MONTHYEARNOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. Project stage: Request ML14050A3182014-02-19019 February 2014 NRR E-mail Capture - Acceptance of Application - License Amendment Request for Revision to Technical Specification 3.3.1, Reactor Trip System Instrumentation - TACs MF3319 and MF3320 Project stage: Acceptance Review NOC-AE-14003143, Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers2014-06-0909 June 2014 Supplement to License Amendment Request Proposed Revision to Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers Project stage: Supplement ML14309A7882014-11-0505 November 2014 NRR E-mail Capture - Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320) Project stage: RAI ML14309A7862014-11-0505 November 2014 NRR E-mail Capture - Request for Additional Information (RAI) - License Amendment Request (LAR) for Revision to Technical Specification (TS) 3.3.1 (TACs MF3319 and MF3320) Project stage: RAI NOC-AE-14003198, Response to Request for Additional Information Regarding the License Amendment Request for Technical Specification 3.3.1, Reactor Trip System Instrumentation, Functional Unit 202014-12-0404 December 2014 Response to Request for Additional Information Regarding the License Amendment Request for Technical Specification 3.3.1, Reactor Trip System Instrumentation, Functional Unit 20 Project stage: Response to RAI NOC-AE-14003205, Supplement to Response to Request for Additional Information Regarding the License Amendment Request for Technical Specification 3.3.1, Reactor Trip System Instrumentation, Functional Unit 20 (TAC MF3319 & Mf 3320)2014-12-17017 December 2014 Supplement to Response to Request for Additional Information Regarding the License Amendment Request for Technical Specification 3.3.1, Reactor Trip System Instrumentation, Functional Unit 20 (TAC MF3319 & Mf 3320) Project stage: Supplement ML15075A1462015-04-29029 April 2015 Issuance of Amendment Nos. 205 and 193, Request to Revise Technical Specification 3.3.1, Functional Unit 20, Reactor Trip Breakers, for Required Actions and Allowed Outage Times Project stage: Approval 2014-12-04
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project – Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project – Draft Request for Additional Information – License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] |
Text
NRR-PMDAPEm Resource From: Singal, Balwant Sent: Wednesday, November 05, 2014 8:25 AM To: Lsterling@stpegs.com
Subject:
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Attachments: MF3319-RAI-STSB.docx By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG- 1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the additional information (RAI) described in the attachment to this e-mail to complete its review of the LAR.
The Draft RAIs were transmitted on October 30, 2014 and the NRC staff was informed on November 4, 2014 that a clarification call is not needed. Please provide your response within 30 days from the date of this e-mail and treat this e-mail as formal transmittal of RAIs.
Balwant K. Singal Senior Project Manager (Comanche Peak, STP, and Palo Verde)
Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 1
Hearing Identifier: NRR_PMDA Email Number: 1678 Mail Envelope Properties (192BB59294514E41B5305C3C8286760801658DBE1CF6)
Subject:
Request for Additional Information - License Amendment Request for Revision to Technical Specification Table 3.3-1 (TACs MF3319 and MF3320)
Sent Date: 11/5/2014 8:25:27 AM Received Date: 11/5/2014 8:25:00 AM From: Singal, Balwant Created By: Balwant.Singal@nrc.gov Recipients:
"Lsterling@stpegs.com" <Lsterling@stpegs.com>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 1441 11/5/2014 8:25:00 AM MF3319-RAI-STSB.docx 36268 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: ZZZ
REQUEST FOR ADDITIONAL INFORMATION SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE AMENDMENT OF TS 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION, FUNCTIONAL UNIT 20 DOCKET NOS. 50-498 AND 50-499 By letter dated January 6, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14035A075), as supplemented by letter dated June 9, 2014 (ADAMS Accession No. ML14184B363), STP Nuclear Operating Company (the licensee) submitted a license amendment request (LAR) to revise South Texas Project (STP), Unit 1 and 2, Technical Specification (TS) 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The proposed amendment would revise TS 3.3.1 allowed outage times and required actions for inoperable reactor trip breakers, Functional Unit 20, to be consistent with those generically approved in NUREG- 1431, Standard Technical Specifications, Westinghouse Plants, Revision 4.
U.S. Nuclear Regulatory Commission (NRC) staff has identified the need for the following additional information to complete its review of the LAR.
Basis for the Request The licensee is proposing to add New Action 12A to Function 20, Reactor Trip Breakers, in TS 3.3.1, Reactor Trip System Instrumentation, Table 3.3-1. The licensee stated in its application that this change is consistent with NUREG-1431, Revision 4.0, Standard Technical Specifications, Westinghouse Plants.
New Action 12A states:
With one of the diverse trip features (undervoltage or shunt trip attachment) inoperable, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> restore it to OPERABLE status or initiate action to fully insert all rods; and within the next hour place the rod control system in a condition incapable of rod withdrawal.
The licensee stated that New Action 12A would address the condition where one diverse trip feature for a reactor trip breaker is inoperable when the reactor trip breakers are in the closed position and the control rod drive system is capable of rod withdrawal in Modes 3, 4, and 5. The licensee also stated that the proposed changes to TS 3.3.1, Table 3.3-1, New Action 12A address a condition that is not in South Texas Project (STP) TSs.
Request for Additional Information Since New Action 12A is not in the licensees current licensing basis (CLB), please explain why New Action 12A is needed and provide a technical evaluation for this 1
change. In addition, please explain, given the CLB TS, how would the inoperability of a diverse trip feature impact the operability of a reactor trip breaker during the modes of applicability. Please include discussion of any TS actions entered, since this New Action 12A is currently not in STPs TSs.
2