ML19346A239: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19346A241
| number = ML19346A241
| issue date = 06/01/1981
| issue date = 06/01/1981
| title = Forwards Updated LER 81-041/03L-1
| title = Updated LER 81-041/03L-1:on 810304,failure Rate of 20% Was Observed on Snubbers Located Outside Drywell.Caused by Worn Snubber Poppets Due to Poppet Low Resistance to Pipe Vibrations.Snubbers Rebuilt.Unit 1 Snubbers to Be Replaced
| author name = Pastva M
| author name = Pastva M
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 00:49, 17 January 2020

Forwards Updated LER 81-041/03L-1
Date released: 12/26/2019 Download: ML19346A239


Updated LER 81-041/03L-1:on 810304,failure Rate of 20% Was Observed on Snubbers Located Outside Drywell.Caused by Worn Snubber Poppets Due to Poppet Low Resistance to Pipe Vibrations.Snubbers Rebuilt.Unit 1 Snubbers to Be Replaced
ML19346A241
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/01/1981
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19346A241 (15)
Forwards Updated LER 81-041/03L-1
ML19346A238
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/01/1981
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19346A238 (1)