Line 2: Line 2:
| number = ML18227B087
| number = ML18227B087
| issue date = 08/05/1976
| issue date = 08/05/1976
| title = 08/05/1976 Letter Operating Status Reports of July 1976
| title = Letter Operating Status Reports of July 1976
| author name = Schmidt A
| author name = Schmidt A
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:hFCn)gfM 195                                               U.S. NUCLL'AR REGULATORY CC "IISSIO           UMBER I2.70I     ~
{{#Wiki_filter:hFCn)gfM 195
                                            ~
~ ~
50-250    51/335 y~
U.S. NUCLL'AR REGULATORY CC "IISSIO I2.70I
FILE NUMBER NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL                                       MONTHLY REPORT DATE OF DOCUMENT
~
                                                            'LORIDA POWER 6('IGHT       CO MIAMI, FLA                               8-5-76 A D SCHMIDT                            DATE RECEIVED 8-13-76 LETTER                 ONOTORIZED                   PROP                  INPUT FORM          NUMBER OF COPIES RECEIVED gCI ORIGINAL
y ~
                        @UN  C LASS I F I E D 1 SIGNED
NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL
                                                    'ONTHLY COPY DESCRIPTION                                   I LETTER TRANS THE FOLLOWING:                                             REPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY &
'LORIDA POWER 6('IGHT CO MIAMI, FLA A D SCHMIDT UMBER 50-250 51/335 FILE NUMBER MONTHLY REPORT DATE OF DOCUMENT 8-5-76 DATE RECEIVED 8-13-76 LETTER g ORIGINAL CI COPY ONOTORIZED
@UNC LASS I F I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1 SIGNED DESCRIPTION I
LETTER TRANS THE FOLLOWING:'ONTHLYREPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~
AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~
NOTE:   ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976..
NOTE:
PLANT NAME: ST LUCIE       gl                                           ACKNOVVLEBGE>
ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976..
TUlUQEY POINTS'03         & 54, gO NOT REMOVE FOR ACTION/INFO RMATION HXPC
PLANT NAME: ST LUCIE gl TUlUQEY POINTS'03
      <r     CYS FOR AC   ON INTERNAL D IST Rl BUTION F&2JX N
& 54, ACKNOVVLEBGE>
BRANCH CHIEF     L EXTERNAL DISTRIBUTION                                             CONTROL NUMBER
gO NOT REMOVE FOR ACTION/INFO RMATION HXPC
                                                \             ~~ ~~
<r CYS FOR AC ON F&2JX N
Nnc roRM ioo     Iwo)
INTERNALD Rl BUTION IST BRANCH CHIEF L EXTERNAL DISTRIBUTION
\\
~ ~ ~ ~
CONTROL NUMBER Nnc roRM ioo Iwo)


0
0
                    'Regoiatory Docket   Fill'LORIDA             POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen:                                                   nn   Oy>
 
Attached are the July, 1976 Operating Status Reports,.       '
'Regoiatory Docket Fill'LORIDA POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen:
Turkey Point Unit Nos. 3 and 4 and St. Lucie U                         . 1.
nn Oy>
St. Lucie Unit No. 1 was previously reported to be in commercial operation, in error. We are attaching the corrected June, 1976 Operating Status Report for St. Lucie Unit No. l.
Attached are the July, 1976 Operating Status Reports,.
We regret any inconvenience   caused by       this error.
Turkey Point Unit Nos.
Very   truly yours,                       t5t gpt,p~g(0 D.~ Sc midt
3 and 4 and St. Lucie U
            ~
. 1.
P-(T-)~
St. Lucie Unit No.
Vice President                          ~~gg   e}au}A10A, p)gMIss}ctH Power Resources                          gag foe}14JL VTC/pm Attachments   '                              }}
1 was previously reported to be in commercial operation, in error.
cc:   Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA
We are attaching the corrected
: June, 1976 Operating Status Report for St. Lucie Unit No. l.
We regret any inconvenience caused by this error.
Very truly yours,
~
~
D. Sc midt Vice President Power Resources t5t gpt,p~g(0 P-(T-)~
~~gg e}au}A10A, p)gMIss}ctH gag foe}14JL VTC/pm Attachments
}}
cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire HELPING BUILD FLORIDA


r N
r N
Line 48: Line 64:
II f
II f


APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No. 3 DM'E Au . 5     1976 COMPLETED BY   V. T. Chilson TELEPEONE   (305) 552 - 3830 Non'8   Jul   1'976 DAY AVERAGE DAILY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 636 17 18
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No.
                                                            '43   (HWe-Net) 642 3                                                     19           639 655                                      20           641 651                                      21           639 649                                      22           640 23 652                                      24           637 650                                      25           638 10          654                                      26           634 652                                      27           640 12          646                                      28           637 13          .644                                      29           636 14          644                                      30           632 15          639                                      31           632 16          641                                      NOTE:   Daily average power level greater than 666 i%He due to cooler condenser cooling water.
3 DM'E Au 5
1976 COMPLETED BY V. T. Chilson TELEPEONE (305) 552 - 3830 Non'8 Jul 1'976 DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 17 '43 3
10 12 13 14 15 16 636 655 651 649 652 650 654 652 646
.644 644 639 641 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NOTE:
642 639 641 639 640 637 638 634 640 637 636 632 632 Daily average power level greater than 666 i%He due to cooler condenser cooling water.


APPENDIX C
APPENDIX C
                                      ~ "OPERATING DATA REPORT
~ "OPERATING DATA REPORT REPORT MONTH Jul 1976
                                                                                    -JN)CKET   NO., 50 - 250
-JN)CKET NO., 50 - 250
                                                                                            ..UNIT Turkey   Point Unit No. 3 3)ATE Au . 5     1976 REPORT MONTH                Jul  1976
..UNIT Turkey Point Unit No.
                                                                                .",COMPLETED   BY V. T- Chilson OPERATING   STATUS',
3 3)ATE Au.
REPORTING PERIODS)001           76,07 01           GROSS'HOURS         IN   REPORTING PERIODs     744.0 2400 76 07 31 26 THROUGH CURPiENTf         ~02(IXr.~       ONER LEVc.L ((tfr1t): 2200 MAX. DEPEND. CAPACITY (A."Ne-Net):
5 1976
3~   PONER LEVEL TO WHICH RESTRICTED                   (ZF AVY) (M1(e-Net):                     NONE 4~   REASONS FOR RESTRICTION               (ZF ANY):
.",COMPLETED BY V. T-Chilson OPERATING STATUS',
THIS     MiQVTH YEAR TO DATE     CUMULA&#xb9;'DE 5   N(LVBER OF HOURS REACTOR NAS CRZTXCAL                       ~     ~     744-0         4   509.9         25 790.0 6~   REACTOR RESERVE SHUTDOAN HOURS                     ~   ~ ~ ~ ~ ~ ~                     64.2 7   HOURS GE"1ERATOR ON         LINE.                                       744.0          4  437.6'4            807.6 8 ~ UNIT RESERVE           SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                                   85.0 9D   GROSS THER1(AL ENERGY GENERATED                 (&#xc3;0()       .....1     629 884       9 580 710       46 892 970 503 700        3 045 360      15''060 596 10,   GROSS ELECTRICAL ENERGY GE:. RA -D (N'rTH) ~ .
REPORTING PERIODS)001 76,07 01 GROSS'HOURS IN REPORTING PERIODs 744.0 THROUGH 2400 76 07 31 26 CURPiENTf~02(IXr.~ ONER LEVc.L ((tfr1t):
: 11. NET ELECTRICAL EVERGY GENERATED (MAH)                       ....'78           780     2 890 825       14'46     587 12   REACTOR SERVICE FACTOR.                                                 100.0             88.2           ': 80.4 13D   REACTOR           AVAILABILITYFACTOR.     ~ ~   ........ '00.                 0           89.5               80. 6 14 ~ UNIT SERVICE FACTOR.                                                     100.0             86.8               77.4
2200 MAX. DEPEND.
: 15. UNIT AVAILABILITYFACTOR....               ~ ............               100.0             86.8             M2~
CAPACITY (A."Ne-Net):
: 16. UNIT CAPACITY FACTOR (Using               MDC).........                 96:6             84.9               67 7
3 ~
: 17. UNIT CAPACITY FACTOR (Using Design MNe)                           .. ~   92 ~ 9           81.6               64.1 18 'NIT     FORCED OUTAGE RATE.                         ~
PONER LEVEL TO WHICH RESTRICTED (ZF AVY) (M1(e-Net):
4 ~
REASONS FOR RESTRICTION (ZF ANY):
NONE THIS MiQVTH YEAR TO DATE CUMULA&#xb9;'DE 5
N(LVBER OF HOURS REACTOR NAS CRZTXCAL
~
~
744-0 4 509.9 25 790.0 6 ~
REACTOR RESERVE SHUTDOAN HOURS
~
~ ~ ~ ~ ~ ~ 64.2 7
HOURS GE"1ERATOR ON LINE.
8 ~
UNIT RESERVE SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 85.0 744.0 4 437.6'4 807.6 9D GROSS THER1(AL ENERGY GENERATED (&#xc3;0().....1 629 884 9 580 710 46 892 970 10, GROSS ELECTRICAL ENERGY GE:.
RA -D (N'rTH) ~.
503 700 3 045 360 15''060 596 11.
NET ELECTRICAL EVERGY GENERATED (MAH)....'78 780 2 890 825 14'46 587 12 REACTOR SERVICE FACTOR.
100.0 88.2
': 80.4 13D REACTOR AVAILABILITYFACTOR. ~ ~........ '00. 0 89.5
: 80. 6 14 ~
UNIT SERVICE FACTOR.
100.0 86.8 77.4 15.
UNIT AVAILABILITYFACTOR....
~............
100.0 86.8 M2~
16.
UNIT CAPACITY FACTOR (Using MDC).........
96:6 84.9 67 7
17.
UNIT CAPACITY FACTOR (Using Design MNe)..
~
92 ~ 9 81.6 64.1 18'NIT FORCED OUTAGE RATE.
~
0.2 7
0.2 7
19 ~   SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES                               DAT,   AND DURATION OF EACH):
19 ~
Refueling, maintenance, and inspections                       -   Oc'tober 4 through November 14, 1076 ED,   ZP SSIITDOIOI AT Ei'D OF REPORZ P RZODESTZAA,TED DATE OF STARTIIP:
SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES DAT, AND DURATION OF EACH):
21 ~   UNZTS       IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION):                               FORECAST     ACHIEVED ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION
Refueling, maintenance, and inspections - Oc'tober 4 through November 14, 1076 ED, ZP SSIITDOIOI AT Ei'D OF REPORZ P
RZODESTZAA,TED DATE OF STARTIIP:
ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION 21 ~
UNZTS IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION):
FORECAST ACHIEVED


APPENDIX D                          DOCKET NO.
(I)
(I) REASON                                                     UNIT SHUTDOWNS AND POWER REDUCiIONS              UNIT NAME  Turkey Point Unit No. 3 e 3 A: EQUIPMENT FAILURE (EXPLAIN)
REASON A:
Bd MAINT. OR TEST                                                                                         ~ DATE        Au ust  5  1976 C: rzrUELINC D: REGULATORY RESTRICTION ~                                                                                 COMPLETED BY V.T. Chilson E: OPERATOR TRAIHING AND LICENSE EXAIIINATION                                                                                   TFLEPHONE    305  552 - 3830 Fd ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
EQUIPMENT FAILURE (EXPLAIN)
Hd OTHER (EXPLAIN).
Bd MAINT. OR TEST C:
(2) METHOD                                                                               METHOD OF I d MANUAL                                 TYPE Fd FORCED    DURATION SHUTTING DOWN THE REACTOR OR 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM     NO.           Sg SCHEDULED     (HOURS)   REASON (ll   REDUCING POWER(2)       CORRECTIVE ACTIONS COMMENTS 43 OTHER (EXPLAIN)
rzrUELINC D:
NONE Ropmaarc 'Unit No. 3 operated at approximately 100       R R.p. dnripg month.
REGULATORY RESTRICTION~
                                                                                                                                                      ~ l,
E:
OPERATOR TRAIHING AND LICENSE EXAIIINATION Fd ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN)
Hd OTHER (EXPLAIN).
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCiIONS DOCKET NO.
UNIT NAME Turkey Point Unit No.
3
~ DATE Au ust 5
1976 COMPLETED BY V.T. Chilson TFLEPHONE 305 552 - 3830 e
3 (2)
METHOD Id MANUAL 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM 43 OTHER (EXPLAIN)
NO.
TYPE Fd FORCED Sg SCHEDULED DURATION (HOURS)
REASON(ll METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2)
CORRECTIVE ACTIONS COMMENTS NONE Ropmaarc 'Unit No.
3 operated at approximately 100 R R.p. dnripg month.
~
l,


APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL
                                                        ,DocxET No. 50 251
,DocxET No. 50 251
                                                                .UNIT Turke   Point Unit No. 4 DATE Au . 5 1976 COMPLETED   BY V T. Chilson TELEPH0NE   305   552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                (MWe-Net) 666                                       17            662 2         666                                       18            661 6 7                                                       60 20           662 21 22           658 669                                        23            661 671                                        24            654 25            656 10                                                      26          466 670                                        27            659 12         659                                       28           657 13                                                    29           653 14          656                                        30           652 15                                                      31           628 16          663                                        NOTE:     Daily average power level greater than 666HWe due to cooler condense" cooling water.
.UNIT Turke Point Unit No.
4 DATE Au 5
1976 COMPLETED BY V T. Chilson TELEPH0NE 305 552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL (MWe-Net)
DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 666 2
666 6
7 669 671 10 670 17 18 20 21 22 23 24 25 26 27 662 661 60 662 658 661 654 656 466 659 12 13 14 15 16 659 656 663 28 29 30 31 NOTE:
657 653 652 628 Daily average power level greater than 666HWe due to cooler condense" cooling water.


APPENDIX C
APPENDIX C
                                          ~   OPERATING DATA REPORT DOCKET NO. 50       251 UNIT Turke    Point Unit o. 4
~
                                                                                                    .'DATEAug. 5       1976 REPORT MONTH            Jul  1976                                                     COt(PLETED BY V.     T. Chilson
OPERATING DATA REPORT REPORT MONTH Jul 1976 DOCKET NO. 50 251 UNITTurke Point Unit o.
                                                          ~,'I 4
4
OPERATINC   STATUS',
.'DATEAug. 5 1976 COt(PLETED BYV. T. Chilson
Rl!PORTIHG PERZOD:0001,76 07 01                           GRDSS HOUIIS         Zll IIEPOEZZHG     PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt)                 t       2200 3,   POWER LEVEL TO NHICH RESTRZCTED                         (IF     ANY)     (M'rfe-Net}:                 NO E 4~   REASONS FOR RESTRICTZOAV                 (ZF ANY) 2 THIS   MONTH     YEAR TO DATE       CUttULiTIVE 4
~,'I 4
5   NUMBER OF HOURS REACTOR NAS                     CRITICAL.. ~ . ~             741.3           3   627.4         ~/~4 6   i!EAOTOR IIESA'RPE SDZITDOAE             HOUIIS..........                       -0 7   HOURS GENERATOR ON           LINE....         . . .         ~ ..   .       738.4           3   456.6'8           I'70.2 Si   UNIT RESERVE SHUTDO'Nit           HOURS       . .        .    .                                              P,   GROSS THEUIAD 'ENERGY GEIIERATED                     I..IO!7.....         1~61     4 2       7   303 040       37 953 676 10*     GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H) .                           ~     511 520       2 345 221           12 324 298 11 ~   NET ELECTRICAL ENERGY CEttERATED (&S&) ~                             ~ ~ ~     487 16I       2 223 446 12 ~   REACTOR SERVICE FACTOR               ~ ~ ~ ~   ~   ~.....             ~     99. 6               71. 0               74.8 13G     REACTOR         AVAILABILITYFACTOR..                       ~ .. ~   .4       99 ~ 6             71.0               75.2 14 ~   UNIT SERVICE FACTOR.                             ~         ~ ~ ~ ~   .       99.2               67.6               70.5
OPERATINC STATUS',
                                                                  ...4
Rl!PORTIHG PERZOD:0001,76 07 01 GRDSS HOUIIS Zll IIEPOEZZHG PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt) t 2200 3,
                                      ~    ~                  ~              ~
POWER LEVEL TO NHICH RESTRZCTED (IF ANY) (M'rfe-Net}:
15 ~    UNIT AVAILABILITYFACTOR. ~                 ~ ~                               99.2               67.6                70.5 16 ~   UNIT CAPACITY FACTOR (Using MDC)                       ....,         .~       98.3               65.3                68.9
4 ~
: 17. UNZT CAPACITY FAC OR             (Using Design               MNe)   ..   ~   94.5               62.8               65.4 18   'NIT     FORCED OUTACE RAT                 ~ ~ ~ ~ ~ ~ ~ ~   ~ ~ ~ ~ ~ ~ ~ ~       0 8                 5.6                 3.4) 19G     SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}:
REASONS FOR RESTRICTZOAV (ZF ANY) 2 NO E
NONE 2D. 17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP:
THIS MONTH YEAR TO DATE CUttULiTIVE 4
210     UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt):                                           FORECAST      ACHI VED INITIAL CRITICALITY INITIAL ELECTRICITY COMt(ERCZAL OPERATION
5 NUMBER OF HOURS REACTOR NAS CRITICAL.. ~. ~
741.3 3 627.4
~/~4 6
i!EAOTOR IIESA'RPE SDZITDOAE HOUIIS..........
-0 7
HOURS GENERATOR ON LINE.......
~...
738.4 3 456.6'8 I'70.2 Si UNIT RESERVE SHUTDO'Nit HOURS
. P, GROSS THEUIAD'ENERGY GEIIERATED I..IO!7..... 1~61 4
2 7 303 040 10*
GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H). ~
511 520 2 345 221 11 ~
NET ELECTRICAL ENERGY CEttERATED (&S&) ~ ~ ~ ~
487 16I 2 223 446 12 ~
REACTOR SERVICE FACTOR
~ ~ ~ ~
~ ~.....
~
: 99. 6
: 71. 0 13G REACTOR AVAILABILITYFACTOR..
~.. ~
. 4 99 ~ 6 71.0 14 ~
UNIT SERVICE FACTOR. ~
~
~
~
~ ~ ~ ~
. ~
99.2 67.6 37 953 676 12 324 298 74.8 75.2 70.5 15 ~
UNIT AVAILABILITYFACTOR. ~ ~ ~
...4 99.2 16 ~
UNIT CAPACITY FACTOR (Using MDC)....,
. ~
98.3 17.
UNZT CAPACITY FAC OR (Using Design MNe)..
~
94.5 67.6 65.3 62.8 70.5 68.9 65.4 18'NIT FORCED OUTACE RAT
~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~
0 8 5.6 3.4) 19G SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}:
NONE 2D.
17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP:
210 UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt):
INITIALCRITICALITY INITIALELECTRICITY COMt(ERCZAL OPERATION FORECAST ACHI VED


APPENDIX D                            DOCKET NO fil) REASON                                                     UNIT SHUTDOWNS AND  PolKR REDUCTIONS                UNIT NAME  Turke    Point Unit  No. 4 As EQUIPMENT FAILURE (EXPLAIN)
fil)
Bs= MAINT. OR TEST                 4                                                                           ~ DATE        u us    5    976 Cs REFUELING Ds PZGULATORY RESTRICTION                                                                                       CQMPrsmD BY v. T. chilson Es OPERATOR TRAINING AND LICENSFa EXAMINATION                                                                                       TELEPHONE          552 -  3830 .
REASON As EQUIPMENT FAILURE (EXPLAIN)
F6  ADMINISTRATIVE                                               REPORT MDNTH  JulY 1976 Gs OPERATIONAL ERROR (EXPI AIN)
Bs=
Hs OTHER (EXPLAIN)               i (2)   METHOD                                                                               METHOD OF I s MANUAL                                   TYPE Fs FORCED    DURATION SHUTTING DOWN THE REACTOR OR 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM     NO. DATE   Ss SCHEDULED   (HOURS)   REASON (I)     REDVCING POWER(2)       CORRECTIVE ACTIONS/COMMENTS 4s  OTHER (EXPLAIN) l 15  76-07-2                    5.6                                      Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No. 77A when the pump low auction pressure trip actuated.
MAINT. OR TEST 4
Corrective action included testing and recalibrating the low suction pressure trip. (Non-nuclear System)
Cs REFUELING Ds PZGULATORY RESTRICTION Es OPERATOR TRAINING AND LICENSFa EXAMINATION F 6 ADMINISTRATIVE Gs OPERATIONAL ERROR (EXPI AIN)
Unit Ro. 4 operated   at approximately     100 4 R.P. during month exceph for outage of July 26, 1976.
Hs OTHER (EXPLAIN) i APPENDIX D UNIT SHUTDOWNS AND PolKR REDUCTIONS REPORT MDNTH JulY 1976 DOCKET NO UNIT NAME
~ DATE Turke Point Unit No.
4 u us 5
976 TELEPHONE 552 - 3830 CQMPrsmD BY v. T. chilson (2)
METHOD Is MANUAL 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM 4s OTHER (EXPLAIN) l NO.
DATE 15 76-07-2 TYPE Fs FORCED Ss SCHEDULED DURATION (HOURS) 5.6 REASON (I)
METHOD OF SHUTTING DOWN THE REACTOR OR REDVCING POWER(2)
CORRECTIVE ACTIONS/COMMENTS Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No.
77A when the pump low auction pressure trip actuated.
Corrective action included testing and recalibrating the low suction pressure trip.
(Non-nuclear System)
Unit Ro.
4 operated at approximately 100 4 R.P. during month exceph for outage of July 26, 1976.
et i
et i


APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO   50 - 335 UNIT St. Lucie Unit   No. 1 DATE Au . 5     19'76 COHPLETED BY   V. T. Chilson
APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO UNIT 50 - 335 St. Lucie Unit No.
                                                    ~   TELEPHONE (305) 552 3830 NONTH     July'1976 DAY AVERAGE DAIIY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe  Net)                                            (NWe-Net) 58                                        17 2          75                                        18 3          561                                        19 4
1 DATE Au 5
        '  563                                        20 566                                        21 531                                        22 23 334                                        24 10           94                                       26 27 12                                                    28 13                                                    29 14                                                    30 31 16
19'76 COHPLETED BY V. T. Chilson
~
TELEPHONE (305) 552 3830 NONTH July'1976 DAY AVERAGE DAIIY POWER LEVEL (MWe Net) 58 2
75 3
561 4
563 566 531 334 DAY AVERAGE DAILY POWER LEVEL (NWe-Net) 17 18 19 20 21 22 23 24 10 12 13 14 16 94 26 27 28 29 30 31


P&7NYENHNMI 75   NL~NNN APPENDIX C
P&7NYENHNMI 75 NL~NNN APPENDIX C
                                        ~ OPERATZNC DATA REPORT DOCKET NO,       50     335 UNIT   S REPORT MONTH           Jul   1976                                                   COMPLETED BY         V. T Chilson
~
                                                                                'f OPERATING STATUS'-
OPERATZNC DATA REPORT DOCKET NO, 50 335 UNIT S
1 MAX. DEPEND. CAPACITY (Mde-Net)               5                                   timated) 3~     POWER LEVEL TO WHICH RESTRICTED                   (IF     ANY) (MWe-Net):             722
REPORT MONTH Jul 1976 COMPLETED BY V. T Chilson
                                                                                              \
'f OPERATING STATUS'-
4     REASONS FOR RESTRICTION           {ZF ANY):
1 MAX. DEPEND.
HOURS' "Temporary 90I       restriction     pending reactor coolant                     floe analysis" THIS MONTH         YEAR TO DATE       CUMULAT'VS 59     N(IFQ)ER OF HOURS REACTOR WAS             CRITICAL....                   360.1 '         1  366.6            1 366.6
CAPACITY (Mde-Net) 5 timated) 3 ~
    ~   REACTOR RESERVE SHUTDOWN                         ...      ~ ~ ~ ~ ~     N/A (1)           N/A               Nfl4 7     HOURS G IIE(IATOR OM       Z,ZNE.......,,.....,                           159.5           1 121.9           1 121.9 8~   UNIT RESERVE       SHUTDOWN     HOURS....     ~ ~ ~ ~   . ~ ~ ~ ~ ~     N/A (1)           N/A (1).           N/A (1) 9,   CRONE     TEENIAL EIIERGY   G   HE(IATEO     (.. "I)   ......         ZOE   0(     '4((5()               ~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~ .                                   89 830           418 670           418 670
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
: 11. NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~                     ~ ~ ~       52296         ~49
722
                                                                              ~
\\
12 'EACTOR SERVICE FACTOP. ~ .             ~   ~ 9'   ~ 9 ~ ~ ~   . ~ ~ ~ ~
4 REASONS FOR RESTRICTION {ZF ANY):
                                                                                  '48 '               66.1              66.1
"Temporary 90I restriction pending reactor coolant floe analysis" THIS MONTH YEAR TO DATE CUMULAT'VS 59 N(IFQ)ER OF HOURS REACTOR WAS CRITICAL....
'13 ~   REACTOR       AVAILABILITYFACTOR. ~ ~         ~ .4..4.         4.'8.4                             '6.1 66.1
360.1 '
    'NIT SERVICE FACTOR.                   ..     ..
~
                                                                                                  ~
REACTOR RESERVE SHUTDOWN HOURS'
14                                    .       . ~   ~      9.       . .".        25.5               54.9              54.9 15,     ill(ZT AYAZLAEZLZTYFACTOR           .....,.....,....,                                         54 9
~ ~ ~ ~ ~
: 16. UNIT CAPACITY FACTOR (Using               MDC).........                   13;8               22.8             22.8
N/A(1) 1 366.6 1 366.6 N/A Nfl4 7
: 17. UNIT CAPACI       " FACTOR   (Using Design             MWc)   .. ~     13.8               22.8             22.8
HOURS G IIE(IATOR OM Z,ZNE.......,,.....,
: 15.     (ft(IT   FORCEO OUTAGE     RATE,........         ~ ~ ~ ~ ~ ~ ~   ~ ~7           ~
159.5 1 121.9 1 121.9 8 ~
                                                                                                                      ~((.9 19 ~   SHUTDOWNS SCHEDULED OVER             NET     6 MOANTHS {TYPEF DATEF AND DURATION OF                         EACH):
UNIT RESERVE SHUTDOWN HOURS....
~ ~ ~ ~. ~ ~ ~ ~ ~
N/A N/A (1)
(1).
N/A(1) 9, CRONE TEENIAL EIIERGY G HE(IATEO (.. "I)......
ZOE 0( '4((5()
~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~.
89 830 418 670 418 670 11.
NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~ ~ ~ ~
52296 ~49 12 'EACTOR SERVICE FACTOP. ~. ~
~ 9'
~ 9 ~ ~ ~. ~ ~ ~ ~
'48 '
'13 ~
REACTOR AVAILABILITYFACTOR. ~ ~
~.4..4. 4.'8.4 66.1
'6.1 66.1 66.1 14'NIT SERVICE FACTOR.
.... ~.. ~
9.
25.5 54.9 15, ill(ZT AYAZLAEZLZTYFACTOR.....,.....,....,~
54 9
54.9 16.
UNIT CAPACITY FACTOR (Using MDC).........
13;8 22.8 22.8 17.
UNIT CAPACI " FACTOR (Using Design MWc)..
~
13.8 22.8 22.8 15.
(ft(IT FORCEO OUTAGE RATE,........
~ ~ ~ ~
~ ~ ~
~ ~7
~ ~ ~((.9 19 ~
SHUTDOWNS SCHEDULED OVER NET 6
MOANTHS
{TYPEF DATEF AND DURATION OF EACH):
N/A( )
N/A( )
20 'F       SHUTD(XIlN   AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP:
20'F SHUTD(XIlN AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP:
219     UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION):                                       FORECAST       A HIEVE INITIAL CRITICALITY                                              1                              ~AYI   2, 1976 INITIAL ELECTRICITY                                                                              M~976
219 UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION):
                ~  COMA(ERCZAL OPERATION NOTE:       (1) Unit   in test status
INITIAL CRITICALITY 1
INITIALELECTRICITY
~
COMA(ERCZAL OPERATION FORECAST A HIEVE
~AYI 2, 1976 M~976 NOTE:
(1) Unit in test status


APPENDIX D                            DOCKET NO. 50  - 335
',1)
',1) REASON                             l                         UNIT SHUTDOWNS AND POWER REDUCTIONS                UNIT NAME    St. Lucie Unit No. 1 Af EQUIPMENT FAILURE {EXPLAIN)   ~
REASON l
By MAINT. OR TEST                                                                                             ~ DATE          August 5, 1976 Cy PXPUELING Dz PZGULATORY RESTRICTION                                                                                       COMPLETED. BY V T  Chilson E: OPEPATOR TRAINING AND LICE:hSE EXAMINATION                                                                                     TELEPHONE      (305) 552  3830 Ff ADMINISTRATIVE                                               REPORT MONTH  JulY 1976 G: OPERATIONAL ERROR (EXPLAIN)
Af EQUIPMENT FAILURE {EXPLAIN)
H: OTHER (EXPLAIN)
~
{2) METHOD                                                                              METHOD OF 1: MM{UAL                                   TYPE                                  SHUTTING DOWN 2 s MANUAL SCRAM                         FI FORCED  DURATION                    THE REACTOR OR 3: AUTOMATIC SCRAM,   NO.     DATE   Sf SCHEDULED   (HOURS)     REASON (1)   REDUCING POWER{2)         CORRECTIVE ACTIONS COMMENTS 4:  OTHER {EXPLAIN)
By MAINT. OR TEST Cy PXPUELING Dz PZGULATORY RESTRICTION E:
Unit was removed from   service to repair leak in the 12    76-07-0                29.2 generator hydrogen system. (Non-nuclear System) 13    76-07-0                  3.8                            3            Reactor was tripped by steam generator level trip during     9':
OPEPATOR TRAINING AND LICE:hSE EXAMINATION Ff ADMINISTRATIVE G:
return of unit to power operation after outage.
OPERATIONAL ERROR (EXPLAIN)
(Non-nuclear System) 14    76-07-0                  5.0                                        Unit was removed from service to investigate and correct problem with turbine control system. (Non-nuclear System) 15    76-07<6                            B                N/A        Load reduction to clean condensate   pump suction strainer.
H:
(Non-nuclear System) 16    76-07-1                516. 3          F                            Unit was.removed .from servic~ for reactor tests and inspection. (Nuclear System) sullllhnrhi Ut Lucia Unit No. 1 power Ascension Test program continued             until July   10,. 1996 when the     ~ft was removed from service for reactor tests and inspection.
OTHER (EXPLAIN)
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JulY 1976 DOCKET NO.
50 - 335 UNIT NAME St. Lucie Unit No.
1
~ DATE August 5, 1976 COMPLETED. BY V T Chilson TELEPHONE (305) 552 3830
{2)
METHOD 1:
MM{UAL 2 s MANUAL SCRAM 3:
AUTOMATIC SCRAM, 4:
OTHER {EXPLAIN)
NO.
12 13 14 15 16 DATE 76-07-0 76-07-0 76-07-0 76-07<6 76-07-1 TYPE FI FORCED Sf SCHEDULED DURATION (HOURS) 29.2 3.8 5.0 516. 3 REASON (1)
B F
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER{2) 3 N/A CORRECTIVE ACTIONS COMMENTS Unit was removed from service to repair leak in the generator hydrogen system.
(Non-nuclear System)
Reactor was tripped by steam generator level trip during return of unit to power operation after outage.
(Non-nuclear System)
Unit was removed from service to investigate and correct problem with turbine control system.
(Non-nuclear System)
Load reduction to clean condensate pump suction strainer.
(Non-nuclear System)
Unit was.removed
.from servic~ for reactor tests and inspection.
(Nuclear System) 9':
sullllhnrhi Ut Lucia Unit No.
1 power Ascension Test program continued until July 10,. 1996 when the ~ft was removed from service for reactor tests and inspection.


APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 50 335 DNIT St. Lucie Unit   No. 1 DATE Au . 5   1976 COHPLETED BY VS   T. Chilson TELEPH0NE   305   552 - 3830 Noma   June 1976   (Corrected)
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No.
DAY AVERAGE DAILY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (WWo-Not)                                              (MWo-Not) 327                                        17 18 32                                        19
50 335 DNIT St. Lucie Unit No.
          . 330                                        20 21           462 22           458 149                                        23           330 316 318                                        25 10          319                                        26           526 322                                      '27           322 12          22                                        28          410 13                                                      29          541 14                                                      30          546 15 16                                                    NOTE      Corrected   - Unit No. '1 was previously reported to be in commercial operation, in error. The unit remained in test status.
1 DATE Au.
5 1976 COHPLETED BY VS T. Chilson TELEPH0NE 305 552 - 3830 Noma June 1976 (Corrected)
DAY AVERAGE DAILY POWER LEVEL (WWo-Not) 327 32
. 330 DAY AVERAGE DAILY POWER LEVEL (MWo-Not) 17 18 19 20 10 12 13 14 15 16 149 316 318 319 322 22 21 22 23 25 26
'27 28 29 30 NOTE 462 458 330 526 322 410 541 546 Corrected - Unit No.
'1 was previously reported to be in commercial operation, in error.
The unit remained in test status.


APPFNDZX C OPERATING DATA REPORT DOCKET NO. 50         - 335
APPFNDZX C OPERATING DATA REPORT REPORT MONTH June 1976
                                                                                                      =UNIT     St. Lucie Unit No.       1 DATE Aug.     5, 1976 REPORT MONTH                  June 1976  . Corrected)                                    COMPLETED       BY V. T. Chilson 4
. Corrected) 4 DOCKET NO. 50 - 335
TELEPHONE         305 552-4 ~
=UNIT St. Lucie Unit No. 1 DATE Aug. 5, 1976 COMPLETED BY V. T. Chilson TELEPHONE 305 552-4 ~
OPERATING     STATUS'-'e REPORTZNG PERIOD: 000                                   GROSS HOURS 20 REPORTZH                       PEIIZOD:   720.0 THROUGH 2400 76 0 2,   CURRENTLY AUTHORIZED POWER LEVEL (MWt) t                                       2560 MAX. DEPEND. CAPAC TY (MWe-Net):                                                           stimated)
OPERATING STATUS'-'e REPORTZNG PERIOD: 000 GROSS HOURS 20 REPORTZH PEIIZOD:
DEszcN EI 0 REUAL RATANG IIUle Nee-
720.0 THROUGH 2400 76 0
: 3. POWER LEVEL TO WHICH RESTRICTED                         (IF     ANY) (MWe-Net):                         722
2, CURRENTLY AUTHORIZED POWER LEVEL (MWt) t 2560 MAX. DEPEND.
: 4. REASONS FOR RESTRICTION                 (ZF ANY) a restriction     pending reactor coolant flow analysis"
CAPAC TY (MWe-Net):
                                                                                                                  '4 "Temporary 90X THIS   MONTH     )EAR TO DATE CUMULATYV (
stimated)
5,   N(L2(BER OF HOURS REACTOR WAS                 CRITICAL               ..        524.1         1.006.5               1 006.5 6   IIEACTOR IIESERUE SHNZDDAN               HOllltS.....,...., ~NA 7,   HOURS GENEIIATOR ON LZHE..                 ~ ~ ~ ~ ~ ~   ~ ~   "~ . ~26.6
DEszcN EI 0 REUAL RATANG IIUle Nee-3.
                                                                            ~                        ~02.4 8~   UNIT RESERVE SHUTDOWN HOURS. ..                 ~     ~ ~ ~ ~ ~       ~          N/A(3)             N/A(3).               N/A (3) 9~   GROSS" THER(AL ENERGY GENERATED                       (&#xc3;&).. ~....               750 137     4 1 187     069'           187 069 100   GROSS     ELECTRICAL ENERGY GEANERAT-D (M'8H) ~                         ~     211 690         328 840               328 840 lie   NET ELECTRICAL ENERGY GENERATED (MWH) ~                             ~ ~ .'89       436         291 784               291 784 12   REACTOR SERVICE FACTOR.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
13 'EACTOR AVAILABILZTYFACAOR                         ~ ~   ~ ~ ~   ~ ~ ~ ~ ~ ~
722 4.
                                                                                  '2   72.8 71.8 8
REASONS FOR RESTRICTION (ZF ANY) a "Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH
76-2 76.2 71.8
)EAR TO DATE CUMULATYV(
                                                                                                                          ~6 71.8 14 ~ UNIT SERVICF FACTOR 15 'NIT AVAILABILITYFACTOR.                     ~ ..   ~ ~ ~ ~ ~     . .~             71.8               71.8                 7+8
5, N(L2(BER OF HOURS REACTOR WAS CRITICAL 524.1 1.006.5 1 006.5 6
: 16. UNZT CAPACITY FACTOR                 (Using   MDC).........                     32:8               28.0                 28.0
IIEACTOR IIESERUE SHNZDDAN HOllltS.....,...., ~NA 7,
: 17. UNIT CAPACITY FACTOR (Using Design                           MWe)     ..   ~   32.8               28.0                28.0 18 'NIT     FORCED OUTAGE RATE.P               .. ~ .......         ~ ~             4.2 .           14.6 4
HOURS GENEIIATOR ON LZHE.. ~
14.6 19 ~   SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS                                 (TYPE, DATE, AND DURATION OF E)2CH):
~
N/A 20     ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD                           ESTZNli,ZED DATE OP 'STARTUP:
~
21     UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION):                                                 FORECAST     A HI VE INITZAL CRITICALITY                                                                              April 22,     1976 IiVITZALELECTRICITY
~ ~ ~
            ~             COME(ERCIAL OPERATION NOTE:             (1) Corrected St. Lucie Unit No. 1 was previously reported to be                                   in .commercial operation, in error.         The   unit       remained     in test- status.
~ ~ "~ ~. ~26.6
(2) Revised values, beginning with                     initial power       generation-to-date.
~02.4'4 8 ~
(3) Unit'n test status.
UNIT RESERVE SHUTDOWN HOURS. ~.. ~ ~ ~ ~ ~
~
N/A(3)
(3).
N/A N/A(3) 9 ~
GROSS" THER(AL ENERGY GENERATED (&#xc3;&).. ~....
750 137 4 1 187 069' 187 069 100 GROSS ELECTRICAL ENERGY GEANERAT-D (M'8H) ~ ~
211 690 328 840 328 840 lie NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~.'89 436 291 784 291 784 12 REACTOR SERVICE FACTOR.
72.8 76-2 13 'EACTOR AVAILABILZTYFACAOR
~ ~
~ ~ ~
~ ~ ~ ~ ~ ~'2 8
76.2
~6 14 ~
UNIT SERVICF FACTOR 71.8 71.8 71.8 15'NIT AVAILABILITYFACTOR. ~..
~ ~ ~ ~ ~
. ~
71.8 71.8 7+8 16.
UNZT CAPACITY FACTOR (Using MDC).........
32:8 28.0 28.0 17.
UNIT CAPACITY FACTOR (Using Design MWe)..
~
32.8 28.0 18'NIT FORCED OUTAGE RATE.P.. ~.......
~ ~
4.2 14.6 14.6 4
19 ~
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E)2CH):
N/A 28.0 20 ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD ESTZNli,ZED DATE OP 'STARTUP:
21 UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION):
FORECAST A HI VE INITZALCRITICALITY IiVITZALELECTRICITY April 22, 1976
~
COME(ERCIAL OPERATION NOTE:
(1) Corrected St. Lucie Unit No. 1 was previously reported to be in.commercial operation, in error.
The unit remained in test-status.
(2) Revised values, beginning with initial power generation-to-date.
(3) Unit'n test status.


AP1'L'ND1X u                            DOCKLT HO. 50  335 s
s (1)
(1) REASON                                                     UNIT SHUTDOWNS AND POWER REDUCAIONS                "'NIT NAME      St. Lucie Unit    No. 1 A: EQUIPMENT FAILURE (EXPLAIN) l Bg MAINT. OR TEST                                                                                             ~ DATE          August 5, 1976 Cs MFUELING DT  REGULATORY ASTRICTION                                                                                         coMPLETED. BY V. T. Chilson Et OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                         TELEPHONE    (305) -  552  -  3830 F: ADMINISTRATIVE                                               REPORT MONTH  June 1976    (Corrected)
REASON A:
Gg OPERATIONAL ERROR (EXPLAIN)
EQUIPMENT FAILURE (EXPLAIN)l Bg MAINT. OR TEST Cs MFUELING D T REGULATORY ASTRICTION Et OPERATOR TRAINING AND LICENSE EXAMINATION F:
Hs OTHER (EXPLAIN)
ADMINISTRATIVE Gg OPERATIONAL ERROR (EXPLAIN)
(2) METHOD                                                                               METHOD OF 11 MAHUAL                                   TYPE                                  SHUTTING DOWN 21 MANUAL SCRAM     l                   Ft  FORCED  DURATION                      THE REACTOR OR 3 s AUTOMATIC SCRAM   NO. DATE     ST SCHEDULED     (HOURS)     REASON (1)     REDUCING POWER(2)         CORRECTIVE ACTIONS COMENTS 4g OTHER (EXPLAIN) )
Hs OTHER (EXPLAIN)
08  76-06-07                    10.1                                        Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System) 09  76-06-1          S,        180.5            B                3          Performing test, generator trip with shutdown outside control room. (Nuclear System)
AP1'L'ND1X u UNIT SHUTDOWNS AND POWER REDUCAIONS REPORT MONTH June 1976 (Corrected)
Outage continued for maintenance. (Nuclear and Non-nuclear Systems) 10  76-06-2                      12.8                                        Reactor was,tripped during transient condition caused by closure- of a HSIV when power supply to a vi'tal instrument bus was lost. (Nuclear System) 11  76-06-2                                B                N/A        Load reduction to clean condensate pump suction strainer.
~ DATE August 5, 1976 coMPLETED. BY V. T.
(Hon-nuclear System) smemsrc R: St. Annie Unit No. 1 Power Ascension Test Program continued..
Chilson TELEPHONE (305) - 552 - 3830 DOCKLT HO.
NOTE: Corrected -. St. Lucie Unit No. 1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status.
50 335
e~
"'NIT NAME St. Lucie Unit No.
                ~ ~
1 (2)
METHOD 11 MAHUAL 21 MANUAL SCRAM l
3 s AUTOMATIC SCRAM 4g OTHER (EXPLAIN) )
NO.
DATE 08 76-06-07 09 76-06-1 10 76-06-2 11 76-06-2 TYPE Ft FORCED ST SCHEDULED S,
DURATION (HOURS) 10.1 180.5 12.8 REASON (1)
B B
METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2) 3 N/A CORRECTIVE ACTIONS COMENTS Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System)
Performing test, generator trip with shutdown outside control room.
(Nuclear System)
Outage continued for maintenance.
(Nuclear and Non-nuclear Systems)
Reactor was,tripped during transient condition caused by closure-of a HSIV when power supply to a vi'tal instrument bus was lost.
(Nuclear System)
Load reduction to clean condensate pump suction strainer.
(Hon-nuclear System) smemsrc R: St. Annie Unit No.
1 Power Ascension Test Program continued..
NOTE:
Corrected -. St. Lucie Unit No.
1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status.
~
~
e ~


Z ,4
Z
~, ~}}
,4
~,
~}}

Latest revision as of 14:41, 5 January 2025

Letter Operating Status Reports of July 1976
ML18227B087
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/05/1976
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B087 (20)


Text

hFCn)gfM 195

~ ~

U.S. NUCLL'AR REGULATORY CC "IISSIO I2.70I

~

y ~

NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL

'LORIDA POWER 6('IGHT CO MIAMI, FLA A D SCHMIDT UMBER 50-250 51/335 FILE NUMBER MONTHLY REPORT DATE OF DOCUMENT 8-5-76 DATE RECEIVED 8-13-76 LETTER g ORIGINAL CI COPY ONOTORIZED

@UNC LASS I F I E D PROP INPUT FORM NUMBER OF COPIES RECEIVED 1 SIGNED DESCRIPTION I

LETTER TRANS THE FOLLOWING:'ONTHLYREPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~

NOTE:

ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976..

PLANT NAME: ST LUCIE gl TUlUQEY POINTS'03

& 54, ACKNOVVLEBGE>

gO NOT REMOVE FOR ACTION/INFO RMATION HXPC

<r CYS FOR AC ON F&2JX N

INTERNALD Rl BUTION IST BRANCH CHIEF L EXTERNAL DISTRIBUTION

\\

~ ~ ~ ~

CONTROL NUMBER Nnc roRM ioo Iwo)

0

'Regoiatory Docket Fill'LORIDA POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen:

nn Oy>

Attached are the July, 1976 Operating Status Reports,.

Turkey Point Unit Nos.

3 and 4 and St. Lucie U

. 1.

St. Lucie Unit No.

1 was previously reported to be in commercial operation, in error.

We are attaching the corrected

June, 1976 Operating Status Report for St. Lucie Unit No. l.

We regret any inconvenience caused by this error.

Very truly yours,

~

~

D. Sc midt Vice President Power Resources t5t gpt,p~g(0 P-(T-)~

~~gg e}au}A10A, p)gMIss}ctH gag foe}14JL VTC/pm Attachments cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA

r N 11 r II I II f

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No. 3 DM'E Au 5 1976 COMPLETED BY V. T. Chilson TELEPEONE (305) 552 - 3830 Non'8 Jul 1'976 DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 DAY AVERAGE DAILY POWER LEVEL (HWe-Net) 17 '43 3 10 12 13 14 15 16 636 655 651 649 652 650 654 652 646 .644 644 639 641 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NOTE: 642 639 641 639 640 637 638 634 640 637 636 632 632 Daily average power level greater than 666 i%He due to cooler condenser cooling water.

APPENDIX C ~ "OPERATING DATA REPORT REPORT MONTH Jul 1976 -JN)CKET NO., 50 - 250 ..UNIT Turkey Point Unit No. 3 3)ATE Au. 5 1976 .",COMPLETED BY V. T-Chilson OPERATING STATUS', REPORTING PERIODS)001 76,07 01 GROSS'HOURS IN REPORTING PERIODs 744.0 THROUGH 2400 76 07 31 26 CURPiENTf~02(IXr.~ ONER LEVc.L ((tfr1t): 2200 MAX. DEPEND. CAPACITY (A."Ne-Net): 3 ~ PONER LEVEL TO WHICH RESTRICTED (ZF AVY) (M1(e-Net): 4 ~ REASONS FOR RESTRICTION (ZF ANY): NONE THIS MiQVTH YEAR TO DATE CUMULA¹'DE 5 N(LVBER OF HOURS REACTOR NAS CRZTXCAL ~ ~ 744-0 4 509.9 25 790.0 6 ~ REACTOR RESERVE SHUTDOAN HOURS ~ ~ ~ ~ ~ ~ ~ 64.2 7 HOURS GE"1ERATOR ON LINE. 8 ~ UNIT RESERVE SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 85.0 744.0 4 437.6'4 807.6 9D GROSS THER1(AL ENERGY GENERATED (Ã0().....1 629 884 9 580 710 46 892 970 10, GROSS ELECTRICAL ENERGY GE:. RA -D (N'rTH) ~. 503 700 3 045 360 15060 596 11. NET ELECTRICAL EVERGY GENERATED (MAH)....'78 780 2 890 825 14'46 587 12 REACTOR SERVICE FACTOR. 100.0 88.2 ': 80.4 13D REACTOR AVAILABILITYFACTOR. ~ ~........ '00. 0 89.5

80. 6 14 ~

UNIT SERVICE FACTOR. 100.0 86.8 77.4 15. UNIT AVAILABILITYFACTOR.... ~............ 100.0 86.8 M2~ 16. UNIT CAPACITY FACTOR (Using MDC)......... 96:6 84.9 67 7 17. UNIT CAPACITY FACTOR (Using Design MNe).. ~ 92 ~ 9 81.6 64.1 18'NIT FORCED OUTAGE RATE. ~ 0.2 7 19 ~ SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES DAT, AND DURATION OF EACH): Refueling, maintenance, and inspections - Oc'tober 4 through November 14, 1076 ED, ZP SSIITDOIOI AT Ei'D OF REPORZ P RZODESTZAA,TED DATE OF STARTIIP: ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION 21 ~ UNZTS IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION): FORECAST ACHIEVED

(I) REASON A: EQUIPMENT FAILURE (EXPLAIN) Bd MAINT. OR TEST C: rzrUELINC D: REGULATORY RESTRICTION~ E: OPERATOR TRAIHING AND LICENSE EXAIIINATION Fd ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) Hd OTHER (EXPLAIN). APPENDIX D UNIT SHUTDOWNS AND POWER REDUCiIONS DOCKET NO. UNIT NAME Turkey Point Unit No. 3 ~ DATE Au ust 5 1976 COMPLETED BY V.T. Chilson TFLEPHONE 305 552 - 3830 e 3 (2) METHOD Id MANUAL 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM 43 OTHER (EXPLAIN) NO. TYPE Fd FORCED Sg SCHEDULED DURATION (HOURS) REASON(ll METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS NONE Ropmaarc 'Unit No. 3 operated at approximately 100 R R.p. dnripg month. ~ l,

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL ,DocxET No. 50 251 .UNIT Turke Point Unit No. 4 DATE Au 5 1976 COMPLETED BY V T. Chilson TELEPH0NE 305 552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL (MWe-Net) DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 666 2 666 6 7 669 671 10 670 17 18 20 21 22 23 24 25 26 27 662 661 60 662 658 661 654 656 466 659 12 13 14 15 16 659 656 663 28 29 30 31 NOTE: 657 653 652 628 Daily average power level greater than 666HWe due to cooler condense" cooling water.

APPENDIX C ~ OPERATING DATA REPORT REPORT MONTH Jul 1976 DOCKET NO. 50 251 UNITTurke Point Unit o. 4 .'DATEAug. 5 1976 COt(PLETED BYV. T. Chilson ~,'I 4 OPERATINC STATUS', Rl!PORTIHG PERZOD:0001,76 07 01 GRDSS HOUIIS Zll IIEPOEZZHG PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt) t 2200 3, POWER LEVEL TO NHICH RESTRZCTED (IF ANY) (M'rfe-Net}: 4 ~ REASONS FOR RESTRICTZOAV (ZF ANY) 2 NO E THIS MONTH YEAR TO DATE CUttULiTIVE 4 5 NUMBER OF HOURS REACTOR NAS CRITICAL.. ~. ~ 741.3 3 627.4 ~/~4 6 i!EAOTOR IIESA'RPE SDZITDOAE HOUIIS.......... -0 7 HOURS GENERATOR ON LINE....... ~... 738.4 3 456.6'8 I'70.2 Si UNIT RESERVE SHUTDO'Nit HOURS . P, GROSS THEUIAD'ENERGY GEIIERATED I..IO!7..... 1~61 4 2 7 303 040 10* GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H). ~ 511 520 2 345 221 11 ~ NET ELECTRICAL ENERGY CEttERATED (&S&) ~ ~ ~ ~ 487 16I 2 223 446 12 ~ REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~..... ~

99. 6
71. 0 13G REACTOR AVAILABILITYFACTOR..

~.. ~ . 4 99 ~ 6 71.0 14 ~ UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ ~ . ~ 99.2 67.6 37 953 676 12 324 298 74.8 75.2 70.5 15 ~ UNIT AVAILABILITYFACTOR. ~ ~ ~ ...4 99.2 16 ~ UNIT CAPACITY FACTOR (Using MDC)...., . ~ 98.3 17. UNZT CAPACITY FAC OR (Using Design MNe).. ~ 94.5 67.6 65.3 62.8 70.5 68.9 65.4 18'NIT FORCED OUTACE RAT ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 8 5.6 3.4) 19G SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}: NONE 2D. 17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP: 210 UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt): INITIALCRITICALITY INITIALELECTRICITY COMt(ERCZAL OPERATION FORECAST ACHI VED

fil) REASON As EQUIPMENT FAILURE (EXPLAIN) Bs= MAINT. OR TEST 4 Cs REFUELING Ds PZGULATORY RESTRICTION Es OPERATOR TRAINING AND LICENSFa EXAMINATION F 6 ADMINISTRATIVE Gs OPERATIONAL ERROR (EXPI AIN) Hs OTHER (EXPLAIN) i APPENDIX D UNIT SHUTDOWNS AND PolKR REDUCTIONS REPORT MDNTH JulY 1976 DOCKET NO UNIT NAME ~ DATE Turke Point Unit No. 4 u us 5 976 TELEPHONE 552 - 3830 CQMPrsmD BY v. T. chilson (2) METHOD Is MANUAL 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM 4s OTHER (EXPLAIN) l NO. DATE 15 76-07-2 TYPE Fs FORCED Ss SCHEDULED DURATION (HOURS) 5.6 REASON (I) METHOD OF SHUTTING DOWN THE REACTOR OR REDVCING POWER(2) CORRECTIVE ACTIONS/COMMENTS Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No. 77A when the pump low auction pressure trip actuated. Corrective action included testing and recalibrating the low suction pressure trip. (Non-nuclear System) Unit Ro. 4 operated at approximately 100 4 R.P. during month exceph for outage of July 26, 1976. et i

APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO UNIT 50 - 335 St. Lucie Unit No. 1 DATE Au 5 19'76 COHPLETED BY V. T. Chilson ~ TELEPHONE (305) 552 3830 NONTH July'1976 DAY AVERAGE DAIIY POWER LEVEL (MWe Net) 58 2 75 3 561 4 563 566 531 334 DAY AVERAGE DAILY POWER LEVEL (NWe-Net) 17 18 19 20 21 22 23 24 10 12 13 14 16 94 26 27 28 29 30 31

P&7NYENHNMI 75 NL~NNN APPENDIX C ~ OPERATZNC DATA REPORT DOCKET NO, 50 335 UNIT S REPORT MONTH Jul 1976 COMPLETED BY V. T Chilson 'f OPERATING STATUS'- 1 MAX. DEPEND. CAPACITY (Mde-Net) 5 timated) 3 ~ POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722 \\ 4 REASONS FOR RESTRICTION {ZF ANY): "Temporary 90I restriction pending reactor coolant floe analysis" THIS MONTH YEAR TO DATE CUMULAT'VS 59 N(IFQ)ER OF HOURS REACTOR WAS CRITICAL.... 360.1 ' ~ REACTOR RESERVE SHUTDOWN HOURS' ~ ~ ~ ~ ~ N/A(1) 1 366.6 1 366.6 N/A Nfl4 7 HOURS G IIE(IATOR OM Z,ZNE.......,,....., 159.5 1 121.9 1 121.9 8 ~ UNIT RESERVE SHUTDOWN HOURS.... ~ ~ ~ ~. ~ ~ ~ ~ ~ N/A N/A (1) (1). N/A(1) 9, CRONE TEENIAL EIIERGY G HE(IATEO (.. "I)...... ZOE 0( '4((5() ~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~. 89 830 418 670 418 670 11. NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~ ~ ~ ~ 52296 ~49 12 'EACTOR SERVICE FACTOP. ~. ~ ~ 9' ~ 9 ~ ~ ~. ~ ~ ~ ~ '48 ' '13 ~ REACTOR AVAILABILITYFACTOR. ~ ~ ~.4..4. 4.'8.4 66.1 '6.1 66.1 66.1 14'NIT SERVICE FACTOR. .... ~.. ~ 9. 25.5 54.9 15, ill(ZT AYAZLAEZLZTYFACTOR.....,.....,....,~ 54 9 54.9 16. UNIT CAPACITY FACTOR (Using MDC)......... 13;8 22.8 22.8 17. UNIT CAPACI " FACTOR (Using Design MWc).. ~ 13.8 22.8 22.8 15. (ft(IT FORCEO OUTAGE RATE,........ ~ ~ ~ ~ ~ ~ ~ ~ ~7 ~ ~ ~((.9 19 ~ SHUTDOWNS SCHEDULED OVER NET 6 MOANTHS {TYPEF DATEF AND DURATION OF EACH): N/A( ) 20'F SHUTD(XIlN AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP: 219 UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION): INITIAL CRITICALITY 1 INITIALELECTRICITY ~ COMA(ERCZAL OPERATION FORECAST A HIEVE ~AYI 2, 1976 M~976 NOTE: (1) Unit in test status

',1) REASON l Af EQUIPMENT FAILURE {EXPLAIN) ~ By MAINT. OR TEST Cy PXPUELING Dz PZGULATORY RESTRICTION E: OPEPATOR TRAINING AND LICE:hSE EXAMINATION Ff ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) H: OTHER (EXPLAIN) APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH JulY 1976 DOCKET NO. 50 - 335 UNIT NAME St. Lucie Unit No. 1 ~ DATE August 5, 1976 COMPLETED. BY V T Chilson TELEPHONE (305) 552 3830 {2) METHOD 1: MM{UAL 2 s MANUAL SCRAM 3: AUTOMATIC SCRAM, 4: OTHER {EXPLAIN) NO. 12 13 14 15 16 DATE 76-07-0 76-07-0 76-07-0 76-07<6 76-07-1 TYPE FI FORCED Sf SCHEDULED DURATION (HOURS) 29.2 3.8 5.0 516. 3 REASON (1) B F METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER{2) 3 N/A CORRECTIVE ACTIONS COMMENTS Unit was removed from service to repair leak in the generator hydrogen system. (Non-nuclear System) Reactor was tripped by steam generator level trip during return of unit to power operation after outage. (Non-nuclear System) Unit was removed from service to investigate and correct problem with turbine control system. (Non-nuclear System) Load reduction to clean condensate pump suction strainer. (Non-nuclear System) Unit was.removed .from servic~ for reactor tests and inspection. (Nuclear System) 9': sullllhnrhi Ut Lucia Unit No. 1 power Ascension Test program continued until July 10,. 1996 when the ~ft was removed from service for reactor tests and inspection.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 50 335 DNIT St. Lucie Unit No. 1 DATE Au. 5 1976 COHPLETED BY VS T. Chilson TELEPH0NE 305 552 - 3830 Noma June 1976 (Corrected) DAY AVERAGE DAILY POWER LEVEL (WWo-Not) 327 32 . 330 DAY AVERAGE DAILY POWER LEVEL (MWo-Not) 17 18 19 20 10 12 13 14 15 16 149 316 318 319 322 22 21 22 23 25 26 '27 28 29 30 NOTE 462 458 330 526 322 410 541 546 Corrected - Unit No. '1 was previously reported to be in commercial operation, in error. The unit remained in test status.

APPFNDZX C OPERATING DATA REPORT REPORT MONTH June 1976 . Corrected) 4 DOCKET NO. 50 - 335 =UNIT St. Lucie Unit No. 1 DATE Aug. 5, 1976 COMPLETED BY V. T. Chilson TELEPHONE 305 552-4 ~ OPERATING STATUS'-'e REPORTZNG PERIOD: 000 GROSS HOURS 20 REPORTZH PEIIZOD: 720.0 THROUGH 2400 76 0 2, CURRENTLY AUTHORIZED POWER LEVEL (MWt) t 2560 MAX. DEPEND. CAPAC TY (MWe-Net): stimated) DEszcN EI 0 REUAL RATANG IIUle Nee-3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722 4. REASONS FOR RESTRICTION (ZF ANY) a "Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH )EAR TO DATE CUMULATYV( 5, N(L2(BER OF HOURS REACTOR WAS CRITICAL 524.1 1.006.5 1 006.5 6 IIEACTOR IIESERUE SHNZDDAN HOllltS.....,...., ~NA 7, HOURS GENEIIATOR ON LZHE.. ~ ~ ~ ~ ~ ~ ~ ~ "~ ~. ~26.6 ~02.4'4 8 ~ UNIT RESERVE SHUTDOWN HOURS. ~.. ~ ~ ~ ~ ~ ~ N/A(3) (3). N/A N/A(3) 9 ~ GROSS" THER(AL ENERGY GENERATED (Ã&).. ~.... 750 137 4 1 187 069' 187 069 100 GROSS ELECTRICAL ENERGY GEANERAT-D (M'8H) ~ ~ 211 690 328 840 328 840 lie NET ELECTRICAL ENERGY GENERATED (MWH) ~ ~ ~.'89 436 291 784 291 784 12 REACTOR SERVICE FACTOR. 72.8 76-2 13 'EACTOR AVAILABILZTYFACAOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~'2 8 76.2 ~6 14 ~ UNIT SERVICF FACTOR 71.8 71.8 71.8 15'NIT AVAILABILITYFACTOR. ~.. ~ ~ ~ ~ ~ . ~ 71.8 71.8 7+8 16. UNZT CAPACITY FACTOR (Using MDC)......... 32:8 28.0 28.0 17. UNIT CAPACITY FACTOR (Using Design MWe).. ~ 32.8 28.0 18'NIT FORCED OUTAGE RATE.P.. ~....... ~ ~ 4.2 14.6 14.6 4 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E)2CH): N/A 28.0 20 ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD ESTZNli,ZED DATE OP 'STARTUP: 21 UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION): FORECAST A HI VE INITZALCRITICALITY IiVITZALELECTRICITY April 22, 1976 ~ COME(ERCIAL OPERATION NOTE: (1) Corrected St. Lucie Unit No. 1 was previously reported to be in.commercial operation, in error. The unit remained in test-status. (2) Revised values, beginning with initial power generation-to-date. (3) Unit'n test status.

s (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)l Bg MAINT. OR TEST Cs MFUELING D T REGULATORY ASTRICTION Et OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE Gg OPERATIONAL ERROR (EXPLAIN) Hs OTHER (EXPLAIN) AP1'L'ND1X u UNIT SHUTDOWNS AND POWER REDUCAIONS REPORT MONTH June 1976 (Corrected) ~ DATE August 5, 1976 coMPLETED. BY V. T. Chilson TELEPHONE (305) - 552 - 3830 DOCKLT HO. 50 335 "'NIT NAME St. Lucie Unit No. 1 (2) METHOD 11 MAHUAL 21 MANUAL SCRAM l 3 s AUTOMATIC SCRAM 4g OTHER (EXPLAIN) ) NO. DATE 08 76-06-07 09 76-06-1 10 76-06-2 11 76-06-2 TYPE Ft FORCED ST SCHEDULED S, DURATION (HOURS) 10.1 180.5 12.8 REASON (1) B B METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER(2) 3 N/A CORRECTIVE ACTIONS COMENTS Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System) Performing test, generator trip with shutdown outside control room. (Nuclear System) Outage continued for maintenance. (Nuclear and Non-nuclear Systems) Reactor was,tripped during transient condition caused by closure-of a HSIV when power supply to a vi'tal instrument bus was lost. (Nuclear System) Load reduction to clean condensate pump suction strainer. (Hon-nuclear System) smemsrc R: St. Annie Unit No. 1 Power Ascension Test Program continued.. NOTE: Corrected -. St. Lucie Unit No. 1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status. ~ ~ e ~

Z ,4 ~, ~}}