ML19344B173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS
| page count = 1
| page count = 1
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:4 .
{{#Wiki_filter:-
        -
4 POWER DISTRIBUTION LIMITS O
POWER DISTRIBUTION LIMITS O SURVEILLANCE REQUIREMENTS (Continued) 1
SURVEILLANCE REQUIREMENTS (Continued)
: 2. When the F[ is less than or equal to the FR limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF x                  and Fxy at least once per 31 EFPD.
When the F[ is less than or equal to the FR 2.
: e. The F     l
limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF and Fxy at least x
  ~
once per 31 EFPD.
shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes                    l
~
: 1. FRTP < 1.71 for all core planes containing bank "D" control rbs,~and
shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes e.
: 2. For all unrodded core planes:
The F l
F     $ 1.68 up to core elevations of 2.4 ft.
1.
l = 10 to 7.2 ft.
FRTP < 1.71 for all core planes containing bank "D" control rbs,~and 2.
FhTP $ 4=M for core elevations from 2.4 f t.
For all unrodded core planes:
RTP Fxy  5 1.61 for core elevations above 7.2 ft.
F
: f. The F     limits of e, above, are not applicable in the following
$ 1.68 up to core elevations of 2.4 ft.
  '
l = 10 FhTP $ 4=M for core elevations from 2.4 f t.
core hane regions as measured in percent of core height from the bottom of the fuel:
to 7.2 ft.
: 1. Lower core region from 0 to 15%, inclusive.
RTP F
: 2. Upper core region from 85 to 100%, inclusive.
5 1.61 for core elevations above 7.2 ft.
: 3. Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%,
xy f.
The F limits of e, above, are not applicable in the following core hane regions as measured in percent of core height from the bottom of the fuel:
1.
Lower core region from 0 to 15%, inclusive.
2.
Upper core region from 85 to 100%, inclusive.
3.
Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%,
60.6 + 2% and 74.9 + 2%, inclusive.
60.6 + 2% and 74.9 + 2%, inclusive.
                                -              -
l_
l_
4.-   Core plane regions within       -2% of core height ( 2.88     . -
4.-
inches) about the bank demand position of the bank "D" control rods.       -
Core plane regions within
b
-2% of core height ( 2.88 inches) about the bank demand position of the bank "D" control rods.
: g. With F C exceeding F         the effects of F   on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 q
C b
t.
g.
4.2.2.3   When qF (Z) is measured pursuant to specification 4.10.2.2, an overall measured F (Z) shall be obtained from a power distribution map n
With F exceeding F the effects of F on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 t.
q 4.2.2.3 When F (Z) is measured pursuant to specification 4.10.2.2, an q
overall measured F (Z) shall be obtained from a power distribution map n
and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.
and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.
FARLEY - UNIT 1                               3/4 2-7
FARLEY - UNIT 1 3/4 2-7
!                                                                  ^
^
                  } 00 UV
} 00 UV
                                          -.                                                . ._}}
._}}

Latest revision as of 11:35, 24 December 2024

Proposed Changes to Tech Spec 4.2.2.2.e.2 Revising Radial Peaking Factor Fxy Surveillance Requirements
ML19344B173
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/15/1980
From:
ALABAMA POWER CO.
To:
Shared Package
ML19344B172 List:
References
NUDOCS 8008250698
Download: ML19344B173 (1)


Text

-

4 POWER DISTRIBUTION LIMITS O

SURVEILLANCE REQUIREMENTS (Continued)

When the F[ is less than or equal to the FR 2.

limit for the appropriate measured core plane, additional power d{stribution mapsshallbetakenandFfcomparedtoF and Fxy at least x

once per 31 EFPD.

~

shallie:imitsforRATEDTHERMALPOWERwithinspecificcoreplanes e.

The F l

1.

FRTP < 1.71 for all core planes containing bank "D" control rbs,~and 2.

For all unrodded core planes:

F

$ 1.68 up to core elevations of 2.4 ft.

l = 10 FhTP $ 4=M for core elevations from 2.4 f t.

to 7.2 ft.

RTP F

5 1.61 for core elevations above 7.2 ft.

xy f.

The F limits of e, above, are not applicable in the following core hane regions as measured in percent of core height from the bottom of the fuel:

1.

Lower core region from 0 to 15%, inclusive.

2.

Upper core region from 85 to 100%, inclusive.

3.

Grid plane regions at 17.8 1 2%, 32.1 1 2%, 46.4 1 2%,

60.6 + 2% and 74.9 + 2%, inclusive.

l_

4.-

Core plane regions within

-2% of core height ( 2.88 inches) about the bank demand position of the bank "D" control rods.

C b

g.

With F exceeding F the effects of F on (Z) shall be evaluaNdtodetermiN,ifF(Z)iswithiEits1 t.

q 4.2.2.3 When F (Z) is measured pursuant to specification 4.10.2.2, an q

overall measured F (Z) shall be obtained from a power distribution map n

and increased by 3% to account for manufacturing tolerances and further increased by 5% to account for measurement uncertainty.

FARLEY - UNIT 1 3/4 2-7

^

} 00 UV

._