| document report number = 89-003, 89-3, NUDOCS 8911140288
| document report number = 89-003, 89-3, NUDOCS 8911140288
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 2
| page count = 2
}}
}}
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,,. _ -
{{#Wiki_filter:,,. _ -
1             s. ,
1 s.
              -*
Alabama Power Company
* Alabama Power Company
( ; inverness Center Parkway Post OffSe Box 1295 i
( ; inverness Center Parkway Post OffSe Box 1295                                                                                       i
Birmingham. Atabama 35201 letophone L'05 8%4501 l
    !      ,, ,          Birmingham. Atabama 35201 letophone L'05 8%4501                                                                                     ,
W. G. Heireton, lil i
W. G. Heireton, lil                                                                                       l i
Senior Vice Prenloent Nuclear Oswations g3h3g g,g t% scuttwn thctrc $> stem i
Senior Vice Prenloent Nuclear Oswations                                                     g3h3g g,g                           !
1 i,'
t% scuttwn thctrc $> stem i
November 1, 1989 i
1 i,'                                                       November 1, 1989 i
l Docket No. 50-348 i
l Docket No. 50-348                                                                                         i
                                                                                                                                  ;
U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555
U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555
  ! j i
! j i
l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No. 89-003, Fire Barrier Penetration Open For More Than Seven Days                                           ;
l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No. 89-003, Fire Barrier Penetration Open For More Than Seven Days 8
8 t
t l
l                        Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the                               l L. ,                   enclosed Special Report No. 89-003, Unit 1, is submitted.                                                 ,
Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the l
Fi ,I Respectfully submitted, WPd .k   r   o   I l
L.,
f VGH,III/JARied 10.59                                                                                     l Enclosure cc Mr. S. D. Ebneter Mr. E. A. Reeves                                                                                 t Mr. G. F. Maxvell                                                                                 I r
enclosed Special Report No. 89-003, Unit 1, is submitted.
                        $12$$$$$               In     '.7                                                               fGO II g 1
Fi,I Respectfully submitted, WPd.k r o
I l,
f VGH,III/JARied 10.59 l
Enclosure cc Mr. S. D. Ebneter Mr. E. A. Reeves t
Mr. G. F. Maxvell I
r
$12$$$$$ In '.7 fGO II g 1
i
i


e..
e..
l     s.
l s.
          .                                      Enclosure l
Enclosure l
Special Report No. 89-003, l' nit 1                         ['
Special Report No. 89-003, l' nit 1
Tire Barrier Penetration                                 .
[
j                                      Open For Here Than Seven ' Jays                           ;
Tire Barrier Penetration j
,              The containment personnel and equipment hatches vere open for more than           !
Open For Here Than Seven ' Jays The containment personnel and equipment hatches vere open for more than seven days during the ninth refueling outage. The hatches vete opened to t
t seven days during the ninth refueling outage. The hatches vete opened to support outage activities. The seven-day time limit for the personnel and equipment hatches was exceeded on October 13, 1989.     Since the containment vall is considered to be a fire barrier, opening these hatches constitutes breaching a fire barrier.
support outage activities.
Technical Specification 3.7.12 requires that, within one hour, either               ;
The seven-day time limit for the personnel and equipment hatches was exceeded on October 13, 1989.
establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification           l 3.7.12 also requires that breached fire barriers be restored to functional         i status within seven days or a Special Report must be submitted Within the following 30 days. Due to the scope of the work in progress, it was not practical to close these hatches within seven days: therefore, this Special Report is being submitted. The containment personnel and equipment hatches         '
Since the containment vall is considered to be a fire barrier, opening these hatches constitutes breaching a fire barrier.
vere closed on October 14, 1989.                                                   l l
Technical Specification 3.7.12 requires that, within one hour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification l
3.7.12 also requires that breached fire barriers be restored to functional i
status within seven days or a Special Report must be submitted Within the following 30 days.
Due to the scope of the work in progress, it was not practical to close these hatches within seven days: therefore, this Special Report is being submitted.
The containment personnel and equipment hatches vere closed on October 14, 1989.
l l
i k
i k
l I
l I
P}}
P
- - - -}}

Latest revision as of 07:28, 31 December 2024

Special Rept 89-003:on 891013,fire Barrier Penetration Open for More than 7 Days During Ninth Refueling Outage.Hatches Opened to Support Outage Activities.Containment Personnel & Equipment Hatches Closed on 891014
ML19327B973
Person / Time
Site: Farley 
Issue date: 11/01/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-003, 89-3, NUDOCS 8911140288
Download: ML19327B973 (2)


Text

,,. _ -

1 s.

Alabama Power Company

( ; inverness Center Parkway Post OffSe Box 1295 i

Birmingham. Atabama 35201 letophone L'05 8%4501 l

W. G. Heireton, lil i

Senior Vice Prenloent Nuclear Oswations g3h3g g,g t% scuttwn thctrc $> stem i

1 i,'

November 1, 1989 i

l Docket No. 50-348 i

U. S. Nuclear Regulatory Commission ATTN Document Control Desk Vashington, D. C. 20555

! j i

l Joseph H. Farley b'uclear Plant - Unit 1 Special Report No.89-003, Fire Barrier Penetration Open For More Than Seven Days 8

t l

Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the l

L.,

enclosed Special Report No.89-003, Unit 1, is submitted.

Fi,I Respectfully submitted, WPd.k r o

I l,

f VGH,III/JARied 10.59 l

Enclosure cc Mr. S. D. Ebneter Mr. E. A. Reeves t

Mr. G. F. Maxvell I

r

$12$$$$$ In '.7 fGO II g 1

i

e..

l s.

Enclosure l

Special Report No.89-003, l' nit 1

[

Tire Barrier Penetration j

Open For Here Than Seven ' Jays The containment personnel and equipment hatches vere open for more than seven days during the ninth refueling outage. The hatches vete opened to t

support outage activities.

The seven-day time limit for the personnel and equipment hatches was exceeded on October 13, 1989.

Since the containment vall is considered to be a fire barrier, opening these hatches constitutes breaching a fire barrier.

Technical Specification 3.7.12 requires that, within one hour, either establish a continuous fire watch or verify the operability of fire detectors and establish an hourly fire watch patrol. Technical Specification action statement requirements vere met in that personnel vere present continuously when the hatches were open. Technical Specification l

3.7.12 also requires that breached fire barriers be restored to functional i

status within seven days or a Special Report must be submitted Within the following 30 days.

Due to the scope of the work in progress, it was not practical to close these hatches within seven days: therefore, this Special Report is being submitted.

The containment personnel and equipment hatches vere closed on October 14, 1989.