{{#Wiki_filter:Entergy Operations, Inc 17265 Rver Road
{{#Wiki_filter:Entergy Operations, Inc 17265 Rver Road Ki 1
-Enteigy                                                                          lKi 1ona LA 70057 3093 r hisum,gentergj om Michael R, Chisum S 1eV Ce Pres dent Waterford 3 W3F1-2014-0017 February 24, 2014 Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov
lona LA 70057 3093
-Enteigy r hisum,gentergj om Michael R, Chisum S 1eV Ce Pres dent Waterford 3 W3F1-2014-0017 February 24, 2014 Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov


==Subject:==
==Subject:==
Line 24: Line 25:


==Reference:==
==Reference:==
: 1. NRC Letter, Mid-Cycle Assessment Letter for Waterford Steam Electric Station Unit 3, Report 05000382/2013006, September 3, 2013 (ADAMS
: 1. NRC Letter, Mid-Cycle Assessment Letter for Waterford Steam Electric Station Unit 3, Report 05000382/2013006, September 3, 2013 (ADAMS Accession No. 1 3240A492)
 
Accession No. 1 3240A492)


==Dear Mr. Dapas:==
==Dear Mr. Dapas:==
In Reference 1, the NRC identified plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, at Waterford Steam Electric Station, Unit 3 (Waterford 3). This letter provides written notification that Waterford 3 is prepared for your review of these issues.
In Reference 1, the NRC identified plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, at Waterford Steam Electric Station, Unit 3 (Waterford 3). This letter provides written notification that Waterford 3 is prepared for your review of these issues.
This report contains no new commitments. Please contact John Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information Sincerely.
This report contains no new commitments. Please contact John Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information Sincerely.
MRC/RJP
MRC/RJP


W3F1 -2014-0017 Page 2 of 2 cc:   US. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 Mr. Greg Werner, Acting Chief, Project Branch E U. S. NRC, Region IV GregWernernrc.gov NRC Project Manager for Waterford 3 AlanWangnrcgov NRC Senior Resident Inspector for Waterford 3 Marlone. Davis©nrc.gov Chris.Speernrc.gov
W3F1 -2014-0017 Page 2 of 2 cc:
US. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 Mr. Greg Werner, Acting Chief, Project Branch E U. S. NRC, Region IV GregWernernrc.gov NRC Project Manager for Waterford 3 AlanWangnrcgov NRC Senior Resident Inspector for Waterford 3 Marlone. Davis©nrc.gov Chris.Speernrc.gov


ATTAcHMENT 9.4                                                                   NRC SuBMITrAL REvIEw FORM Sheet I of 2 Letter #: W3F1 -201 4-0017                                 Response Due: 2/19/14
ATTAcHMENT 9.4 NRC SuBMITrAL REvIEw FORM Sheet I of 2 Letter #: W3F1 -201 4-0017 Response Due: 2/19/14


==Subject:==
==Subject:==
Waterford 3 Request for 1P92723                     Date Issued for Review: 2/19/14 Inspection Correspondence Preparer I Phone #: Jim Poliock / 6561 Section I
Waterford 3 Request for 1P92723 Date Issued for Review: 2/19/14 Inspection Correspondence Preparer I Phone #: Jim Poliock / 6561 Section I Letter Concurrence and Aqreement to Perform Actions POSITION I NAME Action Signature (concurrence, certification, etc.)
-                                                  Letter Concurrence and Aqreement to Perform Actions POSITION I NAME                           Action                                   Signature (concurrence, certification, etc.) (sign. interoffice memo, e-mail, or telecom)
(sign. interoffice memo, e-mail, or telecom)
Licensing Specialist I               Certification                                         1 1
Licensing Specialist I Certification
                                                                            ,            J Jim Pollock                                                                v-.     -L COMM ENTS N/A Section II                                                                       Correspondence_Screening Does this letter contain commitments? If yes, identify the commitments with due                   Yes         LI dates in the submittal and in Section III. When fleet letters contain commitments, a                 No PCRS LO (e.g., LO-LAR, LO-WT) should be initiated with a CA assigned to each applicable site to enter the commitments into the sites commitment management system.
 
Does this letter contain any information or analyses of new safety issues performed at NRC Yes       El request or to satisfy a regulatory requirement? If yes, reflect requirement to update the No UFSAR in Section Ill.
1 1
Does this letter require any document changes (e.g., procedures, DBDs, FSAR, TS Bases,               Yes       Li etc.). if approved? If yes, indicate in Section III an action for the responsible No department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)
J v-.
Does this letter contain information certified accurate? If yes, identify the information Yes and document certification in an attachment. (Attachment 9.5 must be used.)                                     El No EN-Ll-106 Rev. 9
-L Jim Pollock COMM ENTS N/A Section II Correspondence_Screening Does this letter contain commitments? If yes, identify the commitments with due Yes LI dates in the submittal and in Section III. When fleet letters contain commitments, a No PCRS LO (e.g., LO-LAR, LO-WT) should be initiated with a CA assigned to each applicable site to enter the commitments into the sites commitment management system.
Does this letter contain any information or analyses of new safety issues performed at NRC Yes El request or to satisfy a regulatory requirement? If yes, reflect requirement to update the No UFSAR in Section Ill.
Does this letter require any document changes (e.g., procedures, DBDs, FSAR, TS Bases, Yes Li etc.). if approved? If yes, indicate in Section III an action for the responsible No department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)
Does this letter contain information certified accurate? If yes, identify the information Yes and document certification in an attachment. (Attachment 9.5 must be used.)
No El EN-Ll-106 Rev. 9
 
ATTACHMENT 9.4 NRC SuBMITFAL REviEw FORM Sheet2of2 Section III Actions and Commitments Required Actions Due Date Responsible Dept.
Note: Actions needed upon approval should be captured in the pppriateactiontrackingystern


ATTACHMENT 9.4                                                            NRC SuBMITFAL REviEw FORM Sheet2of2 Section III                                                              Actions and Commitments Required Actions                                                Due Date          Responsible Dept.
[ne.
Note: Actions needed upon approval should be captured in the pppriateactiontrackingystern                                 
NA NA
                                                                                              *
[ne.                                                                   NA         NA Commitments
                                            -_
_*
1 Due Date


Responsible Dept.
-__* 1


Note: When fleet letters contain commitments. a PCRS LO should be initiated with a CA assigned to each applicable V
Commitments Due Date Responsible Dept.
site to enter the commitments into the sites commitment manaqement system.
Note: When fleet letters contain commitments. a PCRS LO V
NA None. -
should be initiated with a CA assigned to each applicable site to enter the commitments into the sites commitment manaqement system.
                                                                                      -  -
NA None.
Section IV       Final Document Signoff for Submittal Correspondence Preparer Jim Pollock               I   -
Section IV Final Document Signoff for Submittal Correspondence Preparer Jim Pollock I
I         ___
I Final Submittal Review (optional) 7 Responsible Department Head
_
/iohn EN-LI-106 Rev. 9}}
Final Submittal Review (optional) 7 Responsible Department Head             /iohn EN-LI-106 Rev. 9}}

Latest revision as of 23:03, 10 January 2025

Request for 1P92723 Inspection
ML14055A274
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/24/2014
From: Chisum M
Entergy Operations
To: Dapas M
Document Control Desk, Region 4 Administrator
References
IR-13-006, W3F1-2014-0017
Download: ML14055A274 (4)


Text

Entergy Operations, Inc 17265 Rver Road Ki 1

lona LA 70057 3093

-Enteigy r hisum,gentergj om Michael R, Chisum S 1eV Ce Pres dent Waterford 3 W3F1-2014-0017 February 24, 2014 Mr. Marc L. Dapas Regional Administrator U.S. Nuclear Regulatory Commission Region IV RidsRgn4MailCenter@nrc.gov

Subject:

Waterford 3 Request for 1P92723 Inspection Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Reference:

1. NRC Letter, Mid-Cycle Assessment Letter for Waterford Steam Electric Station Unit 3, Report 05000382/2013006, September 3, 2013 (ADAMS Accession No. 1 3240A492)

Dear Mr. Dapas:

In Reference 1, the NRC identified plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, at Waterford Steam Electric Station, Unit 3 (Waterford 3). This letter provides written notification that Waterford 3 is prepared for your review of these issues.

This report contains no new commitments. Please contact John Jarrell, Regulatory Assurance Manager, at (504) 739-6685 if you have questions regarding this information Sincerely.

MRC/RJP

W3F1 -2014-0017 Page 2 of 2 cc:

US. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 Mr. Greg Werner, Acting Chief, Project Branch E U. S. NRC, Region IV GregWernernrc.gov NRC Project Manager for Waterford 3 AlanWangnrcgov NRC Senior Resident Inspector for Waterford 3 Marlone. Davis©nrc.gov Chris.Speernrc.gov

ATTAcHMENT 9.4 NRC SuBMITrAL REvIEw FORM Sheet I of 2 Letter #: W3F1 -201 4-0017 Response Due: 2/19/14

Subject:

Waterford 3 Request for 1P92723 Date Issued for Review: 2/19/14 Inspection Correspondence Preparer I Phone #: Jim Poliock / 6561 Section I Letter Concurrence and Aqreement to Perform Actions POSITION I NAME Action Signature (concurrence, certification, etc.)

(sign. interoffice memo, e-mail, or telecom)

Licensing Specialist I Certification

1 1

J v-.

-L Jim Pollock COMM ENTS N/A Section II Correspondence_Screening Does this letter contain commitments? If yes, identify the commitments with due Yes LI dates in the submittal and in Section III. When fleet letters contain commitments, a No PCRS LO (e.g., LO-LAR, LO-WT) should be initiated with a CA assigned to each applicable site to enter the commitments into the sites commitment management system.

Does this letter contain any information or analyses of new safety issues performed at NRC Yes El request or to satisfy a regulatory requirement? If yes, reflect requirement to update the No UFSAR in Section Ill.

Does this letter require any document changes (e.g., procedures, DBDs, FSAR, TS Bases, Yes Li etc.). if approved? If yes, indicate in Section III an action for the responsible No department to determine the affected documents. (The Correspondence Preparer may indicate the specific documents requiring revision, if known or may initiate an action for review.)

Does this letter contain information certified accurate? If yes, identify the information Yes and document certification in an attachment. (Attachment 9.5 must be used.)

No El EN-Ll-106 Rev. 9

ATTACHMENT 9.4 NRC SuBMITFAL REviEw FORM Sheet2of2 Section III Actions and Commitments Required Actions Due Date Responsible Dept.

Note: Actions needed upon approval should be captured in the pppriateactiontrackingystern

[ne.

NA NA

-__* 1

Commitments Due Date Responsible Dept.

Note: When fleet letters contain commitments. a PCRS LO V

should be initiated with a CA assigned to each applicable site to enter the commitments into the sites commitment manaqement system.

NA None.

Section IV Final Document Signoff for Submittal Correspondence Preparer Jim Pollock I

I Final Submittal Review (optional) 7 Responsible Department Head

/iohn EN-LI-106 Rev. 9