80ESG-3900 ' | 80ESG-3900 ' | ||
April 30, 1980 i Page 2 i | April 30, 1980 i Page 2 i | ||
Line 49: | Line 48: | ||
Radiation Survey Report of FCEL Facility | Radiation Survey Report of FCEL Facility | ||
{ cc w/ enclosure: | { cc w/ enclosure: | ||
R. H. Engelken, Director, Region V Office, NRC | R. H. Engelken, Director, Region V Office, NRC t | ||
r 1 | |||
1 | |||
.}} | .}} |
Latest revision as of 21:06, 21 February 2020
ML19309G777 | |
Person / Time | |
---|---|
Site: | 05000147 |
Issue date: | 04/30/1980 |
From: | Remley M ROCKWELL INTERNATIONAL CORP. |
To: | Gammill W Office of Nuclear Reactor Regulation |
Shared Package | |
ML19309G778 | List: |
References | |
80ESG-3900, NUDOCS 8005070554 | |
Download: ML19309G777 (2) | |
Text
- 5
- 800^070 BM Ensegy Systems Group 8900 De Soto Awue Canoga Park, CA 91304 Telephone: (213) 341.'
TWX: 910-494-1237 Rockwell Telex:1aio17 International April 30,1980 In reply refer to 80ESG-3900 Mr. William Gammil1 Acting Assistant Director for Operating Reactor Projects Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1) Rockwell International Letter 74AT-4512 dated July 16,1974, L. W. Wheeler to Dcr.ald J. Ncholt,
" Application for Amendment of Facility License CX-17 to Authorize the Dismantling of -he Facility ,
Disposal of its Compontot Parts, and '!aluntary Surrender of the Facility License, Cocker. 3G-147" (2) U.S. AEC letter, George Lear to L. 4. Wheeler, November 1,1974, transmitting the order authorizing the dismantlement of the Fast Critical Experimental Laboratory reactor
Dear Mr. Gammill:
Subject:
Radiation Survey Report of the FCEL Reactor Facility Following Dismantlement and Decontamination of the Facility The Fast Critical Experimental Laboratory (FCEL) reactor covered by Facility License CX-17 has been dismantled in accordance with the dismantling plan submitted with the application transmitted with our letter of July 16,1974 (Reference 1 above) and the dismantling order transmitted with your letter of November 1,1974 (Reference 2 above).
The facility has also been decontaminated as described in the disman-tling plan transmitted with the July 16, 1974 letter. Enclosed with this letter is a report on the radiation survey of the facility showing that the radiation levels in the facility area do indeed meet the require-ments described in the Jismantling plan. Je are now requesting that the facility be inspected by representatives of the Commission, termination of License CX-17 be authorized, and the facility be released for unre-stricted use.
Cio s
/
lll
April 30, 1980 i Page 2 i
l We would appreciate your early attention to inspection of the facility and its release for unres;ricted use, as we have an urgent requirement
, for use of the facility for other activities. If you have questions or desire further information, please call me at (213) 341-1000, Extension 2238.
" ?'(
Q. k Lc-9. ' '
M. E. Remley, Direct $r Health, Safety, & Radiation Services Energy Systems Group sjs:4/1-2 i
l
Enclosure:
Radiation Survey Report of FCEL Facility
{ cc w/ enclosure:
R. H. Engelken, Director, Region V Office, NRC t
r 1
.