ML19347A827: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:1 ATH E NS, AL A. 3 5611 | ||
=.:i::% | =.:i::% | ||
Of | |||
;$h Chatrsan, Nuclear Regulatory Commission 1717 H St. NW Washington, D.C. 20055 Dear Sir; I question the safety design o f the Brown's Ferry Nuclear P1, ant in the following arecs. | |||
Dear Sir; I question the safety design o f the Brown's Ferry Nuclear P1, ant in the following arecs. Although I think some calculations about the drop-ping of a spent fuel bundle and breaka'ge of came were made, I an concerned | Although I think some calculations about the drop-ping of a spent fuel bundle and breaka'ge of came were made, I an concerned about the possibility of a plane crashing accidently or by terrorists, into the secondary containment with spent fuel outside the reactor. | ||
I think the dropped fuel accident assumes that the secondary contain=ent remains intact. | |||
about the possibility of a plane crashing accidently or by terrorists, into the secondary containment with spent fuel outside the reactor. I think the dropped fuel accident assumes that the secondary contain=ent remains intact. What if the plane | What if the plane ca=c through the roof into the reactor core or into the spent fuel pool? | ||
I don't think the FSAR included this possibility or the possibility of a plane crash at the intake structure. | |||
Such a crash could possibly cut off all sources of cooling water with the g | |||
exception of the condensate storage tanks. Of course a fire in the intake tunnel or building ci;;ht possibly result in the dame cutoff. With all the redundancy and seperatione of systems, I still don't understand why all the intake water pu=p wiring for all 3 units was routed through the same cotson tunnel. I know that temporary wiring and pumps could i:e installed on such e an occasion. Nihat I do not know is whether the design pressure of the pri=ary containment is high enough to contain the pressure until such temporary =easures were effected. Do you.know? | exception of the condensate storage tanks. | ||
Of course a fire in the intake tunnel or building ci;;ht possibly result in the dame cutoff. | |||
Thank You, | With all the redundancy and seperatione of systems, I still don't understand why all the intake water pu=p wiring for all 3 units was routed through the same cotson tunnel. | ||
I know that temporary wiring and pumps could i:e installed on such e an occasion. | |||
Nihat I do not know is whether the design pressure of the pri=ary containment is high enough to contain the pressure until such temporary =easures were effected. | |||
Do you.know? | |||
Thank You, Y | |||
8009800325 | George Smith 3 | ||
@b 8009800325 | |||
.}} | |||
Latest revision as of 06:42, 24 December 2024
| ML19347A827 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/24/1980 |
| From: | Galen Smith AFFILIATION NOT ASSIGNED |
| To: | NRC COMMISSION (OCM) |
| Shared Package | |
| ML19347A822 | List: |
| References | |
| NUDOCS 8009300325 | |
| Download: ML19347A827 (1) | |
Text
1 ATH E NS, AL A. 3 5611
=.:i::%
Of
- $h Chatrsan, Nuclear Regulatory Commission 1717 H St. NW Washington, D.C. 20055 Dear Sir; I question the safety design o f the Brown's Ferry Nuclear P1, ant in the following arecs.
Although I think some calculations about the drop-ping of a spent fuel bundle and breaka'ge of came were made, I an concerned about the possibility of a plane crashing accidently or by terrorists, into the secondary containment with spent fuel outside the reactor.
I think the dropped fuel accident assumes that the secondary contain=ent remains intact.
What if the plane ca=c through the roof into the reactor core or into the spent fuel pool?
I don't think the FSAR included this possibility or the possibility of a plane crash at the intake structure.
Such a crash could possibly cut off all sources of cooling water with the g
exception of the condensate storage tanks.
Of course a fire in the intake tunnel or building ci;;ht possibly result in the dame cutoff.
With all the redundancy and seperatione of systems, I still don't understand why all the intake water pu=p wiring for all 3 units was routed through the same cotson tunnel.
I know that temporary wiring and pumps could i:e installed on such e an occasion.
Nihat I do not know is whether the design pressure of the pri=ary containment is high enough to contain the pressure until such temporary =easures were effected.
Do you.know?
Thank You, Y
@b 8009800325
.