ML16125A079: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II | {{#Wiki_filter:4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES | ||
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
Line 34: | Line 32: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II | DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | ||
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
Line 43: | Line 39: | ||
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete. | As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete. | ||
If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516. | If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516. | ||
Sincerel David S Hoffma Director Nuc Org Effectiveness | Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | ||
DSH/cac DEC 14 2015 | |||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure) | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure) | ||
Line 57: | Line 51: | ||
( DUKE H. B. Robinson Steam Q EL1ERGY5 . | ( DUKE H. B. Robinson Steam Q EL1ERGY5 . | ||
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi | |||
cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., | |||
and Mr. | and Mr. | ||
Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016. | Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329. | If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329. | ||
Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac | Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac | ||
*ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | *ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | ||
Line 73: | Line 62: | ||
Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398) | Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398) | ||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments) | Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments) | ||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Line 82: | Line 70: | ||
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of | |||
Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, | Sincerely, | ||
: a. iJ R. Michael Glover | : a. iJ R. Michael Glover | ||
Line 99: | Line 82: | ||
PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | ||
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | ||
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | ||
Line 107: | Line 89: | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | ||
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | ||
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 | AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | ||
Upon removal of Attachment, this letter is decontrolled. | |||
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR | T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN16-0004 JAN 272016 9 | Serial: RNP-RN16-0004 JAN 272016 9 | ||
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior | |||
Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, 4Jtt %N-_ | Sincerely, 4Jtt %N-_ | ||
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | ||
Line 132: | Line 105: | ||
* Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | * Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | ||
Personal Qualification Statement Licensee (NRC Form 398) | Personal Qualification Statement Licensee (NRC Form 398) | ||
II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | ||
C: Document Control Desk (wlo Attachments) | C: Document Control Desk (wlo Attachments) | ||
Line 141: | Line 113: | ||
U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | ||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | ||
Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically | Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary) | ||
Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary) | |||
Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | ||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
Line 164: | Line 132: | ||
I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | ||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
Line 179: | Line 145: | ||
Enclosures to this letter contain ERONALI I D ALINrOawo*- WITh HOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled. | Enclosures to this letter contain ERONALI I D ALINrOawo*- WITh HOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled. | ||
4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II | 4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES | ||
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
Line 197: | Line 161: | ||
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure) | ||
DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II | DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | ||
Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS | |||
==Dear Mr. Bacon:== | ==Dear Mr. Bacon:== | ||
Line 206: | Line 168: | ||
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete. | As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete. | ||
If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516. | If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516. | ||
Sincerel David S Hoffma Director Nuc Org Effectiveness | Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015 | ||
DSH/cac DEC 14 2015 | |||
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure) | United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure) | ||
Line 220: | Line 180: | ||
( DUKE H. B. Robinson Steam Q EL1ERGY5 . | ( DUKE H. B. Robinson Steam Q EL1ERGY5 . | ||
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi | |||
cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., | |||
and Mr. | and Mr. | ||
Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016. | Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329. | If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329. | ||
Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac | Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac | ||
*ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | *ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled. | ||
Line 236: | Line 191: | ||
Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398) | Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398) | ||
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments) | Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments) | ||
NRC Resident Inspector (wlo Attachments) | NRC Resident Inspector (wlo Attachments) | ||
Line 245: | Line 199: | ||
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of | |||
Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016. | |||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, | Sincerely, | ||
: a. iJ R. Michael Glover | : a. iJ R. Michael Glover | ||
Line 262: | Line 211: | ||
PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments: | ||
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398) | ||
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396) | ||
Line 270: | Line 218: | ||
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure) | ||
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | Mr. G. J. McCoy, NRC, Region II (wlo Enclosure) | ||
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 | AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled. | ||
Upon removal of Attachment, this letter is decontrolled. | |||
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR | T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | ||
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6) | |||
Serial: RNP-RN16-0004 JAN 272016 9 | Serial: RNP-RN16-0004 JAN 272016 9 | ||
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II | Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | ||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen: | |||
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior | |||
Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator. | |||
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016. | ||
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569. | ||
Sincerely, 4Jtt %N-_ | Sincerely, 4Jtt %N-_ | ||
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi- | ||
Line 295: | Line 234: | ||
* Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | * Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments: | ||
Personal Qualification Statement Licensee (NRC Form 398) | Personal Qualification Statement Licensee (NRC Form 398) | ||
II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | II. Certification of Medical Examination by Facility Licensee (NRC Form 396) | ||
C: Document Control Desk (wlo Attachments) | C: Document Control Desk (wlo Attachments) | ||
Line 304: | Line 242: | ||
U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | ||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== | ||
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed. | ||
Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically | Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary) | ||
Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary) | |||
Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs. | ||
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy. | ||
Line 327: | Line 261: | ||
I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6) | ||
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II | Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | ||
Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP | |||
==Dear Mr. Guthrie:== | ==Dear Mr. Guthrie:== |
Latest revision as of 03:03, 5 February 2020
ML16125A079 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 04/27/2016 |
From: | Hoffman D Division of Reactor Safety II |
To: | Daniel Bacon Duke Energy Progress |
References | |
50-261/OL-16-301 | |
Download: ML16125A079 (13) | |
Text
4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licens ing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclos ed outlines for examinations scheduled to begin the week of February 1, 2016.
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated author ized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operat or Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Opera tor Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016.
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516.
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (wlo Enclosure)
NRC Regional Administrator, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (wlo Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
..-+/-Y IDeNILflABL. .... ..
R. Michael Glover
( DUKE H. B. Robinson Steam Q EL1ERGY5 .
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc.,
and Mr.
Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac
- ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled.
DEC 21 2015
Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments)
Mr. G. J. McCoy, NRC, Region II
- ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1N RMAToN tHoID-uNoEw1-o-en 2.300 -
Upon removal of Attachment, this letter is decontrolled.
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely,
- a. iJ R. Michael Glover
(_
Site Vice President RMG/cac Attahmentz-t8-thrs-tettui ,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled.
JAN 75 2018
PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments:
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398)
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396)
Enclosure:
NRC Medical Professional Only letters c: Document Control Desk (wlo Attachments and Enclosure)
NRC Resident Inspector (w/o Attachments and Enclosure)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure)
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure)
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled.
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN16-0004 JAN 272016 9
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator.
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely, 4Jtt %N-_
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi-
-Pfl6ONALY IDiNWt*BEE-I N FORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled.
irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl - Wri fJ JI4IJTF7 U
- Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments:
Personal Qualification Statement Licensee (NRC Form 398)
II. Certification of Medical Examination by Facility Licensee (NRC Form 396)
C: Document Control Desk (wlo Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments)
Mr. G. J. McCoy, NRC, Region II kttehicnts1o thl3 Icttor-,
10 R 239O Upon removal of Attachment, this letter is decontrolled.
U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION
Dear Mr. Guthrie:
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed.
Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary)
Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled.
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: Document Control Desk (w/o Enclosures)
NRC Resident Inspector (wlo Enclosures)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures)
-Enee&
A4DENT[fl*BE MATION- WFH LD-INDEfl--
Upon removal of Enclosures, this letter is decontrolled.
I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP
Dear Mr. Guthrie:
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
This document contains no new Regulatory Commitments.
If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: Document Control Desk (w/o Enclosures)
NRC Resident Inspector (w/o Enclosures)
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures)
Enclosures to this letter contain ERONALI I D ALINrOawo*- WITh HOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled.
4 DUKE David S. Hoffman ENERG H. B. Robinson Steam Electric Plant Unit 2 Director Nuc Org Effectiveness Duke Energy Progress 3587 West Entrance Road Hartsyule, SC 29550 0:8438575239 F: 843 857 7319 David.Hoffrnan @duke-energv. corn 10 CFR 55.40 Serial: RNP-RA/1 5-0093 NOV 042015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATI ON OUTLINES
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Operator Licens ing Examination Standards for Power Reactors, Duke Energy Progress, Inc. is providing the enclos ed outlines for examinations scheduled to begin the week of February 1, 2016.
Pursuant to 10 CFR 55.40(b)(3), Mr. Joseph Rackley, as the designated author ized representative of the H. B. Robinson Steam Electric Plant, Unit No. 2, has approved these outlines for examination of the applicants.
As required by Revision 10 of NUREG-1 021, Section ES-201, Initial Operat or Licensing Examination Process, please ensure that these outlines are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richard Drehs at (843) 857-1516.
Director Nuc Org Effectiveness
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0093 Page 2 of 2 DS H/cac Enclosure C: Document Control Desk (wlo Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. Victor McCree, NRC, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (w/o Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
DUKE David S. Hoffman ENERGYa H. B. Robinson Steam Electric Plant Unit 2 Dir Nuc Org Effectiveness Duke Energy Progress 3581 West Entrance Road Hartsvile, SC 29550 0:8438575239 F: 843 857 7379 David. Hoffrnan@duke-en ergy. corn 10 CFR 55.40 Serial: A NP-RAIl 5-0094 DEC 032015 Mr. Daniel Bacon Senior Operations Engineer U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
Dear Mr. Bacon:
In accordance with the guidelines in Revision 10 of NUREG-1 021, Opera tor Licensing Examination Standards tor Power Reactors, Duke Energy Progress, Inc., is providing the enclosed operating test for examinations scheduled to begin the week of February 1, 2016.
As required by Attachment 1 of Revision 10 of NUREG-1 021, Section ES-20 1, Examination Security and Integrity Considerations, please ensure that these examin ation materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. Richar d Drehs at (843) 857-1516.
Sincerel David S Hoffma Director Nuc Org Effectiveness DSH/cac DEC 14 2015
United States Nuclear Regulatory Commission Serial: RNP-RA/1 5-0094 Page 2 of 2 Enclosure C: Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (wlo Enclosure)
NRC Regional Administrator, Region II (w/o Enclosure)
Ms. Martha Barillas, NRC (wlo Enclosure)
Mr. Eugene F. Guthrie, NRC, Region II (w/o Enclosure)
..-+/-Y IDeNILflABL. .... ..
R. Michael Glover
( DUKE H. B. Robinson Steam Q EL1ERGY5 .
Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike.G1oer@duke-energy.co,n 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0095 DEC16 Z015 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 PRELIMINARY APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to NRC letter dated September 3, 2015, Duke Energy Progress, Inc., is submit ting preliminary Personal Qualification Statement Licensee (i.e., NRC Form 398) and Certifi cation of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. The September 3, 2015 letter requested that the preliminary forms be submitted to the NRC at least 30 days before the examination date. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc.,
and Mr.
Daniel Bacon, NRC Region II, arrangements were made to administer the license examin ations at HBRSEP, Unit No.2, beginning February 1,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withhe ld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Richard Hightower, Manag er Nuclear Regulatory Affairs at (843) 857-1329.
Sincerely, vV(c R. Michael Glover Site Vice President R MG/cac
- ttachm.i,ts4e4Ius :tter eIntit3 fR-te-eFw%99O Upon removal of Attachment, this letter is decontrolled.
DEC 21 2015
Ptn86INrIFiAR1E-tN ro flMMtON--wm1HGI-uNBER-1 0 GV-R Q.aOG Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 5-0095 Page 2 of 2 Attachments Attachment I: List of Scheduled Applicants Attachment II: Personal Qualification Statement Licensee (NRC Form 398)
Attachment Ill: Certification of Medical Examination by Facility Licensee (NRC Form 396) c: Document Control Desk (w/o Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC, NRC Project Manager, NRR (wlo Attachments)
Mr. G. J. McCoy, NRC, Region II
- ttachmeAt4e thI3 le.-eontein-N*ILY49ENTWiALE-1N RMAToN tHoID-uNoEw1-o-en 2.300 -
Upon removal of Attachment, this letter is decontrolled.
f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Hadsville, SC 29550 0: 843 857 7707 F: 843 857 7319 Mike. Glover@duke-energy. corn 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN1 5-0096 JAN 1 4 2016 Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to the letter dated September 3, 2015, Duke Energy Progress, Inc., is submitting the original Personal Qualification Statement Licensee (i.e., NRC Form 398) and the Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for eleven Senior Reactor Operator applicants and four Reactor Operator applicants for H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2. As discussed during a meeting between Mr. Frank Giannone, Duke Energy Progress, Inc., and Mr. Daniel Bacon, NRC Region II, arrangements were made to administer the license examinations at HBRSEP, Unit No. 2, beginning February 1, 2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely,
- a. iJ R. Michael Glover
(_
Site Vice President RMG/cac Attahmentz-t8-thrs-tettui ,fltcuFT P[R3ONALLY ID[NTIFMBtE INFORMATiON - WITHHOLD UNDER 10 tR 2.390 Upon removal of Attachment, this letter is decontrolled.
JAN 75 2018
PERBONAt*1ENT1EMBEE-INfOflM ATION WITHHOLD UN DER W-CFR-3oo-Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RNJ 5-0096 Page 2 of 2 Attachments:
List of Scheduled Applicants II. Personal Qualification Statement Licensee (NRC Form 398)
Ill. Certification of Medical Examination by Facility Licensee (NRC Form 396)
Enclosure:
NRC Medical Professional Only letters c: Document Control Desk (wlo Attachments and Enclosure)
NRC Resident Inspector (w/o Attachments and Enclosure)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments and Enclosure)
Mr. G. J. McCoy, NRC, Region II (wlo Enclosure)
AttaGhment& to thi& letter eantain PERSONALL-H3ENT1flADLL INFORMATION WITI II IOLD UNDER 10 CFR 2.390 Upon removal of Attachment, this letter is decontrolled.
T1t*Btt INFORMATION WITI IIDUtI9EW+O-OfR f DUKE R. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Harts yule, SC 29550 0:8438577707 F 843 857 7379 Mike. Glover@dttke-energy.com 10 CFR 55.5 10 CFR 2.390(a)(6)
Serial: RNP-RN16-0004 JAN 272016 9
Regional Administrator, Region II U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 RESUBMIHAL OF APPLICATIONS AND MEDICAL EXAMINATION CERTIFICATIONS FOR OPERATOR LICENSE EXAMINATIONS Ladies and Gentlemen:
In response to an e-mail from Mr. Daniel Bacon, NRC Region II, to Mr. Richard Drehs, Duke Energy Progress, Inc., on January 21, 2016, Duke Energy Progress, Inc. is submitting corrected Personal Qualification Statement Licensee (i.e., NRC Form 398) forms for seven Senior Reactor Operator applicants and two Reactor Operator applicants and Certification of Medical Examination by Facility Licensee (i.e., NRC Form 396) forms for one Senior Reactor Operator.
These corrected forms supersede the previously submitted applications for these individuals by letter RNP-RN15-0096, dated January 14,2016.
Duke Energy Progress, Inc. requests that the information in the attachments be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
If you have any questions concerning this matter, please contact Scott Connelly, Acting Manager Nuclear Regulatory Affairs at (843) 857-1569.
Sincerely, 4Jtt %N-_
R. Michael Glover Site Vice President RMG/cac tte.hments4ais-Ietterventeifi-
-Pfl6ONALY IDiNWt*BEE-I N FORMAT QN-WIThHD1JNDER 1 OFR !59O Upon removal of Attachment, this letter is decontrolled.
irTitwiiIJil I ItI1iD+rirr1IVI, I IJIl - Wri fJ JI4IJTF7 U
- Regional Administrator, Region II United States Nuclear Regulatory Commission Serial: RNP-RN1 6-0004 Page 2 of 2 Attachments:
Personal Qualification Statement Licensee (NRC Form 398)
II. Certification of Medical Examination by Facility Licensee (NRC Form 396)
C: Document Control Desk (wlo Attachments)
NRC Resident Inspector (wlo Attachments)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Attachments)
Mr. G. J. McCoy, NRC, Region II kttehicnts1o thl3 Icttor-,
10 R 239O Upon removal of Attachment, this letter is decontrolled.
U NDEII4O -eFR 2ee f DUKE A. Michael H. B. Robinson Steam ENERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3587 West Entrance Road Hartsville, SC 29550 0:843857 7707 F: 843 857 7379 Mike. Glover@duke-energy.corn 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0014 FEB 2 2 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1 257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION
Dear Mr. Guthrie:
The post examination materials for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1021, ES-501 C.1 .a, as listed below, are enclosed.
Enclosure A: Original examination answer sheets, two clean copies and examination cover sheets Enclosure B: Master examinations and answer keys Submitted Electronically Enclosure C: Questions asked by applicants during exam Enclosure D: Written examination seating chart Enclosure E: Completed Form ES-403-1, Written Examination Grading Quality Checklist; one sheet for RO and one sheet for SRO Enclosure F: Form ES-201-3, Examination Security Agreement (preliminary)
Enclosure G: Post Exam Comments A follow up submittal of Form ES-201 -3, Examination Security Agreement will be provided to include all required signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 1 0 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
ne4QurGLto Upon removal of Enclosures, this letter is decontrolled.
?N-NIT+ft1 LD UP1OW1O CFR United States Nuclear Regulatory Commission Serial: RNP-RN16-0014 Page2of2 If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosures c: Document Control Desk (w/o Enclosures)
NRC Resident Inspector (wlo Enclosures)
Ms. Martha Barillas, NRC Project Manager, NRR (w/o Enclosures)
-Enee&
A4DENT[fl*BE MATION- WFH LD-INDEfl--
Upon removal of Enclosures, this letter is decontrolled.
I I I%PI I II I II Ifl fl I l hUm I II SW I I I II *WI SJII.I 5 1W I I I a.W,W f DUKE R. Michael Glover H. B. Robinson Steam EL\IERGY Electric Plant Unit 2 Site Vice President Duke Energy Progress 3581 West Entrance Road Haflsvile, SC 29550 0:843857 7701 F: 843 857 7379 Mike. Gtover@duke-energy.conz 10 CFR 2.390(a)(6)
Serial: RNP-RN1 6-0021 MAR 2 9 2016 Mr. Eugene F. Guthrie, Branch Chief U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 POST LICENSE EXAMINATION DOCUMENTATION - FOLLOW UP
Dear Mr. Guthrie:
The original Form ES-201-3, Examination Security Agreement for the H. B. Robinson Steam Electric Plant, Unit No. 2 initial license examination, completed on February 17, 2016, submitted in accordance with NUREG-1 021, ES-501 C.1.a, is enclosed, having completed all signature signoffs.
Duke Energy Progress, Inc. requests that the information in the enclosures be withheld from public disclosure in accordance with 10 CFR 2.390(a)(6) since the disclosure of this information would constitute an unwarranted invasion of personal privacy.
This document contains no new Regulatory Commitments.
If you have any questions concerning this matter, please contact Terry Giese, Manager Nuclear Operations Training at (843) 339-3889.
Sincerely, R. Michael Glover Site Vice President RMG/cac Enclosure c: Document Control Desk (w/o Enclosures)
NRC Resident Inspector (w/o Enclosures)
Mr. Dennis Galvin, NRC Project Manager, NRR (w!o Enclosures)
Enclosures to this letter contain ERONALI I D ALINrOawo*- WITh HOLDEtW2.B-Upon removal of Enclosures, this letter is decontrolled.