ML18227B064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML18227B064
| number = ML18227B064
| issue date = 02/14/1978
| issue date = 02/14/1978
| title = 02/14/1978 Letter Operating Status Reports of January 1978
| title = Letter Operating Status Reports of January 1978
| author name = Schmidt A
| author name = Schmidt A
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFOR~ION DISTRIBUTION SYSTEM         S)
{{#Wiki_filter:ORG:
          ,DISTRIBUTION FOR INCOMIWG MATERIAL                       0-250   51/335 REC:                                ORG: SCHMIDT A D                DOCDATE: 02/14/78 NRC                                FL PWR  Cc LIGHT              DATE RCVD: 02/21/78 DOCTYPE:     LETTER     NOTAR I ZED: NO                               COPIES RECEIVED
SCHMIDT A D FL PWR Cc LIGHT REGULATORY INFOR~ION DISTRIBUTION SYSTEM
,DISTRIBUTION FOR INCOMIWG MATERIAL REC:
NRC S) 0-250 51/335 DOCDATE: 02/14/78 DATE RCVD: 02/21/78 DOCTYPE:
LETTER NOTARIZED:
NO COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
LTR 1   ENCL 1 MONTHLY OPERATING REPT FOR SUBJECT UNITS 3 5 4 AND UNIT       i. FOR JANUARY'978.
LTR 1
PLANT NAME: TURKEY PT 03                                   REVIEWER  INITIAL:  X JM TURKEY PT 83                               DISTRIBUTER INITIAL:
ENCL 1
ST LUCIE i>i DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 44++4~%o+<++<+oo<o MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
MONTHLY OPERATING REPT FOR SUBJECT UNITS 3 5 4 AND UNIT i.
(DI STRI BUT ION CODE A003 >
FOR JANUARY'978.
FOR ACTION:         BR CHIEF SC75t   CER++W/2 ENCL INTERNAL:              G FILE+4W F                 NRC PDR++W/ENCL MIPC FOR ACTION++W/2 ENCL EXTERNAL:          LPDR'S MIAMIi FL++W/ENCL TI C~~W/ENCL NSIC++W/ENCL BNL<NATLAB)4+W/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION:       LTR 10       ENCL 10                   CONTROL NBR:    780530005 SIZE: iP+iP+2P
PLANT NAME: TURKEY PT 03 TURKEY PT 83 ST LUCIE i>i REVIEWER INITIAL:
%4%4 4 4 %%%%%%%%4%%%%% k%%%4%%8M+%4%%%       THF END
XJM DISTRIBUTER INITIAL:
DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 44++4~%o+<++<+oo<o MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DISTRI BUTION CODE A003 >
FOR ACTION:
INTERNAL:
EXTERNAL:
BR CHIEF SC75t CER++W/2 ENCL G FILE+4W F MIPC FOR ACTION++W/2 ENCL LPDR'S MIAMIi FL++W/ENCL TIC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)4+W/ENCL
- ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION:
LTR 10 ENCL 10 SIZE:
iP+iP+2P CONTROL NBR:
780530005
%4%4 4 4 %%%%%%%%4%%%%% k%%%4%%8M+%4%%%
THF END


1 "el
1 "el
    %If
%If


FLORIDA POWER & LIGHT COMPANY February 14,         -1978 Office of   Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
FLORIDAPOWER & LIGHTCOMPANY February 14,
Attached are the January, 1978, Operating Summary Repro ts for Turkey Point Unit Noe. 3 and 4 and St. Lucie Un'P No. 1.
-1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D.
f Very  truly yours,                                          Cc,a   1 D. Schmidt Vice President Power Resources VTC/bab i,   +/
C.
cc:   Mr. James P. O'Reilly Robert Lowenstein, Esquire
20555 Gentlemen:
                        'e4 "l]
Very truly yours, D. Schmidt Vice President Power Resources VTC/bab Attached are the January, 1978, Operating Summary Repro ts for Turkey Point Unit Noe.
3 and 4 and St. Lucie Un'P No.
1.
f Cc,a 1
i, +/
cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
'e4 "l]
4ae I 'hc'~
4ae I 'hc'~
780530005 PEOPLE... SERVING PEOPLE
780530005 PEOPLE... SERVING PEOPLE
Line 39: Line 62:
HOHVHG S30IA83S l<0li.llHIHlSi0
HOHVHG S30IA83S l<0li.llHIHlSi0


SAG"WRY OF OPERATING EXPERIFNCE DOCKET NO. 50-250 Turkey Point UNIT n 978 BY V. T. Chilson
SAG"WRY OF OPERATING EXPERIFNCE DOCKET NO.
                                                          'O'i1PLETED TELEPHONE (305) 552-3830 REPORT MONTH Januar   1978 Turkey Point Unit No. 3 scheduled refueling, maintenance, and inspections continued.
50-250 Turkey Point UNIT n
'O'i1PLETED BY V. T. Chilson 978 TELEPHONE (305) 552-3830 REPORT MONTH Januar 1978 Turkey Point Unit No.
3 scheduled refueling, maintenance, and inspections continued.
Major Safety-related maintenance performed during the month will be included in a separate Refueling Outage Report to be submitted after the unit is returned to service.
Major Safety-related maintenance performed during the month will be included in a separate Refueling Outage Report to be submitted after the unit is returned to service.


0 SV~in.'IARY OF 'OPERATING EXPERIENCE DOCKET NO. 50-251 Turkey Point UNIT Unit No. 4 DATE Pebruar   14   1978 COMPLETED BY   V. T. Chilson TELEPElOiVE (305) 552-3824 REPORT i~mONTH Januar     1978 Turkey Point Unit No. 4 operated at approximately 100% R.P.
0 SV~in.'IARY OF 'OPERATING EXPERIENCE DOCKET NO.
except for outage of January 25, 1978. Refer to Unit Shutdowns and Power Reduction Sections of the Operating Status Report, for details of this outage.
50-251 Turkey Point UNIT Unit No.
Major Safety-related Maintenance performed during the month included the corrective actions taken to ensure operability of the flow path from the, Boric Acid Storage Tank to the charging pump suction line. Refer to Licensee Event Report No. 251-78-1 for additional details.
4 DATE Pebruar 14 1978 COMPLETED BY V. T. Chilson TELEPElOiVE (305) 552-3824 REPORT i~mONTH Januar 1978 Turkey Point Unit No.
4 operated at approximately 100% R.P.
except for outage of January 25, 1978.
Refer to Unit Shutdowns and Power Reduction Sections of the Operating Status Report, for details of this outage.
Major Safety-related Maintenance performed during the month included the corrective actions taken to ensure operability of the flow path from the, Boric Acid Storage Tank to the charging pump suction line.
Refer to Licensee Event Report No. 251-78-1 for additional details.


II
II
  ~ ~
~
~


'F SL'~21ARY OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie Unit No. 1 DATE Februar   14, 1978 COMPLETED BY V. T. Chilson TELEPHONE (305)552-3824 REPORT HONTH Januar       1978 St. Lucie Unit No.       1 operated at approximately 100$ R. P.
'F SL'~21ARY OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie Unit No.
except for outages of January 13, 23 25; 28, 29, and 31, 1978.
1 DATE COMPLETED BY TELEPHONE Februar 14, 1978 V. T. Chilson (305)552-3824 REPORT HONTH Januar 1978 St. Lucie Unit No.
Refer to Unit Shutdowns and Power Reduction Section of the Operating Status Report for additional details of these outages.           /
1 operated at approximately 100$
Major Safety-related maintenance performed during the month included the replacement of a failed gasket on the pressur-izer,manway closure head and the replacement of five (5) pressurizer manway clpsure head retaining studs., Refer to Licensee Event Report. No. 335-78-5 for additional details of the inspection and replacement of the pressurizer manway closure head retaining studs.
R.
P.
except for outages of January 13, 23 25; 28, 29, and 31, 1978.
Refer to Unit Shutdowns and Power Reduction Section of the Operating Status Report for additional details of these outages.
/
Major Safety-related maintenance performed during the month included the replacement of a failed gasket on the pressur-izer,manway closure head and the replacement of five (5) pressurizer manway clpsure head retaining studs.,
Refer to Licensee Event Report. No. 335-78-5 for additional details of the inspection and replacement of the pressurizer manway closure head retaining studs.


'4 r~
'4 r~
r ~}}
r
~}}

Latest revision as of 14:41, 5 January 2025

Letter Operating Status Reports of January 1978
ML18227B064
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 02/14/1978
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B064 (9)


Text

ORG:

SCHMIDT A D FL PWR Cc LIGHT REGULATORY INFOR~ION DISTRIBUTION SYSTEM

,DISTRIBUTION FOR INCOMIWG MATERIAL REC:

NRC S) 0-250 51/335 DOCDATE: 02/14/78 DATE RCVD: 02/21/78 DOCTYPE:

LETTER NOTARIZED:

NO COPIES RECEIVED

SUBJECT:

LTR 1

ENCL 1

MONTHLY OPERATING REPT FOR SUBJECT UNITS 3 5 4 AND UNIT i.

FOR JANUARY'978.

PLANT NAME: TURKEY PT 03 TURKEY PT 83 ST LUCIE i>i REVIEWER INITIAL:

XJM DISTRIBUTER INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 44++4~%o+<++<+oo<o MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.

(DISTRI BUTION CODE A003 >

FOR ACTION:

INTERNAL:

EXTERNAL:

BR CHIEF SC75t CER++W/2 ENCL G FILE+4W F MIPC FOR ACTION++W/2 ENCL LPDR'S MIAMIi FL++W/ENCL TIC~~W/ENCL NSIC++W/ENCL BNL<NATLAB)4+W/ENCL

- ACRS CAT B++W/0 ENCL NRC PDR++W/ENCL DISTRIBUTION:

LTR 10 ENCL 10 SIZE:

iP+iP+2P CONTROL NBR:

780530005

%4%4 4 4 %%%%%%%%4%%%%% k%%%4%%8M+%4%%%

THF END

1 "el

%If

FLORIDAPOWER & LIGHTCOMPANY February 14,

-1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

Very truly yours, D. Schmidt Vice President Power Resources VTC/bab Attached are the January, 1978, Operating Summary Repro ts for Turkey Point Unit Noe.

3 and 4 and St. Lucie Un'P No.

1.

f Cc,a 1

i, +/

cc:

Mr. James P. O'Reilly Robert Lowenstein, Esquire

'e4 "l]

4ae I 'hc'~

780530005 PEOPLE... SERVING PEOPLE

HOHVHG S30IA83S l<0li.llHIHlSi0

SAG"WRY OF OPERATING EXPERIFNCE DOCKET NO.

50-250 Turkey Point UNIT n

'O'i1PLETED BY V. T. Chilson 978 TELEPHONE (305) 552-3830 REPORT MONTH Januar 1978 Turkey Point Unit No.

3 scheduled refueling, maintenance, and inspections continued.

Major Safety-related maintenance performed during the month will be included in a separate Refueling Outage Report to be submitted after the unit is returned to service.

0 SV~in.'IARY OF 'OPERATING EXPERIENCE DOCKET NO.

50-251 Turkey Point UNIT Unit No.

4 DATE Pebruar 14 1978 COMPLETED BY V. T. Chilson TELEPElOiVE (305) 552-3824 REPORT i~mONTH Januar 1978 Turkey Point Unit No.

4 operated at approximately 100% R.P.

except for outage of January 25, 1978.

Refer to Unit Shutdowns and Power Reduction Sections of the Operating Status Report, for details of this outage.

Major Safety-related Maintenance performed during the month included the corrective actions taken to ensure operability of the flow path from the, Boric Acid Storage Tank to the charging pump suction line.

Refer to Licensee Event Report No. 251-78-1 for additional details.

II

~

~

'F SL'~21ARY OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie Unit No.

1 DATE COMPLETED BY TELEPHONE Februar 14, 1978 V. T. Chilson (305)552-3824 REPORT HONTH Januar 1978 St. Lucie Unit No.

1 operated at approximately 100$

R.

P.

except for outages of January 13, 23 25; 28, 29, and 31, 1978.

Refer to Unit Shutdowns and Power Reduction Section of the Operating Status Report for additional details of these outages.

/

Major Safety-related maintenance performed during the month included the replacement of a failed gasket on the pressur-izer,manway closure head and the replacement of five (5) pressurizer manway clpsure head retaining studs.,

Refer to Licensee Event Report. No. 335-78-5 for additional details of the inspection and replacement of the pressurizer manway closure head retaining studs.

'4 r~

r

~