ML101170739: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Carrion, Robert From: | {{#Wiki_filter:Carrion, Robert From: | ||
Carrion, Robert Sent: | |||
Wednesday, November 18, 2009 8:23 AM To: | |||
Lake, Louis | |||
==Subject:== | ==Subject:== | ||
Latest revision as of 05:25, 14 January 2025
| ML101170739 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/18/2009 |
| From: | Robert Carrion NRC/RGN-II |
| To: | Lake L NRC/RGN-II |
| References | |
| FOIA/PA-2010-0116 | |
| Download: ML101170739 (1) | |
Text
Carrion, Robert From:
Carrion, Robert Sent:
Wednesday, November 18, 2009 8:23 AM To:
Lake, Louis
Subject:
SIT Sataus Call Hi Lou, From the information which Garry presented, I think that Progress has arrived at the proper conclusion with respect to the repair. I am sure that it was not what they had hoped due to the extra time required to effect the fix. I think that the way Progress has handled this entire event should be seen a big positive for its management.
Do you know the specifics for the status call? Time, etc.?
- Thanks, Bob