{{#Wiki_filter:March 29, 2016 L-2016-069 10 CFR 50.36.b EPP 3.2.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:       St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.
{{#Wiki_filter:*
March 29, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 10 CFR 50.36.b EPP 3.2.4 The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.
Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.
Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt  


==Enclosure:==
==Enclosure:==
VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -
VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -
Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:     USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant
Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:
* Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957  


St. Lucie Units 1 and 2                                               L-2016-069 Docket Nos. 50-335 and 50-389                                       Enclosure Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 Enclosure FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)
Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)
Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)  


March 29, 2016
March 29, 2016
_ Mr. Marc Harris, P.E, _ _               __
_ Mr. Marc Harris, P.E, _ _
Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:     Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)
Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:
Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)
St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:
St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:
: 1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
: 1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
Line 42: Line 45:
: 4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.
: 4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.
Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.
Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.
Florida Power &Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957  


Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).
Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).
If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.
If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.
Sincerely,
Sincerely,  
~~l.t:~
~~l.t:~
Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050
Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050  


==Enclosures:==
==Enclosures:==
(1) Signed application request and report prepared for Florida Power &
(1) Signed application request and report prepared for Florida Power &
Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:     FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office
Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:
FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office  


March 29, 2016 L-2016-069 10 CFR 50.36.b EPP 3.2.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:       St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.
March 29, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 10 CFR 50.36.b EPP 3.2.4 The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.
Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.
Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt
Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt  


==Enclosure:==
==Enclosure:==
VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -
VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -
Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:     USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant
Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:
* Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957  


St. Lucie Units 1 and 2                                               L-2016-069 Docket Nos. 50-335 and 50-389                                       Enclosure Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 Enclosure FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)
Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)
Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)  


March 29, 2016
March 29, 2016
_ Mr. Marc Harris, P.E, _ _               __
_ Mr. Marc Harris, P.E, _ _
Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:     Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)
Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:
Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)
St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:
St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:
: 1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
: 1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
Line 79: Line 85:
: 4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.
: 4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.
Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.
Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.
Florida Power &Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957  


Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).
Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).
If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.
If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.
Sincerely,
Sincerely,  
~~l.t:~
~~l.t:~
Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050
Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050  


==Enclosures:==
==Enclosures:==
(1) Signed application request and report prepared for Florida Power &
(1) Signed application request and report prepared for Florida Power &
Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:     FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office}}
Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:
FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office}}

Latest revision as of 01:47, 10 January 2025

Environmental Protection Plan Report - Request to Renew Industrial Wastewater Facility Permit
ML16095A197
Person / Time
Site: Saint Lucie  
Issue date: 03/29/2016
From: Costanzo C
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16095A193 List:
References
L-2016-069
Download: ML16095A197 (4)


Text

March 29, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 10 CFR 50.36.b EPP 3.2.4 The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.

Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.

Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt

Enclosure:

VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -

Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:

USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 Enclosure FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)

Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)

March 29, 2016

_ Mr. Marc Harris, P.E, _ _

Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:

Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)

St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:

1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
2. Check payable to FDEP for the $7,500.00 processing fee.

As part of this permit renewal, FPL requests the following:

1. Remove the Outfall l-06C from the permit, because there is no industrial activity in the area that contributes to the_ discharge, only employee parking. In addition, the sample point for this outfall is difficult to access safely.
2. Authorize the use of Poly Acrylic Acid to help control feed water iron.

The material will be stored in each unit's store room in two 18'0-gallon steel tote tanks positioned above a dosing skid. The dosing rate is expected to be in the range of 2 to 5 ppb. A Safety Data Sheet is included in the Att~chments for reference.

3. Include a Mixing Zone for Total Residual Oxidants. A report on the justification for this is included in the Attachments.
4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.

Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.

Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).

If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.

Sincerely,

~~l.t:~

Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050

Enclosures:

(1) Signed application request and report prepared for Florida Power &

Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:

FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office

March 29, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 10 CFR 50.36.b EPP 3.2.4 The enclosure requests renewal of the St. Lucie Industrial Wastewater Facility Permit and is being submitted pursuant to the requirements of Section 3.2.4 of the St. Lucie Plant Units 1 and 2 Environmental Protection Plans.

Please contact Corey Spencer at 772-467-7436 if there are any questions on this matter.

Sincerely, Christopher R. Costanzo Site Vice President St. Lucie Plant CRC/tlt

Enclosure:

VPPSL050, RE: Permit No. FL0002208 IWW Permit Renewal Application -

Florida Power & Light Company (FPL) - St. Lucie Power Plant (1 copy) cc:

USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Plant Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit L-2016-069 Enclosure FPL letter VPPSL050 to FDEP-Marc Harris dated March 30, 2016 (2 pages)

Geosyntec Report dated March 2016 includes FDEP Wastewater Signed Application Forms (pages 1-16, 2CS, and 2F-16)

March 29, 2016

_ Mr. Marc Harris, P.E, _ _

Supervisor, Power Plant NPDES Permitting Industrial Wastewater Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 3545 Tallahassee, FL 32399-2400 RE:

Permit No. FL0002208 IWW Permit Renewal Application Florida Power & Light Company (FPL)

St. Lucie Power Plant Please find enclosed the following forms and supporting documentation for the renewal of the above referenced NPDES permit:

1. Signed and P.E. sealed Forms 1, 2CS and 2F including analytical reports, figures and other supporting documents. Note that Form 2CG was not required per direction from your staff. Also, several metals were detected in both the intake and discharge indicating that they are background concentrations and not introduced by the plant operations.
2. Check payable to FDEP for the $7,500.00 processing fee.

As part of this permit renewal, FPL requests the following:

1. Remove the Outfall l-06C from the permit, because there is no industrial activity in the area that contributes to the_ discharge, only employee parking. In addition, the sample point for this outfall is difficult to access safely.
2. Authorize the use of Poly Acrylic Acid to help control feed water iron.

The material will be stored in each unit's store room in two 18'0-gallon steel tote tanks positioned above a dosing skid. The dosing rate is expected to be in the range of 2 to 5 ppb. A Safety Data Sheet is included in the Att~chments for reference.

3. Include a Mixing Zone for Total Residual Oxidants. A report on the justification for this is included in the Attachments.
4. Include a Mixing Zone for Thermal for heated water discharges. A Heated Water Plan of Study and Biological Plan of Study were completed and submitted to FDEP on December 12, 2014, in accordance with Conditions 17 and 20, respectively, of the Administrative Order A0-022-TL.

Please note that FPL proposes to prepare and submit permit application material in support of EPA's new §316(b) Rule within 45 months of the current permit expiration date, which would be June 29, 2020.

Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957

Additional time may eventually be necessary, but in any case we feel that all submittal requirements under 40 CFR 122.21 (r)(2)-(13) should be complete prior to the next permit application renewal submittal due date (April 1, 2021 ).

If you have any comments or questions on this submittal, please contact Cory Spencer at 772-467-7436.

Sincerely,

~~l.t:~

Christopher R. Costanzo Site Vice President St. Lucie Plant VPPSL050

Enclosures:

(1) Signed application request and report prepared for Florida Power &

Light Company (FPL) - St. Lucie Plant by Geosyntec dated March 2016 (2 copies) and (2) Check payable to FDEP for $7,500.00 cc:

FDEP - Southeast District Office FDEP - Siting Coordination Office FDEP - Local Office