ML19332C470: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[ST-HL-AE-3296, Monthly Operating Repts for Oct 1989 for South Texas Units 1 & 2]]
| number = ML19332C470
| issue date = 10/31/1989
| title = Monthly Operating Repts for Oct 1989 for South Texas Units 1 & 2.W/891115 Ltr
| author name = Kent A, Mcburnett M
| author affiliation = HOUSTON LIGHTING & POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000498, 05000499
| license number =
| contact person =
| document report number = ST-HL-AE-3296, NUDOCS 8911280168
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 14
}}
 
=Text=
{{#Wiki_filter:,
4
    ,,                                      4 4
  .,s i  -
          .              The Light                                                                                        1 P.0, Box 1700 Houston. Thas 77001 (713) 228 9211 E caton Lighting & Power ___._.
L 4
November 15, 1989                ;
ST-HL-AE 3296 File No.: G02                    .
10CFR50.71                      ;
^
U. S. Nuclear Regulatory Commission Attention: Document Control Desk
                          - Washington, DC--      20555 South- Texas Project Electric Generating Station Units 1 6 2                                              ,.
Docket Nos. STN 50 498'& 50-499 Month 1v Ooerr. ting Reports for October. 1989                          -
Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly                           i Operating Reports.for October, 1989.                                                                ,
If yoti should have any questions on this matter, please contact -
Mr. C. A. Ayala at (512) 972-8628.
nett Manager                                        :
Support Licensing                              i i
MAM/BEM/n1 Attachments:      .1)  STPEGS Unit 1 Monthly Operating Report - October, 1989                      <
: 2)  STPEGS Unit 2 Monthly Operating Report - October, 1989                      -
                                                                                                                              .i 1.
l 091'1280168 891031 DR  ADOCK 0500        93                                                              p).]
A1/023.NL5                A Subsidiary of Houston Industries incorporated
                                .ac
 
    ,-...          c                                                                                            P L
                    .1
                ''                                                                    ST-HL-AE 3296 m                          Houston Lighting & Power Company                      File No.: CO2
    '"                      ' South Texas Project Electric Generating Station        Page 2 cc:                                                                                r
    '                  :    Regional Administrator Region IV                  Rufus S. Scott Nuclear Regulatory Commission                    Associate General Counsel y                        611'Ryan Plaza Drive, Suite 1000                  Houston Lighting & Power Company Arlington, TX 76011                              P. O. Box 1700 llouston, TX 77001
                          - George Dick, Project Manager -
                          ' U.S. Nuclear Regulatory Commission                INPO Washington, DC 20555                              Records Center 1100 circle 75 Parkway J. I. Tapia.                                      Atlanta, GA 30339-3064
                        - Senior Resident Inspector c/o U. S. Nuclear Regulatory                      Dr. Joseph M. Hendrie Commission                                    50 Be11 port Lane P. 0.' Box 910                                    Be11 port, NY 11713 Bay City, TX- 77414 D. K. Lacker J. R. Newman, Esquire                            Bureau of Radiation Control Newman & Holtzinger, P.C.                        Texas Departmen* of Ilealth 1615 L Street, N.W.-                              1100 West 49th Street Washington, DC 20036                              Austin, TX 78704 R. L. Rango/R P. Verret Central Power & Light Company
,                            P. 0.' Box 2121 Corpus Christi, TX 78403 J.LC. Lanier Director of Cenerations City of- Austin Electric Utility 721 Barton Springs Road Austin,1DC 78704
                        - R. J. Costello/M. T. Hardt City.Public Service Board P. O. Box 1771 L                            San' Antonio, TX 78296 1'
Revised 11/15/89 i
L4/NRC/
: n.    .
n Q ''i .,
          ' k, ATTACHMENT  I I
'                                                                                                            . ST HL AE 321/                '
PAGE_.L-OE,f.-.  ..,. .. _
u          .                                                                                                                              ,
                                                                                                                                          -i.
E t
4 7"
SOUTH TEXAS PROJECT                                            '
p ELECTRIC GENERATING STATION UNIT 1                                                  ,
i MONTHLY OPERATING REPORT
                                                                                                                                            ;
OCTOBER 1989 HOUSTON-LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498                                            e LICENSE NO.'NPF-76                                            j i
Reviewed  r:                                  "! !39 C
General Supervisor              Date
* Reviewed By:                                  // I!N
                                                                    'P$fi[ Engineering anager        'Date Approve'd By:      h\h        ,            ' h\\\\ 71                              '
Plant'fianager      -\          bade p
1 1
 
pm              pr                                                                                      '
                                                                                                            -}
        .;      .
s u f,      ,
L,-
b                                                                                                              -
ATTACHMENT /
,                                                      Monthiv Sa=<rv.
k~                                                                                    .ST PAnrKLAE 1 OE 7[ N STPEGS Unit' l was returned to service following refueling on 10/19/89 at.
                      '1106. ' The unit remained derated until 10/29/89 for reactor performance testing and low pressure turbine stationary blade stress monitoring.                            .
On 10/30/89 the unit' was derated to ~95% reactor power to allow maintenance.
on a feedwater pump.
i
+
L k
l C
i f
f
 
u4 ATTACHMENT I
                                                                                            . ST.HL AE. 3 2 Y OPERATINC DATA REPORT                    _.P l [.tl. g O f.I .
DOCKET NO. 50 498 UNIT 1 DATE Epv. 6. 1989-COMPLETED BY 'A.P. Rent TELEPHONE 512/972-7786 OPERATING STATUS
                    '1. REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD:                  745
                    ;2. CURRENTLY AUTiiORIZED POWER LEVEL (MWt):        3800 MAX. DEPEND. CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RATING-(MWe-Net): 1250.6
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
                    '4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL.....          407.1       4501.3          6998.2 l
0            0                0 -(
: 6. REACTOR RESERVE SHUTDOWN HOURS...........
: 7. HOURS GENERATOR ON LINE..................          311.4        4332.9          6738.9_
                    -8. UNIT RESERVE SHUTDOWN HOURS..............                0            0                0 l'
: 9. GROSS THERMAL ENERGY GENERATED-(MWt)..... 783890              15374296      '24188817 4
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . , 252630              5216370          8208600 11.~  NET ELECTRICAL ENERGY GENERATED (MWH).... 219398            _
4890335          7681827
: 12. REACTOR SERVICE FACTOR...................          54.6%        61.7%            67.3%  ,
l                  13. REACTOR AVAILABILITY FACTOR..............          54.6%        61.7%            67.3%
: 14. UNIT SERVICC FACT 0R. ....................          41.8%        59.4%            64.8%
l
: 15. UNIT AVAILABILITY FACTOR...........        ..... 41.8%        59.4%            64.8%
: 16. UNIT CAPACITY FACTOR (Using MDC).........          23.6%        53.6%            59.1%
: 17. UNIT CAPACITY FACTOR (Using Design MWe)..          23.6%        53.6%            59.1%
: 18. UNIT FORCED OUTAGE RATE..  ...............            0%        4.9%              7.3%
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 55 day refueling outage to begin April 7, 1990.
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                    N/A
 
e        -          -
4'
                <;
i.
Hi      '
                                                                                      - ATTACHMENT I
: 3. ;.                                                                                  ST-HL AE 11.1/            i I                                              AVERAGE DAILY UNIT POWER LEVEL        .
PArJ + OF_(_. .          j
                                                                                                                .i
  ). .
5 DOCKET NO,    50-498
  !                                                                                  UNIT 1
        >                                                                            DATE Nov. 6. 1989        -3 COMPLETED BY    A.P. Kent-
                                                                                -TELEPHONE ' 512/972-7786
                    .c ;ITH _ OCTOEER r
i DAY    " AVERAGE DAILY POWER LEVEL                DAY    AVERAGE DAILY POWER LEVEL (MWe Net)                                          (MWe Net) 1                    0                            17                    0 2                    0                            18                    2 3            ,
0                            19                  14 l
                      '4                    0                            20                190 l:
5                    0                            21              ' 245-
: 6.                    0                            22                  367                ,
7                    0                            23                492          _
l L                      8                    0                            24                  754
                      ~9~                    0                            25                916 942                -'
10 .                    0                            26 l
11                      0                            27                974 1
                  ' 12 '                    0                            28                1118                  1
                  ~13                      0                            29                1222
:              14;                    O                            30                1219 15                      0                            31                1201 16                      0
 
                                                                          -                                                                              ~.
3.
                                                                                                                                                                                  .. . . 3 IN-Y
: UNIT SHUTDOWNSTAND POWER REDUCTIONS'                                                          A~
DOCKET NO.            50-498              '.
UNIT 1 DATE' Nov. 6.'1989 COMPLETED.BYiA.P! Kent TELEPHONE 512/972-7786
                                                                              . REPORT MONTH OCTOBER 1                      '2                  3                  4          5 No. Date  Type      Duration Reason              Method of    Licensee System Component              "Cause & Corrective Action to (Hours)                    Shutting'      Event    Code      Code                    Prevent Recurrence Down          Raport #
Reactor 89-10 890805      S      410.2           C              4          N/A'    N/A        .N/A          Manual shutdown for refueling and scheduled maintenance.
89-11 891018      S        10.7      .B                1          N/A      TA ~      .TRB          Manual turbine trip due-to indications of water intrusion. It was determined that'the cause was faulty instrumentation and no intrusion occurred. (Reactor Critical)'
89-12 891018      S        12.7          B              9          N/A      TA          TRB          Turbine Overspeed Test. (Reactor Critical) 1 1                      2                                                                                                          S F: Forced              Reason:                                                Method:                  IEEE 805-1983                IEEE 803A-1983 S: Scheduled            A-Equipment Failure-(Explain)                          1-Manual B-Maintenance or Test                                  2-Manual' Scram C-Refueling                                            3-Automatic Scram D-Regulatory Restriction                              '4-Cont. of Existing E-Operator Training 6. License Exam                      -Outage' F-Administrative                                        5-Reduction                      ._ ATTACHMENT \
G-Operational Error (Explain)'                          9-Other.                          . ST.HL-AE- 72 9 4 -
H-Other (Explain)-                                                                          PAGE S OF f                          i
_ . . _ _              _        _          _ - -      - . _ -          n-____.                                      .                . - . . _ ,        __ ._    ___..__a
 
                                                                                                                  =
8                                ,                                                                                  1 b,                . . . .          . - - -.                                                                        ;
            .        9 l
n' . -
ATTACHMENT /              -
ry:
                                                                                        ' ST-HL AE. 72 9/ '
PORVs and Safety Valves Si                pggg g gp g-
                            ;NO PORVs or-, Safety Valves were challenged during this. reporting period.-  .
                                                                                                                      ;
r F
'I i b
i s
t i
1                                                                                                                    -
li                                                                                                                    [
T I
t
          /
                                --            -e                w
* w.
 
                      .t, h:                .
  ;
ATTACHMENT 2.-
T:                                                                          . ST.HL-hE 311' PAGE I OF (
L
.                                              SOUTH TEXAS PROJECT t_ '
ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT
:-                                                  OCTOBER 1989 HOUSTON LIGHTING AND POWER CO, NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Reviewed B                                  Md b General Supervisor              Datu
                          ' Reviewed By:                                //    87                    l Pl[rfdEngineering(tanager      'Da'te                    l Appr'oved By:  11          ,              D h\85 Plant Manager-      T          bale #
I
                                                                                                  'l
!^        s,                                                                                        !
l g
 
g.-
c
      .e      .
9 E.                                                                              ATTACHMENT    2.,
Monthly Su===ry
                                                                                  . ST-HL AE J 2. W PAGE 1 OF (
STPECS Unit 2 began the reporting period at 100% reactor power.
Reactor power was reduced to ~58% on 10/05/89 due to indications of high winding temperatures on_Open Loop Auxiliary Cooling Water pump motors. The unit returned to full power at 0140 on 10/06/89.
On 10/13/89 at 1745 a reactor / turbine trip occurred from a high neutron flux negative rate detection on two of four power range neutron monitoring channels.
4 The unit went back on line at 0115 on 10/16/89.-
t-                      A Notice of Unusual Event (NOUE) was declared on 10/18/89 at 1208 when a-Feedwater Isolation Valve's Nitrogen pressure was below its technical specifi-cation value. - The NOUE was terminated at 1211 on 10/18/89 when Nitrogen pressure was restored to the' valve.
                        .The unit concluded the report period at 100% reactor power.
l                                                                                                          I I
e                                                          I t
l'.                                                                                                        I l
                                                                                                        'l
 
m+
bt L
m
~~
          '~
L }}                                                                                  ATTACHMENT 2
,?        -
ST HL AE J11(
- '                                            OPERATING DATA REPORT                  PAGE 3 OF (
    -j.
DOCKET No. 50-499 UNIT 2 DATE Nov. 3. 1989 4
COMPLETED BY    A.P. Kent TELEPHONE 512/972-7786      ,
OPERATING-STATUS
: 1. REPORTING PERIOD: 10/01-10/31 GROSS HOURS IN REPORTING PERIOD:          745          .
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800-MAX. DEPEND. CAPACITY (MWe-Net);  1250.6                                            >
DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None 3.
                .4. REASONS FOR RESTRICTION (IF.ANY): N/A THIS MONTH. YR-TO DATE CUMULATIVE-
: 5. NUMBER OF HOURS REACTOR WAS CRITICAL.....      695.2        2900.8        2900.8
: 6. REACTOR RESERVE SHUTDOWN HOURS...........            0            0              0 7.. HOURS GENERATOR ON LINE..................      689.5        2771.7        2771.7
: 8. _ UNIT R.' SERVE SHUTDOWN HOURS...-............        0            0              0
: 9. CROSS THERMAL ENERGY CENERATED (MWt) . . . . 2579773        9258454      9258454
:10. CROSS ELECTRICAL ENERGY GENERATED (MWH).. 873300            3124030  ,
3124030
: 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 832187            2946843      2946843
: 12. REACTOR SERVICE FACTOR...................      93.3%          89.5%        89 5%
: 13. _ REACTOR AVAILABILITY FACTOR..............      93.3%          89.5%        89.5%
: 14. UNIT SERVICE FACT 0R......................      92.6%          85.5%        85.5%
: 15. UNIT AVAILABILITY FACTOR. ..............        92.6%          85.5%        85.5%
: 16.  -UNIT CAPACITY FACTOR (Using MDC).........        89 3%        72.7%        72.7%-
: 17. UNIT CAPACITY FACTOR (Using Design MWe)..      89.3%          72621        72.7%
: 18. UNIT FORCED OUTAGE RATE,.................        7.4%        13.0%        13.0%
                ,19. SHUTDOWNS SCHEDULED OVER NEX16 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 44 day outage to begin November 4, 1989 for Bottom Mounted Instrumentation Inspection and Turbine Inspections.
: 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:            N/A
 
1 7a y              ,
            , . y c                                                                          ATTACHMENT 1 AVERAGE DAILY UNIT POWER' LEVEL
                                                                                            ,    HA Tg    OF (
f
                                                                                                    ~
DOCKET NO. -50'499 UNIT '2 DATE Eov.-3. 1989 COMPLETED BY  A.P. Kent TELEPHONE 512/972 7786 MONTH    October 1
3
                        -DAY-  AVERAGE DAILY POWER LEVEL                  DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)-                                        (MWe Net)
^'                        1-              1108                              17              1233 2              1237                            .18              1240            ,
                                                                                                              -l 3              1194                            -19              '1239 4                1238                              20              1216 5 -.            1112                              21              1243 6-              1239                              22              1242-7-              1242                              23              1243 8              124."                            24              1244 9                1247                              25              1235            !
i 10'    _
                                          '1247                              26-              1247
                      ' 11'                1238                              27              1246 12                1232                              28              1245            3 1
13~                901-                            29              1243 14                    0                            30              1244            i l                                                                                                              l l '                      15                    0                            31              1242 16-                ~S58 m..&
 
                                                                                                                                                          .;_ ,
UNIT SHIT 1 DOWNS AND POWER REDUCTIONS ~                                                        c DOCKET NO.          50-499
* UNIT        '2' DATE        Nov. 3. 1989-COMPLETED BY          A.P. Kent
                                                                                                                    . TELEPHONE 512/972-7786 REPORT MONTH OCTOBER 1
No.      Date  Type  Duretion Reason    Method of    Licensee System    Comporent          Cause 6 Corrective Action to (Hcurs)          Shutting      Event      Code      Code-                  Prevent Recurrence Down          Report #
Reactor 89-09 891005      F      0.0          A      5-          N/A      KV        FLT        Reactor power was reduced to ~58% due to indications of high winding temperatures on Open Loop Auxiliary Cooling Water Pump Motors. After the air filters on the motors were cleaned reactor power was increased.
89-10 891013      F      55.5          A      3        2-89-026    JC        IB        Reactor / Turbine trip occurred frt,m a high neutron flux negative rate detection on two of four power range neutron moni-toring channels. The exact cause of the detected negative rate could not be deter-mined, but has been attributed to a Control Rod dropping due to an intermit-tent high resistance connection in its stationary gripper circuit diode. The faulty diode was replaced. The root cause of the event is under investigation.
1 F: Forced          Reason:                                        Method:                IEEE 805-1983              IEEE 803A-1983 S: Scheduled        A-Equipment Failure (Explsin)                  ,1-Manual B-Maintenance or Test                          2-Manual Scram C-Refueling                                    3-Automatic Scram D-Regulatory Restriction                        4-Cont. of Existing                                                --
E-Operator Training & License Exam                Outage                        ~ATT/sCHMENT 1 F-Administ.rative                              5-Reduction                      ST-HL-AE- 12. #
G-Operational Errot (Explain)                  9-Other                          PAGE y ()F 6 H-Other (Explain)
 
            .g
            ?A
          ;        ? .g
                        .' 4 i p
                - If-..      '                                                            - ATTACHMENT  2. -
u                                                                                      . ST-HL AE flid
    ''                                          PORVs and Safety Valves Sn- ry          ;PAGE 6 0F #          ;__
i y                            .No PORVs or: Safety Valves were challenged during this reporting period.
n                                            -                        -
s f
h.
k b
m h
l 1
l l
l-l l-e..                        ,s i
l
[ ''}}

Latest revision as of 02:55, 31 December 2024