ML20005F464: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. _    .            .        _                  _. __
{{#Wiki_filter:.
7'          t c 10 CFR 26.73(d)
10 CFR 26.73(d) 7' t c
                                          ' PHILAD E.LPHIA ELECTRIC COMPANY NU' LEAR GROUP HEADQUARTERS y;
' PHILAD E.LPHIA ELECTRIC COMPANY NU' LEAR GROUP HEADQUARTERS y;
: 955-65 CHESTERBROOK BLVD.
: 955-65 CHESTERBROOK BLVD.
4                                              ~ WAYNE, PA 19087-5691-(215) 640-6550
~ WAYNE, PA 19087-5691-4 (215) 640-6550
                  ' D AVID it. HEL. WIG au$5[[7m' v7e'ai -                                           January 3,_1990 Docket Nos. 50-277
' D AVID it. HEL. WIG au$5((7m' v7e'ai -
  ,                                                                                      278 50-352 50-353.
January 3,_1990 Docket Nos.
License Nos. DPR-44               '
50-277 278 50-352 50-353.
DPR                                                                                             NPF-39           '
License Nos.
NPF-85 U. S.: Nuclear Regulatory Commission Attn: -Document-Control Desk Washington, DC .20555'                                                                       ,
DPR-44 DPR NPF-39 NPF-85 U.
S.: Nuclear Regulatory Commission Attn: -Document-Control Desk Washington, DC.20555'


==SUBJECT:==
==SUBJECT:==
  ' Peach Bottom Atomic Power Station, Units 2 and 3                                 ,
  ' Peach Bottom Atomic Power Station, Units 2 and 3 Limerick' Generating Station, Units 1'and 2 10 CFR.26 - Fitness'for Duty Programs
Limerick' Generating Station, Units 1'and 2                               -
10 CFR.26 - Fitness'for Duty Programs


==Dear Sir:==
==Dear Sir:==
The final rule, " Fitness-for-Duty-Programs,"'10CFR26,.was
The final rule, " Fitness-for-Duty-Programs,"'10CFR26,.was
                  ' issued in the Federal-Register on June 7, 1989 (54FR24468). This rule became effective on July 7,_ 1989 and, in accordance with                               i 10CFR26.2(c), is required to be implemented no later than January 3, 1990.         Furthermore, 10CFR26. 73 (d) requires that each licensee shall certify to-the NRC that it has implemented.a fitness-for-duty-                         :
' issued in the Federal-Register on June 7, 1989 (54FR24468).
program that meets the requirements of 10CFR26, and that the certification shall describe any licensee chemical testing cut-off levels more stringent than those imposed by 10CFR26.
This rule became effective on July 7,_ 1989 and, in accordance with i
To'the best of my knowledge, we have implemented a fitness for Lduty program that meets the requirements of 10CFR26 with one exception.         10CFR26, Appendix A, Subpart B,'section 2.3 requires in
10CFR26.2(c), is required to be implemented no later than January 3,
                  -part that appropriate background checks shall be completed for a:          individuals prior'to assigning them any tasks associated with the administration of the fitness-for-duty program. We have not yet completod'the background check for some of the program administrators, but expect to have these background checks completed by January 5, 1990.
1990.
5 g11603059001o3                                                           hI -
Furthermore, 10CFR26. 73 (d) requires that each licensee shall certify to-the NRC that it has implemented.a fitness-for-duty-program that meets the requirements of 10CFR26, and that the certification shall describe any licensee chemical testing cut-off levels more stringent than those imposed by 10CFR26.
p       ADOCK 05000277
To'the best of my knowledge, we have implemented a fitness for Lduty program that meets the requirements of 10CFR26 with one exception.
* i o PDC
10CFR26, Appendix A, Subpart B,'section 2.3 requires in
                                                                                                                +
-part that appropriate background checks shall be completed for individuals prior'to assigning them any tasks associated with the a:
administration of the fitness-for-duty program.
We have not yet completod'the background check for some of the program administrators, but expect to have these background checks completed by January 5, 1990.
5 g11603059001o3 hI -
p ADOCK 05000277 i o PDC
+


4
4 9'
        ,    .:  9' L
U.SI Nuclear Regulatory Commission January 3, 1990 L
U.SI Nuclear Regulatory Commission                             January 3, 1990 Document-Control Desk                                                   Page 2 l
Document-Control Desk Page 2 l
In addition, in order to certify that we have implemented a fitness-for-duty program at~the Philadelphia Electric-Company (PECO) which meets the requirements of 10CFR26, we are performing a confirmatory' review of our program. This confirmatory _ review will be completed by the end of January, 1990. Accordingly, I will certify by January 31, 1990,-that PECO has implemented a
In addition, in order to certify that we have implemented a fitness-for-duty program at~the Philadelphia Electric-Company (PECO) which meets the requirements of 10CFR26, we are performing a confirmatory' review of our program.
                . fitness-for-duty program that meets the requirements of'10CFR26..
This confirmatory _ review will be completed by the end of January, 1990.
With respect to chemical testing cut-off. levels, we have~ included chemical testing 1for barbituates and benzodiazepines,
Accordingly, I will certify by January 31, 1990,-that PECO has implemented a
      .c with a cut-off level of 300 ng/ml for_both, in addition to testing
. fitness-for-duty program that meets the requirements of'10CFR26..
        ~
With respect to chemical testing cut-off. levels, we have~ included chemical testing 1for barbituates and benzodiazepines, with a cut-off level of 300 ng/ml for_both, in addition to testing
.c
~
for substances at the cut-off11evels specified by 10CFR26.
for substances at the cut-off11evels specified by 10CFR26.
Very truly yours,
Very truly yours,
                                                                                                /
/
cc: W.. T. Russell, Administrator, Region 1, USNRC J. ~J. . Lyash, USNRC Senior Resident Inspector, PBAPS T. J. Kenny, USNRC Senior Resident Inspector, LGS
cc:
                                                                                                  .}}
W.. T. Russell, Administrator, Region 1, USNRC J. ~J.. Lyash, USNRC Senior Resident Inspector, PBAPS T. J. Kenny, USNRC Senior Resident Inspector, LGS
.}}

Latest revision as of 08:11, 23 December 2024

Advises That Licensee Implemented 10CFR26 Rule Re fitness-for-duty Program W/One Exception.Util Has Not Completed Background Check for Some of Program Administrators.Checks Expected to Be Completed by 900105
ML20005F464
Person / Time
Site: Peach Bottom, Limerick, 05000000
Issue date: 01/03/1990
From: Helwig D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9001160305
Download: ML20005F464 (2)


Text

.

10 CFR 26.73(d) 7' t c

' PHILAD E.LPHIA ELECTRIC COMPANY NU' LEAR GROUP HEADQUARTERS y;

955-65 CHESTERBROOK BLVD.

~ WAYNE, PA 19087-5691-4 (215) 640-6550

' D AVID it. HEL. WIG au$5((7m' v7e'ai -

January 3,_1990 Docket Nos.

50-277 278 50-352 50-353.

License Nos.

DPR-44 DPR NPF-39 NPF-85 U.

S.: Nuclear Regulatory Commission Attn: -Document-Control Desk Washington, DC.20555'

SUBJECT:

' Peach Bottom Atomic Power Station, Units 2 and 3 Limerick' Generating Station, Units 1'and 2 10 CFR.26 - Fitness'for Duty Programs

Dear Sir:

The final rule, " Fitness-for-Duty-Programs,"'10CFR26,.was

' issued in the Federal-Register on June 7, 1989 (54FR24468).

This rule became effective on July 7,_ 1989 and, in accordance with i

10CFR26.2(c), is required to be implemented no later than January 3,

1990.

Furthermore, 10CFR26. 73 (d) requires that each licensee shall certify to-the NRC that it has implemented.a fitness-for-duty-program that meets the requirements of 10CFR26, and that the certification shall describe any licensee chemical testing cut-off levels more stringent than those imposed by 10CFR26.

To'the best of my knowledge, we have implemented a fitness for Lduty program that meets the requirements of 10CFR26 with one exception.

10CFR26, Appendix A, Subpart B,'section 2.3 requires in

-part that appropriate background checks shall be completed for individuals prior'to assigning them any tasks associated with the a:

administration of the fitness-for-duty program.

We have not yet completod'the background check for some of the program administrators, but expect to have these background checks completed by January 5, 1990.

5 g11603059001o3 hI -

p ADOCK 05000277 i o PDC

+

4 9'

U.SI Nuclear Regulatory Commission January 3, 1990 L

Document-Control Desk Page 2 l

In addition, in order to certify that we have implemented a fitness-for-duty program at~the Philadelphia Electric-Company (PECO) which meets the requirements of 10CFR26, we are performing a confirmatory' review of our program.

This confirmatory _ review will be completed by the end of January, 1990.

Accordingly, I will certify by January 31, 1990,-that PECO has implemented a

. fitness-for-duty program that meets the requirements of'10CFR26..

With respect to chemical testing cut-off. levels, we have~ included chemical testing 1for barbituates and benzodiazepines, with a cut-off level of 300 ng/ml for_both, in addition to testing

.c

~

for substances at the cut-off11evels specified by 10CFR26.

Very truly yours,

/

cc:

W.. T. Russell, Administrator, Region 1, USNRC J. ~J.. Lyash, USNRC Senior Resident Inspector, PBAPS T. J. Kenny, USNRC Senior Resident Inspector, LGS

.