| title = Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
| title = NRR E-mail Capture - Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
| author name = Singal B
| author name = Singal B
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:NRR-PMDAPEm Resource From:                         Singal, Balwant Sent:                         Wednesday, November 05, 2014 8:25 AM To:                           Lsterling@stpegs.com
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:
Singal, Balwant Sent:
Wednesday, November 05, 2014 8:25 AM To:
Lsterling@stpegs.com


==Subject:==
==Subject:==
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Attachments:                 MF3319-RAI-STSB.docx By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS)
Attachments:
Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No.
MF3319-RAI-STSB.docx By {{letter dated|date=January 6, 2014|text=letter dated January 6, 2014}} (Agencywide Documents Access and Management System (ADAMS)
ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG- 1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
Accession No. ML14035A075), as supplemented by {{letter dated|date=June 9, 2014|text=letter dated June 9, 2014}} (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the additional information (RAI) described in the attachment to this e-mail to complete its review of the LAR.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the additional information (RAI) described in the attachment to this e-mail to complete its review of the LAR.
The Draft RAIs were transmitted on October 30, 2014 and the NRC staff was informed on November 4, 2014 that a clarification call is not needed. Please provide your response within 30 days from the date of this e-mail and treat this e-mail as formal transmittal of RAIs.
The Draft RAIs were transmitted on October 30, 2014 and the NRC staff was informed on November 4, 2014 that a clarification call is not needed. Please provide your response within 30 days from the date of this e-mail and treat this e-mail as formal transmittal of RAIs.
Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)
Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222  


Hearing Identifier:     NRR_PMDA Email Number:           1678 Mail Envelope Properties     (192BB59294514E41B5305C3C8286760801658DBE1CF6)
Hearing Identifier:
NRR_PMDA Email Number:
1678 Mail Envelope Properties (192BB59294514E41B5305C3C8286760801658DBE1CF6)  


==Subject:==
==Subject:==
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Sent Date:             11/5/2014 8:25:27 AM Received Date:         11/5/2014 8:25:00 AM From:                   Singal, Balwant Created By:             Balwant.Singal@nrc.gov Recipients:
Sent Date:
11/5/2014 8:25:27 AM Received Date:
11/5/2014 8:25:00 AM From:
Singal, Balwant Created By:
Balwant.Singal@nrc.gov Recipients:  
"Lsterling@stpegs.com" <Lsterling@stpegs.com>
"Lsterling@stpegs.com" <Lsterling@stpegs.com>
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                           Size                       Date & Time MESSAGE                         1441                     11/5/2014 8:25:00 AM MF3319-RAI-STSB.docx                             36268 Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:           ZZZ
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1441 11/5/2014 8:25:00 AM MF3319-RAI-STSB.docx 36268 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
ZZZ  


REQUEST FOR ADDITIONAL INFORMATION SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE AMENDMENT OF TS 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION, FUNCTIONAL UNIT 20 DOCKET NOS. 50-498 AND 50-499 By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG- 1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
1 REQUEST FOR ADDITIONAL INFORMATION SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE AMENDMENT OF TS 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION, FUNCTIONAL UNIT 20 DOCKET NOS. 50-498 AND 50-499 By {{letter dated|date=January 6, 2014|text=letter dated January 6, 2014}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14035A075), as supplemented by {{letter dated|date=June 9, 2014|text=letter dated June 9, 2014}} (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the following additional information to complete its review of the LAR.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the following additional information to complete its review of the LAR.
Basis for the Request The licensee is proposing to add New Action 12A to Function 20, Reactor Trip Breakers, in TS 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The licensee stated in its application that this change is consistent with NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants.
Basis for the Request The licensee is proposing to add New Action 12A to Function 20, Reactor Trip Breakers, in TS 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The licensee stated in its application that this change is consistent with NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants.
Line 45: Line 60:
With one of the diverse trip features (undervoltage or shunt trip attachment) inoperable, within 48 hours restore it to OPERABLE status or initiate action to fully insert all rods; and within the next hour place the rod control system in a condition incapable of rod withdrawal.
With one of the diverse trip features (undervoltage or shunt trip attachment) inoperable, within 48 hours restore it to OPERABLE status or initiate action to fully insert all rods; and within the next hour place the rod control system in a condition incapable of rod withdrawal.
The licensee stated that New Action 12A would address the condition where one diverse trip feature for a reactor trip breaker is inoperable when the reactor trip breakers are in the closed position and the control rod drive system is capable of rod withdrawal in Modes 3, 4, and 5. The licensee also stated that the proposed changes to TS 3.3.1, Table 3.3-1, New Action 12A address a condition that is not in South Texas Project (STP) TSs.
The licensee stated that New Action 12A would address the condition where one diverse trip feature for a reactor trip breaker is inoperable when the reactor trip breakers are in the closed position and the control rod drive system is capable of rod withdrawal in Modes 3, 4, and 5. The licensee also stated that the proposed changes to TS 3.3.1, Table 3.3-1, New Action 12A address a condition that is not in South Texas Project (STP) TSs.
Request for Additional Information Since New Action 12A is not in the licensees current licensing basis (CLB), please explain why New Action 12A is needed and provide a technical evaluation for this 1
Request for Additional Information Since New Action 12A is not in the licensees current licensing basis (CLB), please explain why New Action 12A is needed and provide a technical evaluation for this  


change. In addition, please explain, given the CLB TS, how would the inoperability of a diverse trip feature impact the operability of a reactor trip breaker during the modes of applicability. Please include discussion of any TS actions entered, since this New Action 12A is currently not in STPs TSs.
2 change. In addition, please explain, given the CLB TS, how would the inoperability of a diverse trip feature impact the operability of a reactor trip breaker during the modes of applicability. Please include discussion of any TS actions entered, since this New Action 12A is currently not in STPs TSs.}}
2}}

Latest revision as of 16:18, 10 January 2025

NRR E-mail Capture - Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
ML14309A788
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/05/2014
From: Balwant Singal
Division of Operating Reactor Licensing
To: Sterling L
South Texas
References
MF3319, MF3320
Download: ML14309A788 (4)


Text

1 NRR-PMDAPEm Resource From:

Singal, Balwant Sent:

Wednesday, November 05, 2014 8:25 AM To:

Lsterling@stpegs.com

Subject:

Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)

Attachments:

MF3319-RAI-STSB.docx By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.

U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the additional information (RAI) described in the attachment to this e-mail to complete its review of the LAR.

The Draft RAIs were transmitted on October 30, 2014 and the NRC staff was informed on November 4, 2014 that a clarification call is not needed. Please provide your response within 30 days from the date of this e-mail and treat this e-mail as formal transmittal of RAIs.

Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222

Hearing Identifier:

NRR_PMDA Email Number:

1678 Mail Envelope Properties (192BB59294514E41B5305C3C8286760801658DBE1CF6)

Subject:

Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)

Sent Date:

11/5/2014 8:25:27 AM Received Date:

11/5/2014 8:25:00 AM From:

Singal, Balwant Created By:

Balwant.Singal@nrc.gov Recipients:

"Lsterling@stpegs.com" <Lsterling@stpegs.com>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1441 11/5/2014 8:25:00 AM MF3319-RAI-STSB.docx 36268 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

ZZZ

1 REQUEST FOR ADDITIONAL INFORMATION SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE AMENDMENT OF TS 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION, FUNCTIONAL UNIT 20 DOCKET NOS. 50-498 AND 50-499 By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG-1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.

U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the following additional information to complete its review of the LAR.

Basis for the Request The licensee is proposing to add New Action 12A to Function 20, Reactor Trip Breakers, in TS 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The licensee stated in its application that this change is consistent with NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants.

New Action 12A states:

With one of the diverse trip features (undervoltage or shunt trip attachment) inoperable, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> restore it to OPERABLE status or initiate action to fully insert all rods; and within the next hour place the rod control system in a condition incapable of rod withdrawal.

The licensee stated that New Action 12A would address the condition where one diverse trip feature for a reactor trip breaker is inoperable when the reactor trip breakers are in the closed position and the control rod drive system is capable of rod withdrawal in Modes 3, 4, and 5. The licensee also stated that the proposed changes to TS 3.3.1, Table 3.3-1, New Action 12A address a condition that is not in South Texas Project (STP) TSs.

Request for Additional Information Since New Action 12A is not in the licensees current licensing basis (CLB), please explain why New Action 12A is needed and provide a technical evaluation for this

2 change. In addition, please explain, given the CLB TS, how would the inoperability of a diverse trip feature impact the operability of a reactor trip breaker during the modes of applicability. Please include discussion of any TS actions entered, since this New Action 12A is currently not in STPs TSs.