ML19346A239: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19346A241 | | number = ML19346A241 | ||
| issue date = 06/01/1981 | | issue date = 06/01/1981 | ||
| title = | | title = Updated LER 81-041/03L-1:on 810304,failure Rate of 20% Was Observed on Snubbers Located Outside Drywell.Caused by Worn Snubber Poppets Due to Poppet Low Resistance to Pipe Vibrations.Snubbers Rebuilt.Unit 1 Snubbers to Be Replaced | ||
| author name = Pastva M | | author name = Pastva M | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. |
Latest revision as of 00:49, 17 January 2020
Date released: 12/26/2019 | Download: ML19346A239 |
---|---|
ML19346A241 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 06/01/1981 |
From: | Pastva M CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19346A241 (15) | |
ML19346A238 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 06/01/1981 |
From: | Dietz C CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19346A238 (1) | |