ML100410114: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Appendix C                                 Page 1 of 15                    Form ES-C-1 Worksheet Facility:           Shearon Harris                      Task No.:  301179H601 Task Title:         Response to Voids In Reactor        JPM No.:    2009B NRC Exam Vessel- Calculate Reactor Vessel                Admin JPM RO A1-1 Maximum Vent Time KIA  
{{#Wiki_filter:Appendix C Facility:
Task
 
==Title:==
KIA  


==Reference:==
==Reference:==
EPE E10 EK3.2    RO 3.2 SRO 3.7 Examinee:                                            NRC Examiner:
Examinee:
Facility Evaluator:                                   Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                               Actual Performance:   x Classroom       X   Simulator           Plant DRJ\fT 2009B NRC Exam Admin JPM RO A1-1 Rev 1
Page 1 of 15 Worksheet Form ES-C-1 Shearon Harris Task No.:
301179H601 Response to Voids In Reactor JPM No.:
2009B NRC Exam Vessel-Calculate Reactor Vessel Admin JPM RO A1-1 Maximum Vent Time EPE E10 EK3.2 RO 3.2 SRO 3.7 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant DRJ\\fT 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Facility:
Task
 
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Page 1 of 15 Worksheet Form ES-C-1 Shearon Harris Task No.:
301179H601 Response to Voids In Reactor JPM No.:
2009B NRC Exam Vessel-Calculate Reactor Vessel Admin JPM RO A1-1 Maximum Vent Time EPE E10 EK3.2 RO 3.2 SRO 3.7 NRC Examiner:
Date: __ _
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant DRJ\\fT 2009B NRC Exam Admin JPM RO A1-1 Rev 1  


Appendix C                                         Page 2 of 15                       Form ES-C-1 Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Appendix C Page 2 of 15 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:         The plant was at 100 percent power when a Small Break LOCA occurred.
Initial Conditions:
* All RCP have been secured.
Initiating Cue:
* SI has been terminated.
The plant was at 100 percent power when a Small Break LOCA occurred.
* RVLlS Upper Range reading is 85 percent
All RCP have been secured.
* Pressurizer level is 90 percent
SI has been terminated.
* RCS Pressure is 1560 psig
RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel.
* Containment Temperature is 195°F
The CRS and STA have reviewed the CSFSTs.
* Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
Initiating Cue:            The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
Task Standard:             Determine maximum Reactor Vessel vent time within +/-5 seconds of calculation.
Task Standard:
Required Materials:         Calculator General  
Determine maximum Reactor Vessel vent time within +/-5 seconds of calculation.
Required Materials:
Calculator General  


==References:==
==References:==
FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
Handouts:                   FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
Handouts:
Time Critical Task:         No Validation Time:           10 minutes 2009B NRC Exam Admin JPM RO A 1-1 Rev 1
FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
Time Critical Task:
No Validation Time:
10 minutes 2009B NRC Exam Admin JPM RO A 1-1 Rev 1 Appendix C Page 2 of 15 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant was at 100 percent power when a Small Break LOCA occurred.
All RCP have been secured.
SI has been terminated.
RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel.
The CRS and STA have reviewed the CSFSTs.
It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
Task Standard:
Determine maximum Reactor Vessel vent time within +/-5 seconds of calculation.
Required Materials:
Calculator General


Appendix C                        Page 3 of 15                      Form ES-C-1 Worksheet Critical Step Justification Without the correct Containment volume you cannot determine the Step 2    maximum venting time Step 3    Without the correct hydrogen volume you cannot determine the maximum venting time Step 4    Without the correct hydrogen flow rate you cannot determine the maximum venting time Step 5    This is the maximum venting time calculation required by the CRS 2009B NRC Exam Admin JPM RD A1-1 Rev 1
==References:==
FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
Handouts:
FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)
Time Critical Task:
No Validation Time:
10 minutes 2009B NRC Exam Admin JPM RO A 1-1 Rev 1  


Appendix C                                 Page 4 of 9                        Form ES-C-1 PERFORMANCE INFORMATION START TIME:
Appendix C Step 2 Step 3 Step 4 Step 5 Page 3 of 15 Worksheet Critical Step Justification Form ES-C-1 Without the correct Containment volume you cannot determine the maximum venting time Without the correct hydrogen volume you cannot determine the maximum venting time Without the correct hydrogen flow rate you cannot determine the maximum venting time This is the maximum venting time calculation required by the CRS 2009B NRC Exam Admin JPM RD A1-1 Rev 1 Appendix C Step 2 Step 3 Step 4 Step 5 Page 3 of 15 Worksheet Critical Step Justification Form ES-C-1 Without the correct Containment volume you cannot determine the maximum venting time Without the correct hydrogen volume you cannot determine the maximum venting time Without the correct hydrogen flow rate you cannot determine the maximum venting time This is the maximum venting time calculation required by the CRS 2009B NRC Exam Admin JPM RD A1-1 Rev 1
FRP-I.3 Performance Step: 1     OBTAIN PROCEDURE (provided with handout)
 
Standard:              Obtains FRP-1.3 and refers to Figure 2 and Attachment 1.
Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
./ Performance Step: 2 Standard:
Comment:
./ Performance Step: 3 Standard:
Comment:
./ - Denotes a Critical Step Page 4 of 9 PERFORMANCE INFORMATION FRP-I.3 OBTAIN PROCEDURE (provided with handout)
Form ES-C-1 Obtains FRP-1.3 and refers to Figure 2 and Attachment 1.
FRP-I.3 Attachment 1 Step 1 Calculate the maximum venting time using Attachment 1.
Calculate Containment Volume at STP 'A' in FT3 Using the provide Containment temperature of 195°F Containment Volume at STP 'A' = 1702094.66 FT3 FRP-1.3 Attachment 1 Step 2 Determine Maximum Hydrogen volume that can be vented 'B' in FT3 Using provided Containment Hydrogen Concentration of 2.15 percent determine maximum Hydrogen volume that can be vented 'B' = 14467.80 FT3 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
./ Performance Step: 2 Standard:
Comment:
./ Performance Step: 3 Standard:
Comment:
./ - Denotes a Critical Step Page 4 of 9 PERFORMANCE INFORMATION FRP-I.3 OBTAIN PROCEDURE (provided with handout)
Form ES-C-1 Obtains FRP-1.3 and refers to Figure 2 and Attachment 1.
FRP-I.3 Attachment 1 Step 1 Calculate the maximum venting time using Attachment 1.
Calculate Containment Volume at STP 'A' in FT3 Using the provide Containment temperature of 195°F Containment Volume at STP 'A' = 1702094.66 FT3 FRP-1.3 Attachment 1 Step 2 Determine Maximum Hydrogen volume that can be vented 'B' in FT3 Using provided Containment Hydrogen Concentration of 2.15 percent determine maximum Hydrogen volume that can be vented 'B' = 14467.80 FT3 2009B NRC Exam Admin JPM RO A1-1 Rev 1
 
Appendix C
../ Performance Step: 4 Standard:
Comment:
../ Performance Step: 5 Standard:
Comment:
Comment:
FRP-I.3 Attachment 1 Step 1
Terminating Cue:
./  Performance Step: 2    Calculate the maximum venting time using Attachment 1.
STOP TIME:  
Calculate Containment Volume at STP 'A' in FT3 Standard:              Using the provide Containment temperature of          195°F Containment Volume at STP 'A' = 1702094.66 FT3 Comment:
../ - Denotes a Critical Step Page 5 of 9 PERFORMANCE INFORMATION FRP-I.3 Attachment 1 Step 3 Form ES-C-1 Determine Hydrogen flow rate as a function of RCS pressure 'C' in FT3/MIN.
FRP-1.3 Attachment 1 Step 2
Determines from Figure 2 that 1560 psig corresponds to 4850 FT3/MIN (Tolerance 4950 - 4750 FT3/MIN)
./  Performance Step: 3    Determine Maximum Hydrogen volume that can be vented 'B' in FT3 Standard:              Using provided Containment Hydrogen Concentration of 2.15 percent determine maximum Hydrogen volume that can be vented 'B' = 14467.80 FT3 Comment:
FRP-1.3 Attachment 1 Step 4 Calculate maximum venting time '0' in minutes.
./ - Denotes a Critical Step                 2009B NRC Exam Admin JPM RO A1-1 Rev 1
Calculates 2.98 minutes (2 minutes and 59 seconds)
 
Tolerance +/- 5 seconds 3 min 4 seconds to 2 min 54 seconds When calculation is returned ENDOFJPM 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C
Appendix C                                    Page 5 of 9                       Form ES-C-1 PERFORMANCE INFORMATION FRP-I.3 Attachment 1 Step 3
../ Performance Step: 4 Standard:
../    Performance Step: 4    Determine Hydrogen flow rate as a function of RCS pressure 'C' in FT3/MIN.
Comment:
Standard:                Determines from Figure 2 that 1560 psig corresponds to 4850 FT3/MIN (Tolerance 4950 - 4750 FT3/MIN)
../ Performance Step: 5 Standard:
Comment:
Comment:
FRP-1.3 Attachment 1 Step 4
Terminating Cue:
../    Performance Step: 5    Calculate maximum venting time '0' in minutes.
STOP TIME:
Standard:                Calculates 2.98 minutes (2 minutes and 59 seconds)
../ - Denotes a Critical Step Page 5 of 9 PERFORMANCE INFORMATION FRP-I.3 Attachment 1 Step 3 Form ES-C-1 Determine Hydrogen flow rate as a function of RCS pressure 'C' in FT3/MIN.
Tolerance +/- 5 seconds 3 min 4 seconds to 2 min 54 seconds Comment:
Determines from Figure 2 that 1560 psig corresponds to 4850 FT3/MIN (Tolerance 4950 - 4750 FT3/MIN)
Terminating Cue:        When calculation is returned ENDOFJPM STOP TIME:
FRP-1.3 Attachment 1 Step 4 Calculate maximum venting time '0' in minutes.
../ - Denotes a Critical Step                  2009B NRC Exam Admin JPM RO A1-1 Rev 1
Calculates 2.98 minutes (2 minutes and 59 seconds)
Tolerance +/- 5 seconds 3 min 4 seconds to 2 min 54 seconds When calculation is returned ENDOFJPM 2009B NRC Exam Admin JPM RO A1-1 Rev 1  


Appendix C                                   Page 6 of 9                 Form ES-C-1 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN WC'l'OR VESSEl.
Appendix C 6000
6000
~
                    ~
~
                    ~
4000 3000 2000 1000 o
4000 3000 2000 1000 o     400     800       1200 11560~1oo 2000  2:4A}O ReS PRESSURE' {PStG)
./ - Denotes a Critical Step Page 6 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN WC'l'OR VESSEl.
I       Rev. 16               I
400 800 1200 11560~1oo ReS PRESSURE' {PStG)
./ - Denotes a Critical Step                    20098 NRC Exam Admin JPM RO A1-1 Rev 1
I Rev. 16 I
Form ES-C-1 2000 2:4A}O 20098 NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C 6000  
~  
~
4000 3000 2000 1000 o  
./ - Denotes a Critical Step Page 6 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN WC'l'OR VESSEl.
400 800 1200 11560~1oo ReS PRESSURE' {PStG)
I Rev. 16 I
Form ES-C-1 2000 2:4A}O 20098 NRC Exam Admin JPM RO A1-1 Rev 1  


Appendix C                                         Page 7 of 9                           Form ES-C-1 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN REACTOR VESSEL Attachment 1 Sheet 1 of 1 INSTRUCTIONS roR DETBRHINING VENTING TIME
Appendix C Page 7 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN REACTOR VESSEL Sheet 1 of 1 INSTRUCTIONS roR DETBRHINING VENTING TIME Form ES-C-1
: 1. Detet'lline CNHT Volwa.e at STI.> A' ;
: 1.
I A - (2.266 x 106 Fr3) x                     492&deg;R (CNtlT 'temperature OF + 460<"R) 1 195&deg;F 1               A .11702094.66 (BT3) 2.
Detet'lline CNHT Volwa.e at STI.>
I A' ;
A -
(2.266 x 106 Fr3) x 492&deg;R (CNtlT 'temperature OF + 460<"R) 1 195&deg;F 1 A.11702094.66
: 2.
(BT3)
B _ 114467.80 1 (nl )
: 3.
Deterllin.e Hydrogen flow rate as a funetion of ReS pressure 'C';
: a.
Cheek ReS pressure and mark on Figure 2.
: b.
Using Figure 2. read hydrogen flQW rate 'C',
ITolerance 4750 - 4950 I
: 4.
Calculate 1I8X1:awa venting time 'D';
KaxiJnUll venting ti:ne - --
EOP-FRP-I.3 c
Tolerance 2 min 54 seconds 3 min 4 seconds Rev. 16 I
c-14850 1 (FT3/MIN) 2 min and 59 seconds n- ___ _
(MINUTES)
Page 22 (If 23
./ - Denotes a Critical Step 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Page 7 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN REACTOR VESSEL Sheet 1 of 1 INSTRUCTIONS roR DETBRHINING VENTING TIME Form ES-C-1
: 1.
Detet'lline CNHT Volwa.e at STI.>
I A' ;
A -
(2.266 x 106 Fr3) x 492&deg;R (CNtlT 'temperature OF + 460<"R) 1 195&deg;F 1 A.11702094.66
: 2.
(BT3)
B _ 114467.80 1 (nl )
B _ 114467.80 1 (nl )
: 3. Deterllin.e Hydrogen flow rate as a funetion of ReS pressure 'C';
: 3.
: a. Cheek ReS pressure and mark on Figure 2.
Deterllin.e Hydrogen flow rate as a funetion of ReS pressure 'C';
: b. Using Figure 2. read hydrogen flQW rate 'C',
: a.
1 4850 1 ITolerance 4750 - 4950 I       c-(FT3/MIN)
Cheek ReS pressure and mark on Figure 2.
: 4. Calculate 1I8X1:awa venting time 'D';
: b.
KaxiJnUll venting ti:ne -   --
Using Figure 2. read hydrogen flQW rate 'C',
c 2 min and 59 seconds n-   ____
ITolerance 4750 - 4950 I
D - ~-----o-Tolerance                            (MINUTES) 2 min 54 seconds 3 min 4 seconds EOP-FRP-I.3                            Rev. 16              I      Page 22 (If 23
: 4.
./ - Denotes a Critical Step                           2009B NRC Exam Admin JPM RO A1-1 Rev 1
Calculate 1I8X1:awa venting time 'D';
KaxiJnUll venting ti:ne - --
EOP-FRP-I.3 c
Tolerance 2 min 54 seconds 3 min 4 seconds Rev. 16 I
c-14850 1 (FT3/MIN) 2 min and 59 seconds D -
~-----o-(MINUTES)
Page 22 (If 23  
./ - Denotes a Critical Step 2009B NRC Exam Admin JPM RO A1-1 Rev 1  


Appendix C                               Page 8 of 9                       Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2009B NRC Exam Admin JPM RO A 1 Response to Voids In Reactor Vessel - Calculate Reactor Vessel Maximum Vent Time Examinee's Name:
Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM RO A 1 Response to Voids In Reactor Vessel - Calculate Reactor Vessel Maximum Vent Time Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 94: Line 217:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT               UNSAT Examiner's Signature:                                       Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
2009B NRC Exam Admin JPM RO A1-1 Rev 1
Date:
2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM RO A 1 Response to Voids In Reactor Vessel - Calculate Reactor Vessel Maximum Vent Time Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
 
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Exam Admin JPM RO A1-1 Rev 1
 
Appendix C Initial Conditions:
Initiating Cue:
Page 9 of 9 JPM CUE SHEET Form ES-C-1 The plant was at 100 percent power when a Small Break LOCA occurred.
All RCP have been secured.
SI has been terminated.
RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195&deg;F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Initial Conditions:
Initiating Cue:
Page 9 of 9 JPM CUE SHEET Form ES-C-1 The plant was at 100 percent power when a Small Break LOCA occurred.
All RCP have been secured.
SI has been terminated.
RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195&deg;F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
2009B NRC Exam Admin JPM RO A1-1 Rev 1  


Appendix C                         Page 9 of 9                      Form ES-C-1 JPM CUE SHEET The plant was at 100 percent power when a Small Break LOCA Initial Conditions: occurred.
Appendix C Facility:
* All RCP have been secured.
Task
* SI has been terminated.
* RVLlS Upper Range reading is 85 percent
* Pressurizer level is 90 percent
* RCS Pressure is 1560 psig
* Containment Temperature is 195&deg;F
* Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.
The crew has completed preparing the Containment for Reactor Initiating Cue:
Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.
2009B NRC Exam Admin JPM RO A1-1 Rev 1


Appendix C                                        Page 1 of 12                          Form ES-C-1 Worksheet Facility:              Shearon Harris                          Task No.:    001004H101 Task Title:             Perform A Manual Shutdown              JPM No.:    20098 NRC Exam Margin Calculation                                  Admin JPM RO A 1-2 KIA  
==Title:==
KIA  


==Reference:==
==Reference:==
G 2.1.25          RO 3.9 SRO 4.2 Examinee:                                                    NRC Examiner:
Examinee:
Facility Evaluator:                                         Oate: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                                       Actual Performance:       x Classroom           X   Simulator             Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Perform A Manual Shutdown Margin Calculation G 2.1.25 RO 3.9 SRO 4.2 Task No.:
Initial Conditions:           The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump
001004H101 JPM No.:
* Core burnup is 140 EFPO
20098 NRC Exam Admin JPM RO A 1-2 NRC Examiner:
* RCS boron concentration is 1140 ppm
Oate: __
* NO rods are believed to be immovable / untrippable
Simulated Performance:
* POWERTRAX is NOT available Initiating Cue:             The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SOM Calculation (Modes 1 and 2)" for current plant conditions.
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPO RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST -1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SOM Calculation (Modes 1 and 2)" for current plant conditions.
NOTE: For this JPM assume independent verification has been performed.
20098 NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Facility:
Task
 
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Perform A Manual Shutdown Margin Calculation G 2.1.25 RO 3.9 SRO 4.2 Task No.:
001004H101 JPM No.:
20098 NRC Exam Admin JPM RO A 1-2 NRC Examiner:
Oate: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPO RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST -1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SOM Calculation (Modes 1 and 2)" for current plant conditions.
NOTE: For this JPM assume independent verification has been performed.
NOTE: For this JPM assume independent verification has been performed.
20098 NRC Admin Exam RO A 1-2 Rev. 1
20098 NRC Admin Exam RO A 1-2 Rev. 1  


Appendix C                                 Page 2 of 12                       Form ES-C-1 Worksheet Task Standard:     OST-1036, Attachment 3, Manual SOM Calculation (Modes 1 and 2),
Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
OST-1036, Attachment 3, Manual SOM Calculation (Modes 1 and 2),
completed with SOM of 5195 +/- 75 pcm (tolerance based on total of curves used and their division readability)
completed with SOM of 5195 +/- 75 pcm (tolerance based on total of curves used and their division readability)
Required Materials: Calculator General  
Required Materials:
Calculator General  


==References:==
==References:==
OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
Curve Book (Cycle 16)
Curve Book (Cycle 16)
Handouts:           OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
Handouts:
Time Critical Task: No Validation Time:    20 minutes Critical Step Justification Step 3              Must determine correct rod insertion limit based on curve value. The number of rod steps will be an input to the calculation.
Time Critical Task:
Step 6              Must determine correct power defect based on curve value. The power defect will provide one of the inputs to the calculation.
Validation Time:
Step 7              Must determine the correct rod worth based on curve value. The rod worth will provide one of the inputs to the calculation.
Step 3 Step 6 Step 7 Step 9 OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
Step 9              The total shutdown margin was the task that the CRS directed applicant to perform.
No 20 minutes Critical Step Justification Must determine correct rod insertion limit based on curve value. The number of rod steps will be an input to the calculation.
2009B NRC Admin Exam RO A1-2 Rev. 1
Must determine correct power defect based on curve value. The power defect will provide one of the inputs to the calculation.
Must determine the correct rod worth based on curve value. The rod worth will provide one of the inputs to the calculation.
The total shutdown margin was the task that the CRS directed applicant to perform.
2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
OST-1036, Attachment 3, Manual SOM Calculation (Modes 1 and 2),
completed with SOM of 5195 +/- 75 pcm (tolerance based on total of curves used and their division readability)
Required Materials:
Calculator General


Appendix C                                Page 3 of 12                        Form ES-C-1 PERFORMANCE INFORMATION START TIME:
==References:==
OST-1036 Performance Step: 1   OBTAIN PROCEDURE (OST-1036 will be provided to allow candidates to write on, Curve Book will be included as a reference)
OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
Standard:              OST-1036, Section 7.3, Attachment 3, and Curve Book Comment:
Curve Book (Cycle 16)
OST-1036 Attachment 3 Step 1 Performance Step: 2    Enters Reactor Power Level Standard:             Refers to given conditions and enters 52%
Handouts:
Time Critical Task:
Validation Time:
Step 3 Step 6 Step 7 Step 9 OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)
No 20 minutes Critical Step Justification Must determine correct rod insertion limit based on curve value. The number of rod steps will be an input to the calculation.
Must determine correct power defect based on curve value. The power defect will provide one of the inputs to the calculation.
Must determine the correct rod worth based on curve value. The rod worth will provide one of the inputs to the calculation.
The total shutdown margin was the task that the CRS directed applicant to perform.
2009B NRC Admin Exam RO A1-2 Rev. 1
 
Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Comment:
CST-1036 Attachment 3 Step 2
Performance Step: 2 Standard:
./ Performance Step: 3     Determine Rod Insertion Limit for power level Standard:             Refers to Curve F-16-1 and determines TS limit for RIL to be 96
Comment:
                            +/- 2 steps (tolerance based on curve division readability)
./ Performance Step: 3 Standard:
Comment:
Comment:
OST-1036 Attachment 3 Step 3 Performance Step: 4    Enters core Burn Up Standard:              Refers to given conditions and enters 140 EFPD Comment:
Performance Step: 4 Standard:
./ - Denotes Critical Steps                       2009B NRC Admin Exam RO A 1-2 Rev. 1
Comment:
./ - Denotes Critical Steps Page 3 of 12 PERFORMANCE INFORMATION OST-1036 Form ES-C-1 OBTAIN PROCEDURE (OST-1036 will be provided to allow candidates to write on, Curve Book will be included as a reference)
OST-1036, Section 7.3, Attachment 3, and Curve Book OST-1036 Attachment 3 Step 1 Enters Reactor Power Level Refers to given conditions and enters 52%
CST -1036 Attachment 3 Step 2 Determine Rod Insertion Limit for power level Refers to Curve F-16-1 and determines TS limit for RIL to be 96
+/- 2 steps (tolerance based on curve division readability)
OST-1036 Attachment 3 Step 3 Enters core Burn Up Refers to given conditions and enters 140 EFPD 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Performance Step: 2 Standard:
Comment:
./ Performance Step: 3 Standard:
Comment:
Performance Step: 4 Standard:
Comment:  
./ - Denotes Critical Steps Page 3 of 12 PERFORMANCE INFORMATION OST-1036 Form ES-C-1 OBTAIN PROCEDURE (OST-1036 will be provided to allow candidates to write on, Curve Book will be included as a reference)
OST-1036, Section 7.3, Attachment 3, and Curve Book OST-1036 Attachment 3 Step 1 Enters Reactor Power Level Refers to given conditions and enters 52%
CST -1036 Attachment 3 Step 2 Determine Rod Insertion Limit for power level Refers to Curve F-16-1 and determines TS limit for RIL to be 96
+/- 2 steps (tolerance based on curve division readability)
OST-1036 Attachment 3 Step 3 Enters core Burn Up Refers to given conditions and enters 140 EFPD 2009B NRC Admin Exam RO A 1-2 Rev. 1  


Appendix C                                   Page 4 of 12                    Form ES-C-1 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 4 Performance Step: 5     Enters RCS Boron Concentration Standard:              Refers to initial conditions and enters 1140 ppm Comment:
Appendix C Performance Step: 5 Standard:
Evaluator Note:        ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS INCLUDED AS PART OF ATTACHMENT.
OST-1036 Attachment 3 Step 6
./ Performance Step: 6      Determines Power Defect for current power level Standard:               Refers to Curve C-16-1 and determines power defect to    be 1060 +/-50 pcm (tolerance based on curve division readability)
Comment:
Comment:
OST-1036 Attachment 3 Step 7
Evaluator Note:
./ Performance Step: 7     Determines Rod Worth for RIL position determined above Standard:              Refers to Curve A-16-9 and determines rod worth to be 725 + 25 pcm (tolerance based on curve division readability)
./ Performance Step: 6 Standard:
Comment:
./ Performance Step: 7 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 4 Enters RCS Boron Concentration Refers to initial conditions and enters 1140 ppm Form ES-C-1 ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS INCLUDED AS PART OF ATTACHMENT.
OST-1036 Attachment 3 Step 6 Determines Power Defect for current power level Refers to Curve C-16-1 and determines power defect to be 1060 +/-50 pcm (tolerance based on curve division readability)
OST-1036 Attachment 3 Step 7 Determines Rod Worth for RIL position determined above Refers to Curve A-16-9 and determines rod worth to be 725 + 25 pcm (tolerance based on curve division readability) 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Performance Step: 5 Standard:
Comment:
Comment:
./ - Denotes Critical Steps                           2009B NRC Admin Exam RO A 1-2 Rev. 1
Evaluator Note:
./ Performance Step: 6 Standard:
Comment:
./ Performance Step: 7 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 4 Enters RCS Boron Concentration Refers to initial conditions and enters 1140 ppm Form ES-C-1 ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS INCLUDED AS PART OF ATTACHMENT.
OST-1036 Attachment 3 Step 6 Determines Power Defect for current power level Refers to Curve C-16-1 and determines power defect to be 1060 +/-50 pcm (tolerance based on curve division readability)
OST-1036 Attachment 3 Step 7 Determines Rod Worth for RIL position determined above Refers to Curve A-16-9 and determines rod worth to be 725 + 25 pcm (tolerance based on curve division readability) 2009B NRC Admin Exam RO A 1-2 Rev. 1  


Appendix C                                 Page 5 of 12                         Form ES-C-1 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 8 Performance Step: 8    Enters worth of any additional immovable or untrippable rods Standard:              Refers to given conditions and enters 0 Comment:
Appendix C Performance Step: 8 Standard:
OST-1036 Attachment 3 Step 9 0/  Performance Step: 9    Determines Total Shutdown Margin Standard:              Determines Total Shutdown Margin to be 5195 +/- 75 pcm (tolerance based on total of all curves used and their division readability)
Comment:
0/ Performance Step: 9 Standard:
Comment:
Page 5 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 8 Form ES-C-1 Enters worth of any additional immovable or untrippable rods Refers to given conditions and enters 0 OST-1036 Attachment 3 Step 9 Determines Total Shutdown Margin Determines Total Shutdown Margin to be 5195 +/- 75 pcm (tolerance based on total of all curves used and their division readability)
OST-1036 Section 7.3 Performance Step: 10 Signs off Section 7.3 steps Standard:
Signs off steps as complete Comment:
Terminating Cue:
STOP TIME:
0/ - Denotes Critical Steps When OST-1036, Attachment 3, Manual SOM Calculation is completed.
ENOOFJPM 2009B NRC Admin Exam RD A 1-2 Rev. 1 Appendix C Performance Step: 8 Standard:
Comment:
Comment:
OST-1036 Section 7.3 Performance Step: 10   Signs off Section 7.3 steps Standard:             Signs off steps as complete Comment:
0/ Performance Step: 9 Standard:
Terminating Cue:           When OST-1036, Attachment 3, Manual SOM Calculation is completed.
Comment:
ENOOFJPM STOP TIME:
Page 5 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 8 Form ES-C-1 Enters worth of any additional immovable or untrippable rods Refers to given conditions and enters 0 OST-1036 Attachment 3 Step 9 Determines Total Shutdown Margin Determines Total Shutdown Margin to be 5195 +/- 75 pcm (tolerance based on total of all curves used and their division readability)
0/ - Denotes Critical Steps                        2009B NRC Admin Exam RD A 1-2 Rev. 1
OST-1036 Section 7.3 Performance Step: 10 Signs off Section 7.3 steps Standard:
Signs off steps as complete Comment:
Terminating Cue:
STOP TIME:
0/ - Denotes Critical Steps When OST-1036, Attachment 3, Manual SOM Calculation is completed.
ENOOFJPM 2009B NRC Admin Exam RD A 1-2 Rev. 1  


Appendix C                                         Page 6 of 12                     Form ES-C-1 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 CRITICAL BORON CONCENTRATION &#xa5;s. CYCLE EXPOSURE AT HFP. MO. EQU1UBR1UM XENON CONDmoNS 1900 1800 1100 1600 1500 400 300 200 100 51!FPDlDIV                 eYe I.E EXPOSURE (EFPD)
Appendix C 1900 1800 1100 1600 1500 400 300 200 100 Page 6 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 CRITICAL BORON CONCENTRATION &#xa5;s. CYCLE EXPOSURE AT HFP. MO. EQU1UBR1UM XENON CONDmoNS 51!FPDlDIV eYe I.E EXPOSURE (EFPD)
IDetermination of Boron concentration for 140 EFPD CURVE NO.         .-':--'I"II'--!~FRinr----
I Determination of Boron concentration for 140 EFPD CURVE NO.  
                                    .-';--'I'1':~~~inr----                  ~~""'!'-
.-':--'I"II'--!~FRinr---- REV NO. ~~""'!'-
REV NO. ~~-:-
ORIGINATOR
ORIGINATOR         ~~~K:J.;5>>f""=--
:u;J~~~~~~:-::: DATE SUPERVISOR Il~~~
:u;J~~~~~~:-:::                 DATE SUPERVISOR         Il~~~
__ ~"..,..~....... DATE SUPSRINTENDENT ~
                                    ....         __~"..,..~.......
SHIFT OPERATIONS DATE Form ES-C-1
                                    .l4-.::~~~~E:o'-'''''''o"'F--   DATE SUPSRINTENDENT ~
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C 1900 1800 1100 1600 1500 400 300 200 100 Page 6 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 CRITICAL BORON CONCENTRATION &#xa5;s. CYCLE EXPOSURE AT HFP. MO. EQU1UBR1UM XENON CONDmoNS 51!FPDlDIV eYe I.E EXPOSURE (EFPD)
SHIFT OPERATIONS                                   DATE
I Determination of Boron concentration for 140 EFPD CURVE NO.  
./ - Denotes Critical Steps                                 2009B NRC Admin Exam RO A1-2 Rev. 1
.-';--'I'1':~~~inr---- REV NO. ~~-:-
ORIGINATOR
~~~K:J.;5>>f""=-- DATE SUPERVISOR
.l4-.::~~~~E:o'-'''''''o"'F-- DATE SUPSRINTENDENT ~
SHIFT OPERATIONS DATE Form ES-C-1
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1  


Appendix C                                                                   Page 7 of 12                                                       Form ES-C-1 PERFORMANCE INFORMATION HARRIS UNIT 1 CYCLE 16 ROD INSERTION LIMITS 240 8,.2: ~
Appendix C 2 40 2 20 2 01) 1
(46 8,.2   t5)         (l 2.2 22!
~
(l2.2       221i~
80
:,
~vL '~
                                                                            , r 220 1// V   /
100.1 ~8~ t L ~G 6D
                                                                ,.'
; /
                                                                /' V /
11" ~
201) 180                        '"
40
t"lo
,~ if'
                                                  ~
/
r: '1',
20 (0 ~28 1
                                            ~
nn Page 7 of 12 PERFORMANCE INFORMATION HARRIS UNIT 1 CYCLE 16 ROD INSERTION LIMITS (46 8,.2: t5)
                                                      ~~ ~
(l2.2 221i~  
                                                  ,,: ~,
, r
                                                      ,
/ /
V
,.' /
                                                          ,
~~ ~ ~
                                                          ~
, '1',,.
                                                            ~...
~~ ~
                                                                ,.                                                                   /
!'-'" B~ <<
rL,/
/  
                                                                                                                                        ,,k
/ c/
/ V
,.,; l'f: ':' v: ~
... 9 V v:~ ".Iv
~
1/"" 1/
l/
/
" /
/  
,,k
,/
Form ES-C-1
('00,196)
(100,186) m
. ~..
r
\\.,....
V~ j'"
E! AN KO 80
/.
~
J /. V
/'/,
60
/
/
40
/ L (0 1(1 / /
20
,/ /
lL. 1/
V (0,( ~G) 0 0
1Q 20 30 40
! ~ GO 70 30 90 1
PERCENT OF RATED THERMAL POWER CURVE NO, REYNO ~
ORIGINATOR
'foi:~~~=~~- DATE
* SUPERVISOR DATE SUPERINTENDEIU r SHIFT OPERATIONS DATE 'i ~.-:1
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C 2 40 2 20 2 01)
~
r:
80 t"lo  
~
I'  
~
1 10.1 ~e\\ /
/ ~c1 6D
, ~v I /"
40 f
./
/
(0 128 20 1
nn Page 7 of 12 PERFORMANCE INFORMATION HARRIS UNIT 1 CYCLE 16 ROD INSERTION LIMITS (46 8,.2 ~ (l 2.2 22!
1/ V
/' V  
~,, ~
V ~  
~4 ~
!'-'" B AN f<c V
/ /
: j.  
/ /
.,; y.,.' / ~
~~./ ~1 :;..,;
;I
/~ /
1/
/
I L
/
r L Form ES-C-1
('00,196)
('00,196)
(100,186)
(100,186)  
                                      ~
~
                                      ~vL I' '~      ~~ ~
r
                                                      ~4    ~
'\\..' ".~  
                          ~e\ t 10.1 ~8~
~ ~ ;"
6D 100.1            / L/ ~c1
8 AN KI 80  
                                      ,
~I' J  
                                                  ~
/,/ 'I' 60
                                            ~G !'-'" BB~            <<
/'
AN f<c                                                      ~
40
                                                                                                                            ;I  "/I L/
/ /
11"    ~
(0 1(1 /" /
                                            ~v                                                                      /~
20 1,1 /
                            ;I /
L. !/  
                                  /"                                                                                  1/""1/
/ (0, lOG) 0  
                                                                                                                          /
~
40
0 1Q 20 30 40 E
                    ,~
GO 70 30 90 1
f if'
PERCENT OF RATED THERMAL POWER CURVE NO, REYNO ~
                          ./                                                                                  / l/
ORIGINATOR  
V    1/
'r~~~~~;:u::;-:- ~TETE'",
                    /                                                                        "'.           /  /
SUPERVISOR
c/
. \\
20 (0 ~28 128
I->;M.
: y.      *
SUPERINTENDEIU r SHIFT OPERATIONS DATE 'i ~.. :1  
                                                                                        ...: j.
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A 1-2 Rev. 1  
                                                                                            ,.'      v:
                                                                                                        /
V
                                                                                                            /
m                                    ,.,; l'f:
                                                                                .,;          ':'      / ~
1
                                                                          . 9 v:~
                                                                          .~~        V
                                                                                    ./      ~1 ".Iv  :;..,;
nn
              ~
              .~    ....                                              r V~            \.
                                                                                      '\..'
                                                                                            ,.
                                                                                            ".~  ...
80                                                 /.
                                                                  ~     ~  ~        ;"
j'"
8E! AN KI  KO J /.
                                                          /,/ 'I'
                                                          /'/
                                                                , ~I'V 60
                                              ""L/ "
                                              /        // '
40                      /
(0(0 1(1       //" /
20
                          ,/
1,1   /
L. 1/
lL.  !/
0 V/ (0,   (0,( ~G) lOG) 0           1Q         20             30       40           !E~ GO                       70       30         90     1 PERCENT OF RATED THERMAL POWER CURVE NO,                                                                                       REYNO ~
ORIGINATOR ORIGINATOR SUPERVISOR
                                                          'r~~~~~;:u::;-:-
                                                          'foi:~~~=~~- DATE
                                                          .\
                                                                                                                  ~TETE'",
DATE I->;M.
                                                                                                                            *
                                                                                                                              '    "
                                                                                                                                            ,
                                                                                                                                            ,
SUPERINTENDEIU
                                                                                                                                'i ~ ...- :1 r
SHIFT OPERATIONS                                                                                DATE
./ - Denotes Critical Steps                                                                         2009B NRC Admin Exam RO A 1-2 Rev. 1


Appendix C                                   Page 8 of 12                   Form ES-C-1 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 POWER DEFECT vs. POWER LEVEL for VARIOUS BORON CONCENTRATIONS BOL (0 :I EFPD ~ 160) 2D P<:MiD1\f 20       40                       80 POWER LEVEL (peRCENT)
Appendix C 2D P<:MiD1\\f Page 8 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 POWER DEFECT vs. POWER LEVEL for VARIOUS BORON CONCENTRATIONS BOL (0 :I EFPD ~ 160) 20 40 80 POWER LEVEL (peRCENT)
CURVE NO,                                   REV NO   0 ORIGINATOR SUPERVISOR
CURVE NO, REV NO 0
                                    ~~fMiz..L~~~~!:!",- DATE   DATE
ORIGINATOR
                                                                      .~.
~~fMiz..L~~~~!:!",- DATE.~.
SUPERJNTENIENT -
SUPERVISOR DATE SUPERJNTENIENT -
SHIFT OPERATIONS                           DATE
SHIFT OPERATIONS DATE Form ES-C-1
./ - Denotes Critical Steps                           2009B NRC Admin Exam RO A1-2 Rev. 1
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C 2D P<:MiD1\\f Page 8 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 POWER DEFECT vs. POWER LEVEL for VARIOUS BORON CONCENTRATIONS BOL (0 :I EFPD ~ 160) 20 40 80 POWER LEVEL (peRCENT)
CURVE NO, REV NO 0
ORIGINATOR  
~~fMiz..L~~~~!:!",- DATE.~.
SUPERVISOR DATE SUPERJNTENIENT -
SHIFT OPERATIONS DATE Form ES-C-1
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1  


Appendix C                                               Page 9 of 12                          Form ES-C-1 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 DIFFERENTIAL AND INTEGRAL ROD WORTH CONTROL BANKS D and C MOVING WITH 103 STEP OVERLAP SOL (0 ~ EfPD S 160). HFP, SQUIUBRIUM XENON
Appendix C  
            -1800                                                                                 *18
-1800  
            ~1700                                                                                 *17
~1700  
            ~1GOO
~1GOO  
            -1500                                                                                 *15
-1500  
            ,-1400                                                                                 *14
,-1400  
            &1300
&1300  
      .... -1200
.... -1200  
        &sect; e   --1100
&sect; e --1100  
      ~
~ -1000 0
0
~ -900 0  
            -1000
~.aoo  
      ~       -900 0
..J r2  
      ~ .aoo
-725 m
      ..J r2 -725 m
I-
I-ie    -600
-600 ie
              .000
.000  
              -400
-400  
              -300
-300  
              -zoo
-zoo  
              *100
*100
:UPCtM)N 0
:UPCtM)N 0
96 0       20   40     60   80           120   140 160   180   200 220     240
0 20 Page 9 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 DIFFERENTIAL AND INTEGRAL ROD WORTH CONTROL BANKS D and C MOVING WITH 103 STEP OVERLAP SOL (0 ~ EfPD S 160). HFP, SQUIUBRIUM XENON Form ES-C-1
                $ STePlilDIV I)                               tt3                                 :a~1
*18
                      ~-----------------.--------~~-----------.
*17
II BANKO 129
*15
                      *~----~~~K~C---------*
*14 40 60 96 80 120 140 160 180 200 220 240  
CURVE CURVE NO.
$ STePlilDIV I) tt3
NO.
:a~1 II ~-----------------.--------~~-----------.
ORIGINATOR          ~~~~~~_ _ _
BANKO 129 *
REV NO.
~----~~~K~C---------*
DATE SQ  ..
CURVE NO.
SUPERVISOR          ~~~:l:t:~::;;Clrel:~_ DATE SUPERlmEMDENT -
ORIGINATOR SUPERVISOR SUPERlmEMDENT -
SHIFT OPERAilONS OPERA.lIONS                                 DA lE   Cr
SHIFT OPERAilONS
./ - Denotes Critical Steps                                         2009B NRC Admin Exam RO A1-2 Rev. 1
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C
-1800
~1700
~1GOO
-1500
,-1400
&1300 Page 9 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 DIFFERENTIAL AND INTEGRAL ROD WORTH CONTROL BANKS D and C MOVING WITH 103 STEP OVERLAP SOL (0 ~ EfPD S 160). HFP, SQUIUBRIUM XENON Form ES-C-1
*18
*17
*15
*14 40 60 96 80 120 140 160 180 200 220 240 tt3
:a~1
~-----------------.--------~~-----------.
BANKO CURVE NO.
REV NO. SQ ORIGINATOR
~~~~~~
___ DATE SUPERVISOR
~~~:l:t:~::;;Clrel:~_ DATE SUPERlmEMDENT -
SHIFT OPERA.lIONS DA lE Cr  
./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1  


Appendix C                                         Page 10 of 12                           Form ES-C-1 PERFORMANCE INFORMATION (SHADED AREA BELOW INDICATES DATA ALREADY PROVIDED)
Appendix C Page 10 of 12 PERFORMANCE INFORMATION (SHADED AREA BELOW INDICATES DATA ALREADY PROVIDED)
Manual SDM Calculation (Modes 1 and 2)
Manual SDM Calculation (Modes 1 and 2)
: 1. Reactor power level.                                                             52      %
: 1. Reactor power level.
: 2. Rod insertion limit for the above power level 96 +/- 2 96+/-2     steps on bank     D
: 2. Rod insertion limit for the above power level 96+/-2 steps on bank
: 3. Burn up (POWERTRAXIMCR Status Board).                                             140     EFPD
: 3. Burn up (POWERTRAXIMCR Status Board).
: 4. Present RCS Boron Concentration                                                 1140     ppm NOTE: Use absolute values of numbers obtained from curves.
: 4. Present RCS Boron Concentration NOTE: Use absolute values of numbers obtained from curves.
Form ES-C-1 52 D
140 EFPD 1140 ppm
: 5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 16.
: 6. Cycle 16 Power defect for the power level recorded in Step 1.
(Refer to Curves C-X-1 to C-X-3).
Curve used C-16-1 NOTE: HFP curves are used for power levels of 10% or greater.
: 7. Inserted control rod worth at the rod insertion limit recorded in Step 2.
(Refer to Curves A-X-6 to A-X-11)
Curve used A-16-9 pcm
( a )
1060 +/-50 pcm
( b )
725 +/-25 pcm
( c )
: 8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1129 pcm) or obtain individual withdrawn rod worth from the reactor engineer).
o pcm
( d )
: 9. Determine the Total Shutdown Margin using the following formula:
Total SDM CB =
6980
- 1060 +/ 725 +/ 0
( e )
( a )
./ - Denotes Critical Steps
( b )
(c)
( d )
5195 +/- 75 pcm
( e) 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Page 10 of 12 PERFORMANCE INFORMATION Manual SDM Calculation (Modes 1 and 2)
: 1. Reactor power level.
: 2. Rod insertion limit for the above power level Form ES-C-1 52 96 +/- 2 steps on bank D
: 3. Burn up (POWERTRAXIMCR Status Board).
140 EFPD
: 4. Present RCS Boron Concentration 1140 ppm NOTE: Use absolute values of numbers obtained from curves.
: 5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 16.
: 5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 16.
pcm (a )
: 6. Cycle 16 Power defect for the power level recorded in Step 1.
: 6. Cycle 16 Power defect for the power level recorded in Step 1.
(Refer to Curves C-X-1 to C-X-3).
(Refer to Curves C-X-1 to C-X-3).
Curve used       C-16-1                 1060 +/-50 pcm (b)
Curve used C-16-1 NOTE: HFP curves are used for power levels of 10% or greater.
NOTE: HFP curves are used for power levels of 10% or greater.
: 7. Inserted control rod worth at the rod insertion limit recorded in Step 2.
: 7. Inserted control rod worth at the rod insertion limit recorded in Step 2.
(Refer to Curves A-X-6 to A-X-11)
(Refer to Curves A-X-6 to A-X-11)
Curve used       A-16-9                   725 +/-25 pcm (c )
Curve used A-16-9
( a )
1060 +/-50 pcm
( b )
725 +/-25 pcm
( c )
: 8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1129 pcm) or obtain individual withdrawn rod worth from the reactor engineer).
: 8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1129 pcm) or obtain individual withdrawn rod worth from the reactor engineer).
o     pcm (d)
o pcm
( d )
: 9. Determine the Total Shutdown Margin using the following formula:
: 9. Determine the Total Shutdown Margin using the following formula:
Total SDM C B  =   6980       - 1060 +/ 725 +/         0 (e )         (a )           (b)         (c)         (d) 5195 +/- 75 pcm
Total SDM CB =
( e)
6980  
      ./ - Denotes Critical Steps                                    2009B NRC Admin Exam RO A1-2 Rev. 1
- 1060 +/ 725 +/ 0
( e )
( a )  
./ - Denotes Critical Steps
( b )
(c)
( d )
5195 +/- 75 pcm
( e) 2009B NRC Admin Exam RO A1-2 Rev. 1  


Appendix C                             Page 11 of 12                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2009B NRC EXAM Admin JPM RO A 1 Perform A Manual Shutdown Margin Calculation Examinee's Name:
Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC EXAM Admin JPM RO A 1 Perform A Manual Shutdown Margin Calculation Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 352: Line 687:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT             UNSAT Examiner's Signature:                                     Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
2009B NRC Admin Exam RO A 1-2 Rev. 1
Date:
2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC EXAM Admin JPM RO A 1 Perform A Manual Shutdown Margin Calculation Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
 
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Admin Exam RO A 1-2 Rev. 1  


Appendix C                         Page 12 of 12                         Form ES-C-1 JPM CUE SHEET The plant has been operating at 52% power for 6 weeks while Initial Conditions:  maintenance is replacing the motor on the 'A' Main Feedwater Pump
Appendix C Initial Conditions:
* Core burnup is 140 EFPD
Initiating Cue:
* RCS boron concentration is 1140 ppm
Page 12 of 12 JPM CUE SHEET Form ES-C-1 The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPD RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SDM Calculation (Modes 1 and 2)" for current plant conditions.
* NO rods are believed to be immovable / untrippable POWERTRAX is NOT available Initiating Cue:
The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SDM Calculation (Modes 1 and 2)" for current plant conditions.
NOTE: For this JPM assume independent verification has been performed.
NOTE: For this JPM assume independent verification has been performed.
2009B NRC Admin Exam RO A1-2 Rev. 1
2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 12 of 12 JPM CUE SHEET Form ES-C-1 The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPD RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SDM Calculation (Modes 1 and 2)" for current plant conditions.
NOTE: For this JPM assume independent verification has been performed.
2009B NRC Admin Exam RO A1-2 Rev. 1  


Appendix C                                         Page 1 of 12                        Form ES-C-1 Worksheet Facility:               Shearon Harris                        Task No.:          005016H101 Task Title:             Perform OP-111 , Attachment 3 -        JPM No.:    2009B NRC Exam Low Head SI Standby Lineup                          Admin JPM RO A2 Checklist KIA  
Appendix C Facility:
Task
 
==Title:==
KIA  


==Reference:==
==Reference:==
G2.2.15        RO 3.9 SRO 4.3 Examinee:                                                    NRC Examiner:
Examinee:
Facility Evaluator:                                         Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Shearon Harris Page 1 of 12 Worksheet Perform OP-111, Attachment 3 -
Initial Conditions:         A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
Low Head SI Standby Lineup Checklist G2.2.15 RO 3.9 SRO 4.3 Form ES-C-1 Task No.:
Initiating Cue:             You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AO is checking the local equipment.
005016H101 JPM No.:
2009B NRC RO Admin Exam JPM RO A2 Rev. 1
2009B NRC Exam Admin JPM RO A2 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AO is checking the local equipment.
2009B NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Facility:
Task
 
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Shearon Harris Page 1 of 12 Worksheet Perform OP-111, Attachment 3 -
Low Head SI Standby Lineup Checklist G2.2.15 RO 3.9 SRO 4.3 Form ES-C-1 Task No.:
005016H101 JPM No.:
2009B NRC Exam Admin JPM RO A2 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AO is checking the local equipment.
2009B NRC RO Admin Exam JPM RO A2 Rev. 1  


Appendix C                                 Page 2 of 12                     Form ES-C-1 Worksheet Task Standard:     All errors identified.
Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
Required Materials: OP-111, Attachment 3, with CHECK column initialed except for the local valves.
All errors identified.
Required Materials:
OP-111, Attachment 3, with CHECK column initialed except for the local valves.
General  
General  


==References:==
==References:==
OP-111 (Rev. 44)
OP-111 (Rev. 44)
Time Critical Task: No Validation Time:   10 minutes Critical Step Justification Step 2              Must identify all out of alignment equipment for Independent Verification Step 3              Must identify all out of alignment equipment for Independent Verification Step 4              Must identify all out of alignment equipment for Independent Verification Step 5              Must identify all out of alignment equipment for Independent Verification Step 6              Must identify all out of alignment equipment for Independent Verification 2009B NRC RO Admin Exam JPM RO A2 Rev. 1
Time Critical Task:
Validation Time:
Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
All errors identified.
Required Materials:
OP-111, Attachment 3, with CHECK column initialed except for the local valves.
General


Appendix C                                       Page 3 of 12                   Form ES-C-1 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator
==References:==
* Reset to IC-170 (Password 9newguys)
OP-111 (Rev. 44)
Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
Time Critical Task:
Validation Time:
Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC RO Admin Exam JPM RO A2 Rev. 1
 
Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)
Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the conditions of this JPM:
To recreate the conditions of this JPM:
* Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
* Place 1RH-30, RHR HEAT XCHG A OUT FLOW CONT to "0%" open on controller
Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CONT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
* Place 1SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)
* Leave control power ON for 1SI-341 S8
Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
* Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN
To recreate the conditions of this JPM:
* Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN
Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
* Silence Acknowledge and Reset Annunciators
Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CONT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
* Freeze and Snap these conditions for future use 20098 NRC RO Admin Exam JPM RO A2 Rev. 1
Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC RO Admin Exam JPM RO A2 Rev. 1  


Appendix C                                 Page 4 of 12                        Form ES-C-1 PERFORMANCE INFORMATION START TIME:
Appendix C START TIME:
OP-111 Attachment 3 Performance Step: 1   Obtain procedure.
Performance Step: 1 Standard:
Standard:               Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Evaluator Cue:
Evaluator Cue:         Provide OP-111, Attachment 3.
Evaluator Note:
Evaluator Note:       The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
Comment:
Comment:
OP-111 Attachment 3 continued
Performance Step: 2 Standard:
"    Performance Step: 2    Locates and compares actual position to required position lAW Attachment 3.
Evaluator Cue:
* 1RH-30, RHR XCHG A OUT FLOW CO NT - (OPEN)
Comment:
Standard:              Determines 1RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.
Evaluator Cue:        As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Provide OP-111, Attachment 3.
The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 RH-30, RHR XCHG A OUT FLOW CO NT - (OPEN)
Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C START TIME:
Performance Step: 1 Standard:
Evaluator Cue:
Evaluator Note:
Comment:
Comment:
./ - Denotes Critical Steps                     2009B NRC Admin Exam JPM RO A2 Rev. 1
Performance Step: 2 Standard:
Evaluator Cue:
Comment:
./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.
Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Provide OP-111, Attachment 3.
The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 RH-30, RHR XCHG A OUT FLOW CO NT - (OPEN)
Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
2009B NRC Admin Exam JPM RO A2 Rev. 1  


Appendix C                                 Page 5 ot 12                       Form ES-C-1 PERFORMANCE INFORMATION OP-111 Attachment 3 continued
Appendix C  
,j   Performance Step: 3   Locates and compares actual position to required position lAW Attachment 3.
,j Performance Step: 3 Standard:
* 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CO NT PWR & VLV POS (OFF)
Comment:
Standard:              Determines 1SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
,j Performance Step: 4 Standard:
Comment:
,j Performance Step: 5 Standard:
Comment:
./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1 SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CO NT PWR & VLV POS (OFF)
Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C
,j Performance Step: 3 Standard:
Comment:
,j Performance Step: 4 Standard:
Comment:
,j Performance Step: 5 Standard:
Comment:
./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1 SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CO NT PWR & VLV POS (OFF)
Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
2009B NRC Admin Exam JPM RO A2 Rev. 1
 
Appendix C
--J Performance Step: 6 Standard:
Comment:
Performance Step: 7 Standard:
Evaluator Cue:
Comment:
Comment:
OP-111 Attachment 3 continued
Terminating Cue:
,j    Performance Step: 4    Locates and compares actual position to required position lAW Attachment 3.
STOP TIME:
* 1SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
Standard:              Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
1CC-167, CCW FROM RHR HEAT EXCHANGER B-SB Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Provide Attachment to CRS.
Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Acknowledge any verbal report.
When the applicable section of the Attachment has been returned to the CRS.
ENDOFJPM 2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C
--J Performance Step: 6 Standard:
Comment:
Comment:
OP-111 Attachment 3 continued
Performance Step: 7 Standard:
,j    Performance Step: 5    Locates and compares actual position to required position lAW Attachment 3.
Evaluator Cue:
* 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Standard:             Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
Comment:
Comment:
./ - Denotes Critical Steps                   2009B NRC Admin Exam JPM RO A2 Rev. 1
Terminating Cue:
STOP TIME:
./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1CC-167, CCW FROM RHR HEAT EXCHANGER B-SB Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Provide Attachment to CRS.
Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Acknowledge any verbal report.
When the applicable section of the Attachment has been returned to the CRS.
ENDOFJPM 2009B NRC Admin Exam JPM RO A2 Rev. 1  


Appendix C                                 Page 60t 12                       Form ES-C-1 PERFORMANCE INFORMATION OP-111 Attachment 3 continued
Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
--J  Performance Step: 6    Locates and compares actual position to required position lAW Attachment 3.
2009B NRC Exam Admin JPM RO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:
* 1CC-167, CCW FROM RHR HEAT EXCHANGER B-SB Standard:              Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
Date Performed:
Comment:
Facility Evaluator:
OP-111 Attachment 3 continued Performance Step: 7    Provide Attachment to CRS.
Number of Attempts:
Standard:               Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Time to Complete:
Evaluator Cue:         Acknowledge any verbal report.
Question Documentation:
Comment:
Question:
Terminating Cue:             When the applicable section of the Attachment has been returned to the CRS.
ENDOFJPM STOP TIME:
./ - Denotes Critical Steps                    2009B NRC Admin Exam JPM RO A2 Rev. 1


Appendix C                             Page 7 of 12                     Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2009B NRC Exam Admin JPM RO A2 - Perform OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist Examinee's Name:
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM RO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 447: Line 916:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT             UNSAT Examiner's Signature:                                     Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
                      ------------------------------
Date:
2009B NRC Admin Exam JPM RO A2 Rev. 1
2009B NRC Admin Exam JPM RO A2 Rev. 1  


Appendix C                         Page 8 of 12                       Form ES-C-1 JPM CUE SHEET Initial Conditions: A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
Appendix C Initial Conditions:
Initiating Cue:    You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
Initiating Cue:
Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
An AO is checking the local equipment.
2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
An AO is checking the local equipment.
An AO is checking the local equipment.
2009B NRC Exam Admin JPM RO A2 Rev. 1
2009B NRC Exam Admin JPM RO A2 Rev. 1  


Appendix C                                           Page 9 of 12                           Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby Lineup Checklist Sheet 1 of4 Person(s) Performing Checklist Initials       Name (Print)                          Initials    Name (Print)
Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Lineup Checklist Sheet 1 of4 Person(s) Performing Checklist Initials Name (Print)  
                  ----~~~---------
----~~~---------
TR             Terry Right Remarks - Indicate any component not in the prescribed position.
Initials Name (Print)
Checklist Started                                             Time 0(;00       Date TODAY Checklist Completed                                          Time              Date ______
TR Terry Right Remarks - Indicate any component not in the prescribed position.
_ _ __    __
Checklist Started Checklist Completed Approved by UnitSCQ Time 0(;00 Time Date TODAY Date ______ __
Approved by                                                                    Date Date _ _ __
Date ----
UnitSCQ                                        ----
After receiving the final review signature, this OP Attachment becomes a QA RECORD.
IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Lineup Checklist Sheet 1 of4 Person(s) Performing Checklist Initials Name (Print)
Initials Name (Print)
TR Terry Right Remarks - Indicate any component not in the prescribed position.
Checklist Started Checklist Completed Approved by UnitSCQ Time 0(;00 Time Date TODAY Date ___
Date ___ _
After receiving the final review signature, this OP Attachment becomes a QA RECORD.
After receiving the final review signature, this OP Attachment becomes a QA RECORD.
IOP-111                                         Rev. 44                           Page 142 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1
IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1  


Appendix C                                         Page 10 of 12                             Form ES-C-1 JPM CUE SHEET Attachment 3 -low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER           COMPONENT DESCRIPTION                     POSmON       CHECK VERIFY 1RH-1             RCS lOOP A TO RHR PUMP A-SA                   Shut       TR 1RH-2             RCS lOOP A TO RHR PUMP A-SA                   Shut       TR 1RH-39           RCS lOOP C TO RHR PUMP B-SB                   Shut       TR 1RH-40           RCSlOOPCTO RHRPUMP B-SB                       Shut       TR 1RH-30           RHR HEAT XCHG A OUT flOW CONT                 Open       TR 1RH-66           RHR HEAT XCHG B OUT FLOW CONT                             TR (HC-603B1)                                   Open 1RH-20           RHR HEAT XCHG A BVP FLOW CaNT               Manual &
Appendix C Page 10 of 12 JPM CUE SHEET Form ES-C-1 -low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 1RH-1 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS lOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSlOOPCTO RHRPUMP B-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT flOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT (HC-603B1)
Shut       TR 1RH-58           RHR HEAT XCHG B BVP FLOW CaNT               Manual &
Open TR 1RH-20 RHR HEAT XCHG A BVP FLOW CaNT Manual &
Shut       TR 1RH-26 '"'       RHR Header A to eves letdown lsol         locked Shut     TR Vlv 1RH-64 '"'       RHR Header B to eves Letdown lsol         locked Shut     TR Vlv 1RH-31           RHR PUMP A-SA MINI FLOW                       Opeo       TR 1RH-69           RHR PUMP B-SB MINI FLOW                       Opeo       TR 1CS-28           RHR LETDOWN (HC-1421)                         Shut       TR 1CC-146 **       RHR HX A OuOet Throttle Valve                 Locked       TR Throttled 1CC-147           CCW FROM RHR HEAT EXCHANGER                               TR Shut A-SA
Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CaNT Manual &
  .
Shut TR 1RH-26 '"'
  **     Throttled =
RHR Header A to eves letdown lsol locked Shut TR Vlv 1RH-64 '"'
This is a local valve operated in the body of the procedure.
RHR Header B to eves Letdown lsol Vlv locked Shut TR 1RH-31 RHR PUMP A-SA MINI FLOW Opeo TR 1RH-69 RHR PUMP B-SB MINI FLOW Opeo TR 1CS-28 RHR LETDOWN (HC-1421)
Shut TR 1CC-146 **
RHR HX A OuOet Throttle Valve Locked TR Throttled 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.
Throttled =
should be as recorded in the last OST-1216. This ensures the required flow for E CSfunction.
IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 10 of 12 JPM CUE SHEET Form ES-C-1 -low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 1RH-1 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS lOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSlOOPCTO RHRPUMP B-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT flOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT (HC-603B1)
Open TR 1RH-20 RHR HEAT XCHG A BVP FLOW CaNT Manual &
Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CaNT Manual &
Shut TR 1RH-26 '"'
RHR Header A to eves letdown lsol locked Shut TR Vlv 1RH-64 '"'
RHR Header B to eves Letdown lsol Vlv locked Shut TR 1RH-31 RHR PUMP A-SA MINI FLOW Opeo TR 1RH-69 RHR PUMP B-SB MINI FLOW Opeo TR 1CS-28 RHR LETDOWN (HC-1421)
Shut TR 1CC-146 **
RHR HX A OuOet Throttle Valve Locked TR Throttled 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.
Throttled =
should be as recorded in the last OST-1216. This ensures the required flow for E CSfunction.
should be as recorded in the last OST-1216. This ensures the required flow for E CSfunction.
IOP-111                                       Rev. 44                           Page 143 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1
IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1
 
Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet3of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Oullet Throttle Vatve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER Shut TR B-SB 1SI-340SA LOW HEAD 51lRAlN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & Vl V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG
~&Pull TR to Lock 1SI-341 SB LOW HEAD 51 TRAIN B TO COLD LEG Off TR CONT PWR & VlV pas 1SI-326SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD 51 TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last 05T-1216. This ensures the required flow for ECCS function.
IOP-111 Rev. 44 Page 144 of 153 I 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet3of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Oullet Throttle Vatve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER Shut TR B-SB 1SI-340SA LOW HEAD 51lRAlN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & Vl V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG
~&Pull TR to Lock 1SI-341 SB LOW HEAD 51 TRAIN B TO COLD LEG Off TR CONT PWR & VlV pas 1SI-326SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD 51 TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last 05T-1216. This ensures the required flow for ECCS function.
IOP-111 Rev. 44 Page 144 of 153 I 2009B NRC Exam Admin JPM RO A2 Rev. 1  


Appendix C                                       Page 11 of 12                             Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby Uneup Checklist Sheet3of4 COMPONENT NUMBER           COMPONENT DESCRIPTION                       POsmON      CHECK VERIFY 1CC-166-         RHR HX B Oullet Throttle Vatve              Locked       TR Throttled 1CC-167          CCW FROM RHR HEAT EXCHANGER                              TR Shut B-SB 1SI-340SA        LOW HEAD 51lRAlN A TO COLD LEG Open & Pull to Lock      TR 1SI-340SA        LOW HEAD SI TRAIN A TO COLD LEG                Off       TR CONT PWR & VlV POS 1SI-341 SB       LOW HEAD SI TRAIN B TO COLD LEG            ~&Pull to Lock      TR 1SI-341 SB        LOW HEAD 51 TRAIN B TO COLD LEG                Off       TR CONT PWR & VlV pas 1SI-326SA        LOW HEAD SI TRAIN A TO HOT LEG                Open        TR CROSSOVER 1SI-327SB        LOW HEAD 51 TRAIN B TO HOT LEG                Open        TR CROSSOVER 1SI-322SA        RWST TO RHR PUMP A-SA                         Open        TR 1SI-323SB        RWST TO RHR PUMP B-SB                         Open        TR
Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS L~
    -     Throttled position should be as recorded in the last 05T-1216. This ensures the required flow for ECCS function.
A to RHR Pump 1A-SA Locked Off TR (1RH-2) oth Bkrs)
IOP-111                                       Rev. 44                           Page 144 of 153 I 2009B NRC Exam Admin JPM RO A2 Rev. 1
Locked Off TR 1A21-SA-8A RCS L~
C to RHR PUfll> 1B-SB Locked Off TR (1 RH4O) (Both Bkrs)
Locked Off TR 4tlUV MGG-1tl21-S1:i 1B21-SB-5B RCS ~
RHR Pump 1A-SA (1RH-1)
Bkrs)
Locked Off TR Locked Off TR 1 B21-SB-11A RCS ~
C to RHR PUrIll1B-SB Locked Off TR (1RH-39J (Both Bkrs)
Locked Off TR 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS L~
A to RHR Pump 1A-SA Locked Off TR (1RH-2) oth Bkrs)
Locked Off TR 1A21-SA-8A RCS L~
C to RHR PUfll> 1B-SB Locked Off TR (1 RH4O) (Both Bkrs)
Locked Off TR 4tlUV MGG-1tl21-S1:i 1B21-SB-5B RCS ~
RHR Pump 1A-SA (1RH-1)
Bkrs)
Locked Off TR Locked Off TR 1 B21-SB-11A RCS ~
C to RHR PUrIll1B-SB Locked Off TR (1RH-39J (Both Bkrs)
Locked Off TR 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1  


Appendix C                                   Page 12 of 12                        Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER          COMPONENT DESCRIPTION                  POSmON    CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B    RCS L~A to RHR Pump 1A-SA              Locked Off  TR (1RH-2) oth Bkrs)
Appendix C Facility:
Locked Off    TR 1A21-SA-8A    RCS L~ C to RHR PUfll> 1B-SB          Locked Off  TR (1 RH4O) (Both Bkrs)
Task
Locked Off  TR 4tlUV MGG-1tl21-S1:i 1B21-SB-5B    RCS ~ RHR Pump 1A-SA (1RH-1)      Bkrs)                    Locked Off  TR Locked Off  TR 1B21-SB-11A    RCS ~ C to RHR PUrIll1B-SB            Locked Off  TR (1RH-39J (Both Bkrs)
Locked Off  TR 1 OP-111                                Rev. 44                          Page 145 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1


Appendix C                                  Page 1 of 8                      Form ES-C-1 Worksheet Facility:            Shearon Harris                      Task No.:
==Title:==
Task Title:          Using survey maps determine stay    JPM No.:    20098 NRC Exam times                                          Admin JPM RD A-3 KIA  
KIA  


==Reference:==
==Reference:==
G.2.3.4      RO 3.2 SRO 3.7 Examinee:                                            NRC Examiner:
Examinee:
Facility Evaluator:                                   Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                               Actual Performance:   x Classroom       X   Simulator           Plant 20098 NRC Exam Admin JPM ROA3 Rev. 1
Shearon Harris Page 1 of 8 Worksheet Form ES-C-1 Task No.:
Using survey maps determine stay JPM No.:
20098 NRC Exam times Admin JPM RD A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant 20098 NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Facility:
Task


Appendix C                                         Page 2 of 8                         Form ES-C-1 Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
==Title:==
Initial Conditions:         Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
KIA
* 1ED-12
 
* 1ED-13
==Reference:==
* 1ED-14
Examinee:
* 1ED-15
Facility Evaluator:
* 1ED-17
Method of testing:
* 1ED-18 Initiating Cue:            Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
Shearon Harris Page 1 of 8 Worksheet Form ES-C-1 Task No.:
Using survey maps determine stay JPM No.:
20098 NRC Exam times Admin JPM RD A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant 20098 NRC Exam Admin JPM ROA3 Rev. 1
 
Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1 ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Line 510: Line 1,045:
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Complete the information below and return to the evaluator when complete.
2009B NRC Exam Admin JPM ROA3 Rev. 1
2009B NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1 ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
2009B NRC Exam Admin JPM ROA3 Rev. 1  


Appendix C                                 Page 3 of 8                       Form ES-C-1 Worksheet Task Standard:     Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:
Required Materials: Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General  
Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Required Materials:
Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General  


==References:==
==References:==
DOS-NGGC-0004 (Rev. 10)
DOS-NGGC-0004 (Rev. 10)
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non- Progress Energy dose for the current year has been determined.
Time Critical Task:
Time Critical Task: No Validation Time:   12 minutes Critical Task Justification Step 1              Must determine dose rates in order to calculate stay time Step 2              Must determine available dose to determine stay time.
Validation Time:
Step 3              Calculation of stay time.
Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
2009B NRC Exam Admin JPM ROA3 Rev. 1
No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.
Calculation of stay time.
2009B NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:
Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Required Materials:
Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General
 
==References:==
DOS-NGGC-0004 (Rev. 10)
Time Critical Task:
Validation Time:
Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.
Calculation of stay time.
2009B NRC Exam Admin JPM ROA3 Rev. 1
 
Appendix C START TIME:
Evaluator Note:
./ Performance Step: 1 Standard:
Comment:
./ Performance Step: 2 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of OOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem - 700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C START TIME:
Evaluator Note:
./ Performance Step: 1 Standard:
Comment:
./ Performance Step: 2 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of OOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem - 700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM RO A3 Rev. 1  


Appendix C                                   Page 4 of 8                     Form ES-C-1 PERFORMANCE INFORMATION START TIME:
Appendix C  
Evaluator Note:       The order of performance does not matter IF THE APPLICANT ASKS FOR IT: Provide a copy of OOS-NGGC-0004, Rev. 10
./ Performance Step: 3 Standard:
./ Performance Step: 1      Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Standard:               Identifies that General Area Dose Rates are 120 mrem/hr Comment:
Comment:
./ Performance Step: 2     Determine the remaining dose for the year for each individual Standard:              Operator 1: 240 mrem (2000 mrem - 1760 mrem      =240 mrem Operator 2: 600 mrem 4000 mrem - 700 mrem (PE) - 2700 mrem (SL)      =600 mrem Comment:
Terminating Cue:
./ - Denotes Critical Steps                    2009B NRC Exam Admin JPM RO A3 Rev. 1
STOP TIME:
../ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
Operator 1: 2 hours 240 mrem + 120mrem/hr = 2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr = 5 hours After the stay time has been calculated, this JPM is complete ENDOFJPM 2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C
./ Performance Step: 3 Standard:
Comment:
Terminating Cue:
STOP TIME:  
../ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
Operator 1: 2 hours 240 mrem + 120mrem/hr = 2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr = 5 hours After the stay time has been calculated, this JPM is complete ENDOFJPM 2009B NRC Exam Admin JPM RO A3 Rev. 1  


Appendix C                                 Page 5 of 8                       Form ES-C-1 PERFORMANCE INFORMATION
Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
./ Performance Step: 3      Determine stay time for each operator (based on 1st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
2009B NRC Exam Admin JPM RO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
Standard:             Operator 1: 2 hours 240 mrem + 120mrem/hr =2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr    =5 hours Comment:
Examinee's Name:
Terminating Cue:       After the stay time has been calculated, this JPM is complete ENDOFJPM STOP TIME:
Date Performed:
../ - Denotes Critical Steps                    2009B NRC Exam Admin JPM RO A3 Rev. 1
Facility Evaluator:
Number of Attempts:
Time to Complete:
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
Question Documentation:
Question:


Appendix C                                               Page 6 of 8                       Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:           2009B NRC Exam Admin JPM RO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
===Response===
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT =2 rem Progress Energy dose not to exceed 4 rem total dose if non- Progress Energy dose for the current year has been determined.
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM RO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
Examinee's Name:
Examinee's Name:
Date Performed:
Date Performed:
Line 541: Line 1,133:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                             SAT                           UNSAT Examiner's Signature:                                                                 Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
                      ----------------------------------------------------------------
Date:
2009B NRC Exam Admin JPM RO A3 Rev. 1
2009B NRC Exam Admin JPM RO A3 Rev. 1  


Appendix C                                 Page 7 of 8                         Form ES-C-1 JPM CUE SHEET Initial Conditions: Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
Appendix C Initial Conditions:
* 1ED-12
INITIATING CUE:
* 1ED-13
Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
* 1ED-14
1 ED-12 1 ED-13 1 ED-14 1ED-15 1ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
* 1ED-15
* 1ED-17
* 1ED-18 INITIATING CUE:    Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Line 562: Line 1,152:
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Complete the information below and return to the evaluator when complete.
Name _____________________________________
Name ____________________________________ _
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Operator 1: ____________________
Operator 1: _____________________ Operator 2:
_____________________ Operator 2:
2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C Initial Conditions:
2009B NRC Exam Admin JPM RO A3 Rev. 1
INITIATING CUE:
Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1 ED-12 1 ED-13 1 ED-14 1ED-15 1ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Name ____________________________________ _
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Operator 1: ____________________ Operator 2:
2009B NRC Exam Admin JPM RO A3 Rev. 1  


                                                                                                                                                                                                                              "0
I\\)
                                                                                                                                                                                                                              '0
o o CD OJ Z
                                                                                                                                                                                                                                >>
JJ
MapM                                                                                                                                                                                                                    "0
()
                                                                                                                                                                                                                              '0 CD Unit I                             190' N I Al\l;li; Equi~Drain'frM$f"TankJPlWpa !p~~;
m
I Sidg/Cleo: RAB 190'N                                                                                                  1f/30/eFt I Tin);;; CCC 1 ptWF#1,l38 RWFH1,l38                                          :::l Co x'
~
CWltJ1'Qtt(!I\t:
3 6:
CWltj1'Qtt(!I\t:    NLA                    """oft W"orkDCSCflpiion!
3 5'
DCSCflpiion!              i f.?~M;..:;~=-~:..w.~_..::::..::::.:..::c.:...,;.;..:,
c..  
uuif.?M~n~                        broio XfIlH"                ~19nk    1?ur"l  p. C\:::Qronce                                            ()
"U
SlIl'VC}'OJ!    J. ~B,ave:..
                          ~B,                    Sl!:illature:  J. Btu.V'o..
Btu.V'o.,                                                                          IRlwlew\1dby: r. 2vl0 Comn}c:l1~          ICl:0tlJe.vd d t.                .;,(:5 b                                                                                                                    I>>I '     1_
I\)
o o
CD
                                                                            /                                                                                                                ---+--.-.-.-------
I----+~-,~~~
i----f--,~~~    .. - -
                                                                                                                                                                                                          .. - - - -
c..
                                                                                                                                                                                                                          "U
:s::
:s::
JJ o
~
JJ CD
~
MapM Unit I I Sidg/Cleo: RAB 190'N I Al\\l;li; Equi~Drain'frM$f"TankJPlWpa !p~~; 1f/30/eFt I Tin);;; CCC 1 ptWF#1,l38 CWltJ1'Qtt(!I\\t:
NLA W"orkDCSCflpiion!
uif.?M~n~ broio XfIlH" ~19nk 1?ur"l p. C\\:::Qronce SlIl'VC}'OJ! J. ~B,ave:..
Sl!:illature: J. Btu.V'o..
IRlwlew\\1dby: r. 2vl0 Comn}c:l1~
ICl:0tlJe.vd d t..;,(:5 b I >> I '
1_
/
fL.,.,.", '11.
i[" ~"':?;6 1~
L,'.".....,."...... l/*"~'''~~'\\,
* "c..,'
~'1, /'
1\\&#xa5;1 X
/
v'-
..,.,.(..6 RA~iiltion Al~-"---
jJ Beta Dose R-;;;---~*
I----+~
-,~~~
% hJWt)t'.. """=='""""!
Jnstnuncnt HRA H4l!t it<Jdiatillfl Areu 11 N l1u~mll Dose: RIIte LI,jR,A ~t:d HlithRadi~i()n Mi:'<1 R Rcmlh(ouf VHRA Vr:rv High Ramntilm Area XXXX B6undary ARA AirDume Radlnlion Area 0
Suwar LocalllJoll CA Cot'lulminlltinll Afi!tl b
Atf SalnJ)le Locatiuu Air Activity
~"
Scli~1 No'/UTC 776&#xa5;&#xa5;O 77(.;1.1.3 NU., __ DAC_, ___ %. tl.ll jl&#xa5;&#xa5;7it}'~"",-~
utL!..,.
No, OAt
% ~Y'-
UCL'1Xr--~---+-""""'....c:::::;:*-----;--I NO~1':3:
AdlVit)'
UCi/CIC'-~~~
~
RMA RlidiOi.)ctiv~ Maleriuls Nell K
toOO lJose Ralell in tnrCwl1r nnje!>s otherwise noted QARb:ord c..
"U "0
"0 CD
:::l Co x'
()
:s:: "U
()~
()~
C m
C CD m OJ enS.
enS.
I OJ m
                                                                                                                                                                                                                                "U CD OJ OJ                                                                                                                                                                                                                        I     OJ Z
~
m JJ                                                                    fL.,.,.", '11.                                                                                                                                     ~
o 3 m
en o I.....
I\\)
o o CD OJ Z
JJ
()
()
                                                                            ~"':?;6                        1~
m  
                                                                            ". . ,." . . .~'1,l/*"~'''~~'\,
~
L,'*."c..,'
3 6:
i [ "
m
~                                                                                                     /'              !
3                                                                         1\&#xa5;1v'- X .. ,.,.(..6/
6:
3 5'
3 5'
c..
c..  
"U
"U
:s::                                                                                                                                               ,          % hJWt)t'.."""=='""""! Jnstnuncnt    Scli~1  No'/UTC JJ o    RA~iiltion Al~-"---                                jJ  Beta Dose R-;;;---~*                                                                AkActiYJly Air Activity            ~"                      776&#xa5;&#xa5;O                      "3 o
:s::
JJ o  
~
~
HRA H4l!t it<Jdiatillfl Areu LI,jR,A ~t:d HlithRadi~i()n Mi:'<1 VHRA Vr:rv High Ramntilm Area 11 Nl1u~mll Dose: RIIte
JJ CD  
                                                  . R Rcmlh(ouf XXXX B6undary NU.,_ _DAC_,___%.                    tl.lljl&#xa5;&#xa5;7it}'~"",-~        utL!..,.            77(.;1.1.3 m
JJ   ARA AirDume Radlnlion Area                        0 Suwar LocalllJoll
                                                                                                                                                % ~Y'-                        UCL'1Xr--~---+-""""'....c:::::;:*-----;--I      en U>
CD
~
~
CA        Cot'lulminlltinll Afi!tl RMA RlidiOi.)ctiv~ Maleriuls Nell b Atf SalnJ)le Locatiuu K toOO No, NO~1':3: AdlVit)'
MapM Unit I Sidg/Cleo: RAB 190' N CWltj1'Qtt(!I\\t:
OAt UCi/CIC'-~~~                       ~           o....
NLA
                                                                                                                                                                                                                                .....
"""oft DCSCflpiion!
I
u i f.?~M;..:;~=-~:..w.~_..::::..::::.:..::c.:...,;.;..:,
..... lJose Ralell in tnrCwl1r nnje!>s otherwise noted QARb:ord
SlIl'VC}'OJ! J. ~B, Sl!:illature: J. Btu.V'o.,
QARb:ord Tin);;; CCC 1 RWFH1,l38 AkActiYJly
---+--. -. -.-------
i----f--,~~~
Jnstnuncnt Scli~1 No'/UTC 776&#xa5;&#xa5;O
'0
'0 CD
:::l Co x'
()
o 3 m
U> o I....  
 
Appendix C Facility:
Task
 
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Shearon Harris Page 1 of 6 Worksheet During a Loss of Shutdown Cooling.
determine the time that the RCS will reach Core Boiling and Boil-Off G2.1.20 RD 4.6 SRO 4.6 Form ES-C-1 Task No.:
JPM No.:
2009B NRC Exam Admin JPM SRO A1-1 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
While the Reactor cavity was being filled the 'B' RHR pump tripped.
Motor repairs are not expected to be completed until 9/25/09.
The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
On 9/22/09 at 1400 the 'A' RHR pump tripped.
The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
Core exit thermocouples are rising; they are currently reading 135&deg;F.
lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
2009B NRC Exam Admin JPM SRO A 1-1 Rev. 1 Appendix C Facility:
Task


Appendix C                                            Page 1 of 6                              Form ES-C-1 Worksheet Facility:              Shearon Harris                                Task No.:
==Title:==
Task Title:              During a Loss of Shutdown Cooling.          JPM No.:      2009B NRC Exam determine the time that the RCS will Admin JPM SRO A1-1 reach Core Boiling and Boil-Off KIA  
KIA  


==Reference:==
==Reference:==
G2.1.20          RD 4.6 SRO 4.6 Examinee:                                                        NRC Examiner:
Examinee:
Facility Evaluator:                                               Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                                           Actual Performance:         x Classroom           X       Simulator               Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Shearon Harris Page 1 of 6 Worksheet During a Loss of Shutdown Cooling.
Initial Conditions:         On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
determine the time that the RCS will reach Core Boiling and Boil-Off G2.1.20 RD 4.6 SRO 4.6 Form ES-C-1 Task No.:
* While the Reactor cavity was being filled the 'B' RHR pump tripped.
JPM No.:
2009B NRC Exam Admin JPM SRO A1-1 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
While the Reactor cavity was being filled the 'B' RHR pump tripped.
Motor repairs are not expected to be completed until 9/25/09.
Motor repairs are not expected to be completed until 9/25/09.
* The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
* No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
* On 9/22/09 at 1400 the 'A' RHR pump tripped.
On 9/22/09 at 1400 the 'A' RHR pump tripped.
* The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
* Core exit thermocouples are rising; they are currently reading 135&deg;F.
Core exit thermocouples are rising; they are currently reading 135&deg;F.
Initiating Cue:            lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
2009B NRC Exam Admin JPM SRO A 1-1 Rev. 1
2009B NRC Exam Admin JPM SRO A 1-1 Rev. 1  


Appendix C                                 Page 2 of 6                         Form ES-C-1 Worksheet Task Standard:     Candidate obtains curves and correctly identifies the time to reach core boiling and core boil-off time Required Materials: Curves H-X-8 through H-X-11 (All Rev. 2)
Appendix C Page 2 of 6 Worksheet Form ES-C-1 Task Standard:
Candidate obtains curves and correctly identifies the time to reach core boiling and core boil-off time Required Materials:
Curves H-X-8 through H-X-11 (All Rev. 2)
General  
General  


==References:==
==References:==
AOP-020 (Rev. 31) Curve Book curves H-X-8, 9,10 and 11 (All Rev. 2)
AOP-020 (Rev. 31) Curve Book curves H-X-8, 9,10 and 11 (All Rev. 2)
Time Critical Task: No Validation Time:   10 minutes Critical Step Justification Step 3              Step required in order to accurately determine ''time to boil" using the appropriate curve.
Time Critical Task:
Step 4              Step required in order to accurately determine ''time to boil-off" using the appropriate curve.
No Validation Time:
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
10 minutes Step 3 Step 4 Critical Step Justification Step required in order to accurately determine ''time to boil" using the appropriate curve.
Step required in order to accurately determine ''time to boil-off" using the appropriate curve.
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Page 2 of 6 Worksheet Form ES-C-1 Task Standard:
Candidate obtains curves and correctly identifies the time to reach core boiling and core boil-off time Required Materials:
Curves H-X-8 through H-X-11 (All Rev. 2)
General


Appendix C                                  Page 3 of 6                          Form ES-C-1 PERFORMANCE INFORMATION START TIME:
==References:==
Performance Step: 1   OBTAIN CURVES NEEDED FOR CALCULATION (Curves will be provided to the candidate)
AOP-020 (Rev. 31) Curve Book curves H-X-8, 9,10 and 11 (All Rev. 2)
Standard:              Refers to curves H-X-8 through H-X-11 Comment:
Time Critical Task:
Performance Step: 2    Refers to provided data and determines that curve H-X-9 is required to calculate ''time to boil" and curve H-X-11 is required to calculate "boil-off' time Standard:              Reviews curves and determines which ones are appropriate to determine the ''time to boil" and "boil-off time" Comment:
No Validation Time:
./  Performance Step: 3    Based on time since shutdown (9/5/09 - 9/22109) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-9 determine ''time to boil" Standard:              Reviews curve H-X-9 Determines that ''time to boil" is 22 minutes (+/- 1 minute)
10 minutes Step 3 Step 4 Critical Step Justification Step required in order to accurately determine ''time to boil" using the appropriate curve.
Step required in order to accurately determine ''time to boil-off" using the appropriate curve.
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
 
Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Performance Step: 2 Standard:
Comment:
./ Performance Step: 3 Standard:
Comment:
./ - Denotes Critical Steps Page 3 of 6 PERFORMANCE INFORMATION OBTAIN CURVES NEEDED FOR CALCULATION (Curves will be provided to the candidate)
Refers to curves H-X-8 through H-X-11 Form ES-C-1 Refers to provided data and determines that curve H-X-9 is required to calculate ''time to boil" and curve H-X-11 is required to calculate "boil-off' time Reviews curves and determines which ones are appropriate to determine the ''time to boil" and "boil-off time" Based on time since shutdown (9/5/09 - 9/22109) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-9 determine ''time to boil" Reviews curve H-X-9 Determines that ''time to boil" is 22 minutes (+/- 1 minute) 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Comment:
./ - Denotes Critical Steps                   2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
Performance Step: 2 Standard:
Comment:
./ Performance Step: 3 Standard:
Comment:
./ - Denotes Critical Steps Page 3 of 6 PERFORMANCE INFORMATION OBTAIN CURVES NEEDED FOR CALCULATION (Curves will be provided to the candidate)
Refers to curves H-X-8 through H-X-11 Form ES-C-1 Refers to provided data and determines that curve H-X-9 is required to calculate ''time to boil" and curve H-X-11 is required to calculate "boil-off' time Reviews curves and determines which ones are appropriate to determine the ''time to boil" and "boil-off time" Based on time since shutdown (9/5/09 - 9/22109) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-9 determine ''time to boil" Reviews curve H-X-9 Determines that ''time to boil" is 22 minutes (+/- 1 minute) 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1  


Appendix C                                 Page 4 of 6                           Form ES-C-1 PERFORMANCE INFORMATION
Appendix C  
./ Performance Step: 4      Based on time since shutdown (9/5/09 - 9/22/09) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-11 determine ''time to boil-oft" Standard:              Reviews curve H-X-11 Determines that ''time to boil-off' is 4 hrs and 45 minutes
./ Performance Step: 4 Standard:
                            <+/- 15 minutes) or (4.5 to 5.0 hours)
Comment:
Terminating Cue:
STOP TIME:
./ - Denotes Critical Steps Page 4 of 6 PERFORMANCE INFORMATION Form ES-C-1 Based on time since shutdown (9/5/09 - 9/22/09) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-11 determine ''time to boil-oft" Reviews curve H-X-11 Determines that ''time to boil-off' is 4 hrs and 45 minutes  
<+/- 15 minutes) or (4.5 to 5.0 hours)
After completing the "time to boil" and "time to boil-off" calculation, the evaluation on this JPM is complete.
ENDOFJPM 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C
./ Performance Step: 4 Standard:
Comment:
Comment:
Terminating Cue:       After completing the "time to boil" and "time to boil-off" calculation, the evaluation on this JPM is complete.
Terminating Cue:
ENDOFJPM STOP TIME:
STOP TIME:
./ - Denotes Critical Steps                2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
./ - Denotes Critical Steps Page 4 of 6 PERFORMANCE INFORMATION Form ES-C-1 Based on time since shutdown (9/5/09 - 9/22/09) 17 days 14 hours since shutdown and current RCS temperature of 135&deg;F using curve H-X-11 determine ''time to boil-oft" Reviews curve H-X-11 Determines that ''time to boil-off' is 4 hrs and 45 minutes
<+/- 15 minutes) or (4.5 to 5.0 hours)
After completing the "time to boil" and "time to boil-off" calculation, the evaluation on this JPM is complete.
ENDOFJPM 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1  


Appendix C                               Page 5 of 6                       Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2009B NRC Exam Admin JPM SRO A1 During a Loss of Shutdown Cooling, determine the time that the RCS will reach Core Boiling and Boil-Off Examinee's Name:
Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM SRO A1 During a Loss of Shutdown Cooling, determine the time that the RCS will reach Core Boiling and Boil-Off Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 672: Line 1,390:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT               UNSAT Examiner's Signature:                                       Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
Date:
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM SRO A1 During a Loss of Shutdown Cooling, determine the time that the RCS will reach Core Boiling and Boil-Off Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


Appendix C                                 Page 6 of 6                         Form ES-C-1 JPM CUE SHEET Initial Conditions:       On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
===Response===
* While the Reactor cavity was being filled the '8' RHR pump tripped. Motor repairs are not expected to be completed until 9/25/09.
Result:
* The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
SAT UNSAT Examiner's Signature:
* No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
Date:
* On 9/22/09 at 1400 the 'A' RHR pump tripped.
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
* The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
 
* Core exit thermocouples are rising; they are currently reading 135&deg;F.
Appendix C Initial Conditions:
INITIATING CUE:            lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
INITIATING CUE:
Name _______________________________________________
Page 6 of 6 JPM CUE SHEET Form ES-C-1 On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
While the Reactor cavity was being filled the '8' RHR pump tripped. Motor repairs are not expected to be completed until 9/25/09.
The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
On 9/22/09 at 1400 the 'A' RHR pump tripped.
The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
Core exit thermocouples are rising; they are currently reading 135&deg;F.
lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
Name ______________________________________________ _
Record your calculations here and return your curves to the examiner:
TIME TO BOIL ________ _
TIME TO BOIL-OFF ________ _
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Initial Conditions:
INITIATING CUE:
Page 6 of 6 JPM CUE SHEET Form ES-C-1 On 9/05/09 at 0000 the plant was shutdown for a refueling outage.
While the Reactor cavity was being filled the '8' RHR pump tripped. Motor repairs are not expected to be completed until 9/25/09.
The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.
No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.
On 9/22/09 at 1400 the 'A' RHR pump tripped.
The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.
Core exit thermocouples are rising; they are currently reading 135&deg;F.
lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of ''time to boil" and ''time to boil-off' on the lines at the bottom of this page (below).
Name ______________________________________________ _
Record your calculations here and return your curves to the examiner:
Record your calculations here and return your curves to the examiner:
TIME TO BOIL _ _ _ _ _ _ _ __
TIME TO BOIL ________ _
TIME TO BOIL-OFF _ ____ __ __  _ __ __ ___
TIME TO BOIL-OFF _______ _
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1
2009B NRC Exam Admin JPM SRO A1-1 Rev. 1  
 
Appendix C Facility:
Task


Appendix C                                          Page 1 of 7                        Form ES-C-1
==Title:==
                                    .... ii        Worksheet Facility:              Shearon Harris                          Task No.:  301013H401 Task Title:             Determine Boric Acid Addition          JPM No.:    2009B NRC Exam Following CR Evacuation                            Admin JPM SRO A1-2 KIA  
KIA  


==Reference:==
==Reference:==
G2.1.25              RO 3.9 SRO 4.2 Examinee:                                                    NRC Examiner:
Examinee:
Facility Evaluator:                                           Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                                       Actual Performance:     x Classroom           X       Simulator           Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Page 1 of 7 Form ES-C-1 ii Worksheet Shearon Harris Determine Boric Acid Addition Following CR Evacuation G2.1.25 RO 3.9 SRO 4.2 Task No.:
Initial Conditions:         The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83% with a concentration of 7205 ppm. The RCS is currently 915 ppm.
301013H401 JPM No.:
Initiating Cue:            You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.
2009B NRC Exam Admin JPM SRO A1-2 NRC Examiner:
DRAFT 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83% with a concentration of 7205 ppm. The RCS is currently 915 ppm.
You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST -1036 cold shutdown boron requirement of 1740 ppm.
DRAFT 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Facility:
Task


Appendix C                                   Page 2 of 7                           Form ES-C-1 Worksheet Task Standard:     Utilizes Curve E-X-2 to determine required boric acid addition to achieve cold shutdown and Curve D-2 to obtain a change of 27 to 29 percent in BAT level (or a final level of 54 to 56 percent).
==Title:==
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
Page 1 of 7 Form ES-C-1 ii Worksheet Shearon Harris Determine Boric Acid Addition Following CR Evacuation G2.1.25 RO 3.9 SRO 4.2 Task No.:
301013H401 JPM No.:
2009B NRC Exam Admin JPM SRO A1-2 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83% with a concentration of 7205 ppm. The RCS is currently 915 ppm.
You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST -1036 cold shutdown boron requirement of 1740 ppm.
DRAFT 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
 
Appendix C Page 2 of 7 Worksheet Form ES-C-1 Task Standard:
Utilizes Curve E-X-2 to determine required boric acid addition to achieve cold shutdown and Curve D-2 to obtain a change of 27 to 29 percent in BAT level (or a final level of 54 to 56 percent).
Actual is 28% change (or 55% final).
Actual is 28% change (or 55% final).
Required Materials: Curve Book Calculator General  
Required Materials:
Curve Book Calculator General  


==References:==
==References:==
AOP-004 (Rev. 46)
AOP-004 (Rev. 46)
Curve Book nomograph E-X-2 (Rev. 4) and Curve D-2 (Rev. 0)
Time Critical Task:
Time Critical Task: No Validation Time:    15 minutes Critical Step Justification Step 3              Step is critical in order to correctly identify the amount of boric acid required boric acid concentration.
Validation Time:
Step 4              Step is critical in order to determine the change in tank level.
Step 3 Step 4 Curve Book nomograph E-X-2 (Rev. 4) and Curve D-2 (Rev. 0)
2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
No 15 minutes Critical Step Justification Step is critical in order to correctly identify the amount of boric acid required boric acid concentration.
Step is critical in order to determine the change in tank level.
2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Page 2 of 7 Worksheet Form ES-C-1 Task Standard:
Utilizes Curve E-X-2 to determine required boric acid addition to achieve cold shutdown and Curve D-2 to obtain a change of 27 to 29 percent in BAT level (or a final level of 54 to 56 percent).
Actual is 28% change (or 55% final).
Required Materials:
Curve Book Calculator General


Appendix C                                  Page 3 of 7                        Form ES-C-1 VERIFICATION OF COMPLETION START TIME:
==References:==
Performance Step: 1   OBTAIN PROCEDURE Standard:             Obtains AOP-004 and refers to Section 3.2 Step 25 (Copy of step will be provided to the candidate)
AOP-004 (Rev. 46)
Time Critical Task:
Validation Time:
Step 3 Step 4 Curve Book nomograph E-X-2 (Rev. 4) and Curve D-2 (Rev. 0)
No 15 minutes Critical Step Justification Step is critical in order to correctly identify the amount of boric acid required boric acid concentration.
Step is critical in order to determine the change in tank level.
2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
 
Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Comment:
Performance Step: 2   Obtain cold shutdown boron concentration using copy of latest OST-1036 in back of book.
Performance Step: 2 Standard:
Standard:
Evaluator Cue:
Evaluator Cue:        (If candidate asks: This information is provided in the initiating cue.)
Comment:
Required shutdown boron concentration is 1740 ppm Comment:
./ Performance Step: 3 Standard:
./ Performance Step: 3     Determine required gallons of boric acid to achieve required RCS boron concentration using the formula on the boron addition nomograph E-2 Standard:              Utilizes formula on Nomograph E-2 and calculates between 9130 to 9030 gallons of boric acid to be added. Actual is 9080 gallons Boron Addition (ReS @ 350 D F)
./ - Denotes Critical Steps Page 3 of 7 VERIFICATION OF COMPLETION OBTAIN PROCEDURE Obtains AOP-004 and refers to Section 3.2 Step 25 (Copy of step will be provided to the candidate)
Vi =. -M 1n(7000-Cf) 8.33   7000 - Ci M =538,000
Form ES-C-1 Obtain cold shutdown boron concentration using copy of latest OST -1036 in back of book.
./- Denotes Critical Steps                    2009B NRC Exam Admin JPMSRO A1-2 Rev. 1
(If candidate asks: This information is provided in the initiating cue.)
Required shutdown boron concentration is 1740 ppm Determine required gallons of boric acid to achieve required RCS boron concentration using the formula on the boron addition nomograph E-2 Utilizes formula on Nomograph E-2 and calculates between 9130 to 9030 gallons of boric acid to be added. Actual is 9080 gallons Boron Addition (ReS @ 350DF)
Vi =. -M 1n(7000-Cf) 8.33 7000 - Ci M =538,000 2009B NRC Exam Admin JPMSRO A1-2 Rev. 1 Appendix C START TIME:
Performance Step: 1 Standard:
Comment:
Performance Step: 2 Standard:
Evaluator Cue:
Comment:  
./ Performance Step: 3 Standard:
./ - Denotes Critical Steps Page 3 of 7 VERIFICATION OF COMPLETION OBTAIN PROCEDURE Obtains AOP-004 and refers to Section 3.2 Step 25 (Copy of step will be provided to the candidate)
Form ES-C-1 Obtain cold shutdown boron concentration using copy of latest OST -1036 in back of book.
(If candidate asks: This information is provided in the initiating cue.)
Required shutdown boron concentration is 1740 ppm Determine required gallons of boric acid to achieve required RCS boron concentration using the formula on the boron addition nomograph E-2 Utilizes formula on Nomograph E-2 and calculates between 9130 to 9030 gallons of boric acid to be added. Actual is 9080 gallons Boron Addition (ReS @ 350DF)
Vi =. -M 1n(7000-Cf) 8.33 7000 - Ci M =538,000 2009B NRC Exam Admin JPMSRO A1-2 Rev. 1  


Appendix C                                   Page 4 of 7                 Form ES-C-1 VERIFICATION OF COMPLETION Examiners NOTE:        The Nomograph formula found on Curve E-X-2 assumes that the BAT boron concentration is 7000 ppm. In this JPM the given information is BAT concentration is 7205 ppm. The candidate MUST use the given concentration of 7205 ppm to come to the correct boron addition.
Appendix C Examiners NOTE:
CORRECT CALCULATION
Comment:
                                      -538000 InlZ205 -1740).
./ - Denotes Critical Steps Page 4 of 7 VERIFICATION OF COMPLETION Form ES-C-1 The Nomograph formula found on Curve E-X-2 assumes that the BAT boron concentration is 7000 ppm. In this JPM the given information is BAT concentration is 7205 ppm. The candidate MUST use the given concentration of 7205 ppm to come to the correct boron addition.
VB = 8. 33             \-7205 - 915 . =9080 If candidate uses 7000 ppm for BAT BA concentration (from the nomograph) instead of changing to 7205 ppm the result will be 9409 gallons INCORRECT CALCULATION (using wrong BAT concentration)
CORRECT CALCULATION  
                                      -538000 I (!OOO -1740)
-538000 InlZ205 -1740).
VB =     8.. 33     n\7000 - 915 . =9409 If candidate uses correct BAT BA concentration but uses the wrong Curve (E-X-1 verses E-X-2) the result will be 7443 gallons INCORRECT CALCULATION (using wrong RCS Mass - wrong curve)
VB = 8. 33  
                                      -441000 l (Z205 -1740)
\\-7205 - 915. = 9080 If candidate uses 7000 ppm for BAT BA concentration (from the nomograph) instead of changing to 7205 ppm the result will be 9409 gallons INCORRECT CALCULATION (using wrong BAT concentration)  
VB =     8.33       n\720S - 915 ; =7443 Comment:
-538000 I (!OOO -1740)
./- Denotes Critical Steps                     2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
VB =
8.. 33 n\\7000 - 915. = 9409 If candidate uses correct BAT BA concentration but uses the wrong Curve (E-X-1 verses E-X-2) the result will be 7443 gallons INCORRECT CALCULATION (using wrong RCS Mass - wrong curve)  
-441000 l (Z205 -1740)
VB = 8.33 n\\720S - 915 ; = 7443 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Examiners NOTE:
Comment:  
./ - Denotes Critical Steps Page 4 of 7 VERIFICATION OF COMPLETION Form ES-C-1 The Nomograph formula found on Curve E-X-2 assumes that the BAT boron concentration is 7000 ppm. In this JPM the given information is BAT concentration is 7205 ppm. The candidate MUST use the given concentration of 7205 ppm to come to the correct boron addition.
CORRECT CALCULATION
-538000 InlZ205 -1740).
VB = 8. 33
\\-7205 - 915. = 9080 If candidate uses 7000 ppm for BAT BA concentration (from the nomograph) instead of changing to 7205 ppm the result will be 9409 gallons INCORRECT CALCULATION (using wrong BAT concentration)
-538000 I (!OOO -1740)
VB =
8.. 33 n\\7000 - 915. = 9409 If candidate uses correct BAT BA concentration but uses the wrong Curve (E-X-1 verses E-X-2) the result will be 7443 gallons INCORRECT CALCULATION (using wrong RCS Mass - wrong curve)
-441000 l (Z205 -1740)
VB = 8.33 n\\720S - 915 ; = 7443 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1  


Appendix C                                                   Page 5 of 7                                       Form ES-C-1 VERIFICATION OF COMPLETION 0/  Performance Step: 4                    Determine the change in boric acid tank level equivalent to the required gallons of boric acid using the boric acid tank curve 0-2 Standard:                              Utilizes Curve 0-2 and obtains a change of 27 to 29 percent (or a final level of 54 to 56 percent).
Appendix C 0/ Performance Step: 4 Standard:
Actual is 28% change (or 55% final).
Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Determine the change in boric acid tank level equivalent to the required gallons of boric acid using the boric acid tank curve 0-2 Utilizes Curve 0-2 and obtains a change of 27 to 29 percent (or a final level of 54 to 56 percent).
        -:':51)00           1IIIIIIIIIIIIIIltill IIllllL1l1ll1ll1t II lt60rle n60r1e Add Tonk Volume in     ~n(lrt
Actual is 28% change (or 55% final).  
                                            ~n(lrt"
-:':51)00 1IIIIIIIIIIIIIIltill n60r1e Add Tonk Volume in  
                  .
~n(lrt" 15000 f}
                                                                                                                    .+
10 fO 30 120000 -9080 = 10020 40
I 15000 I  rm III Curve arlg Sup';
~ONTROL ROOM COpy Comment:
OpS
STOP TIME:
                                                            * **
Curve Ji.  
Ji.
..:1 Rey W1.
C!KVe..JJ
arlg
                                                                ~
'"'L.{ J htit.f.:-z:t-Sup'; ~. if' nflte~
SUpy ....
OpS 5O~50 It Incnceted *
* u.&(
. I Olt.~
1l-.1
III 1111/11 IU'II 70 80[!!]
                                                                            ..:1 "I.. (-,,;
90  
                                                                        '"'L.{
\\83-55=28\\  
                                                                              ..fI' lUll U
.+
                                                                          ~l *
100 Terminating Cue:
                                                                              .
When candidate completes the calculations the JPM is completed.
if' Rey W1.
ENDOFJPM 0/- Denotes Critical Steps 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C 0/ Performance Step: 4 Standard:
RevW1.
Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Determine the change in boric acid tank level equivalent to the required gallons of boric acid using the boric acid tank curve 0-2 Utilizes Curve 0-2 and obtains a change of 27 to 29 percent (or a final level of 54 to 56 percent).
ra...t.f.:-z:t-SI.
Actual is 28% change (or 55% final).  
J htit.f.:-z:t-nflte~
-:':51)00 IIllllL1l1ll1ll1t II lt60rle Add Tonk Volume in
l"Ii\lte~
~n(lrt 15000 I
Olt.~
I rm III f}
                                                                                        . .....
10 fO 30 120000 -9080 = 10020 40
1/
~ONTROL ROOM COpy Comment:
III 1111/11 IU'II 10        fO        30      40        5O~50                  70           80[!!] 90   100 120000 - 9080 = 10020 f}
                                                  .
It Incnceted *          \83-55=28\
~ONTROL ROOM COpy                                              . I
    .....................  ---,...._-
Comment:
STOP TIME:
STOP TIME:
Terminating Cue:                       When candidate completes the calculations the JPM is completed.
1l-.1 RevW1.
ENDOFJPM 0/- Denotes Critical Steps                                       2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1
C!KVe..JJ "I.. (-,,; ra...t.f.:-z:t-SI.
arlg SUpy.... u.&(
.fI' l"Ii\\lte~
OpS lUll
~l
* 5O~50 It Incnceted *
. I Olt.~
U 1/
70 80[!!]
90
\\83-55=28\\
.+
100 Terminating Cue:
When candidate completes the calculations the JPM is completed.
ENDOFJPM 0/- Denotes Critical Steps 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1  
 
Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
20098 NRC Exam Admin JPM SRO A 1 Determine boric acid addition following control room evacuation Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:


Appendix C                                 Page 6 of 7                         Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   20098 NRC Exam Admin JPM SRO A 1 Determine boric acid addition following control room evacuation Examinee's Name:
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
../ - Denotes Critical Steps 20098 NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
20098 NRC Exam Admin JPM SRO A 1 Determine boric acid addition following control room evacuation Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 781: Line 1,629:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                       SAT                 UNSAT Examiner's Signature:                                           Date:
Result:
                        ----------------------------
SAT UNSAT Examiner's Signature:
../- Denotes Critical Steps                   20098 NRC Exam Admin JPMSRO A 1-2 Rev. 1
Date:  
../ - Denotes Critical Steps 20098 NRC Exam Admin JPMSRO A 1-2 Rev. 1  


Appendix C                           Page 7 of 7                       Form ES-C-1 JPM CUE SHEET The Control Room has been evacuated and the MCB transfer to Initial Conditions:
Appendix C Initial Conditions:
the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83%
Initiating Cue:
Page 7 of 7 JPM CUE SHEET Form ES-C-1 The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83%
with a concentration of 7205 ppm. The RCS is currently 915 ppm.
with a concentration of 7205 ppm. The RCS is currently 915 ppm.
Initiating Cue:     You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.
You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.
2009B NRC Exam Admin JPMSRO A1-2 Rev. 1
2009B NRC Exam Admin JPMSRO A1-2 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 7 of 7 JPM CUE SHEET Form ES-C-1 The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83%
with a concentration of 7205 ppm. The RCS is currently 915 ppm.
You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.
2009B NRC Exam Admin JPMSRO A1-2 Rev. 1  
 
Appendix C Facility:
Task


Appendix C              DRAFT                    Page 1 of 12 Worksheet Form ES-C-1 Facility:                Shearon Harris                          Task No.:        005016H101 Task Title:             Perform OP-111, Attachment 3 -.        JPM No.:    2009B NRC Exam Low Head SI Standby Lineup                          Admin JPM SRO A2 Checklist KIA  
==Title:==
KIA  


==Reference:==
==Reference:==
G2.2.15        RO 3.9 SRO 4.3 Examinee:                                                    NRC Examiner:
Examinee:
Facility Evaluator:                                         Date: _ __
Facility Evaluator:
Method of testing:
Method of testing:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
DRAFT Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Task No.:
Initial Conditions:         A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
005016H101 Perform OP-111, Attachment 3 -.
Initiating Cue:            You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AD is checking the local equipment.
JPM No.:
2009B NRC Exam Admin JPM SRO A2 Rev. 1
2009B NRC Exam Low Head SI Standby Lineup Admin JPM SRO A2 Checklist G2.2.15 RO 3.9 SRO 4.3 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AD is checking the local equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Facility:
Task


Appendix C                                   Page 2 of 12                     Form ES-C-1 Worksheet Task Standard:     All errors identified.
==Title:==
Required Materials: OP-111, Attachment 3, with CHECK column initialed except for the local valves.
KIA
 
==Reference:==
Examinee:
Facility Evaluator:
Method of testing:
DRAFT Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Task No.:
005016H101 Perform OP-111, Attachment 3 -.
JPM No.:
2009B NRC Exam Low Head SI Standby Lineup Admin JPM SRO A2 Checklist G2.2.15 RO 3.9 SRO 4.3 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
X Classroom Simulator X
Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AD is checking the local equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1
 
Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
All errors identified.
Required Materials:
OP-111, Attachment 3, with CHECK column initialed except for the local valves.
General  
General  


==References:==
==References:==
OP-111 (Rev. 44)
OP-111 (Rev. 44)
Time Critical Task: No Validation Time:   10 minutes Critical Step Justification:
Time Critical Task:
Step 2              Must identify all out of alignment equipment for Independent Verification Step 3              Must identify all out of alignment equipment for Independent Verification Step 4              Must identify all out of alignment equipment for Independent Verification Step 5              Must identify all out of alignment equipment for Independent Verification Step 6              Must identify all out of alignment equipment for Independent Verification 2009B NRC Exam Admin JPM SRO A2 Rev. 1
Validation Time:
Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification:
Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:
All errors identified.
Required Materials:
OP-111, Attachment 3, with CHECK column initialed except for the local valves.
General


Appendix C                                       Page 3 of 12                   Form ES-C-1 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator
==References:==
* Reset to IC-170 (Password 9newguys)
OP-111 (Rev. 44)
Silence and Acknowledge annunciators GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
Time Critical Task:
Validation Time:
Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification:
Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC Exam Admin JPM SRO A2 Rev. 1
 
Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)
Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the conditions of this JPM:
Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CO NT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)
Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)
To recreate the conditions of this JPM:
To recreate the conditions of this JPM:
* Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)
* Place 1RH-30, RHR HEAT XCHG A OUT FLOW CO NT to "0%" open on controller
Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CO NT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
* Place 1SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)
Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC Exam Admin JPM SRO A2 Rev. 1
* Leave control power ON for 1SI-341 S8
 
* Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN
Appendix C START TIME:
* Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN
Performance Step: 1 Standard:
* Silence Acknowledge and Reset Annunciators
Evaluator Cue:
* Freeze and Snap these conditions for future use 20098 NRC Exam Admin JPM SRO A2 Rev. 1
Evaluator Note:
Comment:
~ Performance Step: 2 Standard:
Evaluator Cue:
Comment:
../ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.
Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Provide OP-111, Attachment 3.
The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 RH-30, RHR XCHG A OUT FLOW CONT - (OPEN)
Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C START TIME:
Performance Step: 1 Standard:
Evaluator Cue:
Evaluator Note:
Comment:
~ Performance Step: 2 Standard:
Evaluator Cue:
Comment:
../ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.
Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Provide OP-111, Attachment 3.
The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 RH-30, RHR XCHG A OUT FLOW CONT - (OPEN)
Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                   Page 4 of 12                         Form ES-C-1 PERFORMANCE INFORMATION START TIME:
Appendix C Performance Step: 3 Standard:
OP-111 Attachment 3 Performance Step: 1   Obtain procedure.
Comment:
Standard:              Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.
Performance Step: 4 Standard:
Evaluator Cue:          Provide OP-111, Attachment 3.
Comment:
Evaluator Note:        The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.
Performance Step: 5 Standard:
Comment:
./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CONT PWR & VLV POS (OFF)
Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
Determines 1 SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Performance Step: 3 Standard:
Comment:
Comment:
OP-111 Attachment 3 continued
Performance Step: 4 Standard:
~    Performance Step: 2    Locates and compares actual position to required position lAW Attachment 3.
* 1RH-30, RHR XCHG A OUT FLOW CONT - (OPEN)
Standard:             Determines 1RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.
Evaluator Cue:        As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.
Comment:
Comment:
../ - Denotes Critical Steps                     2009B NRC Exam Admin JPM SRO A2 Rev. 1
Performance Step: 5 Standard:
Comment:
./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CONT PWR & VLV POS (OFF)
Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
Determines 1 SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.
1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                 Page 5 ot 12                      Form ES-C-1 PERFORMANCE INFORMATION OP-111 Attachment 3 continued
Appendix C Performance Step: 6 Standard:
"    Performance Step: 3    Locates and compares actual position to required position lAW Attachment 3.
Comment:
* 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CONT PWR & VLV POS (OFF)
Performance Step: 7 Standard:
Standard:             Determines 1SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.
Evaluator Cue:
Comment:
Comment:
OP-111 Attachment 3 continued     '
Terminating Cue:
"    Performance Step: 4    Locates and compares actual position to required position lAW Attachment 3.
STOP TIME:
* 1SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)
./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
Standard:              Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.
1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Provide Attachment to CRS.
Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Acknowledge any verbal report.
When the applicable section of the Attachment has been returned to the CRS:
ENDOFJPM 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Performance Step: 6 Standard:
Comment:
Comment:
OP-111 Attachment 3 continued
Performance Step: 7 Standard:
"    Performance Step: 5    Locates and compares actual position to required position lAW Attachment 3.
Evaluator Cue:
* 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Standard:             Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.
Comment:
Comment:
./ - Denotes Critical Steps                   2009B NRC Exam Admin JPM SRO A2 Rev. 1
Terminating Cue:
STOP TIME:
./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.
1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
OP-111 Attachment 3 continued Provide Attachment to CRS.
Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Acknowledge any verbal report.
When the applicable section of the Attachment has been returned to the CRS:
ENDOFJPM 20098 NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                 Page 60t 12                       Form ES-C-1 PERFORMANCE INFORMATION OP-111 Attachment 3 continued
Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
"    Performance Step: 6    Locates and compares actual position to required position lAW Attachment 3.
2009B NRC Exam Admin JPM SRO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:
* 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 Standard:              Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.
Date Performed:
Comment:
Facility Evaluator:
OP-111 Attachment 3 continued Performance Step: 7    Provide Attachment to CRS.
Number of Attempts:
Standard:               Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.
Time to Complete:
Evaluator Cue:         Acknowledge any verbal report.
Question Documentation:
Comment:
Question:
Terminating Cue:            When the applicable section of the Attachment has been returned to the CRS:
ENDOFJPM STOP TIME:
./ - Denotes Critical Steps                  20098 NRC Exam Admin JPM SRO A2 Rev. 1


Appendix C                             Page 7 of 12                     Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2009B NRC Exam Admin JPM SRO A2 - Perform OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist Examinee's Name:
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM SRO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 875: Line 1,845:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT               UNSAT Examiner's Signature:                                     Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
2009B NRC Exam Admin JPM SRO A2 Rev. 1
Date:
2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                         Page 8 of 12                       Form ES-C-1 JPM CUE SHEET Initial Conditions: A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
Appendix C Initial Conditions:
Initiating Cue:    You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
Initiating Cue:
Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
An AO is checking the local equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.
You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.
An AO is checking the local equipment.
An AO is checking the local equipment.
2009B NRC Exam Admin JPM SRO A2 Rev. 1
2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                           Page 9 of 12                           Form ES-C-1 JPM CUE SHEET Attacmnent 3 - Low Head Safety Injection Standby Lineup Checklist Sheet1of4 Person(s) Perfonning Cheddisf Initials       Name (Print)                         Initials     Name (Print)
Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 Attacmnent 3 - Low Head Safety Injection Standby Lineup Checklist Sheet1of4 Person(s) Perfonning Cheddisf Initials Name (Print)
TR             Terry Ilight Remarks - Indicate any component not in the prescribed positiorL Checklist Started                                                               Date TODAY' Checklist Completed                                          Time              Date _ _ __
Initials Name (Print)
Approved by                                                                    Date UnitSCO
TR Terry Ilight Remarks - Indicate any component not in the prescribed positiorL Checklist Started Checklist Completed Approved by Time UnitSCO Date TODAY' Date ___ _
                                                                                        ----
Date ----
After receiving the final review signature. this OP Attadvnent becomes a QA RECORD.
IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 Attacmnent 3 - Low Head Safety Injection Standby Lineup Checklist Sheet1of4 Person(s) Perfonning Cheddisf Initials Name (Print)
Initials Name (Print)
TR Terry Ilight Remarks - Indicate any component not in the prescribed positiorL Checklist Started Checklist Completed Approved by Time UnitSCO Date TODAY' Date ___ _
Date ----
After receiving the final review signature. this OP Attadvnent becomes a QA RECORD.
After receiving the final review signature. this OP Attadvnent becomes a QA RECORD.
IOP-111                                         Rev. 44                           Page 142 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1
IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1
 
Appendix C Page 10 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSITION CHECK 1RH-1 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS LOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSLOOPCTORHRPUMPB-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT FLOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT Open TR (HCr03B1) 1RH-20 RHR HEAT XCHG A BVP FLOW CONT Manual &
Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CONT Manual &
Shut TR 1RH-26,.
RHR Header A to eves Letdown 1501 Locked Shut TR Vlv 1RH-64
* RHR Header B to cves Letdown lsol Locked Shut TR Vlv 1RH-31 RHR PUMP A-SA MINI FLOW Open TR 1RH-69 RHR PUMP B-SB MINI FLOW Open TR 1CS-28 RHR LETDOWN (HC-1421)
Shut TR 1CC-146-RHR HX A Outlet Throttle Valve Locked TR ThrotHed 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.
Form ES-C-1 VERIFY Throttled ~0I1 should be as recorded in the last OST-1216. This ensures the required flow for E CS function.
IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 10 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSITION CHECK 1RH-1 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS LOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSLOOPCTORHRPUMPB-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT FLOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT Open TR (HCr03B1) 1RH-20 RHR HEAT XCHG A BVP FLOW CONT Manual &
Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CONT Manual &
Shut TR 1RH-26,.
RHR Header A to eves Letdown 1501 Locked Shut TR Vlv 1RH-64
* RHR Header B to cves Letdown lsol Locked Shut TR Vlv 1RH-31 RHR PUMP A-SA MINI FLOW Open TR 1RH-69 RHR PUMP B-SB MINI FLOW Open TR 1CS-28 RHR LETDOWN (HC-1421)
Shut TR 1CC-146-RHR HX A Outlet Throttle Valve Locked TR ThrotHed 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.
Form ES-C-1 VERIFY Throttled ~0I1 should be as recorded in the last OST-1216. This ensures the required flow for E CS function.
IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                         Page 10 of 12                           Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER             COMPONENT DESCRIPTION                     POSITION    CHECK VERIFY 1RH-1            RCS LOOP A TO RHR PUMP A-SA                    Shut      TR 1RH-2              RCS LOOP A TO RHR PUMP A-SA                    Shut      TR 1RH-39            RCS LOOP C TO RHR PUMP B-SB                   Shut      TR 1RH-40            RCSLOOPCTORHRPUMPB-SB                          Shut     TR 1RH-30            RHR HEAT XCHG A OUT FLOW CONT                  Open     TR 1RH-66            RHR HEAT XCHG B OUT FLOW CONT                            TR (HCr03B1)                                      Open 1RH-20            RHR HEAT XCHG A BVP FLOW CONT               Manual &
Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby lineup Checklist Sheet 3 of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Outlet Throttle Valve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER B-SB Shut TR 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & VL V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG
Shut      TR 1RH-58            RHR HEAT XCHG B BVP FLOW CONT               Manual &
~&Pull TR to Lock 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG Off TR CONT PWR & VLV POS 1SI-326 SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD SI TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322 SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last OST-1216. This ensures the required flow for ECCS function.
Shut      TR 1RH-26 ,.        RHR Header A to eves Letdown 1501 Vlv                                        Locked Shut  TR 1RH-64
1 OP-111 Rev. 44 Page 144 of 1531 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby lineup Checklist Sheet 3 of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Outlet Throttle Valve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER B-SB Shut TR 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & VL V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG
* RHR Header B to cves Letdown lsol          Locked Shut    TR Vlv 1RH-31            RHR PUMP A-SA MINI FLOW                        Open       TR 1RH-69            RHR PUMP B-SB MINI FLOW                        Open       TR 1CS-28            RHR LETDOWN (HC-1421)                          Shut      TR 1CC-146-         RHR HX A Outlet Throttle Valve               Locked       TR ThrotHed 1CC-147          CCW FROM RHR HEAT EXCHANGER                               TR A-SA                                           Shut
~&Pull TR to Lock 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG Off TR CONT PWR & VLV POS 1SI-326 SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD SI TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322 SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last OST-1216. This ensures the required flow for ECCS function.
  ... This is a local valve operated in the body of the procedure.
1 OP-111 Rev. 44 Page 144 of 1531 20098 NRC Exam Admin JPM SRO A2 Rev. 1  
  -       Throttled ~0I1 should be as recorded in the last OST-1216. This ensures the required flow for E CS function.
IOP-111                                         Rev. 44                           Page 143 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1


Appendix C                                         Page 11 of 12                             Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby lineup Checklist Sheet 3 of4 COMPONENT NUMBER             COMPONENT DESCRIPTION                     POsmON      CHECK VERIFY 1CC-166-           RHR HX B Outlet Throttle Valve              Locked       TR Throttled 1CC-167          CCW FROM RHR HEAT EXCHANGER                              TR B-SB                                           Shut 1SI-340SA        LOW HEAD SI TRAIN A TO COLD LEG Open & Pull to Lock      TR 1SI-340SA        LOW HEAD SI TRAIN A TO COLD LEG                Off       TR CONT PWR & VLV POS 1SI-341 SB       LOW HEAD SI TRAIN B TO COLD LEG            ~&Pull to Lock      TR 1SI-341 SB       LOW HEAD SI TRAIN B TO COLD LEG                Off       TR CONT PWR & VLV POS 1SI-326 SA       LOW HEAD SI TRAIN A TO HOT LEG                Open        TR CROSSOVER 1SI-327SB        LOW HEAD SI TRAIN B TO HOT LEG                Open        TR CROSSOVER 1SI-322 SA       RWST TO RHR PUMP A-SA                         Open        TR 1SI-323SB        RWST TO RHR PUMP B-SB                         Open        TR
Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS Lg(B A to RHR Puflll1A-SA Locked Off TR (1RH-2) oth 8krs)
    -      Throttled position should be as recorded in the last OST-1216. This ensures the required flow for ECCS function.
Locked Off TR 1A21-SA-8A RCS L~
1 OP-111                                       Rev. 44                           Page 144 of 1531 20098 NRC Exam Admin JPM SRO A2 Rev. 1
C to RHR PlIfIl> 1B-SB Locked Off TIt (1RH-40) (Both Bkrs)
Locked Off TIt 4tlUV MCG-1tl21-!::)H 1B21-SB-5B RCS ~
RHR Puflll1A-SA (1RH-1) 8krs)
Locked Off TIt Locked Off TIt 1B21-SB-11A RCS ~
C to RHR PUf1ll1E~-SB Locked Off TR (1RH-39)(Both Bkrs)
Locked Off TIt 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS Lg(B A to RHR Puflll1A-SA Locked Off TR (1RH-2) oth 8krs)
Locked Off TR 1A21-SA-8A RCS L~
C to RHR PlIfIl> 1B-SB Locked Off TIt (1RH-40) (Both Bkrs)
Locked Off TIt 4tlUV MCG-1tl21-!::)H 1B21-SB-5B RCS ~
RHR Puflll1A-SA (1RH-1) 8krs)
Locked Off TIt Locked Off TIt 1B21-SB-11A RCS ~
C to RHR PUf1ll1E~-SB Locked Off TR (1RH-39)(Both Bkrs)
Locked Off TIt 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1  


Appendix C                                   Page 12 of 12                      Form ES-C-1 JPM CUE SHEET Attachment 3 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER        COMPONENT DESCRIPTION                  POSmON    CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B    RCS Lg(B A to RHR Puflll1A-SA          Locked Off  TR (1RH-2) oth 8krs)
Appendix C Facility:
Locked Off    TR 1A21-SA-8A    RCS L~ C    to RHR PlIfIl> 1B-SB      Locked Off  TIt (1RH-40) (Both Bkrs)
Page 1 of 8 Worksheet Form ES-C-1 Task No.:
Locked Off  TIt 4tlUV MCG-1tl21-!::)H 1B21-SB-5B    RCS ~ RHR Puflll1A-SA (1RH-1)      8krs)                    Locked Off  TIt Locked Off  TIt 1B21-SB-11A    RCS ~ C to RHR PUf1ll1E~-SB            Locked Off  TR (1RH-39)(Both Bkrs)
Task
Locked Off  TIt 1 OP-111                                  Rev. 44                      Page 145 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1


Appendix C                                  Page 1 of 8                      Form ES-C-1 Worksheet Facility:                                                Task No.:
==Title:==
Task Title:          Using survey maps determine stay   JPM No.:   2009B NRC Exam times                                           Admin JPM SRO A-3 KIA  
Using survey maps determine stay JPM No.:
2009B NRC Exam times Admin JPM SRO A-3 KIA  


==Reference:==
==Reference:==
G.2.3.4       RO 3.2 SRO 3.7 Examinee:                                             NRC Examiner:
G.2.3.4 RO 3.2 SRO 3.7 Examinee:
Facility Evaluator:                                   Date: _ __
NRC Examiner:
Facility Evaluator:
Date: __
Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:
                          ---
Actual Performance:
Actual Performance:   x Classroom       X   Simulator           Plant 2009B NRC Exam Admin JPM SRO A3 Rev. 1
x Classroom X
Simulator Plant 2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Facility:
Task


Appendix C                                         Page 2 of 8                         Form ES-C-1 Worksheet READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
==Title:==
Initial Conditions:         Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
KIA
* 1ED-12
 
* 1ED-13
==Reference:==
* 1ED-14
Examinee:
* 1ED-15
Facility Evaluator:
* 1ED-17
Method of testing:
* 1ED-18 Initiating Cue:             Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
Page 1 of 8 Worksheet Task No.:
Form ES-C-1 Using survey maps determine stay JPM No.:
2009B NRC Exam times Admin JPM SRO A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:
Date: __
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant 2009B NRC Exam Admin JPM SRO A3 Rev. 1
 
Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1 ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1 ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Line 935: Line 1,971:
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Complete the information below and return to the evaluator when complete.
2009B NRC Exam Admin JPM SRO A3 Rev. 1
2009B NRC Exam Admin JPM SRO A3 Rev. 1  


Appendix C                                 Page 3 of 8                       Form ES-C-1 Worksheet Task Standard:     Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:
Required Materials: Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General  
Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Required Materials:
Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General  


==References:==
==References:==
DOS-NGGC-0004 (Rev. 10)
DOS-NGGC-0004 (Rev. 10)
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non- Progress Energy dose for the current year has been determined.
Time Critical Task:
Time Critical Task: No Validation Time:    12 minutes Critical Task Justification Step 1              Must determine dose rates in order to calculate stay time Step 2              Must determine available dose to determine stay time.
Validation Time:
Step 3              Calculation of stay time.
Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
2009B NRC Exam Admin JPM SRO A3 Rev. 1
No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.
Calculation of stay time.
2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:
Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.
Required Materials:
Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General


Appendix C                                    Page 4 of 8                      Form ES-C-1 PERFORMANCE INFORMATION START TIME:
==References:==
Evaluator Note:         The order of performance does not matter IF THE APPLICANT ASKS FOR IT: Provide a copy of DOS-NGGC-0004, Rev. 10
DOS-NGGC-0004 (Rev. 10)
.;' Performance Step: 1      Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Standard:              Identifies that General Area Dose Rates are 120 mrem/hr Comment:
Time Critical Task:
.;' Performance Step: 2     Determine the remaining dose for the year for each individual Standard:              Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem -700 mrem (PE) - 2700 mrem (SL)       =600 mrem Comment:
Validation Time:
./ - Denotes Critical Steps                   2009B NRC Exam Admin JPM SRO A3 Rev. 1
Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.
Calculation of stay time.
2009B NRC Exam Admin JPM SRO A3 Rev. 1
 
Appendix C START TIME:
Evaluator Note:  
.;' Performance Step: 1 Standard:
Comment:
.;' Performance Step: 2 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of DOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem -700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C START TIME:
Evaluator Note:
.;' Performance Step: 1 Standard:
Comment:  
.;' Performance Step: 2 Standard:
Comment:
./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of DOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem -700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM SRO A3 Rev. 1
 
Appendix C
./ Performance Step: 3 Standard:
Comment:
Terminating Cue:
STOP TIME:
./ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
Operator 1: 2 hours 240 mrem + 120mremihr = 2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr = 5 hours After the stay time has been calculated, this JPM is complete.
ENDOFJPM 20098 NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C
./ Performance Step: 3 Standard:
Comment:
Terminating Cue:
STOP TIME:
./ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
Operator 1: 2 hours 240 mrem + 120mremihr = 2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr = 5 hours After the stay time has been calculated, this JPM is complete.
ENDOFJPM 20098 NRC Exam Admin JPM SRO A3 Rev. 1  


Appendix C                                 Page 5 of 8                       Form ES-C-1 PERFORMANCE INFORMATION
Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
./ Performance Step: 3      Determine stay time for each operator (based on 1st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)
2009B NRC Exam Admin JPM SRO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
Standard:               Operator 1: 2 hours 240 mrem + 120mremihr =2 hrs Operator 2: 5 hours 600 mrem + 120 mrem/hr = 5 hours Comment:
Examinee's Name:
Terminating Cue:       After the stay time has been calculated, this JPM is complete.
Date Performed:
ENDOFJPM STOP TIME:
Facility Evaluator:
./ - Denotes Critical Steps                  20098 NRC Exam Admin JPM SRO A3 Rev. 1
Number of Attempts:
Time to Complete:
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
Question Documentation:
Question:


Appendix C                                                 Page 6 of 8                         Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:           2009B NRC Exam Admin JPM SRO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
===Response===
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non- Progress Energy dose for the current year has been determined.
Result:
SAT UNSAT Examiner's Signature:
Date:
2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
2009B NRC Exam Admin JPM SRO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)
Examinee's Name:
Examinee's Name:
Date Performed:
Date Performed:
Line 967: Line 2,051:
Number of Attempts:
Number of Attempts:
Time to Complete:
Time to Complete:
DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                               SAT                           UNSAT Examiner's Signature:                                                                     Date:
Result:
                      -------------------------------------------------------------------
SAT UNSAT Examiner's Signature:
2009B NRC Exam Admin JPM SRO A3 Rev. 1
Date:
2009B NRC Exam Admin JPM SRO A3 Rev. 1  


Appendix C                                 Page 7 of 8                         Form ES-C-1 JPM CUE SHEET Initial Conditions: Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
Appendix C Initial Conditions:
* 1ED-12
Initiating Cue:
* 1ED-13
Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
* 1ED-14
1 ED-12 1 ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
* 1ED-15
* 1ED-17
* 1ED-18 Initiating Cue:    Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Line 987: Line 2,070:
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Complete the information below and return to the evaluator when complete.
Name _____________________________________
Name ____________________________________ _
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Operator 1: _____________________ Operator 2:
Operator 1: _____________________ Operator 2:
2009B NRC Exam Admin JPM SRO A3 Rev. 1
2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:
1 ED-12 1 ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.
The clearance and work activity is for the 'A' ED Tank Transfer Pump.
Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.
Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits: Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.
Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.
Complete the information below and return to the evaluator when complete.
Name ____________________________________ _
Record the maximum allowable stay time calculations below to the nearest hour and minute.
Operator 1: _____________________ Operator 2:
2009B NRC Exam Admin JPM SRO A3 Rev. 1
 
Appendix C Job Performance Measure Form ES-C-1 F~, ["'). F.\\ Fe:, r:~"'-'I Worksheet f~F ~i{:, l'~~~~" fl Facility:
Shearon Harris Task No.:
345001 H602 Task
 
==Title:==
Classify an event JPM No.:
2009B NRC Exam Admin JPM SRO A4 KIA
 
==Reference:==
G2.4.41 RO 2.9 SRO 4.6 Examinee:
NRC Examiner Facility Evaluator:
Date: __
Method of testing:
Simulated Performance:
Actual Performance:
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
THIS IS A TIME CRITICAL JPM.
2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Job Performance Measure Form ES-C-1 F~, ["'). F.\\ Fe:, r:~"'-'I Worksheet f~F ~i{:, l'~~~~" fl Facility:
Shearon Harris Task No.:
345001 H602 Task


Appendix C                                        Job Performance Measure                Form ES-C-1 F~,  ["'). F.\ Fe:, r:~"'-'I          Worksheet f~F ~i{:, l'~~~~"      fl Facility:                Shearon Harris                              Task No.:  345001 H602 Task Title:             Classify an event                           JPM No.:   2009B NRC Exam Admin JPM SRO A4 KIA  
==Title:==
Classify an event JPM No.:
2009B NRC Exam Admin JPM SRO A4 KIA  


==Reference:==
==Reference:==
G2.4.41                 RO 2.9 SRO 4.6 Examinee:                                                         NRC Examiner Facility Evaluator:                                               Date: _ __
G2.4.41 RO 2.9 SRO 4.6 Examinee:
NRC Examiner Facility Evaluator:
Date: __
Method of testing:
Method of testing:
Simulated Performance:                                           Actual Performance:     x Classroom             X           Simulator - - - Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Simulated Performance:
Initial Conditions:         A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Actual Performance:
Initiating Cue:              Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
x Classroom X
Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Initiating Cue:
A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
THIS IS A TIME CRITICAL JPM.
THIS IS A TIME CRITICAL JPM.
2009B NRC Exam Admin JPM SRO A4 Rev. 1
2009B NRC Exam Admin JPM SRO A4 Rev. 1  


Appendix C                         Job Performance Measure             Form ES-C-1 Worksheet Task Standard:     Event classified as an Site Area Emergency (2-4-3)
Appendix C Job Performance Measure Worksheet Task Standard:
Required Materials: None General  
Event classified as an Site Area Emergency (2-4-3)
Required Materials:
None General  


==References:==
==References:==
PEP-110 EAL Flowpath EP-EAL (allowed reference)
PEP-110 EAL Flowpath EP-EAL (allowed reference)
Handouts:           JPM Cue Sheets Pages 4 and 5 PEP-110 EAL Flowpath EP-EAL (allowed reference)
Handouts:
Time Critical Task: Yes Validation Time:   15 minutes Critical Step Justification Step 2             Classification of the event.
JPM Cue Sheets Pages 4 and 5 PEP-110 EAL Flowpath EP-EAL (allowed reference)
2009B NRC Exam Admin JPM SRO A4 Rev. 1
Time Critical Task:
Yes Validation Time:
15 minutes Critical Step Justification Step 2 Classification of the event.
Form ES-C-1 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Job Performance Measure Worksheet Task Standard:
Event classified as an Site Area Emergency (2-4-3)
Required Materials:
None General


Appendix C                                 Page 3 of 7                     Form ES-C-1 PERFORMANCE INFORMATION Evaluator Note:        Start Time for this JPM begins when the individual has been briefed START TIME:
==References:==
Performance Step: 1     OBTAIN EAL FLOW PATH.
PEP-110 EAL Flowpath EP-EAL (allowed reference)
Standard:              Obtains EAL Flow Path. (EP-EAL is an allowed reference)
Handouts:
JPM Cue Sheets Pages 4 and 5 PEP-110 EAL Flowpath EP-EAL (allowed reference)
Time Critical Task:
Yes Validation Time:
15 minutes Critical Step Justification Step 2 Classification of the event.
Form ES-C-1 2009B NRC Exam Admin JPM SRO A4 Rev. 1
 
Appendix C Evaluator Note:
START TIME:
Performance Step: 1 Standard:
Comment:
./ - Denotes a Critical Step Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Start Time for this JPM begins when the individual has been briefed OBTAIN EAL FLOW PATH.
Obtains EAL Flow Path. (EP-EAL is an allowed reference) 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Evaluator Note:
START TIME:
Performance Step: 1 Standard:
Comment:
./ - Denotes a Critical Step Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Start Time for this JPM begins when the individual has been briefed OBTAIN EAL FLOW PATH.
Obtains EAL Flow Path. (EP-EAL is an allowed reference) 2009B NRC Exam Admin JPM SRO A4 Rev. 1
 
Appendix C
-/ Performance Step: 2 Standard:
Comment:
Comment:
./ - Denotes a Critical Step                   2009B NRC Exam Admin JPM SRO A4 Rev. 1
STOP TIME:
 
Terminating Cue:
Appendix C                                    Page 4 of 7                         Form ES-C-1 PERFORMANCE INFORMATION
-/ - Denotes a Critical Step Page 4 of 7 PERFORMANCE INFORMATION CLASSIFY EVENT Identifies an Site Area Emergency (2-4-3),
-/ Performance Step: 2      CLASSIFY EVENT Standard:                Identifies an Site Area Emergency (2-4-3),
Form ES-C-1 DAMAGE TO SPENT FUEL with ANY SPENT FUEL POOL AREA RAD MON > 700 mRlHR Basis:
DAMAGE TO SPENT FUEL with ANY SPENT FUEL POOL AREA RAD MON > 700 mRlHR Basis:
Damage to spent fuel in the Fuel Handling Building is assessed to determine if a single or multiple assemblies are affected.
Damage to spent fuel in the Fuel Handling Building is assessed to determine if a single or multiple assemblies are affected.
Trigger points for the FHB area radiation monitors were calculated to provide a symptomatic indication of damage the affected assembly(s). The 700 mRlHR criteria is the dose rate expected at the monitor nearest the damaged assembly(s) based on the expected dose rate from damaging more than 1 spent fuel assembly that had recently been removed from the reactor.
Trigger points for the FHB area radiation monitors were calculated to provide a symptomatic indication of damage the affected assembly(s). The 700 mRlHR criteria is the dose rate expected at the monitor nearest the damaged assembly(s) based on the expected dose rate from damaging more than 1 spent fuel assembly that had recently been removed from the reactor.
Line 1,026: Line 2,183:
Fuel handling accidents are analyzed as part of the HNP Licensing Basis. These accidents (as demonstrated through evaluation) are not expected to exceed Part 100 limits.
Fuel handling accidents are analyzed as part of the HNP Licensing Basis. These accidents (as demonstrated through evaluation) are not expected to exceed Part 100 limits.
Emergency filtration units are available to mitigate the consequences of these accidents.
Emergency filtration units are available to mitigate the consequences of these accidents.
Event classification stated to evaluator.
ENDOFJPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C
-/ Performance Step: 2 Standard:
Comment:
Comment:
STOP TIME:
STOP TIME:
Terminating Cue:             Event classification stated to evaluator.
Terminating Cue:  
ENDOFJPM
-/ - Denotes a Critical Step Page 4 of 7 PERFORMANCE INFORMATION CLASSIFY EVENT Identifies an Site Area Emergency (2-4-3),
-/ - Denotes a Critical Step                    2009B NRC Exam Admin JPM SRO A4 Rev. 1
Form ES-C-1 DAMAGE TO SPENT FUEL with ANY SPENT FUEL POOL AREA RAD MON > 700 mRlHR Basis:
Damage to spent fuel in the Fuel Handling Building is assessed to determine if a single or multiple assemblies are affected.
Trigger points for the FHB area radiation monitors were calculated to provide a symptomatic indication of damage the affected assembly(s). The 700 mRlHR criteria is the dose rate expected at the monitor nearest the damaged assembly(s) based on the expected dose rate from damaging more than 1 spent fuel assembly that had recently been removed from the reactor.
CLASSIFICATION GUIDANCE:
Fuel handling accidents are analyzed as part of the HNP Licensing Basis. These accidents (as demonstrated through evaluation) are not expected to exceed Part 100 limits.
Emergency filtration units are available to mitigate the consequences of these accidents.
Event classification stated to evaluator.
ENDOFJPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1  


Appendix C                             Page 5 of 7                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 20098 NRC Exam Admin JPM SRO A4 - Classify an event Examinee's Name:
Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
20098 NRC Exam Admin JPM SRO A4 - Classify an event Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,038: Line 2,206:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Question:
Question:  


===Response===
===Response===
Result:                     SAT           UNSAT Examiner's Signature:                                 Date:
Result:
                      ----------------------------
SAT UNSAT Examiner's Signature:
                      ------------------------------
Date:
20098 NRC Exam Admin JPM SRO A4 Rev. 1
20098 NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:
20098 NRC Exam Admin JPM SRO A4 - Classify an event Examinee's Name:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Question Documentation:
Question:
 
===Response===
Result:
SAT UNSAT Examiner's Signature:
Date:
20098 NRC Exam Admin JPM SRO A4 Rev. 1  


Appendix C                         Page 6 of 7                   Form ES-C-1 JPM CUE SHEET Initial Conditions: A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Appendix C Initial Conditions:
Initiating Cue:    Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
Initiating Cue:
THIS IS A TIME CRITICAL JPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1
Page 6 of 7 JPM CUE SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
THIS IS A TIME CRITICAL JPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Initial Conditions:
Initiating Cue:
Page 6 of 7 JPM CUE SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.
THIS IS A TIME CRITICAL JPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1  


Appendix C                                   Page 7 of 7                           Form ES-C-1 JPM CUE SHEET CLASSIFICATION INFORMATION SHEET A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Appendix C Page 7 of 7 JPM CUE SHEET CLASSIFICATION INFORMATION SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Current plant conditions are:
RCS Temp 180&deg;F RCS Pressure 345 psig
'A' RHR pump is in operation Fuel handlers are performing a fuel shuffle and moving assemblies from the 'A' Fuel Pool to 'B' Fuel Pool.
An emergency landing was being attempted by an aircraft returning to RDU. The pilot has lost control and the aircraft has impacted on the west side of the Fuel Handling Building. The side of the building has suffered external damage and a fire is burning at the impact site.
The impact was so severe that a fuel assembly being moved has dropped from the Fuel Bridge Crane and ruptured. The highest Fuel Building Radiation monitor is reading 825 mr/hr.
Classify the event Name ________________________________________________ __
Record your classification here and return to the examiner.
EAL Classification: ________________________ _
2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Page 7 of 7 JPM CUE SHEET CLASSIFICATION INFORMATION SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.
Current plant conditions are:
Current plant conditions are:
* RCS Temp 180&deg;F
RCS Temp 180&deg;F RCS Pressure 345 psig  
* RCS Pressure 345 psig
'A' RHR pump is in operation Fuel handlers are performing a fuel shuffle and moving assemblies from the 'A' Fuel Pool to 'B' Fuel Pool.
    *  'A' RHR pump is in operation Fuel handlers are performing a fuel shuffle and moving assemblies from the 'A' Fuel Pool to 'B' Fuel Pool.
An emergency landing was being attempted by an aircraft returning to RDU. The pilot has lost control and the aircraft has impacted on the west side of the Fuel Handling Building. The side of the building has suffered external damage and a fire is burning at the impact site.
An emergency landing was being attempted by an aircraft returning to RDU. The pilot has lost control and the aircraft has impacted on the west side of the Fuel Handling Building. The side of the building has suffered external damage and a fire is burning at the impact site.
The impact was so severe that a fuel assembly being moved has dropped from the Fuel Bridge Crane and ruptured. The highest Fuel Building Radiation monitor is reading 825 mr/hr.
The impact was so severe that a fuel assembly being moved has dropped from the Fuel Bridge Crane and ruptured. The highest Fuel Building Radiation monitor is reading 825 mr/hr.
Classify the event Name __________________________________________________
Classify the event Name ________________________________________________ __
Record your classification here and return to the examiner.
Record your classification here and return to the examiner.
EAL Classification: _________________________
EAL Classification: ________________________ _
2009B NRC Exam Admin JPM SRO A4 Rev. 1}}
2009B NRC Exam Admin JPM SRO A4 Rev. 1}}

Latest revision as of 06:38, 14 January 2025

Initial Exam 2009-302 Draft Administrative JPMs
ML100410114
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/05/2010
From:
NRC/RGN-II
To:
References
IR-09-302
Download: ML100410114 (80)


Text

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 15 Worksheet Form ES-C-1 Shearon Harris Task No.:

301179H601 Response to Voids In Reactor JPM No.:

2009B NRC Exam Vessel-Calculate Reactor Vessel Admin JPM RO A1-1 Maximum Vent Time EPE E10 EK3.2 RO 3.2 SRO 3.7 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant DRJ\\fT 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 15 Worksheet Form ES-C-1 Shearon Harris Task No.:

301179H601 Response to Voids In Reactor JPM No.:

2009B NRC Exam Vessel-Calculate Reactor Vessel Admin JPM RO A1-1 Maximum Vent Time EPE E10 EK3.2 RO 3.2 SRO 3.7 NRC Examiner:

Date: __ _

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant DRJ\\fT 2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C Page 2 of 15 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The plant was at 100 percent power when a Small Break LOCA occurred.

All RCP have been secured.

SI has been terminated.

RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel.

The CRS and STA have reviewed the CSFSTs.

It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.

The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.

Task Standard:

Determine maximum Reactor Vessel vent time within +/-5 seconds of calculation.

Required Materials:

Calculator General

References:

FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)

Handouts:

FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)

Time Critical Task:

No Validation Time:

10 minutes 2009B NRC Exam Admin JPM RO A 1-1 Rev 1 Appendix C Page 2 of 15 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The plant was at 100 percent power when a Small Break LOCA occurred.

All RCP have been secured.

SI has been terminated.

RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel.

The CRS and STA have reviewed the CSFSTs.

It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.

The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using Attachment 1 of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.

Task Standard:

Determine maximum Reactor Vessel vent time within +/-5 seconds of calculation.

Required Materials:

Calculator General

References:

FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)

Handouts:

FRP-1.3 Figure 2 and Attachment 1 (Rev. 16)

Time Critical Task:

No Validation Time:

10 minutes 2009B NRC Exam Admin JPM RO A 1-1 Rev 1

Appendix C Step 2 Step 3 Step 4 Step 5 Page 3 of 15 Worksheet Critical Step Justification Form ES-C-1 Without the correct Containment volume you cannot determine the maximum venting time Without the correct hydrogen volume you cannot determine the maximum venting time Without the correct hydrogen flow rate you cannot determine the maximum venting time This is the maximum venting time calculation required by the CRS 2009B NRC Exam Admin JPM RD A1-1 Rev 1 Appendix C Step 2 Step 3 Step 4 Step 5 Page 3 of 15 Worksheet Critical Step Justification Form ES-C-1 Without the correct Containment volume you cannot determine the maximum venting time Without the correct hydrogen volume you cannot determine the maximum venting time Without the correct hydrogen flow rate you cannot determine the maximum venting time This is the maximum venting time calculation required by the CRS 2009B NRC Exam Admin JPM RD A1-1 Rev 1

Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

./ Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

./ - Denotes a Critical Step Page 4 of 9 PERFORMANCE INFORMATION FRP-I.3 OBTAIN PROCEDURE (provided with handout)

Form ES-C-1 Obtains FRP-1.3 and refers to Figure 2 and Attachment 1.

FRP-I.3 Attachment 1 Step 1 Calculate the maximum venting time using Attachment 1.

Calculate Containment Volume at STP 'A' in FT3 Using the provide Containment temperature of 195°F Containment Volume at STP 'A' = 1702094.66 FT3 FRP-1.3 Attachment 1 Step 2 Determine Maximum Hydrogen volume that can be vented 'B' in FT3 Using provided Containment Hydrogen Concentration of 2.15 percent determine maximum Hydrogen volume that can be vented 'B' = 14467.80 FT3 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

./ Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

./ - Denotes a Critical Step Page 4 of 9 PERFORMANCE INFORMATION FRP-I.3 OBTAIN PROCEDURE (provided with handout)

Form ES-C-1 Obtains FRP-1.3 and refers to Figure 2 and Attachment 1.

FRP-I.3 Attachment 1 Step 1 Calculate the maximum venting time using Attachment 1.

Calculate Containment Volume at STP 'A' in FT3 Using the provide Containment temperature of 195°F Containment Volume at STP 'A' = 1702094.66 FT3 FRP-1.3 Attachment 1 Step 2 Determine Maximum Hydrogen volume that can be vented 'B' in FT3 Using provided Containment Hydrogen Concentration of 2.15 percent determine maximum Hydrogen volume that can be vented 'B' = 14467.80 FT3 2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C

../ Performance Step: 4 Standard:

Comment:

../ Performance Step: 5 Standard:

Comment:

Terminating Cue:

STOP TIME:

../ - Denotes a Critical Step Page 5 of 9 PERFORMANCE INFORMATION FRP-I.3 Attachment 1 Step 3 Form ES-C-1 Determine Hydrogen flow rate as a function of RCS pressure 'C' in FT3/MIN.

Determines from Figure 2 that 1560 psig corresponds to 4850 FT3/MIN (Tolerance 4950 - 4750 FT3/MIN)

FRP-1.3 Attachment 1 Step 4 Calculate maximum venting time '0' in minutes.

Calculates 2.98 minutes (2 minutes and 59 seconds)

Tolerance +/- 5 seconds 3 min 4 seconds to 2 min 54 seconds When calculation is returned ENDOFJPM 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C

../ Performance Step: 4 Standard:

Comment:

../ Performance Step: 5 Standard:

Comment:

Terminating Cue:

STOP TIME:

../ - Denotes a Critical Step Page 5 of 9 PERFORMANCE INFORMATION FRP-I.3 Attachment 1 Step 3 Form ES-C-1 Determine Hydrogen flow rate as a function of RCS pressure 'C' in FT3/MIN.

Determines from Figure 2 that 1560 psig corresponds to 4850 FT3/MIN (Tolerance 4950 - 4750 FT3/MIN)

FRP-1.3 Attachment 1 Step 4 Calculate maximum venting time '0' in minutes.

Calculates 2.98 minutes (2 minutes and 59 seconds)

Tolerance +/- 5 seconds 3 min 4 seconds to 2 min 54 seconds When calculation is returned ENDOFJPM 2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C 6000

~

~

4000 3000 2000 1000 o

./ - Denotes a Critical Step Page 6 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN WC'l'OR VESSEl.

400 800 1200 11560~1oo ReS PRESSURE' {PStG)

I Rev. 16 I

Form ES-C-1 2000 2:4A}O 20098 NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C 6000

~

~

4000 3000 2000 1000 o

./ - Denotes a Critical Step Page 6 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN WC'l'OR VESSEl.

400 800 1200 11560~1oo ReS PRESSURE' {PStG)

I Rev. 16 I

Form ES-C-1 2000 2:4A}O 20098 NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C Page 7 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN REACTOR VESSEL Sheet 1 of 1 INSTRUCTIONS roR DETBRHINING VENTING TIME Form ES-C-1

1.

Detet'lline CNHT Volwa.e at STI.>

I A' ;

A -

(2.266 x 106 Fr3) x 492°R (CNtlT 'temperature OF + 460<"R) 1 195°F 1 A.11702094.66

2.

(BT3)

B _ 114467.80 1 (nl )

3.

Deterllin.e Hydrogen flow rate as a funetion of ReS pressure 'C';

a.

Cheek ReS pressure and mark on Figure 2.

b.

Using Figure 2. read hydrogen flQW rate 'C',

ITolerance 4750 - 4950 I

4.

Calculate 1I8X1:awa venting time 'D';

KaxiJnUll venting ti:ne - --

EOP-FRP-I.3 c

Tolerance 2 min 54 seconds 3 min 4 seconds Rev. 16 I

c-14850 1 (FT3/MIN) 2 min and 59 seconds n- ___ _

(MINUTES)

Page 22 (If 23

./ - Denotes a Critical Step 2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Page 7 of 9 PERFORMANCE INFORMATION KEY RESPONSE TO VOIDS IN REACTOR VESSEL Sheet 1 of 1 INSTRUCTIONS roR DETBRHINING VENTING TIME Form ES-C-1

1.

Detet'lline CNHT Volwa.e at STI.>

I A' ;

A -

(2.266 x 106 Fr3) x 492°R (CNtlT 'temperature OF + 460<"R) 1 195°F 1 A.11702094.66

2.

(BT3)

B _ 114467.80 1 (nl )

3.

Deterllin.e Hydrogen flow rate as a funetion of ReS pressure 'C';

a.

Cheek ReS pressure and mark on Figure 2.

b.

Using Figure 2. read hydrogen flQW rate 'C',

ITolerance 4750 - 4950 I

4.

Calculate 1I8X1:awa venting time 'D';

KaxiJnUll venting ti:ne - --

EOP-FRP-I.3 c

Tolerance 2 min 54 seconds 3 min 4 seconds Rev. 16 I

c-14850 1 (FT3/MIN) 2 min and 59 seconds D -

~-----o-(MINUTES)

Page 22 (If 23

./ - Denotes a Critical Step 2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A 1 Response to Voids In Reactor Vessel - Calculate Reactor Vessel Maximum Vent Time Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Page 8 of 9 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A 1 Response to Voids In Reactor Vessel - Calculate Reactor Vessel Maximum Vent Time Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C Initial Conditions:

Initiating Cue:

Page 9 of 9 JPM CUE SHEET Form ES-C-1 The plant was at 100 percent power when a Small Break LOCA occurred.

All RCP have been secured.

SI has been terminated.

RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.

The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.

2009B NRC Exam Admin JPM RO A1-1 Rev 1 Appendix C Initial Conditions:

Initiating Cue:

Page 9 of 9 JPM CUE SHEET Form ES-C-1 The plant was at 100 percent power when a Small Break LOCA occurred.

All RCP have been secured.

SI has been terminated.

RVLlS Upper Range reading is 85 percent Pressurizer level is 90 percent RCS Pressure is 1560 psig Containment Temperature is 195°F Chemistry reports that Containment Hydrogen Concentration is 2.15 percent Based on the present conditions a void has formed in the Reactor Vessel. The CRS and STA have reviewed the CSFSTs. It was determined that FRP-1.3, Response To Voids In Reactor Vessel should be implemented.

The crew has completed preparing the Containment for Reactor Vessel venting. The CRS has directed you to calculate the maximum time the Reactor Vessel should be vented, using of FRP-1.3 Your calculation should be determined to the second to allow timing using the MCR timer.

2009B NRC Exam Admin JPM RO A1-1 Rev 1

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Perform A Manual Shutdown Margin Calculation G 2.1.25 RO 3.9 SRO 4.2 Task No.:

001004H101 JPM No.:

20098 NRC Exam Admin JPM RO A 1-2 NRC Examiner:

Oate: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPO RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST -1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SOM Calculation (Modes 1 and 2)" for current plant conditions.

NOTE: For this JPM assume independent verification has been performed.

20098 NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Perform A Manual Shutdown Margin Calculation G 2.1.25 RO 3.9 SRO 4.2 Task No.:

001004H101 JPM No.:

20098 NRC Exam Admin JPM RO A 1-2 NRC Examiner:

Oate: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPO RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST -1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SOM Calculation (Modes 1 and 2)" for current plant conditions.

NOTE: For this JPM assume independent verification has been performed.

20098 NRC Admin Exam RO A 1-2 Rev. 1

Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

OST-1036, Attachment 3, Manual SOM Calculation (Modes 1 and 2),

completed with SOM of 5195 +/- 75 pcm (tolerance based on total of curves used and their division readability)

Required Materials:

Calculator General

References:

OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)

Curve Book (Cycle 16)

Handouts:

Time Critical Task:

Validation Time:

Step 3 Step 6 Step 7 Step 9 OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)

No 20 minutes Critical Step Justification Must determine correct rod insertion limit based on curve value. The number of rod steps will be an input to the calculation.

Must determine correct power defect based on curve value. The power defect will provide one of the inputs to the calculation.

Must determine the correct rod worth based on curve value. The rod worth will provide one of the inputs to the calculation.

The total shutdown margin was the task that the CRS directed applicant to perform.

2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

OST-1036, Attachment 3, Manual SOM Calculation (Modes 1 and 2),

completed with SOM of 5195 +/- 75 pcm (tolerance based on total of curves used and their division readability)

Required Materials:

Calculator General

References:

OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)

Curve Book (Cycle 16)

Handouts:

Time Critical Task:

Validation Time:

Step 3 Step 6 Step 7 Step 9 OST-1036, Shutdown Margin Calculation Modes 1-5 (Rev. 40)

No 20 minutes Critical Step Justification Must determine correct rod insertion limit based on curve value. The number of rod steps will be an input to the calculation.

Must determine correct power defect based on curve value. The power defect will provide one of the inputs to the calculation.

Must determine the correct rod worth based on curve value. The rod worth will provide one of the inputs to the calculation.

The total shutdown margin was the task that the CRS directed applicant to perform.

2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

Performance Step: 4 Standard:

Comment:

./ - Denotes Critical Steps Page 3 of 12 PERFORMANCE INFORMATION OST-1036 Form ES-C-1 OBTAIN PROCEDURE (OST-1036 will be provided to allow candidates to write on, Curve Book will be included as a reference)

OST-1036, Section 7.3, Attachment 3, and Curve Book OST-1036 Attachment 3 Step 1 Enters Reactor Power Level Refers to given conditions and enters 52%

CST -1036 Attachment 3 Step 2 Determine Rod Insertion Limit for power level Refers to Curve F-16-1 and determines TS limit for RIL to be 96

+/- 2 steps (tolerance based on curve division readability)

OST-1036 Attachment 3 Step 3 Enters core Burn Up Refers to given conditions and enters 140 EFPD 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

Performance Step: 4 Standard:

Comment:

./ - Denotes Critical Steps Page 3 of 12 PERFORMANCE INFORMATION OST-1036 Form ES-C-1 OBTAIN PROCEDURE (OST-1036 will be provided to allow candidates to write on, Curve Book will be included as a reference)

OST-1036, Section 7.3, Attachment 3, and Curve Book OST-1036 Attachment 3 Step 1 Enters Reactor Power Level Refers to given conditions and enters 52%

CST -1036 Attachment 3 Step 2 Determine Rod Insertion Limit for power level Refers to Curve F-16-1 and determines TS limit for RIL to be 96

+/- 2 steps (tolerance based on curve division readability)

OST-1036 Attachment 3 Step 3 Enters core Burn Up Refers to given conditions and enters 140 EFPD 2009B NRC Admin Exam RO A 1-2 Rev. 1

Appendix C Performance Step: 5 Standard:

Comment:

Evaluator Note:

./ Performance Step: 6 Standard:

Comment:

./ Performance Step: 7 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 4 Enters RCS Boron Concentration Refers to initial conditions and enters 1140 ppm Form ES-C-1 ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS INCLUDED AS PART OF ATTACHMENT.

OST-1036 Attachment 3 Step 6 Determines Power Defect for current power level Refers to Curve C-16-1 and determines power defect to be 1060 +/-50 pcm (tolerance based on curve division readability)

OST-1036 Attachment 3 Step 7 Determines Rod Worth for RIL position determined above Refers to Curve A-16-9 and determines rod worth to be 725 + 25 pcm (tolerance based on curve division readability) 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Performance Step: 5 Standard:

Comment:

Evaluator Note:

./ Performance Step: 6 Standard:

Comment:

./ Performance Step: 7 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 4 Enters RCS Boron Concentration Refers to initial conditions and enters 1140 ppm Form ES-C-1 ATT 3, STEP 5 NOT PERFORMED SINCE VALUE IS INCLUDED AS PART OF ATTACHMENT.

OST-1036 Attachment 3 Step 6 Determines Power Defect for current power level Refers to Curve C-16-1 and determines power defect to be 1060 +/-50 pcm (tolerance based on curve division readability)

OST-1036 Attachment 3 Step 7 Determines Rod Worth for RIL position determined above Refers to Curve A-16-9 and determines rod worth to be 725 + 25 pcm (tolerance based on curve division readability) 2009B NRC Admin Exam RO A 1-2 Rev. 1

Appendix C Performance Step: 8 Standard:

Comment:

0/ Performance Step: 9 Standard:

Comment:

Page 5 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 8 Form ES-C-1 Enters worth of any additional immovable or untrippable rods Refers to given conditions and enters 0 OST-1036 Attachment 3 Step 9 Determines Total Shutdown Margin Determines Total Shutdown Margin to be 5195 +/- 75 pcm (tolerance based on total of all curves used and their division readability)

OST-1036 Section 7.3 Performance Step: 10 Signs off Section 7.3 steps Standard:

Signs off steps as complete Comment:

Terminating Cue:

STOP TIME:

0/ - Denotes Critical Steps When OST-1036, Attachment 3, Manual SOM Calculation is completed.

ENOOFJPM 2009B NRC Admin Exam RD A 1-2 Rev. 1 Appendix C Performance Step: 8 Standard:

Comment:

0/ Performance Step: 9 Standard:

Comment:

Page 5 of 12 PERFORMANCE INFORMATION OST-1036 Attachment 3 Step 8 Form ES-C-1 Enters worth of any additional immovable or untrippable rods Refers to given conditions and enters 0 OST-1036 Attachment 3 Step 9 Determines Total Shutdown Margin Determines Total Shutdown Margin to be 5195 +/- 75 pcm (tolerance based on total of all curves used and their division readability)

OST-1036 Section 7.3 Performance Step: 10 Signs off Section 7.3 steps Standard:

Signs off steps as complete Comment:

Terminating Cue:

STOP TIME:

0/ - Denotes Critical Steps When OST-1036, Attachment 3, Manual SOM Calculation is completed.

ENOOFJPM 2009B NRC Admin Exam RD A 1-2 Rev. 1

Appendix C 1900 1800 1100 1600 1500 400 300 200 100 Page 6 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 CRITICAL BORON CONCENTRATION ¥s. CYCLE EXPOSURE AT HFP. MO. EQU1UBR1UM XENON CONDmoNS 51!FPDlDIV eYe I.E EXPOSURE (EFPD)

I Determination of Boron concentration for 140 EFPD CURVE NO.

.-':--'I"II'--!~FRinr---- REV NO. ~~""'!'-

ORIGINATOR

u;J~~~~~~:-::: DATE SUPERVISOR Il~~~

__ ~"..,..~....... DATE SUPSRINTENDENT ~

SHIFT OPERATIONS DATE Form ES-C-1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C 1900 1800 1100 1600 1500 400 300 200 100 Page 6 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 CRITICAL BORON CONCENTRATION ¥s. CYCLE EXPOSURE AT HFP. MO. EQU1UBR1UM XENON CONDmoNS 51!FPDlDIV eYe I.E EXPOSURE (EFPD)

I Determination of Boron concentration for 140 EFPD CURVE NO.

.-';--'I'1':~~~inr---- REV NO. ~~-:-

ORIGINATOR

~~~K:J.;5>>f""=-- DATE SUPERVISOR

.l4-.::~~~~E:o'-''o"'F-- DATE SUPSRINTENDENT ~

SHIFT OPERATIONS DATE Form ES-C-1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C 2 40 2 20 2 01) 1

~

80

~vL '~

100.1 ~8~ t L ~G 6D

/

11" ~

40

,~ if'

/

20 (0 ~28 1

nn Page 7 of 12 PERFORMANCE INFORMATION HARRIS UNIT 1 CYCLE 16 ROD INSERTION LIMITS (46 8,.2: t5)

(l2.2 221i~

, r

/ /

,.' /

~~ ~ ~

, '1',,.

~~ ~

!'-'" B~ <<

/

/ c/

/ V

,.,; l'f: ':' v: ~

... 9 V v:~ ".Iv

~

1/"" 1/

l/

/

" /

/

,,k

,/

Form ES-C-1

('00,196)

(100,186) m

. ~..

r

\\.,....

V~ j'"

E! AN KO 80

/.

~

J /. V

/'/,

60

/

/

40

/ L (0 1(1 / /

20

,/ /

lL. 1/

V (0,( ~G) 0 0

1Q 20 30 40

! ~ GO 70 30 90 1

PERCENT OF RATED THERMAL POWER CURVE NO, REYNO ~

ORIGINATOR

'foi:~~~=~~- DATE

  • SUPERVISOR DATE SUPERINTENDEIU r SHIFT OPERATIONS DATE 'i ~.-:1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C 2 40 2 20 2 01)

~

r:

80 t"lo

~

I'

~

1 10.1 ~e\\ /

/ ~c1 6D

, ~v I /"

40 f

./

/

(0 128 20 1

nn Page 7 of 12 PERFORMANCE INFORMATION HARRIS UNIT 1 CYCLE 16 ROD INSERTION LIMITS (46 8,.2 ~ (l 2.2 22!

1/ V

/' V

~,, ~

V ~

~4 ~

!'-'" B AN f<c V

/ /

j.

/ /

.,; y.,.' / ~

~~./ ~1 :;..,;

I

/~ /

1/

/

I L

/

r L Form ES-C-1

('00,196)

(100,186)

~

r

'\\..' ".~

~ ~ ;"

8 AN KI 80

~I' J

/,/ 'I' 60

/'

40

/ /

(0 1(1 /" /

20 1,1 /

L. !/

/ (0, lOG) 0

~

0 1Q 20 30 40 E

GO 70 30 90 1

PERCENT OF RATED THERMAL POWER CURVE NO, REYNO ~

ORIGINATOR

'r~~~~~;:u::;-:- ~TETE'",

SUPERVISOR

. \\

I->;M.

SUPERINTENDEIU r SHIFT OPERATIONS DATE 'i ~.. :1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A 1-2 Rev. 1

Appendix C 2D P<:MiD1\\f Page 8 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 POWER DEFECT vs. POWER LEVEL for VARIOUS BORON CONCENTRATIONS BOL (0 :I EFPD ~ 160) 20 40 80 POWER LEVEL (peRCENT)

CURVE NO, REV NO 0

ORIGINATOR

~~fMiz..L~~~~!:!",- DATE.~.

SUPERVISOR DATE SUPERJNTENIENT -

SHIFT OPERATIONS DATE Form ES-C-1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C 2D P<:MiD1\\f Page 8 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 POWER DEFECT vs. POWER LEVEL for VARIOUS BORON CONCENTRATIONS BOL (0 :I EFPD ~ 160) 20 40 80 POWER LEVEL (peRCENT)

CURVE NO, REV NO 0

ORIGINATOR

~~fMiz..L~~~~!:!",- DATE.~.

SUPERVISOR DATE SUPERJNTENIENT -

SHIFT OPERATIONS DATE Form ES-C-1

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C

-1800

~1700

~1GOO

-1500

,-1400

&1300

.... -1200

§ e --1100

~ -1000 0

~ -900 0

~.aoo

..J r2

-725 m

I-

-600 ie

.000

-400

-300

-zoo

  • 100
UPCtM)N 0

0 20 Page 9 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 DIFFERENTIAL AND INTEGRAL ROD WORTH CONTROL BANKS D and C MOVING WITH 103 STEP OVERLAP SOL (0 ~ EfPD S 160). HFP, SQUIUBRIUM XENON Form ES-C-1

  • 18
  • 17
  • 15
  • 14 40 60 96 80 120 140 160 180 200 220 240

$ STePlilDIV I) tt3

a~1 II ~-----------------.--------~~-----------.

BANKO 129 *

~----~~~K~C---------*

CURVE NO.

ORIGINATOR SUPERVISOR SUPERlmEMDENT -

SHIFT OPERAilONS

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C

-1800

~1700

~1GOO

-1500

,-1400

&1300 Page 9 of 12 PERFORMANCE INFORMATION KEY HARRIS UNIT 1 CYCLE 16 DIFFERENTIAL AND INTEGRAL ROD WORTH CONTROL BANKS D and C MOVING WITH 103 STEP OVERLAP SOL (0 ~ EfPD S 160). HFP, SQUIUBRIUM XENON Form ES-C-1

  • 18
  • 17
  • 15
  • 14 40 60 96 80 120 140 160 180 200 220 240 tt3
a~1

~-----------------.--------~~-----------.

BANKO CURVE NO.

REV NO. SQ ORIGINATOR

~~~~~~

___ DATE SUPERVISOR

~~~:l:t:~::;;Clrel:~_ DATE SUPERlmEMDENT -

SHIFT OPERA.lIONS DA lE Cr

./ - Denotes Critical Steps 2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C Page 10 of 12 PERFORMANCE INFORMATION (SHADED AREA BELOW INDICATES DATA ALREADY PROVIDED)

Manual SDM Calculation (Modes 1 and 2)

1. Reactor power level.
2. Rod insertion limit for the above power level 96+/-2 steps on bank
3. Burn up (POWERTRAXIMCR Status Board).
4. Present RCS Boron Concentration NOTE: Use absolute values of numbers obtained from curves.

Form ES-C-1 52 D

140 EFPD 1140 ppm

5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 16.
6. Cycle 16 Power defect for the power level recorded in Step 1.

(Refer to Curves C-X-1 to C-X-3).

Curve used C-16-1 NOTE: HFP curves are used for power levels of 10% or greater.

7. Inserted control rod worth at the rod insertion limit recorded in Step 2.

(Refer to Curves A-X-6 to A-X-11)

Curve used A-16-9 pcm

( a )

1060 +/-50 pcm

( b )

725 +/-25 pcm

( c )

8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1129 pcm) or obtain individual withdrawn rod worth from the reactor engineer).

o pcm

( d )

9. Determine the Total Shutdown Margin using the following formula:

Total SDM CB =

6980

- 1060 +/ 725 +/ 0

( e )

( a )

./ - Denotes Critical Steps

( b )

(c)

( d )

5195 +/- 75 pcm

( e) 2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Page 10 of 12 PERFORMANCE INFORMATION Manual SDM Calculation (Modes 1 and 2)

1. Reactor power level.
2. Rod insertion limit for the above power level Form ES-C-1 52 96 +/- 2 steps on bank D
3. Burn up (POWERTRAXIMCR Status Board).

140 EFPD

4. Present RCS Boron Concentration 1140 ppm NOTE: Use absolute values of numbers obtained from curves.
5. Total worth of all control and shutdown banks, minus the worth of the most reactive rod for Fuel Cycle 16.
6. Cycle 16 Power defect for the power level recorded in Step 1.

(Refer to Curves C-X-1 to C-X-3).

Curve used C-16-1 NOTE: HFP curves are used for power levels of 10% or greater.

7. Inserted control rod worth at the rod insertion limit recorded in Step 2.

(Refer to Curves A-X-6 to A-X-11)

Curve used A-16-9

( a )

1060 +/-50 pcm

( b )

725 +/-25 pcm

( c )

8. Worth of any additional immovable or untrippable rods (for each stuck rod, use the most reactive single rod worth (1129 pcm) or obtain individual withdrawn rod worth from the reactor engineer).

o pcm

( d )

9. Determine the Total Shutdown Margin using the following formula:

Total SDM CB =

6980

- 1060 +/ 725 +/ 0

( e )

( a )

./ - Denotes Critical Steps

( b )

(c)

( d )

5195 +/- 75 pcm

( e) 2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC EXAM Admin JPM RO A 1 Perform A Manual Shutdown Margin Calculation Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Admin Exam RO A 1-2 Rev. 1 Appendix C Page 11 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC EXAM Admin JPM RO A 1 Perform A Manual Shutdown Margin Calculation Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Admin Exam RO A 1-2 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 12 of 12 JPM CUE SHEET Form ES-C-1 The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPD RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SDM Calculation (Modes 1 and 2)" for current plant conditions.

NOTE: For this JPM assume independent verification has been performed.

2009B NRC Admin Exam RO A1-2 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 12 of 12 JPM CUE SHEET Form ES-C-1 The plant has been operating at 52% power for 6 weeks while maintenance is replacing the motor on the 'A' Main Feedwater Pump Core burnup is 140 EFPD RCS boron concentration is 1140 ppm NO rods are believed to be immovable / untrippable POWERTRAX is NOT available The CRS has directed you to complete OST-1036, Shutdown Margin Calculation Modes 1-5, Section 7.3, "Manual SDM Calculation (Modes 1 and 2)" for current plant conditions.

NOTE: For this JPM assume independent verification has been performed.

2009B NRC Admin Exam RO A1-2 Rev. 1

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 12 Worksheet Perform OP-111, Attachment 3 -

Low Head SI Standby Lineup Checklist G2.2.15 RO 3.9 SRO 4.3 Form ES-C-1 Task No.:

005016H101 JPM No.:

2009B NRC Exam Admin JPM RO A2 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AO is checking the local equipment.

2009B NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 12 Worksheet Perform OP-111, Attachment 3 -

Low Head SI Standby Lineup Checklist G2.2.15 RO 3.9 SRO 4.3 Form ES-C-1 Task No.:

005016H101 JPM No.:

2009B NRC Exam Admin JPM RO A2 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AO is checking the local equipment.

2009B NRC RO Admin Exam JPM RO A2 Rev. 1

Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

All errors identified.

Required Materials:

OP-111, Attachment 3, with CHECK column initialed except for the local valves.

General

References:

OP-111 (Rev. 44)

Time Critical Task:

Validation Time:

Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

All errors identified.

Required Materials:

OP-111, Attachment 3, with CHECK column initialed except for the local valves.

General

References:

OP-111 (Rev. 44)

Time Critical Task:

Validation Time:

Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC RO Admin Exam JPM RO A2 Rev. 1

Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)

Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the conditions of this JPM:

Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)

Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CONT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)

Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC RO Admin Exam JPM RO A2 Rev. 1 Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)

Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the conditions of this JPM:

Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)

Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CONT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)

Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC RO Admin Exam JPM RO A2 Rev. 1

Appendix C START TIME:

Performance Step: 1 Standard:

Evaluator Cue:

Evaluator Note:

Comment:

Performance Step: 2 Standard:

Evaluator Cue:

Comment:

./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.

Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.

Provide OP-111, Attachment 3.

The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 RH-30, RHR XCHG A OUT FLOW CO NT - (OPEN)

Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.

As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.

2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C START TIME:

Performance Step: 1 Standard:

Evaluator Cue:

Evaluator Note:

Comment:

Performance Step: 2 Standard:

Evaluator Cue:

Comment:

./ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.

Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.

Provide OP-111, Attachment 3.

The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 RH-30, RHR XCHG A OUT FLOW CO NT - (OPEN)

Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.

As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.

2009B NRC Admin Exam JPM RO A2 Rev. 1

Appendix C

,j Performance Step: 3 Standard:

Comment:

,j Performance Step: 4 Standard:

Comment:

,j Performance Step: 5 Standard:

Comment:

./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1 SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CO NT PWR & VLV POS (OFF)

Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)

Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.

2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C

,j Performance Step: 3 Standard:

Comment:

,j Performance Step: 4 Standard:

Comment:

,j Performance Step: 5 Standard:

Comment:

./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1 SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CO NT PWR & VLV POS (OFF)

Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)

Determines 1SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.

2009B NRC Admin Exam JPM RO A2 Rev. 1

Appendix C

--J Performance Step: 6 Standard:

Comment:

Performance Step: 7 Standard:

Evaluator Cue:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1CC-167, CCW FROM RHR HEAT EXCHANGER B-SB Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Provide Attachment to CRS.

Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.

Acknowledge any verbal report.

When the applicable section of the Attachment has been returned to the CRS.

ENDOFJPM 2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C

--J Performance Step: 6 Standard:

Comment:

Performance Step: 7 Standard:

Evaluator Cue:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1CC-167, CCW FROM RHR HEAT EXCHANGER B-SB Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Provide Attachment to CRS.

Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.

Acknowledge any verbal report.

When the applicable section of the Attachment has been returned to the CRS.

ENDOFJPM 2009B NRC Admin Exam JPM RO A2 Rev. 1

Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Admin Exam JPM RO A2 Rev. 1 Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Admin Exam JPM RO A2 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.

An AO is checking the local equipment.

2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.

An AO is checking the local equipment.

2009B NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Lineup Checklist Sheet 1 of4 Person(s) Performing Checklist Initials Name (Print)


~~~---------

Initials Name (Print)

TR Terry Right Remarks - Indicate any component not in the prescribed position.

Checklist Started Checklist Completed Approved by UnitSCQ Time 0(;00 Time Date TODAY Date ______ __

Date ----

After receiving the final review signature, this OP Attachment becomes a QA RECORD.

IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Lineup Checklist Sheet 1 of4 Person(s) Performing Checklist Initials Name (Print)

Initials Name (Print)

TR Terry Right Remarks - Indicate any component not in the prescribed position.

Checklist Started Checklist Completed Approved by UnitSCQ Time 0(;00 Time Date TODAY Date ___

Date ___ _

After receiving the final review signature, this OP Attachment becomes a QA RECORD.

IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 10 of 12 JPM CUE SHEET Form ES-C-1 -low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 1RH-1 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS lOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSlOOPCTO RHRPUMP B-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT flOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT (HC-603B1)

Open TR 1RH-20 RHR HEAT XCHG A BVP FLOW CaNT Manual &

Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CaNT Manual &

Shut TR 1RH-26 '"'

RHR Header A to eves letdown lsol locked Shut TR Vlv 1RH-64 '"'

RHR Header B to eves Letdown lsol Vlv locked Shut TR 1RH-31 RHR PUMP A-SA MINI FLOW Opeo TR 1RH-69 RHR PUMP B-SB MINI FLOW Opeo TR 1CS-28 RHR LETDOWN (HC-1421)

Shut TR 1CC-146 **

RHR HX A OuOet Throttle Valve Locked TR Throttled 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.

Throttled =

should be as recorded in the last OST-1216. This ensures the required flow for E CSfunction.

IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 10 of 12 JPM CUE SHEET Form ES-C-1 -low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 1RH-1 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS lOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS lOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSlOOPCTO RHRPUMP B-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT flOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT (HC-603B1)

Open TR 1RH-20 RHR HEAT XCHG A BVP FLOW CaNT Manual &

Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CaNT Manual &

Shut TR 1RH-26 '"'

RHR Header A to eves letdown lsol locked Shut TR Vlv 1RH-64 '"'

RHR Header B to eves Letdown lsol Vlv locked Shut TR 1RH-31 RHR PUMP A-SA MINI FLOW Opeo TR 1RH-69 RHR PUMP B-SB MINI FLOW Opeo TR 1CS-28 RHR LETDOWN (HC-1421)

Shut TR 1CC-146 **

RHR HX A OuOet Throttle Valve Locked TR Throttled 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.

Throttled =

should be as recorded in the last OST-1216. This ensures the required flow for E CSfunction.

IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet3of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Oullet Throttle Vatve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER Shut TR B-SB 1SI-340SA LOW HEAD 51lRAlN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & Vl V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG

~&Pull TR to Lock 1SI-341 SB LOW HEAD 51 TRAIN B TO COLD LEG Off TR CONT PWR & VlV pas 1SI-326SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD 51 TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last 05T-1216. This ensures the required flow for ECCS function.

IOP-111 Rev. 44 Page 144 of 153 I 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet3of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Oullet Throttle Vatve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER Shut TR B-SB 1SI-340SA LOW HEAD 51lRAlN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & Vl V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG

~&Pull TR to Lock 1SI-341 SB LOW HEAD 51 TRAIN B TO COLD LEG Off TR CONT PWR & VlV pas 1SI-326SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD 51 TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last 05T-1216. This ensures the required flow for ECCS function.

IOP-111 Rev. 44 Page 144 of 153 I 2009B NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS L~

A to RHR Pump 1A-SA Locked Off TR (1RH-2) oth Bkrs)

Locked Off TR 1A21-SA-8A RCS L~

C to RHR PUfll> 1B-SB Locked Off TR (1 RH4O) (Both Bkrs)

Locked Off TR 4tlUV MGG-1tl21-S1:i 1B21-SB-5B RCS ~

RHR Pump 1A-SA (1RH-1)

Bkrs)

Locked Off TR Locked Off TR 1 B21-SB-11A RCS ~

C to RHR PUrIll1B-SB Locked Off TR (1RH-39J (Both Bkrs)

Locked Off TR 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1 Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS L~

A to RHR Pump 1A-SA Locked Off TR (1RH-2) oth Bkrs)

Locked Off TR 1A21-SA-8A RCS L~

C to RHR PUfll> 1B-SB Locked Off TR (1 RH4O) (Both Bkrs)

Locked Off TR 4tlUV MGG-1tl21-S1:i 1B21-SB-5B RCS ~

RHR Pump 1A-SA (1RH-1)

Bkrs)

Locked Off TR Locked Off TR 1 B21-SB-11A RCS ~

C to RHR PUrIll1B-SB Locked Off TR (1RH-39J (Both Bkrs)

Locked Off TR 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM RO A2 Rev. 1

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 8 Worksheet Form ES-C-1 Task No.:

Using survey maps determine stay JPM No.:

20098 NRC Exam times Admin JPM RD A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant 20098 NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 8 Worksheet Form ES-C-1 Task No.:

Using survey maps determine stay JPM No.:

20098 NRC Exam times Admin JPM RD A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant 20098 NRC Exam Admin JPM ROA3 Rev. 1

Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1 ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

2009B NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1 ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

2009B NRC Exam Admin JPM ROA3 Rev. 1

Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:

Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.

Required Materials:

Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General

References:

DOS-NGGC-0004 (Rev. 10)

Time Critical Task:

Validation Time:

Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.

Calculation of stay time.

2009B NRC Exam Admin JPM ROA3 Rev. 1 Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:

Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.

Required Materials:

Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General

References:

DOS-NGGC-0004 (Rev. 10)

Time Critical Task:

Validation Time:

Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.

Calculation of stay time.

2009B NRC Exam Admin JPM ROA3 Rev. 1

Appendix C START TIME:

Evaluator Note:

./ Performance Step: 1 Standard:

Comment:

./ Performance Step: 2 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of OOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem - 700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C START TIME:

Evaluator Note:

./ Performance Step: 1 Standard:

Comment:

./ Performance Step: 2 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of OOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem - 700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM RO A3 Rev. 1

Appendix C

./ Performance Step: 3 Standard:

Comment:

Terminating Cue:

STOP TIME:

../ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)

Operator 1: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 240 mrem + 120mrem/hr = 2 hrs Operator 2: 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 600 mrem + 120 mrem/hr = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> After the stay time has been calculated, this JPM is complete ENDOFJPM 2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C

./ Performance Step: 3 Standard:

Comment:

Terminating Cue:

STOP TIME:

../ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)

Operator 1: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 240 mrem + 120mrem/hr = 2 hrs Operator 2: 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 600 mrem + 120 mrem/hr = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> After the stay time has been calculated, this JPM is complete ENDOFJPM 2009B NRC Exam Admin JPM RO A3 Rev. 1

Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM RO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM RO A3 Rev. 1

Appendix C Initial Conditions:

INITIATING CUE:

Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1 ED-13 1 ED-14 1ED-15 1ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

Name ____________________________________ _

Record the maximum allowable stay time calculations below to the nearest hour and minute.

Operator 1: _____________________ Operator 2:

2009B NRC Exam Admin JPM RO A3 Rev. 1 Appendix C Initial Conditions:

INITIATING CUE:

Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1 ED-13 1 ED-14 1ED-15 1ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

Name ____________________________________ _

Record the maximum allowable stay time calculations below to the nearest hour and minute.

Operator 1: ____________________ Operator 2:

2009B NRC Exam Admin JPM RO A3 Rev. 1

I\\)

o o CD OJ Z

JJ

()

m

~

3 6:

3 5'

c..

"U

s::

JJ o

~

JJ CD

~

MapM Unit I I Sidg/Cleo: RAB 190'N I Al\\l;li; Equi~Drain'frM$f"TankJPlWpa !p~~; 1f/30/eFt I Tin);;; CCC 1 ptWF#1,l38 CWltJ1'Qtt(!I\\t:

NLA W"orkDCSCflpiion!

uif.?M~n~ broio XfIlH" ~19nk 1?ur"l p. C\\:::Qronce SlIl'VC}'OJ! J. ~B,ave:..

Sl!:illature: J. Btu.V'o..

IRlwlew\\1dby: r. 2vl0 Comn}c:l1~

ICl:0tlJe.vd d t..;,(:5 b I >> I '

1_

/

fL.,.,.", '11.

i[" ~"':?;6 1~

L,'.".....,."...... l/*"~~~'\\,

  • "c..,'

~'1, /'

1\\¥1 X

/

v'-

..,.,.(..6 RA~iiltion Al~-"---

jJ Beta Dose R-;;;---~*

I----+~

-,~~~

% hJWt)t'.. """=='""""!

Jnstnuncnt HRA H4l!t it<Jdiatillfl Areu 11 N l1u~mll Dose: RIIte LI,jR,A ~t:d HlithRadi~i()n Mi:'<1 R Rcmlh(ouf VHRA Vr:rv High Ramntilm Area XXXX B6undary ARA AirDume Radlnlion Area 0

Suwar LocalllJoll CA Cot'lulminlltinll Afi!tl b

Atf SalnJ)le Locatiuu Air Activity

~"

Scli~1 No'/UTC 776¥¥O 77(.;1.1.3 NU., __ DAC_, ___ %. tl.ll jl¥¥7it}'~"",-~

utL!..,.

No, OAt

% ~Y'-

UCL'1Xr--~---+-""""'....c:::::;:*-----;--I NO~1':3:

AdlVit)'

UCi/CIC'-~~~

~

RMA RlidiOi.)ctiv~ Maleriuls Nell K

toOO lJose Ralell in tnrCwl1r nnje!>s otherwise noted QARb:ord c..

"U "0

"0 CD

l Co x'

()

s:: "U

()~

C CD m OJ enS.

I OJ m

~

o 3 m

en o I.....

I\\)

o o CD OJ Z

JJ

()

m

~

3 6:

3 5'

c..

"U

s::

JJ o

~

JJ CD

~

MapM Unit I Sidg/Cleo: RAB 190' N CWltj1'Qtt(!I\\t:

NLA

"""oft DCSCflpiion!

u i f.?~M;..:;~=-~:..w.~_..::::..::::.:..::c.:...,;.;..:,

SlIl'VC}'OJ! J. ~B, Sl!:illature: J. Btu.V'o.,

QARb:ord Tin);;; CCC 1 RWFH1,l38 AkActiYJly

---+--. -. -.-------

i----f--,~~~

Jnstnuncnt Scli~1 No'/UTC 776¥¥O

'0

'0 CD

l Co x'

()

o 3 m

U> o I....

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 6 Worksheet During a Loss of Shutdown Cooling.

determine the time that the RCS will reach Core Boiling and Boil-Off G2.1.20 RD 4.6 SRO 4.6 Form ES-C-1 Task No.:

JPM No.:

2009B NRC Exam Admin JPM SRO A1-1 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

On 9/05/09 at 0000 the plant was shutdown for a refueling outage.

While the Reactor cavity was being filled the 'B' RHR pump tripped.

Motor repairs are not expected to be completed until 9/25/09.

The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.

No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.

On 9/22/09 at 1400 the 'A' RHR pump tripped.

The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.

Core exit thermocouples are rising; they are currently reading 135°F.

lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of time to boil" and time to boil-off' on the lines at the bottom of this page (below).

2009B NRC Exam Admin JPM SRO A 1-1 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Shearon Harris Page 1 of 6 Worksheet During a Loss of Shutdown Cooling.

determine the time that the RCS will reach Core Boiling and Boil-Off G2.1.20 RD 4.6 SRO 4.6 Form ES-C-1 Task No.:

JPM No.:

2009B NRC Exam Admin JPM SRO A1-1 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

On 9/05/09 at 0000 the plant was shutdown for a refueling outage.

While the Reactor cavity was being filled the 'B' RHR pump tripped.

Motor repairs are not expected to be completed until 9/25/09.

The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.

No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.

On 9/22/09 at 1400 the 'A' RHR pump tripped.

The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.

Core exit thermocouples are rising; they are currently reading 135°F.

lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of time to boil" and time to boil-off' on the lines at the bottom of this page (below).

2009B NRC Exam Admin JPM SRO A 1-1 Rev. 1

Appendix C Page 2 of 6 Worksheet Form ES-C-1 Task Standard:

Candidate obtains curves and correctly identifies the time to reach core boiling and core boil-off time Required Materials:

Curves H-X-8 through H-X-11 (All Rev. 2)

General

References:

AOP-020 (Rev. 31) Curve Book curves H-X-8, 9,10 and 11 (All Rev. 2)

Time Critical Task:

No Validation Time:

10 minutes Step 3 Step 4 Critical Step Justification Step required in order to accurately determine time to boil" using the appropriate curve.

Step required in order to accurately determine time to boil-off" using the appropriate curve.

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Page 2 of 6 Worksheet Form ES-C-1 Task Standard:

Candidate obtains curves and correctly identifies the time to reach core boiling and core boil-off time Required Materials:

Curves H-X-8 through H-X-11 (All Rev. 2)

General

References:

AOP-020 (Rev. 31) Curve Book curves H-X-8, 9,10 and 11 (All Rev. 2)

Time Critical Task:

No Validation Time:

10 minutes Step 3 Step 4 Critical Step Justification Step required in order to accurately determine time to boil" using the appropriate curve.

Step required in order to accurately determine time to boil-off" using the appropriate curve.

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1

Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

./ - Denotes Critical Steps Page 3 of 6 PERFORMANCE INFORMATION OBTAIN CURVES NEEDED FOR CALCULATION (Curves will be provided to the candidate)

Refers to curves H-X-8 through H-X-11 Form ES-C-1 Refers to provided data and determines that curve H-X-9 is required to calculate time to boil" and curve H-X-11 is required to calculate "boil-off' time Reviews curves and determines which ones are appropriate to determine the time to boil" and "boil-off time" Based on time since shutdown (9/5/09 - 9/22109) 17 days 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> since shutdown and current RCS temperature of 135°F using curve H-X-9 determine time to boil" Reviews curve H-X-9 Determines that time to boil" is 22 minutes (+/- 1 minute) 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Comment:

./ Performance Step: 3 Standard:

Comment:

./ - Denotes Critical Steps Page 3 of 6 PERFORMANCE INFORMATION OBTAIN CURVES NEEDED FOR CALCULATION (Curves will be provided to the candidate)

Refers to curves H-X-8 through H-X-11 Form ES-C-1 Refers to provided data and determines that curve H-X-9 is required to calculate time to boil" and curve H-X-11 is required to calculate "boil-off' time Reviews curves and determines which ones are appropriate to determine the time to boil" and "boil-off time" Based on time since shutdown (9/5/09 - 9/22109) 17 days 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> since shutdown and current RCS temperature of 135°F using curve H-X-9 determine time to boil" Reviews curve H-X-9 Determines that time to boil" is 22 minutes (+/- 1 minute) 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1

Appendix C

./ Performance Step: 4 Standard:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 4 of 6 PERFORMANCE INFORMATION Form ES-C-1 Based on time since shutdown (9/5/09 - 9/22/09) 17 days 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> since shutdown and current RCS temperature of 135°F using curve H-X-11 determine time to boil-oft" Reviews curve H-X-11 Determines that time to boil-off' is 4 hrs and 45 minutes

<+/- 15 minutes) or (4.5 to 5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />)

After completing the "time to boil" and "time to boil-off" calculation, the evaluation on this JPM is complete.

ENDOFJPM 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C

./ Performance Step: 4 Standard:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 4 of 6 PERFORMANCE INFORMATION Form ES-C-1 Based on time since shutdown (9/5/09 - 9/22/09) 17 days 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> since shutdown and current RCS temperature of 135°F using curve H-X-11 determine time to boil-oft" Reviews curve H-X-11 Determines that time to boil-off' is 4 hrs and 45 minutes

<+/- 15 minutes) or (4.5 to 5.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />)

After completing the "time to boil" and "time to boil-off" calculation, the evaluation on this JPM is complete.

ENDOFJPM 2009B NRC Exam Admin JPM SRO A1-1 Rev. 1

Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A1 During a Loss of Shutdown Cooling, determine the time that the RCS will reach Core Boiling and Boil-Off Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Page 5 of 6 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A1 During a Loss of Shutdown Cooling, determine the time that the RCS will reach Core Boiling and Boil-Off Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1

Appendix C Initial Conditions:

INITIATING CUE:

Page 6 of 6 JPM CUE SHEET Form ES-C-1 On 9/05/09 at 0000 the plant was shutdown for a refueling outage.

While the Reactor cavity was being filled the '8' RHR pump tripped. Motor repairs are not expected to be completed until 9/25/09.

The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.

No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.

On 9/22/09 at 1400 the 'A' RHR pump tripped.

The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.

Core exit thermocouples are rising; they are currently reading 135°F.

lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of time to boil" and time to boil-off' on the lines at the bottom of this page (below).

Name ______________________________________________ _

Record your calculations here and return your curves to the examiner:

TIME TO BOIL ________ _

TIME TO BOIL-OFF ________ _

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1 Appendix C Initial Conditions:

INITIATING CUE:

Page 6 of 6 JPM CUE SHEET Form ES-C-1 On 9/05/09 at 0000 the plant was shutdown for a refueling outage.

While the Reactor cavity was being filled the '8' RHR pump tripped. Motor repairs are not expected to be completed until 9/25/09.

The Reactor cavity fill was completed to the normal refueling levels with the 'A' RHR pump.

No fuel has been moved due to problems with the Manipulator Crane and the Source Range audible count rate.

On 9/22/09 at 1400 the 'A' RHR pump tripped.

The crew is implementing AOP-020, Loss of RCS Inventory or RHR While Shutdown.

Core exit thermocouples are rising; they are currently reading 135°F.

lAW AOP-020 you are directed to refer to curves H-X-8 through H-X-11 and determine the time to reach core boiling and core boil-off time. Mark up your curves to indicate where you are determining these times. Return the curves to the examiner with this page. Write your estimates of time to boil" and time to boil-off' on the lines at the bottom of this page (below).

Name ______________________________________________ _

Record your calculations here and return your curves to the examiner:

TIME TO BOIL ________ _

TIME TO BOIL-OFF _______ _

2009B NRC Exam Admin JPM SRO A1-1 Rev. 1

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 7 Form ES-C-1 ii Worksheet Shearon Harris Determine Boric Acid Addition Following CR Evacuation G2.1.25 RO 3.9 SRO 4.2 Task No.:

301013H401 JPM No.:

2009B NRC Exam Admin JPM SRO A1-2 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83% with a concentration of 7205 ppm. The RCS is currently 915 ppm.

You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST -1036 cold shutdown boron requirement of 1740 ppm.

DRAFT 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 7 Form ES-C-1 ii Worksheet Shearon Harris Determine Boric Acid Addition Following CR Evacuation G2.1.25 RO 3.9 SRO 4.2 Task No.:

301013H401 JPM No.:

2009B NRC Exam Admin JPM SRO A1-2 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83% with a concentration of 7205 ppm. The RCS is currently 915 ppm.

You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST -1036 cold shutdown boron requirement of 1740 ppm.

DRAFT 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1

Appendix C Page 2 of 7 Worksheet Form ES-C-1 Task Standard:

Utilizes Curve E-X-2 to determine required boric acid addition to achieve cold shutdown and Curve D-2 to obtain a change of 27 to 29 percent in BAT level (or a final level of 54 to 56 percent).

Actual is 28% change (or 55% final).

Required Materials:

Curve Book Calculator General

References:

AOP-004 (Rev. 46)

Time Critical Task:

Validation Time:

Step 3 Step 4 Curve Book nomograph E-X-2 (Rev. 4) and Curve D-2 (Rev. 0)

No 15 minutes Critical Step Justification Step is critical in order to correctly identify the amount of boric acid required boric acid concentration.

Step is critical in order to determine the change in tank level.

2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Page 2 of 7 Worksheet Form ES-C-1 Task Standard:

Utilizes Curve E-X-2 to determine required boric acid addition to achieve cold shutdown and Curve D-2 to obtain a change of 27 to 29 percent in BAT level (or a final level of 54 to 56 percent).

Actual is 28% change (or 55% final).

Required Materials:

Curve Book Calculator General

References:

AOP-004 (Rev. 46)

Time Critical Task:

Validation Time:

Step 3 Step 4 Curve Book nomograph E-X-2 (Rev. 4) and Curve D-2 (Rev. 0)

No 15 minutes Critical Step Justification Step is critical in order to correctly identify the amount of boric acid required boric acid concentration.

Step is critical in order to determine the change in tank level.

2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1

Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Evaluator Cue:

Comment:

./ Performance Step: 3 Standard:

./ - Denotes Critical Steps Page 3 of 7 VERIFICATION OF COMPLETION OBTAIN PROCEDURE Obtains AOP-004 and refers to Section 3.2 Step 25 (Copy of step will be provided to the candidate)

Form ES-C-1 Obtain cold shutdown boron concentration using copy of latest OST -1036 in back of book.

(If candidate asks: This information is provided in the initiating cue.)

Required shutdown boron concentration is 1740 ppm Determine required gallons of boric acid to achieve required RCS boron concentration using the formula on the boron addition nomograph E-2 Utilizes formula on Nomograph E-2 and calculates between 9130 to 9030 gallons of boric acid to be added. Actual is 9080 gallons Boron Addition (ReS @ 350DF)

Vi =. -M 1n(7000-Cf) 8.33 7000 - Ci M =538,000 2009B NRC Exam Admin JPMSRO A1-2 Rev. 1 Appendix C START TIME:

Performance Step: 1 Standard:

Comment:

Performance Step: 2 Standard:

Evaluator Cue:

Comment:

./ Performance Step: 3 Standard:

./ - Denotes Critical Steps Page 3 of 7 VERIFICATION OF COMPLETION OBTAIN PROCEDURE Obtains AOP-004 and refers to Section 3.2 Step 25 (Copy of step will be provided to the candidate)

Form ES-C-1 Obtain cold shutdown boron concentration using copy of latest OST -1036 in back of book.

(If candidate asks: This information is provided in the initiating cue.)

Required shutdown boron concentration is 1740 ppm Determine required gallons of boric acid to achieve required RCS boron concentration using the formula on the boron addition nomograph E-2 Utilizes formula on Nomograph E-2 and calculates between 9130 to 9030 gallons of boric acid to be added. Actual is 9080 gallons Boron Addition (ReS @ 350DF)

Vi =. -M 1n(7000-Cf) 8.33 7000 - Ci M =538,000 2009B NRC Exam Admin JPMSRO A1-2 Rev. 1

Appendix C Examiners NOTE:

Comment:

./ - Denotes Critical Steps Page 4 of 7 VERIFICATION OF COMPLETION Form ES-C-1 The Nomograph formula found on Curve E-X-2 assumes that the BAT boron concentration is 7000 ppm. In this JPM the given information is BAT concentration is 7205 ppm. The candidate MUST use the given concentration of 7205 ppm to come to the correct boron addition.

CORRECT CALCULATION

-538000 InlZ205 -1740).

VB = 8. 33

\\-7205 - 915. = 9080 If candidate uses 7000 ppm for BAT BA concentration (from the nomograph) instead of changing to 7205 ppm the result will be 9409 gallons INCORRECT CALCULATION (using wrong BAT concentration)

-538000 I (!OOO -1740)

VB =

8.. 33 n\\7000 - 915. = 9409 If candidate uses correct BAT BA concentration but uses the wrong Curve (E-X-1 verses E-X-2) the result will be 7443 gallons INCORRECT CALCULATION (using wrong RCS Mass - wrong curve)

-441000 l (Z205 -1740)

VB = 8.33 n\\720S - 915 ; = 7443 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Examiners NOTE:

Comment:

./ - Denotes Critical Steps Page 4 of 7 VERIFICATION OF COMPLETION Form ES-C-1 The Nomograph formula found on Curve E-X-2 assumes that the BAT boron concentration is 7000 ppm. In this JPM the given information is BAT concentration is 7205 ppm. The candidate MUST use the given concentration of 7205 ppm to come to the correct boron addition.

CORRECT CALCULATION

-538000 InlZ205 -1740).

VB = 8. 33

\\-7205 - 915. = 9080 If candidate uses 7000 ppm for BAT BA concentration (from the nomograph) instead of changing to 7205 ppm the result will be 9409 gallons INCORRECT CALCULATION (using wrong BAT concentration)

-538000 I (!OOO -1740)

VB =

8.. 33 n\\7000 - 915. = 9409 If candidate uses correct BAT BA concentration but uses the wrong Curve (E-X-1 verses E-X-2) the result will be 7443 gallons INCORRECT CALCULATION (using wrong RCS Mass - wrong curve)

-441000 l (Z205 -1740)

VB = 8.33 n\\720S - 915 ; = 7443 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1

Appendix C 0/ Performance Step: 4 Standard:

Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Determine the change in boric acid tank level equivalent to the required gallons of boric acid using the boric acid tank curve 0-2 Utilizes Curve 0-2 and obtains a change of 27 to 29 percent (or a final level of 54 to 56 percent).

Actual is 28% change (or 55% final).

-:':51)00 1IIIIIIIIIIIIIIltill n60r1e Add Tonk Volume in

~n(lrt" 15000 f}

10 fO 30 120000 -9080 = 10020 40

~ONTROL ROOM COpy Comment:

STOP TIME:

Curve Ji.

..:1 Rey W1.

arlg

'"'L.{ J htit.f.:-z:t-Sup'; ~. if' nflte~

OpS 5O~50 It Incnceted *

. I Olt.~

III 1111/11 IU'II 70 80[!!]

90

\\83-55=28\\

.+

100 Terminating Cue:

When candidate completes the calculations the JPM is completed.

ENDOFJPM 0/- Denotes Critical Steps 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C 0/ Performance Step: 4 Standard:

Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Determine the change in boric acid tank level equivalent to the required gallons of boric acid using the boric acid tank curve 0-2 Utilizes Curve 0-2 and obtains a change of 27 to 29 percent (or a final level of 54 to 56 percent).

Actual is 28% change (or 55% final).

-:':51)00 IIllllL1l1ll1ll1t II lt60rle Add Tonk Volume in

~n(lrt 15000 I

I rm III f}

10 fO 30 120000 -9080 = 10020 40

~ONTROL ROOM COpy Comment:

STOP TIME:

1l-.1 RevW1.

C!KVe..JJ "I.. (-,,; ra...t.f.:-z:t-SI.

arlg SUpy.... u.&(

.fI' l"Ii\\lte~

OpS lUll

~l

  • 5O~50 It Incnceted *

. I Olt.~

U 1/

70 80[!!]

90

\\83-55=28\\

.+

100 Terminating Cue:

When candidate completes the calculations the JPM is completed.

ENDOFJPM 0/- Denotes Critical Steps 2009B NRC Exam Admin JPMSRO A 1-2 Rev. 1

Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

20098 NRC Exam Admin JPM SRO A 1 Determine boric acid addition following control room evacuation Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

../ - Denotes Critical Steps 20098 NRC Exam Admin JPMSRO A 1-2 Rev. 1 Appendix C Page 6 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

20098 NRC Exam Admin JPM SRO A 1 Determine boric acid addition following control room evacuation Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

../ - Denotes Critical Steps 20098 NRC Exam Admin JPMSRO A 1-2 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 7 of 7 JPM CUE SHEET Form ES-C-1 The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83%

with a concentration of 7205 ppm. The RCS is currently 915 ppm.

You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.

2009B NRC Exam Admin JPMSRO A1-2 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 7 of 7 JPM CUE SHEET Form ES-C-1 The Control Room has been evacuated and the MCB transfer to the ACP has been completed. Plant management has directed a plant cooldown to mode 5 utilizing AOP-004. BAT level is 83%

with a concentration of 7205 ppm. The RCS is currently 915 ppm.

You are the CRS. Perform a calculation of the required boric acid addition to achieve cold shutdown and BAT level change per AOP-004, Section 3.2 Step 25 to obtain an OST-1036 cold shutdown boron requirement of 1740 ppm.

2009B NRC Exam Admin JPMSRO A1-2 Rev. 1

Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

DRAFT Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Task No.:

005016H101 Perform OP-111, Attachment 3 -.

JPM No.:

2009B NRC Exam Low Head SI Standby Lineup Admin JPM SRO A2 Checklist G2.2.15 RO 3.9 SRO 4.3 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AD is checking the local equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

DRAFT Page 1 of 12 Worksheet Form ES-C-1 Shearon Harris Task No.:

005016H101 Perform OP-111, Attachment 3 -.

JPM No.:

2009B NRC Exam Low Head SI Standby Lineup Admin JPM SRO A2 Checklist G2.2.15 RO 3.9 SRO 4.3 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

X Classroom Simulator X

Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves. An AD is checking the local equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

All errors identified.

Required Materials:

OP-111, Attachment 3, with CHECK column initialed except for the local valves.

General

References:

OP-111 (Rev. 44)

Time Critical Task:

Validation Time:

Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification:

Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 2 of 12 Worksheet Form ES-C-1 Task Standard:

All errors identified.

Required Materials:

OP-111, Attachment 3, with CHECK column initialed except for the local valves.

General

References:

OP-111 (Rev. 44)

Time Critical Task:

Validation Time:

Step 2 Step 3 Step 4 Step 5 Step 6 No 10 minutes Critical Step Justification:

Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification Must identify all out of alignment equipment for Independent Verification 2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)

Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the conditions of this JPM:

Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)

Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CO NT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)

Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 3 of 12 Worksheet 20098 NRC Exam - SIMULATOR SETUP Simulator Operator Reset to IC-170 (Password 9newguys)

Silence and Acknowledge annunciators Form ES-C-1 GO TO FREEZE and inform the lead examiner the Simulator is ready. DO NOT GO TO RUN until directed by the lead examiner. (The examiner has provided to the candidate with initial conditions and the initiating cues prior to placing the simulator in RUN.)

To recreate the conditions of this JPM:

Initial Simulator IC-16 (Mode 4 with RHR aligned for ECCS)

Place 1 RH-30, RHR HEAT XCHG A OUT FLOW CO NT to "0%" open on controller Place 1 SI-322, SA RWST TO RHR PUMP A-SA to SHUT (closed indication)

Leave control power ON for 1 SI-341 S8 Place 1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 to OPEN Place 1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA to OPEN Silence Acknowledge and Reset Annunciators Freeze and Snap these conditions for future use 20098 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C START TIME:

Performance Step: 1 Standard:

Evaluator Cue:

Evaluator Note:

Comment:

~ Performance Step: 2 Standard:

Evaluator Cue:

Comment:

../ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.

Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.

Provide OP-111, Attachment 3.

The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 RH-30, RHR XCHG A OUT FLOW CONT - (OPEN)

Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.

As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C START TIME:

Performance Step: 1 Standard:

Evaluator Cue:

Evaluator Note:

Comment:

~ Performance Step: 2 Standard:

Evaluator Cue:

Comment:

../ - Denotes Critical Steps Page 4 of 12 PERFORMANCE INFORMATION OP-111 Attachment 3 Obtain procedure.

Form ES-C-1 Fills out applicable sections of Sheet 1 of 4 and reviews Attachment.

Provide OP-111, Attachment 3.

The Attachment can be performed in any order. The following valves/controls are out of position. All others are correctly positioned.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 RH-30, RHR XCHG A OUT FLOW CONT - (OPEN)

Determines 1 RH-30 is SHUT (0% demand) and notes out-of-position condition in REMARKS section.

As CRS: Throughout the JPM, acknowledge any verbal communications. Instruct them to document mis-positioned controls/valves but continue performing the Attachment without re-aligning any equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Performance Step: 3 Standard:

Comment:

Performance Step: 4 Standard:

Comment:

Performance Step: 5 Standard:

Comment:

./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CONT PWR & VLV POS (OFF)

Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)

Determines 1 SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.

2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Performance Step: 3 Standard:

Comment:

Performance Step: 4 Standard:

Comment:

Performance Step: 5 Standard:

Comment:

./ - Denotes Critical Steps Page 5 ot 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG CONT PWR & VLV POS (OFF)

Determines 1 SI-341 SB is not OFF and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1 SI-322 SA, RWST TO RHR PUMP A-SA (OPEN)

Determines 1 SI-322 SA is not OPEN and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Locates and compares actual position to required position lAW.

1CC-147, CCW FROM RHR HEAT EXCHANGER A-SA Determines 1CC-147 is not SHUT and notes out-ot-position condition in REMARKS section.

2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Performance Step: 6 Standard:

Comment:

Performance Step: 7 Standard:

Evaluator Cue:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Provide Attachment to CRS.

Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.

Acknowledge any verbal report.

When the applicable section of the Attachment has been returned to the CRS:

ENDOFJPM 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Performance Step: 6 Standard:

Comment:

Performance Step: 7 Standard:

Evaluator Cue:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 60t 12 PERFORMANCE INFORMATION OP-111 Attachment 3 continued Form ES-C-1 Locates and compares actual position to required position lAW.

1CC-167, CCW FROM RHR HEAT EXCHANGER 8-S8 Determines 1CC-167 is not SHUT and notes out-ot-position condition in REMARKS section.

OP-111 Attachment 3 continued Provide Attachment to CRS.

Completes Att. 3, Sheet 1 ot 4 and provides Attachment to CRS.

Acknowledge any verbal report.

When the applicable section of the Attachment has been returned to the CRS:

ENDOFJPM 20098 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 7 of 12 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A2 - Perform OP-111, - Low Head SI Standby Lineup Checklist Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.

An AO is checking the local equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 8 of 12 JPM CUE SHEET Form ES-C-1 A plant heatup is in progress lAW GP-002, Normal Plant Heatup From Cold Solid To Hot Subcritical Mode 5 To Mode 3 OP-111 RESIDUAL HEAT REMOVAL SYSTEM, Section 7.2-Restoring the RHR System to ECCS Mode, has just been completed.

You are the BOP and the CRS has assigned to perform the independent verification on OP-111, Attachment 3 - Low Head SI Standby Lineup Checklist, for the control room operated valves.

An AO is checking the local equipment.

2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 Attacmnent 3 - Low Head Safety Injection Standby Lineup Checklist Sheet1of4 Person(s) Perfonning Cheddisf Initials Name (Print)

Initials Name (Print)

TR Terry Ilight Remarks - Indicate any component not in the prescribed positiorL Checklist Started Checklist Completed Approved by Time UnitSCO Date TODAY' Date ___ _

Date ----

After receiving the final review signature. this OP Attadvnent becomes a QA RECORD.

IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 9 of 12 JPM CUE SHEET Form ES-C-1 Attacmnent 3 - Low Head Safety Injection Standby Lineup Checklist Sheet1of4 Person(s) Perfonning Cheddisf Initials Name (Print)

Initials Name (Print)

TR Terry Ilight Remarks - Indicate any component not in the prescribed positiorL Checklist Started Checklist Completed Approved by Time UnitSCO Date TODAY' Date ___ _

Date ----

After receiving the final review signature. this OP Attadvnent becomes a QA RECORD.

IOP-111 Rev. 44 Page 142 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 10 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSITION CHECK 1RH-1 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS LOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSLOOPCTORHRPUMPB-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT FLOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT Open TR (HCr03B1) 1RH-20 RHR HEAT XCHG A BVP FLOW CONT Manual &

Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CONT Manual &

Shut TR 1RH-26,.

RHR Header A to eves Letdown 1501 Locked Shut TR Vlv 1RH-64

Shut TR 1CC-146-RHR HX A Outlet Throttle Valve Locked TR ThrotHed 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.

Form ES-C-1 VERIFY Throttled ~0I1 should be as recorded in the last OST-1216. This ensures the required flow for E CS function.

IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 10 of 12 JPM CUE SHEET - Low Head Safety Injection Standby Uneup Checklist Sheet2of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSITION CHECK 1RH-1 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-2 RCS LOOP A TO RHR PUMP A-SA Shut TR 1RH-39 RCS LOOP C TO RHR PUMP B-SB Shut TR 1RH-40 RCSLOOPCTORHRPUMPB-SB Shut TR 1RH-30 RHR HEAT XCHG A OUT FLOW CONT Open TR 1RH-66 RHR HEAT XCHG B OUT FLOW CONT Open TR (HCr03B1) 1RH-20 RHR HEAT XCHG A BVP FLOW CONT Manual &

Shut TR 1RH-58 RHR HEAT XCHG B BVP FLOW CONT Manual &

Shut TR 1RH-26,.

RHR Header A to eves Letdown 1501 Locked Shut TR Vlv 1RH-64

Shut TR 1CC-146-RHR HX A Outlet Throttle Valve Locked TR ThrotHed 1CC-147 CCW FROM RHR HEAT EXCHANGER Shut TR A-SA This is a local valve operated in the body of the procedure.

Form ES-C-1 VERIFY Throttled ~0I1 should be as recorded in the last OST-1216. This ensures the required flow for E CS function.

IOP-111 Rev. 44 Page 143 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby lineup Checklist Sheet 3 of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Outlet Throttle Valve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER B-SB Shut TR 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & VL V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG

~&Pull TR to Lock 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG Off TR CONT PWR & VLV POS 1SI-326 SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD SI TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322 SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last OST-1216. This ensures the required flow for ECCS function.

1 OP-111 Rev. 44 Page 144 of 1531 20098 NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 11 of 12 JPM CUE SHEET - Low Head Safety Injection Standby lineup Checklist Sheet 3 of4 Form ES-C-1 COMPONENT NUMBER COMPONENT DESCRIPTION POsmON CHECK VERIFY 1CC-166-RHR HX B Outlet Throttle Valve Locked TR Throttled 1CC-167 CCW FROM RHR HEAT EXCHANGER B-SB Shut TR 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Open & Pull TR to Lock 1SI-340SA LOW HEAD SI TRAIN A TO COLD LEG Off TR CONT PWR & VL V POS 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG

~&Pull TR to Lock 1SI-341 SB LOW HEAD SI TRAIN B TO COLD LEG Off TR CONT PWR & VLV POS 1SI-326 SA LOW HEAD SI TRAIN A TO HOT LEG Open TR CROSSOVER 1SI-327SB LOW HEAD SI TRAIN B TO HOT LEG Open TR CROSSOVER 1SI-322 SA RWST TO RHR PUMP A-SA Open TR 1SI-323SB RWST TO RHR PUMP B-SB Open TR Throttled position should be as recorded in the last OST-1216. This ensures the required flow for ECCS function.

1 OP-111 Rev. 44 Page 144 of 1531 20098 NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS Lg(B A to RHR Puflll1A-SA Locked Off TR (1RH-2) oth 8krs)

Locked Off TR 1A21-SA-8A RCS L~

C to RHR PlIfIl> 1B-SB Locked Off TIt (1RH-40) (Both Bkrs)

Locked Off TIt 4tlUV MCG-1tl21-!::)H 1B21-SB-5B RCS ~

RHR Puflll1A-SA (1RH-1) 8krs)

Locked Off TIt Locked Off TIt 1B21-SB-11A RCS ~

C to RHR PUf1ll1E~-SB Locked Off TR (1RH-39)(Both Bkrs)

Locked Off TIt 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1 Appendix C Page 12 of 12 JPM CUE SHEET Form ES-C-1 - Low Head Safety Injection Standby Uneup Checklist Sheet4of4 COMPONENT NUMBER COMPONENT DESCRIPTION POSmON CHECK VERIFY 480V MCC-1A21-SA 1A21-SA-7B RCS Lg(B A to RHR Puflll1A-SA Locked Off TR (1RH-2) oth 8krs)

Locked Off TR 1A21-SA-8A RCS L~

C to RHR PlIfIl> 1B-SB Locked Off TIt (1RH-40) (Both Bkrs)

Locked Off TIt 4tlUV MCG-1tl21-!::)H 1B21-SB-5B RCS ~

RHR Puflll1A-SA (1RH-1) 8krs)

Locked Off TIt Locked Off TIt 1B21-SB-11A RCS ~

C to RHR PUf1ll1E~-SB Locked Off TR (1RH-39)(Both Bkrs)

Locked Off TIt 1 OP-111 Rev. 44 Page 145 of 1531 2009B NRC Exam Admin JPM SRO A2 Rev. 1

Appendix C Facility:

Page 1 of 8 Worksheet Form ES-C-1 Task No.:

Task

Title:

Using survey maps determine stay JPM No.:

2009B NRC Exam times Admin JPM SRO A-3 KIA

Reference:

G.2.3.4 RO 3.2 SRO 3.7 Examinee:

NRC Examiner:

Facility Evaluator:

Date: __

Method of testing:

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant 2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Facility:

Task

Title:

KIA

Reference:

Examinee:

Facility Evaluator:

Method of testing:

Page 1 of 8 Worksheet Task No.:

Form ES-C-1 Using survey maps determine stay JPM No.:

2009B NRC Exam times Admin JPM SRO A-3 G.2.3.4 RO 3.2 SRO 3.7 NRC Examiner:

Date: __

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant 2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 2 of 8 Worksheet Form ES-C-1 READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits. Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:

Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.

Required Materials:

Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General

References:

DOS-NGGC-0004 (Rev. 10)

Time Critical Task:

Validation Time:

Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.

Calculation of stay time.

2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 3 of 8 Worksheet Form ES-C-1 Task Standard:

Calculation of stay times based on survey maps, two hours for Operator 1, five hours for Operator 2.

Required Materials:

Survey map A4 RAB 190' North Valve MAP 2 SFD-5-S-0684 General

References:

DOS-NGGC-0004 (Rev. 10)

Time Critical Task:

Validation Time:

Step 1 Step 2 Step 3 DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

No 12 minutes Critical Task Justification Must determine dose rates in order to calculate stay time Must determine available dose to determine stay time.

Calculation of stay time.

2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C START TIME:

Evaluator Note:

.;' Performance Step: 1 Standard:

Comment:

.;' Performance Step: 2 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of DOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem -700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C START TIME:

Evaluator Note:

.;' Performance Step: 1 Standard:

Comment:

.;' Performance Step: 2 Standard:

Comment:

./ - Denotes Critical Steps Page 4 of 8 PERFORMANCE INFORMATION The order of performance does not matter Form ES-C-1 IF THE APPLICANT ASKS FOR IT: Provide a copy of DOS-NGGC-0004, Rev. 10 Using Radiological Survey Record Map A4 and RAB 190' North map, determines dose rates in the area where the clearance will be applied Identifies that General Area Dose Rates are 120 mrem/hr Determine the remaining dose for the year for each individual Operator 1: 240 mrem (2000 mrem - 1760 mrem = 240 mrem Operator 2: 600 mrem 4000 mrem -700 mrem (PE) - 2700 mrem (SL) = 600 mrem 2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C

./ Performance Step: 3 Standard:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)

Operator 1: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 240 mrem + 120mremihr = 2 hrs Operator 2: 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 600 mrem + 120 mrem/hr = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> After the stay time has been calculated, this JPM is complete.

ENDOFJPM 20098 NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C

./ Performance Step: 3 Standard:

Comment:

Terminating Cue:

STOP TIME:

./ - Denotes Critical Steps Page 5 of 8 PERFORMANCE INFORMATION Form ES-C-1 Determine stay time for each operator (based on 1 st Operator reaching 2 mrem and the 2nd Operator reaching 4 mrem - for the year)

Operator 1: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 240 mrem + 120mremihr = 2 hrs Operator 2: 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> 600 mrem + 120 mrem/hr = 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> After the stay time has been calculated, this JPM is complete.

ENDOFJPM 20098 NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Page 6 of 8 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

2009B NRC Exam Admin JPM SRO A Using survey maps determine stay times. (DOS-NGGC-0004 Rev. 10)

Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

DOS-NGGC-0004 "Progress Energy Annual Administrative Dose Limits" Section 9.3.1 LIMIT = 2 rem Progress Energy dose not to exceed 4 rem total dose if non-Progress Energy dose for the current year has been determined.

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1 ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits: Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

Name ____________________________________ _

Record the maximum allowable stay time calculations below to the nearest hour and minute.

Operator 1: _____________________ Operator 2:

2009B NRC Exam Admin JPM SRO A3 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 7 of 8 JPM CUE SHEET Form ES-C-1 Two individuals are tasked to hang a clearance on the 'A' ED Tank Transfer Pump. The clearance includes the following valves:

1 ED-12 1 ED-13 1 ED-14 1 ED-15 1 ED-17 1ED-18 Two Operators are being assigned to hang a clearance and perform work in a radiological area. Operator 1 has an accumulated annual Whole Body dose of 1760 mrem (Progress Energy). Operator 2 has an accumulated annual Whole Body dose of 700 mrem (Progress Energy) and worked at Saint Lucie earlier this year where he has accumulated 2700 mrem.

The clearance and work activity is for the 'A' ED Tank Transfer Pump.

Using the supplied survey map, determine the allowable individual stay times for each Operator that would prevent exceeding the annual administrative dose limit while performing these activities.

Calculations should be based on Progress Energy Administrative Dose Limits. Do not consider RWP Administrative Limits: Any required dose extensions have been processed and approved with the exception of any dose extensions requiring the Superintendent - Radiation Protection approval.

Do not consider dose received during transit. The calculated dose should be ONLY what they would receive while working at the valves for the clearance.

Complete the information below and return to the evaluator when complete.

Name ____________________________________ _

Record the maximum allowable stay time calculations below to the nearest hour and minute.

Operator 1: _____________________ Operator 2:

2009B NRC Exam Admin JPM SRO A3 Rev. 1

Appendix C Job Performance Measure Form ES-C-1 F~, ["'). F.\\ Fe:, r:~"'-'I Worksheet f~F ~i{:, l'~~~~" fl Facility:

Shearon Harris Task No.:

345001 H602 Task

Title:

Classify an event JPM No.:

2009B NRC Exam Admin JPM SRO A4 KIA

Reference:

G2.4.41 RO 2.9 SRO 4.6 Examinee:

NRC Examiner Facility Evaluator:

Date: __

Method of testing:

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.

THIS IS A TIME CRITICAL JPM.

2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Job Performance Measure Form ES-C-1 F~, ["'). F.\\ Fe:, r:~"'-'I Worksheet f~F ~i{:, l'~~~~" fl Facility:

Shearon Harris Task No.:

345001 H602 Task

Title:

Classify an event JPM No.:

2009B NRC Exam Admin JPM SRO A4 KIA

Reference:

G2.4.41 RO 2.9 SRO 4.6 Examinee:

NRC Examiner Facility Evaluator:

Date: __

Method of testing:

Simulated Performance:

Actual Performance:

x Classroom X

Simulator Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Initial Conditions:

Initiating Cue:

A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.

THIS IS A TIME CRITICAL JPM.

2009B NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Job Performance Measure Worksheet Task Standard:

Event classified as an Site Area Emergency (2-4-3)

Required Materials:

None General

References:

PEP-110 EAL Flowpath EP-EAL (allowed reference)

Handouts:

JPM Cue Sheets Pages 4 and 5 PEP-110 EAL Flowpath EP-EAL (allowed reference)

Time Critical Task:

Yes Validation Time:

15 minutes Critical Step Justification Step 2 Classification of the event.

Form ES-C-1 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Job Performance Measure Worksheet Task Standard:

Event classified as an Site Area Emergency (2-4-3)

Required Materials:

None General

References:

PEP-110 EAL Flowpath EP-EAL (allowed reference)

Handouts:

JPM Cue Sheets Pages 4 and 5 PEP-110 EAL Flowpath EP-EAL (allowed reference)

Time Critical Task:

Yes Validation Time:

15 minutes Critical Step Justification Step 2 Classification of the event.

Form ES-C-1 2009B NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Evaluator Note:

START TIME:

Performance Step: 1 Standard:

Comment:

./ - Denotes a Critical Step Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Start Time for this JPM begins when the individual has been briefed OBTAIN EAL FLOW PATH.

Obtains EAL Flow Path. (EP-EAL is an allowed reference) 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Evaluator Note:

START TIME:

Performance Step: 1 Standard:

Comment:

./ - Denotes a Critical Step Page 3 of 7 PERFORMANCE INFORMATION Form ES-C-1 Start Time for this JPM begins when the individual has been briefed OBTAIN EAL FLOW PATH.

Obtains EAL Flow Path. (EP-EAL is an allowed reference) 2009B NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C

-/ Performance Step: 2 Standard:

Comment:

STOP TIME:

Terminating Cue:

-/ - Denotes a Critical Step Page 4 of 7 PERFORMANCE INFORMATION CLASSIFY EVENT Identifies an Site Area Emergency (2-4-3),

Form ES-C-1 DAMAGE TO SPENT FUEL with ANY SPENT FUEL POOL AREA RAD MON > 700 mRlHR Basis:

Damage to spent fuel in the Fuel Handling Building is assessed to determine if a single or multiple assemblies are affected.

Trigger points for the FHB area radiation monitors were calculated to provide a symptomatic indication of damage the affected assembly(s). The 700 mRlHR criteria is the dose rate expected at the monitor nearest the damaged assembly(s) based on the expected dose rate from damaging more than 1 spent fuel assembly that had recently been removed from the reactor.

CLASSIFICATION GUIDANCE:

Fuel handling accidents are analyzed as part of the HNP Licensing Basis. These accidents (as demonstrated through evaluation) are not expected to exceed Part 100 limits.

Emergency filtration units are available to mitigate the consequences of these accidents.

Event classification stated to evaluator.

ENDOFJPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C

-/ Performance Step: 2 Standard:

Comment:

STOP TIME:

Terminating Cue:

-/ - Denotes a Critical Step Page 4 of 7 PERFORMANCE INFORMATION CLASSIFY EVENT Identifies an Site Area Emergency (2-4-3),

Form ES-C-1 DAMAGE TO SPENT FUEL with ANY SPENT FUEL POOL AREA RAD MON > 700 mRlHR Basis:

Damage to spent fuel in the Fuel Handling Building is assessed to determine if a single or multiple assemblies are affected.

Trigger points for the FHB area radiation monitors were calculated to provide a symptomatic indication of damage the affected assembly(s). The 700 mRlHR criteria is the dose rate expected at the monitor nearest the damaged assembly(s) based on the expected dose rate from damaging more than 1 spent fuel assembly that had recently been removed from the reactor.

CLASSIFICATION GUIDANCE:

Fuel handling accidents are analyzed as part of the HNP Licensing Basis. These accidents (as demonstrated through evaluation) are not expected to exceed Part 100 limits.

Emergency filtration units are available to mitigate the consequences of these accidents.

Event classification stated to evaluator.

ENDOFJPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

20098 NRC Exam Admin JPM SRO A4 - Classify an event Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

20098 NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Page 5 of 7 VERIFICATION OF COMPLETION Form ES-C-1 Job Performance Measure No.:

20098 NRC Exam Admin JPM SRO A4 - Classify an event Examinee's Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:

Response

Result:

SAT UNSAT Examiner's Signature:

Date:

20098 NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Initial Conditions:

Initiating Cue:

Page 6 of 7 JPM CUE SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.

THIS IS A TIME CRITICAL JPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Initial Conditions:

Initiating Cue:

Page 6 of 7 JPM CUE SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Using the attached information sheet and the EAL Flow Path, classify the event. Mark the EAL Flow Path appropriately.

THIS IS A TIME CRITICAL JPM 2009B NRC Exam Admin JPM SRO A4 Rev. 1

Appendix C Page 7 of 7 JPM CUE SHEET CLASSIFICATION INFORMATION SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Current plant conditions are:

RCS Temp 180°F RCS Pressure 345 psig

'A' RHR pump is in operation Fuel handlers are performing a fuel shuffle and moving assemblies from the 'A' Fuel Pool to 'B' Fuel Pool.

An emergency landing was being attempted by an aircraft returning to RDU. The pilot has lost control and the aircraft has impacted on the west side of the Fuel Handling Building. The side of the building has suffered external damage and a fire is burning at the impact site.

The impact was so severe that a fuel assembly being moved has dropped from the Fuel Bridge Crane and ruptured. The highest Fuel Building Radiation monitor is reading 825 mr/hr.

Classify the event Name ________________________________________________ __

Record your classification here and return to the examiner.

EAL Classification: ________________________ _

2009B NRC Exam Admin JPM SRO A4 Rev. 1 Appendix C Page 7 of 7 JPM CUE SHEET CLASSIFICATION INFORMATION SHEET Form ES-C-1 A refueling outage has just been completed and a plant heat up is being performed lAW GP-002, Normal Plant Heatup From Cold Solid to Hot Subcritical Mode 5 to Mode 3.

Current plant conditions are:

RCS Temp 180°F RCS Pressure 345 psig

'A' RHR pump is in operation Fuel handlers are performing a fuel shuffle and moving assemblies from the 'A' Fuel Pool to 'B' Fuel Pool.

An emergency landing was being attempted by an aircraft returning to RDU. The pilot has lost control and the aircraft has impacted on the west side of the Fuel Handling Building. The side of the building has suffered external damage and a fire is burning at the impact site.

The impact was so severe that a fuel assembly being moved has dropped from the Fuel Bridge Crane and ruptured. The highest Fuel Building Radiation monitor is reading 825 mr/hr.

Classify the event Name ________________________________________________ __

Record your classification here and return to the examiner.

EAL Classification: ________________________ _

2009B NRC Exam Admin JPM SRO A4 Rev. 1