ML17128A181: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By: | {{#Wiki_filter:Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-1-R Page 2 of 7 Revision Record (Summary) | ||
Revision 00 New JPM developed for 2009 NRC Exam. | Revision 00 New JPM developed for 2009 NRC Exam. | ||
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Markup a copy of DOS 1100-02. | : 1. Markup a copy of DOS 1100-02. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-1-R Page 4 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 1100-02 was performed last shift. | : 2. DOS 1100-02 was performed last shift. | ||
| Line 50: | Line 50: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-1-R Page 5 of 7 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the provided copy of DOS 1100-02. | Provide the examinee with the provided copy of DOS 1100-02. | ||
* 1. Student should identify step | * 1. | ||
Student should identify step I.4 should NOT have been initialed. | |||
* 2. Student should identify step | Identifies that step should NOT have been initialed. | ||
N/Ad. | * 2. | ||
: 3. Notify Unit Supervisor of | Student should identify step I.9.g should NOT have been N/Ad. | ||
Identifies that step should NOT have been N/Ad. | |||
: 3. | |||
Notify Unit Supervisor of discrepancies. | |||
Notifies Unit Supervisor, to verify/correct issues. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-1-R Page 6 of 7 Operators Name: | ||
Job | Job | ||
| Line 79: | Line 81: | ||
==Title:== | ==Title:== | ||
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures. | 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures. | ||
K/A Number and Importance: Generic.2.1.18 | K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 20 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 85: | Line 93: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-1-R Page 7 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 1100-02 was performed last shift. | : 2. DOS 1100-02 was performed last shift. | ||
| Line 98: | Line 107: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct. | : 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-2-R Page 2 of 10 Revision Record (Summary) | ||
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator. | This is a tabletop JPM utilizing simulator procedures. | ||
: 3. Turn TV screen off. | : 2. | ||
Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator. | |||
: 3. | |||
Turn TV screen off. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Copy of M-15 Sheet 1. | : 1. Copy of M-15 Sheet 1. | ||
: 2. Copy of M-16. | : 2. Copy of M-16. | ||
: 3. Copy of OP-AA-109-101. | : 3. Copy of OP-AA-109-101. | ||
: 4. Copy of OP-DR-109-1001. | : 4. Copy of OP-DR-109-1001. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-2-R Page 4 of 10 INITIAL CONDITIONS | ||
: 1. You are an Extra NSO. | : 1. You are an Extra NSO. | ||
: 2. Unit 2 is at 500 MWe. | : 2. Unit 2 is at 500 MWe. | ||
| Line 142: | Line 151: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | A-N-2-R Page 5 of 10 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-2-R Page 6 of 10 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16. | Provide the examinee with the provided copy of M-15 Sheet 1 and M-16. | ||
If the examinee requests Clearance and Tagging procedures, they may be provided. | If the examinee requests Clearance and Tagging procedures, they may be provided. | ||
The following steps may be performed in any order | The following steps may be performed in any order | ||
: 1. Candidate identifies 2C | : 1. | ||
: 1. | Candidate identifies 2C Condensate/Condensate Booster pump on M-15 Sheet | ||
* 2. Candidate determines | : 1. | ||
Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M-15 Sheet 1. | |||
(Located on M-15 Sht. 1) | * 2. | ||
Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump: | |||
(Located on M-15 Sht. 1) 2-3301-C-500 (Closed) 2-3302-C-500 (Closed) | |||
* 3. Candidate determines | * 3. | ||
Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump: | |||
2-3305-C-500 (Closed) | |||
(Located on M-15 Sht. 1) | (Located on M-15 Sht. 1) 2-3401-C-500 (Closed) | ||
(Located on M-16) | |||
(Located on M-16) | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-2-R Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | |||
: 4. | |||
Completes worksheet with EPN and required hang position. | |||
Notifies Unit Supervisor, to verify/correct issues. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-2-R Page 8 of 10 Operators Name: | ||
Job | Job | ||
| Line 194: | Line 199: | ||
==Title:== | ==Title:== | ||
299L012 Determine points of isolation in order to remove a piece of equipment from service. | 299L012 Determine points of isolation in order to remove a piece of equipment from service. | ||
K/A Number and Importance: Generic.2.2.41 | K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 200: | Line 211: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-2-R Page 9 of 10 INITIAL CONDITIONS | ||
: 1. You are an Extra NSO. | : 1. You are an Extra NSO. | ||
: 2. Unit 2 is at 500 MWe. | : 2. Unit 2 is at 500 MWe. | ||
| Line 221: | Line 233: | ||
: 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header. | : 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header. | ||
: 2. Record recommended Isolation Points and Required Positions on the sheet provided. | : 2. Record recommended Isolation Points and Required Positions on the sheet provided. | ||
: 3. Inform the Unit Supervisor when the task is complete. | : 3. Inform the Unit Supervisor when the task is complete. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-2-R Page 10 of 10 EPN Hang Position | |||
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-3-R Page 2 of 7 Revision Record (Summary) | ||
Revision 00 New JPM. | Revision 00 New JPM. | ||
Revision 01 Revised for 2010 NRC exam. | Revision 01 Revised for 2010 NRC exam. | ||
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 3. Ensure a calculator is available and the memory/display has been cleared. | : 2. | ||
No Simulator setup needed. | |||
: 3. | |||
Ensure a calculator is available and the memory/display has been cleared. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-3-R Page 4 of 7 INITIAL CONDITIONS | ||
: 1. You are an extra NSO. | : 1. You are an extra NSO. | ||
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) | : 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) | ||
| Line 264: | Line 276: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-3-R Page 5 of 7 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the provided copy of DOS 1500-08. | Provide the examinee with the provided copy of DOS 1500-08. | ||
The following steps can be performed in any order. | The following steps can be performed in any order. | ||
If examinee states to stop, due to errors, inform him/her to continue calculations. | If examinee states to stop, due to errors, inform him/her to continue calculations. | ||
* 1. Examinee calculates Dilution | * 1. | ||
flow (1,017,000 gpm). | Examinee calculates Dilution flow (1,017,000 gpm). | ||
: 2. Examinee enters dilution flow | See attached key. | ||
(from above) to calculate CCSW Activity Limit. | : 2. | ||
* 3. Examinee calculates CCSW | Examinee enters dilution flow (from above) to calculate CCSW Activity Limit. | ||
Activity Limit (2.91 x 10-5). | See attached key. | ||
* 4. Examinee verifies CCSW | * 3. | ||
Examinee calculates CCSW Activity Limit (2.91 x 10-5). | |||
: 5. Recommends to the Unit | See attached key. | ||
sample limit exceeds the allowable discharge. | * 4. | ||
: 6. Informs Unit Supervisor task | Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit | ||
: 5. | |||
Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. | |||
Makes recommendation to Unit Supervisor. | |||
: 6. | |||
Informs Unit Supervisor task is complete. | |||
Examinee notifies the Unit Supervisor. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-3-R Page 6 of 7 Operators Name: | ||
Job | Job | ||
| Line 301: | Line 317: | ||
==Title:== | ==Title:== | ||
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | ||
K/A Number and Importance: Generic.2.3.11 | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 307: | Line 329: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-3-R Page 7 of 7 INITIAL CONDITIONS | ||
: 1. You are an extra NSO. | : 1. You are an extra NSO. | ||
: 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons. | : 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons. | ||
| Line 320: | Line 343: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Complete the performance of DOS 1500-08. | : 1. Complete the performance of DOS 1500-08. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-4-R Page 2 of 8 Revision Record (Summary) | ||
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam. | Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam. | ||
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-4-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a copy of DOA 0010-10 and DOA 0010-S1. | : 1. Provide a copy of DOA 0010-10 and DOA 0010-S1. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-4-R Page 4 of 8 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A fire is burning at the Lift Station, no explosion has occurred. | : 2. A fire is burning at the Lift Station, no explosion has occurred. | ||
| Line 360: | Line 382: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-4-R Page 5 of 8 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the supplied copy of DOA 0010-10. | Provide the examinee with the supplied copy of DOA 0010-10. | ||
Provide the examinee with the supplied copy of DOA 0010-S1 when requested. | Provide the examinee with the supplied copy of DOA 0010-S1 when requested. | ||
* 1. Notify Coal City Fire | * 1. | ||
Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.) | |||
* 2. Dial 815-942-0336 and | From DOA 0010-S1 determines that 815-942-0336 is the number needed to contact the CCFPD. | ||
* 2. | |||
Dial 815-942-0336 and communicate the details of the fire. | |||
Dials 815-942-0336 and communicates the details of the fire: | |||
Location of fire Assistance is required CUE: | |||
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities. | If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities. | ||
: 3. Notifies TSO via direct line for | : 3. | ||
phone number. | Notifies TSO via direct line for major fire. | ||
: 4. Notify | Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number. | ||
assistance in providing access to affected area if | : 4. | ||
Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary. | |||
: 5. Informs Unit Supervisor task | Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station. | ||
: 5. | |||
Informs Unit Supervisor task is complete. | |||
Examinee notifies the Unit Supervisor. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END | END | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-4-R Page 6 of 8 JPM Stop Time:_________ | |||
A-N-4-R | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-4-R Page 7 of 8 Operators Name: | ||
Job | Job | ||
| Line 399: | Line 424: | ||
==Title:== | ==Title:== | ||
295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 | 295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 405: | Line 436: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-4-R Page 8 of 8 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A fire is burning at the Lift Station, no explosion has occurred. | : 2. A fire is burning at the Lift Station, no explosion has occurred. | ||
| Line 421: | Line 453: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3. | : 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-1-S Page 2 of 7 Revision Record (Summary) | ||
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam. | Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. None. | : 1. None. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-1-S Page 4 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 3 Unit Supervisor. | : 1. You are the Unit 3 Unit Supervisor. | ||
: 2. Unit 2 and Unit 3 are operating at rated power. | : 2. Unit 2 and Unit 3 are operating at rated power. | ||
| Line 459: | Line 490: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-1-S Page 5 of 7 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Candidate locates a copy of Reportability Manual. | Candidate locates a copy of Reportability Manual. | ||
EXAMINER NOTE: | EXAMINER NOTE: | ||
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4. | The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4. | ||
* 1. | * 1. | ||
fulfillment of a Safety Function. | Determines the event is reportable per SAF 1.8. | ||
* 2. Determines the time limit to | Determines the event is reportable per SAF 1.8, Event or Condition that could have prevented fulfillment of a Safety Function. | ||
END JPM Stop Time:_________ | * 2. | ||
Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours of the occurrence (Time 0542). | |||
END JPM Stop Time:_________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-1-S Page 6 of 7 Operators Name: | ||
Job | Job | ||
| Line 486: | Line 517: | ||
==Title:== | ==Title:== | ||
299L001, Determine Reportability requirements as outlined in station Reportability manual. | 299L001, Determine Reportability requirements as outlined in station Reportability manual. | ||
K/A Number and Importance: Generic.2.1.2 | K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 20 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 492: | Line 529: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-1-S Page 7 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 3 Unit Supervisor. | : 1. You are the Unit 3 Unit Supervisor. | ||
: 2. Unit 2 and Unit 3 are operating at rated power. | : 2. Unit 2 and Unit 3 are operating at rated power. | ||
| Line 507: | Line 545: | ||
* 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge. | * 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. | : 1. Utilizing the Reportability Manual, determine the earliest reportability requirement. | ||
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-2-S Page 2 of 8 Revision Record (Summary) | ||
Revision 00 Modified for 2010 Cert Exam. | Revision 00 Modified for 2010 Cert Exam. | ||
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam. | Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Marked up copy of OP-AA-105-102. | : 1. Marked up copy of OP-AA-105-102. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-2-S Page 4 of 8 INITIAL CONDITIONS | ||
: 1. You are the Shift Manager. | : 1. | ||
: 2. An SRO is in the process of license reactivation. | You are the Shift Manager. | ||
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | : 2. | ||
An SRO is in the process of license reactivation. | |||
: 3. | |||
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions. | : 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions. | ||
| Line 543: | Line 583: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-2-S Page 5 of 8 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comm ent NOTE: | |||
Provide the Examinee the provided marked up copy of OP-AA-105-102. | Provide the Examinee the provided marked up copy of OP-AA-105-102. | ||
: 1. Review OP-AA-105-102, | : 1. | ||
: 2. Check that Hours on Shift are in | Review OP-AA-105-102,. | ||
quarter and cannot be counted towards license re-activation. | Reviews OP-AA-105-102,. | ||
: 3. Check that Hours on Shift are | : 2. | ||
Check that Hours on Shift are in the same calendar quarter. | |||
Notes 12.0 hours listed on 6/26/16 are performed during the 2nd calendar quarter and cannot be counted towards license re-activation. | |||
: 3. | |||
Check that Hours on Shift are applicable for license reactivation. | |||
Determines 12.0 hours as WEC listed on 07/3/16 cannot be credited towards license re-activation. | |||
EXAMINER NOTE: | EXAMINER NOTE: | ||
Steps 2 and 3 lead to the determination in step 4 | Steps 2 and 3 lead to the determination in step 4 | ||
: 4. | |||
requirement. | Check that licensee has the required 40 hours. | ||
Determines that licensee does NOT have adequate hours to meet the 40 hour requirement. | |||
: 6. Report the results of the review | : 5. | ||
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. | Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed. | ||
: 6. | |||
Report the results of the review to the Shift Operations Superintendent (SOS). | |||
Returns without signing OP-AA-105-102, Attachment 2 to the SOS. | |||
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete. | |||
CUE: | CUE: | ||
As the SOS, acknowledge the report. | As the SOS, acknowledge the report. | ||
END | END | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-2-S Page 6 of 8 JPM Stop Time:_________ | |||
A-N-2-S | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-2-S Page 7 of 8 Operators Name: | ||
Job | Job | ||
| Line 580: | Line 627: | ||
==Title:== | ==Title:== | ||
Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 | Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 12 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 586: | Line 639: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-2-S Page 8 of 8 INITIAL CONDITIONS | ||
: 1. You are the Shift Manager. | : 1. | ||
: 2. An SRO is in the process of license reactivation. | You are the Shift Manager. | ||
: 3. OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | : 2. | ||
An SRO is in the process of license reactivation. | |||
: 3. | |||
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions | : 1. | ||
The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions | |||
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-3-R Page 2 of 7 Revision Record (Summary) | ||
Revision 01 Bank JPM. | Revision 01 Bank JPM. | ||
Revision 02 Revised for 2010 NRC exam. | Revision 02 Revised for 2010 NRC exam. | ||
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 6600-02. | : 1. Provide a marked up copy of DOS 6600-02. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-3-R Page 4 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Unit Supervisor. | : 1. You are the Unit 2 Unit Supervisor. | ||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | : 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | ||
| Line 636: | Line 694: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-3-R Page 5 of 7 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the provided copy of DOS 6600-02. | Provide the examinee with the provided copy of DOS 6600-02. | ||
* 1. Candidate should identify | * 1. | ||
Candidate should identify step I.1.e has a mathematical error. | |||
* 2. Candidate should identify | Identifies differential pressure should read 4. | ||
signed off as verified dP of <6 | * 2. | ||
(actual is 7). | Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7). | ||
* 3. Candidate should identify that | Identifies incorrect verification of dP <6. | ||
initialed by the same person | * 3. | ||
performing the surveillance and were NOT independently verified. | Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified. | ||
: 4. Notify Unit Supervisor of | Identifies step NOT independently verified. | ||
may initiate IR. | : 4. | ||
Notify Unit Supervisor of discrepancies. | |||
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-3-R Page 6 of 7 Operators Name: | ||
Job | Job | ||
| Line 669: | Line 727: | ||
==Title:== | ==Title:== | ||
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 | 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 12 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 675: | Line 739: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-3-R Page 7 of 7 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Unit Supervisor. | : 1. You are the Unit 2 Unit Supervisor. | ||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | : 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | ||
| Line 689: | Line 754: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Perform calculation verification and ensure paperwork is correct. | : 1. Perform calculation verification and ensure paperwork is correct. | ||
: 2. Inform me when the task is complete. | : 2. Inform me when the task is complete. | ||
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-4-S Page 2 of 8 Revision Record (Summary) | ||
Revision 00 New JPM. | Revision 00 New JPM. | ||
Revision 01 Revised for 2010 NRC exam. | Revision 01 Revised for 2010 NRC exam. | ||
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam. | Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-4-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 3. Ensure a calculator is available and the memory/display has been cleared. | : 2. | ||
No Simulator setup needed. | |||
: 3. | |||
Ensure a calculator is available and the memory/display has been cleared. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-4-S Page 4 of 8 INITIAL CONDITIONS | ||
: 1. You are the U2 US. | : 1. You are the U2 US. | ||
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | : 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | ||
| Line 727: | Line 792: | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-4-S Page 5 of 8 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the examinee with the provided copy of DOS 1500-08. | Provide the examinee with the provided copy of DOS 1500-08. | ||
The following steps can be performed in any order. | The following steps can be performed in any order. | ||
* 1. Verifies | * 1. | ||
gpm. | Verifies Dilution flow calculation (1,017,000 gpm). | ||
* 2. Enters dilution flow | Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm. | ||
* 2. | |||
Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit. | |||
Determines 2.91 x 10-5 is the correct CCSW sample activity limit. | |||
NOTE: | NOTE: | ||
If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated: | If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated: | ||
Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review. | Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review. | ||
: 3. Verifies CCSW Heat | : 3. | ||
Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5. | |||
: 4. | |||
Correct value is 2.01 x10-5. | Re-Performs Canal Activity Calculation. | ||
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger. | |||
Correct value is 2.01 x10-5. | |||
: 5. | |||
Determines Canal Activity Concentration. | |||
Determines Canal Activity Concentration is 6.9 x10-8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-4-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | |||
: 6. Determines need for | : 6. | ||
Determines need for NSO to re-perform calculations. | |||
Examinee directs NSO to re-perform calculations CUE: | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-4-S Page 7 of 8 Operators Name: | ||
Job | Job | ||
| Line 766: | Line 838: | ||
==Title:== | ==Title:== | ||
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | ||
K/A Number and Importance: Generic.2.3.11 | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 772: | Line 850: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-4-S Page 8 of 8 INITIAL CONDITIONS | ||
: 1. You are the U2 US. | : 1. You are the U2 US. | ||
: 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | : 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS. | ||
| Line 785: | Line 864: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Review and Verify DOS 1500-08. | : 1. Review and Verify DOS 1500-08. | ||
: 2. Inform the Unit 2 Supervisor when the task is complete. | : 2. Inform the Unit 2 Supervisor when the task is complete. | ||
SRRS: 3D.105 (when utilized for operator initial or continuing training) | |||
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | A-N-5-S Page 2 of 8 Revision Record (Summary) | ||
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. | ||
: 2. No Simulator setup needed. | This is a tabletop JPM utilizing simulator procedures. | ||
: 2. | |||
No Simulator setup needed. | |||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. For exam purposes/exam security provide a colored copy of a blank NARS form. | : 1. For exam purposes/exam security provide a colored copy of a blank NARS form. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-5-S Page 4 of 8 INITIAL CONDITIONS | ||
: 1. This is a time critical JPM. | : 1. This is a time critical JPM. | ||
: 2. You are the Shift Emergency Director. | : 2. You are the Shift Emergency Director. | ||
| Line 824: | Line 903: | ||
* Denotes critical steps. | * Denotes critical steps. | ||
* Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | A-N-5-S Page 5 of 8 Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | A-N-5-S Page 6 of 8 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts. | Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts. | ||
Provide the supplied NARS Form. | Provide the supplied NARS Form. | ||
Provide the supplied screen shot of the meteorological data. | Provide the supplied screen shot of the meteorological data. | ||
* 1. Determines a classification of | * 1. | ||
Security Force that a | Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred. | ||
occurring within the protected area AND Damage to spent fuel pool has occurred. | Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement). | ||
NOTE: | NOTE: | ||
Determines classification start time _______ and stop time _______ . | Determines classification start time _______ and stop time _______. | ||
(15 minute limit) | (15 minute limit) | ||
* 2. Properly fills out NARS form. See attached key for the areas that must be filled out correctly (12 minute requirement) | * 2. | ||
Properly fills out NARS form. | |||
See attached key for the areas that must be filled out correctly (12 minute requirement) | |||
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used. | NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used. | ||
NOTE: | NOTE: | ||
Fill out NARS form start time (when declaration completed) _______ and stop time _______ . | Fill out NARS form start time (when declaration completed) _______ and stop time _______. | ||
(12 minute limit) | (12 minute limit) | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | A-N-5-S Page 7 of 8 Operators Name: | ||
Job | Job | ||
| Line 863: | Line 941: | ||
==Title:== | ==Title:== | ||
295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 | 295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: | ||
Simulator Control Room In-Plant Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
| Line 869: | Line 953: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | A-N-5-S Page 8 of 8 INITIAL CONDITIONS | ||
: 1. This is a time critical JPM. | : 1. This is a time critical JPM. | ||
: 2. You are the Shift Emergency Director. | : 2. You are the Shift Emergency Director. | ||
| Line 889: | Line 974: | ||
INITIATING CUES | INITIATING CUES | ||
: 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. | : 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. | ||
Give the NARS form to the WEC Supervisor, who will make the state notification. | Give the NARS form to the WEC Supervisor, who will make the state notification. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By: | TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DOP 1100-02 | Initiating cue (and terminating cue if required) are properly identified. | ||
Procedure | : 6. | ||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
SME / Instructor | If an alternate path is used, the task standard contains criteria for successful completion. | ||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 1100-02 Rev: 19 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary) | ||
Revision 02 Revised for 2013 NRC exam. | Revision 02 Revised for 2013 NRC exam. | ||
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam | Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam | ||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to IC _51_. | : 1. Reset the simulator to IC _51_. | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Run CAEP file S-N-a.cae. | : 2. Run CAEP file S-N-a.cae. | ||
: 3. If the CAEP file cannot be run then insert the following Expert Commands: | : 3. If the CAEP file cannot be run then insert the following Expert Commands: | ||
: a. Insert following Malfunctions and/or Remotes: | : a. Insert following Malfunctions and/or Remotes: | ||
IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure). | |||
IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure). | |||
IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so # | |||
whichever pump is started first will not develop flow) | whichever pump is started first will not develop flow) | ||
IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so # | |||
whichever pump is started first will not develop flow) | whichever pump is started first will not develop flow) | ||
IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF) | |||
: b. Setup the following Triggers: | : b. Setup the following Triggers: | ||
TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position) | |||
TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction) | |||
TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position) | |||
TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction) | |||
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard. | DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard. | ||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 NSO. | : 1. You are the Unit 2 NSO. | ||
: 2. A transient has occurred, resulting in an ATWS. | : 2. A transient has occurred, resulting in an ATWS. | ||
| Line 954: | Line 1,047: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-a Rev 03 JPM Start Time: | |||
: 1. Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS) | STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy. | ||
: 2. Place | : 1. | ||
: 3. Verifies applicable SQUIB pilot | Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS) | ||
: 2. | |||
Note | Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position. | ||
: 4. Verifies applicable PUMP pilot | Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position. | ||
light | : 3. | ||
Verifies applicable SQUIB pilot light NOT lit. | |||
SQUIB A or B light off. | |||
Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup). | |||
: 4. | |||
Verifies applicable PUMP pilot light lit. | |||
PUMP light on. | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 5. Verifies FLOW pilot light lit. | : 5. | ||
: 6. SBLC SQUIB VLV CKT FAILURE | Verifies FLOW pilot light lit. | ||
FLOW light off (SBLC is NOT injecting). | |||
: 6. | |||
1. | SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6). | ||
: 8. Verifies opposite PUMP pilot light | Annunciator 902-5 H-6 illuminated. | ||
*7. | |||
Note | Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step | ||
: 9. Verifies RWCU valve 2-1201-1 | : 1. | ||
Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1. | |||
: 8. | |||
Verifies opposite PUMP pilot light lit. | |||
Opposite PUMP light on. | |||
Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned. | |||
: 9. | |||
Verifies RWCU valve 2-1201-1 closed. | |||
Examinee recognizes that valve 2-1201-1 valve did NOT close. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
: 11. Verifies RWCU valve 2-1201-1A | *10. | ||
Closes RWCU valve 2-1201-1. | |||
: 12. Verifies RWCU valve 2-1201-2 | Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position. | ||
: 11. | |||
: 14. Verifies RWCU valve 2-1201-3 | Verifies RWCU valve 2-1201-1A closed. | ||
GREEN light illuminated. | |||
: 15. Verifies RWCU valve 2-1201-7 | : 12. | ||
Verifies RWCU valve 2-1201-2 closed. | |||
: 16. Informs Unit Supervisor task is | Examinee recognizes that valve 2-1201-2 valve did NOT close. | ||
Cue | *13. | ||
END JPM Stop Time: | Closes RWCU valve 2-1201-2. | ||
Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position. | |||
: 14. | |||
Verifies RWCU valve 2-1201-3 closed. | |||
GREEN light illuminated. | |||
: 15. | |||
Verifies RWCU valve 2-1201-7 closed. | |||
RED light illuminated. | |||
: 16. | |||
Informs Unit Supervisor task is complete. | |||
Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically. | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-a Rev 03 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a | SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and | ||
==Title:== | ==Title:== | ||
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 | 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path: | ||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 NSO. | : 1. You are the Unit 2 NSO. | ||
: 2. A transient has occurred, resulting in an ATWS. | : 2. A transient has occurred, resulting in an ATWS. | ||
| Line 1,021: | Line 1,146: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card. | : 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By: | TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DOP 0600-06 | Initiating cue (and terminating cue if required) are properly identified. | ||
Procedure | : 6. | ||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
SME / Instructor | If an alternate path is used, the task standard contains criteria for successful completion. | ||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 0600-06 Rev: 44 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Revision Record (Summary) | ||
Revision 02 Bank JPM. | Revision 02 Bank JPM. | ||
Revision 03 Revised for 2009 NRC Exam. | Revision 03 Revised for 2009 NRC Exam. | ||
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam | Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam | ||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to IC _52_. | : 1. Reset the simulator to IC _52_. | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Verify BOTH FW REG ISOL VALVES are OPEN: | : 2. Verify BOTH FW REG ISOL VALVES are OPEN: | ||
* MO 2-3206A | * MO 2-3206A | ||
| Line 1,066: | Line 1,200: | ||
* None. | * None. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Copy of DOP 0600-06 marked up through limitations and actions. | : 1. | ||
Copy of DOP 0600-06 marked up through limitations and actions. | |||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit Startup is in progress. | : 2. Unit Startup is in progress. | ||
| Line 1,086: | Line 1,220: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-b Rev 04 JPM Start Time: | |||
: 1. Verify 2A and 2B FWRVs have | STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600-06. | ||
been pre-operationally tested per Step G.1. | : 1. | ||
: 2. Verify the following valves are | Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1. | ||
Condition met in initial conditions. | |||
: 2. | |||
Verify the following valves are open: | |||
MO 2-3205A, FW LINE STOP. | |||
MO 2-3205B, FW LINE STOP. | |||
MO 2-3206A, 2A FW REG ISOL. | |||
MO 2-3206B, 2B FW REG ISOL. | |||
GREEN lights illuminated on the following: | |||
* MO 2-3205A | * MO 2-3205A | ||
* MO 2-3205B | * MO 2-3205B | ||
* MO 2-3206A | * MO 2-3206A | ||
* MO 2-3206B | |||
* MO 2-3206B | : 3. | ||
Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level. | |||
: 3. Adjust MASTER CONTROL | Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION. | ||
: 4. Select appropriate FWLCS RPV | : 4. | ||
: 5. Place RX LO FLOW CONTROL | Select appropriate FWLCS RPV level signal per Section G.17. | ||
STATION. | Depresses appropriate FWLCS RPV level signal pushbutton. | ||
: 5. | |||
: 7. Verify other REG VLV CONTROL | Place RX LO FLOW CONTROL STATION to AUTO. | ||
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION. | |||
*6. | |||
Place one REG VLV CONTROL STATION in AUTO. | |||
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION. | |||
: 7. | |||
Verify other REG VLV CONTROL STATION in MAN. | |||
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
Note | *8. | ||
: 9. Informs Unit Supervisor task is | Place MASTER CONTROL STATION in AUTO. | ||
Cue | Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION. | ||
END JPM Stop Time: | Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow. | ||
: 9. | |||
Informs Unit Supervisor task is complete. | |||
Examinee notifies the Unit Supervisor. | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-b Rev 04 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b | Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and | ||
==Title:== | ==Title:== | ||
259L021, Place FRV in service in AUTO (unit startup). | 259L021, Place FRV in service in AUTO (unit startup). | ||
K/A Number and Importance: | K/A Number and Importance: | ||
259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit Startup is in progress. | : 2. Unit Startup is in progress. | ||
| Line 1,150: | Line 1,309: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2. | : 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By: | TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DEOP 0500-03 Rev: 23 Procedure | Initiating cue (and terminating cue if required) are properly identified. | ||
Procedure | : 6. | ||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
SME / Instructor | If an alternate path is used, the task standard contains criteria for successful completion. | ||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DEOP 0500-03 Rev: 23 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary) | ||
Revision 06 Bank JPM. | Revision 06 Bank JPM. | ||
Revision 07 Revised for ILT 12-1 Cert Exam. | Revision 07 Revised for ILT 12-1 Cert Exam. | ||
Revision 08 Revised for ILT 14-1 NRC Exam. | Revision 08 Revised for ILT 14-1 NRC Exam. | ||
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam. | Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to any IC (IC _53__ used for validation). | : 1. Reset the simulator to any IC (IC _53__ used for validation). | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Verify ALL LP ECCS Pumps are in PTL. | : 2. Verify ALL LP ECCS Pumps are in PTL. | ||
: 3. Run the following CAEP file: S-N-d.cae | : 3. Run the following CAEP file: S-N-d.cae | ||
: 4. If the CAEP cannot be ran, insert the following Expert Commands: | : 4. If the CAEP cannot be ran, insert the following Expert Commands: | ||
Insert the following Malfunctions, Remotes, and/or Overrides: | |||
o | o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close Assign the following trigger assignment: | ||
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems. | |||
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems. | |||
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection. | : 2. A transient has occurred requiring Alternate Water Injection. | ||
| Line 1,213: | Line 1,378: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-d Rev 09 JPM Start Time: | |||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE: | |||
Provide the Examinee with the provided copy of DEOP 0500-03. | Provide the Examinee with the provided copy of DEOP 0500-03. | ||
: 1. Verifies 2A LPCI PP control | : 1. | ||
switch in Pull-to-Lock. | Verifies 2A LPCI PP control switch in Pull-to-Lock. | ||
: 2. Place PP SUCT VLV MO 2- | ALL lights extinguished. | ||
1501-5A control switch in Manual Bypass and verify closed. | : 2. | ||
: 3. Verify MIN FLOW VLV 2- | Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed. | ||
1501-13A closed if not needed. | RED light illuminated. | ||
: 3. | |||
Verify MIN FLOW VLV 2-1501-13A closed if not needed. | |||
RED light illuminated. | |||
CUE: | CUE: | ||
2-1501-13A is not required for 2B LPCI pump. | 2-1501-13A is not required for 2B LPCI pump. | ||
NOTE: | NOTE: | ||
The following valves may be verified in any order | The following valves may be verified in any order | ||
: 4. Verify TORUS CLG/TEST | : 4. | ||
valves 2-1501-20A and 2-1501-38A closed. | Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed. | ||
: 5. Verify TORUS SPRAY VLVs | GREEN lights illuminated. | ||
2-1501-19A and 2-1501-18A closed. | : 5. | ||
: 6. Verify DW SPRAY VLVs 2- | Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. | ||
1501-28A and 2-1501-27A closed. | GREEN lights illuminated. | ||
: 7. Verify TORUS CLG/TEST | : 6. | ||
valves 2-1501-20B and 2-1501-38B closed. | Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed. | ||
: 8. Verify TORUS SPRAY VLVs | GREEN lights illuminated. | ||
2-1501-19B and 2-1501-18B closed. | : 7. | ||
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed. | |||
GREEN lights illuminated. | |||
: 8. | |||
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed. | |||
GREEN lights illuminated. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 9. Verify DW SPRAY VLVs 2- | S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | ||
1501-28B and 2-1501-27B closed. | : 9. | ||
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed. | |||
GREEN lights illuminated. | |||
NOTE: | NOTE: | ||
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8). | For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8). | ||
CUE: | CUE: | ||
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed. | When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed. | ||
: 10. Unlock AND open 2-1501- | : 10. Unlock AND open 2-1501-74A, U2 LPCI A PMP VENT VLV. | ||
Instructs EO to complete step G.12.c.(5).(a). | |||
: 11. Crack open 2-1501-15A, U2 | : 11. Crack open 2-1501-15A, U2 LPCI A PMP VENT VLV until flow is observed from pipe. | ||
Instructs EO to complete step G.12.c.(5).(b). | |||
: 12. Close 2(3)-1501-15A, U2 | : 12. Close 2(3)-1501-15A, U2 LPCI A PMP VENT VLV. | ||
: 13. Close AND lock 2-1501-74A, | Instructs EO to complete step G.12.c.(5).(c). | ||
: 13. Close AND lock 2-1501-74A, U2(3) LPCI A PMP VENT VLV. | |||
: 14. Open 2-1501-47A-R, U2 | Instructs EO to complete step G.12.c.(5).(d). | ||
: 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig. | |||
Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6). & G.12.c.(7). | |||
CUE: | CUE: | ||
PI 2-1501-47A indicates 15.5 psig. | PI 2-1501-47A indicates 15.5 psig. | ||
: 15. Recognizes reading is NOT | : 15. Recognizes reading is NOT less than 15 psig. | ||
Determines reading is greater than 15 psig. | |||
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 16. Close 2-1501-47A-R, U2 | S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | ||
: 16. Close 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV. | |||
Instructs EO to close 2-1501-47A per step G.12.c.(8). | |||
CUE: | CUE: | ||
2-1501-47A-R is Closed. | 2-1501-47A-R is Closed. | ||
: 17. Open PP SUCT VLV MO 2- | : 17. Open PP SUCT VLV MO 2-1501-5A. | ||
GREEN light illuminated. | |||
: 18. Notify Unit Supervisor that 2A | : 18. Notify Unit Supervisor that 2A LPCI pump cannot be used with suction from the CST. | ||
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump. | |||
CUE: | CUE: | ||
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST. | Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST. | ||
Maintain the 2A LPCI pump in PTL. | Maintain the 2A LPCI pump in PTL. | ||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 19. Verifies 2C LPCI PP control | : 19. Verifies 2C LPCI PP control switch in Pull-to-Lock. | ||
switch in Pull-to-Lock. | ALL lights extinguished. | ||
* 20. Place PP SUCT VLV MO 2- | * 20. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed. | ||
1501-5C control switch in Manual Bypass and verify closed. | RED light illuminated. | ||
: 21. Verify MIN FLOW VLV 2- | : 21. Verify MIN FLOW VLV 2-1501-13B closed if not needed. | ||
1501-13B closed if not needed. | RED light illuminated. | ||
CUE: | CUE: | ||
2-1501-13B is not required for 2D LPCI pump. | 2-1501-13B is not required for 2D LPCI pump. | ||
: 22. Verify TORUS CLG/TEST | : 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed. | ||
valves 2-1501-20A and 2-1501-38A closed. | GREEN lights illuminated. | ||
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 23. Verify TORUS SPRAY VLVs | S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | ||
2-1501-19A and 2-1501-18A closed. | : 23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. | ||
: 24. Verify DW SPRAY VLVs 2- | GREEN lights illuminated. | ||
1501-28A and 2-1501-27A closed. | : 24. Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed. | ||
: 25. Verify TORUS CLG/TEST | GREEN lights illuminated. | ||
valves 2-1501-20B and 2-1501-38B closed. | : 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed. | ||
: 26. Verify TORUS SPRAY VLVs | GREEN lights illuminated. | ||
2-1501-19B and 2-1501-18B closed. | : 26. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed. | ||
: 27. Verify DW SPRAY VLVs 2- | GREEN lights illuminated. | ||
1501-28B and 2-1501-27B closed. | : 27. Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed. | ||
: 28. Unlock AND open 2-1501- | GREEN lights illuminated. | ||
: 28. Unlock AND open 2-1501-74C, U2 LPCI C PMP VENT VLV. | |||
: 29. Crack open 2-1501-15C, U2 | Instructs EO to complete step G.12.e.(5).(a). | ||
: 29. Crack open 2-1501-15C, U2 LPCI C PMP VENT VLV until flow is observed from pipe. | |||
: 30. Close 2(3)-1501-15C, U2 | Instructs EO to complete step G.12.e.(5).(b). | ||
: 31. Close AND lock 2-1501-74C, | : 30. Close 2(3)-1501-15C, U2 LPCI C PMP VENT VLV. | ||
Instructs EO to complete step G.12.e.(5).(c). | |||
: 32. Open 2-1501-47C-R, U2 LPCI | : 31. Close AND lock 2-1501-74C, U2 LPCI C PMP VENT VLV. | ||
pump) and verify PI 2-1501-47C indicates less than 15 psig. | Instructs EO to complete step G.12.e.(5).(d). | ||
: 32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig. | |||
Instructs EO to obtain PI 2-1501-47C reading per step G.12.e.(6). | |||
CUE: | CUE: | ||
Pressure is 10 psig. . | Pressure is 10 psig.. | ||
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 33. Recognizes reading is less | S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | ||
: 34. Close 2-1501-47C-R, U2 LPCI | : 33. Recognizes reading is less than 15 psig. | ||
* 35. Unlock AND open 2-1501- | Determines reading is LESS than 15 psig. | ||
: 34. Close 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV. | |||
Instructs EO to close 2-1501-47C per step G.12.e.(8). | |||
* 35. Unlock AND open 2-1501-31C, U2 LPCI C PMP SUCT VLV FROM CST [at 2 C LPCI Pump] | |||
Directs EO to perform step G.12.e.(10)(a) | |||
CUE: | CUE: | ||
2-1501-31C is open. | 2-1501-31C is open. | ||
* 36. Unlock AND open 2-1501- | * 36. Unlock AND open 2-1501-37, U2 LPCI & CS SUCT FROM 2/3A CST SV (located at 2/3A CST) | ||
FROM 2/3A CST SV (located at 2/3A CST) | Directs EO to perform step G.12.e.(10)(b) | ||
Simulator Operator / Evaluator: | Simulator Operator / Evaluator: | ||
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST. | Activate Trigger 15 to lineup 2C LPCI pump suction to the CST. | ||
| Line 1,324: | Line 1,505: | ||
Examiner Note: | Examiner Note: | ||
If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue) | If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue) | ||
* 37. Start 2C LPCI PP | * 37. Start 2C LPCI PP Places control switch to start. RED light illuminated. | ||
illuminated. | |||
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 38. Inform Unit Supervisor that | S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment | ||
to the CST and the task is | : 38. Inform Unit Supervisor that 2C LPCI pump is lined up to the CST and the task is complete. | ||
Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete. | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time: | END JPM Stop Time: | ||
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-d Rev 09 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d | LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and | ||
==Title:== | ==Title:== | ||
29502LK061, Lineup LPCI to the CST K/A Number and Importance: | 29502LK061, Lineup LPCI to the CST K/A Number and Importance: | ||
203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection. | : 2. A transient has occurred requiring Alternate Water Injection. | ||
| Line 1,367: | Line 1,556: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03. | : 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A) | TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A) | ||
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By: | JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DEOP 0500-04 Rev: 16 Procedure | Initiating cue (and terminating cue if required) are properly identified. | ||
Procedure | : 6. | ||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
SME / Instructor | If an alternate path is used, the task standard contains criteria for successful completion. | ||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DEOP 0500-04 Rev: 16 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Revision Record (Summary) | ||
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | ||
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation). | : 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation). | ||
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
| Line 1,405: | Line 1,601: | ||
: 4. If the CAEP file cannot be ran insert the following Expert Commands: | : 4. If the CAEP file cannot be ran insert the following Expert Commands: | ||
: a. Insert following Malfunctions, Remotes, and/or Overrides: | : a. Insert following Malfunctions, Remotes, and/or Overrides: | ||
IMF CIGP2I (Spurious Group II Isolation) | |||
Adjusts Torus Level indications to ~20 feet. | |||
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 | v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts. | ||
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig. | |||
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled | |||
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0 | v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0 | ||
: 5. Verify the SBGT system operating and verify flow ~4000 scfm. | : 5. Verify the SBGT system operating and verify flow ~4000 scfm. | ||
: 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04. | : 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04. | ||
: 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running. | : 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running. | ||
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting. | DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting. | ||
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS | ||
: 1. You are the Aux 2 NSO. | : 1. You are the Aux 2 NSO. | ||
: 2. A break inside the Unit 2 Primary Containment has occurred. | : 2. A break inside the Unit 2 Primary Containment has occurred. | ||
| Line 1,440: | Line 1,631: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-e Rev 00 JPM Start Time: | |||
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500-04. | |||
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM. | Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM. | ||
: 1. Verify SBGT is operating and flow | : 1. | ||
: 2. Verify Reactor Mode switch NOT | Verify SBGT is operating and flow is ~ 4000 scfm. | ||
: 3. Place VENT ISOL SIGNAL | Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm. | ||
: 2. | |||
: 4. Open AO 2-1601-61, TORUS 2- | Verify Reactor Mode switch NOT in RUN. | ||
Verifies Reactor Mode switch NOT in RUN. | |||
: 3. | |||
Green light extinguishes and Red light illuminates. | Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS. | ||
Momentarily places Bypass switch to Torus Position. | |||
Green light extinguishes and Red light illuminates. | : 4. | ||
: 8. Determine if SBGT flow is | Open AO 2-1601-61, TORUS 2-INCH VENT VLV. | ||
Torus Bottom pressure below the Primary Containment Pressure Limit. | Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open. | ||
*5. | |||
Place the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL. | |||
Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL | |||
*6. | |||
Open AO 2-1601-62, DW 2-INCH VENT VLV. | |||
Places AO 2-1601-62 control switch to OPEN. | |||
Green light extinguishes and Red light illuminates. | |||
*7. | |||
Open AO 2-1601-63, VENT TO SBGT. | |||
Places AO 2-1601-63 control switch to OPEN. | |||
Green light extinguishes and Red light illuminates. | |||
: 8. | |||
Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit. | |||
Determines Containment pressure trend. | |||
Examiner Note: | Examiner Note: | ||
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service. | DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service. | ||
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly. | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 9. Determines use of AUGMENTED | : 9. | ||
PRI CNMT VENT (APCV) System is required. | Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required. | ||
Proceeds to Attachment 1 step 6. | |||
: 11. Verify closed AO 2-1601-63, VENT | *10. | ||
Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902-3 Rotates control switch clockwise to APCV position | |||
: 12. Verify closed AO 2-1601-91, VENT | : 11. | ||
Verify closed AO 2-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed. | |||
GREEN light lit, RED light extinguished. | |||
: 12. | |||
Verify closed AO 2-1601-91, VENT TO RX BLDG EXH SYS Verifies AO-2-1601-91 in closed. | |||
RED light lit, GREEN light extinguished. | |||
*13. | |||
Place TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch clockwise and holds | |||
*14. | |||
Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 keylock switch clockwise and releases | |||
*15. | |||
Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch | |||
*16. | |||
Place CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 switch to OVERRIDE and release on 902-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 keylock switch clockwise and releases | |||
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
*17. | |||
Open AO 2-1601-60, TORUS VENT VLV. | |||
Cue: | Determines Torus Water Level is less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV. | ||
*18. | |||
Open AO 2-1601-24, VENT TO RX BLDG EXH SYS. | |||
Rotates AO 2-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates | |||
*19. | |||
Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit. | |||
Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates Cue: | |||
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit. | DW pressure is being controlled and maintained below the Primary Containment Pressure Limit. | ||
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering. | If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering. | ||
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report). | If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report). | ||
: 20. Informs Unit Supervisor task is | : 20. | ||
Cue | Informs Unit Supervisor task is complete. | ||
END JPM Stop Time: | Examinee notifies the Unit Supervisor. | ||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-e Rev 00 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
Containment - Vent Containment with APCV - (A) | Containment - Vent Containment with APCV - (A) | ||
JPM Number: S-N-e | JPM Number: S-N-e Revision Number: 00 Task Number and | ||
==Title:== | ==Title:== | ||
295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit. | 295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit. | ||
K/A Number and Importance: | K/A Number and Importance: | ||
223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS | ||
: 1. You are the Aux 2 NSO. | : 1. You are the Aux 2 NSO. | ||
: 2. A break inside the Unit 2 Primary Containment has occurred. | : 2. A break inside the Unit 2 Primary Containment has occurred. | ||
| Line 1,525: | Line 1,755: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure. | : 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DOP 6700-18 | Initiating cue (and terminating cue if required) are properly identified. | ||
Procedure | : 6. | ||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
: 8. | |||
SME / Instructor | If an alternate path is used, the task standard contains criteria for successful completion. | ||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 6700-18 Rev: 13 Procedure Rev: | |||
Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary) | ||
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam | Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam | ||
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to any IC (IC _51__ used for validation). | : 1. Reset the simulator to any IC (IC _51__ used for validation). | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES. | : 2. Hold MCC 29-7/28-7 Feed from Bus 29 in TRIP until MCC 29-7/28-7 Feed from Bus 28 CLOSES. | ||
: 3. This completes the setup for this JPM. | : 3. This completes the setup for this JPM. | ||
DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage. | DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage. | ||
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS | ||
: 1. MCC 28-7/29-7 is powered from Bus 28. | : 1. MCC 28-7/29-7 is powered from Bus 28. | ||
: 2. Power has been restored to Bus 29. | : 2. Power has been restored to Bus 29. | ||
| Line 1,576: | Line 1,814: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-f Rev 03 JPM Start Time: | |||
: 1. Declare BOTH LPCI subsystems | STEP ELEMENT STANDARD SAT UNSAT Comment Number | ||
Reference TS 3.5.2 Cue | : 1. | ||
Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable. | |||
BUS 28, by placing control switch in TRIP AND maintain switch in TRIP. | Reference TS 3.5.2 Cue Respond: Division 1 and 2 LPCI subsystems are inoperable. | ||
*2. | |||
Open the feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP. | |||
: 5. Notify the Unit 2 Supervisor that | Opens the feed breaker AND maintains the switch in TRIP. | ||
normal feed has been restored to MCC 28-7/29-7. | *3. | ||
Cue | Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS | ||
END JPM Stop Time: | : 29. | ||
Closes the feed breaker | |||
*4. | |||
Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch. | |||
Releases feed breaker control switch | |||
: 5. | |||
Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7. | |||
Unit 2 Supervisor notified. | |||
Cue Acknowledge report of task completion. | |||
END JPM Stop Time: | |||
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-f Rev 03 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f | Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and | ||
==Title:== | ==Title:== | ||
262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance: | 262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance: | ||
262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS | ||
: 1. MCC 28-7/29-7 is powered from Bus 28. | : 1. MCC 28-7/29-7 is powered from Bus 28. | ||
: 2. Power has been restored to Bus 29. | : 2. Power has been restored to Bus 29. | ||
| Line 1,622: | Line 1,877: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5 | : 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5 | ||
: 2. Notify the Unit 2 Supervisor when the task is complete | : 2. Notify the Unit 2 Supervisor when the task is complete | ||
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP) | TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP) | ||
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By: | S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DOP 0700-01 | Initiating cue (and terminating cue if required) are properly identified. | ||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
SME / Instructor | : 8. | ||
If an alternate path is used, the task standard contains criteria for successful completion. | |||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary) | ||
Revision 00 New JPM for the 2010 LORT exam. | Revision 00 New JPM for the 2010 LORT exam. | ||
Revision 01 Updated for the 2012 LORT exam. | Revision 01 Updated for the 2012 LORT exam. | ||
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam | Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam | ||
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation). | : 1. Reset the simulator to a 2-3% power IC (IC _53__ used for validation). | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position) | : 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position) | ||
: 3. Run CAEP file: S-N-f.cae | : 3. Run CAEP file: S-N-f.cae | ||
| Line 1,661: | Line 1,926: | ||
: 1) imf nis22det (Inserts SRM 22 stuck malfunction) | : 1) imf nis22det (Inserts SRM 22 stuck malfunction) | ||
: b. Triggers required: | : b. Triggers required: | ||
: 1) trgset 1 nilsdet(2) .and. nil104do | : 1) trgset 1 nilsdet(2).and. nil104do | ||
: 2) trgset 2 et_array(1) .and. nilsdet(2) .and. nil101di | : 2) trgset 2 et_array(1).and. nilsdet(2).and. nil101di | ||
: 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures: | : 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures: | ||
DOP 0700-01, Source Range monitor Operation (SRM) | |||
DOA 0700-02, SRM or IRM Detector Stuck | |||
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS | ||
: 1. Unit 2 startup is in progress. | : 1. Unit 2 startup is in progress. | ||
: 2. You are an extra NSO assisting the startup. | : 2. You are an extra NSO assisting the startup. | ||
| Line 1,682: | Line 1,947: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-g Rev 02 JPM Start Time: | |||
: 1. WHEN IRM down scale alarms | STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700-01. | ||
withdrawal and maintain SRM | : 1. | ||
WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x104 cps. | |||
IRM down scales are cleared by initial conditions. | |||
Monitors count rate when withdrawing SRMs. | |||
Verifies SELECT light lit. | *2. | ||
Depress the applicable SELECT switch (LIT when selected). | |||
BEGIN ALTERNATE PATH | Depresses each SRMs SELECT switch. | ||
: 4. Verify that SRMs indication is | Verifies SELECT light lit. | ||
*3. | |||
Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps. | |||
Depress and hold the DRIVE OUT switch to withdraw SRMs BEGIN ALTERNATE PATH | |||
: 4. | |||
For SRM 22 indications remain unchanged. | Verify that SRMs indication is changing as expected. | ||
: 5. Report | For SRMs 21, 23 & 24: | ||
Note | Count rate drops. | ||
Cue | Period indicates negative. | ||
Note | OUT light is lit when detector reaches full out position. | ||
For SRM 22 indications remain unchanged. | |||
: 5. | |||
Report SRM 22 detector did not move and/or appears to be stuck. | |||
Reports SRM 22 detector did not move and/or appears to be stuck. | |||
Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw. | |||
Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02. | |||
Note The Examinee may have already deselected SRMs earlier. | |||
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
Note | *6. | ||
Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit. | |||
detector in both directions to free it. | Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted. | ||
: 8. Verify indication that SRM 22 is | *7. | ||
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. | |||
Depresses DRIVE IN switch to move SRM 22. | |||
: 8. | |||
Verify indication that SRM 22 is moving. | |||
Observes SRM 22: | |||
Count rate rises. | |||
Period indicates positive. | |||
: 11. Verify that SRM 22 indication is | *9. | ||
Depress DRIVE IN switch to stop SRM 22. | |||
Depresses DRIVE IN switch to stop SRM 22. | |||
*10. | |||
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it. | |||
: 12. Report SRM 22 detector is fully | Depresses and holds DRIVE OUT switch to move SRM 22. | ||
Cue | Drives SRM 22 fully out. | ||
END JPM Stop Time: | : 11. | ||
Verify that SRM 22 indication is changing as expected. | |||
Observes SRMs 22: | |||
Count rate drops. | |||
Period indicates negative. | |||
OUT light is lit when detector reaches full out position. | |||
: 12. | |||
Report SRM 22 detector is fully withdrawn. | |||
Reports SRM 22 detector is fully withdrawn. | |||
Cue Acknowledge report. | |||
END JPM Stop Time: | |||
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-g Rev 02 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
Withdraw SRM Detectors with a Stuck SRM Detector (AP) | Withdraw SRM Detectors with a Stuck SRM Detector (AP) | ||
JPM Number: S-N-g | JPM Number: S-N-g Revision Number: 02 Task Number and | ||
==Title:== | ==Title:== | ||
215L022 Respond to an SRM or IRM stuck detector. | 215L022 Respond to an SRM or IRM stuck detector. | ||
K/A Number and Importance: | K/A Number and Importance: | ||
215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS | ||
: 1. Unit 2 startup is in progress. | : 1. Unit 2 startup is in progress. | ||
: 2. You are an extra NSO assisting the startup. | : 2. You are an extra NSO assisting the startup. | ||
| Line 1,761: | Line 2,050: | ||
: 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM). | : 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM). | ||
: 2. Your Pre-Job Brief has been completed. | : 2. Your Pre-Job Brief has been completed. | ||
: 3. Notify the Unit supervisor upon completion of the task. | : 3. Notify the Unit supervisor upon completion of the task. | ||
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By: | ||
Instructor | Instructor Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | Prior to JPM usage, revalidate JPM using steps 9 and 13 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Procedure DOP 7500-01 | Initiating cue (and terminating cue if required) are properly identified. | ||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk (*). | |||
SME / Instructor | : 8. | ||
If an alternate path is used, the task standard contains criteria for successful completion. | |||
: 9. | |||
Verify the procedure(s) referenced by this JPM reflects the current revision: | |||
Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev: | |||
: 10. Verify cues both verbal and visual are free of conflict. | |||
: 11. Verify performance time is accurate | |||
: 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. | |||
: 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 Revision Record (Summary) | TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary) | ||
Revision 01 Bank JPM. | Revision 01 Bank JPM. | ||
Revision 02 Revised for 2010 Cert Exam. | Revision 02 Revised for 2010 Cert Exam. | ||
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam | Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam | ||
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SIMULATOR SETUP INSTRUCTIONS | TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS | ||
: 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation). | : 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation). | ||
NOTE: | NOTE: | ||
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Place the 2/3A SBGT train control switch in STBY. | : 2. Place the 2/3A SBGT train control switch in STBY. | ||
: 3. Place the 2/3B SBGT train control switch in PRI. | : 3. Place the 2/3B SBGT train control switch in PRI. | ||
| Line 1,815: | Line 2,113: | ||
: g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan). | : g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan). | ||
: h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan). | : h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan). | ||
: i. imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan). | : i. | ||
imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan). | |||
DOCUMENT PREPARATION Clean copy of DOP 7500-01. | DOCUMENT PREPARATION Clean copy of DOP 7500-01. | ||
Clean copy of DAN 902(3)-3 F-14 | Clean copy of DAN 902(3)-3 F-14 | ||
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | : 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | ||
| Line 1,835: | Line 2,134: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 JPM Start Time: | TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-h Rev 03 JPM Start Time: | |||
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01. | |||
*1. | |||
: 3. Verify the 2/3A and B AIR | Place the 2/3A SBGT SELECT switch to A PRI position. | ||
Places the 2/3A SBGT SELECT switch to the A PRI position. | |||
: 4. Verify the 2/3A and B Fans are | *2. | ||
Place the 2/3B SBGT SELECT switch to B STBY position. | |||
: 5. Verify annunciators 923-5 A-6 and | Places the 2/3B SBGT SELECT switch to the B STBY position. | ||
: 6. Verify 2/3B SBGT SELECT | : 3. | ||
Note | Verify the 2/3A and B AIR HEATERs are OFF. | ||
Both GREEN lights illuminated. | |||
: 8. Verifies the 2/3A SBGT train | : 4. | ||
: 9. Records the Start Time on | Verify the 2/3A and B Fans are OFF. | ||
BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions. | Both GREEN lights illuminated. | ||
: 5. | |||
Verify annunciators 923-5 A-6 and 923-5 B-6 are NOT in alarm. | |||
Both annunciator tiles extinguished. | |||
: 6. | |||
Verify 2/3B SBGT SELECT SWITCH in B STBY position. | |||
Verifies 2/3 B SBGT Select switch in B STBY. | |||
Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation. | |||
*7. | |||
Starts 2/3A SBGT train. | |||
Places 2/3 A SBGT Select switch to START A position. | |||
: 8. | |||
Verifies the 2/3A SBGT train initiated properly. | |||
Begins verifying the 2/3A SBGT train operating properly. | |||
: 9. | |||
Records the Start Time on Operator Aid. | |||
Records the Start Time on Operator Aid BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions. | |||
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update: | Cue If examinee does not react to the alarm on the 902-3 panel, make the following update: | ||
Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update. | Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update. | ||
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN. | |||
*10. | |||
Verifies trip of 3A RX BLDG VENT FAN. | |||
Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3A RX BLDG VENT FAN to the Trip position. | Places control switch 3A RX BLDG VENT FAN to the Trip position. | ||
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated). | Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated). | ||
*11. | |||
Verifies trip of 3B RX BLDG VENT FAN. | |||
Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3B RX BLDG VENT FAN to the Trip position. | Places control switch 3B RX BLDG VENT FAN to the Trip position. | ||
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated). | Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated). | ||
: 12. Verifies trip of 3C RX BLDG VENT | : 12. | ||
Verifies trip of 3C RX BLDG VENT FAN. | |||
GREEN light illuminated. | |||
*13. | |||
Verifies trip of 3A RX BLDG EXH FAN. | |||
Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3A RX BLDG EXH FAN to the Trip position. | Places control switch 3A RX BLDG EXH FAN to the Trip position. | ||
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated). | Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated). | ||
*14. | |||
Verifies trip of 3B RX BLDG EXH FAN. | |||
Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated). | |||
Places control switch 3B RX BLDG EXH FAN to the Trip position. | Places control switch 3B RX BLDG EXH FAN to the Trip position. | ||
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated). | Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated). | ||
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
: 15. Verifies trip of 3C RX BLDG EXH | S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number | ||
: 15. | |||
: 16. Verifies trip of 2A RX BLDG VENT | Verifies trip of 3C RX BLDG EXH FAN. | ||
: 17. Verifies trip of 2B RX BLDG VENT | GREEN light illuminated. | ||
: 18. Verifies trip of 2C RX BLDG VENT | : 16. | ||
Verifies trip of 2A RX BLDG VENT FAN. | |||
: 19. Verifies trip of 2A RX BLDG EXH | GREEN and AMBER lights illuminated. | ||
: 20. Verifies trip of 2B RX BLDG EXH | : 17. | ||
: 21. Verifies trip of 2C RX BLDG EXH | Verifies trip of 2B RX BLDG VENT FAN. | ||
GREEN and AMBER lights illuminated. | |||
: 18. | |||
Verifies trip of 2C RX BLDG VENT FAN. | |||
GREEN light illuminated. | |||
: 19. | |||
Verifies trip of 2A RX BLDG EXH FAN. | |||
GREEN and AMBER lights illuminated. | |||
: 20. | |||
Verifies trip of 2B RX BLDG EXH FAN. | |||
GREEN and AMBER lights illuminated. | |||
: 21. | |||
Verifies trip of 2C RX BLDG EXH FAN. | |||
GREEN light illuminated. | |||
*22. | |||
Verifies 3A INLET DAMPER AO 3-5741A closed. | |||
Verifies 3B INLET DAMPER AO 3-5741B closed. | |||
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated). | |||
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position. | Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position. | ||
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated). | Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated). | ||
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
*23. | |||
Verifies 3A OUTLET DAMPER AO 3-5742A closed. | |||
Verifies 3B OUTLET DAMPER AO 3-5742B closed. | |||
Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated). | |||
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position. | Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position. | ||
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated). | Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated). | ||
*24. | |||
Verifies 2A INLET DAMPER AO 2-5741A closed. | |||
Verifies 2B INLET DAMPER AO 2-5741B closed. | |||
Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated). | |||
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position. | Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position. | ||
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated). | Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated). | ||
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 | TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number | |||
*25. | |||
Verifies 2A OUTLET DAMPER AO 2-5742A closed. | |||
Verifies 2B OUTLET DAMPER AO 2-5742B closed. | |||
Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated). | |||
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position. | Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position. | ||
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated). | Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated). | ||
: 26. Verifies trip of 2A D/W & Torus | : 26. | ||
: 27. Verifies trip of 2B D/W & Torus | Verifies trip of 2A D/W & Torus Purge Fan. | ||
: 28. Verifies trip of 3A D/W & Torus | Condition met from previous steps in the procedure. | ||
: 29. Verifies trip of 3B D/W & Torus | : 27. | ||
: 30. Notifies US of Secondary | Verifies trip of 2B D/W & Torus Purge Fan. | ||
successful manual completion of the isolation. | Condition met from previous steps in the procedure. | ||
: 28. | |||
Verifies trip of 3A D/W & Torus Purge Fan. | |||
Condition met from previous steps in the procedure. | |||
: 29. | |||
Verifies trip of 3B D/W & Torus Purge Fan. | |||
Condition met from previous steps in the procedure. | |||
: 30. | |||
Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation. | |||
Examinee notifies the Unit Supervisor. | |||
Cue Acknowledge report. | Cue Acknowledge report. | ||
END JPM Stop Time: | END JPM Stop Time: | ||
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 JPM | TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training) | ||
S-N-h Rev 03 JPM | |||
==SUMMARY== | ==SUMMARY== | ||
Operators Name: | |||
Operators Name: | Emp. ID#: ____________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
RO | RO SRO SRO Cert JPM | ||
==Title:== | ==Title:== | ||
SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP) | SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP) | ||
JPM Number: S-N-h | JPM Number: S-N-h Revision Number: 03 Task Number and | ||
==Title:== | ==Title:== | ||
261L002, Start the SBGT system. | 261L002, Start the SBGT system. | ||
K/A Number and Importance: | K/A Number and Importance: | ||
261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path: | |||
Yes No SRO Only: | |||
Yes No Time Critical: | |||
Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment: | |||
Simulator Control Room In-Plant Other Testing Method: | |||
Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: | |||
minutes EVALUATION | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | Evaluators Name (Print): | ||
Evaluators Signature: | Evaluators Signature: | ||
Date: | |||
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 INITIAL CONDITIONS | TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS | ||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | : 2. U2 HPCI surveillance is in progress and is at the point of starting a SBGT train. | ||
| Line 1,945: | Line 2,309: | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01. | : 1. The Unit 2 Supervisor has directed you to start the 2/3A SBGT train per DOP 7500-01. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By: | Page 1 of 10 Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By: | ||
Exam Author | Exam Author Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Initiating cue (and terminating cue if required) are properly identified. | |||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk | |||
(*). | (*). | ||
: 8. | |||
Procedure DOP 4700-03 | Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
Procedure | Procedure DOP 4700-03 Rev: 22 Procedure Rev: | ||
Procedure Rev: | |||
: 9. | |||
Verify cues both verbal and visual are free of conflict. | |||
: 10. Verify performance time is accurate | |||
SME / Instructor | : 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | ||
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | Page 3 of 10 Revision Record (Summary) | ||
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | Revision 00 Created for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | ||
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee. | DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | Page 5 of 10 INITIAL CONDITIONS | ||
: 1. Unit 3 is shutdown for a refuel outage. | : 1. Unit 3 is shutdown for a refuel outage. | ||
: 2. 2A IAC is unavailable due to an oil leak. | : 2. 2A IAC is unavailable due to an oil leak. | ||
| Line 1,992: | Line 2,362: | ||
: 7. Main Control Room is monitoring IA parameters. | : 7. Main Control Room is monitoring IA parameters. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY . | : 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY. | ||
: 2. All applicable prerequisites of DOP 4700-03 have been met. | : 2. All applicable prerequisites of DOP 4700-03 have been met. | ||
: 3. Your Pre Job Brief has been completed. | : 3. Your Pre Job Brief has been completed. | ||
| Line 2,002: | Line 2,372: | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
The timeclock starts when the candidate acknowledges the initiating cue. | Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | Page 7 of 10 JPM Start Time: _________ | ||
Comment # | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | ||
Provide examinee a current copy of DOP 4700-03. | |||
: 1. Identifies Step G.9 as the | : 1. Identifies Step G.9 as the correct step in DOP 4700- | ||
correct step in DOP 4700-03. | : 03. | ||
: 2. Verify closed 3-4799-501A, | Proceeds to Step G.9. | ||
: 2. Verify closed 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV. | |||
(Valve is located above 3B IAC) | Verifies 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV stem is in. | ||
CUE The component is in the position you described. | (Valve is located above 3B IAC) | ||
CUE The component is in the position you described. | |||
(Valve is located North of 3A IAC) | *3. Close 2/3-4799-424, U2/U3 X-TIE SV. | ||
CUE The component is in the position you described. | Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in. | ||
(Valve is located North of 3A IAC) | |||
CUE The component is in the position you described. | |||
*4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV. | |||
Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV counter clockwise until stem is out. | |||
(Valve is located North of 3A IAC) | (Valve is located North of 3A IAC) | ||
CUE The component is in the position you described. | CUE The component is in the position you described. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | |||
*5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS. | |||
Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out. | |||
(Valve is located North of Cardox tank) | (Valve is located North of Cardox tank) | ||
CUE The component is in the position you described. | CUE The component is in the position you described. | ||
*6. Open 2-47350-329, U2 INST AIR HDR ISOL VLV. | |||
Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV counter clockwise until stem is out. | |||
(Valve is located North of 2B IAC) | (Valve is located North of 2B IAC) | ||
CUE The component is in the position you described. | CUE The component is in the position you described. | ||
: 7. Report completion of task to | : 7. Report completion of task to Unit Supervisor. | ||
END JPM Stop Time:_________ | Reports completion of task to Unit Supervisor. | ||
END JPM Stop Time:_________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | Page 9 of 10 Operators Name: | ||
Job | Job | ||
==Title:== | ==Title:== | ||
q RO | q RO q SRO JPM | ||
==Title:== | ==Title:== | ||
| Line 2,051: | Line 2,422: | ||
==Title:== | ==Title:== | ||
278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 | 278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environment: In-Plant Suggested Testing Environment: | ||
q Simulator Plant q Control Room Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes | |||
==References:== | ==References:== | ||
| Line 2,057: | Line 2,433: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | Page 10 of 10 INITIAL CONDITIONS | ||
: 1. Unit 3 is shutdown for a refuel outage. | : 1. Unit 3 is shutdown for a refuel outage. | ||
: 2. 2A IAC is unavailable due to an oil leak. | : 2. 2A IAC is unavailable due to an oil leak. | ||
| Line 2,073: | Line 2,450: | ||
: 7. Main Control Room is monitoring IA parameters. | : 7. Main Control Room is monitoring IA parameters. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY . | : 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY. | ||
: 2. All applicable prerequisites of DOP 4700-03 have been met. | : 2. All applicable prerequisites of DOP 4700-03 have been met. | ||
: 3. Your Pre Job Brief has been completed. | : 3. Your Pre Job Brief has been completed. | ||
: 4. Notify the Unit Supervisor when you are complete with the task. | : 4. Notify the Unit Supervisor when you are complete with the task. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By: | Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By: | ||
Exam Author | Exam Author Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Initiating cue (and terminating cue if required) are properly identified. | |||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk | |||
(*). | (*). | ||
: 8. | |||
Procedure DEOP 500-02 | Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
Procedure | Procedure DEOP 500-02 Rev: 16 Procedure Rev: | ||
Procedure Rev: | |||
: 9. | |||
Verify cues both verbal and visual are free of conflict. | |||
: 10. Verify performance time is accurate | |||
SME / Instructor | : 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | ||
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | Revision Record (Summary) | ||
Rev 08: | Rev 08: | ||
Updated for the 2007 LORT exam Rev 09: | |||
Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM. | ||
DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee. | DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
| Line 2,130: | Line 2,517: | ||
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | JPM Start Time: _________ | ||
Comment # | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | ||
Provide examinee a current copy of DEOP 500-02. | |||
1 Proceed to Step G.3 of | 1 Proceed to Step G.3 of procedure. | ||
NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor. | Locates Step G.3 NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor. | ||
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are: | NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are: | ||
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet. | Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet. | ||
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room. | Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room. | ||
2 Obtain | 2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet. | ||
Cabinet. | OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet. | ||
CUE DEOP Equipment Box you have identified is in your hand. | CUE DEOP Equipment Box you have identified is in your hand. | ||
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and | NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32. | ||
Locates Panel 903-32. | |||
NOTE Simulated JPM - Examinee must explain the task. | NOTE Simulated JPM - Examinee must explain the task. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | |||
*4 Lift AND tape lead on 903-32 panel terminal block AA terminal point 6 OR terminal point 7. | |||
On 903-32 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves. | |||
Loosens screw with standard screwdriver. | |||
Uses split blade screwdriver to grasp screw and remove it. | |||
Tapes the loose wire with electricians tape. | |||
to grasp screw and remove it. | CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | ||
*5 Lift AND tape lead on 903-33 panel terminal block AA terminal point 6 OR terminal point 7. | |||
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | On 903-33 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves. | ||
Loosens screw with standard screwdriver. | |||
Uses split blade screwdriver to grasp screw and remove it. | |||
Tapes the loose wire with electricians tape. | |||
to grasp screw and remove it. | |||
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped. | ||
6 Notify Unit Supervisor | 6 Notify Unit Supervisor upon completion of task. | ||
Notifies Unit Supervisor upon completion of task. | |||
CUE Acknowledge report of task completion. | CUE Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
| Line 2,181: | Line 2,566: | ||
==Title:== | ==Title:== | ||
295L074, Bypass the Trip of Drywell Coolers. | 295L074, Bypass the Trip of Drywell Coolers. | ||
K/A Number and Importance: 295028.A1.03 | K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment: | ||
q Simulator Plant q Control Room Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes | |||
==References:== | ==References:== | ||
| Line 2,187: | Line 2,577: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | Page 9 of 9 INITIAL CONDITIONS | ||
: 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34. | : 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34. | ||
: 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1. | : 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1. | ||
| Line 2,202: | Line 2,594: | ||
: 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02. | : 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02. | ||
: 2. Your Pre-Job Brief has been completed. | : 2. Your Pre-Job Brief has been completed. | ||
: 3. Notify the Unit Supervisor when the in-plant actions are complete | : 3. Notify the Unit Supervisor when the in-plant actions are complete | ||
Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By: | Page 1 of 11 Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By: | ||
Exam Author | Exam Author Date Approved By: | ||
Facility Representative | Facility Representative Date | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. | ||
Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | Prior to JPM usage, revalidate JPM using steps 8 and 12 below. | ||
: 1. | |||
Task description and number, JPM description and number are identified. | |||
: 2. | |||
Knowledge and Abilities (K/A) references are included. | |||
: 3. | |||
Performance location specified. (in-plant, control room, simulator, or other) | |||
: 4. | |||
Initial setup conditions are identified. | |||
: 5. | |||
Initiating cue (and terminating cue if required) are properly identified. | |||
: 6. | |||
Task standards identified and verified by SME review. | |||
: 7. | |||
Critical steps meet the criteria for critical steps and are identified with an asterisk | |||
(*). | (*). | ||
: 8. | |||
Procedure DOP 0300-03 | Verify the procedure(s) referenced by this JPM reflects the current revision: | ||
Procedure | Procedure DOP 0300-03 Rev: 25 Procedure Rev: | ||
Procedure Rev: | |||
: 9. | |||
Verify cues both verbal and visual are free of conflict. | |||
: 10. Verify performance time is accurate | |||
SME / Instructor | : 11. If the JPM cannot be performed as written with proper responses, then revise the JPM. | ||
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below: | |||
SME / Instructor Date SME / Instructor Date SME / Instructor Date | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Revision Record (Summary) | Page 3 of 11 Revision Record (Summary) | ||
Revision 14 | Revision 14 Updated for the 2007 LORT exam. | ||
Revision 15 | Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS: | Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS: | ||
N/A: In-Plant JPM. | N/A: In-Plant JPM. | ||
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee. | DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | Page 5 of 11 INITIAL CONDITIONS | ||
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | : 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | ||
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | : 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | ||
| Line 2,257: | Line 2,656: | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The time clock starts when the candidate acknowledges the initiating cue. | The time clock starts when the candidate acknowledges the initiating cue. | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | Page 6 of 11 JPM Start Time: _________ | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | |||
: 1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room. | |||
: 1. Proceed to Unit 2 CRD | CRD FCVs located and communications established with control room. | ||
communications with | |||
control room. | |||
NOTE Step G.2 is N/A. | NOTE Step G.2 is N/A. | ||
: 2. Verify OPEN 2-0301-30, | : 2. Verify OPEN 2-0301-30, U2 CRD SYS FCV CONT AIR PRV ISOL VLV. | ||
Verifies 2-0301-30 stem/handwheel backed out. | |||
CUE Valve 2-0301-30 stem/ handwheel is backed out. | CUE Valve 2-0301-30 stem/ handwheel is backed out. | ||
: 3. Verify OPEN 2-0301-144B, | : 3. Verify OPEN 2-0301-144B, U2 CRD SYS FCV 2-0302-6B AIR ISOL VLV. | ||
Verifies 2-0301-144B valve stem/handwheel backed out. | |||
CUE Valve 2-0301-144B stem/handwheel is backed out. | CUE Valve 2-0301-144B stem/handwheel is backed out. | ||
: 4. Verify OPEN 2-0301-40B, | : 4. Verify OPEN 2-0301-40B, U2 CRD SYS B FCV INLET VLV. | ||
Verifies 2-0301-40B valve stem/handwheel backed out. | |||
CUE Valve 2-0301-40B stem/handwheel is backed out. | CUE Valve 2-0301-40B stem/handwheel is backed out. | ||
: 5. Cycle the 2B FCV full open | : 5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally. | ||
PRV 2-0301-34 locally. | Adjusts PRV 2-0301-34 locally to cycle 2B FCV. | ||
Verifies cycling by observing stem position and/or light indication on the CRD FCV | Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station. | ||
electrical transfer station. | CUE 2B FCV cycles full open and then full closed. | ||
CUE 2B FCV cycles full open and then full closed. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | ||
NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP). | |||
: 6. Verify PRV 2-0301-34 | : 6. Verify PRV 2-0301-34 closed. | ||
Verifies PRV 2-0301-34 valve stem backed out and turning freely. | |||
CUE PRV 2-0301-34 valve stem is backed out and turning freely. | CUE PRV 2-0301-34 valve stem is backed out and turning freely. | ||
: 7. Verify Pressure gauge PI | : 7. Verify Pressure gauge PI 2-0302-60 indicates 0 psig. | ||
Verifies pressure gauge PI 2-0302-60 reading 0 psig. | |||
CUE After examinee locates and observes the indicator, then cue: | CUE After examinee locates and observes the indicator, then cue: | ||
PI 2-0302-60 is reading 0 psig. | PI 2-0302-60 is reading 0 psig. | ||
: 8. Verify via U2 NSO that | : 8. Verify via U2 NSO that CRD FCV Controller in MANUAL and demand is set to minimum. | ||
CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum. | Calls U2 NSO to verify CRD FCV Controller configuration CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum. | ||
*9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service. | |||
CUE The transfer switch is in the "Valve B" position. | At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2-0302-6B in service CUE The transfer switch is in the "Valve B" position. | ||
*10. Select the 2B E/P | *10. Select the 2B E/P converter by placing U2 CRD SYS FCV A/B SELECTOR VLV 2-0301-29 to B. | ||
Selects the 2B E/P converter by placing 2-0301-29 to B. | |||
29 to B. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Comment # | Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | ||
CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position. | |||
Examiner Note: | Examiner Note: | ||
On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve. | On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve. | ||
*11. Place U2 CRD SYS FCV | *11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2-0301-38, switch to the automatic position. | ||
Places 2-0302-6B selector switch to the automatic position. | |||
position. | CUE 2-0302-6B selector switch is in automatic. | ||
CUE 2-0302-6B selector switch is in automatic. | *12. Place the U2 CRD SYS FCV 2-0302-6A MAN/AUTO SELECTOR VLV, 2-0301-37, to the manual position. | ||
*12. Place the U2 CRD SYS | Places the 2-0302-6A selector switch to the manual position. | ||
MAN/AUTO SELECTOR VLV, 2-0301-37, to the | CUE The 2-0302-6A selector switch is in manual. | ||
manual position. | *13. Open 2-0301-41B, U2 CRD SYS A/B FCV OUTLET VLV. | ||
CUE The 2-0302-6A selector switch is in manual. | Opens 2-0301-41B valve. | ||
*13. Open 2-0301-41B, U2 | Full CCW, stem/handwheel backed out. | ||
backed out. | |||
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out. | CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out. | ||
: 14. Notify Unit NSO that the | : 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902-5 Panel AND that system flow should be adjusted to maintain stable flow rate. | ||
flow | Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow. | ||
maintain stable flow | CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate. | ||
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment # | |||
*15. Slowly close 2-0301-41A, U2 CRD SYS A/B FCV OUTLET VLV. | |||
Closes 2-0301-41A valve slowly (full CW or stem/ | |||
handwheel in). | |||
CUE The 2-0301-41A valve stem/handwheel is full CW or in. | CUE The 2-0301-41A valve stem/handwheel is full CW or in. | ||
: 16. Notifies Unit Supervisor | : 16. Notifies Unit Supervisor of completion of in-plant actions per DOP and that the remaining steps are from the 902-5 panel. | ||
actions per DOP and that the remaining steps are | Unit Supervisor notified of completion of in-plant actions. | ||
from the 902-5 panel. | |||
CUE Acknowledge report of task completion. | CUE Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | END JPM Stop Time:_________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: ___________________________________ | Page 10 of 11 Operators Name: ___________________________________ | ||
Job | Job | ||
==Title:== | ==Title:== | ||
rRO | rRO rSRO JPM | ||
==Title:== | ==Title:== | ||
| Line 2,349: | Line 2,736: | ||
==Title:== | ==Title:== | ||
201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 | 201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environment: In-Plant Suggested Testing Environment: | ||
q Simulator Plant q Control Room Testing Method: | |||
Simulate Alternate Path: | |||
Yes No Perform SRO Only: | |||
Yes No Time Critical: | |||
Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes | |||
==References:== | ==References:== | ||
| Line 2,355: | Line 2,747: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? | Were all the Critical Elements performed satisfactorily? | ||
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: | |||
Satisfactory Unsatisfactory Comments: | |||
Evaluators Name: ____________________________ | Evaluators Name: ____________________________ | ||
(Print) | (Print) | ||
Evaluators Signature: ___________________________ Date: _________ | Evaluators Signature: ___________________________ Date: _________ | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | Page 11 of 11 INITIAL CONDITIONS | ||
: 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | : 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation. | ||
: 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | : 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer. | ||
| Line 2,370: | Line 2,763: | ||
: 2. Prerequisites have been met. | : 2. Prerequisites have been met. | ||
: 3. Your Pre-Job Brief is complete. | : 3. Your Pre-Job Brief is complete. | ||
: 4. Notify the Unit Supervisor upon completion of in-plant actions. | : 4. Notify the Unit Supervisor upon completion of in-plant actions.}} | ||
Latest revision as of 08:41, 9 January 2025
| ML17128A181 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/01/2016 |
| From: | Chuck Zoia Exelon Generation Co |
| To: | NRC/RGN-III/DRS/OLB |
| Shared Package | |
| ML16257A680 | List: |
| References | |
| Download: ML17128A181 (170) | |
Text
Exelon Nuclear Job Performance Measure VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE JPM Number: A-N-1-R Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-R Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed for 2009 NRC Exam.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-1-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Markup a copy of DOS 1100-02.
A-N-1-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 1100-02 was performed last shift.
- 3. The EO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 1100-02.
- 1.
Student should identify step I.4 should NOT have been initialed.
Identifies that step should NOT have been initialed.
- 2.
Student should identify step I.9.g should NOT have been N/Ad.
Identifies that step should NOT have been N/Ad.
- 3.
Notify Unit Supervisor of discrepancies.
Notifies Unit Supervisor, to verify/correct issues.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-1-R Page 6 of 7 Operators Name:
Job
Title:
Title:
VERIFY STANDBY LIQUID CONTROL HEATER SURVEILLANCE Revision Number: 01 JPM Number: A-N-1-R Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 Actual Time Used:
minutes
References:
DOS 1100-02, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-1-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 1100-02 was performed last shift.
- 3. The EO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. The Unit Supervisor has directed you to verify all requirements are within specifications, and paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER JPM Number: A-N-2-R Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-R Page 2 of 10 Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
A-N-2-R Page 3 of 10 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
Pull up prints M-15 Sheet 1, M-16, and M-3658 Sheet 1 on Large TV in simulator.
- 3.
Turn TV screen off.
DOCUMENT PREPARATION
- 1. Copy of M-15 Sheet 1.
- 2. Copy of M-16.
- 3. Copy of OP-AA-109-101.
- 4. Copy of OP-DR-109-1001.
A-N-2-R Page 4 of 10 INITIAL CONDITIONS
- 1. You are an Extra NSO.
- 2. Unit 2 is at 500 MWe.
- 3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
- 4. Vent and Drain paths do NOT require manipulation.
- 5. Condensate/Condensate Booster Pump seal isolation is not required.
- 6. Hydrogen Addition injection isolation is not required.
- 7. Passport is not available, but is expected to return this shift.
- 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
- 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
- 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
- 2. Record recommended Isolation Points and Required Positions on the sheet provided.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
A-N-2-R Page 5 of 10 Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 6 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of M-15 Sheet 1 and M-16.
If the examinee requests Clearance and Tagging procedures, they may be provided.
The following steps may be performed in any order
- 1.
Candidate identifies 2C Condensate/Condensate Booster pump on M-15 Sheet
- 1.
Candidate correctly locates and identifies 2C Condensate/Condensate Booster pump on M-15 Sheet 1.
- 2.
Candidate determines isolation points and required positions for 2C condensate pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
(Located on M-15 Sht. 1) 2-3301-C-500 (Closed) 2-3302-C-500 (Closed)
- 3.
Candidate determines isolation points and required positions for 2C condensate booster pump Candidate identifies the following valves are necessary isolation points for 2C Condensate pump:
2-3305-C-500 (Closed)
(Located on M-15 Sht. 1) 2-3401-C-500 (Closed)
(Located on M-16)
A-N-2-R Page 7 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 4.
Completes worksheet with EPN and required hang position.
Notifies Unit Supervisor, to verify/correct issues.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R Page 8 of 10 Operators Name:
Job
Title:
Title:
DETERMINE ISOLATION POINTS FOR CLEARANCE ORDER Revision Number: 00 JPM Number: A-N-2-R Task Number and
Title:
299L012 Determine points of isolation in order to remove a piece of equipment from service.
K/A Number and Importance: Generic.2.2.41 3.5/3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes
References:
OP-AA-109-101 Rev. 10, OP-DR-109-101-1001 Rev. 10, M-15 Sheet 1 Rev. M, M-16 Rev. AP EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-2-R Page 9 of 10 INITIAL CONDITIONS
- 1. You are an Extra NSO.
- 2. Unit 2 is at 500 MWe.
- 3. 2C Condensate/Condensate Booster pump requires removal from service due to a leak.
- 4. Vent and Drain paths do NOT require manipulation.
- 5. Condensate/Condensate Booster Pump seal isolation is not required.
- 6. Hydrogen Addition injection isolation is not required.
- 7. Passport is not available, but is expected to return this shift.
- 8. The Unit NSO has procured controlled copies of the required prints and the revisions have been verified.
- 9. Authorization for an EXCEPTIONAL clearance order has been given if necessary.
- 10. Other NSOs are tasked with determining electrical and air isolations.
INITIATING CUE
- 1. The Unit Supervisor has directed you to determine the isolation points necessary to remove ONLY the 2C Condensate and 2C Condensate Booster pump from the condensate header.
- 2. Record recommended Isolation Points and Required Positions on the sheet provided.
- 3. Inform the Unit Supervisor when the task is complete.
A-N-2-R Page 10 of 10 EPN Hang Position
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-3-R Revision Number: 02 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-R Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
- 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI)
HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Complete the performance of DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
If examinee states to stop, due to errors, inform him/her to continue calculations.
- 1.
Examinee calculates Dilution flow (1,017,000 gpm).
See attached key.
- 2.
Examinee enters dilution flow (from above) to calculate CCSW Activity Limit.
See attached key.
- 3.
Examinee calculates CCSW Activity Limit (2.91 x 10-5).
See attached key.
- 4.
Examinee verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Examinee determines CCSW Heat Exchanger A sample activity is greater than or equal to the calculated CCSW activity limit
- 5.
Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge.
Makes recommendation to Unit Supervisor.
- 6.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R Page 6 of 7 Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-3-R Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. The Unit 2 NSO started DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS then had to leave shift for medical reasons.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Complete the performance of DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure DETERMINE ACTIONS FOR A FIRE JPM Number: A-N-4-R Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-R Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM for ILT 12-1 (2013-301) NRC Exam.
Revision 01 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-4-R Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a copy of DOA 0010-10 and DOA 0010-S1.
A-N-4-R Page 4 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A fire is burning at the Lift Station, no explosion has occurred.
- 3. The fire has been classified as a major fire.
- 4. Hazmat and rescue response are not required.
- 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
- 6. A dedicated outside line is not available.
INITIATING CUE
- 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the supplied copy of DOA 0010-10.
Provide the examinee with the supplied copy of DOA 0010-S1 when requested.
- 1.
Notify Coal City Fire Protection District. (Refer to DOA 0010-S1, Key Phone Numbers for DOA 0010 Block Procedures.)
From DOA 0010-S1 determines that 815-942-0336 is the number needed to contact the CCFPD.
- 2.
Dial 815-942-0336 and communicate the details of the fire.
Dials 815-942-0336 and communicates the details of the fire:
Location of fire Assistance is required CUE:
If requested by the examinee, the TSO (NORTH and SOUTH) cannot contact the Coal City Fire Department because they are currently dealing with grid instabilities.
- 3.
Notifies TSO via direct line for major fire.
Notifies the TSO from a control room phone using the TSO direct line button and provides call back phone number.
- 4.
Notify Security Shift Supervisor that outside fire department will be responding AND request assistance in providing access to affected area if necessary.
Notifies the Security Shift Supervisor that the CCFPD will be responding to the Lift Station.
- 5.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
CUE:
Acknowledge report of task completion.
END
A-N-4-R Page 6 of 8 JPM Stop Time:_________
A-N-4-R Page 7 of 8 Operators Name:
Job
Title:
Title:
DETERMINE ACTIONS FOR A FIRE Revision Number: 01 JPM Number: A-N-4-R Task Number and
Title:
295L009, Respond to a fire/explosion K/A Number and Importance: Generic.2.4.27 3.4 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used:
minutes
References:
DOA 0010-10, rev 20; DOA 0010-S1, rev 14 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-4-R Page 8 of 8 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A fire is burning at the Lift Station, no explosion has occurred.
- 3. The fire has been classified as a major fire.
- 4. Hazmat and rescue response are not required.
- 5. The Fire brigade has been alerted and is attempting to combat the fire unsuccessfully.
- 6. A dedicated outside line is not available.
INITIATING CUE
- 1. The Unit supervisor has directed you to enter and execute DOA 0010-10, FIRE-EXPLOSION through step D.3.
- 2. Inform the Unit Supervisor when the task is complete.
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-1-S Page 2 of 7 Revision Record (Summary)
Revision 00 New JPM developed ILT 15-1 (2016-301) NRC Exam.
A-N-1-S Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. None.
A-N-1-S Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. Unit 2 and Unit 3 are operating at rated power.
- 3. The following timeline occurred:
- 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
- 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
- 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Candidate locates a copy of Reportability Manual.
EXAMINER NOTE:
The candidate will locate the decision trees in Volume 1 of the reportability manual. The candidate will begin in Operations Decision Tree 1 and continue evaluating Reportablity Criteria through Operations Decision Tree 4.
- 1.
Determines the event is reportable per SAF 1.8.
Determines the event is reportable per SAF 1.8, Event or Condition that could have prevented fulfillment of a Safety Function.
- 2.
Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Determines the time limit to Notify the NRC Operations Center via the ENS as soon as practical and in all cases within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of the occurrence (Time 0542).
END JPM Stop Time:_________
A-N-1-S Page 6 of 7 Operators Name:
Job
Title:
Title:
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and
Title:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 20 Actual Time Used:
minutes
References:
Reportability Tables and Decision Trees LS-AA-1020 Rev 23, Safety (SAF) LS-AA-1110 Rev. 22 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-1-S Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. Unit 2 and Unit 3 are operating at rated power.
- 3. The following timeline occurred:
- 2142 - Reactor Building differential pressure did not meet the required 0.25 inches of vacuum water gauge due to failure of the control system.
- 2205 - Unit 3 Reactor Building Ventilation was secured and manually isolated.
- 2207 - Reactor Building differential pressure returned to greater than 0.25 inches of vacuum water gauge.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the earliest reportability requirement.
Exelon Nuclear Job Performance Measure REACTIVATION OF AN SRO LICENSE JPM Number: A-N-2-S Revision Number: 01 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-2-S Page 2 of 8 Revision Record (Summary)
Revision 00 Modified for 2010 Cert Exam.
Revision 01 Modified for ILT 15-1 (2016-301) NRC Exam.
A-N-2-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Marked up copy of OP-AA-105-102.
A-N-2-S Page 4 of 8 INITIAL CONDITIONS
- 1.
You are the Shift Manager.
- 2.
An SRO is in the process of license reactivation.
- 3.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
- 1. The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comm ent NOTE:
Provide the Examinee the provided marked up copy of OP-AA-105-102.
- 1.
Review OP-AA-105-102,.
Reviews OP-AA-105-102,.
- 2.
Check that Hours on Shift are in the same calendar quarter.
Notes 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> listed on 6/26/16 are performed during the 2nd calendar quarter and cannot be counted towards license re-activation.
- 3.
Check that Hours on Shift are applicable for license reactivation.
Determines 12.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> as WEC listed on 07/3/16 cannot be credited towards license re-activation.
EXAMINER NOTE:
Steps 2 and 3 lead to the determination in step 4
- 4.
Check that licensee has the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.
Determines that licensee does NOT have adequate hours to meet the 40 hour4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> requirement.
- 5.
Verifies Plant Tour completed per step 4.b Determines that Plant Tour date and signature are not completed.
- 6.
Report the results of the review to the Shift Operations Superintendent (SOS).
Returns without signing OP-AA-105-102, Attachment 2 to the SOS.
Informs the SOS that the licensees license CANNOT be reactivated due to insufficient hours on shift and plant tour incomplete.
CUE:
As the SOS, acknowledge the report.
END
A-N-2-S Page 6 of 8 JPM Stop Time:_________
A-N-2-S Page 7 of 8 Operators Name:
Job
Title:
Title:
REACTIVATION OF AN SRO LICENSE Revision Number: 01 JPM Number: A-N-2-S Task Number and
Title:
Title: 299L024, Maintain an Active License K/A Number and Importance: Generic.2.1.4 3.3 / 3.8 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 Actual Time Used:
minutes
References:
OP-AA-105-102, Rev. 11 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-2-S Page 8 of 8 INITIAL CONDITIONS
- 1.
You are the Shift Manager.
- 2.
An SRO is in the process of license reactivation.
- 3.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point of Shift Manager review for the licensee.
INITIATING CUE
- 1.
The Shift Operation Superintendent directs you to perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee and report any errors or omissions
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-S Revision Number: 04 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-3-R Page 2 of 7 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
Revision 03 Revised for 2015 NRC exam Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam.
A-N-3-R Page 3 of 7 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R Page 4 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform me when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 5 of 7 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 6600-02.
- 1.
Candidate should identify step I.1.e has a mathematical error.
Identifies differential pressure should read 4.
- 2.
Candidate should identify step I.1.w OR step I.1.v is signed off as verified dP of <6 (actual is 7).
Identifies incorrect verification of dP <6.
- 3.
Candidate should identify that steps I.1.ab have been initialed by the same person performing the surveillance and were NOT independently verified.
Identifies step NOT independently verified.
- 4.
Notify Unit Supervisor of discrepancies.
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R Page 6 of 7 Operators Name:
Job
Title:
Title:
VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 04 JPM Number: A-N-3-S Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 12 Actual Time Used:
minutes
References:
DOS 6600-02, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-3-R Page 7 of 7 INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Unit Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The Equipment Operator reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform me when the task is complete.
Exelon Nuclear Job Performance Measure REVIEW CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 02 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-4-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
Revision 02 Modified for ILT 15-1 (2016-301) NRC Exam.
A-N-4-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
- 3.
Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S Page 4 of 8 INITIAL CONDITIONS
- 1. You are the U2 US.
- 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Review and Verify DOS 1500-08.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 5 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
- 1.
Verifies Dilution flow calculation (1,017,000 gpm).
Determines Dilution flow was incorrectly determined. Correct Dilution flow is 1,017,000 gpm.
- 2.
Enters dilution flow (1,017,000 gpm) to calculate CCSW Activity Limit.
Determines 2.91 x 10-5 is the correct CCSW sample activity limit.
NOTE:
If the candidate attempts to terminate the review based on incorrect dilution flow previously calculated:
Direct the candidate to complete the review and make any necessary adjustments as necessary and another SRO will review.
- 3.
Verifies CCSW Heat Exchanger A sample activity is less than or equal to the calculated CCSW activity limit Determines 2.01 x 10-5 is less than 2.91 x 10-5.
- 4.
Re-Performs Canal Activity Calculation.
Uses 1,017,000 gpm as Dilution Flow. Determines incorrect activity level used for A Activity level of CCSW Heat Exchanger.
Correct value is 2.01 x10-5.
- 5.
Determines Canal Activity Concentration.
Determines Canal Activity Concentration is 6.9 x10-8
A-N-4-S Page 6 of 8 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 6.
Determines need for NSO to re-perform calculations.
Examinee directs NSO to re-perform calculations CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-S Page 7 of 8 Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 02 JPM Number: A-N-4-S Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-4-S Page 8 of 8 INITIAL CONDITIONS
- 1. You are the U2 US.
- 2. The Unit 2 NSO has completed DOS 1500-08, DISCHARGE OF CONTAINMENT COOLING SERVICE WATER (CCSW) FROM LOW PRESSURE COOLANT INJECTION (LPCI) HEAT EXCHANGER DURING CCSW PUMP OPERATIONS.
- 3. Only the A CCSW Heat Exchanger is going to be placed in service.
INITIATING CUE
- 1. Review and Verify DOS 1500-08.
- 2. Inform the Unit 2 Supervisor when the task is complete.
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Exelon Nuclear Job Performance Measure DETERMINE AN EP PROTECTIVE ACTION RECOMMENDATION JPM Number: A-N-5-S Revision Number: 00 Date: 02/16 Developed By:
Instructor Date Approved By:
Facility Representative Date
A-N-5-S Page 2 of 8 Revision Record (Summary)
Revision 00 New JPM developed for ILT 15-1 (2016-301) NRC Exam.
A-N-5-S Page 3 of 8 SIMULATOR SETUP INSTRUCTIONS
- 1.
This is a tabletop JPM utilizing simulator procedures.
- 2.
No Simulator setup needed.
DOCUMENT PREPARATION
- 1. For exam purposes/exam security provide a colored copy of a blank NARS form.
A-N-5-S Page 4 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions.
- 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
- 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
- 6. Visible damage to spent fuel has occurred.
- 7. Fuel pool level is lowering at 1 foot per minute.
- 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
- 9. A large hole is present in the Reactor Building wall.
- 10. There is NO verifier available.
INITIATING CUES
- 1. Determine EAL(s) (ignore discretionary EALs) and complete a NARS form. Give the NARS form to the WEC Supervisor, who will make the state notification.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
A-N-5-S Page 5 of 8 Some operations that are performed from outside of the C/R may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 6 of 8 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Examinee locates a copy of Radiological Emergency Plan Annex for Dresden EP-AA-1004 charts.
Provide the supplied NARS Form.
Provide the supplied screen shot of the meteorological data.
- 1.
Determines a classification of GENERAL EMERGENCY, due to notification from the Security Force that a HOSTILE ACTION is occurring within the protected area AND Damage to spent fuel pool has occurred.
Determines highest classification is a GENERAL EMERGENCY per EAL HG1 (15 minute requirement).
NOTE:
Determines classification start time _______ and stop time _______.
(15 minute limit)
- 2.
Properly fills out NARS form.
See attached key for the areas that must be filled out correctly (12 minute requirement)
NARS form Block 8 either meters/sec or miles/hr may be annotated. Only one is required. Ground level parameters must be used.
NOTE:
Fill out NARS form start time (when declaration completed) _______ and stop time _______.
(12 minute limit)
END JPM Stop Time:_________
A-N-5-S Page 7 of 8 Operators Name:
Job
Title:
Title:
DETERMINE EP PROTECTIVE ACTION RECOMMENDATION Revision Number: 00 JPM Number: A-N-5-S Task Number and
Title:
295L160, Given a plant in an off normal condition, determine the EP classification K/A Number and Importance: Generic.2.4.44 2.4 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment:
Simulator Control Room In-Plant Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 Actual Time Used:
minutes
References:
EP-AA-1004 Addendum 3 Rev. 002 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
A-N-5-S Page 8 of 8 INITIAL CONDITIONS
- 1. This is a time critical JPM.
- 2. You are the Shift Emergency Director.
- 3. Unit 2 was operating at near rated conditions.
- 4. Security reported a HOSTILE ACTION is occurring and terrorists gained access to the reactor building.
- 5. An explosive device was detonated in the spent fuel pool resulting in a loss of fuel pool level.
- 6. Visible damage to spent fuel has occurred.
- 7. Fuel pool level is lowering at 1 foot per minute.
- 8. Refuel floor CAM is alarming due to high airborne particulate contamination.
- 9. A large hole is present in the Reactor Building wall.
- 10. There is NO verifier available.
INITIATING CUES
Give the NARS form to the WEC Supervisor, who will make the state notification.
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST Job Performance Measure SBLC - INJECTION WITH PUMP AND RWCU FAILURES JPM Number: S-N-a Revision Number: 03 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 1100-02 Rev: 19 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 Revision Record (Summary)
Revision 02 Revised for 2013 NRC exam.
Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC _51_.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Run CAEP file S-N-a.cae.
- 3. If the CAEP file cannot be run then insert the following Expert Commands:
- a. Insert following Malfunctions and/or Remotes:
IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
IMF SCRLFVAD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
whichever pump is started first will not develop flow)
IMF SCRLFVBD 0.0 (Inserts BOTH SBLC Pump relief valve setpoint drift to 0.0 so #
whichever pump is started first will not develop flow)
IOR SCD3013 OFF (Overrides SBLC SYS1&2 and SYS2&1 positions OFF)
- b. Setup the following Triggers:
TRGSET 1 "SCD301_DRW(1)" (Trigger 1 Activates when SBLC control switch is placed to SYS1 position)
TRG 1 "DMF SCRLFVBD" (Deletes 2B SBLC relief valve setpoint drift malfunction)
TRGSET 2 "SCD301_DRW(2)" (Trigger 2 Activates when SBLC control switch is placed to SYS2 position)
TRG 2 "DMF SCRLFVAD" (Deletes 2A SBLC relief valve setpoint drift malfunction)
DOCUMENT PREPARATION Clean copy of DOP 1100-02 hardcard.
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Examinee should locate the hard card, then provide the included copy.
- 1.
Selects the correct procedure step. Determines correct procedure step is per DOP 1100-02 Page 6, Initiate SBLC for Boron Injection or Level Control (ATWS)
- 2.
Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 OR SYS 2 position.
Turns the SBLC INJECTION CONTROL keylock switch to either the intermediate right OR intermediate left position.
- 3.
Verifies applicable SQUIB pilot light NOT lit.
SQUIB A or B light off.
Note The selected pump starts but does not develop flow (relief valve failure in the JPM setup).
- 4.
Verifies applicable PUMP pilot light lit.
PUMP light on.
BEGIN ALTERNATE PATH
- 5.
Verifies FLOW pilot light lit.
FLOW light off (SBLC is NOT injecting).
- 6.
SBLC SQUIB VLV CKT FAILURE annunciator alarms (902-5 H-6).
Annunciator 902-5 H-6 illuminated.
- 7.
Places SBLC INJECTION CONTROL keylock switch to opposite position taken to in step
- 1.
Turns the SBLC INJECTION CONTROL keylock switch to the opposite direction turned in step 1.
- 8.
Verifies opposite PUMP pilot light lit.
Opposite PUMP light on.
Note Flow light will illuminate when SBLC INJECTION CONTROL keylock switch is re-positioned.
- 9.
Verifies RWCU valve 2-1201-1 closed.
Examinee recognizes that valve 2-1201-1 valve did NOT close.
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 10.
Closes RWCU valve 2-1201-1.
Takes manual action for a failed automatic action and closes 2-1201-1 valve, by placing c/s in the CLOSED position.
- 11.
Verifies RWCU valve 2-1201-1A closed.
GREEN light illuminated.
- 12.
Verifies RWCU valve 2-1201-2 closed.
Examinee recognizes that valve 2-1201-2 valve did NOT close.
- 13.
Closes RWCU valve 2-1201-2.
Takes manual action for a failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED position.
- 14.
Verifies RWCU valve 2-1201-3 closed.
GREEN light illuminated.
- 15.
Verifies RWCU valve 2-1201-7 closed.
RED light illuminated.
- 16.
Informs Unit Supervisor task is complete.
Reports SBLC is injecting but the first pump did not inject and valves 2-1201-1 and 2-1201-2 failed to close automatically.
Cue Acknowledge report of task completion.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-a Rev 03 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
SBLC - Injection with Pump and RWCU Failures JPM Number: S-N-a Revision Number: 03 Task Number and
Title:
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DOP 1100-02, Rev 19 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-a Rev 03 INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Job Performance Measure PLACE A FRV IN SERVICE IN AUTO DURING UNIT STARTUP JPM Number: S-N-b Revision Number: 04 Date: 02/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0600-06 Rev: 44 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 Revision Record (Summary)
Revision 02 Bank JPM.
Revision 03 Revised for 2009 NRC Exam.
Revision 04 Revised for ILT 15-1 (2016-301) NRC Exam
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC _52_.
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify BOTH FW REG ISOL VALVES are OPEN:
- MO 2-3206A
- MO 2-3206B
- 3. Verify 2A & 2B REG VLV CONTROL STATIONS in MAN and CLOSED.
- 4. Verify MASTER CONTROL STATION is in MAN.
- 5. Low Flow Reg Valve is controlling level at 30 in AUTO.
- 6. Insert following Malfunctions and/or Remotes:
- None.
- 7. Setup the following Triggers:
- None.
DOCUMENT PREPARATION
- 1.
Copy of DOP 0600-06 marked up through limitations and actions.
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
- 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the examinee with the provided copy of DOP 0600-06.
- 1.
Verify 2A and 2B FWRVs have been pre-operationally tested per Step G.1.
Condition met in initial conditions.
- 2.
Verify the following valves are open:
MO 2-3205A, FW LINE STOP.
MO 2-3205B, FW LINE STOP.
MO 2-3206A, 2A FW REG ISOL.
MO 2-3206B, 2B FW REG ISOL.
GREEN lights illuminated on the following:
- MO 2-3205A
- MO 2-3205B
- MO 2-3206A
- MO 2-3206B
- 3.
Adjust MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION, setpoint to match actual RPV level.
Depresses appropriate pushbutton to verify setpoint to match actual RPV level on MASTER CONTROL STATION OR RX LO FLOW CONTROL STATION.
- 4.
Select appropriate FWLCS RPV level signal per Section G.17.
Depresses appropriate FWLCS RPV level signal pushbutton.
- 5.
Place RX LO FLOW CONTROL STATION to AUTO.
Verifies AUTO light illuminated on RX LO FLOW CONTROL STATION.
- 6.
Place one REG VLV CONTROL STATION in AUTO.
Depresses AUTO pushbutton on 2B REG VLV CONTROL STATION.
- 7.
Verify other REG VLV CONTROL STATION in MAN.
Verifies MAN light illuminated on 2A REG VLV CONTROL STATION.
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 8.
Place MASTER CONTROL STATION in AUTO.
Depresses AUTO pushbutton on FWLC MASTER CONTROL STATION.
Note The LOW FLOW FWRV will automatically transfer to the 2B FWRV when the LOW FLOW FWRV position is 85% feedwater flow.
- 9.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Cue Acknowledge report of task completion.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-b Rev 04 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
Place a FRV in Service in Auto During Unit Startup JPM Number: S-N-b Revision Number: 04 Task Number and
Title:
259L021, Place FRV in service in AUTO (unit startup).
K/A Number and Importance:
259002.A4.03 3.8 / 3.6 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DOP 0600-06, Rev 44 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-b Rev 04 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit Startup is in progress.
- 3. The FWLCS is controlling level with the Low Flow Reg Valve.
- 4. 2A & 2B REG VLV CONTROL STATIONS are closed in manual mode.
- 5. 2A & 2B FRVs have been pre-operationally tested.
- 6. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to place 2B FRV in service (Unit Startup) in the Master Automatic mode in accordance with DOP 0600-06 per step G.2.
- 2. Inform the Unit Supervisor when the task is complete.
TQ-AA-150-J020 Revision 00 Page 1 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 09 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-03 Rev: 23 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for ILT 12-1 Cert Exam.
Revision 08 Revised for ILT 14-1 NRC Exam.
Revision 09 Revised for ILT 15-1 (2016-301) NRC Exam.
TQ-AA-150-J020 Revision 00 Page 4 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 3. Run the following CAEP file: S-N-d.cae
- 4. If the CAEP cannot be ran, insert the following Expert Commands:
Insert the following Malfunctions, Remotes, and/or Overrides:
o imf ser0016 on o imf ser0155 on o ior lpdvlvcl25 close o ior lpdvlvop16 open o ior rrd5bcls close Assign the following trigger assignment:
o irf lpcstppc (15) true DOCUMENT PREPARATION Markup a copy of DEOP 0500-03, Alternate Water Injection Systems.
TQ-AA-150-J020 Revision 00 Page 5 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
Examiner Note: The following parameters do not match the simulator indications.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 140 psig and slowly dropping.
- 6. B Loop is selected for injection.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 JPM Start Time:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03.
- 1.
Verifies 2A LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 2.
Place PP SUCT VLV MO 2-1501-5A control switch in Manual Bypass and verify closed.
RED light illuminated.
- 3.
Verify MIN FLOW VLV 2-1501-13A closed if not needed.
RED light illuminated.
CUE:
2-1501-13A is not required for 2B LPCI pump.
NOTE:
The following valves may be verified in any order
- 4.
Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
- 5.
Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
- 6.
Verify DW SPRAY VLVs 2-1501-28A and 2-1501-27A closed.
GREEN lights illuminated.
- 7.
Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 8.
Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 7 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 9.
Verify DW SPRAY VLVs 2-1501-28B and 2-1501-27B closed.
GREEN lights illuminated.
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the EO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the EO in the field, communicate that the steps (either individually of as a whole) have been completed.
Instructs EO to complete step G.12.c.(5).(a).
Instructs EO to complete step G.12.c.(5).(b).
Instructs EO to complete step G.12.c.(5).(c).
Instructs EO to complete step G.12.c.(5).(d).
- 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI 2-1501-47A ROOT VLV (at pump) and verify PI 2-1501-47A indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47A reading per step G.12.c.(6). & G.12.c.(7).
CUE:
PI 2-1501-47A indicates 15.5 psig.
- 15. Recognizes reading is NOT less than 15 psig.
Determines reading is greater than 15 psig.
TQ-AA-150-J020 Revision 00 Page 8 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Instructs EO to close 2-1501-47A per step G.12.c.(8).
CUE:
2-1501-47A-R is Closed.
- 17. Open PP SUCT VLV MO 2-1501-5A.
GREEN light illuminated.
Examinee notifies Unit Supervisor of 2A LPCI pump suction pressure problem when aligned to CST. May recommend using another LPCI pump.
CUE:
Notify the examinee that injection is still needed and to line up 2C LPCI pump suction to the CST.
Maintain the 2A LPCI pump in PTL.
BEGIN ALTERNATE PATH
- 19. Verifies 2C LPCI PP control switch in Pull-to-Lock.
ALL lights extinguished.
- 20. Place PP SUCT VLV MO 2-1501-5C control switch in Manual Bypass and verify closed.
RED light illuminated.
- 21. Verify MIN FLOW VLV 2-1501-13B closed if not needed.
RED light illuminated.
CUE:
2-1501-13B is not required for 2D LPCI pump.
- 22. Verify TORUS CLG/TEST valves 2-1501-20A and 2-1501-38A closed.
GREEN lights illuminated.
TQ-AA-150-J020 Revision 00 Page 9 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 23. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed.
GREEN lights illuminated.
GREEN lights illuminated.
- 25. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed.
GREEN lights illuminated.
- 26. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed.
GREEN lights illuminated.
GREEN lights illuminated.
Instructs EO to complete step G.12.e.(5).(a).
Instructs EO to complete step G.12.e.(5).(b).
Instructs EO to complete step G.12.e.(5).(c).
Instructs EO to complete step G.12.e.(5).(d).
- 32. Open 2-1501-47C-R, U2 LPCI C PUMP SUCT PI 2-1501-47C ROOT VLV (at pump) and verify PI 2-1501-47C indicates less than 15 psig.
Instructs EO to obtain PI 2-1501-47C reading per step G.12.e.(6).
CUE:
Pressure is 10 psig..
TQ-AA-150-J020 Revision 00 Page 10 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
- 33. Recognizes reading is less than 15 psig.
Determines reading is LESS than 15 psig.
Instructs EO to close 2-1501-47C per step G.12.e.(8).
Directs EO to perform step G.12.e.(10)(a)
CUE:
2-1501-31C is open.
Directs EO to perform step G.12.e.(10)(b)
Simulator Operator / Evaluator:
Activate Trigger 15 to lineup 2C LPCI pump suction to the CST.
CUE:
2-1501-37 is open.
Examiner Note:
If a RPV level band is requested: Direct the candidate to maintain RPV level between +8 and +48 (NOTE: RPV level is -65 and dropping per the cue)
- 37. Start 2C LPCI PP Places control switch to start. RED light illuminated.
TQ-AA-150-J020 Revision 00 Page 11 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment
Informs Unit Supervisor that 2C LPCI pump is lined up to the CST and injecting; the task is complete.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 12 of 13 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-d Rev 09 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
LPCI - Mitigate High Suction Pressure While Lining up to CST suction for Injection JPM Number: S-N-d Revision Number: 09 Task Number and
Title:
29502LK061, Lineup LPCI to the CST K/A Number and Importance:
203000.A1.04 3.6 / 3.6 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DEOP 0500-03, Rev 23 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 38 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 13 of 13 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-d Rev 09 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 140 psig and slowly dropping.
- 6. B Loop is selected for injection.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump with CST suction and inject to raise RPV water level per DEOP 0500-03.
- 2. Inform the Unit Supervisor when the task is complete.
TQ-AA-150-J020 Revision 00 Page 1 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Job Performance Measure CONTAINMENT - VENT CONTAINMENT WITH APCV - (A)
JPM Number: S-N-e Revision Number: 00 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 0500-04 Rev: 16 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
TQ-AA-150-J020 Revision 00 Page 4 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. (IC _51__ used for validation).
NOTE:It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure Torus water level is <30 feet.
- 3. Run the following CAEP file: S-N-e.cae
- 4. If the CAEP file cannot be ran insert the following Expert Commands:
- a. Insert following Malfunctions, Remotes, and/or Overrides:
IMF CIGP2I (Spurious Group II Isolation)
Adjusts Torus Level indications to ~20 feet.
v ior atl10 25.0 v ior pcltr10a 20 v ior pcltr10b 20 Adjusts Torus Bottom Pressure to 58.0 psig v ior pcptr103 58.0 Prevents the 2-1601-61 from opening v ior pcdcl61 close v ior pcdop61 off Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts.
v irf lp1aaf1f pulled v irf lp701af pulled v irf lp1aaf2f pulled v irf lp701bf pulled v irf csalgoff pulled v irf csblgoff pulled v irf hp2a1f1 pulled v irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig.
v ior pcp8524 50.0 v ior pcpdw102 50.0 v ior pcp85401 5.0 v ior pcptr1 5.0
- 6. Start ALL available ventilation exhaust fans as directed in DEOP 0500-04.
- 7. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-04, Containment Venting.
TQ-AA-150-J020 Revision 00 Page 5 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide examinee the marked up copy of DEOP 0500-04.
Annunciator 902-3 A-15, Pri Cnmt Vent/Sample Isol Bypass, will be received during this JPM.
- 1.
Verify SBGT is operating and flow is ~ 4000 scfm.
Verifies 2/3A SBGT train FI 7540-13 is reading ~4000 scfm.
- 2.
Verify Reactor Mode switch NOT in RUN.
Verifies Reactor Mode switch NOT in RUN.
- 3.
Place VENT ISOL SIGNAL BYPASS switch on 902-5 panel to TORUS.
Momentarily places Bypass switch to Torus Position.
- 4.
Open AO 2-1601-61, TORUS 2-INCH VENT VLV.
Places AO 2-1601-61 control switch to OPEN position and determines that the valve will not open.
- 5.
Place the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL.
Places the VENT ISOL SIGNAL BYPASS Switch on 902-5 to DRYWELL
- 6.
Open AO 2-1601-62, DW 2-INCH VENT VLV.
Places AO 2-1601-62 control switch to OPEN.
Green light extinguishes and Red light illuminates.
- 7.
Open AO 2-1601-63, VENT TO SBGT.
Places AO 2-1601-63 control switch to OPEN.
Green light extinguishes and Red light illuminates.
- 8.
Determine if SBGT flow is adequate to control and maintain Torus Bottom pressure below the Primary Containment Pressure Limit.
Determines Containment pressure trend.
Examiner Note:
DW pressure as indicated on PR/FR 2-8540-2/4 is as read and no change is expected with the small diameter vent path in service.
TQ-AA-150-J020 Revision 00 Page 7 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number Cue If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
BEGIN ALTERNATE PATH
- 9.
Determines use of AUGMENTED PRI CNMT VENT (APCV) System is required.
Proceeds to Attachment 1 step 6.
- 10.
Place AUGMENTED PRI CNMT VENT MODE SWITCH to APCV on Panel 902-3 Rotates control switch clockwise to APCV position
- 11.
Verify closed AO 2-1601-63, VENT TO SBGT Verifies AO-2-1601-63 in closed.
GREEN light lit, RED light extinguished.
- 12.
Verify closed AO 2-1601-91, VENT TO RX BLDG EXH SYS Verifies AO-2-1601-91 in closed.
RED light lit, GREEN light extinguished.
- 13.
Place TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 switch to OVERRIDE and hold on 902-3 Panel Rotates TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch clockwise and holds
- 14.
Place DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 switch to OVERRIDE and release on 902-3 Panel Rotates DRYWELL ISOLATION GROUP 2 OVERRIDE 2-1601-23 keylock switch clockwise and releases
- 15.
Release TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 on 902-3 Panel Releases TORUS ISOLATION GROUP 2 OVERRIDE 2-1601-60 keylock switch
- 16.
Place CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 switch to OVERRIDE and release on 902-3 Panel Rotates CMNT ISOLATION GROUP 2 OVERRIDE 2-1601-24 keylock switch clockwise and releases
TQ-AA-150-J020 Revision 00 Page 8 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 17.
Open AO 2-1601-60, TORUS VENT VLV.
Determines Torus Water Level is less than 30 feet and opens AO 2-1601-60, TORUS VENT VLV.
- 18.
Open AO 2-1601-24, VENT TO RX BLDG EXH SYS.
Rotates AO 2-1601-24, VENT TO RX BLDG EXH SYS control switch clockwise and verifies GREEN light extinguishes and RED light illuminates
- 19.
Open AO 2-1601-92 VENT TO MAIN CHIMNEY to control and maintain Primary Containment pressure below limit.
Rotates AO 2-1601-92 VENT TO MAIN CHIMNEY control switch clockwise and verifies GREEN light extinguishes and RED light illuminates Cue:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks, DW pressure recorder PR/FR 2-8540-2/4 is slowly lowering.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 20.
Informs Unit Supervisor task is complete.
Examinee notifies the Unit Supervisor.
Cue Acknowledge report of task completion.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 9 of 10 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-e Rev 00 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
Containment - Vent Containment with APCV - (A)
JPM Number: S-N-e Revision Number: 00 Task Number and
Title:
295L101, Vent the primary containment through the augmented primary containment vent (APCV) to stay below the Primary Containment Pressure Limit.
K/A Number and Importance:
223001.A4.07 4.2*/4.1 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DEOP 0500-04, Rev 16 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 9 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 10 of 10 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-e Rev 00 INITIAL CONDITIONS
- 1. You are the Aux 2 NSO.
- 2. A break inside the Unit 2 Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 0200-01.
- 4. Torus water level is 20 feet.
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
- 9. The N2 System is in its normal lineup.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Unit 2 Primary Containment in accordance with DEOP 0500-04, to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
TQ-AA-150-J020 Revision 00 Page 1 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Job Performance Measure Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 6700-18 Rev: 13 Procedure Rev:
Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 Revision Record (Summary)
Revision 02 Updated to comply with rev 4 of DOP 6500-10 Revision 03 Revised for ILT 15-1 (2016-301) NRC Exam
TQ-AA-150-J020 Revision 00 Page 4 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 3. This completes the setup for this JPM.
DOCUMENT PREPARATION Mark up copy of DOP 6700-18, Bus 28 Outage.
TQ-AA-150-J020 Revision 00 Page 5 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
- 1. MCC 28-7/29-7 is powered from Bus 28.
- 2. Power has been restored to Bus 29.
- 3. You are the Unit 2 Assistant NSO.
- 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
- 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
- 2. Notify the Unit 2 Supervisor when the task is complete Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-f Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 1.
Declare BOTH LPCI subsystems inoperable Informs the Unit Supervisor BOTH LPCI subsystems must be declared inoperable.
Reference TS 3.5.2 Cue Respond: Division 1 and 2 LPCI subsystems are inoperable.
- 2.
Open the feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, by placing control switch in TRIP AND maintain switch in TRIP.
Opens the feed breaker AND maintains the switch in TRIP.
- 3.
Close feed breaker from Bus 29, MCC 29-7/28-7 FEED FROM BUS
- 29.
Closes the feed breaker
- 4.
Release feed breaker from Bus 28, MCC 29-7/28-7 FEED FROM BUS 28, control switch.
Releases feed breaker control switch
- 5.
Notify the Unit 2 Supervisor that normal feed has been restored to MCC 28-7/29-7.
Unit 2 Supervisor notified.
Cue Acknowledge report of task completion.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 7 of 8 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-f Rev 03 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
Restore Normal Feed to 28-7/29-7 from Bus 29 JPM Number: S-N-f Revision Number: 03 Task Number and
Title:
262L026, Restore Normal Feed to 28-7/29-7 from Bus 29 K/A Number and Importance:
262001.A4.01 3.4 / 3.7 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DOP 6700-18, Rev 13 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 12 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 8 of 8 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-f Rev 03 INITIAL CONDITIONS
- 1. MCC 28-7/29-7 is powered from Bus 28.
- 2. Power has been restored to Bus 29.
- 3. You are the Unit 2 Assistant NSO.
- 4. DOP 6700-18 Attachment F loads are in the desired position as specified by Unit Supervisor.
INITIATING CUE
- 1. You have been directed by the Unit Supervisor to restore the normal feed to MCC 28-7/29-7 per DOP 6700-18 Step G.5
- 2. Notify the Unit 2 Supervisor when the task is complete
TQ-AA-150-J020 Revision 00 Page 1 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Job Performance Measure Withdraw SRM Detectors with a Stuck SRM Detector (AP)
S-N-g Revision Number: 02 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0700-01 Rev: 15 Procedure DOA 0700-02 Rev: 13 Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 Revision Record (Summary)
Revision 00 New JPM for the 2010 LORT exam.
Revision 01 Updated for the 2012 LORT exam.
Revision 02 Revised for ILT 15-1 (2016-301) NRC Exam
TQ-AA-150-J020 Revision 00 Page 4 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 SIMULATOR SETUP INSTRUCTIONS
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Position SRM detectors for a 104 to 105 count rate. (Should not be in the fully withdrawn position)
- 3. Run CAEP file: S-N-f.cae
- 4. If CAEP file cannot be ran, insert the following Expert Commands:
- a. Malfunctions required:
- 1) imf nis22det (Inserts SRM 22 stuck malfunction)
- b. Triggers required:
- 1) trgset 1 nilsdet(2).and. nil104do
- 2) trgset 2 et_array(1).and. nilsdet(2).and. nil101di
- 3) trg 2 dmf nis22det DOCUMENT PREPARATION Clean copies of the following procedures:
DOP 0700-01, Source Range monitor Operation (SRM)
DOA 0700-02, SRM or IRM Detector Stuck
TQ-AA-150-J020 Revision 00 Page 5 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
- 1. Unit 2 startup is in progress.
- 2. You are an extra NSO assisting the startup.
- 3. Primary Containment has been established.
INITIATING CUE
- 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit supervisor upon completion of the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 0700-01.
- 1.
WHEN IRM down scale alarms have cleared, THEN start SRM withdrawal and maintain SRM count rate 290 cps to 8.85x104 cps.
IRM down scales are cleared by initial conditions.
Monitors count rate when withdrawing SRMs.
- 2.
Depress the applicable SELECT switch (LIT when selected).
Depresses each SRMs SELECT switch.
Verifies SELECT light lit.
- 3.
Depress and hold the DRIVE OUT switch to withdraw SRMs to maintain SRM count rate of 290 cps to 8.85x104 cps.
Depress and hold the DRIVE OUT switch to withdraw SRMs BEGIN ALTERNATE PATH
- 4.
Verify that SRMs indication is changing as expected.
For SRMs 21, 23 & 24:
Count rate drops.
Period indicates negative.
OUT light is lit when detector reaches full out position.
For SRM 22 indications remain unchanged.
- 5.
Report SRM 22 detector did not move and/or appears to be stuck.
Reports SRM 22 detector did not move and/or appears to be stuck.
Note The Examinee should allow SRMs 21, 23, 24 to fully withdraw.
Cue Acknowledge report. Announce entering DOA 0700-02, SRM or IRM Detector Stuck. Direct the Examinee to perform DOA 0700-02. When the Examinee locates DOA 0700-02, give him the provided copy of DOA 0700-02.
Note The Examinee may have already deselected SRMs earlier.
TQ-AA-150-J020 Revision 00 Page 7 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 6.
Depress SRM SELECT switches to establish ONLY SRM 22 selected Depresses SRM SELECT switches to establish ONLY SRM 22 SELECT light lit.
Note An automatic Trigger is setup to delete the SRM stuck detector malfunction when it is inserted.
- 7.
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.
Depresses DRIVE IN switch to move SRM 22.
- 8.
Verify indication that SRM 22 is moving.
Observes SRM 22:
Count rate rises.
Period indicates positive.
- 9.
Depress DRIVE IN switch to stop SRM 22.
Depresses DRIVE IN switch to stop SRM 22.
- 10.
Use DRIVE IN AND DRIVE OUT switches to move stuck SRM detector in both directions to free it.
Depresses and holds DRIVE OUT switch to move SRM 22.
Drives SRM 22 fully out.
- 11.
Verify that SRM 22 indication is changing as expected.
Observes SRMs 22:
Count rate drops.
Period indicates negative.
OUT light is lit when detector reaches full out position.
- 12.
Report SRM 22 detector is fully withdrawn.
Reports SRM 22 detector is fully withdrawn.
Cue Acknowledge report.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 8 of 9 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-g Rev 02 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
Withdraw SRM Detectors with a Stuck SRM Detector (AP)
JPM Number: S-N-g Revision Number: 02 Task Number and
Title:
215L022 Respond to an SRM or IRM stuck detector.
K/A Number and Importance:
215004A4.04 3.2 / 3.2 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DOP 0700-01, Rev 15 DOA 0700-02, Rev 13 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 18 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 9 of 9 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-g Rev 02 INITIAL CONDITIONS
- 1. Unit 2 startup is in progress.
- 2. You are an extra NSO assisting the startup.
- 3. Primary Containment has been established.
INITIATING CUE
- 1. The Unit 2 Supervisor directs you to fully withdraw SRM detectors per DOP 0700-01, Source Range Monitor Operation (SRM).
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit supervisor upon completion of the task.
TQ-AA-150-J020 Revision 00 Page 1 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Job Performance Measure SBGT - START SBGT WITH A FAILURE OF RX BLDG VENT TO ISOLATE JPM Number: S-N-h Revision Number: 03 Date: 2/16 EXAM MATERIAL Developed By:
Instructor Date Approved By:
Facility Representative Date
TQ-AA-150-J020 Revision 00 Page 2 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
- 8.
If an alternate path is used, the task standard contains criteria for successful completion.
- 9.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 7500-01 Rev: 36 Procedure DAN 902(3)-3 F-14 Rev: 20 Procedure Rev:
- 10. Verify cues both verbal and visual are free of conflict.
- 11. Verify performance time is accurate
- 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
TQ-AA-150-J020 Revision 00 Page 3 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 Cert Exam.
Revision 03 Modified for ILT 15-1 (2016-301) NRC Exam
TQ-AA-150-J020 Revision 00 Page 4 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with Rx Bldg Vent operating normally (IC _53_ used for validation).
NOTE:
It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Place the 2/3A SBGT train control switch in STBY.
- 4. Verify the following fans operating:
- 2A RX BLDG VENT FAN
- 2B RX BLDG VENT FAN
- 2A RX BLDG EXH FAN
- 2B RX BLDG EXH FAN
- 3A RX BLDG VENT FAN
- 3B RX BLDG VENT FAN
- 3A RX BLDG EXH FAN
- 3B RX BLDG EXH FAN
- 5. Run CAEP file S-N-h.cae
- 6. If the CAEP file cannot be ran, insert the following Expert Commands:
- a. ior vrdtp3c trip (Prevents autostart of 2C RB vent fan)
- b. ior vrdtp4c trip (Prevents autostart of 2C RB exhaust fan)
- c. irf cirbvall lifted (Prevents Secondary Containment Isolation on U2)
- d. trgset 16 "vgdstrta_drw" (Trigger 16 automatically activates when 2/3A SBGT is placed to START)
- e. imf radrbvah (16 30) (After 30 sec, inserts RX Bldg Rad Mon failed high to cause a Secondary Containment Isolation signal)
- f. imf x04 (16 30) (After 30 sec, trips 2A RBV Supply Fan).
- g. imf x05 (16 30) (After 30 sec, trips 2B RBV Supply Fan).
- h. imf x07 (16 30) (After 30 sec, trips 2A RBV Exhaust Fan).
- i.
imf x08 (16 30) (After 30 sec, trips 2B RBV Exhaust Fan).
DOCUMENT PREPARATION Clean copy of DOP 7500-01.
Clean copy of DAN 902(3)-3 F-14
TQ-AA-150-J020 Revision 00 Page 5 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
TQ-AA-150-J020 Revision 00 Page 6 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number Note Provide the Examinee a copy of DOP 7500-01.
- 1.
Place the 2/3A SBGT SELECT switch to A PRI position.
Places the 2/3A SBGT SELECT switch to the A PRI position.
- 2.
Place the 2/3B SBGT SELECT switch to B STBY position.
Places the 2/3B SBGT SELECT switch to the B STBY position.
- 3.
Verify the 2/3A and B AIR HEATERs are OFF.
Both GREEN lights illuminated.
- 4.
Verify the 2/3A and B Fans are OFF.
Both GREEN lights illuminated.
- 5.
Verify annunciators 923-5 A-6 and 923-5 B-6 are NOT in alarm.
Both annunciator tiles extinguished.
- 6.
Verify 2/3B SBGT SELECT SWITCH in B STBY position.
Verifies 2/3 B SBGT Select switch in B STBY.
Note When 2/3A SBGT train starts, a Trigger auto activates which inserts a RBV Rad Mon Hi Hi condition after 30 seconds. The resulting Secondary Containment Isolation fails and the operator should complete the isolation.
- 7.
Starts 2/3A SBGT train.
Places 2/3 A SBGT Select switch to START A position.
- 8.
Verifies the 2/3A SBGT train initiated properly.
Begins verifying the 2/3A SBGT train operating properly.
- 9.
Records the Start Time on Operator Aid.
Records the Start Time on Operator Aid BEGIN ALTERNATE PATH Note The examinee should recognize the Secondary Containment Isolation did NOT occur, and perform the Limitations and Actions.
Cue If examinee does not react to the alarm on the 902-3 panel, make the following update:
Attention for an Update. RX BLDG VENT CH A RAD HI-HI is in. End of Update.
TQ-AA-150-J020 Revision 00 Page 7 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number Note If the examinee starts to head to the 902-3 panel to respond to the 902-3 F-14 annunciator stop them and hand them the provided copy of the DAN.
- 10.
Verifies trip of 3A RX BLDG VENT FAN.
Determines 3A RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG VENT FAN to the Trip position.
Determines 3A RX BLDG VENT FAN tripped (GREEN light illuminated).
- 11.
Verifies trip of 3B RX BLDG VENT FAN.
Determines 3B RX BLDG VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG VENT FAN to the Trip position.
Determines 3B RX BLDG VENT FAN tripped (GREEN light illuminated).
- 12.
Verifies trip of 3C RX BLDG VENT FAN.
GREEN light illuminated.
- 13.
Verifies trip of 3A RX BLDG EXH FAN.
Determines 3A RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3A RX BLDG EXH FAN to the Trip position.
Determines 3A RX BLDG EXH FAN tripped (GREEN light illuminated).
- 14.
Verifies trip of 3B RX BLDG EXH FAN.
Determines 3B RX EXH VENT FAN is NOT tripped. (BLUE lights illuminated).
Places control switch 3B RX BLDG EXH FAN to the Trip position.
Determines 3B RX BLDG EXH FAN tripped (GREEN light illuminated).
TQ-AA-150-J020 Revision 00 Page 8 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 15.
Verifies trip of 3C RX BLDG EXH FAN.
GREEN light illuminated.
- 16.
Verifies trip of 2A RX BLDG VENT FAN.
GREEN and AMBER lights illuminated.
- 17.
Verifies trip of 2B RX BLDG VENT FAN.
GREEN and AMBER lights illuminated.
- 18.
Verifies trip of 2C RX BLDG VENT FAN.
GREEN light illuminated.
- 19.
Verifies trip of 2A RX BLDG EXH FAN.
GREEN and AMBER lights illuminated.
- 20.
Verifies trip of 2B RX BLDG EXH FAN.
GREEN and AMBER lights illuminated.
- 21.
Verifies trip of 2C RX BLDG EXH FAN.
GREEN light illuminated.
- 22.
Verifies 3A INLET DAMPER AO 3-5741A closed.
Verifies 3B INLET DAMPER AO 3-5741B closed.
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT INLET ISOL DAM 3-5741A & 3-5741B to the CLOSE position.
Determines 3A & 3B INLET DAMPERs AO 3-5741A & B did not close (GREEN lights illuminated).
TQ-AA-150-J020 Revision 00 Page 9 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 23.
Verifies 3A OUTLET DAMPER AO 3-5742A closed.
Verifies 3B OUTLET DAMPER AO 3-5742B closed.
Determines 3A & 2B OUTLET DAMPERs AO 3-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 3A & 3B RX BLDG VENT OTLT ISOL DAM 3-5742A & 3-5742B to the CLOSE position.
Determines 3A & 3B OUTLET DAMPERs AO 3-5742A & B did not close (GREEN lights illuminated).
- 24.
Verifies 2A INLET DAMPER AO 2-5741A closed.
Verifies 2B INLET DAMPER AO 2-5741B closed.
Determines 3A & 3B INLET DAMPERs AO 2-5741A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT INLET ISOL DAM 2-5741A & 2-5741B to the CLOSE position.
Determines 2A & 2B INLET DAMPERs AO 2-5741A & B did not close (GREEN lights illuminated).
TQ-AA-150-J020 Revision 00 Page 10 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 STEP ELEMENT STANDARD SAT UNSAT Comment Number
- 25.
Verifies 2A OUTLET DAMPER AO 2-5742A closed.
Verifies 2B OUTLET DAMPER AO 2-5742B closed.
Determines 2A & 2B OUTLET DAMPERs AO 2-5742A & B are NOT closed (GREEN lights illuminated).
Places control switch 2A & 2B RX BLDG VENT OTLT ISOL DAM 2-5742A & 2-5742B to the CLOSE position.
Determines 2A & 3B OUTLET DAMPERs AO 2-5742A & B did not close (GREEN lights illuminated).
- 26.
Verifies trip of 2A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
- 27.
Verifies trip of 2B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
- 28.
Verifies trip of 3A D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
- 29.
Verifies trip of 3B D/W & Torus Purge Fan.
Condition met from previous steps in the procedure.
- 30.
Notifies US of Secondary Containment Isolation Failure and successful manual completion of the isolation.
Examinee notifies the Unit Supervisor.
Cue Acknowledge report.
END JPM Stop Time:
TQ-AA-150-J020 Revision 00 Page 11 of 12 This replaced TQ-JA-150-02 SRRS: 3D.105 (when utilized for operator initial or continuing training)
S-N-h Rev 03 JPM
SUMMARY
Operators Name:
Emp. ID#: ____________
Job
Title:
Title:
SBGT - Start SBGT with a Failure of RX BLDG VENT to Isolate (AP)
JPM Number: S-N-h Revision Number: 03 Task Number and
Title:
261L002, Start the SBGT system.
K/A Number and Importance:
261000.A4.09 2.7 / 2.7 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): DOP 7500-01, Rev 36 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used:
minutes EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature:
Date:
TQ-AA-150-J020 Revision 00 Page 12 of 12 This replaced TQ-JA-150-02 SRRS: 3D.100; There are no retention requirements for this section S-N-h Rev 03 INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. DOP 7500-M1/E1 is not required per the Unit Supervisor.
- 4. The 2/3A SBGT Initial Cumulative Run Time has been recorded.
- 5. There has been NO painting or operation of propane powered equipment in the power block in the last 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
INITIATING CUE
- 2. Inform the Unit Supervisor when the task is complete.
Page 1 of 10 Exelon Nuclear Job Performance Measure Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 00 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
- 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 4700-03 Rev: 22 Procedure Rev:
Procedure Rev:
- 9.
Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
Page 3 of 10 Revision Record (Summary)
Revision 00 Created for ILT 15-1 (2016-301) NRC Exam.
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation to examinee.
Page 5 of 10 INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. 2A IAC is unavailable due to an oil leak.
- 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
- 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
- 6. Unit 2 SAC is running.
- 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 4. Notify the Unit Supervisor when you are complete with the task.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Page 6 of 10 The timeclock starts when the candidate acknowledges the initiating cue.
Page 7 of 10 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Provide examinee a current copy of DOP 4700-03.
- 1. Identifies Step G.9 as the correct step in DOP 4700-
- 03.
Proceeds to Step G.9.
Verifies 3-4799-501A, 3C IAC DISCH TO U-3 INST AIR HEADER ISOL VLV stem is in.
(Valve is located above 3B IAC)
CUE The component is in the position you described.
- 3. Close 2/3-4799-424, U2/U3 X-TIE SV.
Rotates 2/3-4799-424, U2/U3 X-TIE SV clockwise until stem is in.
(Valve is located North of 3A IAC)
CUE The component is in the position you described.
- 4. Open 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV.
Rotates 2/3-4799-425, 3C IAC TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.
(Valve is located North of 3A IAC)
CUE The component is in the position you described.
Page 8 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 5. Open 2-47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS.
Rotates 47350-500, U2 INST AIR SYS XTIE FROM THE U3 INST AIR SYS counter clockwise until stem is out.
(Valve is located North of Cardox tank)
CUE The component is in the position you described.
Rotates 2-47350-329, U2 INST AIR HDR ISOL VLV counter clockwise until stem is out.
(Valve is located North of 2B IAC)
CUE The component is in the position you described.
- 7. Report completion of task to Unit Supervisor.
Reports completion of task to Unit Supervisor.
END JPM Stop Time:_________
Page 9 of 10 Operators Name:
Job
Title:
Title:
Align IACs to Unit 2 Instrument Air header Revision Number: 00 JPM Number: S-N-i Task Number and
Title:
278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environment: In-Plant Suggested Testing Environment:
q Simulator Plant q Control Room Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete:_ 20__minutes Actual Time Used: _______ minutes
References:
DOP 4700-03, Rev. 22 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 10 of 10 INITIAL CONDITIONS
- 1. Unit 3 is shutdown for a refuel outage.
- 2. 2A IAC is unavailable due to an oil leak.
- 3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
- 4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
- 5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
- 6. Unit 2 SAC is running.
- 7. Main Control Room is monitoring IA parameters.
INITIATING CUE
- 1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY.
- 2. All applicable prerequisites of DOP 4700-03 have been met.
- 3. Your Pre Job Brief has been completed.
- 4. Notify the Unit Supervisor when you are complete with the task.
Exelon Nuclear Job Performance Measure Bypass the Trip of Drywell Coolers JPM Number: S-N-j Revision Number: 10 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
- 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DEOP 500-02 Rev: 16 Procedure Rev:
Procedure Rev:
- 9.
Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
Revision Record (Summary)
Rev 08:
Updated for the 2007 LORT exam Rev 09:
Updated for the 2010 LORT exam Revision 10 Revised for ILT 15-1 (2016-301) NRC Exam.
SIMULATOR SETUP INSTRUCTIONS N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a clean copy of current revision of DEOP 0500-02, Bypassing Interlocks and Isolations to provide to examinee.
INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Provide examinee a current copy of DEOP 500-02.
1 Proceed to Step G.3 of procedure.
Locates Step G.3 NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.
NOTE Examinee should locate the proper Equipment Box in the cabinet. Tools required are:
Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.
Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.
2 Obtain appropriate Equipment Box from the Control Room DEOP Equipment Storage Cabinet.
OBTAINS appropriate EQUIPMENT BOX from the Control Room DEOP Equipment Storage Cabinet.
CUE DEOP Equipment Box you have identified is in your hand.
NOTE DS key is required for entry into the AEER 3 Proceed to the AEER and panel 903-32.
Locates Panel 903-32.
NOTE Simulated JPM - Examinee must explain the task.
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
On 903-32 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.
Loosens screw with standard screwdriver.
Uses split blade screwdriver to grasp screw and remove it.
Tapes the loose wire with electricians tape.
CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
On 903-33 panel terminal block AA terminal point 6 OR terminal point 7 Puts on insulated gloves.
Loosens screw with standard screwdriver.
Uses split blade screwdriver to grasp screw and remove it.
Tapes the loose wire with electricians tape.
CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.
6 Notify Unit Supervisor upon completion of task.
Notifies Unit Supervisor upon completion of task.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Operators Name: ___________________________________
Job
Title:
Title:
Bypass the Trip of Drywell Coolers Revision Number: 10 JPM Number: S-N-j Task Number and
Title:
295L074, Bypass the Trip of Drywell Coolers.
K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment:
q Simulator Plant q Control Room Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: 15 minutes Actual Time Used: _______ minutes
References:
DEOP 500-02, Rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 9 of 9 INITIAL CONDITIONS
- 1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
- 2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
- 3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
- 5. Drywell temperature and pressure are rising.
INITIATING CUE
- 1. Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
- 2. Your Pre-Job Brief has been completed.
- 3. Notify the Unit Supervisor when the in-plant actions are complete
Page 1 of 11 Exelon Nuclear Job Performance Measure Swap CRD Flow Control Valves JPM Number: S-N-k Revision Number: 15 Date: 02/16 Developed By:
Exam Author Date Approved By:
Facility Representative Date
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1.
Task description and number, JPM description and number are identified.
- 2.
Knowledge and Abilities (K/A) references are included.
- 3.
Performance location specified. (in-plant, control room, simulator, or other)
- 4.
Initial setup conditions are identified.
- 5.
Initiating cue (and terminating cue if required) are properly identified.
- 6.
Task standards identified and verified by SME review.
- 7.
Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
- 8.
Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure DOP 0300-03 Rev: 25 Procedure Rev:
Procedure Rev:
- 9.
Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date
Page 3 of 11 Revision Record (Summary)
Revision 14 Updated for the 2007 LORT exam.
Revision 15 Revised for ILT 15-1 (2016-301) NRC Exam.
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS:
N/A: In-Plant JPM.
DOCUMENT PREPARATION Provide a copy of DOP 0300-03, CRD System Flow Control Valve Transfer, to provide to examinee.
Page 5 of 11 INITIAL CONDITIONS
- 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
- 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
- 3. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
- 2. Prerequisites have been met.
- 3. Your Pre-Job Brief is complete.
- 4. Notify the Unit Supervisor upon completion of in-plant actions.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information for Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
Page 6 of 11 JPM Start Time: _________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
- 1. Proceed to Unit 2 CRD Flow Control Valves (FCVs) and establish communications with the control room.
CRD FCVs located and communications established with control room.
NOTE Step G.2 is N/A.
Verifies 2-0301-30 stem/handwheel backed out.
CUE Valve 2-0301-30 stem/ handwheel is backed out.
Verifies 2-0301-144B valve stem/handwheel backed out.
CUE Valve 2-0301-144B stem/handwheel is backed out.
Verifies 2-0301-40B valve stem/handwheel backed out.
CUE Valve 2-0301-40B stem/handwheel is backed out.
- 5. Cycle the 2B FCV full open and full closed by adjusting PRV 2-0301-34 locally.
Adjusts PRV 2-0301-34 locally to cycle 2B FCV.
Verifies cycling by observing stem position and/or light indication on the CRD FCV electrical transfer station.
CUE 2B FCV cycles full open and then full closed.
Page 7 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
NOTE The Unit Supervisor has addressed the TRM per the Initial Conditions (addresses note preceding G.5 of DOP).
- 6. Verify PRV 2-0301-34 closed.
Verifies PRV 2-0301-34 valve stem backed out and turning freely.
CUE PRV 2-0301-34 valve stem is backed out and turning freely.
Verifies pressure gauge PI 2-0302-60 reading 0 psig.
CUE After examinee locates and observes the indicator, then cue:
PI 2-0302-60 is reading 0 psig.
Calls U2 NSO to verify CRD FCV Controller configuration CUE The Unit 2 CRD Flow Controller is in MANUAL and demand is set to minimum.
- 9. At CRD Electrical Transfer, place the transfer switch TS160 to the "Valve B" position to place FCV 2-0302-6B in service.
At CRD Electrical Transfer Station, places the transfer switch to the "Valve B" position to place FCV 2-0302-6B in service CUE The transfer switch is in the "Valve B" position.
Selects the 2B E/P converter by placing 2-0301-29 to B.
Page 8 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
CUE The 2-0301-29 Unit 2 CRD MANUAL E/P SELECTOR VALVE is in the B position.
Examiner Note:
On valves 2-0301-37 and 2-0301-38 an arrow is embossed on the handle. The shorter end of the handle and arrow point to the in service position of the valve.
- 11. Place U2 CRD SYS FCV 2-0302-6B MAN/AUTO SELECTOR VLV, 2-0301-38, switch to the automatic position.
Places 2-0302-6B selector switch to the automatic position.
CUE 2-0302-6B selector switch is in automatic.
Places the 2-0302-6A selector switch to the manual position.
CUE The 2-0302-6A selector switch is in manual.
Opens 2-0301-41B valve.
Full CCW, stem/handwheel backed out.
CUE The 2-0301-41B valve is full CCW, stem/handwheel backed out.
- 14. Notify Unit NSO that the 2B CRD FCV can now be controlled from the 902-5 Panel AND that system flow should be adjusted to maintain stable flow rate.
Notifies Unit NSO of 2B CRD FCV status and directs Unit NSO to adjust system flow rate to maintain stable flow.
CUE Acknowledge report of CRD FCV Status and report that system flow has been adjusted to maintain stable flow rate.
Page 9 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
Closes 2-0301-41A valve slowly (full CW or stem/
handwheel in).
CUE The 2-0301-41A valve stem/handwheel is full CW or in.
- 16. Notifies Unit Supervisor of completion of in-plant actions per DOP and that the remaining steps are from the 902-5 panel.
Unit Supervisor notified of completion of in-plant actions.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
Page 10 of 11 Operators Name: ___________________________________
Job
Title:
rRO rSRO JPM
Title:
Swap CRD Flow Control Valves Revision Number: 15 JPM Number: S-N-k Task Number and
Title:
201L011, Respond to a CRD Flow Control Valve Failure K/A Number and Importance: 201001.A4.03 2.9/2.8 Suggested Testing Environment: In-Plant Suggested Testing Environment:
q Simulator Plant q Control Room Testing Method:
Simulate Alternate Path:
Yes No Perform SRO Only:
Yes No Time Critical:
Yes No Estimated Time to Complete: _ 23__ minutes Actual Time Used: _______ minutes
References:
DOP 0300-03, Rev. 25 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
(Print)
Evaluators Signature: ___________________________ Date: _________
Page 11 of 11 INITIAL CONDITIONS
- 1. Unit 2 is at 100% power when 2A CRD FCV developed a small air leak that requires the FCV to be taken OOS for maintenance, but NOT big enough to immediately affect valve operation.
- 2. The Unit 2 NSO has already performed all control room procedure actions in preparation for the CRD FCV transfer.
- 4. The Unit Supervisor has reviewed the TRM and has taken required actions.
INITIATING CUE
- 1. The Unit Supervisor has directed you to perform the in-plant actions to transfer Unit 2 CRD FCVs, placing the 2B CRD FCV in service in "Automatic" per DOP 0300-03.
- 2. Prerequisites have been met.
- 3. Your Pre-Job Brief is complete.
- 4. Notify the Unit Supervisor upon completion of in-plant actions.