ML20003E575: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:i i
{{#Wiki_filter:i i
p%                     North Carolina State University a        3                                 Box 5o67. Raleigh 2765o m,
p%
orkdawk                                                                                   March 27 Mr. Thomas Novak                                                                                             ',.'
North Carolina State University 3
Assistant Director of Operational Reactors                                                   g                 '' $
Box 5o67. Raleigh 2765o a
US Nuclear Regulatory Commission                                                                             ye   A,
m, orkdawk March 27 Mr. Thomas Novak Assistant Director of Operational Reactors g
                                                                                                              ;,
US Nuclear Regulatory Commission ye A,
Washington, D.C.               20555                                                                     $3         ,
Washington, D.C.
                                                                                                    \
20555
Docket No. 50-111                               i h                -
$3
\\
h Docket No. 50-111 i


==Dear Mr. Novak:==
==Dear Mr. Novak:==
                                                                              \.                   s A proposed plan to dismantle the R-3 reactor on the' North" Carolina State University campus was submitted to your office by letter dated 5 June 1980. Since this submission, increased trgency has occurred to timely resolve this matter. Plans are in progress to renovate or demoligh and replace with a new building the one-story (18,000 ft ) Burlington Nuclear Laboratory (BNL) building which houses the R-3 reactor. The
\\.
        -relationship of the BNL to the remainder of our nuclear complex is shown by the attached fig ure .                           The shaded area is the Burlington Nuclear Laboratory.
s A proposed plan to dismantle the R-3 reactor on the' North" Carolina State University campus was submitted to your office by letter dated 5 June 1980.
A letter from Mr. Robert W. Reid, Operating Reactors Branch
Since this submission, increased trgency has occurred to timely resolve this matter.
          #4, dated March 6, 1981, transmitting the NRC criteria for the release of our reactor facility to unrestricted use has been received. Our personnel are in contact with the NRC office, l
Plans are in progress to renovate or demoligh and replace with a new building the one-story (18,000 ft ) Burlington Nuclear Laboratory (BNL) building which houses the R-3 reactor.
Region II, to reach a mutual agreement on the procedures for compliance. Mr. Reid's letter has assisted us in furthering our planning of the dismantling work.
The
Your prompt attention to our submittals will enable us to meet our scheduled date for release of our reactor facility to
-relationship of the BNL to the remainder of our nuclear complex is shown by the attached fig ure.
!        unrestricted use by no later than February 1982. We would                                                               '
The shaded area is the Burlington Nuclear Laboratory.
welcome the opportunity to define with your office a schedule of major milestones involving the NRC which would assure this l         schedule.         Dr. Robert G. Cockrell, Director, Nuclear Reactor l
A letter from Mr. Robert W.
Program, may be contacted for further details and to coordinate scheduling (919-737-2322). Let.me thank you in advance for your staff's cooperation in this matter.
Reid, Operating Reactors Branch
#4, dated March 6, 1981, transmitting the NRC criteria for the release of our reactor facility to unrestricted use has been received.
Our personnel are in contact with the NRC office, Region II, to reach a mutual agreement on the procedures for l
compliance.
Mr. Reid's letter has assisted us in furthering our planning of the dismantling work.
Your prompt attention to our submittals will enable us to meet our scheduled date for release of our reactor facility to unrestricted use by no later than February 1982.
We would welcome the opportunity to define with your office a schedule of major milestones involving the NRC which would assure this l
schedule.
Dr. Robert G.
Cockrell, Director, Nuclear Reactor l
Program, may be contacted for further details and to coordinate scheduling (919-737-2322).
Let.me thank you in advance for your staff's cooperation in this matter.
Sincerely,
Sincerely,
(                                             ,
(
Joab L. Thomas, Chancellor O
Joab L.
Attachment                                                                                                     gS i       cc:     Dr. P. J. Turinsky, Dr. E. G. Cockrell                                                                     s(
Thomas, Chancellor O
Mr. T. C. Bray,
Attachment gS i
_. R. D. Cross Mr. R. E. Carter (USNRC/NRR)
cc:
Mr. P. Erickson (USNRD/NRR)
Dr.
                .Dr. C. Julian (USNRC/ Reg . II) unk carvL,ua sure universir, at Ralezgk is a constituent instururwn of The universay of knh cansna.
P.
J.
Turinsky, Dr.
E.
G.
Cockrell s(
Mr. T. C.
: Bray, R.
D.
Cross Mr.
R.
E. Carter (USNRC/NRR)
Mr.
P.
Erickson (USNRD/NRR)
.Dr.
C. Julian (USNRC/ Reg. II) unk carvL,ua sure universir, at Ralezgk is a constituent instururwn of The universay of knh cansna.


      \'
\\
1
1 f
.      f                                                                I   ,
I Ufftces. Classrac-s and Lancrato r te s l
Ufftces. Classrac-s and Lancrato r te s         l A                                                               :$.
A l
l PULSTAR Reactor 3ay                     g
PULSTAR Reactor 3ay g
                                            "            't E
't E
                        '                                l l
l l
1 4      .-
4 1
                                                                )     l r
)
  ;
l U"w r
U"w                                             :
/
                                  /                           V
/
                                                              /                   b l
b l
l                               /                                  :
/
                          /[/j < //                                   !
V l
/[/
/
/
f'ly/),//
f'ly/),//
L mn A 3CRLINGTCN NUCLEAR L$3CRATCR!ES 4
j L
Side Walk - Yarborough Drive BURLINGTON ENGINEERING-LABORATORIES COMPLEX
mn A 4 3CRLINGTCN NUCLEAR L$3CRATCR!ES Side Walk - Yarborough Drive BURLINGTON ENGINEERING-LABORATORIES COMPLEX
  ;
~
                                        *                          ~
A e}}
A e}}

Latest revision as of 13:52, 23 December 2024

Requests Prompt Attention to Univ Submittals Re Dismantling of Reactor.Plans in Progress to Renovate or Demolish Reactor Bldg.Map of Bldg & Surrounding Area Encl
ML20003E575
Person / Time
Site: North Carolina State University
Issue date: 03/27/1981
From: John Thomas
North Carolina State University, RALEIGH, NC
To: Novak T
Office of Nuclear Reactor Regulation
References
NUDOCS 8104060410
Download: ML20003E575 (2)


Text

i i

p%

North Carolina State University 3

Box 5o67. Raleigh 2765o a

m, orkdawk March 27 Mr. Thomas Novak Assistant Director of Operational Reactors g

US Nuclear Regulatory Commission ye A,

Washington, D.C.

20555

$3

\\

h Docket No. 50-111 i

Dear Mr. Novak:

\\.

s A proposed plan to dismantle the R-3 reactor on the' North" Carolina State University campus was submitted to your office by letter dated 5 June 1980.

Since this submission, increased trgency has occurred to timely resolve this matter.

Plans are in progress to renovate or demoligh and replace with a new building the one-story (18,000 ft ) Burlington Nuclear Laboratory (BNL) building which houses the R-3 reactor.

The

-relationship of the BNL to the remainder of our nuclear complex is shown by the attached fig ure.

The shaded area is the Burlington Nuclear Laboratory.

A letter from Mr. Robert W.

Reid, Operating Reactors Branch

  1. 4, dated March 6, 1981, transmitting the NRC criteria for the release of our reactor facility to unrestricted use has been received.

Our personnel are in contact with the NRC office, Region II, to reach a mutual agreement on the procedures for l

compliance.

Mr. Reid's letter has assisted us in furthering our planning of the dismantling work.

Your prompt attention to our submittals will enable us to meet our scheduled date for release of our reactor facility to unrestricted use by no later than February 1982.

We would welcome the opportunity to define with your office a schedule of major milestones involving the NRC which would assure this l

schedule.

Dr. Robert G.

Cockrell, Director, Nuclear Reactor l

Program, may be contacted for further details and to coordinate scheduling (919-737-2322).

Let.me thank you in advance for your staff's cooperation in this matter.

Sincerely,

(

Joab L.

Thomas, Chancellor O

Attachment gS i

cc:

Dr.

P.

J.

Turinsky, Dr.

E.

G.

Cockrell s(

Mr. T. C.

Bray, R.

D.

Cross Mr.

R.

E. Carter (USNRC/NRR)

Mr.

P.

Erickson (USNRD/NRR)

.Dr.

C. Julian (USNRC/ Reg. II) unk carvL,ua sure universir, at Ralezgk is a constituent instururwn of The universay of knh cansna.

\\

1 f

I Ufftces. Classrac-s and Lancrato r te s l

A l

PULSTAR Reactor 3ay g

't E

l l

4 1

)

l U"w r

/

/

b l

/

V l

/[/

/

/

f'ly/),//

j L

mn A 4 3CRLINGTCN NUCLEAR L$3CRATCR!ES Side Walk - Yarborough Drive BURLINGTON ENGINEERING-LABORATORIES COMPLEX

~

A e