighting & Power Company Arlington, TX 76011                              P. O. Box 1700 llouston, TX 77001
                          - George Dick, Project Manager -
                          ' U.S. Nuclear Regulatory Commission                INPO Washington, DC 20555                              Records Center 1100 circle 75 Parkway J. I. Tapia.                                      Atlanta, GA 30339-3064
                        - Senior Resident Inspector c/o U. S. Nuclear Regulatory                      Dr. Joseph M. Hendrie Commission                                    50 Be11 port Lane P. 0.' Box 910                                    Be11 port, NY 11713 Bay City, TX- 77414 D. K. Lacker J. R. Newman, Esquire                            Bureau of Radiation Control Newman & Holtzinger, P.C.                        Texas Departmen* of Ilealth 1615 L Street, N.W.-                              1100 West 49th Street Washington, DC 20036                              Austin, TX 78704 R. L. Rango/R P. Verret Central Power & Light Company
,                            P. 0.' Box 2121 Corpus Christi, TX 78403 J.LC. Lanier Director of Cenerations City of- Austin Electric Utility 721 Barton Springs Road Austin,1DC 78704
                        - R. J. Costello/M. T. Hardt City.Public Service Board P. O. Box 1771 L                            San' Antonio, TX 78296 1'
Revised 11/15/89 i
L4/NRC/
: n.    .
n Q ''i .,
          ' k, ATTACHMENT  I I
'                                                                                                            . ST HL AE 321/                '
PAGE_.L-OE,f.-.  ..,. .. _
u          .                                                                                                                              ,
                                                                                                                                          -i.
E t
4 7"
SOUTH TEXAS PROJECT                                            '
p ELECTRIC GENERATING STATION UNIT 1                                                  ,
i MONTHLY OPERATING REPORT OCTOBER 1989 HOUSTON-LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498                                            e LICENSE NO.'NPF-76                                            j i
Reviewed  r:                                  "! !39 C
General Supervisor              Date
* Reviewed By:                                  // I!N
                                                                    'P$fi[ Engineering anager        'Date Approve'd By:      h\h        ,            ' h\\\\ 71                              '
Plant'fianager      -\          bade p
1 1
 
pm              pr                                                                                      '
                                                                                                            -}
s u f,      ,
L,-
b                                                                                                              -
ATTACHMENT /
,                                                      Monthiv Sa=<rv.
k~                                                                                    .ST PAnrKLAE 1 OE 7[ N STPEGS Unit' l was returned to service following refueling on 10/19/89 at.
                      '1106. ' The unit remained derated until 10/29/89 for reactor performance testing and low pressure turbine stationary blade stress monitoring.                            .
On 10/30/89 the unit' was derated to ~95% reactor power to allow maintenance.
on a feedwater pump.
i
+
L k
l C
i f
f
 
u4 ATTACHMENT I
                                                                                            . ST.HL AE. 3 2 Y OPERATINC DATA REPORT                    _.P l [.tl. g O f.I .
DOCKET NO. 50 498 UNIT 1 DATE Epv. 6. 1989-COMPLETED BY 'A.P. Rent TELEPHONE 512/972-7786 OPERATING STATUS
                    '1. REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD:                  745
                    ;2. CURRENTLY AUTiiORIZED POWER LEVEL (MWt):        3800 MAX. DEPEND. CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RATING-(MWe-Net): 1250.6
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
                    '4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL.....          407.1        4501.3          6998.2 l
0            0                0 -(
: 6. REACTOR RESERVE SHUTDOWN HOURS...........
: 7. HOURS GENERATOR ON LINE..................          311.4        4332.9          6738.9_
                    -8. UNIT RESERVE SHUTDOWN HOURS..............                0            0                0 l'
: 9. GROSS THERMAL ENERGY GENERATED-(MWt)..... 783890              15374296      '24188817 4
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . , 252630              5216370          8208600 11.~  NET ELECTRICAL ENERGY GENERATED (MWH).... 219398            _
4890335          7681827
: 12. REACTOR SERVICE FACTOR...................          54.6%        61.7%            67.3%  ,
l                  13. REACTOR AVAILABILITY FACTOR..............          54.6%        61.7%            67.3%
: 14. UNIT SERVICC FACT 0R. ....................          41.8%        59.4%            64.8%
l
: 15. UNIT AVAILABILITY FACTOR...........        ..... 41.8%        59.4%            64.8%
: 16. UNIT CAPACITY FACTOR (Using MDC).........          23.6%        53.6%            59.1%
: 17. UNIT CAPACITY FACTOR (Using Design MWe)..          23.6%        53.6%            59.1%
: 18. UNIT FORCED OUTAGE RATE..  ...............            0%        4.9%              7.3%
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 55 day refueling outage to begin April 7, 1990.
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                    N/A
 
e        -          -
4' i.
Hi      '
                                                                                      - ATTACHMENT I
: 3. ;.                                                                                  ST-HL AE 11.1/            i I                                              AVERAGE DAILY UNIT POWER LEVEL        .
PArJ + OF_(_. .          j
                                                                                                                .i
  ). .
5 DOCKET NO,    50-498
  !                                                                                  UNIT 1
        >                                                                            DATE Nov. 6. 1989        -3 COMPLETED BY    A.P. Kent-
                                                                                -TELEPHONE ' 512/972-7786
                    .c ;ITH _ OCTOEER r
i DAY    " AVERAGE DAILY POWER LEVEL                DAY    AVERAGE DAILY POWER LEVEL (MWe Net)                                          (MWe Net) 1                    0                            17                    0 2                    0                            18                    2 3            ,
0                            19                  14 l
                      '4                    0                            20                190 l:
5                    0                            21              ' 245-
: 6.                    0                            22                  367                ,
7                    0                            23                492          _
l L                      8                    0                            24                  754
                      ~9~                    0                            25                916 942                -'
10 .                    0                            26 l
11                      0                            27                974 1
                  ' 12 '                    0                            28                1118                  1
                  ~13                      0                            29                1222
:              14;                    O                            30                1219 15                      0                            31                1201 16                      0
 
                                                                          -                                                                              ~.
3.
                                                                                                                                                                                  .. . . 3 IN-Y
: UNIT SHUTDOWNSTAND POWER REDUCTIONS'                                                          A~
DOCKET NO.            50-498              '.
UNIT 1 DATE' Nov. 6.'1989 COMPLETED.BYiA.P! Kent TELEPHONE 512/972-7786
                                                                              . REPORT MONTH OCTOBER 1                      '2                  3                  4          5 No. Date  Type      Duration Reason              Method of    Licensee System Component              "Cause & Corrective Action to (Hours)                    Shutting'      Event    Code      Code                    Prevent Recurrence Down          Raport #
Reactor 89-10 890805      S      410.2           C              4          N/A'    N/A        .N/A          Manual shutdown for refueling and scheduled maintenance.
89-11 891018      S        10.7      .B                1          N/A      TA ~      .TRB          Manual turbine trip due-to indications of water intrusion. It was determined that'the cause was faulty instrumentation and no intrusion occurred. (Reactor Critical)'
89-12 891018      S        12.7          B              9          N/A      TA          TRB          Turbine Overspeed Test. (Reactor Critical) 1 1                      2                                                                                                          S F: Forced              Reason:                                                Method:                  IEEE 805-1983                IEEE 803A-1983 S: Scheduled            A-Equipment Failure-(Explain)                          1-Manual B-Maintenance or Test                                  2-Manual' Scram C-Refueling                                            3-Automatic Scram D-Regulatory Restriction                              '4-Cont. of Existing E-Operator Training 6. License Exam                      -Outage' F-Administrative                                        5-Reduction                      ._ ATTACHMENT \
G-Operational Error (Explain)'                          9-Other.                          . ST.HL-AE- 72 9 4 -
H-Other (Explain)-                                                                          PAGE S OF f                          i
_ . . _ _              _        _          _ - -      - . _ -          n-____.                                      .                . - . . _ ,        __ ._    ___..__a
 
                                                                                                                  =
8                                ,                                                                                  1 b,                . . . .          . - - -.                                                                        ;
            .        9 l
n' . -
ATTACHMENT /              -
ry:
                                                                                        ' ST-HL AE. 72 9/ '
PORVs and Safety Valves Si                pggg g gp g-
                            ;NO PORVs or-, Safety Valves were challenged during this. reporting period.-  .
r F
'I i b
i s
t i
1                                                                                                                    -
li                                                                                                                    [
T I
t
          /
                                --            -e                w
* w.
 
                      .t, h:                .
ATTACHMENT 2.-
T:                                                                          . ST.HL-hE 311' PAGE I OF (
L
.                                              SOUTH TEXAS PROJECT t_ '
ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT
:-                                                  OCTOBER 1989 HOUSTON LIGHTING AND POWER CO, NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewed B                                  Md b General Supervisor              Datu
                          ' Reviewed By:                                //    87                    l Pl[rfdEngineering(tanager      'Da'te                    l Appr'oved By:  11          ,              D h\85 Plant Manager-      T          bale #
I
                                                                                                  'l
!^        s,                                                                                        !
l g
 
g.-
c
      .e      .
9 E.                                                                              ATTACHMENT    2.,
Monthly Su===ry
                                                                                  . ST-HL AE J 2. W PAGE 1 OF (
STPECS Unit 2 began the reporting period at 100% reactor power.
Reactor power was reduced to ~58% on 10/05/89 due to indications of high winding temperatures on_Open Loop Auxiliary Cooling Water pump motors. The unit returned to full power at 0140 on 10/06/89.
On 10/13/89 at 1745 a reactor / turbine trip occurred from a high neutron flux negative rate detection on two of four power range neutron monitoring channels.
4 The unit went back on line at 0115 on 10/16/89.-
t-                      A Notice of Unusual Event (NOUE) was declared on 10/18/89 at 1208 when a-Feedwater Isolation Valve's Nitrogen pressure was below its technical specifi-cation value. - The NOUE was terminated at 1211 on 10/18/89 when Nitrogen pressure was restored to the' valve.
                        .The unit concluded the report period at 100% reactor power.
l                                                                                                          I I
e                                                          I t
l'.                                                                                                        I l
                                                                                                        'l
 
m+
bt L
m
~~
          '~
L }}                                                                                  ATTACHMENT 2
,?        -
ST HL AE J11(
- '                                            OPERATING DATA REPORT                  PAGE 3 OF (
    -j.
DOCKET No. 50-499 UNIT 2 DATE Nov. 3. 1989 4
COMPLETED BY    A.P. Kent TELEPHONE 512/972-7786      ,
OPERATING-STATUS
: 1. REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD:          745          .
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800-MAX. DEPEND. CAPACITY (MWe-Net);  1250.6                                            >
DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None 3.
                .4. REASONS FOR RESTRICTION (IF.ANY): N/A THIS MONTH. YR-TO DATE CUMULATIVE-
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL.....      695.2        2900.8        2900.8
: 6. REACTOR RESERVE SHUTDOWN HOURS...........            0            0              0 7.. HOURS GENERATOR ON LINE..................      689.5        2771.7        2771.7
: 8. _ UNIT R.' SERVE SHUTDOWN HOURS...-............        0            0              0
: 9. CROSS THERMAL ENERGY CENERATED (MWt) . . . . 2579773        9258454      9258454
:10. CROSS ELECTRICAL ENERGY GENERATED (MWH).. 873300            3124030  ,
3124030
: 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 832187            2946843      2946843
: 12. REACTOR SERVICE FACTOR...................      93.3%          89.5%        89 5%
: 13. _ REACTOR AVAILABILITY FACTOR..............      93.3%          89.5%        89.5%
: 14. UNIT SERVICE FACT 0R......................      92.6%          85.5%        85.5%
: 15. UNIT AVAILABILITY FACTOR. ..............        92.6%          85.5%        85.5%
: 16.  -UNIT CAPACITY FACTOR (Using MDC).........        89 3%        72.7%        72.7%-
: 17. UNIT CAPACITY FACTOR (Using Design MWe)..      89.3%          72621        72.7%
: 18. UNIT FORCED OUTAGE RATE,.................        7.4%        13.0%        13.0%
                ,19. SHUTDOWNS SCHEDULED OVER NEX16 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 44 day outage to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection and Turbine Inspections.
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:            N/A
 
1 7a y              ,
            , . y c                                                                          ATTACHMENT 1 AVERAGE DAILY UNIT POWER' LEVEL
                                                                                            ,    HA Tg    OF (
f
                                                                                                    ~
DOCKET NO. -50'499 UNIT '2 DATE Eov.-3. 1989 COMPLETED BY  A.P. Kent TELEPHONE 512/972 7786 MONTH    October 1
3
                        -DAY-  AVERAGE DAILY POWER LEVEL                  DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)-                                        (MWe Net)
^'                        1-              1108                              17              1233 2              1237                            .18              1240            ,
                                                                                                              -l 3              1194                            -19              '1239 4                1238                              20              1216 5 -.            1112                              21              1243 6-              1239                              22              1242-7-              1242                              23              1243 8              124."                            24              1244 9                1247                              25              1235            !
i 10'    _
                                          '1247                              26-              1247
                      ' 11'                1238                              27              1246 12                1232                              28              1245            3 1
13~                901-                            29              1243 14                    0                            30              1244            i l                                                                                                              l l '                      15                    0                            31              1242 16-                ~S58 m..&
 
UNIT SHIT 1 DOWNS AND POWER REDUCTIONS ~                                                        c DOCKET NO.          50-499
* UNIT        '2' DATE        Nov. 3. 1989-COMPLETED BY          A.P. Kent
                                                                                                                    . TELEPHONE 512/972-7786 REPORT MONTH OCTOBER 1
No.      Date  Type  Duretion Reason    Method of    Licensee System    Comporent          Cause 6 Corrective Action to (Hcurs)          Shutting      Event      Code      Code-                  Prevent Recurrence Down          Report #
Reactor 89-09 891005      F      0.0          A      5-          N/A      KV        FLT        Reactor power was reduced to ~58% due to indications of high winding temperatures on Open Loop Auxiliary Cooling Water Pump Motors. After the air filters on the motors were cleaned reactor power was increased.
89-10 891013      F      55.5          A      3        2-89-026    JC        IB        Reactor / Turbine trip occurred frt,m a high neutron flux negative rate detection on two of four power range neutron moni-toring channels. The exact cause of the detected negative rate could not be deter-mined, but has been attributed to a Control Rod dropping due to an intermit-tent high resistance connection in its stationary gripper circuit diode. The faulty diode was replaced. The root cause of the event is under investigation.
1 F: Forced          Reason:                                        Method:                IEEE 805-1983              IEEE 803A-1983 S: Scheduled        A-Equipment Failure (Explsin)                  ,1-Manual B-Maintenance or Test                          2-Manual Scram C-Refueling                                    3-Automatic Scram D-Regulatory Restriction                        4-Cont. of Existing                                                --
E-Operator Training & License Exam                Outage                        ~ATT/sCHMENT 1 F-Administ.rative                              5-Reduction                      ST-HL-AE- 12. #
G-Operational Errot (Explain)                  9-Other                          PAGE y ()F 6 H-Other (Explain)
 
            .g
            ?A
          ;        ? .g
                        .' 4 i p
                - If-..      '                                                            - ATTACHMENT  2. -
u                                                                                      . ST-HL AE flid
    ''                                          PORVs and Safety Valves Sn- ry          ;PAGE 6 0F #          ;__
i y                            .No PORVs or: Safety Valves were challenged during this reporting period.
n                                            -                        -
s f
h.
k b
m h
l 1
l l
l-l l-e..                        ,s i
l
[ ''}}

Latest revision as of 02:55, 31 December 2024