{{#Wiki_filter:Pacific Gas and Electric Company John T. Conway                        77 Beale Street Senior Vice President-Energy Supply & Mail Code B32 Chief Nuclear Officer                San Francisco, CA 94105 March 31,2011                                                                           415.973.3336 Internal: 223.3336 Fax: 415.973.2313 PG&E Letter HBL-11-003                               10 CFR 50.75                      Alternate Address Diablo Canyon Power Plant
{{#Wiki_filter:Pacific Gas and Electric Company March 31,2011 PG&E Letter HBL-11-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-133, OP-DPR-7 Humboldt Bay Power Plant Unit 3 John T. Conway Senior Vice President-Energy Supply &
: p. O. Box 56 U.S. Nuclear Regulatory Commission                                                     Avila Beach, CA 93424 ATTN: Document Control Desk                                                             805.545.3333 Fax: 805.545.4884 Washington, DC 20555-0001 Docket No. 50-133, OP-DPR-7 Humboldt Bay Power Plant Unit 3 Decommissioning Funding Report for Humboldt Bay Power Plant Unit 3
Chief Nuclear Officer 10 CFR 50.75 Decommissioning Funding Report for Humboldt Bay Power Plant Unit 3  


==Dear Commissioners and Staff:==
==Dear Commissioners and Staff:==
 
77 Beale Street Mail Code B32 San Francisco, CA 94105 415.973.3336 Internal: 223.3336 Fax: 415.973.2313 Alternate Address Diablo Canyon Power Plant
PG&E is submitting the decommissioning funding report for Humboldt Bay Power Plant (HBPP) Unit 3, pursuant to the requirements of 10 CFR 50.75(f).
: p. O. Box 56 Avila Beach, CA 93424 805.545.3333 Fax: 805.545.4884 PG&E is submitting the decommissioning funding report for Humboldt Bay Power Plant (HBPP) Unit 3, pursuant to the requirements of 10 CFR 50.75(f).
Humboldt Bay Unit 3 At the end of calendar year 2010, the market value of the HBPP Unit 3 (220 MWt) decommissioning trust funds was $313.8 million. PG&E estimates an additional
Humboldt Bay Unit 3 At the end of calendar year 2010, the market value of the HBPP Unit 3 (220 MWt) decommissioning trust funds was $313.8 million. PG&E estimates an additional  
$69.15 million (future nominal dollars) will need to be collected over three years beginning in 2011 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the California Public Utilities Commission (CPU C) per Decision 0.10-07-047. The CPUC Application is based on an Independent Spent Fuel Storage Installation (ISFSI) that would be in operation until 2020 when all fuel would be removed from HBPP by the Department of Energy (DOE).
$69.15 million (future nominal dollars) will need to be collected over three years beginning in 2011 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the California Public Utilities Commission (CPU C) per Decision 0.10-07-047. The CPUC Application is based on an Independent Spent Fuel Storage Installation (ISFSI) that would be in operation until 2020 when all fuel would be removed from HBPP by the Department of Energy (DOE).
The market value of the HBPP trust, plus actual incurred costs through 2010, is lower than the minimum amount of the NRC decommissioning estimate of
The market value of the HBPP trust, plus actual incurred costs through 2010, is lower than the minimum amount of the NRC decommissioning estimate of  
$619.0 million (2011 dollars) that was calculated pursuant to the requirements specified in 10 CFR 50.75(c), which is based on a minimum 1200 MWt plant.
$619.0 million (2011 dollars) that was calculated pursuant to the requirements specified in 10 CFR 50.75(c), which is based on a minimum 1200 MWt plant.
PG&E is confident the HBPP trust, with the noted additional contributions, will be sufficient to ensure successful decommissioning and maintaining the spent fuel in an ISFS"I at HBPP until 2020 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the CPUC Decision 0.10-07-047.
PG&E is confident the HBPP trust, with the noted additional contributions, will be sufficient to ensure successful decommissioning and maintaining the spent fuel in an ISFS"I at HBPP until 2020 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the CPUC Decision 0.10-07-047.
Supporting Cost Estimates Based on a site-specific cost estimate prepared by TLG Services, Inc., PG&E has estimated that the decommissioning costs are approximately $555.9 million (including
Supporting Cost Estimates Based on a site-specific cost estimate prepared by TLG Services, Inc., PG&E has estimated that the decommissioning costs are approximately $555.9 million (including  
$127.0 million disbursed from the Trust(s) through December 2010 and $317.6 million future radiological removal costs) for HBPP Unit 3 in 2010 dollars. These costs do not include site restoration of the facilities ($2.0 million), nor spent fuel management until 2020 ($109.3 million).
$127.0 million disbursed from the Trust(s) through December 2010 and $317.6 million future radiological removal costs) for HBPP Unit 3 in 2010 dollars. These costs do not include site restoration of the facilities ($2.0 million), nor spent fuel management until 2020 ($109.3 million).  


Document Control Desk                                           PG&E Letter HBL-11-003 March 31,2011 Page 2 To assure that sufficient funds will be available for decommissioning, PG&E has established external sinking trust fund accounts for HBPP Unit 3.
Document Control Desk March 31,2011 Page 2 PG&E Letter HBL-11-003 To assure that sufficient funds will be available for decommissioning, PG&E has established external sinking trust fund accounts for HBPP Unit 3.
Supporting Enclosures Supporting documentation for this report is included as Enclosures 1 through 4. provides decommissioning funding status information in a format suggested by Nuclear Energy Institute (NEI) and the NRC. provides information on the escalation of the required decommissioning funding amounts from 1986 dollars to 2010 dollars. As required by 10 CFR 50.75(c)(2),
Supporting Enclosures Supporting documentation for this report is included as Enclosures 1 through 4. provides decommissioning funding status information in a format suggested by Nuclear Energy Institute (NEI) and the NRC. provides information on the escalation of the required decommissioning funding amounts from 1986 dollars to 2010 dollars. As required by 10 CFR 50.75(c)(2),
and using NUREG-1577, "Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance," Revision 1, and NUREG-1307, "Report on Waste Burial Charges," Revision 14, the information includes escalation factors for energy, labor, and waste burial costs. is Appendix D from the TLG Services, Inc. decommissioning cost estimate report prepared in March 2009 for PG&E for HBPP Unit 3. The TLG Services, Inc. cost estimate has then been adjusted to reflect the costs in 2011 dollars per the CPUC Decision D.1 0-07 -04 7. The report provides cost estimates for decommissioning of nuclear, non-nuclear facilities, and spent fuel management, including operation of the ISFSI. is a cash flow of the total decommissioning of HBPP that identifies the monies for NRC scope (removal of radiological contamination), site restoration (including the nonradiological work), and the spent fuel management.
and using NUREG-1577, "Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance," Revision 1, and NUREG-1307, "Report on Waste Burial Charges," Revision 14, the information includes escalation factors for energy, labor, and waste burial costs. is Appendix D from the TLG Services, Inc. decommissioning cost estimate report prepared in March 2009 for PG&E for HBPP Unit 3. The TLG Services, Inc. cost estimate has then been adjusted to reflect the costs in 2011 dollars per the CPUC Decision D.1 0-07 -04 7. The report provides cost estimates for decommissioning of nuclear, non-nuclear facilities, and spent fuel management, including operation of the ISFSI. is a cash flow of the total decommissioning of HBPP that identifies the monies for NRC scope (removal of radiological contamination), site restoration (including the nonradiological work), and the spent fuel management.
There are no regulatory commitments in this letter.
There are no regulatory commitments in this letter.
Should you have any questions in regard to this document please feel free to call Mr. Bob Kapus at (707) 444-0810.
Should you have any questions in regard to this document please feel free to call Mr. Bob Kapus at (707) 444-0810.
Sincerely,
Sincerely,  
  ~
~
              ---
/.
                /.
Joh T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Enclosures cc/enc:
Joh T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Enclosures cc/enc: Elmo E. Collins, NRC Region IV John B. Hickman, NRC Project Manager INPO HBPP Humboldt Distribution
Elmo E. Collins, NRC Region IV John B. Hickman, NRC Project Manager INPO HBPP Humboldt Distribution PG&E Letter HBL-11-003 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)
 
Enclosure 1 PG&E Letter HBL-11-003 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)
(2 pages)
(2 pages)
 
PG&E Letter HBL-11-003 Page 1 of 2 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)
Enclosure 1 PG&E Letter HBL-11-003 Page 1 of 2 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)
As provided in 10 CFR 50. 75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning March 31, 1999, and annually thereafter, on the status of its decommissioning funding for each reactor that it owns and has already closed.
As provided in 10 CFR 50. 75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning March 31, 1999, and annually thereafter, on the status of its decommissioning funding for each reactor that it owns and has already closed.
                                                                                          $ in Millions
: 1. The minimum decommissioning fund estimate, pursuant to 10 CFR 50.75(b) and (C).1 January 2011 dollars (HBPP is a shutdown unit with a Site Specific Cost Study; therefore, the minimum decommissioning fund estimate is based on the Site Specific Cost Study shown in item 8 of this enclosure.)
: 1. The minimum decommissioning fund estimate, pursuant to 10 CFR 50.75(b) and (C).1 January 2011 dollars                                               $619.0 (HBPP is a shutdown unit with a Site Specific Cost Study; therefore, the minimum decommissioning fund estimate is based on the Site Specific Cost Study shown in item 8 of this enclosure.)
: 2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c). (Alternatively, the total amount accumulated at the end of the calendar year preceding the date of the report can be reported here if the cover letter transmitting the report provides the total estimate and indicates what portion of that estimate is for items not included in 10 CFR 50.75(b) and (c)).
: 2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c). (Alternatively, the total amount accumulated at the end of the calendar year preceding the date of the report can be reported here if the cover letter transmitting the report provides the total estimate and indicates what portion of that estimate is for items not included in 10 CFR 50.75(b) and (c)).
Market Value (December 201 0 dollars)                               $313.8
Market Value (December 201 0 dollars)
: 3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c). (Alternatively, the annual amounts remaining to be collected can include items beyond those required in 10 CFR 50.75(b) and (c) if the cover letter transmitting the report provides a total cost estimate and indicates what portion of that estimate is for items that are not included in 10 CFR 50.75(b) and (c)). All values below are from 2009 Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) filing, Final Decision D.10-07-047.
: 3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c). (Alternatively, the annual amounts remaining to be collected can include items beyond those required in 10 CFR 50.75(b) and (c) if the cover letter transmitting the report provides a total cost estimate and indicates what portion of that estimate is for items that are not included in 10 CFR 50.75(b) and (c)). All values below are from 2009 Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) filing, Final Decision D.10-07-047.
Amount remaining                                                     $69.15 Number of years to collect beginning in 2010                         3 years Annual amount to be collected                                         $23.05 1
Amount remaining Number of years to collect beginning in 2010 Annual amount to be collected  
$ in Millions
$619.0
$313.8
$69.15 3 years
$23.05 1
* The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing nonradiological systems and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfers to Department of Energy are not included in the cost formulas.
* The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing nonradiological systems and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfers to Department of Energy are not included in the cost formulas.
 
PG&E Letter HBL-11-003 Page 2 of 2
Enclosure 1 PG&E Letter HBL-11-003 Page 2 of 2
: 4. The assumptions used regarding escalation in decommissioning cost, rates of earnings on decommissioning funds (assumes trust will be gradually converted to a more conservative, all fixed income portfolio after 2010), and rates of other factors used in funding projections (all values below are from the2009 NDCTP filing).
: 4. The assumptions used regarding escalation in decommissioning cost, rates of earnings on decommissioning funds (assumes trust will be gradually converted to a more conservative, all fixed income portfolio after 2010), and rates of other factors used in funding projections (all values below are from the2009 NDCTP filing).
Escalation in decommissioning costs Rate of Return on Qualified Trust 2011                             3.76 percent Rate of Return on Qualified Trust 2012                             3.34 percent Rate of Return on Qualified Trust 2013                             2.95 percent Rate of Return on Qualified Trust (2014-2020)                     2.95 percent Rate of Return on Nonqualified Trust 2011                       2.95 percent Rate of Return on Nonqualified Trust 2012                       2.95 percent Rate of Return on Nonqualified Trust 2013                       2.95 percent Rate of Return on Nonqualified Trust (2014-2020)                 2.95 percent
Escalation in decommissioning costs Rate of Return on Qualified Trust 2011 Rate of Return on Qualified Trust 2012 Rate of Return on Qualified Trust 2013 Rate of Return on Qualified Trust (2014-2020)
Rate of Return on Nonqualified Trust 2011 Rate of Return on Nonqualified Trust 2012 Rate of Return on Nonqualified Trust 2013 Rate of Return on Nonqualified Trust (2014-2020)
: 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1 )(v).
: 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1 )(v).
NONE
NONE
Line 64: Line 65:
NONE
NONE
: 8. California Public Utilities Commission (CPUC) Submittal in 2011 dollars in millions:
: 8. California Public Utilities Commission (CPUC) Submittal in 2011 dollars in millions:
Total Project (Decommission 2011)                                 $559.9 Scope Excluded from NRC calculations                             $ 2.0 Scope of ISFSI from Licensing to Decommissioning in 2020         $109.3 Scope Decommissioned and disbursed from Trust(s)                 $127.0 Total NRC Decommissioning Remaining Scope                         $317.6
Total Project (Decommission 2011)
Scope Excluded from NRC calculations Scope of ISFSI from Licensing to Decommissioning in 2020 Scope Decommissioned and disbursed from Trust(s)
Total NRC Decommissioning Remaining Scope 3.76 percent 3.34 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent
$559.9 2.0
$109.3
$127.0
$317.6 PG&E Letter HBL-11-003 2011 Decommissioning Estimate (1 page)
Composite Escalation (1 page)
Development of B Component (1 page)
Development of E Component (7 pages)
Development of L Component (7 pages)


Enclosure 2 PG&E Letter HBL-11-003
2011 Decommissioning Estimate Nuclear Regulatory Commission Estimate of Decommission Costs for Boiling Water Reactor (BWR) in 2011 HBPP BWR
* 2011 Decommissioning Estimate (1 page)
* Composite Escalation (1 page)
* Development of B Component (1 page)
* Development of E Component (7 pages)
* Development of L Component (7 pages)
 
Enclosure 2 PG&E Letter HBL-11-003 2011 Decommissioning Estimate Nuclear Regulatory Commission Estimate of Decommission Costs for Boiling Water Reactor (BWR) in 2011 HBPP BWR
($ in Millions)
($ in Millions)
January 1986 Estimate $114.8 Escalated to 1999       $128.9     (Table 2.1 in NUREG 1307, Revision 12, has no value for 1999 Burial)
January 1986 Estimate  
Escalated to 2000       $400.2     ($360.9 in 2000 Submittal)
$114.8 Escalated to 1999  
Escalated to 2001       $354.1     ($425.3 in 2001 Submittal)
$128.9 (Table 2.1 in NUREG 1307, Revision 12, has no value for 1999 Burial)
Escalated to 2002       $357.4     ($445.6 in 2002 Submittal)
Escalated to 2000  
Escalated to 2003       $373.8     ($430.1 in 2003 Submittal)
$400.2
Escalated to 2004       $388.0     ($439.6 in 2004 Submittal)
($360.9 in 2000 Submittal)
Escalated to 2005       $416.8     ($453.2 in 2005 Submittal)
Escalated to 2001  
Escalated to 2006       $519.2     ($494.3 in 2006 Submittal)
$354.1
Escalated to 2007       $549.8     ($548.6 in 2007 Submittal)
($425.3 in 2001 Submittal)
Escalated to 2008       $565.6     ($590.9 in 2008 Submittal)
Escalated to 2002  
Escalated to 2009       $574.4     ($573.8 in 2009 Submittal)
$357.4
Escalated to 2010       $596.8     ($596.6 in 2010 Submittal)
($445.6 in 2002 Submittal)
Escalated to 2011       $619.0 January 1986: based on 10 CFR 50.75(c) Table of Minimum Amounts.
Escalated to 2003  
BWR based on minimum 1200 MWt = ($104 + (.009xMWt>> million per unit where BWR less than 1200 MWt use P=1200 MWt, HBPP 220 MWt
$373.8
($430.1 in 2003 Submittal)
Escalated to 2004  
$388.0
($439.6 in 2004 Submittal)
Escalated to 2005  
$416.8
($453.2 in 2005 Submittal)
Escalated to 2006  
$519.2
($494.3 in 2006 Submittal)
Escalated to 2007  
$549.8
($548.6 in 2007 Submittal)
Escalated to 2008  
$565.6
($590.9 in 2008 Submittal)
Escalated to 2009  
$574.4
($573.8 in 2009 Submittal)
Escalated to 2010  
$596.8
($596.6 in 2010 Submittal)
Escalated to 2011  
$619.0 January 1986: based on 10 CFR 50.75(c) Table of Minimum Amounts.
BWR based on minimum 1200 MWt = ($104 + (.009xMWt>> million per unit where BWR less than 1200 MWt use P=1200 MWt, HBPP 220 MWt PG&E Letter HBL-11-003


Enclosure 2 PG&E Letter HBL-11-003 Composite Escalation Calculating Overall Escalation Rate BWR           Jan-86       Jan-99       Jan-OO     Jan-01     Jan-02     Jan-03     Jan-04     Jan-05     Jan-06     Jan-07 Jan-08 Jan-09 Jan-10   Jan-11 Weight (1 )
Composite Escalation Calculating Overall Escalation Rate PG&E Letter HBL-11-003 BWR Jan-86 Jan-99 Jan-OO Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Weight (1 )
L (Labor)                 1.0000       1.5624      1.6370    0.9365      0.9733      1.0122      1.0612    1.0958    2.0724  2.1465  2.2207  2.2639  2.2928  2.3299    0.65 E (Energy)                1.0000      0.8257      1.0220    1.1841      0.9715      1.2003      1.2131     1.4810    1.8656  1.8226  2.3961  1.7963  2.1190  2.3659    0.13 B (Burial)                1.0000      0.0000    10.4061    10.5540    10.7015      11.0993    11.5119    12.3889    13.3331 14.3491 14.4164 14.9931 15.6028  16.2269    0.22 (1) From NUREG-1307, Revision 14, Report on Waste Burial Charges, Section 2 Summary, Page 3 ... where A, B, and C are the fractions of the total 1986 dollar costs that are attributable to labor (0.65), energy (0.13), and burial (0.22), respectively, and sum to 1.0.
L (Labor)
E (Energy)
B (Burial) 1.0000 1.0000 1.0000 1.5624 0.8257 0.0000 1.6370 1.0220 10.4061 0.9365 1.1841 10.5540 0.9733 0.9715 10.7015 1.0122 1.2003 11.0993 1.0612 1.2131 11.5119 1.0958 1.4810 12.3889 2.0724 1.8656 13.3331 2.1465 1.8226 14.3491 2.2207 2.3961 14.4164 2.2639 1.7963 14.9931 (1) From NUREG-1307, Revision 14, Report on Waste Burial Charges, Section 2 Summary, Page 3... where A, B, and C are the fractions of the total 1986 dollar costs that are attributable to labor (0.65), energy (0.13), and burial (0.22), respectively, and sum to 1.0.
(2) Jan-01, Jan-03, Jan-05, Jan-07, and Jan-08 B (Burial) value in this table see calculation notes in Development of B Component spreadsheet BWR Combined Escalation Rate for:
(2) Jan-01, Jan-03, Jan-05, Jan-07, and Jan-08 B (Burial) value in this table see calculation notes in Development of B Component spreadsheet BWR Combined Escalation Rate for:
Jan-86       Jan-99     Jan-OO       Jan-01     Jan-02     Jan-03     Jan-04     Jan-05     Jan-06     Jan-07 Jan-08 Jan-09 Jan-10   Jan-11 1.0000     1.1229     3.4862       3.0846     3.1133     3.2558     3.3801     3.6303     4.5229     4.7890 4.9265 5.0035 5.1984   5.3919
2.2928 2.1190 15.6028 Jan-86 Jan-99 Jan-OO Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 1.0000 1.1229 3.4862 3.0846 3.1133 3.2558 3.3801 3.6303 4.5229 4.7890 4.9265 5.0035 5.1984 5.3919 2.3299 0.65 2.3659 0.13 16.2269 0.22


Development of B Component                                        Enclosure 2 PG&E Letter HBL-11-003 Development of Burial Escalation Developed from NUREG-1307, Revision 14 Table 2.1 "VALUES OF B SUB-X AS A FUNCTION OF LLW BURIAL SITE, WASTE VENDOR, AND YEAR" (Summary for non-Atlantic Compact).
Development of Burial Escalation Developed from NUREG-1307, Revision 14 Table 2.1 Development of B Component PG&E Letter HBL-11-003 "VALUES OF B SUB-X AS A FUNCTION OF LLW BURIAL SITE, WASTE VENDOR, AND YEAR" (Summary for non-Atlantic Compact).
Revised to Bx Values for Generic LLW Disposal Site (Assumed to be same as that provided for the Atlantic Compact for lack of a better alternative at this time).
1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Revised to Bx Values for Generic LLW Disposal Site (Assumed to be same as that provided for the Atlantic Compact for lack of a better alternative at this time).
BWR                             BWR Burial Costs                   Restated to (South Carolina}                 1986 = 100 1986              1.561                             1.0000 1987 1988              1.831                             1.1730 1989 1990 1991              2.361                             1.5125 1992 1993              9.434                             6.0436 1994              9.794                             6.2742 1995              10.42                             6.6752 1996              10.379                             6.6489 1997              13.837                             8.8642 1998              13.948                             8.9353 1999                                                0.0000 2000              16.244                           10.4061 2001              16.474                           10.5535 2002              16.705                           10.7015 2003              17.326                           11.0993 2004              17.970                           11.5119 2005              19.339                           12.3889 2006              20.813                           13.3331 2007              22.399                           14.3491 2008              25.231                           16.1634 2009              26.240                           16.8099 2010              27.292                           17.4837 2011              28.384                           18.1830 Table 2.1 Note ('c) From 7/1/95 through 6/30/2000 access was allowed for all states except North Carolina. Effective 7/1/2000 rates are based on whether a waste generator is or is not a member of the Atlantic Compact.
BWR BWR Burial Costs Restated to (South Carolina}
1986 = 100 1.561 1.0000 1.831 1.1730 2.361 1.5125 9.434 6.0436 9.794 6.2742 10.42 6.6752 10.379 6.6489 13.837 8.8642 13.948 8.9353 0.0000 16.244 10.4061 16.474 10.5535 16.705 10.7015 17.326 11.0993 17.970 11.5119 19.339 12.3889 20.813 13.3331 22.399 14.3491 25.231 16.1634 26.240 16.8099 27.292 17.4837 28.384 18.1830 Table 2.1 Note ('c) From 7/1/95 through 6/30/2000 access was allowed for all states except North Carolina. Effective 7/1/2000 rates are based on whether a waste generator is or is not a member of the Atlantic Compact.
2001 has no information in NUREG-1307 Rev 12. 2001 is an estimate that is calculated by applying the average percent change between 2000 and 2002, and adding to the 2000 base 2003 has no information in NUREG-1307 Rev 12. 2003 is an estimate that is calculated by applying the average percent change between 2002 and 2004, and adding to the 2002 base 2005 has no information in NUREG-1307 Rev 12. 2005 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2004 base.
2001 has no information in NUREG-1307 Rev 12. 2001 is an estimate that is calculated by applying the average percent change between 2000 and 2002, and adding to the 2000 base 2003 has no information in NUREG-1307 Rev 12. 2003 is an estimate that is calculated by applying the average percent change between 2002 and 2004, and adding to the 2002 base 2005 has no information in NUREG-1307 Rev 12. 2005 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2004 base.
2007 has no information in NUREG-1307 Rev 12. 2007 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2006 base.
2007 has no information in NUREG-1307 Rev 12. 2007 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2006 base.
2008 has no information in NUREG-1307 Rev 12. 2008 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2007 base.
2008 has no information in NUREG-1307 Rev 12. 2008 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2007 base.
2009 has no information in NUREG-1307 Rev 13. 2009 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base.
2009 has no information in NUREG-1307 Rev 13. 2009 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base.
2010 has no information in NUREG-1307 Rev 13. 2010 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base 2011 is an estimate that is calculated by applying the historical estimated escallation of 1.04 percent of previous year and adding to the 2010 base
2010 has no information in NUREG-1307 Rev 13. 2010 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base 2011 is an estimate that is calculated by applying the historical estimated escallation of 1.04 percent of previous year and adding to the 2010 base  


Enclosure 2 PG&E Letter HBL-11-003 Page 1 of 7 Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt= 0.54                     BWR wt = 0.46 Jan-86                   114.2                           82.0                           1.0000                          1.0000               1.0000 Feb-86                   115.0                           62.4                           1.0070                           0.7610               0.8938 Mar-86                   114.4                           51.3                           1.0018                           0.6256               0.8287 Apr-86                   113.7                           49.8                           0.9956                           0.6073               0.8170 May-86                   114.1                           47.0                           0.9991                           0.5732               0.8032 Jun-86                   115.3                           44.7                           1.0096                           0.5451               0.7960 Jul-86                 116.2                           36.4                           1.0175                           0.4439               0.7537 Aug-86                   116.3                           40.1                           1.0184                           0.4890               0.7749 Sep-86                   116.3                           46.3                           1.0184                           0.5646               0.8097 Oct-86                   113.0                           43.1                           0.9895                           0.5256               0.7761 Nov-86                   112.7                           43.5                           0.9869                           0.5305               0.7769 Dec-86                   112.3                           45.6                           0.9834                           0.5561               0.7868 Jan-87                   110.3                             51.4                         0.9658                           0.6268               0.8099 Feb-87                   109.8                           53.1                           0.9615                           0.6476               0.8171 Mar-87                   110.2                           49.7                           0.9650                           0.6061               0.7999 Apr-87                   109.9                             52.0                         0.9623                           0.6341               0.8114 May-87                   111.8                             53.3                         0.9790                           0.6500               0.8277 Jun-87                   113.9                           55.1                           0.9974                           0.6720               0.8477 Jul-87                 116.2                             56.3                         1.0175                           0.6866               0.8653 Aug-87                   115.7                             59.4                         1.0131                           0.7244               0.8803 Sep-87                   115.5                             56.8                         1.0114                           0.6927               0.8648 Oct-87                   111.0                             59.3                         0.9720                           0.7232               0.8575 Nov-87                   109.2                             61.2                         0.9562                           0.7463               0.8597 Dec-87                   109.6                             58.1                         0.9597                           0.7085               0.8442 Jan-88                   108.8                             54.8                         0.9527                           0.6683               0.8219 Feb-88                   109.0                             51.5                         0.9545                           0.6280               0.8043 Mar-88                   109.0                             49.7                         0.9545                           0.6061               0.7942 Apr-88                   109.1                             53.3                         0.9553                           0.6500               0.8149 May-88                   108.9                             54.3                         0.9536                           0.6622               0.8195 Jun-88                   117.2                             50.6                         1.0263                           0.6171               0.8380 Jul-88                 118.2                             46.9                         1.0350                           0.5720               0.8220 Aug-88                   118.3                           46.8                           1.0359                           0.5707               0.8219 Sep-88                   118.5                           45.9                           1.0377                           0.5598               0.8178 Oct-88                   114.2                           42.3                           1.0000                           0.5159               0.7773 Nov-88                   109.2                           47.2                           0.9562                           0.5756               0.7811 Dec-88                   110.5                             50.6                         0.9676                           0.6171               0.8064 Jan-89                   112.0                             54.9                         0.9807                           0.6695               0.8376 Feb-89                   112.0                           54.0                           0.9807                           0.6585               0.8325 Mar-89                   112.3                             57.3                         0.9834                           0.6988               0.8525 Apr-89                   112.4                             61.5                         0.9842                           0.7500               0.8765 May-89                   113.6                             57.5                         0.9947                           0.7012               0.8597 Jun-89                   119.8                             53.3                         1.0490                           0.6500               0.8655 Jul-89                 122.2                             52.7                         1.0701                           0.6427               0.8735 Aug-89                   122.4                             53.5                         1.0718                           0.6524               0.8789 Sep-89                   122.5                           59.3                           1.0727                           0.7232               0.9119 Oct-89                   117.2                             64.0                         1.0263                           0.7805               0.9132 Nov-89                   113.5                             64.4                         0.9939                           0.7854               0.8980 Dec-89                   114.2                           68.1                           1.0000                           0.8305               0.9220 Jan-90                   114.9                           85.3                           1.0061                           1.0402               1.0218 Feb-90                   115.0                             59.4                         1.0070                           0.7244               0.8770 Mar-90                   115.4                           60.4                           1.0105                           0.7366               0.8845
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt = 0.46 Jan-86 114.2 82.0 1.0000 1.0000 Feb-86 115.0 62.4 1.0070 0.7610 Mar-86 114.4 51.3 1.0018 0.6256 Apr-86 113.7 49.8 0.9956 0.6073 May-86 114.1 47.0 0.9991 0.5732 Jun-86 115.3 44.7 1.0096 0.5451 Jul-86 116.2 36.4 1.0175 0.4439 Aug-86 116.3 40.1 1.0184 0.4890 Sep-86 116.3 46.3 1.0184 0.5646 Oct-86 113.0 43.1 0.9895 0.5256 Nov-86 112.7 43.5 0.9869 0.5305 Dec-86 112.3 45.6 0.9834 0.5561 Jan-87 110.3 51.4 0.9658 0.6268 Feb-87 109.8 53.1 0.9615 0.6476 Mar-87 110.2 49.7 0.9650 0.6061 Apr-87 109.9 52.0 0.9623 0.6341 May-87 111.8 53.3 0.9790 0.6500 Jun-87 113.9 55.1 0.9974 0.6720 Jul-87 116.2 56.3 1.0175 0.6866 Aug-87 115.7 59.4 1.0131 0.7244 Sep-87 115.5 56.8 1.0114 0.6927 Oct-87 111.0 59.3 0.9720 0.7232 Nov-87 109.2 61.2 0.9562 0.7463 Dec-87 109.6 58.1 0.9597 0.7085 Jan-88 108.8 54.8 0.9527 0.6683 Feb-88 109.0 51.5 0.9545 0.6280 Mar-88 109.0 49.7 0.9545 0.6061 Apr-88 109.1 53.3 0.9553 0.6500 May-88 108.9 54.3 0.9536 0.6622 Jun-88 117.2 50.6 1.0263 0.6171 Jul-88 118.2 46.9 1.0350 0.5720 Aug-88 118.3 46.8 1.0359 0.5707 Sep-88 118.5 45.9 1.0377 0.5598 Oct-88 114.2 42.3 1.0000 0.5159 Nov-88 109.2 47.2 0.9562 0.5756 Dec-88 110.5 50.6 0.9676 0.6171 Jan-89 112.0 54.9 0.9807 0.6695 Feb-89 112.0 54.0 0.9807 0.6585 Mar-89 112.3 57.3 0.9834 0.6988 Apr-89 112.4 61.5 0.9842 0.7500 May-89 113.6 57.5 0.9947 0.7012 Jun-89 119.8 53.3 1.0490 0.6500 Jul-89 122.2 52.7 1.0701 0.6427 Aug-89 122.4 53.5 1.0718 0.6524 Sep-89 122.5 59.3 1.0727 0.7232 Oct-89 117.2 64.0 1.0263 0.7805 Nov-89 113.5 64.4 0.9939 0.7854 Dec-89 114.2 68.1 1.0000 0.8305 Jan-90 114.9 85.3 1.0061 1.0402 Feb-90 115.0 59.4 1.0070 0.7244 Mar-90 115.4 60.4 1.0105 0.7366 Energy Escalation Factor (E) forBWR (Humboldt) 1.0000 0.8938 0.8287 0.8170 0.8032 0.7960 0.7537 0.7749 0.8097 0.7761 0.7769 0.7868 0.8099 0.8171 0.7999 0.8114 0.8277 0.8477 0.8653 0.8803 0.8648 0.8575 0.8597 0.8442 0.8219 0.8043 0.7942 0.8149 0.8195 0.8380 0.8220 0.8219 0.8178 0.7773 0.7811 0.8064 0.8376 0.8325 0.8525 0.8765 0.8597 0.8655 0.8735 0.8789 0.9119 0.9132 0.8980 0.9220 1.0218 0.8770 0.8845 PG&E Letter HBL-11-003 Page 1 of 7


Enclosure 2 PG&E Letter HBL-11-003 Page 2 of?
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt = 0.54                   BWR wt= 0.46 Apr-90                   115.1                           61.0                           1.0079                           0.7439               0.8865 May-90                   117.0                           58.4                           1.0245                           0.7122               0.8808 Jun-90                   123.9                           53.0                           1.0849                           0.6463               0.8832 Jul-90                 124.4                           51.6                           1.0893                           0.6293               0.8777 Aug-90                   124.6                           72.3                           1.0911                           0.8817               0.9948 Sep-90                   125.0                           87.3                           1.0946                           1.0646               1.0808 Oct-90                   121.2                           104.8                           1.0613                           1.2780               1.1610 Nov-90                   120.2                           98.9                           1.0525                           1.2061               1.1232 Dec-90                   118.9                           89.3                           1.0412                           1.0890               1.0632 Jan-91                   124.2                           82.9                           1.0876                           1.0110               1.0523 Feb-91                   124.3                             74.3                         1.0884                           0.9061               1.0046 Mar-91                   124.3                             61.6                         1.0884                           0.7512               0.9333 Apr-91                   124.7                           60.0                           1.0919                           0.7317               0.9262 May-91                   128.2                           59.6                           1.1226                           0.7268               0.9405 Jun-91                   132.6                             57.6                         1.1611                           0.7024               0.9501 Jul-91                 134.5                             58.1                         1.1778                           0.7085               0.9619 Aug-91                   133.8                             62.1                         1.1716                           0.7573               0.9810 Sep-91                   133.8                           65.4                           1.1716                           0.7976               0.9996 Oct-91                   128.3                             67.6                         1.1235                           0.8244               0.9859 Nov-91                   123.1                             71.0                         1.0779                           0.8659               0.9804 Dec-91                   125.1                             62.2                         1.0954                           0.7585               0.9405 Jan-92                   125.9                           54.4                           1.1025                           0.6634               0.9005 Feb-92                   125.3                             57.3                         1.0972                           0.6988               0.9139 Mar-92                   125.8                             56.0                         1.1016                           0.6829               0.9090 Apr-92                   124.8                             59.0                         1.0928                           0.7195               0.9211 May-92                   128.5                             62.1                         1.1252                           0.7573               0.9560 Jun-92                   134.8                             65.4                         1.1804                           0.7976               1.0043 Jul-92                 135.6                             64.6                         1.1874                           0.7878               1.0036 Aug-92                   135.1                             63.3                         1.1830                           0.7720               0.9939 Sep-92                   135.9                             65.6                         1.1900                           0.8000               1.0106 Oct-92                   131.2                             68.2                         1.1489                           0.8317               1.0030 Nov-92                   125.5                             64.2                         1.0989                           0.7829               0.9536 Dec-92                   126.7                             59.4                         1.1095                           0.7244               0.9323 Jan-93                   127.1                             59.0                         1.1130                           0.7195               0.9320 Feb-93                   126.4                             60.4                         1.1068                           0.7366               0.9365 Mar-93                   126.7                             63.2                         1.1095                           0.7707               0.9536 Apr-93                   126.8                             62.4                         1.1103                           0.7610               0.9496 May-93                   127.5                             62.6                         1.1165                           0.7634               0.9541 Jun-93                   136.9                             60.8                         1.1988                           0.7415               0.9884 Jul-93                 137.1                             57.0                         1.2005                           0.6951               0.9680 Aug-93                   137.2                             54.4                         1.2014                           0.6634               0.9539 Sep-93                   137.6                             59.3                         1.2049                           0.7232               0.9833 Oct-93                   131.9                             65.4                         1.1550                           0.7976               0.9906 Nov-93                   126.3                             61.6                         1.1060                           0.7512               0.9428 Dec-93                   126.0                             51.4                         1.1033                           0.6268               0.8841 Jan-94                   126.2                             51.5                         1.1051                           0.6280               0.8856 Feb-94                   125.9                             57.5                         1.1025                           0.7012               0.9179 Mar-94                   125.8                             56.2                         1.1016                           0.6854               0.9101 Apr-94                   125.4                             54.7                         1.0981                           0.6671               0.8998 May-94                   126.0                             54.7                         1.1033                           0.6671               0.9027 Jun-94                   133.5                             54.1                         1.1690                           0.6598               0.9347
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt = 0.54 BWR wt= 0.46 Apr-90 115.1 61.0 1.0079 0.7439 May-90 117.0 58.4 1.0245 0.7122 Jun-90 123.9 53.0 1.0849 0.6463 Jul-90 124.4 51.6 1.0893 0.6293 Aug-90 124.6 72.3 1.0911 0.8817 Sep-90 125.0 87.3 1.0946 1.0646 Oct-90 121.2 104.8 1.0613 1.2780 Nov-90 120.2 98.9 1.0525 1.2061 Dec-90 118.9 89.3 1.0412 1.0890 Jan-91 124.2 82.9 1.0876 1.0110 Feb-91 124.3 74.3 1.0884 0.9061 Mar-91 124.3 61.6 1.0884 0.7512 Apr-91 124.7 60.0 1.0919 0.7317 May-91 128.2 59.6 1.1226 0.7268 Jun-91 132.6 57.6 1.1611 0.7024 Jul-91 134.5 58.1 1.1778 0.7085 Aug-91 133.8 62.1 1.1716 0.7573 Sep-91 133.8 65.4 1.1716 0.7976 Oct-91 128.3 67.6 1.1235 0.8244 Nov-91 123.1 71.0 1.0779 0.8659 Dec-91 125.1 62.2 1.0954 0.7585 Jan-92 125.9 54.4 1.1025 0.6634 Feb-92 125.3 57.3 1.0972 0.6988 Mar-92 125.8 56.0 1.1016 0.6829 Apr-92 124.8 59.0 1.0928 0.7195 May-92 128.5 62.1 1.1252 0.7573 Jun-92 134.8 65.4 1.1804 0.7976 Jul-92 135.6 64.6 1.1874 0.7878 Aug-92 135.1 63.3 1.1830 0.7720 Sep-92 135.9 65.6 1.1900 0.8000 Oct-92 131.2 68.2 1.1489 0.8317 Nov-92 125.5 64.2 1.0989 0.7829 Dec-92 126.7 59.4 1.1095 0.7244 Jan-93 127.1 59.0 1.1130 0.7195 Feb-93 126.4 60.4 1.1068 0.7366 Mar-93 126.7 63.2 1.1095 0.7707 Apr-93 126.8 62.4 1.1103 0.7610 May-93 127.5 62.6 1.1165 0.7634 Jun-93 136.9 60.8 1.1988 0.7415 Jul-93 137.1 57.0 1.2005 0.6951 Aug-93 137.2 54.4 1.2014 0.6634 Sep-93 137.6 59.3 1.2049 0.7232 Oct-93 131.9 65.4 1.1550 0.7976 Nov-93 126.3 61.6 1.1060 0.7512 Dec-93 126.0 51.4 1.1033 0.6268 Jan-94 126.2 51.5 1.1051 0.6280 Feb-94 125.9 57.5 1.1025 0.7012 Mar-94 125.8 56.2 1.1016 0.6854 Apr-94 125.4 54.7 1.0981 0.6671 May-94 126.0 54.7 1.1033 0.6671 Jun-94 133.5 54.1 1.1690 0.6598 Energy Escalation Factor (E) forBWR (Humboldt) 0.8865 0.8808 0.8832 0.8777 0.9948 1.0808 1.1610 1.1232 1.0632 1.0523 1.0046 0.9333 0.9262 0.9405 0.9501 0.9619 0.9810 0.9996 0.9859 0.9804 0.9405 0.9005 0.9139 0.9090 0.9211 0.9560 1.0043 1.0036 0.9939 1.0106 1.0030 0.9536 0.9323 0.9320 0.9365 0.9536 0.9496 0.9541 0.9884 0.9680 0.9539 0.9833 0.9906 0.9428 0.8841 0.8856 0.9179 0.9101 0.8998 0.9027 0.9347 PG&E Letter HBL-11-003 Page 2 of?


Enclosure 2 PG&E Letter HBL-11-003 Page 3 of?
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASEO TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASEO TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt= 0.54                     BWR wt= 0.46 Jul-94                 134.5                           56.3                           1.1778                           0.6866               0.9518 Aug-94                   134.5                           57.5                           1.1778                           0.7012               0.9586 Sep-94                   134.9                           57.7                           1.1813                           0.7037               0.9616 Oct-94                   129.1                           57.7                           1.1305                           0.7037               0.9341 Nov-94                   127.0                           58.8                           1.1121                           0.7171               0.9304 Oec-94                   127.4                           54.7                           1.1156                           0.6671               0.9093 Jan-95                   127.6                           54.7                           1.1173                           0.6671               0.9102 Feb-95                   128.0                           53.3                           1.1208                           0.6500               0.9043 Mar-95                   128.3                           54.3                           1.1235                           0.6622               0.9113 Apr-95                   126.4                           57.1                           1.1068                           0.6963               0.9180 May-95                   130.2                           59.1                           1.1401                           0.7207               0.9472 Jun-95                   135.3                           55.8                           1.1848                           0.6805               0.9528 Jul-95                 136.6                           53.5                           1.1961                           0.6524               0.9460 Aug-95                   136.5                           55.6                           1.1953                           0.6780               0.9573 Sep-95                   133.7                             58.2                         1.1708                           0.7098               0.9587 Oct-95                   131.4                             57.8                         1.1506                           0.7049               0.9456 Nov-95                   127.6                           59.5                           1.1173                           0.7256               0.9371 Oec-95                   127.7                           60.6                           1.1182                           0.7390               0.9438 Jan-96                   127.9                             62.6                         1.1200                           0.7634               0.9560 Feb-96                   127.1                             59.7                         1.1130                           0.7280               0.9359 Mar-96                   127.8                             63.5                         1.1191                           0.7744               0.9605 Apr-96                   129.1                             74.7                         1.1305                           0.9110               1.0295 May-96                   135.0                             72.0                         1.1821                           0.8780               1.0423 Jun-96                   137.5                             62.8                         1.2040                           0.7659               1.0025 Jul-96                 136.0                             64.3                         1.1909                           0.7841               1.0038 Aug-96                   136.2                           66.5                           1.1926                           0.8110               1.0171 Sep-96                   136.2                             73.4                         1.1926                           0.8951               1.0558 Oct-96                   131.2                             79.7                         1.1489                           0.9720               1.0675 Nov-96                   127.1                             76.5                         1.1130                           0.9329               1.0301 Oec-96                   127.7                             76.1                         1.1182                           0.9280               1.0307 Jan-97                   128.3                             73.7                         1.1235                           0.8988               1.0201 Feb-97                   128.1                             72.3                         1.1217                           0.8817               1.0113 Mar-97                   128.2                             65.2                         1.1226                           0.7951               0.9720 Apr-97                   127.3                             65.3                         1.1147                           0.7963               0.9683 May-97                   129.7                             64.2                         1.1357                           0.7829               0.9734 Jun-97                   135.1                             60.8                         1.1830                           0.7415               0.9799 Jul-97                 135.9                             57.8                         1.1900                           0.7049               0.9669 Aug-97                   134.7                             61.5                         1.1795                           0.7500               0.9819 Sep-97                   136.0                             60.4                         1.1909                           0.7366               0.9819 Oct-97                   130.1                             64.8                         1.1392                           0.7902               0.9787 Nov-97                   127.9                             65.8                         1.1200                           0.8024               0.9739 Oec-97                   128.3                             59.4                         1.1235                           0.7244               0.9399 Jan-98                   127.4                             54.1                         1.1156                           0.6598               0.9059 Feb-98                   127.2                             52.0                         1.1138                           0.6341               0.8932 Mar-98                   126.7                           48.3                           1.1095                           0.5890               0.8701 Apr-98                   126.4                             50.2                         1.1068                           0.6122               0.8793 May-98                   129.2                             50.0                         1.1313                           0.6098               0.8914 Jun-98                   133.8                           46.3                           1.1716                           0.5646               0.8924 Jul-98                 134.8                           45.0                           1.1804                           0.5488               0.8898 Aug-98                   135.2                             44.0                         1.1839                           0.5366               0.8861 Sep-98                   135.2                           48.3                           1.1839                           0.5890               0.9103
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Jul-94 134.5 56.3 1.1778 0.6866 Aug-94 134.5 57.5 1.1778 0.7012 Sep-94 134.9 57.7 1.1813 0.7037 Oct-94 129.1 57.7 1.1305 0.7037 Nov-94 127.0 58.8 1.1121 0.7171 Oec-94 127.4 54.7 1.1156 0.6671 Jan-95 127.6 54.7 1.1173 0.6671 Feb-95 128.0 53.3 1.1208 0.6500 Mar-95 128.3 54.3 1.1235 0.6622 Apr-95 126.4 57.1 1.1068 0.6963 May-95 130.2 59.1 1.1401 0.7207 Jun-95 135.3 55.8 1.1848 0.6805 Jul-95 136.6 53.5 1.1961 0.6524 Aug-95 136.5 55.6 1.1953 0.6780 Sep-95 133.7 58.2 1.1708 0.7098 Oct-95 131.4 57.8 1.1506 0.7049 Nov-95 127.6 59.5 1.1173 0.7256 Oec-95 127.7 60.6 1.1182 0.7390 Jan-96 127.9 62.6 1.1200 0.7634 Feb-96 127.1 59.7 1.1130 0.7280 Mar-96 127.8 63.5 1.1191 0.7744 Apr-96 129.1 74.7 1.1305 0.9110 May-96 135.0 72.0 1.1821 0.8780 Jun-96 137.5 62.8 1.2040 0.7659 Jul-96 136.0 64.3 1.1909 0.7841 Aug-96 136.2 66.5 1.1926 0.8110 Sep-96 136.2 73.4 1.1926 0.8951 Oct-96 131.2 79.7 1.1489 0.9720 Nov-96 127.1 76.5 1.1130 0.9329 Oec-96 127.7 76.1 1.1182 0.9280 Jan-97 128.3 73.7 1.1235 0.8988 Feb-97 128.1 72.3 1.1217 0.8817 Mar-97 128.2 65.2 1.1226 0.7951 Apr-97 127.3 65.3 1.1147 0.7963 May-97 129.7 64.2 1.1357 0.7829 Jun-97 135.1 60.8 1.1830 0.7415 Jul-97 135.9 57.8 1.1900 0.7049 Aug-97 134.7 61.5 1.1795 0.7500 Sep-97 136.0 60.4 1.1909 0.7366 Oct-97 130.1 64.8 1.1392 0.7902 Nov-97 127.9 65.8 1.1200 0.8024 Oec-97 128.3 59.4 1.1235 0.7244 Jan-98 127.4 54.1 1.1156 0.6598 Feb-98 127.2 52.0 1.1138 0.6341 Mar-98 126.7 48.3 1.1095 0.5890 Apr-98 126.4 50.2 1.1068 0.6122 May-98 129.2 50.0 1.1313 0.6098 Jun-98 133.8 46.3 1.1716 0.5646 Jul-98 134.8 45.0 1.1804 0.5488 Aug-98 135.2 44.0 1.1839 0.5366 Sep-98 135.2 48.3 1.1839 0.5890 Energy Escalation Factor (E) forBWR (Humboldt) 0.9518 0.9586 0.9616 0.9341 0.9304 0.9093 0.9102 0.9043 0.9113 0.9180 0.9472 0.9528 0.9460 0.9573 0.9587 0.9456 0.9371 0.9438 0.9560 0.9359 0.9605 1.0295 1.0423 1.0025 1.0038 1.0171 1.0558 1.0675 1.0301 1.0307 1.0201 1.0113 0.9720 0.9683 0.9734 0.9799 0.9669 0.9819 0.9819 0.9787 0.9739 0.9399 0.9059 0.8932 0.8701 0.8793 0.8914 0.8924 0.8898 0.8861 0.9103 PG&E Letter HBL-11-003 Page 3 of?


Enclosure 2 PG&E Letter HBL-11-003 Page 4 of?
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt= 0.54                     BWR wt= 0.46 Oct-98                   130.4                           47.4                           1.1419                           0.5780               0.8825 Nov-98                   127.6                           46.2                           1.1173                           0.5634               0.8625 Dec-98                   126.6                           38.8                           1.1086                           0.4732               0.8163 Jan-99                   126.1                           40.9                           1.1042                           0.4988               0.8257 Feb-99                   125.5                           38.2                           1.0989                           0.4659               0.8077 Mar-99                   125.5                           42.8                           1.0989                           0.5220               0.8335 Apr-99                   125.2                           52.5                           1.0963                           0.6402               0.8865 May-99                   127.4                           52.6                           1.1156                           0.6415               0.8975 Jun-99                   131.0                           52.4                           1.1471                           0.6390               0.9134 Jul-99                 133.9                           58.7                           1.1725                           0.7159               0.9624 Aug-99                   133.9                               63                         1.1725                           0.7683               0.9866 Sep-99                   134.1                           67.6                           1.1743                           0.8244               1.0133 Oct-99                   129.5                           65.5                           1.1340                           0.7988               0.9798 Nov-99                   127.5                           71.3                           1.1165                           0.8695               1.0029 Dec-99                   126.5                             72.9                         1.1077                           0.8890               1.0071 Jan-OO                   126.8                             75.3                         1.1103                           0.9183               1.0220 Feb-OO                   126.7                             87.9                         1.1095                           1.0720               1.0922 Mar-OO                   126.7                           89.7                           1.1095                           1.0939               1.1023 Apr-OO                   126.8                             83.1                         1.1103                           1.0134               1.0658 May-OO                   128.6                             82.9                         1.1261                           1.0110               1.0731 Jun-OO                   133.6                             86.2                         1.1699                           1.0512               1.1153 Jul-OO                 136.2                           88.7                           1.1926                           1.0817               1.1416 Aug-OO                   137.4                             91.6                         1.2032                           1.1171               1.1636 Sep-OO                   137.8                           110.1                           1.2067                           1.3427               1.2692 Oct-OO                   134.1                           108.6                           1.1743                           1.3244               1.2433 Nov-OO                   130.9                           108.4                           1.1462                           1.3220               1.2271 Dec-OO                   132.7                           100.6                           1.1620                           1.2268               1.1918 Jan-01                   136.4                             96.1                         1.1944                           1.1720               1.1841 Feb-01                   136.4                             91.6                         1.1944                           1.1171               1.1588 Mar-01                   136.5                             83.1                         1.1953                           1.0134               1.1116 Apr-01                   135.1                             86.2                         1.1830                           1.0512               1.1224 May-01                   136.2                             94.2                         1.1926                           1.1488               1.1725 Jun-01                   148.4                             90.2                         1.2995                           1.1000               1.2077 Jul-01                 149.5                             81.3                         1.3091                           0.9915               1.1630 Aug-01                   148.9                             83.2                         1.3039                           1.0146               1.1708 Sep-01                   148.2                               93                         1.2977                           1.1341               1.2225 Oct-01                   143.8                             76.8                         1.2592                           0.9366               1.1108 Nov-01                   137.3                             70.5                         1.2023                           0.8598               1.0447 Dec-01                   136.9                             56.6                         1.1988                           0.6902               0.9649 Jan-02                   136.3                             58.3                         1.1935                           0.7110               0.9715 Feb-02                   135.4                             59.6                         1.1856                           0.7268               0.9746 Mar-02                   135.7                             69.1                         1.1883                           0.8427               1.0293 Apr-02                 135.4                             76.4                         1.1856                           0.9317               1.0688 May-02                   137.9                               75                         1.2075                           0.9146               1.0728 Jun-02                   143.6                             71.4                         1.2574                           0.8707               1.0796 Jul-02                 144.9                             75.5                         1.2688                           0.9207               1.1087 Aug-02                   145.0                             77.9                         1.2697                           0.9500               1.1226 Sep-02                   145.8                             89.5                         1.2767                           1.0915               1.1915 Oct-02                   140.0                             95.1                         1.2259                           1.1598               1.1955 Nov-02                   139.5                             82.8                         1.2215                           1.0098               1.1241 Dec-02                   139.6                             84.6                         1.2224                           1.0317               1.1347
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Oct-98 130.4 47.4 1.1419 0.5780 Nov-98 127.6 46.2 1.1173 0.5634 Dec-98 126.6 38.8 1.1086 0.4732 Jan-99 126.1 40.9 1.1042 0.4988 Feb-99 125.5 38.2 1.0989 0.4659 Mar-99 125.5 42.8 1.0989 0.5220 Apr-99 125.2 52.5 1.0963 0.6402 May-99 127.4 52.6 1.1156 0.6415 Jun-99 131.0 52.4 1.1471 0.6390 Jul-99 133.9 58.7 1.1725 0.7159 Aug-99 133.9 63 1.1725 0.7683 Sep-99 134.1 67.6 1.1743 0.8244 Oct-99 129.5 65.5 1.1340 0.7988 Nov-99 127.5 71.3 1.1165 0.8695 Dec-99 126.5 72.9 1.1077 0.8890 Jan-OO 126.8 75.3 1.1103 0.9183 Feb-OO 126.7 87.9 1.1095 1.0720 Mar-OO 126.7 89.7 1.1095 1.0939 Apr-OO 126.8 83.1 1.1103 1.0134 May-OO 128.6 82.9 1.1261 1.0110 Jun-OO 133.6 86.2 1.1699 1.0512 Jul-OO 136.2 88.7 1.1926 1.0817 Aug-OO 137.4 91.6 1.2032 1.1171 Sep-OO 137.8 110.1 1.2067 1.3427 Oct-OO 134.1 108.6 1.1743 1.3244 Nov-OO 130.9 108.4 1.1462 1.3220 Dec-OO 132.7 100.6 1.1620 1.2268 Jan-01 136.4 96.1 1.1944 1.1720 Feb-01 136.4 91.6 1.1944 1.1171 Mar-01 136.5 83.1 1.1953 1.0134 Apr-01 135.1 86.2 1.1830 1.0512 May-01 136.2 94.2 1.1926 1.1488 Jun-01 148.4 90.2 1.2995 1.1000 Jul-01 149.5 81.3 1.3091 0.9915 Aug-01 148.9 83.2 1.3039 1.0146 Sep-01 148.2 93 1.2977 1.1341 Oct-01 143.8 76.8 1.2592 0.9366 Nov-01 137.3 70.5 1.2023 0.8598 Dec-01 136.9 56.6 1.1988 0.6902 Jan-02 136.3 58.3 1.1935 0.7110 Feb-02 135.4 59.6 1.1856 0.7268 Mar-02 135.7 69.1 1.1883 0.8427 Apr-02 135.4 76.4 1.1856 0.9317 May-02 137.9 75 1.2075 0.9146 Jun-02 143.6 71.4 1.2574 0.8707 Jul-02 144.9 75.5 1.2688 0.9207 Aug-02 145.0 77.9 1.2697 0.9500 Sep-02 145.8 89.5 1.2767 1.0915 Oct-02 140.0 95.1 1.2259 1.1598 Nov-02 139.5 82.8 1.2215 1.0098 Dec-02 139.6 84.6 1.2224 1.0317 Energy Escalation Factor (E) forBWR (Humboldt) 0.8825 0.8625 0.8163 0.8257 0.8077 0.8335 0.8865 0.8975 0.9134 0.9624 0.9866 1.0133 0.9798 1.0029 1.0071 1.0220 1.0922 1.1023 1.0658 1.0731 1.1153 1.1416 1.1636 1.2692 1.2433 1.2271 1.1918 1.1841 1.1588 1.1116 1.1224 1.1725 1.2077 1.1630 1.1708 1.2225 1.1108 1.0447 0.9649 0.9715 0.9746 1.0293 1.0688 1.0728 1.0796 1.1087 1.1226 1.1915 1.1955 1.1241 1.1347 PG&E Letter HBL-11-003 Page 4 of?


Enclosure 2 PG&E Letter HBL-11-003 Page 5 of?
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt= 0.54                     BWR wt= 0.46 Jan-03                   140.3                           95.7                           1.2285                           1.1671               1.2003 Feb-03                   140.6                           120.4                           1.2312                           1.4683               1.3402 Mar-03                   143.3                           128.9                           1.2548                           1.5720               1.4007 Apr-03                   144.3                           98.3                           1.2636                           1.1988               1.2338 May-03                   145.1                           85.5                           1.2706                           1.0427               1.1657 Jun-03                   148.3                           87.2                           1.2986                           1.0634               1.1904 Jul-03                 151.6                           90.1                           1.3275                           1.0988               1.2223 Aug-03                   151.3                           94.1                           1.3249                           1.1476               1.2433 Sep-03                   152.0                           88.2                           1.3310                           1.0756               1.2135 Oct-03                   147.4                           97.8                           1.2907                           1.1927               1.2456 Nov-03                   142.7                           93.0                           1.2496                           1.1341               1.1965 Dec-03                   142.9                           95.8                           1.2513                           1.1683               1.2131 Jan-04                   143.1                           106.8                           1.2531                           1.3024               1.2758 Feb-04                   143.1                           100.8                           1.2531                           1.2293               1.2421 Mar-04                   143.1                           107.8                           1.2531                           1.3146               1.2814 Apr-04                   143.1                           115.2                           1.2531                           1.4049               1.3229 May-04                   144.2                             116                           1.2627                         '1.4146               1.3326 Jun-04                   152.4                           111.5                           1.3345                           1.3598               1.3461 Jul-04                 152.2                           119.3                           1.3327                           1.4549               1.3889 Aug-04                   154.0                           131.1                           1.3485                           1.5988               1.4636 Sep-04                   154.0                           136.8                           1.3485                           1.6683               1.4956 Oct-04                   145.8                           161.7                           1.2767                           1.9720               1.5965 Nov-04                   144.9                           153.6                           1.2688                           1.8732               1.5468 Dec-04                   146.2                           133.8                           1.2802                           1.6317               1.4419 Jan-05                   148.9                           138.5                           1.3039                           1.6890               1.4810 Feb-05                   148.0                             146                           1.2960                           1.7805               1.5188 Mar-05                   148.1                           169.4                           1.2968                           2.0659               1.6506 Apr-05                   148.7                           170.9                           1.3021                           2.0841               1.6618 May-05                   151.1                           165.3                           1.3231                           2.0159               1.6418 Jun-05                   159.7                           180.6                           1.3984                           2.2024               1.7683 Jul-05                 162.1                           186.2                           1.4194                           2.2707               1.8110 Aug-05                   162.5                           194.5                           1.4229                           2.3720               1.8595 Sep-05                   162.8                           209.9                           1.4256                           2.5598               1.9473 Oct-05                   159.5                           252.0                           1.3967                           3.0732               2.1679 Nov-05                   161.1                           199.1                           1.4107                           2.4280               1.8787 Dec-05                   161.4                           193.6                           1.4133                           2.3610               1.8492 Jan-06                   167.0                           191.8                           1.4623                           2.3390               1.8656 Feb-06                   168.6                           190.0                           1.4764                           2.3171               1.8631 Mar-06                   167.4                           199.2                           1.4658                           2.4293               1.9090 Apr-06                   169.6                           221.9                           1.4851                           2.7061               2.0468 May-06                   170.8                           231.4                           1.4956                           2.8220               2.1057 Jun-06                   181.2                           238.1                           1.5867                           2.9037               2.1925 Jul-06                 181.9                           231.6                           1.5928                           2.8244               2.1593 Aug-06                   180.2                           241.4                           1.5779                           2.9439               2.2063 Sep-06                   181.0                           203.1                           1.5849                           2.4768               1.9952 Oct-06                   171.2                           198.1                           1.4991                           2.4159               1.9208 Nov-06                   167.2                           198.2                           1.4641                           2.4171               1.9025 Dec-06                   167.8                           200.4                           1.4694                           2.4439               1.9176 Jan-07                   171.9                           180.0                           1.5053                           2.1951               1.8226 Feb-07                   175.7                           191.5                           1.5385                           2.3354               1.9051 Mar-07                   172.1                           215.1                           1.5070                           2.6232               2.0204
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Jan-03 140.3 95.7 1.2285 1.1671 Feb-03 140.6 120.4 1.2312 1.4683 Mar-03 143.3 128.9 1.2548 1.5720 Apr-03 144.3 98.3 1.2636 1.1988 May-03 145.1 85.5 1.2706 1.0427 Jun-03 148.3 87.2 1.2986 1.0634 Jul-03 151.6 90.1 1.3275 1.0988 Aug-03 151.3 94.1 1.3249 1.1476 Sep-03 152.0 88.2 1.3310 1.0756 Oct-03 147.4 97.8 1.2907 1.1927 Nov-03 142.7 93.0 1.2496 1.1341 Dec-03 142.9 95.8 1.2513 1.1683 Jan-04 143.1 106.8 1.2531 1.3024 Feb-04 143.1 100.8 1.2531 1.2293 Mar-04 143.1 107.8 1.2531 1.3146 Apr-04 143.1 115.2 1.2531 1.4049 May-04 144.2 116 1.2627  
'1.4146 Jun-04 152.4 111.5 1.3345 1.3598 Jul-04 152.2 119.3 1.3327 1.4549 Aug-04 154.0 131.1 1.3485 1.5988 Sep-04 154.0 136.8 1.3485 1.6683 Oct-04 145.8 161.7 1.2767 1.9720 Nov-04 144.9 153.6 1.2688 1.8732 Dec-04 146.2 133.8 1.2802 1.6317 Jan-05 148.9 138.5 1.3039 1.6890 Feb-05 148.0 146 1.2960 1.7805 Mar-05 148.1 169.4 1.2968 2.0659 Apr-05 148.7 170.9 1.3021 2.0841 May-05 151.1 165.3 1.3231 2.0159 Jun-05 159.7 180.6 1.3984 2.2024 Jul-05 162.1 186.2 1.4194 2.2707 Aug-05 162.5 194.5 1.4229 2.3720 Sep-05 162.8 209.9 1.4256 2.5598 Oct-05 159.5 252.0 1.3967 3.0732 Nov-05 161.1 199.1 1.4107 2.4280 Dec-05 161.4 193.6 1.4133 2.3610 Jan-06 167.0 191.8 1.4623 2.3390 Feb-06 168.6 190.0 1.4764 2.3171 Mar-06 167.4 199.2 1.4658 2.4293 Apr-06 169.6 221.9 1.4851 2.7061 May-06 170.8 231.4 1.4956 2.8220 Jun-06 181.2 238.1 1.5867 2.9037 Jul-06 181.9 231.6 1.5928 2.8244 Aug-06 180.2 241.4 1.5779 2.9439 Sep-06 181.0 203.1 1.5849 2.4768 Oct-06 171.2 198.1 1.4991 2.4159 Nov-06 167.2 198.2 1.4641 2.4171 Dec-06 167.8 200.4 1.4694 2.4439 Jan-07 171.9 180.0 1.5053 2.1951 Feb-07 175.7 191.5 1.5385 2.3354 Mar-07 172.1 215.1 1.5070 2.6232 Energy Escalation Factor (E) forBWR (Humboldt) 1.2003 1.3402 1.4007 1.2338 1.1657 1.1904 1.2223 1.2433 1.2135 1.2456 1.1965 1.2131 1.2758 1.2421 1.2814 1.3229 1.3326 1.3461 1.3889 1.4636 1.4956 1.5965 1.5468 1.4419 1.4810 1.5188 1.6506 1.6618 1.6418 1.7683 1.8110 1.8595 1.9473 2.1679 1.8787 1.8492 1.8656 1.8631 1.9090 2.0468 2.1057 2.1925 2.1593 2.2063 1.9952 1.9208 1.9025 1.9176 1.8226 1.9051 2.0204 PG&E Letter HBL-11-003 Page 5 of?


Enclosure 2 PG&E Letter HBL-11-003 Page 6 of7 Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products               Fuel Oils                       Related Products                 Fuel Oils             Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                   (1982=100)                       (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power   (F) = Light Fuel Oils           (P) =Industrial Energy Power     (F) = Light Fuel Oils (Humboldt)
PPI for Light PPI for Fuels &
BWR wt= 0.54                     BWR wt = 0.46 Apr-07                   173.1                           231.8                           1.5158                           2.8268               2.1189 May-07                   179.2                           225.3                           1.5692                           2.7476               2.1112 Jun-07                   186.7                           222.4                           1.6349                           2.7122               2.1304 Jul-07                 187.0                           237.8                           1.6375                           2.9000               2.2182 Aug-07                   187.6                           225.5                           1.6427                           2.7500               2.1521 Sep-07                   188.4                           238.9                           1.6497                           2.9134               2.2310 Oct-07                   182.7                           243.3                           1.5998                           2.9671               2.2288 Nov-07                   180.3                           288.2                           1.5788                           3.5146               2.4693 Dec-07                   180.0                           266.7                           1.5762                           3.2524               2.3473 Jan-08                   181.9                           273.8                           1.5928                           3.3390               2.3961 Feb-08                   180.0                           280.2                           1.5762                           3.4171               2.4230 Mar-08                   183.1                           339.6                           1.6033                           4.1415               2.7709 Apr-08                   185.2                           352.5                           1.6217                           4.2988               2.8532 May-08                   189.5                           384.9                           1.6594                           4.6939               3.0553 Jun-08                   191.9                           410.5                           1.6804                           5.0061               3.2102 Jul-08                 196.1                           423.8                           1.7172                           5.1683               3.3047 Aug-08                   197.1                           343.9                           1.7259                           4.1939               2.8612 Sep-08                   195.9                           335.1                           1.7154                           4.0866               2.8062 Oct-08                   193.0                           279.0                           1.6900                           3.4024               2.4777 Nov-08                   187.7                           218.2                           1.6436                           2.6610               2.1116 Dec-08                   188.3                           163.0                           1.6489                           1.9878               1.8048 Jan-09                   190.3                           159.8                           1.6664                           1.9488               1.7963 Feb-09                   190.3                           145.6                           1.6664                           1.7756               1.7166 Mar-09                   187.6                           136.8                           1.6427                           1.6683               1.6545 Apr-09                   186.9                           159.9                           1.6366                           1.9500               1.7808 May-09                   190.5                           158.6                           1.6681                           1.9341               1.7905 Jun-09                   193.3                           183.7                           1.6926                           2.2402               1.9445 Jul-09                 196.2                           165.2                           1.7180                           2.0146               1.8545 Aug-09                   194.7                           196.1                           1.7049                           2.3915               2.0207 Sep-09                   194.9                           186.6                           1.7067                           2.2756               1.9684 Oct-09                   189.9                           193.3                           1.6629                           2.3573               1.9823 Nov-09                   186.0                           207.8                           1.6287                           2.5341               2.0452 Dec-09                   186.0                           197.5                           1.6287                           2.4085               1.9874 Jan-10                   186.3                           220.7                           1.6313                           2.6915               2.1190 Feb-10                   186.1                           200.2                           1.6296                           2.4415               2.0031 Mar-10                   189.0                           217.0                           1.6550                           2.6463               2.1110 Apr-10                   188.8                           231.5                           1.6532                           2.8232               2.1914 May-10                   192.0                           226.0                           1.6813                           2.7561               2.1757 Jun-10                   197.8                           212.4                           1.7320                           2.5902               2.1268 Jul-10                 199.8                           209.3                           1.7496                           2.5524               2.1189 Aug-10                   200.8                           221.4                           1.7583                           2.7000               2.1915 Sep-10                   200.0                           220.0                           1.7513                           2.6829               2.1799 Oct-10                   194.7                           236.0                           1.7049                           2.8780               2.2446 Nov-10                   192.9                           245.5                           1.6891                           2.9939               2.2893 Dec-10                   191.3                           252.1                           1.6751                           3.0744               2.3188 Jan-11                   191.9                           260.0                           1.6804                           3.1707               2.3659
PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)
(1982=100)
(1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt = 0.46 Apr-07 173.1 231.8 1.5158 2.8268 May-07 179.2 225.3 1.5692 2.7476 Jun-07 186.7 222.4 1.6349 2.7122 Jul-07 187.0 237.8 1.6375 2.9000 Aug-07 187.6 225.5 1.6427 2.7500 Sep-07 188.4 238.9 1.6497 2.9134 Oct-07 182.7 243.3 1.5998 2.9671 Nov-07 180.3 288.2 1.5788 3.5146 Dec-07 180.0 266.7 1.5762 3.2524 Jan-08 181.9 273.8 1.5928 3.3390 Feb-08 180.0 280.2 1.5762 3.4171 Mar-08 183.1 339.6 1.6033 4.1415 Apr-08 185.2 352.5 1.6217 4.2988 May-08 189.5 384.9 1.6594 4.6939 Jun-08 191.9 410.5 1.6804 5.0061 Jul-08 196.1 423.8 1.7172 5.1683 Aug-08 197.1 343.9 1.7259 4.1939 Sep-08 195.9 335.1 1.7154 4.0866 Oct-08 193.0 279.0 1.6900 3.4024 Nov-08 187.7 218.2 1.6436 2.6610 Dec-08 188.3 163.0 1.6489 1.9878 Jan-09 190.3 159.8 1.6664 1.9488 Feb-09 190.3 145.6 1.6664 1.7756 Mar-09 187.6 136.8 1.6427 1.6683 Apr-09 186.9 159.9 1.6366 1.9500 May-09 190.5 158.6 1.6681 1.9341 Jun-09 193.3 183.7 1.6926 2.2402 Jul-09 196.2 165.2 1.7180 2.0146 Aug-09 194.7 196.1 1.7049 2.3915 Sep-09 194.9 186.6 1.7067 2.2756 Oct-09 189.9 193.3 1.6629 2.3573 Nov-09 186.0 207.8 1.6287 2.5341 Dec-09 186.0 197.5 1.6287 2.4085 Jan-10 186.3 220.7 1.6313 2.6915 Feb-10 186.1 200.2 1.6296 2.4415 Mar-10 189.0 217.0 1.6550 2.6463 Apr-10 188.8 231.5 1.6532 2.8232 May-10 192.0 226.0 1.6813 2.7561 Jun-10 197.8 212.4 1.7320 2.5902 Jul-10 199.8 209.3 1.7496 2.5524 Aug-10 200.8 221.4 1.7583 2.7000 Sep-10 200.0 220.0 1.7513 2.6829 Oct-10 194.7 236.0 1.7049 2.8780 Nov-10 192.9 245.5 1.6891 2.9939 Dec-10 191.3 252.1 1.6751 3.0744 Jan-11 191.9 260.0 1.6804 3.1707 Energy Escalation Factor (E) forBWR (Humboldt) 2.1189 2.1112 2.1304 2.2182 2.1521 2.2310 2.2288 2.4693 2.3473 2.3961 2.4230 2.7709 2.8532 3.0553 3.2102 3.3047 2.8612 2.8062 2.4777 2.1116 1.8048 1.7963 1.7166 1.6545 1.7808 1.7905 1.9445 1.8545 2.0207 1.9684 1.9823 2.0452 1.9874 2.1190 2.0031 2.1110 2.1914 2.1757 2.1268 2.1189 2.1915 2.1799 2.2446 2.2893 2.3188 2.3659 PG&E Letter HBL-11-003 Page 6 of7


Enclosure 2 PG&E Letter HBL-11-003 Page? of?
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)
REBASED TO 1986 = 100 PPI for Fuels &                 PPI for Light                   PPI for Fuels &                 PPI for Light         Energy Escalation Related Products                 Fuel Oils                       Related Products                Fuel Oils              Factor (E)
REBASED TO 1986 = 100 PPI for Fuels &
(1982 = 100)                    (1982=100)                      (1986 = 100)                     (1986=100)           forBWR (P) =Industrial Energy Power     (F) = Light Fuel Oils           (P) =Industrial Energy Power    (F) = Light Fuel Oils (Humboldt)
Related Products (1982 = 100)
BWR wt = 0.54                   BWR wt = 0.46 Oct 10 through Jan 11 are Preliminary Values from PPllndices
(P) =Industrial Energy Power PPI for Light Fuel Oils (1982=100)
(F) = Light Fuel Oils Oct 10 through Jan 11 are Preliminary Values from PPllndices PPI for Fuels &
PPI for Light Related Products Fuel Oils (1986 = 100)
(1986=100)
(P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt = 0.54 BWR wt = 0.46 Energy Escalation Factor (E) forBWR (Humboldt)
PG&E Letter HBL-11-003 Page? of?


Enclosure 2 PG&E Letter HBL-11-003 Page 1 of 7 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factorfor West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factorfor West Labor (Pg 7)
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
PG&E Letter HBL-11-003 Page 1 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)             Factor Jan-86                     89.8             1.00000 Feb-86 Mar-86 Apr-86                     90.8             1.01114 May-86 Jun-86 Jul-86                   91.2             1.01559 Aug-86 Sep-86 Oct-86                     91.6             1.02004 Nov-86 Dec-86 Jan-87                     92.5             1.03007 Feb-87 Mar-87 Apr-87                     92.6             1.03118 May-87 Jun-87 Jul-87                   93.7             1.04343 Aug-87 Sep-87 Oct-87                     94.1             1.04788 Nov-87 Dec-87 Jan-88                     95.4             1.06236 Feb-88 Mar-88 Apr-88                     96.3             1.07238 May-88 Jun-88 Jul-88                     97             1.08018 Aug-88 Sep-88 Oct-88                     97.7             1.08797 Nov-88 Dec-88 Jan-89                     98.8             1.10022 Feb-89 Mar-89 Apr-89                     100             1.11359 May-89 Jun-89 Jul-89                     101             1.12472 Aug-89 Sep-89 Oct-89                   101.8             1.13363 Nov-89 Dec-89
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
Factor Jan-86 89.8 1.00000 Feb-86 Mar-86 Apr-86 90.8 1.01114 May-86 Jun-86 Jul-86 91.2 1.01559 Aug-86 Sep-86 Oct-86 91.6 1.02004 Nov-86 Dec-86 Jan-87 92.5 1.03007 Feb-87 Mar-87 Apr-87 92.6 1.03118 May-87 Jun-87 Jul-87 93.7 1.04343 Aug-87 Sep-87 Oct-87 94.1 1.04788 Nov-87 Dec-87 Jan-88 95.4 1.06236 Feb-88 Mar-88 Apr-88 96.3 1.07238 May-88 Jun-88 Jul-88 97 1.08018 Aug-88 Sep-88 Oct-88 97.7 1.08797 Nov-88 Dec-88 Jan-89 98.8 1.10022 Feb-89 Mar-89 Apr-89 100 1.11359 May-89 Jun-89 Jul-89 101 1.12472 Aug-89 Sep-89 Oct-89 101.8 1.13363 Nov-89 Dec-89  


Enclosure 2 PG&E Letter HBL-11-003 Page 2 of 7 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU20100000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU20100000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
PG&E Letter HBL-11-003 Page 2 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)             Factor Jan-90                   103.3             1.15033 Feb-90 Mar-90 Apr-90                   104.5             1.16370 May-90 Jun-90 Jul-90                   105.6             1.17595 Aug-90 Sep-90 Oct-90                   106.3             1.18374 Nov-90 Dec-90 Jan-91                   107.5             1.19710 Feb-91 Mar-91 Apr-91                   108.9             1.21269 May-91 Jun-91 Jul-91                     110             1.22494 Aug-91 Sep-91 Oct-91                   110.9             1.23497 Nov-91 Dec-91 Jan-92                   111.9             1.24610 Feb-92 Mar-92 Apr-92                   112.9             1.25724 May-92 Jun-92 JUI-92                   114.1             1.27060 Aug-92 Sep-92 Oct-92                   114.9             1.27951 Nov-92 Dec-92 Jan-93                   116.2             1.29399 Feb-93 Mar-93 Apr-93                   116.4             1.29621 May-93 Jun-93 Jul-93                   117.8             1.31180 Aug-93 Sep-93 Oct-93                   118.1             1.31514 Nov-93 Dec-93
Employment Cost I ndust West Region Labor Private Industry Escalation (1989=100)
Factor Jan-90 103.3 1.15033 Feb-90 Mar-90 Apr-90 104.5 1.16370 May-90 Jun-90 Jul-90 105.6 1.17595 Aug-90 Sep-90 Oct-90 106.3 1.18374 Nov-90 Dec-90 Jan-91 107.5 1.19710 Feb-91 Mar-91 Apr-91 108.9 1.21269 May-91 Jun-91 Jul-91 110 1.22494 Aug-91 Sep-91 Oct-91 110.9 1.23497 Nov-91 Dec-91 Jan-92 111.9 1.24610 Feb-92 Mar-92 Apr-92 112.9 1.25724 May-92 Jun-92 JUI-92 114.1 1.27060 Aug-92 Sep-92 Oct-92 114.9 1.27951 Nov-92 Dec-92 Jan-93 116.2 1.29399 Feb-93 Mar-93 Apr-93 116.4 1.29621 May-93 Jun-93 Jul-93 117.8 1.31180 Aug-93 Sep-93 Oct-93 118.1 1.31514 Nov-93 Dec-93  


Enclosure 2 PG&E Letter HBL-11-003 Page 3 of?
Development of L Component Calculation of Labor Escalation Factor-Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor- Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
PG&E Letter HBL-11-003 Page 3 of?
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region             Labor Private Industry       Escalation (1989=100)             Factor Jan-94                   119.4             1.32962 Feb-94 Mar-94 Apr-94                   120.5             1.34187 May-94 Jun-94 JUI-94                   121.3             1.35078 Aug-94 Sep-94 Oct-94                   121.7             1.35523 Nov-94 Dec-94 Jan-95                   122.6             1.36526 Feb-95 Mar-95 Apr-95                   123.4             1.37416 May-95 Jun-95 Jul-95                   123.9             1.37973 Aug-95 Sep-95 Oct-95                     125             1.39198 Nov-95 Dec-95 Jan-96                   125.9             1.40200 Feb-96 Mar-96 Apr-96                   127.3             1.41759 May-96 Jun-96 Jul-96                   128.3             1.42873 Aug-96 Sep-96 Oct-96                   128.9             1.43541 Nov-96 Dec-96 Jan-97                   130.3             1.45100 Feb-97 Mar-97 Apr-97                   131.4             1.46325 May-97 Jun-97 JUI-97                   132.5             1.47550 Aug-97 Sep-97 Oct-97                   133.4             1.48552 Nov-97 Dec-97
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
Factor Jan-94 119.4 1.32962 Feb-94 Mar-94 Apr-94 120.5 1.34187 May-94 Jun-94 JUI-94 121.3 1.35078 Aug-94 Sep-94 Oct-94 121.7 1.35523 Nov-94 Dec-94 Jan-95 122.6 1.36526 Feb-95 Mar-95 Apr-95 123.4 1.37416 May-95 Jun-95 Jul-95 123.9 1.37973 Aug-95 Sep-95 Oct-95 125 1.39198 Nov-95 Dec-95 Jan-96 125.9 1.40200 Feb-96 Mar-96 Apr-96 127.3 1.41759 May-96 Jun-96 Jul-96 128.3 1.42873 Aug-96 Sep-96 Oct-96 128.9 1.43541 Nov-96 Dec-96 Jan-97 130.3 1.45100 Feb-97 Mar-97 Apr-97 131.4 1.46325 May-97 Jun-97 JUI-97 132.5 1.47550 Aug-97 Sep-97 Oct-97 133.4 1.48552 Nov-97 Dec-97  


Enclosure 2 PG&E Letter HBL-11-003 Page 4 of 7 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
PG&E Letter HBL-11-003 Page 4 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)               Factor Jan-98                   135.2             1.50557 Feb-98 Mar-98 Apr-98                   136.6             1.52116 May-98 Jun-98 Jul-98                   138.5             1.54232 Aug-98 Sep-98 Oct-98                     140             1.55902 Nov-98 Dec-98 Jan-99                   140.3             1.56236 Feb-99 Mar-99 Apr-99                   142.1             1.58241 May-99 Jun-99 JUI-99                   143.3             1.59577 Aug-99 Sep-99 Oct-99                   144.7             1.61136 Nov-99 Dec-99 Jan-OO                     147             1.63697 Feb-OO Mar-OO Apr-OO                   148.8             1.65702 May-OO Jun-OO Jul-OO                   150.8             1.67929 Aug-OO Sep-OO Oct-OO                   151.8             1.69042 Nov-OO Dec-OO Jan-01                     84.1             0.93653 Feb-01 Mar-01 Apr-01                       85             0.94655 May-01 Jun-01 Jul-01                   85.9             0.95657 Aug-01 Sep-01 Oct-01                     86.9             0.96771 Nov-01 Dec-01
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
Factor Jan-98 135.2 1.50557 Feb-98 Mar-98 Apr-98 136.6 1.52116 May-98 Jun-98 Jul-98 138.5 1.54232 Aug-98 Sep-98 Oct-98 140 1.55902 Nov-98 Dec-98 Jan-99 140.3 1.56236 Feb-99 Mar-99 Apr-99 142.1 1.58241 May-99 Jun-99 JUI-99 143.3 1.59577 Aug-99 Sep-99 Oct-99 144.7 1.61136 Nov-99 Dec-99 Jan-OO 147 1.63697 Feb-OO Mar-OO Apr-OO 148.8 1.65702 May-OO Jun-OO Jul-OO 150.8 1.67929 Aug-OO Sep-OO Oct-OO 151.8 1.69042 Nov-OO Dec-OO Jan-01 84.1 0.93653 Feb-01 Mar-01 Apr-01 85 0.94655 May-01 Jun-01 Jul-01 85.9 0.95657 Aug-01 Sep-01 Oct-01 86.9 0.96771 Nov-01 Dec-01  


Enclosure 2 PG&E Letter HBL-11-003 Page 5 of 7 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
PG&E Letter HBL-11-003 Page 5 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)             Factor Jan-02                     87.4             0.97327 Feb-02 Feb-02 Mar-02 Apr-02                     88.5             0.98552 May-02 Jun-02 Jul-02                   89.1             0.99220 Aug-02 Sep-02 Oct-02                     89.8             1.00000 Nov-02 Dec-02 Jan-03                     90.9             1.01225 Feb-03 Mar-03 Apr-03                       92             1.02450 May-03 Jun-03 Jul-03                   93.2             1.03786 Aug-03 Sep-03 Oct-03                     93.8             1.04454 Nov-03 Dec-03 Jan-04                     95.3             1.06125 Feb-04 Mar-04 Apr-04                     96.2             1.07127 May-04 Jun-04 Jul-04                   96.9             1.07906 Aug-04 Sep-04 Oct-04                     97.4             1.08463 Nov-04 Dec-04 Jan-05                     98.4             1.09577 Feb-05 Mar-05 Apr-05                     99.3             1.10579 May-05 Jun-05 Jul-05                   99.7             1.11024 Aug-05 Sep-05 Oct-05 (Note 1)             100             2.06000 Nov-05
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
Factor Jan-02 87.4 0.97327 Feb-02 Feb-02 Mar-02 Apr-02 88.5 0.98552 May-02 Jun-02 Jul-02 89.1 0.99220 Aug-02 Sep-02 Oct-02 89.8 1.00000 Nov-02 Dec-02 Jan-03 90.9 1.01225 Feb-03 Mar-03 Apr-03 92 1.02450 May-03 Jun-03 Jul-03 93.2 1.03786 Aug-03 Sep-03 Oct-03 93.8 1.04454 Nov-03 Dec-03 Jan-04 95.3 1.06125 Feb-04 Mar-04 Apr-04 96.2 1.07127 May-04 Jun-04 Jul-04 96.9 1.07906 Aug-04 Sep-04 Oct-04 97.4 1.08463 Nov-04 Dec-04 Jan-05 98.4 1.09577 Feb-05 Mar-05 Apr-05 99.3 1.10579 May-05 Jun-05 Jul-05 99.7 1.11024 Aug-05 Sep-05 Oct-05 (Note 1) 100 2.06000 Nov-05  


Enclosure 2 PG&E Letter HBL-11-003 Page 6 of?
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU201 00000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU201 00000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
PG&E Letter HBL-11-003 Page 6 of?
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)             Factor Dec-05 Jan-06                   100.6             2.07236 Feb-06 Mar-06 Apr-06                   101.8             2.09708 May-06 Jun-06 Jul-06                   102.5             2.11150 Aug-06 Sep-06 Oct-06                     103             2.12180 Nov-06 Dec-06 Jan-07                   104.2             2.14652 Feb-07 Mar-07 Apr-07                   104.9             2.16094 May-07 Jun-07 Jul-07                   105.7             2.17742 Aug-07 Sep-07 Oct-07                   106.5             2.19390 Nov-07 Dec-07 Jan-08                   107.8             2.22068 Feb-08 Mar-08 Apr-08                   108.4             2.23304 May-08 Jun-08 Jul-08                   109.3             2.25158 Aug-08 Sep-08 Oct-08                   109.4             2.25364 Nov-08 Dec-08 Jan-09                   109.9             2.26394 Feb-09 Mar-09 Apr-09                     110             2.26600 May-09 Jun-09 Jul-09                   110.3             2.27218 Aug-09 Sep-09 Oct-09                   110.6             2.27836 Nov-09
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
Factor Dec-05 Jan-06 100.6 2.07236 Feb-06 Mar-06 Apr-06 101.8 2.09708 May-06 Jun-06 Jul-06 102.5 2.11150 Aug-06 Sep-06 Oct-06 103 2.12180 Nov-06 Dec-06 Jan-07 104.2 2.14652 Feb-07 Mar-07 Apr-07 104.9 2.16094 May-07 Jun-07 Jul-07 105.7 2.17742 Aug-07 Sep-07 Oct-07 106.5 2.19390 Nov-07 Dec-07 Jan-08 107.8 2.22068 Feb-08 Mar-08 Apr-08 108.4 2.23304 May-08 Jun-08 Jul-08 109.3 2.25158 Aug-08 Sep-08 Oct-08 109.4 2.25364 Nov-08 Dec-08 Jan-09 109.9 2.26394 Feb-09 Mar-09 Apr-09 110 2.26600 May-09 Jun-09 Jul-09 110.3 2.27218 Aug-09 Sep-09 Oct-09 110.6 2.27836 Nov-09  


Enclosure 2 PG&E Letter HBL-11-003 Page 7 of 7 Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)
Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
PG&E Letter HBL-11-003 Page 7 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.
Employment Cost Indust West Region               Labor Private Industry         Escalation (1989=100)               Factor Dec-09 Jan-10                   111.3             2.29278 Feb-10 Mar-10 Apr-10                   111.7             2.30102 May-10 Jun-10 Jul-10                   112.3             2.31338 Aug-10 Sep-10 Oct-10                   112.5             2.31750 Nov-10 Dec-10 Jan-11                   113.1             2.32986 Jan-11 is an estimate based on cyclical differences between 0409-0110 and 0408-0109; roughly .6.
Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)
 
Factor Dec-09 Jan-10 111.3 2.29278 Feb-10 Mar-10 Apr-10 111.7 2.30102 May-10 Jun-10 Jul-10 112.3 2.31338 Aug-10 Sep-10 Oct-10 112.5 2.31750 Nov-10 Dec-10 Jan-11 113.1 2.32986 Jan-11 is an estimate based on cyclical differences between 0409-0110 and 0408-0109; roughly.6.
Enclosure 3 PG&E Letter HBL-11-003 Humboldt Bay Power Plant, Unit 3 Decommissioning Cost Study Area-By-Area Estimate (7 pages)
PG&E Letter HBL-11-003 Humboldt Bay Power Plant, Unit 3 Decommissioning Cost Study Area-By-Area Estimate (7 pages)  


Humboldt Bay Power Plant Unit 3                                                                                                                              Humboldt Bay Power Plant, Unit 3                                                                                                                                                Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                                   PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D AREA-BY -AREA ESTIMATE                                                                                                                                                      Page 1 of 7 Thousands of 2008 Dollars                                                                                                            Thousands of 2011 Dollars Off-Site    LLRW                                                                                                                  Off-Site    LLRW                                        Burial/               Utility and Activity                                                                    Decon  Removal Packaging  Transport  Processing  Disposal  Other        Total        Total Class A  Class B  ClassC    GTCC    Decon  Removal  Packaging  Transport  Processing  Disposal    Other      Total      Total    Processed    Craft    Contractor Index                                Activity Description                    Cost    Cost    Costs      Costs      Costs      Costs    Costs    Contingency    Costs  Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Cost    Cost      Costs      Costs      Costs      Costs      Costs    Contingency  Costs    Wt., Lb$. Manhours  Manhours I
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I
PERIOD 2 - SAFSTOR Dormancy ISFSI Completed Projects ISFSI  Design & Licensing 1998-2000                                                                                          -  5,362                  5.362        -                  -        -      -                                                      -    5,362            -    5.362            -
PERIOD 2 - SAFSTOR Dormancy ISFSI Completed Projects ISFSI Design & Licensing 1998-2000 ISFSI Design & Licensing 2001 ISFSI Design & Licensing 2002 ISFSI Design & Licensing 2003 ISFSI Design & Licensing 2004 ISFSI Design & Licensing 2005 ISFSI Design & Licensing 2006 ISFSI Design/Licensing/Construction 2007 ISFSI Design/Licensing/Construction 2008 ISFSI Design/Licensing/Construction 2009 HBPP Unit #3 1996 - 2008 Completed Projects Dismantlement of Ventilation Stack Caisson In-Leakage Repair Suppression Chamber/Remove Baffling & Floor Plates Site Characterization for Dismantlement Miscellaneous Dismantlement Activities Planning Decommissioning Activity/Misc Dismantlement Activities Remove & Dispose Asbestos Radiological Characterization Plant Systems Irradiated Hardware Spent Fuel Pool Cleanout and Disposal Removal & Disposal Energy Absorber Removal & Disposal Control Rod Drive Hydraulic Pump Equipment Removal & Disposal Service Water Heat Exchanger Equipment Decon Cost Removal & Disposal Reactor Water Cleanup Demineralizer Resin Tank Removal/Disposal Class A Radioactive Waste Material Removal/Disposal Class B & C Materials inel Resin PERIOD 2 TOTALS I
ISFSI  Design & Licensing 2001                                                                                              -    398                    398        -                  -        -      -                              -                        -      398            -      398            -        -
PERIOD 3b - Planning and Preparation I
ISFSI  Design & Licensing 2002                                                                                              -    114                    114        -                  -              -                              -                        -      114            -      114            -
Period 3b Additional Costs 3b.2.1 Additional Support Facilities - Radiological Protection 3b.2.2 Additional Support Facilities - Access, Fencing, Laydown Areas 3b.2.3 Personnel & Material Access RB Access Shaft 3b.2.4 Cross Contamination Plan 3b.2.5 Replacement of Rad Protection Access Software System 3b.2.6 Employee Emergency Notification System 3b.2.7 Infrastructure for Facility Modifications 3b.2.8 Mixed Waste Disposal 3b.2.9 Rebuild Refueling Building Crane 3b.2.10 Sr-90 Groundwater Program 3b.2.11 Package Legacy Class B & C Waste 3b.2.12 Procure Initial Inventory of Tools and Equipment 3b.2 Subtotal Period 3b Additional Costs Period 3b Collateral Costs 3b.3.1 Decon equipment 954 3b.3.2 DOC staff relocation expenses 3b.3.3 Pipe cutting equipment 3b.3 Subtotal Period 3b Collateral Costs 954 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 14 Period 3b Period-Dependent Costs (continued) 3b.4.2 Insurance 3b.4.3 Property taxes 3b.4.4 Health physics supplies 3bA.5 Heavy equipment rental 3b.4.6 Disposal of DAW generated 3b.4.7 Plant energy budget 3b.4.8 NRC Fees 3b.4.9 Emergency Planning Fees 3bA.10 Environmental/ Engineering Support 3b.4.11 ISFSI Operating Costs 3b.4.12 Security Staff Cost 3bA.13 DOC Staff Cost 3b.4.14 Utility Staff Cost 3b.4 Subtotal Period 3b Period-Dependent Costs 14 3b.0 TOTAL PERIOD 3b COST 969 Removal Packaging Cost Costs 3
ISFSI  Design & Licensing 2003                                                                                              -  2,539                  2.539        -         -                -      -                             -            -          -    2,539            -    2,539            -
3 1,000 1,000 146 74 0
ISFSI  Design & Licensing 2004                                                                                  -          -  1,445                  1,445        -        -        -        -      -                              -                        -    1,445            -    1,445            -
219 0
ISFSI  Design & Licensing 2005                                                                      -            -          -  1,672                  1,672        -                  -        -      -        -                    -                        -    1,672            -    1,672            -
1,219 4
ISFSI  Design & Licensing 2006                                                                      -            -          -  3,547                  3,547        -        -        -              -       -                    -                            3,547                  3,547            -
Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 5,362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 1,385 378 520 720 480 320 720 7
ISFSI  Design/Licensing/Construction 2007                                                          -            -              9,509                  9,509        -        -        -        -              -          -                                        9,509                  9,509            -                      -
61 1,418 454 1,535 2,100 7
ISFSI  Design/Licensing/Construction 2008                                                          -            -            29,200                  29,200                  -        -       -      -        -          -                      -              29,200                  29,200            -
61 10,030 1,436 1,436 20 0
ISFSI  Design/Licensing/Construction 2009                                                          -                              500                    500                  -        -              -        -          -                      -          -      500                    500            -
29 45 61 25 999 21 897 2,151 1,246 0
HBPP Unit #3 1996 - 2008 Completed Projects Dismantlement of Ventilation Stack                                                                  -            -          -  5,740                  5,740        -        -        -                                                          -          -    5,740                  5,740            -        -
29 5,465 7
Caisson In-Leakage Repair                                                              -          -                        -  1,528                  1,528        -        -                        -                  -          -            -          -    1,528              -  1,528            -
90 16,931 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B ClassC Contingency Costs Cu. Feet Cu. Feet Cu. Feet 5.362 398 114 2.539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 267 1,652 73 451 100 620 180 900 120 600 80 400 180 900 21 92 126 273 1,691 87 541 296 1,831 405 2,505 2,083 12,183 126 613 1,568 277 1,713 321 1,321 1,211 4,602 5
Suppression Chamber/Remove Baffling & Floor Plates                                      -           -            -              7,931                  7,931                  -        -              -                                                            7,931                  7,931            -                      -
19 3
Site Characterization for Dismantlement                                                -          -            -              1,150                  1,150                                    -              -                    -                            1,150                  1,150             -                      -
23 47 192 24 97 9
Miscellaneous Dismantlement Activities                                                  -          -            -                300                    300                                    -      -                              -                              300              -    300            -        -            -
39 116 9
Planning Decommissioning Activity/Misc Dismantlement Activities                                    -            -                864                    864                                    -      -                    -        -            -          -      864              -    864            -        -            -
53 8
Remove & Dispose Asbestos                                                              -          -            -           -     800                    800                  -                -      -        -          -                                        800                    800            -        -            -
69 3
Radiological Characterization Plant Systems                                                                      -                732                    732                                            -        -          -                      -                  732                    732            -
28 192 1,191 4
Irradiated Hardware Spent Fuel Pool Cleanout and Disposal                                                        -              2,676                  2,676                                    -      -        -          -                      -          -    2,676              -  2,676             -        -            -
25 173 1,070 415 2,566 240 1,486 1,131 6,B60 116 4,425 23,645 242 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 4
Removal & Disposal Energy Absorber                                                                  -            -                122                    122        -        -        -              -        -          -                      -          -      122              -    122            -        -            -
8 70 4
Removal & Disposal Control Rod Drive Hydraulic Pump Equipment                                      -            -                201                    201                                                    -                                              -      201                    201            -                      -
8 70 1,010 1,058 1,010 1,058 15 154 78 0
Removal & Disposal Service Water Heat Exchanger Equipment                              -          -            -                  66                    66        -                  -        -      -                    -                      -          -      66                    66            -                      -
0 34 15 232 0
Removal & Disposal Reactor Water Cleanup Demineralizer Resin Tank                                                -                  37                    37        -        -        -              -                              -                        -      37                    37            -                      -
0 34 1,025 1,290 4
Removal/Disposal Class A Radioactive Waste Material                                                                              1,045                  1,045                                                                          -            -          -    1,045                  1,045            -
8 104 Other Total Costs Contingency 5,362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 1,465 282 400 77 564 109 762 190 508 127 338 85 762 190 23 1,500 289 480 93 1,666 321 2,221 428 10,609 2,203 649 1,519 293 340 1,519 1,281 5
Removal/Disposal Class B & C Materials inel Resin                                                                -              4,822                  4,822        -        -        -                                              -            -          -    4,822                  4,822            -                     -
21 3
PERIOD 2 TOTALS                                                                                                                  -          - 82,301                - 82,301        -        -        -        -      -        -                                                  82,301              -                    -
49 25 10 47 9
I PERIOD 3b - Planning and Preparation I
65 8
Period 3b Additional Costs 3b.2.1          Additional Support Facilities - Radiological Protection                                                          -          -  1,385            267  1,652                            -        -      -        -          -                      -          -    1,465          282    1,747            -
26 3
3b.2.2          Additional Support Facilities - Access, Fencing, Laydown Areas                                                                -    378            73    451                  -        -        -      -        -          -        -            -          -      400            77      477            -        -
1,056 204 22 4
3b.2.3          Personnel & Material Access RB Access Shaft                                              -                        -          -    520            100    620        -        -        -        -      -                    -                      -          -      564           109     672            -        -
949 183 2,276 439 1,318 254 5,781 1,196 17,909 4,681 Total Costs 5.362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 1,747 477 672 952 635 423 952 104 1,789 573 1,987 2,650 12,894 1,658 1,812 1,398 4,868 20 24 203 103 44 56 73 30 1,260 26 1,132 2,714 1,572 7,259 25,021 PG&E Letter HBL-11-003 Page 1 of 7 Burial/
3b.2.4          Cross Contamination Plan                                                                                                            720            180    900                            -        -                                    -            -          -      762           190     952            -
Utility and Processed Craft Contractor Wt., Lb$.
3b.2.5          Replacement of Rad Protection Access Software System                                                                          -    480            120    600                            -                        -                    -            -          -      508          127      635            -        -
Manhours Manhours 18,395 18,395 2,318 1
3b.2.6          Employee Emergency Notification System                                                                -          -                320            80    400                            -                        -                    -                        -      338            85      423            -        -
16,457 25,113 19,713 2,318 1
3b.2.7          Infrastructure for Facility Modifications                                                            -                            720            180    900                            -                                              -                              762          190      952            -
61,2B2 20,713 1
3b.2.8         Mixed Waste Disposal                                                                    3         7            -        61                      21      92      126                  -        -      -        -          4         8                      70          -          23      104      18,395          -
61,282  
3b.2.9          Rebuild Refueling Building Crane                                                                      -          -              1,418            273  1,691        -                  -              -        -          -        -                            1,500          289    1,789            -                      -
3b.2.10        Sr-90 Groundwater Program                                                                            -          -                454            87    541        -                  -        -      -        -          -        -            -          -      480            93      573            -
3b.2.11        Package Legacy Class B & C Waste                                                                                  -          -  1,535            296  1,831        -        -        -        -      -        -          -        -                            1,666          321    1,987            -                      -
3b.2.12         Procure Initial Inventory of Tools and Equipment                                                      -          -              2,100            405  2,505        -        -        -        -      -                    -                      -                2,221          428    2,650            -                      -
3b.2           Subtotal Period 3b Additional Costs                                                      3          7            -        61  10,030          2,083  12,183      126        -       -       -      -                  4          8            -        70    10,609        2,203  12,894      18,395                      -
Period 3b Collateral Costs 3b.3.1          Decon equipment                                                    954                                                        -                    613  1,568        -                  -          1,010                              -          -          -        -          649    1,658                      -            -
3b.3.2          DOC staff relocation expenses                                          -      -        -                                    -  1,436            277  1,713        -                  -                                    -          -                      -    1,519          293    1,812                      -
3b.3.3          Pipe cutting equipment                                                -  1,000                                  -          -        -          321  1,321        -                  -                  1,058            -          -                                            340    1,398                      -            -
3b.3            Subtotal Period 3b Collateral Costs                                954    1,000                                              -  1,436          1,211  4,602        -                  -          1,010  1,058            -          -                            1,519        1,281    4,868            -
Period 3b Period-Dependent Costs 3b.4.1          Decon supplies                                                      14        -                      -          -                                  5      19        -        -        -        -    15        -          -          -                      -                      5      20            -                      -
Period 3b Period-Dependent Costs (continued)                                                                                                                                                                              -        -          -                      -          -        -            -        -
3b.4.2          Insurance                                                              -                -            -          -                  20              3      23          -                -        -              -          -                      -          -      21            3      24            -                      -
3b.4.3          Property taxes                                                        -                              -          -                    -              -      -        -        -        -        -              -          -          -                      -        -                                                          -
3b.4.4          Health physics supplies                                                -    146          -          -          -                                47    192        -                  -        -            154          -          -                                            49      203            -                      -
3bA.5          Heavy equipment rental                                                -      74                      -                      -        -            24      97        -                  -                      78          -          -                                            25      103            -
3b.4.6          Disposal of DAW generated                                              -      -        0          0            -        29        -            9      39      116                  -        -              -          0          0                      34                    10      44        2,318        1 3b.4.7          Plant energy budget                                                            -          -          -          -          -      45              9      53          -                -                        -          -                                          47            9      56            -
3b.4.8          NRC Fees                                                                      -        -            -          -          -      61              8      69          -                -        -      -        -          -                      -          -        65            8      73                                    -
3b.4.9          Emergency Planning Fees                                                                  -            -          -          -      25              3      28          -                -        -      -                    -                      -                  26            3      30 3bA.10          Environmental/ Engineering Support                                            -          -          -          -                999            192  1,191          -        -        -        -      -        -          -                      -          -    1,056          204    1,260            -
3b.4.11        ISFSI Operating Costs                                                          -        -            -          -                  21              4      25          -        -        -        -      -                    -                                          22            4      26 3b.4.12        Security Staff Cost                                                    -      -        -            -          -          -    897            173  1,070          -        -        -        -      -                    -          -                              949          183    1,132            -                16,457 3bA.13          DOC Staff Cost                                                        -                  -          -          -              2,151            415  2,566          -                          -                          -          -                            2,276          439    2,714            -                25,113 3b.4.14        Utility Staff Cost                                                    -      -        -            -          -          -  1,246            240  1,486          -        -        -        -      -        -          -          -                        -  1,318          254    1,572            -                19,713 3b.4            Subtotal Period 3b Period-Dependent Costs                          14      219        0          0            -        29    5,465          1,131  6,B60      116                                15      232          0          0                      34    5,781        1,196    7,259        2,318         1     61,2B2 3b.0            TOTAL PERIOD 3b COST                                              969    1,219        4          7            -        90  16,931          4,425  23,645      242                              1,025    1,290          4          8                    104    17,909        4,681  25,021      20,713         1     61,282


Humboldt Bay Power Plant Unit 3                                                                                                                    Humboldt Bay Power Plant, Unit 3                                                                                                                                                      Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                               PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D AREA-BY-AREA ESTIMATE                                                                                                                                                              Page 2 of7 Thousands of 2008 Dollars                                                                                                                Thousands of 2011 Dollars Off*Site    LLRW                                                                                                                        Off*Site      LLRW                                      Burial I              Utility and Activity                                                          Decon  Removal Packaging  Transport  Processing  Disposal  Other        Total        Total Class A    Class B  Class C  GTCC    Decon  Removal   Packaging    Transport  Processing    Disposal  Other      Total      Total    Processed    Craft    Contractor Index                              Activity Description          Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency    Costs  Cu. Feet  Cu. Feet Cu. Feet Cu. Feet  Cost    Cost        Costs        Costs      Costs        Costs    Costs    Contingency  Costs      Wt., Lbs. Manhours  Manhours PERIOD 3 TOTALS                                                          969    1,219          4           7                      90  16,931          4,425  23,645      242          .                   1,025    1,290            4            8            .       104  17,909          4,681  25,021        20,713          1       61,282 PERIOD 4a
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description PERIOD 3 TOTALS PERIOD 4a
* Systems Removal Period 4a Direct Decommissioning Activities Removal of Major Equipment 4a.1.1           Main Turbine!Generator                                    -     555        70        102                  1,469        -            679  2,875    5,850          -                               587          74        127              -     1,825        -          718    3,331      488,000      3,392            -
* Systems Removal Period 4a Direct Decommissioning Activities Removal of Major Equipment 4a.1.1 Main Turbine!Generator 4a.1.2 Main Condensers 4a.1.3 Remove Spent Fuel Racks 4a.1.4 Fuel Pool Cleanup Disposal of Plant Systems 4a.1.5.1 RB2-1 4a.1.5.2 RB2-2 4a.1.5.3 RB2-3 4a.1.5.4 RB2-4 4a.1.5.5 RB2-5 4a.1.5.6 RB2-6 4a.1.5.7 RB3-1 4a.1.5.8 RB4-1 4a.1.5.9 TB1-1 4a.1.5.10 TB1-2 4a.1.5.11 TB1-3 4a.1.5.12 TB2-1 4a.1.5.13 TB2-2 4a.1.5.14 TB3*1 4a.1.5.15 TB3-2 4a.1.5.16 TB3-3 clean area 4a.1.5.17 TB4-1 4a.1.5.18 TB4-2 4a.1.5.19 TB5-1 4a.1.5.20 TB5-2 4a.1.5.21 TB6-1 4a.1.5.22 TB6-2 4a.1.5.23 YARD 4a.1.5.24 YD1-1 clean area 4a.1.5 Totals 4a.1.6 Scaffolding in support of decommissioning 4a.1 Subtotal Period 4a Activity Costs Period 4a Additional Costs 4a.2.1 Modifications Supporting Access for Equipment Removal 4a.2.2 Activation Analysis of Reactor Subtotal Period 4a Additional Costs Period 4a Collateral Costs 4a.3.1 Process liquid waste 4a.3.2 Small tool allowance 4a.3 Subtotal Period 4a Collateral Costs Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 4a.4.2 Insurance 4a.4.3 Property taxes 4a.4.4 Health physics supplies 4a.4.5 Heavy equipment rental 4a.4.6 Disposal of DAW generated 4a.4.7 Plant energy budget 4a.4.8 NRC Fees 4a.4.9 Emergency Planning Fees 4a.4.10 Environmental! Engineering Support 4a.4.11 ISFSI Operating Costs 4a.4.12 Security Staff Cost 4a.4.13 DOC Staff Cost 4a.4.14 Utility Staff Cost 4a.4 Subtotal Period 4a Period-Dependent Costs 4a.0 TOTAL PERIOD 4a COST PERIOD 4b - Reactor Vessel Removal Period 4b Direct Decommissioning Activities Nuclear Steam Supply System Removal 4b.1.1.1 CRDMs & Nls Removal 4b.1.1.2 I Reactor Vessel Internals Decon Removal Packaging Cost Cost Costs 969 1,219 4
4a.1.2          Main Condensers                                          -     496        914          41                  3,047        -         1,264  5,762  12,135          -        -       -              525        966          52              -     3,786        -       1,337    6,665      247,000      1,984            -
555 70 496 914 55 11 23 119 20 124 25 205 9
4a.1.3          Remove Spent Fuel Racks                                  55      11          23          21                    510        -           210    830    2,025          -        -        -    58        11          24          26              -      634        -          222      976        34,700        211            -
48 3
4a.1.4          Fuel Pool Cleanup                                                                                                  -     415            80    495                    -                 -      -          -            -                        -         -    439            85    524              -      750            -
284 54 367 24 95 14 148 30 283 122 4
Disposal of Plant Systems 4a.1.5.1         RB2-1                                                     -     119        20            6            -      169                      96    410      868          -                -      -      129          21            7            -      210        -          104      472        32,917      2,012            -
16 1,149 117 38 509 85 6
4a.1.5.2        RB2-2                                                            124          25          7            -      233                      119    509    1,089                            -      -      134          27            9            -      290        -          129      590        41,259      2,071            -
10 117 20 697 62 153 12 92 13 109 19 128 26 2
4a.1.5.3        RB2-3                                                            205          9          2             -        20                      74    310      322                                    -      222          10            3            -        25        -            80    340        12,297      3,538            -
15 4,719 654 151 4
4a.1.5.4        RB2-4                                                    -      48          3          1            -        8        -            18      78      123          -                        -        52            3            1                      10                      20      86        4,686        820            -
55 5,932 1,664 15 8
4a.1.5.5        RB2-5                                                    -      284          54          10            -       96        -            131    575    1,551          -                                308          59          12                    119                    142      641        59,756      4,801            -
93 15 93 8
4a.1.5.6         RB2-6                                                            367          24          7                      63        -            143    604    1,024          -                                398          26            8                      79        -          155      666        38,844      6,263            -
117 2,385 1,268 8
4a.1.5.7        RB3-1                                                     -      95          14          3             -        64                      53    229      407          -        -              -      103          15            3                     79        -           58    259        15,696      1,654            -
117 3,653 8
4a.1.5.8        RB4-1                                                            148          30          9            -      213                      121    520    1,354                            -      -      160          33          11                    264        -          132      599        51,348      2,506            -
187 9,679 1,680 4
4a.1.5.9        TB1-1                                                            283        122          41            -    1,620                      635  2,702    6,430                                  -      308        133            51            -    2,013                    689    3,193      242,716      4,932            -
31 104 13 1,774 1,656 Thousands of 2008 Dollars Off*Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 7
4a.1.5.10        TB1-2                                                              4                                     -          -                      1      5          -                                  -        4            -                        -                                1        5            -        68            -
90 16,931 102 1,469 41 3,047 21 510 415 6
4a.1.5.11        TB1-3                                                    -      16                                                -                      5      21          -                                          18            -                        -                                6      23            -      291            -
169 7
4a.1.5.12       TB2-1                                                          1,149        117          34            -   1,341        -            822  3,462    5,321                                    -   1,247        127          42              -    1,666                    891    3,973      201,577      19,280            -
233 2
4a.1.5.13        TB2-2                                                             38                                    -          -                    12      51          -                                          42            -            -            -                                13      55            -      692            -
20 1
4a.1.5.14        TB3*1                                                    -      509          85          23             -      429          -          316  1,361    3,601                            -              552          92          28              -      532        -          343    1,548      134,937      8,633            -
8 10 96 7
4a.1.5.15        TB3-2                                                      -      6                                    -          -        -            2      8          -                  -        -      -        7           -            -            -                  -            2        9            -      113            -
63 3
4a.1.5.16        TB3-3 clean area                                          -      10          -                        -          -      -              3      14          -                  -        -      -      11            -            -                      -        -            4      15            -      188            -
64 9
4a.1.5.17        TB4-1                                                     -      117          20          6             -      167       -            95    404      950                  -        -      -      126          21            7                     208        -          103      466        35,935      1,857            -
213 41 1,620 34 1,341 23 429 6
4a.1.5.18        TB4-2                                                    -      697          62          17                    458        -            382  1,615    2,602                  -        -      -      756          67          21                     569        -          415    1,827        98,837    11,710            -
167 17 458 3
4a.1.5.19        TB5-1                                                    -      153          12          3                     141        -           97    406      560                  -       -      -      166          13            4            -      175        -          105      464        20,574      2,617            -
141 3
4a.1.5.20        TB5-2                                                     -      92          13          3            -      107        -            66    280      498          -        -                -      100          14            4                    132                      72    322        18,961      1,543            -
107 5
4a.1.5.21        TB6-1                                                    -      109          19          5            -      131                      80     344      742          -        -                -      119           20            6                    162                      87    394        28,239      1,832            -
131 7
4a.1.5.22        TB6-2                                                     -    128          26          7            -      202          -          111    474    1,148          -        -                -      139          28            9                    251                    120      547        43,543      2,166            -
202 182 5,462 0
4a.1.5.23        YARD                                                      -        2                        -                              -              1       2                                              -        2            -                        -          -        -            1       2             -        31            -
10 6
4a.1.5.24       YD1-1 clean area                                          -      15                        -                              -              5      20                   -                        -      17            -                        -                  -            5      22            -      278            -
346 10 10,495 415 170 80 250 34 26 34 26 162 3
4a.1.5          Totals                                                    -  4,719        654        182                  5,462          -        3,390  14,406  28,591          -                              5,121        710          226                    6,785                  3,678  16,519    1,082,122      79,898            -
844 459 1,316 202 7,273 170 7,182 21,109 12,325 3
4a.1.6          Scaffolding in support of decommissioning                -      151          4          0          10          6        -            53    225        20                                          164            4            0            13        8        -            58    247        5,967        825            -
844 50,198 383 10 11,365 50,863 20 202 384 1,497 119 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 4,425 23,645 242 679 2,875 5,850 1,264 5,762 12,135 210 830 2,025 80 495 96 410 868 119 509 1,089 74 310 322 18 78 123 131 575 1,551 143 604 1,024 53 229 407 121 520 1,354 635 2,702 6,430 1
4a.1             Subtotal Period 4a Activity Costs                        55    5,932      1,664        346            10    10,495      415          5,675  24,593  48,622          -                -    60    6,437      1,806          430            13    13,037      451        6,158  28,392    1,857,788      87,060            -
5 5
Period 4a Additional Costs 4a.2.1          Modifications Supporting Access for Equipment Removal              -                                    -          -    170            33    203          -                          -      -                                                          -    184            36    220              -          -            -
21 822 3,462 5,321 12 51 316 1,361 3,601 2
4a.2.2          Activation Analysis of Reactor                            -        -          -            -            -          -      80            20     100          -        -                -      -        -                        -            -          -      87            22    109              -          -            -
8 3
Subtotal Period 4a Additional Costs                                                                      -          -    250            53    303          -                          -      -                      -                                          271            57    328              -          -            -
14 95 404 950 382 1,615 2,602 97 406 560 66 280 498 80 344 742 111 474 1,148 1
Period 4a Collateral Costs 4a.3.1           Process liquid waste                                    15        -          8          34            -        26                      26    108      104          -                      17         -          8           42                     33                     28    127        6,251        27            -
2 5
4a.3.2          Small tool allowance                                      -      93                                    -                  -            30    123          -        -                                101            -            -            -          -        -            33     134              -          -            -
20 3,390 14,406 28,591 53 225 20 5,675 24,593 48,622 33 203 20 100 53 303 26 108 104 30 123 56 232 104 37 154 21 183 766 3,152 407 1,675 273 1,128 3,349 89 548 169 1,485 26 228 1,402 8,675 33 203 1,384 8,567 4,069 25,177 2,376 14,700 11,052 65,875 3,349 16,835 91,003 52,075 95 456 913 3,358 8,802 506 470 Thousands of 2011 Dollars Off*Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 1,025 1,290 4
4a.3            Subtotal Period 4a Collateral Costs                      15      93          8          34            -        26        -            56    232      104          -        -              17       101            8          42                      33        -            60    261        6,251        27            -
8 104 587 74 127 1,825 525 966 52 3,786 58 11 24 26 634 129 21 7
Period 4a Period-Dependent Costs 4a.4.1           Decon supplies                                          117                                                        -        -            37    154          -                          -    127          -          -                        -                                41      167            -          -            -
210 134 27 9
4a.4.2          Insurance                                                  -                                -                      -    162            21    183          -                          -      -                                                                176            23     199            -          -            -
290 222 10 3
4a.4.3          Property taxes                                            -        -          -          -                      -        -              -      -        -        -        -        -      -          -          -                        -                                          -            -          -            -
25 52 3
4a.4.4          Health physics supplies                                    -  2,385            -          -                      -        -          766  3,152          -        -        -        -            2,588            -            -            -                  -          832    3,420              -          -            -
1 10 308 59 12 119 398 26 8
4a.4.5          Heavy equipment rental                                        1,268                                                -        -          407  1,675          -                  -                    1,376                                      -                              442    1,818              -                      -
79 103 15 3
4a.4.6          Disposal of DAW generated                                                      8          3            -      844        -          273  1,128    3,349          -        -                -                    9            4            -    1,048        -          296   1,358        66,974        22            -
79 160 33 11 264 308 133 51 2,013 4
4a.4.7          Plant energy budget                                                                                      -          -    459            89    548                    -        -        -                                          -            -          -    498            96    595              -                      -
18 1,247 127 42 1,666 42 552 92 28 532 7
4a.4.8          NRC Fees                                                                                                                1,316            169  1,485                            -                                                                            -  1,428            184  1,612              -          -            -
11 126 21 7
4a.4.9           Emergency Planning Fees                                    -                                                             202            26    228          -                 -                -          -            -                        -                219            28    247              -                      -
208 756 67 21 569 166 13 4
4a.4.10          Environmental! Engineering Support                        -                                                        -  7,273          1,402  8,675          -                -        -      -          -            -                        -              7,892        1,521    9,413              -                      -
175 100 14 4
4a.4.11          ISFSI Operating Costs                                                                                                    170            33    203          -                -        -                  -            -                        -                184            36    220              -          -
132 119 20 6
4a.4.12          Security Staff Cost                                        -                                -                      -  7,182          1,384  8,567          -                  -        -                  -                                                    7,794        1,502    9,296              -          -    133,486 4a.4.13          DOC Staff Cost                                            -        -                                              -  21,109          4,069  25,177          -        -        -        -                                          -            -            22,905        4,415  27,320                        -    251,787 4a.4.14          Utility Staff Cost                                                  -                                              -  12,325          2,376  14,700          -                -        -      -                                                -        -  13,374        2,578  15,951                        -    213,619 4a.4            Subtotal Period 4a Period-Dependent Costs              117    3,653          8            3            -      844  50,198        11,052  65,875    3,349                  -            127    3,964            9            4              -    1,048  54,471        11,992  71,616        66,974         22     598,892 4a.0            TOTAL PERIOD 4a COST                                    187    9,679      1,680        383            10  11,365    50,863        16,835  91,003    52,075                  -            203    10,503        1,823        476            13    14,118  55,193        18,268  100,597    1,931,014    87,108    598,892 PERIOD 4b - Reactor Vessel Removal Period 4b Direct Decommissioning Activities                                                                                                                                                                                  -            -          -                      -                                -
162 139 28 9
Nuclear Steam Supply System Removal 4b.1.1.1        CRDMs & Nls Removal                                      4      31        104          20                    202                      95    456      913                  -        -      5        33        113          25                    251                    103      530      24,050        628            -
251 2
4b.1.1.2        IReactor Vessel Internals                                13    1,774      1,656        384              -    1,497      119          3,358  8,802        506                470              14    1,925        1,797        477                    1,859      129        3,644    9,846        60,589     13,200           660
17 5,121 710 226 6,785 164 4
0 13 8
60 6,437 1,806 430 13 13,037 17 8
42 33 101 17 101 8
42 33 127 2,588 1,376 9
4 1,048 127 3,964 9
4 1,048 203 10,503 1,823 476 13 14,118 5
33 113 25 251 14 1,925 1,797 477 1,859 Other Total Total Costs Contingency Costs 17,909 4,681 25,021 718 3,331 1,337 6,665 222 976 439 85 524 104 472 129 590 80 340 20 86 142 641 155 666 58 259 132 599 689 3,193 1
5 6
23 891 3,973 13 55 343 1,548 2
9 4
15 103 466 415 1,827 105 464 72 322 87 394 120 547 1
2 5
22 3,678 16,519 58 247 451 6,158 28,392 184 36 220 87 22 109 271 57 328 28 127 33 134 60 261 41 167 176 23 199 832 3,420 442 1,818 296 1,358 498 96 595 1,428 184 1,612 219 28 247 7,892 1,521 9,413 184 36 220 7,794 1,502 9,296 22,905 4,415 27,320 13,374 2,578 15,951 54,471 11,992 71,616 55,193 18,268 100,597 103 530 129 3,644 9,846 PG&E Letter HBL-11-003 Page 2 of7 Burial I Utility and Processed Craft Contractor Wt., Lbs.
Manhours Manhours 20,713 1
61,282 488,000 3,392 247,000 1,984 34,700 211 750 32,917 2,012 41,259 2,071 12,297 3,538 4,686 820 59,756 4,801 38,844 6,263 15,696 1,654 51,348 2,506 242,716 4,932 68 291 201,577 19,280 692 134,937 8,633 113 188 35,935 1,857 98,837 11,710 20,574 2,617 18,961 1,543 28,239 1,832 43,543 2,166 31 278 1,082,122 79,898 5,967 825 1,857,788 87,060 6,251 27 6,251 27 66,974 22 133,486 251,787 213,619 66,974 22 598,892 1,931,014 87,108 598,892 24,050 628 60,589 13,200 660  


Humboldt Bay Power Plant Unit 3                                                                                                          Humboldt Bay Power Plant, Unit 3                                                                                                                                                      Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                   PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D AREA-BY-AREA ESTIMATE                                                                                                                                                              Page 3 of 7 Thousands of 2008 Dollars                                                                                                                Thousands of 2011 Dollars Off-Site    LLRW                                                                                                                        Off-Site    LLRW                                      Burial I                Utility and Activity                                                Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total        Total Class A  Class B  Class C    GTCC    Decon  Removal    Packaging  Transport  Processing  Disposal  Other      Total    Total    Processed      Craft    Contractor Index                            Activity Description Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency    Costs  Cu. Feet  Cu. Feet  Cu. Feet  Cu. Feet Cost    Cost        Costs      Costs      Costs      Costs    Costs    Contingency  Costs    Wt., Lbs. Manhours    Manhours 4b.l.l.3        Reactor Vessel                                  2    4,098        536        132                  7,966      119        9.306  22.158      381    2,699          -         -      2    4,447        581        164              -    9.896      129        10,098 25.317      298.310      13.200          660 4b.l.l          Totals                                        20    5,903      2,296        536            -     9.664      238        12.759  31.416    1.800    2,699        470        -   21      6,406      2,491        666              -  12.006      258        13.845 35.693      382.950      27.028        1.320 Disposal of Plant Systems 4b.l.2.1       RB2-7                                                  306        28            6            -      108                    138    585      904                  -        -      -      332          30          7            -      134        -          149    653      34,459      5.136 4b.l.2.2       RB2-8                                        115      269        62          21            -      203                    237    906    3.267        -        -        -  125        291          67        26              -      252        -          257  1.018      123.326      6.053 4b.l.2.3       RB2-9                                        115      267          59          20            -      192                    233    886    3.104                  -        -  125        290          64        24              -      239                    253    994      117.173      6.249 4b.l.2.4       RW1-1                                                  265        27            7                    283                    181    764    1.124                            -      -      288          30          9            -      352                    196    875      42,705      4.503 4b.l.2.5        RWl-2                                                  269          54          16            -      161                    148    648    2.604                            -      -      292          59        19              -      201                    161    731      92.757      4.611              -
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4b.l.l.3 Reactor Vessel 4b.l.l Totals Disposal of Plant Systems 4b.l.2.1 RB2-7 4b.l.2.2 RB2-8 4b.l.2.3 RB2-9 4b.l.2.4 RW1-1 4b.l.2.5 RWl-2 4b.l.2.6 RWl-3 4b.l.2.7 RWl-4 4b.1.2.8 RWl-5 4b.l.2.9 RWl-6 4b.l.2.10 RWl-7 4b.l.2.11 RWl-8 4b.l.2.12 RWl-9 4b.l.2.13 RWP 4b.l.2 Totals 4b.l.3 Scaffolding in support of decommissioning 4b.l Subtotal Period 4b Activity Costs Period 4b Additional Costs 4b.2.1 Discharge Piping 4b.2.2 Asbestos Removal 4b.2.3 Expand Waste Packaging Laydown Area 4b.2 Subtotal Period 4b Additional Costs Period 4b Collateral Costs 4b.3.1 Process liquid waste 4b.3.2 Small tool allowance 4b.3 Subtotal Period 4b Collateral Costs Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 4b.4.2 Insurance 4b.4.3 Property taxes 4b.4.4 Health physics supplies 4b.4.5 Heavy equipment rental 4b.4.6 Disposal of DAW generated 4b.4.7 Plant energy budget 4b.4.8 NRC Fees 4b.4.9 Emergency Planning Fees 4b.4.10 Environmental I Engineering Support 4b.4.11 Radwaste Processing Equipment/Services 4b.4.12 ISFSI Operating Costs 4b.4.13 Security Staff Cost 4b.4.14 DOC Staff Cost 4b.4.15 Utility Staff Cost 4b.4 Subtotal Period 4b Period-Dependent Costs 4b.0 TOTAL PERIOD 4b COST PERIOD 4c - Prepare Buildings for Demolition Period 4c Direct Decommissioning Activities Disposal of Plant Systems 4c.1.1.1 HMS1-l 4c.l.1.2 HMSl-2 4c.1.1.3 HMSP 4c.l.l.4 OTS-l 4c.l.l.5 OTS-2 4c.l.l.6 OTS-3 4c.l.l.7 OTS-4 4c.l.1.8 OTS-5 4c.l.l.9 OTS-6 4c.l.l.10 RB1-l 4c.l.1.11 RBl-2 4c.l.1.12 RBl-3 4c.l.1.13 RBl-4 4c.1.1.14 RBl-5 4c.l.1.15 RBl-6 4c.1.1.16 RB3-2 4c.l.l.17 RB4-2 4c.l.1.18 RB5-1 4c.l.l.19 RB5-1 (HVAC Scope)
4b.l.2.6        RWl-3                                                    5          1          0            -          8                      4     19        34                            -      -          6          1          0            -      10                      5      21        1.303          87            -
Decon Removal Packaging Cost Cost Costs 2
4b.l.2.7        RWl-4                                                   122          15          4           -      173                      98    412      741        -                  -      -      133          16          5            -      214                    106    475      26.242      2.124              -
4,098 536 20 5,903 2,296 306 28 115 269 62 115 267 59 265 27 269 54 5
4b.1.2.8        RWl-5                                                  108          11          3                    140                      82    343      554        -                  -      -      117          12          4            -      173                      88    395      19,650      1.875              -
1 122 15 108 11 49 14 19 5
4b.l.2.9        RWl-6                                                    49          14          4            -         44                    32    144      708        -        -        -      -        53          15          6            -      55        -            35    164      26.687        784              -
5 1
4b.l.2.10      RWl-7                                                    19          5          1                      11        -          10      47      172        -        -        -      -        21            5          1             -      13                      11      52        6.568        295 4b.l.2.11      RWl-8                                                    5          1          0                      2                      3      11        34                            -      -          6          1          0            -        3        -            3      12        1.311          83 4b.l.2.12      RWl-9                                            -       4           0          0            -          1                     2      7        17        -         -         -      -          4          0          0            -        1        -            2        8          626          69 4b.l.2.13      RWP                                              -     178                                    -          -                    57    235          -        -        -        -      -      193                                      -                  -            62    255              -    3.080 4b.l.2          Totals                                        230    1.867        277          83            -     1.325                  1.225  5.006  13.264                              -   249      2.026        300        103              -    1.646        -        1.329  5.653      492.806      34,951              -
4 0
4b.l.3          Scaffolding in support of decommissioning        -     189          5          0          13          8                    66    281        25                            -     -      205            5          0          16        10        -           72    309        7,458      1,031              -
178 230 1.867 277 189 5
4b.l            Subtotal Period 4b Activity Costs             249    7,959      2.577        619            13    10.998      238        14,050  36,703  15.089      2,699      470        -  271      8,637      2.797        769            16    13.662      258        15.246 41.655      883,214      63.010        1.320 Period 4b Additional Costs 4b.2.1          Discharge Piping                              50       21           9         36            -      144          -          94    354    2,361                  -        -    55        23          10        45              -      179        -          102    413      165.240        811              -
249 7,959 2.577 50 21 9
4b.2.2         Asbestos Removal                                                                              -          -    285            55    340          -                  -        -      -          -          -          -            -        -      309            60    369                          -
50 21 9
4b.2.3         Expand Waste Packaging Laydown Area                                    -          -          -          -    136            26    162          -        -        -        -      -          -                      -            -        -      147            28    176                          -
31 15 73 31 73 15 475 1,822 2,261 6
4b.2           Subtotal Period 4b Additional Costs            50        21          9         36                    144      421          175    856    2,361                            -   55        23          10        45              -      179      457          190    957      165,240        811 Period 4b Collateral Costs 4b.3.1         Process liquid waste                          31          -        15          68            -        53        -          52    218      210                  -        -    33            -        16          84            -      66        -            56    256      12,581          55 4b.3.2          Small tool allowance                            -      73                        -          -          -        -          23      96          -                  -        -      -        79                                      -        -        -            25    104              -          -
475 4,083 6
                                                                                                                                                                                                            -          -                                    -        -                              -
806 12,136 2,608 36 8
4b.3           Subtotal Period 4b Collateral Costs            31        73          15          68                      53        -          75    314      210                            -    33        79          16          84            -      66          -          81    360      12,581          55            -
5 3
Period 4b Period-Dependent Costs 4b.4.1         Decon supplies                                475          -                                                        -          153    628          -                            -  516            -          -          -            -        -        -          166    681              -          -
6 1
4b.4.2         Insurance                                                                                                        122            16    138          -       -                   -      -          -          -          -            -        -      132            17    150              -          -
6 6
4b.4.3          Property taxes                                  -        -                                  -                    -            -      -        -                            -      -          -          -          -            -        -        -                                  -          -
7 6
4b.4.4          Health physics supplies                          -    1,822                                    -                    -          585  2,407          -        -                  -      -    1,977            -          -                      -        -          635  2.612              -          -
25 3
4b.4.5          Heavy equipment rental                          -    2,261                                                        -          726  2,988          -        -                  -      -    2,454            -          -            -        -        -          788  3.242              -          -
1 88 8
4b.4.6          Disposal of DAW generated                                            6          3                    652          -          211    872    2,587                            -      -          -          7           3                    810          -          229  1,049      51,732          17 4b.4.7          Plant energy budget                                                                -          -                273            53    325          -        -                  -      -          -          -          -            -        -      296            57    353              -          -            -
32 3
4b.4.8          NRC Fees                                        -                    -                      -          -    990          127  1,117          -        -        -        -      -          -          -                                  -    1.074          138   1.212              -          -            -
21 2
4b.4.9          Emergency Planning Fees                          -        -          -                                        152           20    171          -                            -      -          -          -                                  -      165            21    186              -          -
116 14 127 16 52 211 20 15 3
4b.4.10        Environmental I Engineering Support                                    -                      -          -  4.225          814  5,039          -                  -        -      -          -          -                                  -    4,584          884  5,468              -          -            -
62 7
4b.4.11        Radwaste Processing Equipment/Services                                -                      -          -    564          109    673          -                  -        -      -          -          -          -            -        -      612          118    730              -          -            -
23 3
4b.4.12         ISFSI Operating Costs                                                  -                      -          -    128            25    152          -                  -        -      -          -          -          -                      -      139            27    165              -          -            -
22 9
4b.4.13        Security Staff Cost                                                    -          -                      -  5.387        1,038  6,425          -                  -        -      -         -          -                                  -  5,846        1,127  6.972              -          -    100.389 4b.4.14        DOC Staff Cost                                  -                                            -              14.641        2.822  17,463          -                            -      -          -          -          -                      -  15.887        3.062  18.949              -          -    177.845 4b.4.15        Utility Staff Cost                                                                            -              9,835        1,896  11,731          -                            -                  -          -          -                      -  10,673        2.057  12.730              -          -    168.370 4b.4           Subtotal Period 4b Period-Dependent Costs    475    4,083          6           3           -      652  36,316          8,594  50,129    2,587                    -        -  516     4,430            7           3                   810   39,407        9,325  54,499      51,732          17    446.604 4b.0            TOTAL PERIOD 4b COST                          806    12,136      2,608        725            13    11.847  36.975        22,894  88.003    20.246    2.699      470        -  874    13.169      2.830        900            16  14,717    40.122        24.843  97,471    1.112.768      63.892      447.924 PERIOD 4c - Prepare Buildings for Demolition Period 4c Direct Decommissioning Activities Disposal of Plant Systems 4c.1.1.1        HMS1-l                                                  36          8           3            -        34        -          24    105      419                    -                -      39            9          3                    42          -          26    119      15.816        601 4c.l.1.2       HMSl-2                                                    5          3           1           -          9        -            5      24      152                    -        -      -        6          3          1                     12          -            6      28        5.726          96 4c.1.1.3        HMSP                                                      6           1          0            -          2                      3     12        34                    -                          7          1          0                      3        -            3      13        1.275          99 4c.l.l.4        OTS-l                                                    6                                   -                    -            2       7          -                  -                          6            -          -                      -        -            2       8             -      101              -
Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 132 7,966 119 536 9.664 238 6
4c.l.l.5        OTS-2                                                     6                                    -                    -            2      8         -        -        -                          6            -           -                       -        -            2        8            -      102 4c.l.l.6        OTS-3                                                    7                                    -                    -            2      10          -                  -                          8            -          -                      -        -            3      11            -      132              -
108 21 203 20 192 7
4c.l.l.7        OTS-4                                            -        6                                   -          -        -            2      8          -                  -        -      -        6           -                        -          -        -            2        8            -      103              -
283 16 161 0
4c.l.1.8        OTS-5                                            -      25          3          1           -        21        -          15      65        84          -        -                -      27            3          1                    26         -          17      74        3.217        418              -
8 4
4c.l.l.9        OTS-6                                            -        1                                   -          -                    0        1        -                  -        -      -        1           -                                  -        -            0        1            -        13            -
173 3
4c.l.l.10      RB1-l                                                    88          8          2            -        91                    59    248      361                                            95            9          3                    113          -          64    284        13.723      1.508 4c.l.1.11      RBl-2                                                    32          3           1           -        29        -          20      85      116                    -        -      -      35            3          1                      36        -          22      97        4,417       544             -
140 4
4c.l.1.12      RBl-3                                            -      21          2          1            -          7        -            9      40      106                    -                        23            2           1                      8        -          10      44        4.001        368              -
44 1
4c.l.1.13      RBl-4                                                  116          14          4            -        50        -          56    239      611                    -        -              126          16          5                     61          -          60    268      23.199      1.990 4c.1.1.14      RBl-5                                                  127          16          4            -        44        -          58    249      711                    -                      138          17          5                      55        -          63    277      26.146      2.170              -
11 0
4c.l.1.15      RBl-6                                          52      211          20          6            -      228          -          178    695      907          -        -              57      229          22          7                    284          -          193    791      34.362      4.245 4c.1.1.16      RB3-2                                            -      15          3          1            -        22        -          12      53        93          -        -                -        16          3          1                      27        -          13      61        3,566        265 4c.l.l.17      RB4-2                                                    62          7          2            -        76        -          46    193      325                    -        -              68            7          2            -        94        -          50    221        11.592      1.082 4c.l.1.18      RB5-1                                            -      23          3          1            -        9        -          11      47      148          -        -        -      -        25          3          1                      11        -          12      53        5.513        381 4c.l.l.19      RB5-1 (HVAC Scope)                              -      22          9            3            -        29                    18      80      467                    -        -              23          10          4                      36        -          19      92        17,640       319
2 0
1 83 1.325 0
13 8
619 13 10.998 238 36 144 285 136 36 144 421 68 53 68 53 122 3
652 273 990 152 4.225 564 128 5.387 14.641 9,835 3
652 36,316 725 13 11.847 36.975 3
34 1
9 0
2 1
21 2
91 1
29 1
7 4
50 4
44 6
228 1
22 2
76 1
9 3
29 Humboldt Bay Power Plant, Unit 3 AREA-BY-AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 9.306 22.158 381 2,699 12.759 31.416 1.800 2,699 470 138 585 904 237 906 3.267 233 886 3.104 181 764 1.124 148 648 2.604 4
19 34 98 412 741 82 343 554 32 144 708 10 47 172 3
11 34 2
7 17 57 235 1.225 5.006 13.264 66 281 25 14,050 36,703 15.089 2,699 470 94 354 2,361 55 340 26 162 175 856 2,361 52 218 210 23 96 75 314 210 153 628 16 138 585 2,407 726 2,988 211 872 2,587 53 325 127 1,117 20 171 814 5,039 109 673 25 152 1,038 6,425 2.822 17,463 1,896 11,731 8,594 50,129 2,587 22,894 88.003 20.246 2.699 470 24 105 419 5
24 152 3
12 34 2
7 2
8 2
10 2
8 15 65 84 0
1 59 248 361 20 85 116 9
40 106 56 239 611 58 249 711 178 695 907 12 53 93 46 193 325 11 47 148 18 80 467 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 2
4,447 581 164 9.896 21 6,406 2,491 666 12.006 332 30 7
134 125 291 67 26 252 125 290 64 24 239 288 30 9
352 292 59 19 201 6
1 0
10 133 16 5
214 117 12 4
173 53 15 6
55 21 5
1 13 6
1 0
3 4
0 0
1 193 249 2.026 300 103 1.646 205 5
0 16 10 271 8,637 2.797 769 16 13.662 55 23 10 45 179 55 23 10 45 179 33 16 84 66 79 33 79 16 84 66 516 1,977 2,454 7
3 810 516 4,430 7
3 810 874 13.169 2.830 900 16 14,717 39 9
3 42 6
3 1
12 7
1 0
3 6
6 8
6 27 3
1 26 1
95 9
3 113 35 3
1 36 23 2
1 8
126 16 5
61 138 17 5
55 57 229 22 7
284 16 3
1 27 68 7
2 94 25 3
1 11 23 10 4
36 Other Total Total Costs Contingency Costs 129 10,098 25.317 258 13.845 35.693 149 653 257 1.018 253 994 196 875 161 731 5
21 106 475 88 395 35 164 11 52 3
12 2
8 62 255 1.329 5.653 72 309 258 15.246 41.655 102 413 309 60 369 147 28 176 457 190 957 56 256 25 104 81 360 166 681 132 17 150 635 2.612 788 3.242 229 1,049 296 57 353 1.074 138 1.212 165 21 186 4,584 884 5,468 612 118 730 139 27 165 5,846 1,127 6.972 15.887 3.062 18.949 10,673 2.057 12.730 39,407 9,325 54,499 40.122 24.843 97,471 26 119 6
28 3
13 2
8 2
8 3
11 2
8 17 74 0
1 64 284 22 97 10 44 60 268 63 277 193 791 13 61 50 221 12 53 19 92 PG&E Letter HBL-11-003 Page 3 of 7 Burial I Utility and Processed Craft Contractor Wt., Lbs.
Manhours Manhours 298.310 13.200 660 382.950 27.028 1.320 34,459 5.136 123.326 6.053 117.173 6.249 42,705 4.503 92.757 4.611 1.303 87 26.242 2.124 19,650 1.875 26.687 784 6.568 295 1.311 83 626 69 3.080 492.806 34,951 7,458 1,031 883,214 63.010 1.320 165.240 811 165,240 811 12,581 55 12,581 55 51,732 17 100.389 177.845 168.370 51,732 17 446.604 1.112.768 63.892 447.924 15.816 601 5.726 96 1.275 99 101 102 132 103 3.217 418 13 13.723 1.508 4,417 544 4.001 368 23.199 1.990 26.146 2.170 34.362 4.245 3,566 265 11.592 1.082 5.513 381 17,640 319  


Humboldt Bay Power Plant Unit 3                                                                                                          Humboldt Bay Power Plant, Unit 3                                                                                                                                                      Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                     PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D AREA-BY-AREA ESTIMATE                                                                                                                                                                Page 4 of 7 Thousands of 2008 Dollars                                                                                                            Thousands of 2011 Dollars Off*Site    LLRW                                                                                                                      Off*Site    LLRW                                        Burial!                Utility and Activity                                                  Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total        Total Class A  Class B  Class C  GTCC    Decon  Removal    Packaging    Transport    Processing  Disposal  Other      Total      Total    Processed      Craft    Contractor Index                              Activity Description  Cost    Cost      Costs      Costs      Costs      Costs    Costs  Contingency    Costs  Cu. Feet  Cu. Feet Cu. Feet Cu. Feet Cost    Cost        Costs        Costs        Costs      Costs    Costs    Contingency  Costs      WI., Lbs. Manhours    Manhours 4c.1.1.20      RBP                                              23      199          2          2                      8                    82    315      135        .        -        -    25      215            2            2            -        10        -            89      344          9,465      2,710 4c.1.1.21      TB7-1                                             -     59                                                                    19      78          -                -              -        64            -          -            -          -        -            21        85            -      1,067 4c.1.1.22      TB7*2                                                     9            -                      -          -                    3      13          -                -        -    -        10            -                        -          -                      3      14            -        171 4c.1.1.23      TB7*3                                                    11          4          1            -         13                    9      38      209                  -        -    -        12            4            2            -        16        -              9      43        7,906        161 4c.1.1.24      TB7-4                                                     13                      0            -          3        -                            28                  -        -    -        14            1                         -        3        -             5       23        1,040        227 4c.1.1.25      TB7-5                                                    27 1
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4c.1.1.20 RBP 4c.1.1.21 TB7-1 4c.1.1.22 TB7*2 4c.1.1.23 TB7*3 4c.1.1.24 TB7-4 4c.1.1.25 TB7-5 4c.1.1.26 TB7-6 Disposal of Plant Systems (continued) 4c.1.1.27 TB7-7 4c.1.1.28 TBP 4c.1.1.29 YD1-2 4c.1.1.30 YD1-5 4c.1.1.31 YD2*1 4c.1.1.32 YD2-2 4c.1.1.33 YD2-3 4c.1.1.34 YD2-4 4c.1.1.35 YD2-5 4c.1.1.36 YD2-6 4c.1.1.37 YDP 4c.1.1 Totals 4c.1.2 Scaffolding in support of decommissioning Decontamination of Site Buildings 4c.1.3.1 HMS 4c.1.3.2 Hot Machine Shop & Calibration 4c.1.3.3 RBi 4c.1.3.4 RB2 4c.1.3.5 RB3 4c.1.3.6 RB4 4c.1.3.7 RB5-1 (Refuel Bldg Roof) 4c.1.3.8 RW1 4c.1.3.9 Refueling 4c.1.3.10 TB1 4c.1.3.11 TB2 4c.1.3.12 TB3 4c.1.3.13 TB4 4c.1.3.14 TB5 4c.1.3.15 TB6 4c.1.3.16 TB7 4c.1.3.17 Turbine 4c.1.3.18 YD1 4c.1.3.19 YD2 4c.1.3 Totals 4c.1 Activity Costs Period 4c Additional Costs 4c.2.1 Contaminated Soil Removal 4c.2.2 Replacement of Drains and Catch Basins 4c.2.3 Caisson Mixed Waste Removal 4c.2.4 Site work supporting spent fuel pool removal 4c.2.5 Removal of 3 spent fuel pool walls 4c.2.6 Removal of Yard Pipe Tunnel 4c.2.7 Contaminated Soil & Concrete Storage Facility 4c.2 Total Period 4c Collateral Costs 4c.3.1 Process liquid waste 4c.3.2 Small tool allowance 4c.3.3 Decommissioning Equipment Disposition 4c.3 Subtotal Period 4c Collateral Costs Period 4c Period.Dependent Costs 4c.4.1 Decon supplies 4c.4.2 Insurance 4c.4.3 Property taxes 4c.4.4 Health physics supplies 4c.4.5 Heavy equipment rental Period 4c Period*Dependent Costs (continued) 4c.4.6 Disposal of DAW generated 4c.4.7 Plant energy budget 4c.4.8 NRC Fees 4c.4.9 Emergency Planning Fees 4c.4.10 Environmental I Engineering Support 4c.4.11 Radwaste Processing Equipment/Services 4c.4.12 ISFSI Operating Costs 4c.4.13 Security Staff Cost 4c.4.14 DOC Staff Cost 4c.4.15 Utility Staff Cost Decon Removal Packaging Cost Cost Costs 23 199 2
8          2            -        11        -
59 9
5 13 21 61      348                  -        -    -        29            8            ° 3            -        13                      15        68      13,169        427 4c.1.1.26      TB7-6                                                    39          10          3           -      100        -          47    199      514                  -              -        42          11            4             -      125        -            51      233        19,435        587 Disposal of Plant Systems (continued)                                                                                                                                                                -          -                        -            -          -        -              -        -
11 4
4c.1.1.27      TB7-7                                                    13                                                -      -            4      18          -                -              -        14                                      -          -                      5      19                      240 4c.1.1.28      TBP                                                    1,000                                                -      -         321  1,322          -                -                    1,086            -            -            -          -                    349    1,434                    17,317 4c.1.1.29      YD1-2                                              -      7          2          1            -        31        -          13      55      124        -        -                        8            3            1            -        39                      14        64        4,692        104              -
13 1
4c.1.1.30      YD1-5                                                      9          2          1            -          7        -            6      25      114        -        -                      10           2            1            -        9                        6      28        4,272        138 4c.1.1.31      YD2*1                                              -      56          4          1            -        14        -          23      98      168        -        -                      61            5            1            -        17                      25      108          6,375        947 4c.1.1.32      YD2-2                                                    19          3           1           -          8        -            9      40      133                  -                      20            3           1             -        10                      10        45        5,024        302              -
27 8
4c.1.1.33      YD2-3                                                     8          2          .1           -          9                    6      26      111                  -                        9            3           1            -        11                        6      29        4,197        125              -
39 10 13 1,000 7
4c.1.1.34      YD2-4                                              -    116        30            8            -      351        -          156    661    1,394                  -                      126          32          10            -      436                    169      774        49,592      1,994 4c.1.1.35      YD2-5                                              -    253        46          15            -      585        -          278  1,176    2,320                  -              -      275          50          18            -      726                    302    1,371        87,642      4,102 4c.1.1.36      YD2-6                                                   185        28            9            -      350        -          177    750    1,390                  -              -      201          30          11            -      435                    193      870        52,552      2,693              -
2 9
4c.1.1.37      YDP                                                      178          17          5            -        54        -          78    331      864                  -        -      -      193          18            6            -        67                      84      369        31,068      1,875              -
2 56 4
4c.1.1          Totals                                          76    3,016        258          78            -    2,195        -        1,771  7,393    12,387        -        -            82    3,273        280          97              -    2,726        -        1,921    8,380      466,620      49,727              -
19 3
4c.1.2          Scaffolding in support of decommissioning          -      38          1                        3                  -          13      56        5                 -              -      41            1                          3        2                      14        62        1,492        206              -
8 2
                                                                                                      °                      2
116 30 253 46 185 28 178 17 76 3,016 258 38 1
                                                                                                                                                                                                                                            ° Decontamination of Site Buildings 4c.1.3.1        HMS                                                      57          6          4           -        18        -          25    110      281        -        -        -              62            6            5            -        22                      28      122        19,674        821              -
57 6
4c.1.3.2        Hot Machine Shop & Calibration                            3          1                        -          9       -            4     18        48                  -        -              4           1                          -        11         -              5      21        2,015          55            -
3 1
4c.1.3.3        RBi                                              91    1,748        542        180°            -    3,807        -        1,948  8,317    18,660                  -        -    99    1.897        589          224°            -    4,730        -        2,113    9,652      989,526      29,415              -
91 1,748 542 3,120 207 99 7
4c.1.3.4       RB2                                                -  3,120        207          49            -    1,693        -        1,582  6,651    6,249                  -        -          3,385        225          61              -    2,103        -        1,717    7,491      280,809      54,462              -
81 7
4c.1.3.5        RB3                                                      99          7          3           -        54        -          51    214      328                  -              -      108            7            4            -        67        -            55      241        17,949      1,484              -
19 4
4c.1.3.6        RB4                                                      81           7           3            -        54        -          45    191      336                  -                      88            7            4             -        68        -            49      216        18,543      1,206              -
534 166 3
4c.1.3.7        RB5-1 (Refuel Bldg Roof)                                  19          4           3                     12       -          11      47      190                  -                      20            4            3            -        15        -            12        54      13,290        254 4c.1.3.8        RW1                                                -    534        166           44            -    1,289                    616  2,649    5,192                  -                      580        180            55            -    1,601        -          668    3,084      247,927      7,988 4c.1.3.9        Refueling                                          -      3           4          1           -        46                    16      70      190                  -              -        3            4            1             -        57        -            18        83        5,487          53 4c.1.3.10      TB1                                                      93          8           5                     46                    47    198      417                  -                      101            9            6              -      57        -            50      223        26,269      1,356 4c.1.3.11      TB2                                                -    122          11          7                      47        -          57    244      538                  -        -      -      133          12           8              -      58        -            62      273        35,623      1,775 4c.1.3.12      TB3                                                      30          6          4                     25       -          19      84      293                  -              -      33            6           5              -      31        -            21        96      19,550        423 4c.1.3.13      TB4                                                -    203          11          6            -        73                    91    385      565        -        -              -      221          12            8              -      90        -            99      430        33,971      3,005              -
4 93 8
4c.1.3.14      TB5                                                      87          4          3                     13        -           33    140      209                  -       -      -      94            5            3             -      16        -            36      154        14,628      1,270 4c.1.3.15      TB6                                                      76          4          3                      12        -          29    124       196                  -        -      -      82            4            3              -      15        -            32      136        13,698      1,106 4c.1.3.16      TB7                                                -      31          6          4            -        20                    18      79      313                  -        -      -      33            7           5             -      24        -            19        89      21,936        423 4c.1.3.17      Turbine                                            -      4          4          1            -        54                    20      83      223                  -        -      -        5            5            1              -      67        -            21        99        6,442          76 4c.1.3.18      YD1                                                      24          3          2                      8                    11     47       129        -        -        -      -      26            3            2             -      10        -            12        53        9,054        343              -
122 11 30 6
4c.1.3.19       YD2                                                -      98          12          8                      36        -          46    200      582         -        -        -            107          13          10              -      45        -            50      224        40,746      1,403 4c.1.3          Totals                                          91    6,434      1,012        330                  7,315                  4,669  19,851    34,940                  -        -    99     6,981      1,098          410              -    9,088        -        5,066  22,742      1,817,136    106,919 4c.1 Activity Costs                                            166    9,487      1,271        409            3    9,511                  6,453  27,300    47,332                  -            181    10,295      1,379          508              3   11,816        -        7,002  31,184    2,285,247    156,852 Period 4c Additional Costs 4c.2.1          Contaminated Soil Removal                               211        663      2,567                  14,035                  5,157  22,633  169,154                                                                                                                                  11,840,787      2,684 4c.2.2          Replacement of Drains and Catch Basins            -      75                                                        -          24      99          -                -              -      82                          -                      -        -            26      108                      687              -
203 11 87 4
4c.2.3         Caisson Mixed Waste Removal                        -    159          10          40            -    1,175                    438  1,822    2,433                  -              -      173          11           50              -    1,459        -          475    2,168      170,284      2,117              -
76 4
4c.2.4         Site work supporting spent fuel pool removal      -                                                            990          191  1,180         -        -        -        -      -        -                        -            -        -    1,074          207    1,281                      507 4c.2.5         Removal of 3 spent fuel pool walls                -    704          68        418            -    3,479        -        1,433  6,101    24,120        -        -                      764          73        519                    4,322        -        1,555    7,233    2,210,400      49,551 4c.2.6          Removal of Yard Pipe Tunnel                        -    647          14        205            -    2,561        -        1,072  4,498    10,162        -                        -      702           15         254               -    3,181         -        1,163    5,315    1,219,420      24,962 4c.2.7          Contaminated Soil & Concrete Storage Facility      -        -                      -          -                436            84    520          -        -                -      -                      -                                    -      473            91      564                      476              -
31 6
4c.2            Total                                                 1,796        754      3,230                  21,250    1,425        8,398  36,854  205,$69                                        1,949        819        4,012                  26,399    1,547        9,113  43,838    15,440,890      80,983 Period 4c Collateral Costs 4c.3.1         Process liquid waste                            28        -        14          61            -        48                    47    197      189                                30          -          15          76              -      59        -            51      231        11,354          49 4c.3.2          Small tool allowance                                    179            -                      -          -      -          58    237                            -              -      195            -            -            -        -        -            62     257               -
4 4
4c.3.3          Decommissioning Equipment Disposition                      -      206            7          540      335                    240  1,328    1,058                  -              -                  224            8          671      417        -          260   1,580       309,936        123 4c.3            Subtotal Period 4c Collateral Costs              28      179        220          68          540      383                    344  1,762    1,247                  -            30      195        239            84          671      476        -          373    2,068      321,290        173 Period 4c Period.Dependent Costs 4c.4.1         Decon supplies                                  58        -                                                                  19      77          -       -                      63                      -            -            -                              20        84              -                        -
24 3
4c.4.2          Insurance                                          -                                -                            72            9      81          -        -                                  -            -            -            -                78            10        88              -
98 12 91 6,434 1,012 166 9,487 1,271 211 663 75 159 10 704 68 647 14 1,796 754 28 14 179 206 28 179 220 58 624 1,503 1
4c.4.3          Property taxes                                    -                                                        -      -            -      -        -        -        -                        -                        -                      -                                -            -
Thousands of 2008 Dollars Off*Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 2
4c.4.4         Health physics supplies                            -    624            -          -                      -      -          200    824          -                                        677            -            -            -        -        -          218      895              -
8 1
4c.4.5         Heavy equipment rental                            -  1,503                        -          -                  -          290  1,793          -                                      1,631                                                                      314    1,946 Period 4c Period*Dependent Costs (continued) 4c.4.6          Disposal of DAW generated                                  -          1           1          -      134        -          43    179      533                  -              -                      1           1             -      167          -          47      216        10,651          3 4c.4.7         Plant energy budget                                                                            -                97            19    115                            -                                                                                  105            20      125                                      -
13 0
4c.4.8          NRC Fees                                                    -                                              -    658            85    743                  -        -              -                      -                                  -      714            92      806              -
3 2
4c.4.9         Emergency Planning Fees                            -        -                                  -          -    101            13    114                            -        -      -                      -          -            -        -      110            14      124              -
11 3
4c.4.10        Environmental I Engineering Support                        -                                  -              2,648          510  3,159                  -                        -                      -                                        2,874          554    3,428 4c.4.11        Radwaste Processing Equipment/Services            -                                                        -    375            72    447          -                -                          -            -            -                      -      407            78      485 4c.4.12          ISFSI Operating Costs                            -        -                                  -                85            16    101          -                                -          -            -            -                              92            18      110                          -
100 1
4c.4.13        Security Staff Cost                                -                                                          3,591          692  4,283          -                                            -            -            -                          3,897          751    4,648                                  66,743 4c.4.14        DOC Staff Cost                                    -        -                                  -              9,559        1,843  11,402          -                -              -          -            -                                      10,373        1,999  12,372                                119,282 4c.4.15        Utility Staff Cost                                                                              -            6,662        1,284  7,946          -        -        -                          -            -            -                      -  7,229        1,393    8,622              -          -    115,757
31 1
7 1
14 1
8
.1 9
8 351 15 585 9
350 5
54 78 2,195
° 3
2 4
18
° 9
180 3,807 49 1,693 3
54 3
54 3
12 44 1,289 1
46 5
46 7
47 4
25 6
73 3
13 3
12 4
20 1
54 2
8 8
36 330 7,315 409 3
9,511 2,567 14,035 40 1,175 990 418 3,479 205 2,561 436 3,230 21,250 1,425 61 48 7
540 335 68 540 383 72 1
134 97 658 101 2,648 375 85 3,591 9,559 6,662 Humboldt Bay Power Plant, Unit 3 AREA-BY-AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 82 315 135 19 78 3
13 9
38 209 5
21 28 13 61 348 47 199 514 4
18 321 1,322 13 55 124 6
25 114 23 98 168 9
40 133 6
26 111 156 661 1,394 278 1,176 2,320 177 750 1,390 78 331 864 1,771 7,393 12,387 13 56 5
25 110 281 4
18 48 1,948 8,317 18,660 1,582 6,651 6,249 51 214 328 45 191 336 11 47 190 616 2,649 5,192 16 70 190 47 198 417 57 244 538 19 84 293 91 385 565 33 140 209 29 124 196 18 79 313 20 83 223 11 47 129 46 200 582 4,669 19,851 34,940 6,453 27,300 47,332 5,157 22,633 169,154 24 99 438 1,822 2,433 191 1,180 1,433 6,101 24,120 1,072 4,498 10,162 84 520 8,398 36,854 205,$69 47 197 189 58 237 240 1,328 1,058 344 1,762 1,247 19 77 9
81 200 824 290 1,793 43 179 533 19 115 85 743 13 114 510 3,159 72 447 16 101 692 4,283 1,843 11,402 1,284 7,946 GTCC Cu. Feet Thousands of 2011 Dollars Off*Site LLRW Decon Removal Packaging Transport Processing Disposal Cost Cost Costs Costs Costs Costs 25 215 2
2 10 64 10 12 4
2 16 14 1
° 3
29 8
3 13 42 11 4
125 14 1,086 8
3 1
39 10 2
1 9
61 5
1 17 20 3
1 10 9
3 1
11 126 32 10 436 275 50 18 726 201 30 11 435 193 18 6
67 82 3,273 280 97 2,726 41 1
° 3
2 62 6
5 22 4
1
° 11 99 1.897 589 224 4,730 3,385 225 61 2,103 108 7
4 67 88 7
4 68 20 4
3 15 580 180 55 1,601 3
4 1
57 101 9
6 57 133 12 8
58 33 6
5 31 221 12 8
90 94 5
3 16 82 4
3 15 33 7
5 24 5
5 1
67 26 3
2 10 107 13 10 45 99 6,981 1,098 410 9,088 181 10,295 1,379 508 3
11,816 82 173 11 50 1,459 764 73 519 4,322 702 15 254 3,181 1,949 819 4,012 26,399 30 15 76 59 195 224 8
671 417 30 195 239 84 671 476 63 677 1,631 1
1 167 Other Total Total Costs Contingency Costs 89 344 21 85 3
14 9
43 5
23 15 68 51 233 5
19 349 1,434 14 64 6
28 25 108 10 45 6
29 169 774 302 1,371 193 870 84 369 1,921 8,380 14 62 28 122 5
21 2,113 9,652 1,717 7,491 55 241 49 216 12 54 668 3,084 18 83 50 223 62 273 21 96 99 430 36 154 32 136 19 89 21 99 12 53 50 224 5,066 22,742 7,002 31,184 26 108 475 2,168 1,074 207 1,281 1,555 7,233 1,163 5,315 473 91 564 1,547 9,113 43,838 51 231 62 257 260 1,580 373 2,068 20 84 78 10 88 218 895 314 1,946 47 216 105 20 125 714 92 806 110 14 124 2,874 554 3,428 407 78 485 92 18 110 3,897 751 4,648 10,373 1,999 12,372 7,229 1,393 8,622 PG&E Letter HBL-11-003 Page 4 of 7 Burial!
Utility and Processed Craft Contractor WI., Lbs.
Manhours Manhours 9,465 2,710 1,067 171 7,906 161 1,040 227 13,169 427 19,435 587 240 17,317 4,692 104 4,272 138 6,375 947 5,024 302 4,197 125 49,592 1,994 87,642 4,102 52,552 2,693 31,068 1,875 466,620 49,727 1,492 206 19,674 821 2,015 55 989,526 29,415 280,809 54,462 17,949 1,484 18,543 1,206 13,290 254 247,927 7,988 5,487 53 26,269 1,356 35,623 1,775 19,550 423 33,971 3,005 14,628 1,270 13,698 1,106 21,936 423 6,442 76 9,054 343 40,746 1,403 1,817,136 106,919 2,285,247 156,852 11,840,787 2,684 687 170,284 2,117 507 2,210,400 49,551 1,219,420 24,962 476 15,440,890 80,983 11,354 49 309,936 123 321,290 173 10,651 3
66,743 119,282 115,757  


Humboldt Bay Power Plant Unit 3                                                                                                                                                                                                                                                                                                          Enclosure 3 Humboldt Bay Power Plant, Unit 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                             PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D                                                                                                                             AREA-BY-AREA ESTIMATE Page 5 of 7 Thousands of 2008 Dollars                                                                                                            Thousands of 2011 Dollars Off-Site    LLRW                                                                                                                    Off-Site    LLRW                                      Burial!                Utility and Activity                                                              Decon  Removal  Packaging  Transport  Processing    Disposal  Other      Total        Total Class A  Class B  Class C  GTCC    Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total      Total  Processed    Craft    Contractor Index                                Activity Description            Cost    Cost      Costs      Costs      Costs        Costs    Costs    Contingency    Costs  Cu. Feet Cu. Feet Cu. Feet Cu. Feet  Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency  Costs    Wt..Lbs. Manhours    Manhours 4cA              Subtotal Period 4c Period-Dependent Costs                   58  2,127          1           1                    134    23,848        5,096  31,265      533                -       -    63    2,308          1          1                    167  25,878        5,529  33,948      10,651          3     301,782 4c.O            TOTAL PERIOD 4c COST                                        252  13,590      2,247      3,707            543    31,279    25,274        20,290  97,181  254,980                  -            274    14,747      2,438      4,605        674    38,858    27,425        22,017  111,038  18,058,079  238,011      301,782 PERIOD 4d - Building Demolition, Yard Work, Soil Remediation Demolition of Site Buildings 4d.1.1            Contaminated Equipment Storage                                      7          10          42                    174                      44      278    2,842                -              -        8          11        52            -        216                    48      335    198,936          90 4d.1.2            Gas Stack                                                    -      33        82          331            -    1,381          -          347    2,175    22,563                -              -        36          89        412            -    1,715                    377    2,629  1,579,419        184              -
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4cA Subtotal Period 4c Period-Dependent Costs 4c.O TOTAL PERIOD 4c COST PERIOD 4d - Building Demolition, Yard Work, Soil Remediation Demolition of Site Buildings 4d.1.1 Contaminated Equipment Storage 4d.1.2 Gas Stack 4d.1.3 Hot Machine Shop & Calibration 4d.1A New Off Gas Vault 4d.1.5 Radwaste Treatment 4d.1.6 Refueling 4d.1.7 Solid Waste Vault 4d.1.8 Turbine 4d.1.9 Yard Structures 4d.l ITotals I
4d.1.3           Hot Machine Shop & Calibration                              -     20        24          95            -      394          -          101      634    6,445                -              -        22        26        118                    490                    110      765    451,120        252 4d.1A            New Off Gas Vault                                                  80        189          759            -    3,163          -          796    4,987    51,687                -              -        87        205        943                  3,930                    863    6,028  3,618,076        460              -
Period 4d Additional Costs 4d.2.1 Backfill of Structures and Site 4d.2 I Subtotal Period 4c Additional Costs Period 4d Collateral Costs 4d.3.1 Small Tool Allowance ISubtotal Period 4d Collateral Costs Period 4d Period-Dependent Costs 4dA.l Insurance 4dA.2 Property taxes 4dA.3 Health phYSics supplies 4dAA Heavy equipment rental 4dA.5 Disposal of DAW generated 4dA.6 Plant energy budget 4dA.7 NRC Fees 4d.4.8 Emergency Planning Fees 4dA.9 Environmental/Engineering Support 4dA.l0 Radwaste Processing Equipment/Services 4dA.11 ISFSI Operating Costs 4dA.12 Security Staff Cost 4dA.13 DOC Staff Cost 4dA.14 Utility Staff Cost Subtotal Period 4d Period-Dependent Costs 4d.0 TOTAL PERIOD 4d COST PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 4e.l.2 Terminate license 4e.l Subtotal Period 4e Activity Costs Period 4e Additional Costs 4e.2.1 I License Termination Survey (sample analysis & equipment) 4e.2 Subtotal Period 4e Additional Costs Period 4e Collateral Costs 4e.3.1 I DOC staff relocation expenses 4e.3 Subtotal Period 4e Collateral Costs Period 4e Period-Dependent Costs 4eA.1 Insurance 4e.4.2 Property taxes 4eA.3 Health physics supplies 4eAA Disposal of DAW generated 4eA.5 Plant energy budget 4eA.6 NRC Fees 4eA.7 Emergency Planning Fees 4eA.8 Environmental/Engineering Support 4eA.9 ISFSI Operating Costs 4eA.10 Security Staff Cost 4eA.l1 DOC Staff Cost 4eA.12 Utility Staff Cost 4eA Subtotal Period 4e Period-Dependent Costs 4e.0 TOTAL PERIOD 4e COST PERIOD 4 TOTALS Decon Removal Packaging Cost Cost Costs 58 2,127 1
4d.1.5            Radwaste Treatment                                          -    145        149          597            -    2,490                    642    4,023    40,680                -               -      157        161        742            -    3,093          -          697    4,850  2,847,575      1,322              -
252 13,590 2,247 7
4d.1.6            Refueling                                                    -  1,099        310      1,247             -    5,196                  1,494    9,346    84,907        -        -        -      -    1,192        337      1,549                  6,455          -        1,621  11,154  5,943,511      3,112 4d.1.7            Solid Waste Vault                                            -      4          6          23             -        96                    24      153    1,572                -        -      -        4          6        29            -        120        -          27      185    110,067          30 4d.1.8          Turbine                                                      -    243        389      1,565             -    6,522                   1,656  10,375  106,576                -              -      263        422      1,944                  8,103          -        1,797  12,530  7,460,292      1,674 4d.1.9          Yard Structures                                              -      57        36          143            -      598          -          158      992    9,765                -              -        62          39        178            -        742        -          172    1,193    683,540        647 4d.l            ITotals                                                        -  1,687      1,195      4,803              -    20,015          -        5,262  32,962  327,036                                -     1,831      1,296      5,967            -   24,864          -        5,710  39,668  22,892,536      7,770 I
10 33 82 20 24 80 189 145 149 1,099 310 4
Period 4d Additional Costs 4d.2.1            Backfill of Structures and Site                              -  1,460                                    -          -        -          281    1,741        -                                      1,584                                              -        -          305    1,890            -
6 243 389 57 36 1,687 1,195 1,460 1,460 9
4d.2            I Subtotal Period 4c Additional Costs                          -  1,460                                    -          -        -          281    1,741                          -        -      -    1,584            -        -                      -        -          305    1,890            -
9 441 925 1
Period 4d Collateral Costs 4d.3.1           Small Tool Allowance                                                9                                     -                    -            2       11 ISubtotal Period 4d Collateral Costs                          -      9                                    -          -        -            2      11                           -                        10            -                      -          -        -            2      11            -                        -
1,366 1
Period 4d Period-Dependent Costs 4dA.l            Insurance                                                    -        -          -                        -          -      138            18      155        -                -        -      -          -                    -            -                149            19      168            -          -            -
4,522 1,196 192 0
4dA.2            Property taxes                                              -        -                                    -          -        -                              -                -                                                                                                                    -                        -
192 0
4dA.3            Health phYSics supplies                                      -    441                                    -                    -          142      582                          -        -              478            -                      -                    -          154      632            -                        -
192 0
4dAA              Heavy equipment rental                                      -    925          -                        -          -        -          178    1,104                  -        -        -            1,004            -                      -          -        -          194    1,198            -                        -
1,246 40,119 7,731 Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 1
4dA.5            Disposal of DAW generated                                    -        -          1          0            -        98        -          32      131      390                -                          -          1          0                    122                    34      158        7,793          3             -
134 23,848 3,707 543 31,279 25,274 42 174 331 1,381 95 394 759 3,163 597 2,490 1,247 5,196 23 96 1,565 6,522 143 598 4,803 20,015 138 0
4dA.6             Plant energy budget                                          -        -                                    -          -     150            29      179                          -              -          -          -        -                              163            31      194            -                        -
98 150 350 194 3,137 719 163 6,079 14,518 10,603 0
4dA.7            NRC Fees                                                    -                                            -          -      350            45      395        -                -        -      -          -          -                                        380            49      429            -          -            -
98 36,051 4,803 20,113 36,051 151 151 725 725 1,436 1,436 24 0
4d.4.8           Emergency Planning Fees                                      -                                            -                194            25      218                                    -                            -                                        210            27      237            -                        -
38 16 236 34 443 28 948 2,128 1,457 0
4dA.9            Environmental/Engineering Support                            -        -                      -            -          -    3,137          605    3,742         -                -        -                            -                      -      -        3,405          656    4,061            -          -            -
38 5,314 0
4dA.l0            Radwaste Processing Equipment/Services                      -        -                                    -          -      719          139      858        -                          -                -          -        -                              781          150      931            -                        -
38 7,626 9,618 566 74,641 156,788 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 5,096 31,265 533 20,290 97,181 254,980 44 278 2,842 347 2,175 22,563 101 634 6,445 796 4,987 51,687 642 4,023 40,680 1,494 9,346 84,907 24 153 1,572 1,656 10,375 106,576 158 992 9,765 5,262 32,962 327,036 281 1,741 281 1,741 2
4dA.11            ISFSI Operating Costs                                                                                      -          -      163            31      194                          -        -      -          -          -                                        177            34      211            -                        -
11 2
4dA.12            Security Staff Cost                                          -                                            -          -    6,079        1,172    7,251                          -        -                            -                      -          -    6,596        1,271    7,868            -                116,520 4dA.13            DOC Staff Cost                                              -                                -            -          -  14,518        2,798  17,316                          -        -      -          -          -                                    15,754        3,037  18,790            -                194,800 4dA.14            Utility Staff Cost                                          -        -                                    -          -  10,603        2,044  12,647        -                -        -      -                      -                                    11,505        2,218  13,723            -                176,920 Subtotal Period 4d Period-Dependent Costs                    -  1,366          1           0            -        98  36,051        7,257  44,773      390                -        -            1,482          1          0                    122  39,119        7,874  48,599        7,793          3     488,240 4d.0              TOTAL PERIOD 4d COST                                        -  4,522      1,196      4,803              -    20,113    36,051        12,802  79,486  327,426                  -        -            4,907      1,298      5,967                24,986    39,119       13,892   90,169 22,900,330      7,773      488,240 PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1            ORISE confirmatory survey                                    -                                            -          -      151            29     180        -                -        -      -                    -          -                      -      164            32      195            -          -            -
11 18 155 142 582 178 1,104 32 131 390 29 179 45 395 25 218 605 3,742 139 858 31 194 1,172 7,251 2,798 17,316 2,044 12,647 7,257 44,773 390 12,802 79,486 327,426 29 180 29 180 279 1,004 279 1,004 277 1,713 277 1,713 3
4e.l.2            Terminate license                                            -                                            -          -        -            -                -                -        -      -          -          -          -          -          -                                -          -          -            -
27 62 254 12 51 152 3
4e.l              Subtotal Period 4e Activity Costs                            -                    -          -            -          -      151            29      180        -                -              -                                -          -          -      164            32      195            -          -            -
19 30 266 4
Period 4e Additional Costs 4e.2.1         ILicense Termination Survey (sample analysis & equipment)                          -            -                      -      725          279    1,004        -        -        -        -      -                      -          -                            787          303    1,090            -         -            -
38 85 528 5
4e.2              Subtotal Period 4e Additional Costs                                              -            -                      -      725          279    1,004        -        -        -        -      -                    -                                        787          303    1,090            -          -            -
34 183 1,131 410 2,538 281 1,737 1,080 6,624 152 1,665 9,522 152 74,487 365,195 654,879 2,699 470 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 63 2,308 1
Period 4e Collateral Costs 4e.3.1          IDOC staff relocation expenses                                -                                -            -          -    1,436          277    1,713        -        -        -                          -          -                                      1,559          300    1,859            -          -            -
1 167 274 14,747 2,438 4,605 674 38,858 8
4e.3             Subtotal Period 4e Collateral Costs                                                                        -          -    1,436          277    1,713        -        -        -                          -          -          -                          1,559          300    1,859            -          -            -
11 52 216 36 89 412 1,715 22 26 118 490 87 205 943 3,930 157 161 742 3,093 1,192 337 1,549 6,455 4
Period 4e Period-Dependent Costs 4eA.1            Insurance                                                                                                                    24            3       27                          -                -        -          -          -                      -      26            3      29            -                        -
6 29 120 263 422 1,944 8,103 62 39 178 742 1,831 1,296 5,967 24,864 1,584 1,584 10 478 1,004 1
4e.4.2            Property taxes                                                        -          -                        -          -        -                      -                          -        -                -                      -          -          -                      -        -          -                        -
0 122 1,482 1
4eA.3             Health physics supplies                                            192                                    -          -        -          62      254        -                -        -              209            -          -          -          -                    67      276            -
0 122 4,907 1,298 5,967 24,986 209 0
4eAA              Disposal of DAW generated                                            -          0          0                      38        -          12      51      152                -        -                -          0          0            -        48                    13      62        3,036          1 4eA.5            Plant energy budget                                          -        -                                    -          -      16            3      19        -                -        -                            -          -                      -      18            3      21            -
0 48 209 0
4eA.6            NRC Fees                                                                                                  -          -    236            30      266        -                -        -      -                    -          -                            256            33      289            -
0 48 209 0
4eA.7            Emergency Planning Fees                                      -        -                                                      34            4      38        -        -        -        -      -                    -                                        37            5      41            -                        -
0 48 1,352 43,534 8,389 11,948 703 92,727 Other Total Total Costs Contingency Costs 25,878 5,529 33,948 27,425 22,017 111,038 48 335 377 2,629 110 765 863 6,028 697 4,850 1,621 11,154 27 185 1,797 12,530 172 1,193 5,710 39,668 305 1,890 305 1,890 2
4eA.8            Environmental/Engineering Support                            -        -          -          -            -          -    443            85      528        -                -        -      -                    -                                        481            93      573            -
11 149 19 168 154 632 194 1,198 34 158 163 31 194 380 49 429 210 27 237 3,405 656 4,061 781 150 931 177 34 211 6,596 1,271 7,868 15,754 3,037 18,790 11,505 2,218 13,723 39,119 7,874 48,599 39,119 13,892 90,169 164 32 195 164 32 195 787 303 1,090 787 303 1,090 1,559 300 1,859 1,559 300 1,859 26 3
4eA.9            ISFSI Operating Costs                                        -                    -                        -                  28            5      34        -        -        -                -        -          -                                        31            6      37            -
29 67 276 13 62 18 3
4eA.10            Security Staff Cost                                          -                                                              948          183    1,131        -        -        -        -      -                    -          -                      -  1,029          198    1,227            -                  18,126 4eA.l1            DOC Staff Cost                                              -                    -          -            -          -  2,128          410    2,538        -        -        -                -                                -                          2,309          445    2,754            -                  28,757 4eA.12            Utility Staff Cost                                          -                    -          -                        -  1,457          281    1,737        -                -                -        -          -          -                      -  1,581          305    1,885            -                  22,831 4eA              Subtotal Period 4e Period-Dependent Costs                          192          0          0                      38    5,314        1,080    6,624      152        -        -        -      -      209          0          0            -        48    5,766        1,171    7,194        3,036          1      69,714 4e.0              TOTAL PERIOD 4e COST                                        -    192          0          0                      38    7,626        1,665    9,522      152                -        -      -      209          0          0            -        48    8,275        1,807  10,339        3,036          1      69,714 PERIOD 4 TOTALS                                                            1,246  40,119      7,731        9,618          566    74,641  156,788        74,487  365,195  654,879    2,699      470        -  1,352    43,534      8,389      11,948          703    92,727  170,134        80,827  409,613  44,005,225   396,785   1,906,552
21 256 33 289 37 5
41 481 93 573 31 6
37 1,029 198 1,227 2,309 445 2,754 1,581 305 1,885 5,766 1,171 7,194 8,275 1,807 10,339 170,134 80,827 409,613 PG&E Letter HBL-11-003 Page 5 of 7 Burial!
Utility and Processed Craft Contractor Wt..Lbs.
Manhours Manhours 10,651 3
301,782 18,058,079 238,011 301,782 198,936 90 1,579,419 184 451,120 252 3,618,076 460 2,847,575 1,322 5,943,511 3,112 110,067 30 7,460,292 1,674 683,540 647 22,892,536 7,770 7,793 3
116,520 194,800 176,920 7,793 3
488,240 22,900,330 7,773 488,240 3,036 1
18,126 28,757 22,831 3,036 1
69,714 3,036 1
69,714 44,005,225 396,785 1,906,552  


Humboldt Bay Power Plant Unit 3                                                                                                            Humboldt Bay Power Plant, Unit 3                                                                                                                                                          Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                           PG&E Letter HBL-11-003 AREA-BY-AREA ESTIMATE                                                                                                                                                                  Page 6 of 7 TLG Services, Inc., Appendix D Thousands of 2008 Dollars                                                                                                                  Thousands of 2011 Dollars Off-Site    LLRW                                                                                                                          Off-Site    LLRW                                        Burial I                Utility and Activity                                                 Decon    Removal  Packaging  Transport  Processing  Disposal  Other        Total        Total  Class A  Class B  ClassC    GTCC    Decon    Removal  Packaging  Transport  Processing  Disposal  Other        Total      Total      Processed      Craft    Contractor Index                               Activity Description Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency    Costs  Cu. Feet  Cu. Feet  Cu. Feet  Cu. Feet  Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency  Costs      Wt., Lbs. Manhours  Manhours I
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I
PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Site Closeout Activities 5b.1.1           Grade & landscape site                           -      41                                    -                  -            13        55        -        -        -        -      -      45            -          -            -        -        -            14        59                      105 5b.1.2           Final report to NRC                               -                                              -          -    195            38      233          -        -        -        -      -                                              -        -      212            41      252                          -        1,560 5b.1             Subtotal Period 5b Activity Costs                 -      41                        -            -          -    195            51      287          -                                      -      45            -          -            -        -      212            55      312                      105          1,560 Period 5b Additional Costs 5b.2.1           Disposal of Asphalt Roadways                       -                                -            -                63            12        75                                                                                              -        -      68            13        81 5b.2.2           Disposal of Legacy Class B & C Waste             -                              148                  1,400        -          478    2,026          -      384        96        -                -          -        183            -    1,739        -          519    2,441        14,050          -            -
PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Site Closeout Activities 5b.1.1 Grade & landscape site 5b.1.2 Final report to NRC 5b.1 Subtotal Period 5b Activity Costs Period 5b Additional Costs 5b.2.1 Disposal of Asphalt Roadways 5b.2.2 Disposal of Legacy Class B & C Waste 5b.2.3 Disposal of Intermodal Containers 5b.2 Subtotal Period 5b Additional Costs Period 5b Collateral Costs 5b.3.1 ISmail tool allowance 5b.3 Subtotal Period 5b Collateral Costs I
5b.2.3           Disposal of Intermodal Containers                 -                                -                      -    975            188    1,163                                                          -          -                        -        -    1,058            204    1,262 5b.2             Subtotal Period 5b Additional Costs               -        -                    148                  1,400    1,038            678    3,264                  384      96          -        -        -          -        183            -    1,739    1,126            736    3,785        14,050          -            -
Period 5b Period-Dependent Costs 5bA.1 Insurance 5bA.2 Property taxes 5bA.3 Plant energy budget 5bAA NRC ISFSI Fees 5bA.5 Emergency Planning Fees 5b.4.6 ISFSI Operating Costs 5bA.7 Security Staff Cost 5bA.8 DOC Staff Cost Period 5b Period-Dependent Costs (continued) 5bA.9 Utility Staff Cost 5bA Subtotal Period 5b Period-Dependent Costs 5b.0 TOTAL PERIOD 5b COST PERIOD 5c - Fuel Storage Operations Period 5c Period-Dependent Costs 5cA.1 Insurance 5cA.2 Property taxes 5cA.3 Plant energy budget 5cAA NRC ISFSI Fees 5c.4.5 Emergency Planning Fees 5cA.6 ISFSI Operating Costs 5cA.7 Security Staff Cost 5cA.8 DOC Staff Cost 5cA.9 Utility Staff Cost 5cA Subtotal Period 5c Period-Dependent Costs 5c.0 TOTAL PERIOD 5c COST PERIOD 5d - Spent Fuel and GTCC shipping Period 5d Direct Decommissioning Activities Nuclear Steam Supply System Removal 5d.1.1.1 Vessel & Internals GTCC Disposal 5d.1 Subtotal Period 5d Activity Costs Period 5d Collateral Costs 5d.3.1 ITransfer Spent Fuel to DOE 5d.3.1 Subtotal Period 5d Collateral Costs I
Period 5b Collateral Costs 5b.3.1         ISmail tool allowance                               -        0                                              -                      0        0        -        -        -        -        -        0          -          -            -        -        -              0        0                        -            -
Period 5d Period-Dependent Costs 5dA.1 Insurance 5dA.2 Property taxes 5dA.3 Plant energy budget 5dAA NRC ISFSI Fees 5dA.5 Emergency Planning Fees 5dA.6 ISFSI Operating Costs 5dA.7 Security Staff Cost 5d.4.8 DOC Staff Cost 5dA.9 Utility Staff Cost 5dA.
5b.3             Subtotal Period 5b Collateral Costs               -        0                                    -          -                      0        0        -        -                  -      -        0          -          -            -        -        -              0        0            -          -            -
Subtotal Period 5d Period-Dependent Costs 5d.0 TOTAL PERIOD 5d COST PERIOD 5e - ISFSI Decontamination Thousands of 2008 Dollars Off-Site LLRW Decon Removal Packaging Transport Processing Disposal Cost Cost Costs Costs Costs Costs 41 41 148 1,400 148 1,400 0
I Period 5b Period-Dependent Costs 5bA.1           Insurance                                         -        -          -                        -          -      36              5        40        -        -        -                  -        -          -                                  -        39              5      44              -          -            -
0 41 148 1,400 95 346 95 346 95 346 Other Costs 195 195 63 975 1,038 36 12 98 50 42 1,422 127 428 2,215 3,448 251 709 354 297 9,998 198 1,087 12,896 12,896 462 462 36 99 51 43 1,430 28 156 1,841 2,303 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B ClassC Contingency Costs Cu. Feet Cu. Feet Cu. Feet 13 55 38 233 51 287 12 75 478 2,026 384 96 188 1,163 678 3,264 384 96 0
5bA.2           Property taxes                                             -          -                        -          -                      -        -        -        -        -        -        -                    -          -            -                  -              -                      -          -            -
0 0
5bA.3           Plant energy budget                               -        -                                    -          -      12              2        14        -        -                  -        -                    -          -            -                  13              3      16              -          -            -
0 5
5bAA             NRC ISFSI Fees                                   -        -                                    -          -      98            13      111          -        -                            -        -          -          -            -                106            14      120              -          -            -
40 2
5bA.5           Emergency Planning Fees                           -        -                                    -          -      50              6        57        -                            -        -        -          -                        -        -        55              7      62              -          -            -
14 13 111 6
5b.4.6           ISFSI Operating Costs                                                                                       -      42              8        50        -        -                            -        -          -                        -        -        46              9      55              -          -            -
57 8
5bA.7           Security Staff Cost                                         -          -                                  -  1,422            274    1,696          -        -        -        -        -        -          -                        -              1,543            297    1,840              -          -      27,040 5bA.8           DOC Staff Cost                                   -        -          -                                  -    127            24      152          -        -        -        -        -        -          -          -            -                138            27      164              -          -        1,300 Period 5b Period-Dependent Costs (continued)                                                                                                                                                                   -        -          -          -            -                  -              -
50 274 1,696 24 152 83 511 415 2,631 1,144 6,182 384 96 32 284 91 801 45 399 57 355 1,927 11,925 38 236 210 1,297 2,401 15,297 2,401 15,297 79 519 79 519 89 551 89 551 7
5bA.9           Utility Staff Cost                               -        -                                              -    428            83      511          -        -                  -        -        -          -                        -                465            90      554              -          -        7,540 5bA               Subtotal Period 5b Period-Dependent Costs                 -          -                        -          -  2,215            415    2,631          -        -                  -        -        -          -                        -        -    2,404            451    2,855              -                  35,880 5b.0             TOTAL PERIOD 5b COST                               -      41                    148                  1,400    3,448          1,144    6,182          -      384        96                  -      45          -        183            -    1,739    3,742          1,242    6,951        14,050        105        37,440 PERIOD 5c - Fuel Storage Operations Period 5c Period-Dependent Costs 5cA.1             Insurance                                         -        -                                              -    251            32      284          -        -          -        -        -        -                                    -        -      273            35      308              -                        -
43 13 111 7
5cA.2             Property taxes                                   -        -          -                        -          -        -              -        -        -        -          -                -        -                                    -                                  -                      -                        -
57 8
5cA.3             Plant energy budget                                       -                                              -                                -        -        -                                    -          -                        -                  -              -                      -                        -
51 276 1,705 5
5cAA             NRC ISFSI Fees                                   -        -          -                                  -    709            91      801          -                            -        -        -          -                        -                770            99      869              -                        -
34 30 186 345 2,187 513 3,257 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 45 45 183 1,739 183 1,739 0
5c.4.5           Emergency Planning Fees                           -        -                      -                      -    354            45      399          -        -                  -        -        -                                  -                384            49      433              -          -              -
0 45 183 1,739 17 103 429 17 103 429 17 103 429 Other Total Costs Contingency 14 212 41 212 55 68 13 519 1,058 204 1,126 736 0
5cA.6             ISFSI Operating Costs                             -                                                        -    297            57      355          -        -          -                          -                                  -                323            62      385              -                        -
0 39 5
5cA.7             Security Staff Cost                               -        -                                              -  9,998          1,927  11,925          -        -                                    -          -                        -            10,849          2,091  12,941              -                190,023 5cA.8             DOC Staff Cost                                   -        -          -                        -          -    198            38      236          -                  -        -                  -          -                        -                215            41      257              -                    1,827 5cA.9             Utility Staff Cost                               -        -                      -                      -  1,087            210    1,297          -                                    -        -          -          -            -        -    1,180            227    1,407              -                  14,617 5cA               Subtotal Period 5c Period-Dependent Costs         -        -                                              -  12,896          2,401  15,297          -        -          -                                      -                                  -  13,993          2,606  16,599              -                206,467 5c.0             TOTAL PERIOD 5c COST                               -        -                                              -  12,896          2,401  15,297          -                  -                                                                                                                                    -    206,467 PERIOD 5d - Spent Fuel and GTCC shipping Period 5d Direct Decommissioning Activities Nuclear Steam Supply System Removal 5d.1.1.1         Vessel & Internals GTCC Disposal                 -                  95                        -      346        -            79      519          -                  -      17        -        -      103                                429                      86      618          3,228                        -
13 3
5d.1             Subtotal Period 5d Activity Costs                 -                  95                        -      346        -            79      519          -                  -      17        -        -      103                        -      429                      86      618          3,228                        -
106 14 55 7
Period 5d Collateral Costs 5d.3.1         ITransfer Spent Fuel to DOE                         -        -                      -          -          -    462            89      551          -        -        -                                                                                                                          -                        -
46 9
5d.3.1           Subtotal Period 5d Collateral Costs               -                                -                            462            89      551          -                  -
1,543 297 138 27 465 90 2,404 451 3,742 1,242 273 35 770 99 384 49 323 62 10,849 2,091 215 41 1,180 227 13,993 2,606 86 86 39 8
I Period 5d Period-Dependent Costs 5dA.1             Insurance                                         -        -                      -                            36              7      43          -                  -                          -          -          -                      -      39              8      47 5dA.2             Property taxes                                   -        -          -            -                      -        -              -        -        -                  -                  -        -          -                        -
107 14 55 7
5dA.3             Plant energy budget                                         -          -            -                      -        -              -        -        -        -        -                          -          -          -            -                  -                        -
46 9
5dAA             NRC ISFSI Fees                                             -          -          -                      -      99            13      111          -                  -                          -          -                                        107              14      121                          -
1,551 299 31 6
5dA.5             Emergency Planning Fees                           -        -          -            -                      -      51              7      57          -                  -                          -          -                        -                55              7      62              -                        -
169 33 1,998 375 2,499 557 Total Costs 59 252 312 81 2,441 1,262 3,785 0
5dA.6             ISFSI Operating Costs                                                 -            -                      -      43              8      51          -                  -                          -          -                        -                46              9        55              -          -
0 44 16 120 62 55 1,840 164 554 2,855 6,951 308 869 433 385 12,941 257 1,407 16,599 618 618 47 121 62 55 1,850 37 201 2,373 3,588 PG&E Letter HBL-11-003 Page 6 of 7 Burial I Utility and Processed Craft Contractor Wt., Lbs.
5dA.7             Security Staff Cost                                         -          -          -            -        -  1,430            276    1,705          -                  -        -                -          -                                      1,551            299    1,850                          -
Manhours Manhours 105 1,560 105 1,560 14,050 14,050 27,040 1,300 7,540 35,880 14,050 105 37,440 190,023 1,827 14,617 206,467 206,467 3,228 3,228 2,091 2,091 3,228 2,091  
5d.4.8           DOC Staff Cost                                   -                    -            -                            28              5      34          -                  -        -        -        -          -                        -        -      31              6        37                        -
5dA.9             Utility Staff Cost                                                     -            -                      -    156            30      186          -                  -                  -        -          -                                  -      169            33      201              -                  2,091 5dA.             Subtotal Period 5d Period-Dependent Costs         -                     -           -                          1,841           345    2,187          -                   -                 -        -          -          -            -            1,998            375    2,373                                    2,091 5d.0              TOTAL PERIOD 5d COST                              -                  95            -          -        346  2,303            513   3,257           -         -                17         -        -        103           -                  429   2,499           557   3,588           3,228           -        2,091 PERIOD 5e - ISFSI Decontamination


Humboldt Bay Power Plant Unit 3                                                                                                                    Humboldt Bay Power Plant, Unit 3                                                                                                                                                Enclosure 3 Decommissioning Cost Study                                                                                                                                                                                                                                                                                         PG&E Letter HBL-11-003 TLG Services, Inc., Appendix D AREA-BY -AREA ESTIMATE                                                                                                                                                        Page 7 of 7 Thousands of 2008 Dollars                                                                                                          Thousands of 2011 Dollars Off-Site    LLRW                                                                                                                Off-Site    LLRW                                        Burial I              Utility and Activity                                                         Decon  Removal  Packaging  Transport  Processing  Disposal  Other      Total        Total Class A  Class B  Class C  GTCC    Decon  Removal  Packaging Transport  Processing  Disposal  Other      Total      Total    Processed      Craft    Contractor Index                             Activity Description           Cost    Cost      Costs      Costs      Costs      Costs    Costs    Contingency    Costs  Cu. Feet Cu. Feet Cu. Feet Cu. Feet  Cost    Cost      Costs    Costs      Costs      Costs    Costs    Contingency  Costs      Wt., lbs. Manhours  Manhours I
Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I
Period 5e Additional Costs Se.2.1           ISFSI Decontamination                                     -        S          0          2            -        10  1,169          231    1,417      116        -        -        -      -        6          0        2            -        13    1,268          250    1,539        10,376      1,270        2,S60 Se.2             Subtotal Period 5e Additional Costs                       -        S          0          2                      10  1,169          231    1,417      116        -        -        -      -        6          0        2            -        13    1,268          2S0    1,539        10,376      1,270        2,S60 Period 5e Collateral Costs Se.3.1         ISmail tool allowance                                       -        0                                    -          -                    0        0        -        -        -        -      -        0          -        -            -          -      -            0        0                      -
Period 5e Additional Costs Se.2.1 ISFSI Decontamination Se.2 Subtotal Period 5e Additional Costs Period 5e Collateral Costs Se.3.1 ISmail tool allowance Se.3 Subtotal Period 5e Collateral Costs I
Se.3             Subtotal Period 5e Collateral Costs                       -        0                                              -                    0        0        -        -        -        -      -        0          -        -            -          -      -            0        0                      -
Period 5e Period-Dependent Costs Se.4.1 Insurance Se.4.2 Property taxes Se.4.3 Heavy equipment rental 5e.4.4 Plant energy budget 5e.4.5 Security Staff Cost Se.4.6 DOC Staff Cost Se.4.7 Utility Staff Cost Se.4.
I Period 5e Period-Dependent Costs Se.4.1           Insurance                                                           -                                    -          -      23            3      26        -        -        -        -      -        -          -        -            -          -      2S            3      29              -        -
Subtotal Period 5e Period-Dependent Costs Se.O TOTAL PERIOD Se COST PERIOD 5f -ISFSI Site Restoration Period 5f Additional Costs 5f.2.1 IiSFSI Demolition Sf.2 Subtotal Period 5f Additional Costs Period 5f Collateral Costs 5f.3.1 ISmail tool allowance 5f.3 Subtotal Period Sf Collateral Costs I
Se.4.2           Property taxes                                           -        -                      -            -          -        -            -        -                -        -        -      -        -          -        -            -          -      -            -                      -        -            -
Period 5f Period-Dependent Costs 5f.4.1 Insurance 5f.4.2 Property taxes 5f.4.3 Heavy equipment rental Sf.4.4 Plant energy budget Sf.4.S Security Staff Cost Sf.4.6 DOC Staff Cost Sf.4.7 Utility Staff Cost Sf.4 Subtotal Period 5f Period-Dependent Costs Sf.O TOTAL PERIOD Sf COST PERIOD 5 TOTALS TOTAL COST TO DECOMMISSION TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:
Se.4.3           Heavy equipment rental                                   -      118                                    -          -        -          23      141                  -        -        -      -      128          -        -            -          -      -            25      153              -        -            -
TOTAL NRC LICENSE TERMINATION COST IS 84.3% OR SPENT FUEL MANAGEMENT COST IS 15.3% OR:
5e.4.4           Plant energy budget                                       -        -                                    -          -        -                      -        -        -        -        -      -        -          -        -            -          -      -            -                      -        -            -
NON-NUCLEAR DEMOLITION COST IS 0.4% OR:
5e.4.5           Security Staff Cost                                       -        -                      -            -                877          169    1,046                  -        -        -      -        -                    -            -          -    9S2          183    1,135              -        -      17,680 Se.4.6           DOC Staff Cost                                           -        -                      -                      -      17            3      21                          -        -      -        -          -                      -          -      19            4      22                        -          170 Se.4.7           Utility Staff Cost                                       -        -                      -            -                95            18      114                  -        -        -      -        -          -        -            -          -    103            20      123                        -        1,360 Se.4.           Subtotal Period 5e Period-Dependent Costs                         118                                    -          -  1,013          216    1,347                  -        -        -      -      128          -        -            -          -  1,099          235    1,462                        -      19,210 Se.O             TOTAL PERIOD Se COST                                     -      124          0          2            -        10  2,181          447    2,764      116        -        -        -      -      134          0        2            -        13    2,367          485    3,001        10,376      1,270      21,770 PERIOD 5f -ISFSI Site Restoration Period 5f Additional Costs 5f.2.1         IiSFSI Demolition                                                   270                                                      48            61      380        -        -                -      -      293                                -          -      52            67      412              -    2,643          160 Sf.2             Subtotal Period 5f Additional Costs                       -      270                        -          -          -      48            61      380        -        -        -        -      -      293                                -          -      S2            67      412                    2,643          160 Period 5f Collateral Costs 5f.3.1         ISmail tool allowance                                       -        3          -            -                      -        -            1        3        -        -        -        -      -        3                                -          -        -            1        4            -        -            -
TOTAL Class A RADWASTE VOLUME BURIED:
5f.3             Subtotal Period Sf Collateral Costs                       -        3          -            -          -                                1        3        -        -        -        -      -        3                    -            -          -        -            1        4            -        -            -
TOTAL Class B & C RADWASTE VOLUME BURIED:
I Period 5f Period-Dependent Costs 5f.4.1           Insurance                                                 -        -                      -          -          -        -            -        -        -        -        -        -      -          -        -        -            -          -        -            -                      -          -            -
Decon Removal Cost Cost S
5f.4.2           Property taxes                                                       -          -            -                      -                      -        -                -        -        -      -        -                  -            -          -        -                      -                      -            -
S 0
5f.4.3           Heavy equipment rental                                             61          -            -                                          12      73        -        -        -        -      -        66                    -            -          -        -          13      79                        -
0 118 118 124 270 270 3
Sf.4.4           Plant energy budget                                       -                                                                              -        -        -        -        -        -                -                                -          -        -            -                                -              -
3 61 61 334 499 2,214 41,837 TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:
Sf.4.S           Security Staff Cost                                       -                                -          -          -    492            9S      S87        -        -        -        -      -        -        -        -            -          -    S34          103      637                        -        9,360 Sf.4.6           DOC Staff Cost                                                                                                     -      10            2      12        -        -                -      -                              -            -          -      11            2      13              -          -          90 Sf.4.7           Utility Staff Cost                                                   -                      -                            S4            10      64                  -        -        -      -          -                  -            -          -      58            11      69                        -          720 Sf.4             Subtotal Period 5f Period-Dependent Costs                         61                        -                            S55          119      735                  -                -      -      66                    -            -          -    603          129      798                                10,170 Sf.O             TOTAL PERIOD Sf COST                                             334          -                                  -    604          181    1,119        -        -                -      -      363                    -            -          -    655          196    1,214              -    2,643      10,330 PERIOD 5 TOTALS                                                             -      499          95        149                  1,756  21,432        4,686  28,618      116      384      96      17      -      542        103      185            -      2,181  23,256        5,085  31,353        27,654      4,019    278,099 TOTAL COST TO DECOMMISSION                                             2,214    41,837      7,830        9,774          566    76,487  277,452        83,598  499,759  655,237    3,083      566      17  2,403    45,399      8,496    12,142          703    95,020  301,069        90,714  555,946  44,053,592    400,805  2,245,933 TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:                                         499,759  thousands of 2008 dollars TOTAL NRC LICENSE TERMINATION COST IS 84.3% OR                                           421,241    thousands of 2008 dollars SPENT FUEL MANAGEMENT COST IS 15.3% OR:                                                   76,647    thousands of 2008 dollars NON-NUCLEAR DEMOLITION COST IS 0.4% OR:                                                   1,871    thousands of 2008 dollars TOTAL Class A RADWASTE VOLUME BURIED:                                                   655,237    Cubic Feet TOTAL Class B & C RADWASTE VOLUME BURIED:                                                 3,648    Cubic Feet TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:                                         17  Cubic Feet TOTAL CRAFT LABOR REQUIREMENTS:                                                         400,805    Man-hours End Notes:
TOTAL CRAFT LABOR REQUIREMENTS:
End Notes:
nfa - indicates that this activity not charged as decommissioning expense.
nfa - indicates that this activity not charged as decommissioning expense.
a - indicates that this activity performed by decommissioning staff.
a - indicates that this activity performed by decommissioning staff.
0- indicates that this value is less than 0.5 but is non-zero.
0- indicates that this value is less than 0.5 but is non-zero.
A cell containing" - " indicates a zero value.
A cell containing" - " indicates a zero value.
Thousands of 2008 Dollars Off-Site LLRW Packaging Transport Processing Disposal Other Costs Costs Costs Costs Costs 0
2 10 1,169 0
2 10 1,169 23 877 17 95 1,013 0
2 10 2,181 48 48 492 10 S4 S55 604 95 149 1,756 21,432 7,830 9,774 566 76,487 277,452 499,759 thousands of 2008 dollars 421,241 thousands of 2008 dollars 76,647 thousands of 2008 dollars 1,871 thousands of 2008 dollars 655,237 Cubic Feet 3,648 Cubic Feet 17 Cubic Feet 400,805 Man-hours Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 231 1,417 116 231 1,417 116 0
0 0
0 3
26 23 141 169 1,046 3
21 18 114 216 1,347 447 2,764 116 61 380 61 380 1
3 1
3 12 73 9S S87 2
12 10 64 119 735 181 1,119 4,686 28,618 116 384 96 83,598 499,759 655,237 3,083 566 GTCC Decon Removal Packaging Cu. Feet Cost Cost Costs 6
0 6
0 0
0 128 128 134 0
293 293 3
3 66 66 363 17 542 103 17 2,403 45,399 8,496 Thousands of 2011 Dollars Off-Site LLRW Transport Processing Disposal Other Total Costs Costs Costs Costs Contingency 2
13 1,268 250 2
13 1,268 2S0 0
0 2S 3
25 9S2 183 19 4
103 20 1,099 235 2
13 2,367 485 52 67 S2 67 1
1 13 S34 103 11 2
58 11 603 129 655 196 185 2,181 23,256 5,085 12,142 703 95,020 301,069 90,714 Total Costs 1,539 1,539 0
0 29 153 1,135 22 123 1,462 3,001 412 412 4
4 79 637 13 69 798 1,214 31,353 555,946 PG&E Letter HBL-11-003 Page 7 of 7 Burial I Utility and Processed Craft Contractor Wt., lbs.
Manhours Manhours 10,376 1,270 2,S60 10,376 1,270 2,S60 17,680 170 1,360 19,210 10,376 1,270 21,770 2,643 160 2,643 160 9,360 90 720 10,170 2,643 10,330 27,654 4,019 278,099 44,053,592 400,805 2,245,933


Enclosure 4 PG&E Letter HBL-11-003 Humboldt Bay Power Plant Decommissioning Cash Flow (Estimated in 2011 Dollars)
Humboldt Bay Power Plant Decommissioning Cash Flow (Estimated in 2011 Dollars)
(1 page)
(1 page)
PG&E Letter HBL-11-003


Humboldt Bay Power Plant Unit 3                                                           Enclosure 4 Decommissioning Cash Flow (Note 1)                                               PG&E Letter HBL-11-003 (Estimated in 2011 Dollars)
Year 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 TOTAL Notes:
ISFSI EngrlLicense Construction                                 Cummulative         Trust Account NRC Scope            Non-NRC Scope            Operation                                   Decommission             Funding (Radiological)        (Nonradiological)          (Note 1)                 Total               Estimate             (Note 2)
: 1.
Year 1996          $1,678,452                                                           $1,678,452             $1,678,452 1997          $8,663,216                                                           $8,663,216          $10,341,669 1998          $5,573,757                                      $344,408             $5,918,165           $16,259,834 1999            $723,490                                    $2,281,454             $3,004,944           $19,264,778 2000              $85,241                                  $2,736,091             $2,821,331           $22,086,109 2001              $89,543                                    $398,012               $487,555           $22,573,664 2002            $994,127                                      $113,704             $1,107,831           $23,681,495 2003            $494,838                                    $2,539,476             $3,034,313           $26,715,809 2004            $491,070                                    $1,444,628             $1,935,698           $28,651,506 2005            $161,506                                    $1,671,769             $1,833,274           $30,484,781 2006          $1,073,612                                    $3,546,617             $4,620,229           $35,105,009 2007          $4,474,247                                    $9,240,172           $13,714,418           $48,819,428 2008          $12,590,383                                  $28,485,988             $41,076,371           $89,895,799 2009          $32,901,391                                    $3,179,956           $36,081,347         $125,977,145 2010          $56,957,494                                    $5,734,776           $62,692,270         $188,669,415         $188,669,415 2011          $76,343,508                                    $5,156,500           $81,500,008         $270,169,423 2012          $73,123,800                                    $4,776,200           $77,900,000         $348,069,423 2013        $81,958,000                $945,300            $4,776,200           $87,679,500         $435,748,923 2014          $41 ,272,700              $945,300            $4,776,200           $46,994,200         $482,743,123         $502,451,875 2015        $36,892,300                $140,600            $4,776,200           $41,809,100         $524,552,223 2016          $4,484,500                                    $4,776,200             $9,260,700         $533,812,923 2017                    $0                                  $4,776,200             $4,776,200         $538,589,123         $536,954,618 2018                    $0                                  $4,776,200             $4,776,200         $543,365,323 2019                    $0                                  $4,776,200             $4,776,200         $548,141 ,523 2020            $3,564,900                                    $4,239,100             $7,804,000         $555,945,523 TOTAL        $444,592,074              $2,031,200          $109,322,249          $555,945,523 Notes:
: 2.
: 1. Cash Flow is based on construction of the Independent Spent Fuel Storage Installation (ISFSI) and Fuel removed from HBPP in 2020 (Assumes Department of Energy Used Fuel Repository opens 2020 allowing Humboldt Bay Power Plant (HBPP) Fuel to be shipped duri
NRC Scope Non-NRC Scope (Radiological)
: 2. Trust Account Value of $348.3 million is Expense Equivalent Liquidation Value (Includes Tax Break)
(Nonradiological)
$1,678,452
$8,663,216
$5,573,757
$723,490
$85,241
$89,543
$994,127
$494,838
$491,070
$161,506
$1,073,612
$4,474,247
$12,590,383
$32,901,391
$56,957,494
$76,343,508
$73,123,800
$81,958,000
$945,300
$41,272,700
$945,300
$36,892,300
$140,600
$4,484,500
$0
$0
$0
$3,564,900
$444,592,074
$2,031,200 Humboldt Bay Power Plant Unit 3 Decommissioning Cash Flow (Note 1)
(Estimated in 2011 Dollars)
ISFSI EngrlLicense Construction Cummulative Operation Decommission (Note 1)
Total Estimate  
$1,678,452  
$1,678,452  
$8,663,216  
$10,341,669  
$344,408  
$5,918,165  
$16,259,834  
$2,281,454  
$3,004,944  
$19,264,778  
$2,736,091  
$2,821,331  
$22,086,109  
$398,012  
$487,555  
$22,573,664  
$113,704  
$1,107,831  
$23,681,495  
$2,539,476  
$3,034,313  
$26,715,809  
$1,444,628  
$1,935,698  
$28,651,506  
$1,671,769  
$1,833,274  
$30,484,781  
$3,546,617  
$4,620,229  
$35,105,009  
$9,240,172  
$13,714,418  
$48,819,428  
$28,485,988  
$41,076,371  
$89,895,799  
$3,179,956  
$36,081,347  
$125,977,145  
$5,734,776  
$62,692,270  
$188,669,415  
$5,156,500  
$81,500,008  
$270,169,423  
$4,776,200  
$77,900,000  
$348,069,423  
$4,776,200  
$87,679,500  
$435,748,923  
$4,776,200  
$46,994,200  
$482,743,123  
$4,776,200  
$41,809,100  
$524,552,223  
$4,776,200  
$9,260,700  
$533,812,923  
$4,776,200  
$4,776,200  
$538,589,123  
$4,776,200  
$4,776,200  
$543,365,323  
$4,776,200  
$4,776,200  
$548,141,523  
$4,239,100  
$7,804,000  
$555,945,523  
$109,322,249
$555,945,523 Trust Account Funding (Note 2)
$188,669,415
$502,451,875
$536,954,618 Cash Flow is based on construction of the Independent Spent Fuel Storage Installation (ISFSI) and Fuel removed from HBPP in 2020 PG&E Letter HBL-11-003 (Assumes Department of Energy Used Fuel Repository opens 2020 allowing Humboldt Bay Power Plant (HBPP) Fuel to be shipped duri Trust Account Value of $348.3 million is Expense Equivalent Liquidation Value (Includes Tax Break)
Market Value of Trust as of 12/2010 was $313.8 million, actual expended as of 12/2010 was $188.7 million.}}
Market Value of Trust as of 12/2010 was $313.8 million, actual expended as of 12/2010 was $188.7 million.}}

Latest revision as of 07:24, 13 January 2025

Decommissioning Funding Report
ML110910149
Person / Time
Site: Humboldt Bay
Issue date: 03/31/2011
From: Conway J
Pacific Gas & Electric Co
To:
NRC/FSME, Document Control Desk
References
HBL-11-003, OP-DPR-07
Download: ML110910149 (33)


Text

Pacific Gas and Electric Company March 31,2011 PG&E Letter HBL-11-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-133, OP-DPR-7 Humboldt Bay Power Plant Unit 3 John T. Conway Senior Vice President-Energy Supply &

Chief Nuclear Officer 10 CFR 50.75 Decommissioning Funding Report for Humboldt Bay Power Plant Unit 3

Dear Commissioners and Staff:

77 Beale Street Mail Code B32 San Francisco, CA 94105 415.973.3336 Internal: 223.3336 Fax: 415.973.2313 Alternate Address Diablo Canyon Power Plant

p. O. Box 56 Avila Beach, CA 93424 805.545.3333 Fax: 805.545.4884 PG&E is submitting the decommissioning funding report for Humboldt Bay Power Plant (HBPP) Unit 3, pursuant to the requirements of 10 CFR 50.75(f).

Humboldt Bay Unit 3 At the end of calendar year 2010, the market value of the HBPP Unit 3 (220 MWt) decommissioning trust funds was $313.8 million. PG&E estimates an additional

$69.15 million (future nominal dollars) will need to be collected over three years beginning in 2011 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the California Public Utilities Commission (CPU C) per Decision 0.10-07-047. The CPUC Application is based on an Independent Spent Fuel Storage Installation (ISFSI) that would be in operation until 2020 when all fuel would be removed from HBPP by the Department of Energy (DOE).

The market value of the HBPP trust, plus actual incurred costs through 2010, is lower than the minimum amount of the NRC decommissioning estimate of

$619.0 million (2011 dollars) that was calculated pursuant to the requirements specified in 10 CFR 50.75(c), which is based on a minimum 1200 MWt plant.

PG&E is confident the HBPP trust, with the noted additional contributions, will be sufficient to ensure successful decommissioning and maintaining the spent fuel in an ISFS"I at HBPP until 2020 based on a site-specific decommissioning cost estimate prepared by TLG Services, Inc., and approved by the CPUC Decision 0.10-07-047.

Supporting Cost Estimates Based on a site-specific cost estimate prepared by TLG Services, Inc., PG&E has estimated that the decommissioning costs are approximately $555.9 million (including

$127.0 million disbursed from the Trust(s) through December 2010 and $317.6 million future radiological removal costs) for HBPP Unit 3 in 2010 dollars. These costs do not include site restoration of the facilities ($2.0 million), nor spent fuel management until 2020 ($109.3 million).

Document Control Desk March 31,2011 Page 2 PG&E Letter HBL-11-003 To assure that sufficient funds will be available for decommissioning, PG&E has established external sinking trust fund accounts for HBPP Unit 3.

Supporting Enclosures Supporting documentation for this report is included as Enclosures 1 through 4. provides decommissioning funding status information in a format suggested by Nuclear Energy Institute (NEI) and the NRC. provides information on the escalation of the required decommissioning funding amounts from 1986 dollars to 2010 dollars. As required by 10 CFR 50.75(c)(2),

and using NUREG-1577, "Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance," Revision 1, and NUREG-1307, "Report on Waste Burial Charges," Revision 14, the information includes escalation factors for energy, labor, and waste burial costs. is Appendix D from the TLG Services, Inc. decommissioning cost estimate report prepared in March 2009 for PG&E for HBPP Unit 3. The TLG Services, Inc. cost estimate has then been adjusted to reflect the costs in 2011 dollars per the CPUC Decision D.1 0-07 -04 7. The report provides cost estimates for decommissioning of nuclear, non-nuclear facilities, and spent fuel management, including operation of the ISFSI. is a cash flow of the total decommissioning of HBPP that identifies the monies for NRC scope (removal of radiological contamination), site restoration (including the nonradiological work), and the spent fuel management.

There are no regulatory commitments in this letter.

Should you have any questions in regard to this document please feel free to call Mr. Bob Kapus at (707) 444-0810.

Sincerely,

~

/.

Joh T. Conway Senior Vice President - Energy Supply and Chief Nuclear Officer Enclosures cc/enc:

Elmo E. Collins, NRC Region IV John B. Hickman, NRC Project Manager INPO HBPP Humboldt Distribution PG&E Letter HBL-11-003 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)

(2 pages)

PG&E Letter HBL-11-003 Page 1 of 2 NRC Decommissioning Funding Status Report Humboldt Bay Power Plant - Unit 3 (220 MWt)

As provided in 10 CFR 50. 75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning March 31, 1999, and annually thereafter, on the status of its decommissioning funding for each reactor that it owns and has already closed.

1. The minimum decommissioning fund estimate, pursuant to 10 CFR 50.75(b) and (C).1 January 2011 dollars (HBPP is a shutdown unit with a Site Specific Cost Study; therefore, the minimum decommissioning fund estimate is based on the Site Specific Cost Study shown in item 8 of this enclosure.)
2. The amount accumulated at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c). (Alternatively, the total amount accumulated at the end of the calendar year preceding the date of the report can be reported here if the cover letter transmitting the report provides the total estimate and indicates what portion of that estimate is for items not included in 10 CFR 50.75(b) and (c)).

Market Value (December 201 0 dollars)

3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c). (Alternatively, the annual amounts remaining to be collected can include items beyond those required in 10 CFR 50.75(b) and (c) if the cover letter transmitting the report provides a total cost estimate and indicates what portion of that estimate is for items that are not included in 10 CFR 50.75(b) and (c)). All values below are from 2009 Nuclear Decommissioning Cost Triennial Proceeding (NDCTP) filing, Final Decision D.10-07-047.

Amount remaining Number of years to collect beginning in 2010 Annual amount to be collected

$ in Millions

$619.0

$313.8

$69.15 3 years

$23.05 1

  • The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing nonradiological systems and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfers to Department of Energy are not included in the cost formulas.

PG&E Letter HBL-11-003 Page 2 of 2

4. The assumptions used regarding escalation in decommissioning cost, rates of earnings on decommissioning funds (assumes trust will be gradually converted to a more conservative, all fixed income portfolio after 2010), and rates of other factors used in funding projections (all values below are from the2009 NDCTP filing).

Escalation in decommissioning costs Rate of Return on Qualified Trust 2011 Rate of Return on Qualified Trust 2012 Rate of Return on Qualified Trust 2013 Rate of Return on Qualified Trust (2014-2020)

Rate of Return on Nonqualified Trust 2011 Rate of Return on Nonqualified Trust 2012 Rate of Return on Nonqualified Trust 2013 Rate of Return on Nonqualified Trust (2014-2020)

5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1 )(v).

NONE

6. Any modifications to a licensee's current method providing financial assurance occurring since the last submitted report.

NONE

7. Any material changes to trust agreements.

NONE

8. California Public Utilities Commission (CPUC) Submittal in 2011 dollars in millions:

Total Project (Decommission 2011)

Scope Excluded from NRC calculations Scope of ISFSI from Licensing to Decommissioning in 2020 Scope Decommissioned and disbursed from Trust(s)

Total NRC Decommissioning Remaining Scope 3.76 percent 3.34 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent 2.95 percent

$559.9 2.0

$109.3

$127.0

$317.6 PG&E Letter HBL-11-003 2011 Decommissioning Estimate (1 page)

Composite Escalation (1 page)

Development of B Component (1 page)

Development of E Component (7 pages)

Development of L Component (7 pages)

2011 Decommissioning Estimate Nuclear Regulatory Commission Estimate of Decommission Costs for Boiling Water Reactor (BWR) in 2011 HBPP BWR

($ in Millions)

January 1986 Estimate

$114.8 Escalated to 1999

$128.9 (Table 2.1 in NUREG 1307, Revision 12, has no value for 1999 Burial)

Escalated to 2000

$400.2

($360.9 in 2000 Submittal)

Escalated to 2001

$354.1

($425.3 in 2001 Submittal)

Escalated to 2002

$357.4

($445.6 in 2002 Submittal)

Escalated to 2003

$373.8

($430.1 in 2003 Submittal)

Escalated to 2004

$388.0

($439.6 in 2004 Submittal)

Escalated to 2005

$416.8

($453.2 in 2005 Submittal)

Escalated to 2006

$519.2

($494.3 in 2006 Submittal)

Escalated to 2007

$549.8

($548.6 in 2007 Submittal)

Escalated to 2008

$565.6

($590.9 in 2008 Submittal)

Escalated to 2009

$574.4

($573.8 in 2009 Submittal)

Escalated to 2010

$596.8

($596.6 in 2010 Submittal)

Escalated to 2011

$619.0 January 1986: based on 10 CFR 50.75(c) Table of Minimum Amounts.

BWR based on minimum 1200 MWt = ($104 + (.009xMWt>> million per unit where BWR less than 1200 MWt use P=1200 MWt, HBPP 220 MWt PG&E Letter HBL-11-003

Composite Escalation Calculating Overall Escalation Rate PG&E Letter HBL-11-003 BWR Jan-86 Jan-99 Jan-OO Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Weight (1 )

L (Labor)

E (Energy)

B (Burial) 1.0000 1.0000 1.0000 1.5624 0.8257 0.0000 1.6370 1.0220 10.4061 0.9365 1.1841 10.5540 0.9733 0.9715 10.7015 1.0122 1.2003 11.0993 1.0612 1.2131 11.5119 1.0958 1.4810 12.3889 2.0724 1.8656 13.3331 2.1465 1.8226 14.3491 2.2207 2.3961 14.4164 2.2639 1.7963 14.9931 (1) From NUREG-1307, Revision 14, Report on Waste Burial Charges, Section 2 Summary, Page 3... where A, B, and C are the fractions of the total 1986 dollar costs that are attributable to labor (0.65), energy (0.13), and burial (0.22), respectively, and sum to 1.0.

(2) Jan-01, Jan-03, Jan-05, Jan-07, and Jan-08 B (Burial) value in this table see calculation notes in Development of B Component spreadsheet BWR Combined Escalation Rate for:

2.2928 2.1190 15.6028 Jan-86 Jan-99 Jan-OO Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 1.0000 1.1229 3.4862 3.0846 3.1133 3.2558 3.3801 3.6303 4.5229 4.7890 4.9265 5.0035 5.1984 5.3919 2.3299 0.65 2.3659 0.13 16.2269 0.22

Development of Burial Escalation Developed from NUREG-1307, Revision 14 Table 2.1 Development of B Component PG&E Letter HBL-11-003 "VALUES OF B SUB-X AS A FUNCTION OF LLW BURIAL SITE, WASTE VENDOR, AND YEAR" (Summary for non-Atlantic Compact).

1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Revised to Bx Values for Generic LLW Disposal Site (Assumed to be same as that provided for the Atlantic Compact for lack of a better alternative at this time).

BWR BWR Burial Costs Restated to (South Carolina}

1986 = 100 1.561 1.0000 1.831 1.1730 2.361 1.5125 9.434 6.0436 9.794 6.2742 10.42 6.6752 10.379 6.6489 13.837 8.8642 13.948 8.9353 0.0000 16.244 10.4061 16.474 10.5535 16.705 10.7015 17.326 11.0993 17.970 11.5119 19.339 12.3889 20.813 13.3331 22.399 14.3491 25.231 16.1634 26.240 16.8099 27.292 17.4837 28.384 18.1830 Table 2.1 Note ('c) From 7/1/95 through 6/30/2000 access was allowed for all states except North Carolina. Effective 7/1/2000 rates are based on whether a waste generator is or is not a member of the Atlantic Compact.

2001 has no information in NUREG-1307 Rev 12. 2001 is an estimate that is calculated by applying the average percent change between 2000 and 2002, and adding to the 2000 base 2003 has no information in NUREG-1307 Rev 12. 2003 is an estimate that is calculated by applying the average percent change between 2002 and 2004, and adding to the 2002 base 2005 has no information in NUREG-1307 Rev 12. 2005 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2004 base.

2007 has no information in NUREG-1307 Rev 12. 2007 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2006 base.

2008 has no information in NUREG-1307 Rev 12. 2008 is an estimate that is calculated by applying the average percent change between 2004 and 2006, and adding to the 2007 base.

2009 has no information in NUREG-1307 Rev 13. 2009 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base.

2010 has no information in NUREG-1307 Rev 13. 2010 is an estimate that is calculated by applying the average percent change between 2006 and 2008, and adding to the 2008 base 2011 is an estimate that is calculated by applying the historical estimated escallation of 1.04 percent of previous year and adding to the 2010 base

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt = 0.46 Jan-86 114.2 82.0 1.0000 1.0000 Feb-86 115.0 62.4 1.0070 0.7610 Mar-86 114.4 51.3 1.0018 0.6256 Apr-86 113.7 49.8 0.9956 0.6073 May-86 114.1 47.0 0.9991 0.5732 Jun-86 115.3 44.7 1.0096 0.5451 Jul-86 116.2 36.4 1.0175 0.4439 Aug-86 116.3 40.1 1.0184 0.4890 Sep-86 116.3 46.3 1.0184 0.5646 Oct-86 113.0 43.1 0.9895 0.5256 Nov-86 112.7 43.5 0.9869 0.5305 Dec-86 112.3 45.6 0.9834 0.5561 Jan-87 110.3 51.4 0.9658 0.6268 Feb-87 109.8 53.1 0.9615 0.6476 Mar-87 110.2 49.7 0.9650 0.6061 Apr-87 109.9 52.0 0.9623 0.6341 May-87 111.8 53.3 0.9790 0.6500 Jun-87 113.9 55.1 0.9974 0.6720 Jul-87 116.2 56.3 1.0175 0.6866 Aug-87 115.7 59.4 1.0131 0.7244 Sep-87 115.5 56.8 1.0114 0.6927 Oct-87 111.0 59.3 0.9720 0.7232 Nov-87 109.2 61.2 0.9562 0.7463 Dec-87 109.6 58.1 0.9597 0.7085 Jan-88 108.8 54.8 0.9527 0.6683 Feb-88 109.0 51.5 0.9545 0.6280 Mar-88 109.0 49.7 0.9545 0.6061 Apr-88 109.1 53.3 0.9553 0.6500 May-88 108.9 54.3 0.9536 0.6622 Jun-88 117.2 50.6 1.0263 0.6171 Jul-88 118.2 46.9 1.0350 0.5720 Aug-88 118.3 46.8 1.0359 0.5707 Sep-88 118.5 45.9 1.0377 0.5598 Oct-88 114.2 42.3 1.0000 0.5159 Nov-88 109.2 47.2 0.9562 0.5756 Dec-88 110.5 50.6 0.9676 0.6171 Jan-89 112.0 54.9 0.9807 0.6695 Feb-89 112.0 54.0 0.9807 0.6585 Mar-89 112.3 57.3 0.9834 0.6988 Apr-89 112.4 61.5 0.9842 0.7500 May-89 113.6 57.5 0.9947 0.7012 Jun-89 119.8 53.3 1.0490 0.6500 Jul-89 122.2 52.7 1.0701 0.6427 Aug-89 122.4 53.5 1.0718 0.6524 Sep-89 122.5 59.3 1.0727 0.7232 Oct-89 117.2 64.0 1.0263 0.7805 Nov-89 113.5 64.4 0.9939 0.7854 Dec-89 114.2 68.1 1.0000 0.8305 Jan-90 114.9 85.3 1.0061 1.0402 Feb-90 115.0 59.4 1.0070 0.7244 Mar-90 115.4 60.4 1.0105 0.7366 Energy Escalation Factor (E) forBWR (Humboldt) 1.0000 0.8938 0.8287 0.8170 0.8032 0.7960 0.7537 0.7749 0.8097 0.7761 0.7769 0.7868 0.8099 0.8171 0.7999 0.8114 0.8277 0.8477 0.8653 0.8803 0.8648 0.8575 0.8597 0.8442 0.8219 0.8043 0.7942 0.8149 0.8195 0.8380 0.8220 0.8219 0.8178 0.7773 0.7811 0.8064 0.8376 0.8325 0.8525 0.8765 0.8597 0.8655 0.8735 0.8789 0.9119 0.9132 0.8980 0.9220 1.0218 0.8770 0.8845 PG&E Letter HBL-11-003 Page 1 of 7

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt = 0.54 BWR wt= 0.46 Apr-90 115.1 61.0 1.0079 0.7439 May-90 117.0 58.4 1.0245 0.7122 Jun-90 123.9 53.0 1.0849 0.6463 Jul-90 124.4 51.6 1.0893 0.6293 Aug-90 124.6 72.3 1.0911 0.8817 Sep-90 125.0 87.3 1.0946 1.0646 Oct-90 121.2 104.8 1.0613 1.2780 Nov-90 120.2 98.9 1.0525 1.2061 Dec-90 118.9 89.3 1.0412 1.0890 Jan-91 124.2 82.9 1.0876 1.0110 Feb-91 124.3 74.3 1.0884 0.9061 Mar-91 124.3 61.6 1.0884 0.7512 Apr-91 124.7 60.0 1.0919 0.7317 May-91 128.2 59.6 1.1226 0.7268 Jun-91 132.6 57.6 1.1611 0.7024 Jul-91 134.5 58.1 1.1778 0.7085 Aug-91 133.8 62.1 1.1716 0.7573 Sep-91 133.8 65.4 1.1716 0.7976 Oct-91 128.3 67.6 1.1235 0.8244 Nov-91 123.1 71.0 1.0779 0.8659 Dec-91 125.1 62.2 1.0954 0.7585 Jan-92 125.9 54.4 1.1025 0.6634 Feb-92 125.3 57.3 1.0972 0.6988 Mar-92 125.8 56.0 1.1016 0.6829 Apr-92 124.8 59.0 1.0928 0.7195 May-92 128.5 62.1 1.1252 0.7573 Jun-92 134.8 65.4 1.1804 0.7976 Jul-92 135.6 64.6 1.1874 0.7878 Aug-92 135.1 63.3 1.1830 0.7720 Sep-92 135.9 65.6 1.1900 0.8000 Oct-92 131.2 68.2 1.1489 0.8317 Nov-92 125.5 64.2 1.0989 0.7829 Dec-92 126.7 59.4 1.1095 0.7244 Jan-93 127.1 59.0 1.1130 0.7195 Feb-93 126.4 60.4 1.1068 0.7366 Mar-93 126.7 63.2 1.1095 0.7707 Apr-93 126.8 62.4 1.1103 0.7610 May-93 127.5 62.6 1.1165 0.7634 Jun-93 136.9 60.8 1.1988 0.7415 Jul-93 137.1 57.0 1.2005 0.6951 Aug-93 137.2 54.4 1.2014 0.6634 Sep-93 137.6 59.3 1.2049 0.7232 Oct-93 131.9 65.4 1.1550 0.7976 Nov-93 126.3 61.6 1.1060 0.7512 Dec-93 126.0 51.4 1.1033 0.6268 Jan-94 126.2 51.5 1.1051 0.6280 Feb-94 125.9 57.5 1.1025 0.7012 Mar-94 125.8 56.2 1.1016 0.6854 Apr-94 125.4 54.7 1.0981 0.6671 May-94 126.0 54.7 1.1033 0.6671 Jun-94 133.5 54.1 1.1690 0.6598 Energy Escalation Factor (E) forBWR (Humboldt) 0.8865 0.8808 0.8832 0.8777 0.9948 1.0808 1.1610 1.1232 1.0632 1.0523 1.0046 0.9333 0.9262 0.9405 0.9501 0.9619 0.9810 0.9996 0.9859 0.9804 0.9405 0.9005 0.9139 0.9090 0.9211 0.9560 1.0043 1.0036 0.9939 1.0106 1.0030 0.9536 0.9323 0.9320 0.9365 0.9536 0.9496 0.9541 0.9884 0.9680 0.9539 0.9833 0.9906 0.9428 0.8841 0.8856 0.9179 0.9101 0.8998 0.9027 0.9347 PG&E Letter HBL-11-003 Page 2 of?

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASEO TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Jul-94 134.5 56.3 1.1778 0.6866 Aug-94 134.5 57.5 1.1778 0.7012 Sep-94 134.9 57.7 1.1813 0.7037 Oct-94 129.1 57.7 1.1305 0.7037 Nov-94 127.0 58.8 1.1121 0.7171 Oec-94 127.4 54.7 1.1156 0.6671 Jan-95 127.6 54.7 1.1173 0.6671 Feb-95 128.0 53.3 1.1208 0.6500 Mar-95 128.3 54.3 1.1235 0.6622 Apr-95 126.4 57.1 1.1068 0.6963 May-95 130.2 59.1 1.1401 0.7207 Jun-95 135.3 55.8 1.1848 0.6805 Jul-95 136.6 53.5 1.1961 0.6524 Aug-95 136.5 55.6 1.1953 0.6780 Sep-95 133.7 58.2 1.1708 0.7098 Oct-95 131.4 57.8 1.1506 0.7049 Nov-95 127.6 59.5 1.1173 0.7256 Oec-95 127.7 60.6 1.1182 0.7390 Jan-96 127.9 62.6 1.1200 0.7634 Feb-96 127.1 59.7 1.1130 0.7280 Mar-96 127.8 63.5 1.1191 0.7744 Apr-96 129.1 74.7 1.1305 0.9110 May-96 135.0 72.0 1.1821 0.8780 Jun-96 137.5 62.8 1.2040 0.7659 Jul-96 136.0 64.3 1.1909 0.7841 Aug-96 136.2 66.5 1.1926 0.8110 Sep-96 136.2 73.4 1.1926 0.8951 Oct-96 131.2 79.7 1.1489 0.9720 Nov-96 127.1 76.5 1.1130 0.9329 Oec-96 127.7 76.1 1.1182 0.9280 Jan-97 128.3 73.7 1.1235 0.8988 Feb-97 128.1 72.3 1.1217 0.8817 Mar-97 128.2 65.2 1.1226 0.7951 Apr-97 127.3 65.3 1.1147 0.7963 May-97 129.7 64.2 1.1357 0.7829 Jun-97 135.1 60.8 1.1830 0.7415 Jul-97 135.9 57.8 1.1900 0.7049 Aug-97 134.7 61.5 1.1795 0.7500 Sep-97 136.0 60.4 1.1909 0.7366 Oct-97 130.1 64.8 1.1392 0.7902 Nov-97 127.9 65.8 1.1200 0.8024 Oec-97 128.3 59.4 1.1235 0.7244 Jan-98 127.4 54.1 1.1156 0.6598 Feb-98 127.2 52.0 1.1138 0.6341 Mar-98 126.7 48.3 1.1095 0.5890 Apr-98 126.4 50.2 1.1068 0.6122 May-98 129.2 50.0 1.1313 0.6098 Jun-98 133.8 46.3 1.1716 0.5646 Jul-98 134.8 45.0 1.1804 0.5488 Aug-98 135.2 44.0 1.1839 0.5366 Sep-98 135.2 48.3 1.1839 0.5890 Energy Escalation Factor (E) forBWR (Humboldt) 0.9518 0.9586 0.9616 0.9341 0.9304 0.9093 0.9102 0.9043 0.9113 0.9180 0.9472 0.9528 0.9460 0.9573 0.9587 0.9456 0.9371 0.9438 0.9560 0.9359 0.9605 1.0295 1.0423 1.0025 1.0038 1.0171 1.0558 1.0675 1.0301 1.0307 1.0201 1.0113 0.9720 0.9683 0.9734 0.9799 0.9669 0.9819 0.9819 0.9787 0.9739 0.9399 0.9059 0.8932 0.8701 0.8793 0.8914 0.8924 0.8898 0.8861 0.9103 PG&E Letter HBL-11-003 Page 3 of?

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Oct-98 130.4 47.4 1.1419 0.5780 Nov-98 127.6 46.2 1.1173 0.5634 Dec-98 126.6 38.8 1.1086 0.4732 Jan-99 126.1 40.9 1.1042 0.4988 Feb-99 125.5 38.2 1.0989 0.4659 Mar-99 125.5 42.8 1.0989 0.5220 Apr-99 125.2 52.5 1.0963 0.6402 May-99 127.4 52.6 1.1156 0.6415 Jun-99 131.0 52.4 1.1471 0.6390 Jul-99 133.9 58.7 1.1725 0.7159 Aug-99 133.9 63 1.1725 0.7683 Sep-99 134.1 67.6 1.1743 0.8244 Oct-99 129.5 65.5 1.1340 0.7988 Nov-99 127.5 71.3 1.1165 0.8695 Dec-99 126.5 72.9 1.1077 0.8890 Jan-OO 126.8 75.3 1.1103 0.9183 Feb-OO 126.7 87.9 1.1095 1.0720 Mar-OO 126.7 89.7 1.1095 1.0939 Apr-OO 126.8 83.1 1.1103 1.0134 May-OO 128.6 82.9 1.1261 1.0110 Jun-OO 133.6 86.2 1.1699 1.0512 Jul-OO 136.2 88.7 1.1926 1.0817 Aug-OO 137.4 91.6 1.2032 1.1171 Sep-OO 137.8 110.1 1.2067 1.3427 Oct-OO 134.1 108.6 1.1743 1.3244 Nov-OO 130.9 108.4 1.1462 1.3220 Dec-OO 132.7 100.6 1.1620 1.2268 Jan-01 136.4 96.1 1.1944 1.1720 Feb-01 136.4 91.6 1.1944 1.1171 Mar-01 136.5 83.1 1.1953 1.0134 Apr-01 135.1 86.2 1.1830 1.0512 May-01 136.2 94.2 1.1926 1.1488 Jun-01 148.4 90.2 1.2995 1.1000 Jul-01 149.5 81.3 1.3091 0.9915 Aug-01 148.9 83.2 1.3039 1.0146 Sep-01 148.2 93 1.2977 1.1341 Oct-01 143.8 76.8 1.2592 0.9366 Nov-01 137.3 70.5 1.2023 0.8598 Dec-01 136.9 56.6 1.1988 0.6902 Jan-02 136.3 58.3 1.1935 0.7110 Feb-02 135.4 59.6 1.1856 0.7268 Mar-02 135.7 69.1 1.1883 0.8427 Apr-02 135.4 76.4 1.1856 0.9317 May-02 137.9 75 1.2075 0.9146 Jun-02 143.6 71.4 1.2574 0.8707 Jul-02 144.9 75.5 1.2688 0.9207 Aug-02 145.0 77.9 1.2697 0.9500 Sep-02 145.8 89.5 1.2767 1.0915 Oct-02 140.0 95.1 1.2259 1.1598 Nov-02 139.5 82.8 1.2215 1.0098 Dec-02 139.6 84.6 1.2224 1.0317 Energy Escalation Factor (E) forBWR (Humboldt) 0.8825 0.8625 0.8163 0.8257 0.8077 0.8335 0.8865 0.8975 0.9134 0.9624 0.9866 1.0133 0.9798 1.0029 1.0071 1.0220 1.0922 1.1023 1.0658 1.0731 1.1153 1.1416 1.1636 1.2692 1.2433 1.2271 1.1918 1.1841 1.1588 1.1116 1.1224 1.1725 1.2077 1.1630 1.1708 1.2225 1.1108 1.0447 0.9649 0.9715 0.9746 1.0293 1.0688 1.0728 1.0796 1.1087 1.1226 1.1915 1.1955 1.1241 1.1347 PG&E Letter HBL-11-003 Page 4 of?

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt= 0.46 Jan-03 140.3 95.7 1.2285 1.1671 Feb-03 140.6 120.4 1.2312 1.4683 Mar-03 143.3 128.9 1.2548 1.5720 Apr-03 144.3 98.3 1.2636 1.1988 May-03 145.1 85.5 1.2706 1.0427 Jun-03 148.3 87.2 1.2986 1.0634 Jul-03 151.6 90.1 1.3275 1.0988 Aug-03 151.3 94.1 1.3249 1.1476 Sep-03 152.0 88.2 1.3310 1.0756 Oct-03 147.4 97.8 1.2907 1.1927 Nov-03 142.7 93.0 1.2496 1.1341 Dec-03 142.9 95.8 1.2513 1.1683 Jan-04 143.1 106.8 1.2531 1.3024 Feb-04 143.1 100.8 1.2531 1.2293 Mar-04 143.1 107.8 1.2531 1.3146 Apr-04 143.1 115.2 1.2531 1.4049 May-04 144.2 116 1.2627

'1.4146 Jun-04 152.4 111.5 1.3345 1.3598 Jul-04 152.2 119.3 1.3327 1.4549 Aug-04 154.0 131.1 1.3485 1.5988 Sep-04 154.0 136.8 1.3485 1.6683 Oct-04 145.8 161.7 1.2767 1.9720 Nov-04 144.9 153.6 1.2688 1.8732 Dec-04 146.2 133.8 1.2802 1.6317 Jan-05 148.9 138.5 1.3039 1.6890 Feb-05 148.0 146 1.2960 1.7805 Mar-05 148.1 169.4 1.2968 2.0659 Apr-05 148.7 170.9 1.3021 2.0841 May-05 151.1 165.3 1.3231 2.0159 Jun-05 159.7 180.6 1.3984 2.2024 Jul-05 162.1 186.2 1.4194 2.2707 Aug-05 162.5 194.5 1.4229 2.3720 Sep-05 162.8 209.9 1.4256 2.5598 Oct-05 159.5 252.0 1.3967 3.0732 Nov-05 161.1 199.1 1.4107 2.4280 Dec-05 161.4 193.6 1.4133 2.3610 Jan-06 167.0 191.8 1.4623 2.3390 Feb-06 168.6 190.0 1.4764 2.3171 Mar-06 167.4 199.2 1.4658 2.4293 Apr-06 169.6 221.9 1.4851 2.7061 May-06 170.8 231.4 1.4956 2.8220 Jun-06 181.2 238.1 1.5867 2.9037 Jul-06 181.9 231.6 1.5928 2.8244 Aug-06 180.2 241.4 1.5779 2.9439 Sep-06 181.0 203.1 1.5849 2.4768 Oct-06 171.2 198.1 1.4991 2.4159 Nov-06 167.2 198.2 1.4641 2.4171 Dec-06 167.8 200.4 1.4694 2.4439 Jan-07 171.9 180.0 1.5053 2.1951 Feb-07 175.7 191.5 1.5385 2.3354 Mar-07 172.1 215.1 1.5070 2.6232 Energy Escalation Factor (E) forBWR (Humboldt) 1.2003 1.3402 1.4007 1.2338 1.1657 1.1904 1.2223 1.2433 1.2135 1.2456 1.1965 1.2131 1.2758 1.2421 1.2814 1.3229 1.3326 1.3461 1.3889 1.4636 1.4956 1.5965 1.5468 1.4419 1.4810 1.5188 1.6506 1.6618 1.6418 1.7683 1.8110 1.8595 1.9473 2.1679 1.8787 1.8492 1.8656 1.8631 1.9090 2.0468 2.1057 2.1925 2.1593 2.2063 1.9952 1.9208 1.9025 1.9176 1.8226 1.9051 2.0204 PG&E Letter HBL-11-003 Page 5 of?

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES 10: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

PPI for Light PPI for Fuels &

PPI for Light Related Products Fuel Oils Related Products Fuel Oils (1982 = 100)

(1982=100)

(1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils (P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt= 0.54 BWR wt = 0.46 Apr-07 173.1 231.8 1.5158 2.8268 May-07 179.2 225.3 1.5692 2.7476 Jun-07 186.7 222.4 1.6349 2.7122 Jul-07 187.0 237.8 1.6375 2.9000 Aug-07 187.6 225.5 1.6427 2.7500 Sep-07 188.4 238.9 1.6497 2.9134 Oct-07 182.7 243.3 1.5998 2.9671 Nov-07 180.3 288.2 1.5788 3.5146 Dec-07 180.0 266.7 1.5762 3.2524 Jan-08 181.9 273.8 1.5928 3.3390 Feb-08 180.0 280.2 1.5762 3.4171 Mar-08 183.1 339.6 1.6033 4.1415 Apr-08 185.2 352.5 1.6217 4.2988 May-08 189.5 384.9 1.6594 4.6939 Jun-08 191.9 410.5 1.6804 5.0061 Jul-08 196.1 423.8 1.7172 5.1683 Aug-08 197.1 343.9 1.7259 4.1939 Sep-08 195.9 335.1 1.7154 4.0866 Oct-08 193.0 279.0 1.6900 3.4024 Nov-08 187.7 218.2 1.6436 2.6610 Dec-08 188.3 163.0 1.6489 1.9878 Jan-09 190.3 159.8 1.6664 1.9488 Feb-09 190.3 145.6 1.6664 1.7756 Mar-09 187.6 136.8 1.6427 1.6683 Apr-09 186.9 159.9 1.6366 1.9500 May-09 190.5 158.6 1.6681 1.9341 Jun-09 193.3 183.7 1.6926 2.2402 Jul-09 196.2 165.2 1.7180 2.0146 Aug-09 194.7 196.1 1.7049 2.3915 Sep-09 194.9 186.6 1.7067 2.2756 Oct-09 189.9 193.3 1.6629 2.3573 Nov-09 186.0 207.8 1.6287 2.5341 Dec-09 186.0 197.5 1.6287 2.4085 Jan-10 186.3 220.7 1.6313 2.6915 Feb-10 186.1 200.2 1.6296 2.4415 Mar-10 189.0 217.0 1.6550 2.6463 Apr-10 188.8 231.5 1.6532 2.8232 May-10 192.0 226.0 1.6813 2.7561 Jun-10 197.8 212.4 1.7320 2.5902 Jul-10 199.8 209.3 1.7496 2.5524 Aug-10 200.8 221.4 1.7583 2.7000 Sep-10 200.0 220.0 1.7513 2.6829 Oct-10 194.7 236.0 1.7049 2.8780 Nov-10 192.9 245.5 1.6891 2.9939 Dec-10 191.3 252.1 1.6751 3.0744 Jan-11 191.9 260.0 1.6804 3.1707 Energy Escalation Factor (E) forBWR (Humboldt) 2.1189 2.1112 2.1304 2.2182 2.1521 2.2310 2.2288 2.4693 2.3473 2.3961 2.4230 2.7709 2.8532 3.0553 3.2102 3.3047 2.8612 2.8062 2.4777 2.1116 1.8048 1.7963 1.7166 1.6545 1.7808 1.7905 1.9445 1.8545 2.0207 1.9684 1.9823 2.0452 1.9874 2.1190 2.0031 2.1110 2.1914 2.1757 2.1268 2.1189 2.1915 2.1799 2.2446 2.2893 2.3188 2.3659 PG&E Letter HBL-11-003 Page 6 of7

Development of E Component Calculation of Energy Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.2 Using Regional Indices SERIES ID: WPU0573 Light Fuel Oils (as of 03/06/09) and WPU0543 Industrial Electric Power (as of 03/06/09)

REBASED TO 1986 = 100 PPI for Fuels &

Related Products (1982 = 100)

(P) =Industrial Energy Power PPI for Light Fuel Oils (1982=100)

(F) = Light Fuel Oils Oct 10 through Jan 11 are Preliminary Values from PPllndices PPI for Fuels &

PPI for Light Related Products Fuel Oils (1986 = 100)

(1986=100)

(P) =Industrial Energy Power (F) = Light Fuel Oils BWR wt = 0.54 BWR wt = 0.46 Energy Escalation Factor (E) forBWR (Humboldt)

PG&E Letter HBL-11-003 Page? of?

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factorfor West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 1 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Jan-86 89.8 1.00000 Feb-86 Mar-86 Apr-86 90.8 1.01114 May-86 Jun-86 Jul-86 91.2 1.01559 Aug-86 Sep-86 Oct-86 91.6 1.02004 Nov-86 Dec-86 Jan-87 92.5 1.03007 Feb-87 Mar-87 Apr-87 92.6 1.03118 May-87 Jun-87 Jul-87 93.7 1.04343 Aug-87 Sep-87 Oct-87 94.1 1.04788 Nov-87 Dec-87 Jan-88 95.4 1.06236 Feb-88 Mar-88 Apr-88 96.3 1.07238 May-88 Jun-88 Jul-88 97 1.08018 Aug-88 Sep-88 Oct-88 97.7 1.08797 Nov-88 Dec-88 Jan-89 98.8 1.10022 Feb-89 Mar-89 Apr-89 100 1.11359 May-89 Jun-89 Jul-89 101 1.12472 Aug-89 Sep-89 Oct-89 101.8 1.13363 Nov-89 Dec-89

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU20100000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 2 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost I ndust West Region Labor Private Industry Escalation (1989=100)

Factor Jan-90 103.3 1.15033 Feb-90 Mar-90 Apr-90 104.5 1.16370 May-90 Jun-90 Jul-90 105.6 1.17595 Aug-90 Sep-90 Oct-90 106.3 1.18374 Nov-90 Dec-90 Jan-91 107.5 1.19710 Feb-91 Mar-91 Apr-91 108.9 1.21269 May-91 Jun-91 Jul-91 110 1.22494 Aug-91 Sep-91 Oct-91 110.9 1.23497 Nov-91 Dec-91 Jan-92 111.9 1.24610 Feb-92 Mar-92 Apr-92 112.9 1.25724 May-92 Jun-92 JUI-92 114.1 1.27060 Aug-92 Sep-92 Oct-92 114.9 1.27951 Nov-92 Dec-92 Jan-93 116.2 1.29399 Feb-93 Mar-93 Apr-93 116.4 1.29621 May-93 Jun-93 Jul-93 117.8 1.31180 Aug-93 Sep-93 Oct-93 118.1 1.31514 Nov-93 Dec-93

Development of L Component Calculation of Labor Escalation Factor-Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 3 of?

Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Jan-94 119.4 1.32962 Feb-94 Mar-94 Apr-94 120.5 1.34187 May-94 Jun-94 JUI-94 121.3 1.35078 Aug-94 Sep-94 Oct-94 121.7 1.35523 Nov-94 Dec-94 Jan-95 122.6 1.36526 Feb-95 Mar-95 Apr-95 123.4 1.37416 May-95 Jun-95 Jul-95 123.9 1.37973 Aug-95 Sep-95 Oct-95 125 1.39198 Nov-95 Dec-95 Jan-96 125.9 1.40200 Feb-96 Mar-96 Apr-96 127.3 1.41759 May-96 Jun-96 Jul-96 128.3 1.42873 Aug-96 Sep-96 Oct-96 128.9 1.43541 Nov-96 Dec-96 Jan-97 130.3 1.45100 Feb-97 Mar-97 Apr-97 131.4 1.46325 May-97 Jun-97 JUI-97 132.5 1.47550 Aug-97 Sep-97 Oct-97 133.4 1.48552 Nov-97 Dec-97

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 4 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Jan-98 135.2 1.50557 Feb-98 Mar-98 Apr-98 136.6 1.52116 May-98 Jun-98 Jul-98 138.5 1.54232 Aug-98 Sep-98 Oct-98 140 1.55902 Nov-98 Dec-98 Jan-99 140.3 1.56236 Feb-99 Mar-99 Apr-99 142.1 1.58241 May-99 Jun-99 JUI-99 143.3 1.59577 Aug-99 Sep-99 Oct-99 144.7 1.61136 Nov-99 Dec-99 Jan-OO 147 1.63697 Feb-OO Mar-OO Apr-OO 148.8 1.65702 May-OO Jun-OO Jul-OO 150.8 1.67929 Aug-OO Sep-OO Oct-OO 151.8 1.69042 Nov-OO Dec-OO Jan-01 84.1 0.93653 Feb-01 Mar-01 Apr-01 85 0.94655 May-01 Jun-01 Jul-01 85.9 0.95657 Aug-01 Sep-01 Oct-01 86.9 0.96771 Nov-01 Dec-01

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES 10: CIU201 00000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 5 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Jan-02 87.4 0.97327 Feb-02 Feb-02 Mar-02 Apr-02 88.5 0.98552 May-02 Jun-02 Jul-02 89.1 0.99220 Aug-02 Sep-02 Oct-02 89.8 1.00000 Nov-02 Dec-02 Jan-03 90.9 1.01225 Feb-03 Mar-03 Apr-03 92 1.02450 May-03 Jun-03 Jul-03 93.2 1.03786 Aug-03 Sep-03 Oct-03 93.8 1.04454 Nov-03 Dec-03 Jan-04 95.3 1.06125 Feb-04 Mar-04 Apr-04 96.2 1.07127 May-04 Jun-04 Jul-04 96.9 1.07906 Aug-04 Sep-04 Oct-04 97.4 1.08463 Nov-04 Dec-04 Jan-05 98.4 1.09577 Feb-05 Mar-05 Apr-05 99.3 1.10579 May-05 Jun-05 Jul-05 99.7 1.11024 Aug-05 Sep-05 Oct-05 (Note 1) 100 2.06000 Nov-05

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU201 00000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 6 of?

Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Dec-05 Jan-06 100.6 2.07236 Feb-06 Mar-06 Apr-06 101.8 2.09708 May-06 Jun-06 Jul-06 102.5 2.11150 Aug-06 Sep-06 Oct-06 103 2.12180 Nov-06 Dec-06 Jan-07 104.2 2.14652 Feb-07 Mar-07 Apr-07 104.9 2.16094 May-07 Jun-07 Jul-07 105.7 2.17742 Aug-07 Sep-07 Oct-07 106.5 2.19390 Nov-07 Dec-07 Jan-08 107.8 2.22068 Feb-08 Mar-08 Apr-08 108.4 2.23304 May-08 Jun-08 Jul-08 109.3 2.25158 Aug-08 Sep-08 Oct-08 109.4 2.25364 Nov-08 Dec-08 Jan-09 109.9 2.26394 Feb-09 Mar-09 Apr-09 110 2.26600 May-09 Jun-09 Jul-09 110.3 2.27218 Aug-09 Sep-09 Oct-09 110.6 2.27836 Nov-09

Development of L Component Calculation of Labor Escalation Factor - Reference NUREG-1307, Revision 14, Section 3.1 Using Regional Indices SERIES ID: CIU20100000002401 (as of 03/06/09)

Jan '86 adjusted to reflect NUREG 1307, Revision 14, Scaling Factor for West Labor (Pg 7)

PG&E Letter HBL-11-003 Page 7 of 7 Note 1: The Base Labor factor was reindexed in December 2005, at which time the index was reset to 100.

Employment Cost Indust West Region Labor Private Industry Escalation (1989=100)

Factor Dec-09 Jan-10 111.3 2.29278 Feb-10 Mar-10 Apr-10 111.7 2.30102 May-10 Jun-10 Jul-10 112.3 2.31338 Aug-10 Sep-10 Oct-10 112.5 2.31750 Nov-10 Dec-10 Jan-11 113.1 2.32986 Jan-11 is an estimate based on cyclical differences between 0409-0110 and 0408-0109; roughly.6.

PG&E Letter HBL-11-003 Humboldt Bay Power Plant, Unit 3 Decommissioning Cost Study Area-By-Area Estimate (7 pages)

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I

PERIOD 2 - SAFSTOR Dormancy ISFSI Completed Projects ISFSI Design & Licensing 1998-2000 ISFSI Design & Licensing 2001 ISFSI Design & Licensing 2002 ISFSI Design & Licensing 2003 ISFSI Design & Licensing 2004 ISFSI Design & Licensing 2005 ISFSI Design & Licensing 2006 ISFSI Design/Licensing/Construction 2007 ISFSI Design/Licensing/Construction 2008 ISFSI Design/Licensing/Construction 2009 HBPP Unit #3 1996 - 2008 Completed Projects Dismantlement of Ventilation Stack Caisson In-Leakage Repair Suppression Chamber/Remove Baffling & Floor Plates Site Characterization for Dismantlement Miscellaneous Dismantlement Activities Planning Decommissioning Activity/Misc Dismantlement Activities Remove & Dispose Asbestos Radiological Characterization Plant Systems Irradiated Hardware Spent Fuel Pool Cleanout and Disposal Removal & Disposal Energy Absorber Removal & Disposal Control Rod Drive Hydraulic Pump Equipment Removal & Disposal Service Water Heat Exchanger Equipment Decon Cost Removal & Disposal Reactor Water Cleanup Demineralizer Resin Tank Removal/Disposal Class A Radioactive Waste Material Removal/Disposal Class B & C Materials inel Resin PERIOD 2 TOTALS I

PERIOD 3b - Planning and Preparation I

Period 3b Additional Costs 3b.2.1 Additional Support Facilities - Radiological Protection 3b.2.2 Additional Support Facilities - Access, Fencing, Laydown Areas 3b.2.3 Personnel & Material Access RB Access Shaft 3b.2.4 Cross Contamination Plan 3b.2.5 Replacement of Rad Protection Access Software System 3b.2.6 Employee Emergency Notification System 3b.2.7 Infrastructure for Facility Modifications 3b.2.8 Mixed Waste Disposal 3b.2.9 Rebuild Refueling Building Crane 3b.2.10 Sr-90 Groundwater Program 3b.2.11 Package Legacy Class B & C Waste 3b.2.12 Procure Initial Inventory of Tools and Equipment 3b.2 Subtotal Period 3b Additional Costs Period 3b Collateral Costs 3b.3.1 Decon equipment 954 3b.3.2 DOC staff relocation expenses 3b.3.3 Pipe cutting equipment 3b.3 Subtotal Period 3b Collateral Costs 954 Period 3b Period-Dependent Costs 3b.4.1 Decon supplies 14 Period 3b Period-Dependent Costs (continued) 3b.4.2 Insurance 3b.4.3 Property taxes 3b.4.4 Health physics supplies 3bA.5 Heavy equipment rental 3b.4.6 Disposal of DAW generated 3b.4.7 Plant energy budget 3b.4.8 NRC Fees 3b.4.9 Emergency Planning Fees 3bA.10 Environmental/ Engineering Support 3b.4.11 ISFSI Operating Costs 3b.4.12 Security Staff Cost 3bA.13 DOC Staff Cost 3b.4.14 Utility Staff Cost 3b.4 Subtotal Period 3b Period-Dependent Costs 14 3b.0 TOTAL PERIOD 3b COST 969 Removal Packaging Cost Costs 3

3 1,000 1,000 146 74 0

219 0

1,219 4

Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 5,362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 1,385 378 520 720 480 320 720 7

61 1,418 454 1,535 2,100 7

61 10,030 1,436 1,436 20 0

29 45 61 25 999 21 897 2,151 1,246 0

29 5,465 7

90 16,931 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B ClassC Contingency Costs Cu. Feet Cu. Feet Cu. Feet 5.362 398 114 2.539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 267 1,652 73 451 100 620 180 900 120 600 80 400 180 900 21 92 126 273 1,691 87 541 296 1,831 405 2,505 2,083 12,183 126 613 1,568 277 1,713 321 1,321 1,211 4,602 5

19 3

23 47 192 24 97 9

39 116 9

53 8

69 3

28 192 1,191 4

25 173 1,070 415 2,566 240 1,486 1,131 6,B60 116 4,425 23,645 242 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 4

8 70 4

8 70 1,010 1,058 1,010 1,058 15 154 78 0

0 34 15 232 0

0 34 1,025 1,290 4

8 104 Other Total Costs Contingency 5,362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 82,301 1,465 282 400 77 564 109 762 190 508 127 338 85 762 190 23 1,500 289 480 93 1,666 321 2,221 428 10,609 2,203 649 1,519 293 340 1,519 1,281 5

21 3

49 25 10 47 9

65 8

26 3

1,056 204 22 4

949 183 2,276 439 1,318 254 5,781 1,196 17,909 4,681 Total Costs 5.362 398 114 2,539 1,445 1,672 3,547 9,509 29,200 500 5,740 1,528 7,931 1,150 300 864 800 732 2,676 122 201 66 37 1,045 4,822 1,747 477 672 952 635 423 952 104 1,789 573 1,987 2,650 12,894 1,658 1,812 1,398 4,868 20 24 203 103 44 56 73 30 1,260 26 1,132 2,714 1,572 7,259 25,021 PG&E Letter HBL-11-003 Page 1 of 7 Burial/

Utility and Processed Craft Contractor Wt., Lb$.

Manhours Manhours 18,395 18,395 2,318 1

16,457 25,113 19,713 2,318 1

61,2B2 20,713 1

61,282

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description PERIOD 3 TOTALS PERIOD 4a

  • Systems Removal Period 4a Direct Decommissioning Activities Removal of Major Equipment 4a.1.1 Main Turbine!Generator 4a.1.2 Main Condensers 4a.1.3 Remove Spent Fuel Racks 4a.1.4 Fuel Pool Cleanup Disposal of Plant Systems 4a.1.5.1 RB2-1 4a.1.5.2 RB2-2 4a.1.5.3 RB2-3 4a.1.5.4 RB2-4 4a.1.5.5 RB2-5 4a.1.5.6 RB2-6 4a.1.5.7 RB3-1 4a.1.5.8 RB4-1 4a.1.5.9 TB1-1 4a.1.5.10 TB1-2 4a.1.5.11 TB1-3 4a.1.5.12 TB2-1 4a.1.5.13 TB2-2 4a.1.5.14 TB3*1 4a.1.5.15 TB3-2 4a.1.5.16 TB3-3 clean area 4a.1.5.17 TB4-1 4a.1.5.18 TB4-2 4a.1.5.19 TB5-1 4a.1.5.20 TB5-2 4a.1.5.21 TB6-1 4a.1.5.22 TB6-2 4a.1.5.23 YARD 4a.1.5.24 YD1-1 clean area 4a.1.5 Totals 4a.1.6 Scaffolding in support of decommissioning 4a.1 Subtotal Period 4a Activity Costs Period 4a Additional Costs 4a.2.1 Modifications Supporting Access for Equipment Removal 4a.2.2 Activation Analysis of Reactor Subtotal Period 4a Additional Costs Period 4a Collateral Costs 4a.3.1 Process liquid waste 4a.3.2 Small tool allowance 4a.3 Subtotal Period 4a Collateral Costs Period 4a Period-Dependent Costs 4a.4.1 Decon supplies 4a.4.2 Insurance 4a.4.3 Property taxes 4a.4.4 Health physics supplies 4a.4.5 Heavy equipment rental 4a.4.6 Disposal of DAW generated 4a.4.7 Plant energy budget 4a.4.8 NRC Fees 4a.4.9 Emergency Planning Fees 4a.4.10 Environmental! Engineering Support 4a.4.11 ISFSI Operating Costs 4a.4.12 Security Staff Cost 4a.4.13 DOC Staff Cost 4a.4.14 Utility Staff Cost 4a.4 Subtotal Period 4a Period-Dependent Costs 4a.0 TOTAL PERIOD 4a COST PERIOD 4b - Reactor Vessel Removal Period 4b Direct Decommissioning Activities Nuclear Steam Supply System Removal 4b.1.1.1 CRDMs & Nls Removal 4b.1.1.2 I Reactor Vessel Internals Decon Removal Packaging Cost Cost Costs 969 1,219 4

555 70 496 914 55 11 23 119 20 124 25 205 9

48 3

284 54 367 24 95 14 148 30 283 122 4

16 1,149 117 38 509 85 6

10 117 20 697 62 153 12 92 13 109 19 128 26 2

15 4,719 654 151 4

55 5,932 1,664 15 8

93 15 93 8

117 2,385 1,268 8

117 3,653 8

187 9,679 1,680 4

31 104 13 1,774 1,656 Thousands of 2008 Dollars Off*Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 7

90 16,931 102 1,469 41 3,047 21 510 415 6

169 7

233 2

20 1

8 10 96 7

63 3

64 9

213 41 1,620 34 1,341 23 429 6

167 17 458 3

141 3

107 5

131 7

202 182 5,462 0

10 6

346 10 10,495 415 170 80 250 34 26 34 26 162 3

844 459 1,316 202 7,273 170 7,182 21,109 12,325 3

844 50,198 383 10 11,365 50,863 20 202 384 1,497 119 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 4,425 23,645 242 679 2,875 5,850 1,264 5,762 12,135 210 830 2,025 80 495 96 410 868 119 509 1,089 74 310 322 18 78 123 131 575 1,551 143 604 1,024 53 229 407 121 520 1,354 635 2,702 6,430 1

5 5

21 822 3,462 5,321 12 51 316 1,361 3,601 2

8 3

14 95 404 950 382 1,615 2,602 97 406 560 66 280 498 80 344 742 111 474 1,148 1

2 5

20 3,390 14,406 28,591 53 225 20 5,675 24,593 48,622 33 203 20 100 53 303 26 108 104 30 123 56 232 104 37 154 21 183 766 3,152 407 1,675 273 1,128 3,349 89 548 169 1,485 26 228 1,402 8,675 33 203 1,384 8,567 4,069 25,177 2,376 14,700 11,052 65,875 3,349 16,835 91,003 52,075 95 456 913 3,358 8,802 506 470 Thousands of 2011 Dollars Off*Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 1,025 1,290 4

8 104 587 74 127 1,825 525 966 52 3,786 58 11 24 26 634 129 21 7

210 134 27 9

290 222 10 3

25 52 3

1 10 308 59 12 119 398 26 8

79 103 15 3

79 160 33 11 264 308 133 51 2,013 4

18 1,247 127 42 1,666 42 552 92 28 532 7

11 126 21 7

208 756 67 21 569 166 13 4

175 100 14 4

132 119 20 6

162 139 28 9

251 2

17 5,121 710 226 6,785 164 4

0 13 8

60 6,437 1,806 430 13 13,037 17 8

42 33 101 17 101 8

42 33 127 2,588 1,376 9

4 1,048 127 3,964 9

4 1,048 203 10,503 1,823 476 13 14,118 5

33 113 25 251 14 1,925 1,797 477 1,859 Other Total Total Costs Contingency Costs 17,909 4,681 25,021 718 3,331 1,337 6,665 222 976 439 85 524 104 472 129 590 80 340 20 86 142 641 155 666 58 259 132 599 689 3,193 1

5 6

23 891 3,973 13 55 343 1,548 2

9 4

15 103 466 415 1,827 105 464 72 322 87 394 120 547 1

2 5

22 3,678 16,519 58 247 451 6,158 28,392 184 36 220 87 22 109 271 57 328 28 127 33 134 60 261 41 167 176 23 199 832 3,420 442 1,818 296 1,358 498 96 595 1,428 184 1,612 219 28 247 7,892 1,521 9,413 184 36 220 7,794 1,502 9,296 22,905 4,415 27,320 13,374 2,578 15,951 54,471 11,992 71,616 55,193 18,268 100,597 103 530 129 3,644 9,846 PG&E Letter HBL-11-003 Page 2 of7 Burial I Utility and Processed Craft Contractor Wt., Lbs.

Manhours Manhours 20,713 1

61,282 488,000 3,392 247,000 1,984 34,700 211 750 32,917 2,012 41,259 2,071 12,297 3,538 4,686 820 59,756 4,801 38,844 6,263 15,696 1,654 51,348 2,506 242,716 4,932 68 291 201,577 19,280 692 134,937 8,633 113 188 35,935 1,857 98,837 11,710 20,574 2,617 18,961 1,543 28,239 1,832 43,543 2,166 31 278 1,082,122 79,898 5,967 825 1,857,788 87,060 6,251 27 6,251 27 66,974 22 133,486 251,787 213,619 66,974 22 598,892 1,931,014 87,108 598,892 24,050 628 60,589 13,200 660

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4b.l.l.3 Reactor Vessel 4b.l.l Totals Disposal of Plant Systems 4b.l.2.1 RB2-7 4b.l.2.2 RB2-8 4b.l.2.3 RB2-9 4b.l.2.4 RW1-1 4b.l.2.5 RWl-2 4b.l.2.6 RWl-3 4b.l.2.7 RWl-4 4b.1.2.8 RWl-5 4b.l.2.9 RWl-6 4b.l.2.10 RWl-7 4b.l.2.11 RWl-8 4b.l.2.12 RWl-9 4b.l.2.13 RWP 4b.l.2 Totals 4b.l.3 Scaffolding in support of decommissioning 4b.l Subtotal Period 4b Activity Costs Period 4b Additional Costs 4b.2.1 Discharge Piping 4b.2.2 Asbestos Removal 4b.2.3 Expand Waste Packaging Laydown Area 4b.2 Subtotal Period 4b Additional Costs Period 4b Collateral Costs 4b.3.1 Process liquid waste 4b.3.2 Small tool allowance 4b.3 Subtotal Period 4b Collateral Costs Period 4b Period-Dependent Costs 4b.4.1 Decon supplies 4b.4.2 Insurance 4b.4.3 Property taxes 4b.4.4 Health physics supplies 4b.4.5 Heavy equipment rental 4b.4.6 Disposal of DAW generated 4b.4.7 Plant energy budget 4b.4.8 NRC Fees 4b.4.9 Emergency Planning Fees 4b.4.10 Environmental I Engineering Support 4b.4.11 Radwaste Processing Equipment/Services 4b.4.12 ISFSI Operating Costs 4b.4.13 Security Staff Cost 4b.4.14 DOC Staff Cost 4b.4.15 Utility Staff Cost 4b.4 Subtotal Period 4b Period-Dependent Costs 4b.0 TOTAL PERIOD 4b COST PERIOD 4c - Prepare Buildings for Demolition Period 4c Direct Decommissioning Activities Disposal of Plant Systems 4c.1.1.1 HMS1-l 4c.l.1.2 HMSl-2 4c.1.1.3 HMSP 4c.l.l.4 OTS-l 4c.l.l.5 OTS-2 4c.l.l.6 OTS-3 4c.l.l.7 OTS-4 4c.l.1.8 OTS-5 4c.l.l.9 OTS-6 4c.l.l.10 RB1-l 4c.l.1.11 RBl-2 4c.l.1.12 RBl-3 4c.l.1.13 RBl-4 4c.1.1.14 RBl-5 4c.l.1.15 RBl-6 4c.1.1.16 RB3-2 4c.l.l.17 RB4-2 4c.l.1.18 RB5-1 4c.l.l.19 RB5-1 (HVAC Scope)

Decon Removal Packaging Cost Cost Costs 2

4,098 536 20 5,903 2,296 306 28 115 269 62 115 267 59 265 27 269 54 5

1 122 15 108 11 49 14 19 5

5 1

4 0

178 230 1.867 277 189 5

249 7,959 2.577 50 21 9

50 21 9

31 15 73 31 73 15 475 1,822 2,261 6

475 4,083 6

806 12,136 2,608 36 8

5 3

6 1

6 6

7 6

25 3

1 88 8

32 3

21 2

116 14 127 16 52 211 20 15 3

62 7

23 3

22 9

Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 132 7,966 119 536 9.664 238 6

108 21 203 20 192 7

283 16 161 0

8 4

173 3

140 4

44 1

11 0

2 0

1 83 1.325 0

13 8

619 13 10.998 238 36 144 285 136 36 144 421 68 53 68 53 122 3

652 273 990 152 4.225 564 128 5.387 14.641 9,835 3

652 36,316 725 13 11.847 36.975 3

34 1

9 0

2 1

21 2

91 1

29 1

7 4

50 4

44 6

228 1

22 2

76 1

9 3

29 Humboldt Bay Power Plant, Unit 3 AREA-BY-AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 9.306 22.158 381 2,699 12.759 31.416 1.800 2,699 470 138 585 904 237 906 3.267 233 886 3.104 181 764 1.124 148 648 2.604 4

19 34 98 412 741 82 343 554 32 144 708 10 47 172 3

11 34 2

7 17 57 235 1.225 5.006 13.264 66 281 25 14,050 36,703 15.089 2,699 470 94 354 2,361 55 340 26 162 175 856 2,361 52 218 210 23 96 75 314 210 153 628 16 138 585 2,407 726 2,988 211 872 2,587 53 325 127 1,117 20 171 814 5,039 109 673 25 152 1,038 6,425 2.822 17,463 1,896 11,731 8,594 50,129 2,587 22,894 88.003 20.246 2.699 470 24 105 419 5

24 152 3

12 34 2

7 2

8 2

10 2

8 15 65 84 0

1 59 248 361 20 85 116 9

40 106 56 239 611 58 249 711 178 695 907 12 53 93 46 193 325 11 47 148 18 80 467 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 2

4,447 581 164 9.896 21 6,406 2,491 666 12.006 332 30 7

134 125 291 67 26 252 125 290 64 24 239 288 30 9

352 292 59 19 201 6

1 0

10 133 16 5

214 117 12 4

173 53 15 6

55 21 5

1 13 6

1 0

3 4

0 0

1 193 249 2.026 300 103 1.646 205 5

0 16 10 271 8,637 2.797 769 16 13.662 55 23 10 45 179 55 23 10 45 179 33 16 84 66 79 33 79 16 84 66 516 1,977 2,454 7

3 810 516 4,430 7

3 810 874 13.169 2.830 900 16 14,717 39 9

3 42 6

3 1

12 7

1 0

3 6

6 8

6 27 3

1 26 1

95 9

3 113 35 3

1 36 23 2

1 8

126 16 5

61 138 17 5

55 57 229 22 7

284 16 3

1 27 68 7

2 94 25 3

1 11 23 10 4

36 Other Total Total Costs Contingency Costs 129 10,098 25.317 258 13.845 35.693 149 653 257 1.018 253 994 196 875 161 731 5

21 106 475 88 395 35 164 11 52 3

12 2

8 62 255 1.329 5.653 72 309 258 15.246 41.655 102 413 309 60 369 147 28 176 457 190 957 56 256 25 104 81 360 166 681 132 17 150 635 2.612 788 3.242 229 1,049 296 57 353 1.074 138 1.212 165 21 186 4,584 884 5,468 612 118 730 139 27 165 5,846 1,127 6.972 15.887 3.062 18.949 10,673 2.057 12.730 39,407 9,325 54,499 40.122 24.843 97,471 26 119 6

28 3

13 2

8 2

8 3

11 2

8 17 74 0

1 64 284 22 97 10 44 60 268 63 277 193 791 13 61 50 221 12 53 19 92 PG&E Letter HBL-11-003 Page 3 of 7 Burial I Utility and Processed Craft Contractor Wt., Lbs.

Manhours Manhours 298.310 13.200 660 382.950 27.028 1.320 34,459 5.136 123.326 6.053 117.173 6.249 42,705 4.503 92.757 4.611 1.303 87 26.242 2.124 19,650 1.875 26.687 784 6.568 295 1.311 83 626 69 3.080 492.806 34,951 7,458 1,031 883,214 63.010 1.320 165.240 811 165,240 811 12,581 55 12,581 55 51,732 17 100.389 177.845 168.370 51,732 17 446.604 1.112.768 63.892 447.924 15.816 601 5.726 96 1.275 99 101 102 132 103 3.217 418 13 13.723 1.508 4,417 544 4.001 368 23.199 1.990 26.146 2.170 34.362 4.245 3,566 265 11.592 1.082 5.513 381 17,640 319

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4c.1.1.20 RBP 4c.1.1.21 TB7-1 4c.1.1.22 TB7*2 4c.1.1.23 TB7*3 4c.1.1.24 TB7-4 4c.1.1.25 TB7-5 4c.1.1.26 TB7-6 Disposal of Plant Systems (continued) 4c.1.1.27 TB7-7 4c.1.1.28 TBP 4c.1.1.29 YD1-2 4c.1.1.30 YD1-5 4c.1.1.31 YD2*1 4c.1.1.32 YD2-2 4c.1.1.33 YD2-3 4c.1.1.34 YD2-4 4c.1.1.35 YD2-5 4c.1.1.36 YD2-6 4c.1.1.37 YDP 4c.1.1 Totals 4c.1.2 Scaffolding in support of decommissioning Decontamination of Site Buildings 4c.1.3.1 HMS 4c.1.3.2 Hot Machine Shop & Calibration 4c.1.3.3 RBi 4c.1.3.4 RB2 4c.1.3.5 RB3 4c.1.3.6 RB4 4c.1.3.7 RB5-1 (Refuel Bldg Roof) 4c.1.3.8 RW1 4c.1.3.9 Refueling 4c.1.3.10 TB1 4c.1.3.11 TB2 4c.1.3.12 TB3 4c.1.3.13 TB4 4c.1.3.14 TB5 4c.1.3.15 TB6 4c.1.3.16 TB7 4c.1.3.17 Turbine 4c.1.3.18 YD1 4c.1.3.19 YD2 4c.1.3 Totals 4c.1 Activity Costs Period 4c Additional Costs 4c.2.1 Contaminated Soil Removal 4c.2.2 Replacement of Drains and Catch Basins 4c.2.3 Caisson Mixed Waste Removal 4c.2.4 Site work supporting spent fuel pool removal 4c.2.5 Removal of 3 spent fuel pool walls 4c.2.6 Removal of Yard Pipe Tunnel 4c.2.7 Contaminated Soil & Concrete Storage Facility 4c.2 Total Period 4c Collateral Costs 4c.3.1 Process liquid waste 4c.3.2 Small tool allowance 4c.3.3 Decommissioning Equipment Disposition 4c.3 Subtotal Period 4c Collateral Costs Period 4c Period.Dependent Costs 4c.4.1 Decon supplies 4c.4.2 Insurance 4c.4.3 Property taxes 4c.4.4 Health physics supplies 4c.4.5 Heavy equipment rental Period 4c Period*Dependent Costs (continued) 4c.4.6 Disposal of DAW generated 4c.4.7 Plant energy budget 4c.4.8 NRC Fees 4c.4.9 Emergency Planning Fees 4c.4.10 Environmental I Engineering Support 4c.4.11 Radwaste Processing Equipment/Services 4c.4.12 ISFSI Operating Costs 4c.4.13 Security Staff Cost 4c.4.14 DOC Staff Cost 4c.4.15 Utility Staff Cost Decon Removal Packaging Cost Cost Costs 23 199 2

59 9

11 4

13 1

27 8

39 10 13 1,000 7

2 9

2 56 4

19 3

8 2

116 30 253 46 185 28 178 17 76 3,016 258 38 1

57 6

3 1

91 1,748 542 3,120 207 99 7

81 7

19 4

534 166 3

4 93 8

122 11 30 6

203 11 87 4

76 4

31 6

4 4

24 3

98 12 91 6,434 1,012 166 9,487 1,271 211 663 75 159 10 704 68 647 14 1,796 754 28 14 179 206 28 179 220 58 624 1,503 1

Thousands of 2008 Dollars Off*Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 2

8 1

13 0

3 2

11 3

100 1

31 1

7 1

14 1

8

.1 9

8 351 15 585 9

350 5

54 78 2,195

° 3

2 4

18

° 9

180 3,807 49 1,693 3

54 3

54 3

12 44 1,289 1

46 5

46 7

47 4

25 6

73 3

13 3

12 4

20 1

54 2

8 8

36 330 7,315 409 3

9,511 2,567 14,035 40 1,175 990 418 3,479 205 2,561 436 3,230 21,250 1,425 61 48 7

540 335 68 540 383 72 1

134 97 658 101 2,648 375 85 3,591 9,559 6,662 Humboldt Bay Power Plant, Unit 3 AREA-BY-AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 82 315 135 19 78 3

13 9

38 209 5

21 28 13 61 348 47 199 514 4

18 321 1,322 13 55 124 6

25 114 23 98 168 9

40 133 6

26 111 156 661 1,394 278 1,176 2,320 177 750 1,390 78 331 864 1,771 7,393 12,387 13 56 5

25 110 281 4

18 48 1,948 8,317 18,660 1,582 6,651 6,249 51 214 328 45 191 336 11 47 190 616 2,649 5,192 16 70 190 47 198 417 57 244 538 19 84 293 91 385 565 33 140 209 29 124 196 18 79 313 20 83 223 11 47 129 46 200 582 4,669 19,851 34,940 6,453 27,300 47,332 5,157 22,633 169,154 24 99 438 1,822 2,433 191 1,180 1,433 6,101 24,120 1,072 4,498 10,162 84 520 8,398 36,854 205,$69 47 197 189 58 237 240 1,328 1,058 344 1,762 1,247 19 77 9

81 200 824 290 1,793 43 179 533 19 115 85 743 13 114 510 3,159 72 447 16 101 692 4,283 1,843 11,402 1,284 7,946 GTCC Cu. Feet Thousands of 2011 Dollars Off*Site LLRW Decon Removal Packaging Transport Processing Disposal Cost Cost Costs Costs Costs Costs 25 215 2

2 10 64 10 12 4

2 16 14 1

° 3

29 8

3 13 42 11 4

125 14 1,086 8

3 1

39 10 2

1 9

61 5

1 17 20 3

1 10 9

3 1

11 126 32 10 436 275 50 18 726 201 30 11 435 193 18 6

67 82 3,273 280 97 2,726 41 1

° 3

2 62 6

5 22 4

1

° 11 99 1.897 589 224 4,730 3,385 225 61 2,103 108 7

4 67 88 7

4 68 20 4

3 15 580 180 55 1,601 3

4 1

57 101 9

6 57 133 12 8

58 33 6

5 31 221 12 8

90 94 5

3 16 82 4

3 15 33 7

5 24 5

5 1

67 26 3

2 10 107 13 10 45 99 6,981 1,098 410 9,088 181 10,295 1,379 508 3

11,816 82 173 11 50 1,459 764 73 519 4,322 702 15 254 3,181 1,949 819 4,012 26,399 30 15 76 59 195 224 8

671 417 30 195 239 84 671 476 63 677 1,631 1

1 167 Other Total Total Costs Contingency Costs 89 344 21 85 3

14 9

43 5

23 15 68 51 233 5

19 349 1,434 14 64 6

28 25 108 10 45 6

29 169 774 302 1,371 193 870 84 369 1,921 8,380 14 62 28 122 5

21 2,113 9,652 1,717 7,491 55 241 49 216 12 54 668 3,084 18 83 50 223 62 273 21 96 99 430 36 154 32 136 19 89 21 99 12 53 50 224 5,066 22,742 7,002 31,184 26 108 475 2,168 1,074 207 1,281 1,555 7,233 1,163 5,315 473 91 564 1,547 9,113 43,838 51 231 62 257 260 1,580 373 2,068 20 84 78 10 88 218 895 314 1,946 47 216 105 20 125 714 92 806 110 14 124 2,874 554 3,428 407 78 485 92 18 110 3,897 751 4,648 10,373 1,999 12,372 7,229 1,393 8,622 PG&E Letter HBL-11-003 Page 4 of 7 Burial!

Utility and Processed Craft Contractor WI., Lbs.

Manhours Manhours 9,465 2,710 1,067 171 7,906 161 1,040 227 13,169 427 19,435 587 240 17,317 4,692 104 4,272 138 6,375 947 5,024 302 4,197 125 49,592 1,994 87,642 4,102 52,552 2,693 31,068 1,875 466,620 49,727 1,492 206 19,674 821 2,015 55 989,526 29,415 280,809 54,462 17,949 1,484 18,543 1,206 13,290 254 247,927 7,988 5,487 53 26,269 1,356 35,623 1,775 19,550 423 33,971 3,005 14,628 1,270 13,698 1,106 21,936 423 6,442 76 9,054 343 40,746 1,403 1,817,136 106,919 2,285,247 156,852 11,840,787 2,684 687 170,284 2,117 507 2,210,400 49,551 1,219,420 24,962 476 15,440,890 80,983 11,354 49 309,936 123 321,290 173 10,651 3

66,743 119,282 115,757

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description 4cA Subtotal Period 4c Period-Dependent Costs 4c.O TOTAL PERIOD 4c COST PERIOD 4d - Building Demolition, Yard Work, Soil Remediation Demolition of Site Buildings 4d.1.1 Contaminated Equipment Storage 4d.1.2 Gas Stack 4d.1.3 Hot Machine Shop & Calibration 4d.1A New Off Gas Vault 4d.1.5 Radwaste Treatment 4d.1.6 Refueling 4d.1.7 Solid Waste Vault 4d.1.8 Turbine 4d.1.9 Yard Structures 4d.l ITotals I

Period 4d Additional Costs 4d.2.1 Backfill of Structures and Site 4d.2 I Subtotal Period 4c Additional Costs Period 4d Collateral Costs 4d.3.1 Small Tool Allowance ISubtotal Period 4d Collateral Costs Period 4d Period-Dependent Costs 4dA.l Insurance 4dA.2 Property taxes 4dA.3 Health phYSics supplies 4dAA Heavy equipment rental 4dA.5 Disposal of DAW generated 4dA.6 Plant energy budget 4dA.7 NRC Fees 4d.4.8 Emergency Planning Fees 4dA.9 Environmental/Engineering Support 4dA.l0 Radwaste Processing Equipment/Services 4dA.11 ISFSI Operating Costs 4dA.12 Security Staff Cost 4dA.13 DOC Staff Cost 4dA.14 Utility Staff Cost Subtotal Period 4d Period-Dependent Costs 4d.0 TOTAL PERIOD 4d COST PERIOD 4e - License Termination Period 4e Direct Decommissioning Activities 4e.1.1 ORISE confirmatory survey 4e.l.2 Terminate license 4e.l Subtotal Period 4e Activity Costs Period 4e Additional Costs 4e.2.1 I License Termination Survey (sample analysis & equipment) 4e.2 Subtotal Period 4e Additional Costs Period 4e Collateral Costs 4e.3.1 I DOC staff relocation expenses 4e.3 Subtotal Period 4e Collateral Costs Period 4e Period-Dependent Costs 4eA.1 Insurance 4e.4.2 Property taxes 4eA.3 Health physics supplies 4eAA Disposal of DAW generated 4eA.5 Plant energy budget 4eA.6 NRC Fees 4eA.7 Emergency Planning Fees 4eA.8 Environmental/Engineering Support 4eA.9 ISFSI Operating Costs 4eA.10 Security Staff Cost 4eA.l1 DOC Staff Cost 4eA.12 Utility Staff Cost 4eA Subtotal Period 4e Period-Dependent Costs 4e.0 TOTAL PERIOD 4e COST PERIOD 4 TOTALS Decon Removal Packaging Cost Cost Costs 58 2,127 1

252 13,590 2,247 7

10 33 82 20 24 80 189 145 149 1,099 310 4

6 243 389 57 36 1,687 1,195 1,460 1,460 9

9 441 925 1

1,366 1

4,522 1,196 192 0

192 0

192 0

1,246 40,119 7,731 Thousands of 2008 Dollars Off-Site LLRW Transport Processing Disposal Other Costs Costs Costs Costs 1

134 23,848 3,707 543 31,279 25,274 42 174 331 1,381 95 394 759 3,163 597 2,490 1,247 5,196 23 96 1,565 6,522 143 598 4,803 20,015 138 0

98 150 350 194 3,137 719 163 6,079 14,518 10,603 0

98 36,051 4,803 20,113 36,051 151 151 725 725 1,436 1,436 24 0

38 16 236 34 443 28 948 2,128 1,457 0

38 5,314 0

38 7,626 9,618 566 74,641 156,788 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 5,096 31,265 533 20,290 97,181 254,980 44 278 2,842 347 2,175 22,563 101 634 6,445 796 4,987 51,687 642 4,023 40,680 1,494 9,346 84,907 24 153 1,572 1,656 10,375 106,576 158 992 9,765 5,262 32,962 327,036 281 1,741 281 1,741 2

11 2

11 18 155 142 582 178 1,104 32 131 390 29 179 45 395 25 218 605 3,742 139 858 31 194 1,172 7,251 2,798 17,316 2,044 12,647 7,257 44,773 390 12,802 79,486 327,426 29 180 29 180 279 1,004 279 1,004 277 1,713 277 1,713 3

27 62 254 12 51 152 3

19 30 266 4

38 85 528 5

34 183 1,131 410 2,538 281 1,737 1,080 6,624 152 1,665 9,522 152 74,487 365,195 654,879 2,699 470 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 63 2,308 1

1 167 274 14,747 2,438 4,605 674 38,858 8

11 52 216 36 89 412 1,715 22 26 118 490 87 205 943 3,930 157 161 742 3,093 1,192 337 1,549 6,455 4

6 29 120 263 422 1,944 8,103 62 39 178 742 1,831 1,296 5,967 24,864 1,584 1,584 10 478 1,004 1

0 122 1,482 1

0 122 4,907 1,298 5,967 24,986 209 0

0 48 209 0

0 48 209 0

0 48 1,352 43,534 8,389 11,948 703 92,727 Other Total Total Costs Contingency Costs 25,878 5,529 33,948 27,425 22,017 111,038 48 335 377 2,629 110 765 863 6,028 697 4,850 1,621 11,154 27 185 1,797 12,530 172 1,193 5,710 39,668 305 1,890 305 1,890 2

11 149 19 168 154 632 194 1,198 34 158 163 31 194 380 49 429 210 27 237 3,405 656 4,061 781 150 931 177 34 211 6,596 1,271 7,868 15,754 3,037 18,790 11,505 2,218 13,723 39,119 7,874 48,599 39,119 13,892 90,169 164 32 195 164 32 195 787 303 1,090 787 303 1,090 1,559 300 1,859 1,559 300 1,859 26 3

29 67 276 13 62 18 3

21 256 33 289 37 5

41 481 93 573 31 6

37 1,029 198 1,227 2,309 445 2,754 1,581 305 1,885 5,766 1,171 7,194 8,275 1,807 10,339 170,134 80,827 409,613 PG&E Letter HBL-11-003 Page 5 of 7 Burial!

Utility and Processed Craft Contractor Wt..Lbs.

Manhours Manhours 10,651 3

301,782 18,058,079 238,011 301,782 198,936 90 1,579,419 184 451,120 252 3,618,076 460 2,847,575 1,322 5,943,511 3,112 110,067 30 7,460,292 1,674 683,540 647 22,892,536 7,770 7,793 3

116,520 194,800 176,920 7,793 3

488,240 22,900,330 7,773 488,240 3,036 1

18,126 28,757 22,831 3,036 1

69,714 3,036 1

69,714 44,005,225 396,785 1,906,552

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I

PERIOD 5b - Site Restoration Period 5b Direct Decommissioning Activities Site Closeout Activities 5b.1.1 Grade & landscape site 5b.1.2 Final report to NRC 5b.1 Subtotal Period 5b Activity Costs Period 5b Additional Costs 5b.2.1 Disposal of Asphalt Roadways 5b.2.2 Disposal of Legacy Class B & C Waste 5b.2.3 Disposal of Intermodal Containers 5b.2 Subtotal Period 5b Additional Costs Period 5b Collateral Costs 5b.3.1 ISmail tool allowance 5b.3 Subtotal Period 5b Collateral Costs I

Period 5b Period-Dependent Costs 5bA.1 Insurance 5bA.2 Property taxes 5bA.3 Plant energy budget 5bAA NRC ISFSI Fees 5bA.5 Emergency Planning Fees 5b.4.6 ISFSI Operating Costs 5bA.7 Security Staff Cost 5bA.8 DOC Staff Cost Period 5b Period-Dependent Costs (continued) 5bA.9 Utility Staff Cost 5bA Subtotal Period 5b Period-Dependent Costs 5b.0 TOTAL PERIOD 5b COST PERIOD 5c - Fuel Storage Operations Period 5c Period-Dependent Costs 5cA.1 Insurance 5cA.2 Property taxes 5cA.3 Plant energy budget 5cAA NRC ISFSI Fees 5c.4.5 Emergency Planning Fees 5cA.6 ISFSI Operating Costs 5cA.7 Security Staff Cost 5cA.8 DOC Staff Cost 5cA.9 Utility Staff Cost 5cA Subtotal Period 5c Period-Dependent Costs 5c.0 TOTAL PERIOD 5c COST PERIOD 5d - Spent Fuel and GTCC shipping Period 5d Direct Decommissioning Activities Nuclear Steam Supply System Removal 5d.1.1.1 Vessel & Internals GTCC Disposal 5d.1 Subtotal Period 5d Activity Costs Period 5d Collateral Costs 5d.3.1 ITransfer Spent Fuel to DOE 5d.3.1 Subtotal Period 5d Collateral Costs I

Period 5d Period-Dependent Costs 5dA.1 Insurance 5dA.2 Property taxes 5dA.3 Plant energy budget 5dAA NRC ISFSI Fees 5dA.5 Emergency Planning Fees 5dA.6 ISFSI Operating Costs 5dA.7 Security Staff Cost 5d.4.8 DOC Staff Cost 5dA.9 Utility Staff Cost 5dA.

Subtotal Period 5d Period-Dependent Costs 5d.0 TOTAL PERIOD 5d COST PERIOD 5e - ISFSI Decontamination Thousands of 2008 Dollars Off-Site LLRW Decon Removal Packaging Transport Processing Disposal Cost Cost Costs Costs Costs Costs 41 41 148 1,400 148 1,400 0

0 41 148 1,400 95 346 95 346 95 346 Other Costs 195 195 63 975 1,038 36 12 98 50 42 1,422 127 428 2,215 3,448 251 709 354 297 9,998 198 1,087 12,896 12,896 462 462 36 99 51 43 1,430 28 156 1,841 2,303 Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B ClassC Contingency Costs Cu. Feet Cu. Feet Cu. Feet 13 55 38 233 51 287 12 75 478 2,026 384 96 188 1,163 678 3,264 384 96 0

0 0

0 5

40 2

14 13 111 6

57 8

50 274 1,696 24 152 83 511 415 2,631 1,144 6,182 384 96 32 284 91 801 45 399 57 355 1,927 11,925 38 236 210 1,297 2,401 15,297 2,401 15,297 79 519 79 519 89 551 89 551 7

43 13 111 7

57 8

51 276 1,705 5

34 30 186 345 2,187 513 3,257 Thousands of 2011 Dollars Off-Site LLRW GTCC Decon Removal Packaging Transport Processing Disposal Cu. Feet Cost Cost Costs Costs Costs Costs 45 45 183 1,739 183 1,739 0

0 45 183 1,739 17 103 429 17 103 429 17 103 429 Other Total Costs Contingency 14 212 41 212 55 68 13 519 1,058 204 1,126 736 0

0 39 5

13 3

106 14 55 7

46 9

1,543 297 138 27 465 90 2,404 451 3,742 1,242 273 35 770 99 384 49 323 62 10,849 2,091 215 41 1,180 227 13,993 2,606 86 86 39 8

107 14 55 7

46 9

1,551 299 31 6

169 33 1,998 375 2,499 557 Total Costs 59 252 312 81 2,441 1,262 3,785 0

0 44 16 120 62 55 1,840 164 554 2,855 6,951 308 869 433 385 12,941 257 1,407 16,599 618 618 47 121 62 55 1,850 37 201 2,373 3,588 PG&E Letter HBL-11-003 Page 6 of 7 Burial I Utility and Processed Craft Contractor Wt., Lbs.

Manhours Manhours 105 1,560 105 1,560 14,050 14,050 27,040 1,300 7,540 35,880 14,050 105 37,440 190,023 1,827 14,617 206,467 206,467 3,228 3,228 2,091 2,091 3,228 2,091

Humboldt Bay Power Plant Unit 3 Decommissioning Cost Study TLG Services, Inc., Appendix D Activity Index Activity Description I

Period 5e Additional Costs Se.2.1 ISFSI Decontamination Se.2 Subtotal Period 5e Additional Costs Period 5e Collateral Costs Se.3.1 ISmail tool allowance Se.3 Subtotal Period 5e Collateral Costs I

Period 5e Period-Dependent Costs Se.4.1 Insurance Se.4.2 Property taxes Se.4.3 Heavy equipment rental 5e.4.4 Plant energy budget 5e.4.5 Security Staff Cost Se.4.6 DOC Staff Cost Se.4.7 Utility Staff Cost Se.4.

Subtotal Period 5e Period-Dependent Costs Se.O TOTAL PERIOD Se COST PERIOD 5f -ISFSI Site Restoration Period 5f Additional Costs 5f.2.1 IiSFSI Demolition Sf.2 Subtotal Period 5f Additional Costs Period 5f Collateral Costs 5f.3.1 ISmail tool allowance 5f.3 Subtotal Period Sf Collateral Costs I

Period 5f Period-Dependent Costs 5f.4.1 Insurance 5f.4.2 Property taxes 5f.4.3 Heavy equipment rental Sf.4.4 Plant energy budget Sf.4.S Security Staff Cost Sf.4.6 DOC Staff Cost Sf.4.7 Utility Staff Cost Sf.4 Subtotal Period 5f Period-Dependent Costs Sf.O TOTAL PERIOD Sf COST PERIOD 5 TOTALS TOTAL COST TO DECOMMISSION TOTAL COST TO DECOMMISSION WITH 25% CONTINGENCY:

TOTAL NRC LICENSE TERMINATION COST IS 84.3% OR SPENT FUEL MANAGEMENT COST IS 15.3% OR:

NON-NUCLEAR DEMOLITION COST IS 0.4% OR:

TOTAL Class A RADWASTE VOLUME BURIED:

TOTAL Class B & C RADWASTE VOLUME BURIED:

Decon Removal Cost Cost S

S 0

0 118 118 124 270 270 3

3 61 61 334 499 2,214 41,837 TOTAL GREATER THAN CLASS C RADWASTE VOLUME GENERATED:

TOTAL CRAFT LABOR REQUIREMENTS:

End Notes:

nfa - indicates that this activity not charged as decommissioning expense.

a - indicates that this activity performed by decommissioning staff.

0- indicates that this value is less than 0.5 but is non-zero.

A cell containing" - " indicates a zero value.

Thousands of 2008 Dollars Off-Site LLRW Packaging Transport Processing Disposal Other Costs Costs Costs Costs Costs 0

2 10 1,169 0

2 10 1,169 23 877 17 95 1,013 0

2 10 2,181 48 48 492 10 S4 S55 604 95 149 1,756 21,432 7,830 9,774 566 76,487 277,452 499,759 thousands of 2008 dollars 421,241 thousands of 2008 dollars 76,647 thousands of 2008 dollars 1,871 thousands of 2008 dollars 655,237 Cubic Feet 3,648 Cubic Feet 17 Cubic Feet 400,805 Man-hours Humboldt Bay Power Plant, Unit 3 AREA-BY -AREA ESTIMATE Total Total Class A Class B Class C Contingency Costs Cu. Feet Cu. Feet Cu. Feet 231 1,417 116 231 1,417 116 0

0 0

0 3

26 23 141 169 1,046 3

21 18 114 216 1,347 447 2,764 116 61 380 61 380 1

3 1

3 12 73 9S S87 2

12 10 64 119 735 181 1,119 4,686 28,618 116 384 96 83,598 499,759 655,237 3,083 566 GTCC Decon Removal Packaging Cu. Feet Cost Cost Costs 6

0 6

0 0

0 128 128 134 0

293 293 3

3 66 66 363 17 542 103 17 2,403 45,399 8,496 Thousands of 2011 Dollars Off-Site LLRW Transport Processing Disposal Other Total Costs Costs Costs Costs Contingency 2

13 1,268 250 2

13 1,268 2S0 0

0 2S 3

25 9S2 183 19 4

103 20 1,099 235 2

13 2,367 485 52 67 S2 67 1

1 13 S34 103 11 2

58 11 603 129 655 196 185 2,181 23,256 5,085 12,142 703 95,020 301,069 90,714 Total Costs 1,539 1,539 0

0 29 153 1,135 22 123 1,462 3,001 412 412 4

4 79 637 13 69 798 1,214 31,353 555,946 PG&E Letter HBL-11-003 Page 7 of 7 Burial I Utility and Processed Craft Contractor Wt., lbs.

Manhours Manhours 10,376 1,270 2,S60 10,376 1,270 2,S60 17,680 170 1,360 19,210 10,376 1,270 21,770 2,643 160 2,643 160 9,360 90 720 10,170 2,643 10,330 27,654 4,019 278,099 44,053,592 400,805 2,245,933

Humboldt Bay Power Plant Decommissioning Cash Flow (Estimated in 2011 Dollars)

(1 page)

PG&E Letter HBL-11-003

Year 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 TOTAL Notes:

1.
2.

NRC Scope Non-NRC Scope (Radiological)

(Nonradiological)

$1,678,452

$8,663,216

$5,573,757

$723,490

$85,241

$89,543

$994,127

$494,838

$491,070

$161,506

$1,073,612

$4,474,247

$12,590,383

$32,901,391

$56,957,494

$76,343,508

$73,123,800

$81,958,000

$945,300

$41,272,700

$945,300

$36,892,300

$140,600

$4,484,500

$0

$0

$0

$3,564,900

$444,592,074

$2,031,200 Humboldt Bay Power Plant Unit 3 Decommissioning Cash Flow (Note 1)

(Estimated in 2011 Dollars)

ISFSI EngrlLicense Construction Cummulative Operation Decommission (Note 1)

Total Estimate

$1,678,452

$1,678,452

$8,663,216

$10,341,669

$344,408

$5,918,165

$16,259,834

$2,281,454

$3,004,944

$19,264,778

$2,736,091

$2,821,331

$22,086,109

$398,012

$487,555

$22,573,664

$113,704

$1,107,831

$23,681,495

$2,539,476

$3,034,313

$26,715,809

$1,444,628

$1,935,698

$28,651,506

$1,671,769

$1,833,274

$30,484,781

$3,546,617

$4,620,229

$35,105,009

$9,240,172

$13,714,418

$48,819,428

$28,485,988

$41,076,371

$89,895,799

$3,179,956

$36,081,347

$125,977,145

$5,734,776

$62,692,270

$188,669,415

$5,156,500

$81,500,008

$270,169,423

$4,776,200

$77,900,000

$348,069,423

$4,776,200

$87,679,500

$435,748,923

$4,776,200

$46,994,200

$482,743,123

$4,776,200

$41,809,100

$524,552,223

$4,776,200

$9,260,700

$533,812,923

$4,776,200

$4,776,200

$538,589,123

$4,776,200

$4,776,200

$543,365,323

$4,776,200

$4,776,200

$548,141,523

$4,239,100

$7,804,000

$555,945,523

$109,322,249

$555,945,523 Trust Account Funding (Note 2)

$188,669,415

$502,451,875

$536,954,618 Cash Flow is based on construction of the Independent Spent Fuel Storage Installation (ISFSI) and Fuel removed from HBPP in 2020 PG&E Letter HBL-11-003 (Assumes Department of Energy Used Fuel Repository opens 2020 allowing Humboldt Bay Power Plant (HBPP) Fuel to be shipped duri Trust Account Value of $348.3 million is Expense Equivalent Liquidation Value (Includes Tax Break)

Market Value of Trust as of 12/2010 was $313.8 million, actual expended as of 12/2010 was $188.7 million.